ANDHRA PRADESH RURAL WATER SUPPLY APRWSS PROJECT (APRWSSP) Procurement Plan for Works upto June'2013 Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date) Public Disclosure Authorized A B C D E F G H I J K L M N O P Q R S T New Investments I SVS in Six Districts*

1 SVS Batch-I in Providing Drinking water supply scheme (SVS) to Pardi-B village in, Boath mandal , D.W.S.C- 1 18.27 18.27 L.C.B - 9/7/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - Ch.Rajkumar,Indian 12/31/2012 - Adilabad Dist (AP) Adilabad

Providing drinking water supply scheme (SVS) to Shairguda village in Talamadugu D.W.S.C-

Public Disclosure Authorized 1 11.32 11.32 L.C.B - 9/7/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - Dega Poshetty,Indian 12/31/2012 - Mandal Adilabad

Providing drinking water supply scheme (SVS) to Gondguda village in Mamda Osa D.W.S.C- 1 16.93 16.93 L.C.B - 9/7/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Mandal Bheemanna,Indian Adilabad

Providing water supply scheme (SVS) to Chimnaik Thanda village in Mamda (M) D.W.S.C- 1 20.48 20.48 L.C.B - 9/7/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - A.Rajanna,Indian 12/31/2012 - Adilabad

Providing water supply scheme (SVS) to Osa D.W.S.C- 1 15.35 15.35 L.C.B - 9/7/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Lambadi Thanda village in Mamda mandal Bheemanna,Indian Adilabad

Public Disclosure Authorized Providing water supply scheme (SVS) to Bandal Khanapur village in Mamda Osa D.W.S.C- 1 13.42 13.42 L.C.B - 9/7/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Mandal Bheemanna,Indian Adilabad

Providing drinking water supply scheme (SVS) to New sainagar village in Osa D.W.S.C- 1 16.95 16.95 L.C.B - 9/7/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Sarangapur Mandal Bheemanna,Indian Adilabad

Providing water supply (SVS) to Malegoan Habitation, Malegoan GP of Kubeer Mandal D.W.S.C- 1 23.00 23 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - A.Rajneesh,Indian 12/31/2012 - Adilabad

Providing water supply (SVS) to Sirpally Palsi Habitation, Palsi GP of Kubeer Mandal D.W.S.C- 1 21.09 21.09 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - Dega Poshetty,Indian 12/31/2012 - Adilabad

Providing water supply (SVS) to Jamgoan Habitation, Pardi-K GP of Kubeer Mandal S.Jagan Mohan D.W.S.C- 1 20.11 20.11 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Rao,Indian Adilabad

Providing water supply (SVS) to Durganagar Thand Habitation, Pusapur GP D.W.S.C- 1 15.84 15.84 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - Dega Poshetty,Indian 12/31/2012 - of Lokeshwaram Mandal Adilabad

Providing water supply (SVS) to Ravindrapur Habitation, Basara GP of D.W.S.C- 1 23.00 23 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - A.Rajneesh,Indian 12/31/2012 - Mudhole Mandal Adilabad Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing water supply (SVS) to Talki Habitation, Talki GP of Mudhole Mandal S.Jagan Mohan D.W.S.C- 1 23.00 23 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Rao,Indian Adilabad

Providing water supply (SVS) to Betharoda Habitation, Betharoda GP of Tanoor S.Jagan Mohan D.W.S.C- 1 14.02 14.02 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Mandal Rao,Indian Adilabad

Providing water supply (SVS) to Bolsa Habitation, Bolsa GP of Tanoor Mandal in D.W.S.C- 1 23.00 23 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - Dega Poshetty,Indian 12/31/2012 - Adilabad

Providing water supply (SVS) to Lambadithanda Habitation, Morlawai GP of SK.Fazil D.W.S.C- 1 18.57 18.57 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Jainoor Mandal Ahmed,Indian Adilabad

Providing water supply (SVS) to Irpaguda Habitation, Ushagaon GP of Jainoor SK.Fazil D.W.S.C- 1 22.78 22.78 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Mandal Ahmed,Indian Adilabad

Providing water supply (SVS) to Kota Habitation, Parandoli GP of Kerameri SK.Fazil D.W.S.C- 1 16.87 16.87 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Mandal Ahmed,Indian Adilabad

Providing water supply (SVS) to Gondguda- Yellapur Habitation, Lingapur GP of Sirpur- SK.Fazil D.W.S.C- 1 15.64 15.64 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - U Mandal Ahmed,Indian Adilabad

Providing water supply (SVS) to Powerguda Habitation, Pangidi GP of Sirpur-U Mandal SK.Fazil D.W.S.C- 1 18.63 18.63 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Ahmed,Indian Adilabad

Providing water supply (SVS) to Dasnapurguda Habitation, GP of SK.Fazil D.W.S.C- 1 15.15 15.15 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Indravelly Mandal Ahmed,Indian Adilabad

Providing water supply (SVS) to Khanapur thanda Habitation, Pochampally GP of SK.Fazil D.W.S.C- 1 14.35 14.35 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Indravelly Mandal Ahmed,Indian Adilabad

Providing water supply (SVS) to Chimangudi Habitation, Waipet GP of SK.Fazil D.W.S.C- 1 20.94 20.94 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Indravelly Mandal Ahmed,Indian Adilabad

Providing water supply (SVS) to Venunagar Habitation, Lakkaram GP of G.Ramana D.W.S.C- 1 21.19 21.19 L.C.B - 12/1/2011 - - 12/5/2011 27/01/2012 2/10/2012 - - 12/31/2012 - Mandal Reddy,Indian Adilabad

Providing drinkinkking water supply scheme (SVS) to Ratnapur village in L.C.B (2nd D.W.S.C- 1 15.69 15.69 - 9/7/2011 - - 6/15/2012 7/15/2012 - - - - Talamadugu Mandal call) Adilabad

Providing water supply (SVS) to Anduguda Habitation, Jatharla GP of Bazarhatnoor L.C.B (2nd D.W.S.C- 1 16.87 16.87 - 12/1/2011 - - 6/15/2012 7/15/2012 - - - - Mandal call) Adilabad

Providing water supply (SVS) to Kothaguda Habitation, Jatharla GP of Bazarhatnoor L.C.B (2nd D.W.S.C- 1 16.28 16.28 - 12/1/2011 - - 6/15/2012 7/15/2012 - - - - Mandal call) Adilabad Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing water supply (SVS) to Gondguda- G Habitation, Dhaboli GP of Jainoor L.C.B (2nd D.W.S.C- 1 10.17 10.17 - 12/1/2011 - - 6/15/2012 7/15/2012 - - - - Mandal call) Adilabad

Providing water supply (SVS) to Heerapur New Colony Habitation, Indravelly GP of L.C.B (2nd D.W.S.C- 1 15.46 15.46 - 12/1/2011 - - 6/15/2012 7/15/2012 - - - - Indravelly Mandal call) Adilabad

Providing Single Village Scheme (SVS) to Lokhampur(V)Neradigodna GP, D.W.S.C- 1 12.19 12.19 L.C.B - 12/27/2011 - - 27/12/2011 7/2/2012 3/25/2012 - - B.Gnan Singh,Indian 3/31/2012 - Neradigonda(M) Adilabad

Providing Single Village Scheme (SVS) to Roopnaiakthanda Dharmaram GP, J.Ramana D.W.S.C- 1 16.96 16.96 L.C.B - 12/27/2011 - - 27/12/2011 7/2/2012 3/25/2012 - - 3/31/2012 - Jannaram(M) Reddy,Indian Adilabad

Providing Single Village Scheme (SVS) to Dubbagudem, Mallidi GP, Bheemini(M) J.Ramana D.W.S.C- 1 16.45 16.45 L.C.B - 12/27/2011 - - 27/12/2011 7/2/2012 3/25/2012 - - 3/31/2012 - Reddy,Indian Adilabad

Providing Single Village Scheme (SVS) to Lingampally, Korarical GP, Mamda(M) D.W.S.C- 1 18.16 18.16 L.C.B - 12/27/2011 - - 27/12/2011 7/2/2012 3/25/2012 - - Dega Poshetty,Indian 3/31/2012 - Adilabad

Providing Single Village Scheme (SVS) to Navgad. Ginnedari GP, Thiryani(M) J.Ramana D.W.S.C- 1 13.80 13.8 L.C.B - 12/27/2011 - - 27/12/2011 7/2/2012 3/25/2012 - - 3/31/2012 - Reddy,Indian Adilabad

Providing Single Village Scheme (SVS) to Yellaram, Jankapur GP, Bheemini(M) J.Ramana D.W.S.C- 1 14.58 14.58 L.C.B - 12/27/2011 - - 27/12/2011 7/2/2012 3/25/2012 - - 3/31/2012 - Reddy,Indian Adilabad

Providing Single Village Scheme (SVS) to Andur, Andur GP, Boath(M) D.W.S.C- 1 15.65 15.65 L.C.B - 12/27/2011 - - 27/12/2011 7/2/2012 3/25/2012 - - Ch.Rajkumar,Indian 3/31/2012 - Adilabad

Providing Single Village Scheme (SVS) to Borramaddi, Tosham GP, Gudihathnur(M) D.W.S.C- 1 16.64 16.64 L.C.B - 12/27/2011 - - 27/12/2011 7/2/2012 3/25/2012 - - Ch.Rajkumar,Indian 3/31/2012 - Adilabad

Providing Single Village Scheme (SVS) to Neredigonda-G, Neredigonda-K GP D.W.S.C- 1 15.08 15.08 L.C.B - 12/27/2011 - - 27/12/2011 7/2/2012 3/25/2012 - - Ch.Rajkumar,Indian 3/31/2012 - Ichoda(M) Adilabad

Providing Single Village Scheme (SVS) to Jaithuguda / Gonduguda, Kasipet GP J.Ramana D.W.S.C- 1 18.44 18.44 L.C.B - 12/27/2011 - - 27/12/2011 7/2/2012 3/25/2012 - - 3/31/2012 - Dandepally(M) Reddy,Indian Adilabad

Providing Single Village Scheme (SVS) to Kolamguda Ankoli GP Adilabad(M) D.W.S.C- 1 14.94 14.94 L.C.B - 12/27/2011 - - 27/12/2011 7/2/2012 3/25/2012 - - Ch.Rajkumar,Indian 3/31/2012 - Adilabad

Providing Single Village Scheme (SVS) to Raipur Thanda, Sonkhar GP Bela(M) D.W.S.C- 1 12.35 12.35 L.C.B - 12/27/2011 - - 27/12/2011 7/2/2012 3/25/2012 - - Ch.Rajkumar,Indian 3/31/2012 - Adilabad

Providing Single Village Scheme (SVS) to Kolamguola, Chinchughat GP, Adilabad(M) D.W.S.C- 1 12.41 12.41 L.C.B - 12/27/2011 - - 27/12/2011 7/2/2012 3/25/2012 - - Ch.Rajkumar,Indian 3/31/2012 - Adilabad Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Single Village Scheme (SVS) to Devjiguda, Mangurla GP Jainath(M) D.W.S.C- 1 11.86 11.86 L.C.B - 12/27/2011 - - 27/12/2011 7/2/2012 3/25/2012 - - Ch.Rajkumar,Indian 3/31/2012 - Adilabad

Providing Single Village Scheme (SVS) to Boringguda, Khanapur GP, Adilabad(M) D.W.S.C- 1 11.93 11.93 - 12/27/2011 - - 6/15/2012 7/15/2012 - - - - Adilabad

Providing Single Village Scheme (SVS) to Jalkhori, Anderband GP, Tamsi(M) L.C.B (2nd D.W.S.C- 1 13.78 13.78 - 12/27/2011 - - 6/15/2012 7/15/2012 - - - - call) Adilabad

Providing Single Village Scheme (SVS) to Kolamguda, Sadalpur GP Bela(M) L.C.B (2nd D.W.S.C- 1 12.30 12.3 - 12/27/2011 - - 6/15/2012 7/15/2012 - - - - call) Adilabad

Providing Single Village Scheme (SVS) to Kothapally, Muniyal GP, Kadam(M) L.C.B (2nd D.W.S.C- 1 21.00 21 - 12/27/2011 - - 6/15/2012 7/15/2012 - - - - call) Adilabad

Providing Single Village Scheme (SVS) to Dondarguda, Chinchughat GP Adilabad(M) L.C.B (2nd D.W.S.C- 1 13.68 13.68 - 12/27/2011 - - 6/15/2012 7/15/2012 - - - - call) Adilabad

Providing Single Village Scheme (SVS) to Nijampur, Nirala GP Jainath(M) L.C.B (2nd D.W.S.C- 1 12.08 12.08 - 12/27/2011 - - 6/15/2012 7/15/2012 - - - - call) Adilabad

Providing Single Village Scheme (SVS) to Kashiram Guda, Chandpally GP, Bela(M) L.C.B (2nd D.W.S.C- 1 11.45 11.45 - 12/27/2011 - - 6/15/2012 7/15/2012 - - - - call) Adilabad

Providing Single Village Scheme (SVS) to Old Sai nagar thadna, Dhani GP L.C.B (2nd D.W.S.C- 1 11.81 11.81 - 12/27/2011 - - 6/15/2012 7/15/2012 - - - - Sarangapur(M) call) Adilabad

Providing Single Village Scheme (SVS) to Venkatapur, Naldurthy GP, Mamda (M) L.Krishna Prasad D.W.S.C- 1 21.85 21.85 L.C.B - 1/20/2012 - - 21/01/2012 3/3/2012 4/4/2012 - - 3/31/2013 - Reddy,Indian Adilabad

Providing Single Village Scheme (SVS) to Malkapur, Seethagondi GP, Gudihathnur SK.Fazil D.W.S.C- 1 14.57 14.57 L.C.B - 1/20/2012 - - 21/01/2012 3/3/2012 4/4/2012 - - 3/31/2013 - (M) Ahmed,Indian Adilabad

Providing Single Village Scheme (SVS) to Fakirgutta, Utnoor GP, Utnoor (M) SK.Fazil D.W.S.C- 1 16.90 16.9 L.C.B - 1/20/2012 - - 21/01/2012 3/3/2012 4/4/2012 - - 3/31/2013 - Ahmed,Indian Adilabad

Providing Single Village Scheme (SVS) to Ravindra Nagar Thanda, Sarangapur GP, L.C.B (2nd D.W.S.C- 1 17.00 17 - 7/7/2011 - - 21/01/2012 3/3/2012 4/4/2012 - - A.Rajanna,Indian 3/31/2013 - Sarangapur(M) call) Adilabad

Providing Single Village Scheme (SVS) to Pagepally, Sundersala GP,Chennur (M) J.Ramana D.W.S.C- 1 19.66 19.66 L.C.B - 1/20/2012 - - 21/01/2012 3/3/2012 4/4/2012 - - 3/31/2013 - Reddy,Indian Adilabad

Providing Single Village Scheme (SVS) to Buodmaharguda , Kolama GP, Narnoor (M) L.C.B (2nd D.W.S.C- 1 14.03 14.03 - 1/20/2012 - - 6/15/2012 7/15/2012 - - - - call) Adilabad Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing water supply (SVS) to Muktapur Habitation, Tadihadapanoor GP of Narnoor L.C.B (2nd D.W.S.C- 1 17.22 17.22 - 12/1/2011 - - 6/15/2012 7/15/2012 - - - - Mandal call) Adilabad

Providing water supply (SVS) to Anthapur Habitation, Anthapur GP of Kerameri L.C.B (2nd D.W.S.C- 1 16.06 16.06 - 12/1/2011 - - 6/15/2012 7/15/2012 - - - - Mandal call) Adilabad

Providing Single Village Scheme (SVS) to Jandaguda, Chinchughat GP, Adilabad (M) L.C.B (2nd D.W.S.C- 1 11.96 11.96 - 1/20/2012 - - 6/15/2012 7/15/2012 - - - - call) Adilabad

Providing Single Village Scheme (SVS) to Old Mohabatpur, Kapsi GP, Bela(M) L.C.B (3rd D.W.S.C- 1 10.82 10.82 - 7/7/2011 - - 6/15/2012 7/15/2012 - - - - call) Adilabad

Providing Single Village Scheme (SVS) to Adelly and thanda, Sarangapur GP, N.C.B (2nd D.W.S.C- 1 30.00 30 - 7/7/2011 - - 2/8/2012 19/03/2012 - - - 5/31/2013 - Sarangapur (M) call) Adilabad

Providing Single Village Scheme (SVS) to Abdhullapur, Chinthakunta GP, Mudhole N.C.B (2nd D.W.S.C- 1 30.00 30 - 7/7/2011 - - 2/8/2012 19/03/2012 - - - 5/31/2013 - (M) call) Adilabad

Providing Single Village Scheme (SVS) to Burgupally-G,Suryam thanda and Hanuman N.C.B (2nd D.W.S.C- 1 40.00 40 - 7/7/2011 - - 2/8/2012 19/03/2012 - - - 5/31/2013 - thanda (V),Gulmada GP, Kuntala (M) call) Adilabad

Providing water supply (SVS) to Bhoosi Habitation, Bhoosi GP of Tanoor Mandal D.W.S.C- 1 29.12 29.12 N.C.B - 12/1/2011 - - 2/8/2012 19/03/2012 - - - 5/31/2013 - Adilabad

Providing Single Village Scheme (SVS) to Yellaram / Buttapur, Buttapur GP, D.W.S.C- 1 39.27 39.27 N.C.B - 12/27/2011 - - 2/8/2012 19/03/2012 - - - 5/31/2013 - Kaddam(M) Adilabad

Providing Single Village Scheme (SVS) to Manganpally, Vemanpally GP, D.W.S.C- 1 33.31 33.31 N.C.B - 12/27/2011 - - 2/8/2012 19/03/2012 - - - 5/31/2013 - Vemanpalli(M) Adilabad

Providing Single Village Scheme (SVS) to Bavapur-K. Bavapur-K GP, Khanapur(M) D.W.S.C- 1 26.24 26.24 N.C.B - 12/27/2011 - - 2/8/2012 19/03/2012 - - - 5/31/2013 - Adilabad

Providing Single Village Scheme (SVS) to Nazrulanagar Camp B. Nazrulangar GP, D.W.S.C- 1 24.98 24.98 N.C.B - 12/27/2011 - - 2/8/2012 19/03/2012 - - - 5/31/2013 - Kaghaznagar(M) Adilabad

Providing Single Village Scheme (SVS) to Indhanpally (V), Indhanpally GP, Jannaram D.W.S.C- 1 25.99 25.99 N.C.B - 1/20/2012 - - 2/8/2012 19/03/2012 - - - 5/31/2013 - (M) Adilabad

Providing Single Village Scheme (SVS) to Kotha Bodepally, Bodepally D.W.S.C- 1 26.00 26 N.C.B - 1/20/2012 - - 2/8/2012 19/03/2012 - - - 5/31/2013 - GP,Kaghaznagar (M) Adilabad

Providing Single Village Scheme (SVS) to Jogapur , Gundlasomaram GP, Nennel (M) N.C.B/L.C. D.W.S.C- 1 24.16 24.16 - 1/20/2012 - - 6/15/2012 7/15/2012 - - - - - B (2nd call) Adilabad Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

2 SVS in Batch-II Providing Single Village Scheme (SVS) to 1 19.84 Kasra, Chondi GP, Kubeer(M) S.Jagan Mohan D.W.S.C- 19.84 L.C.B - 12/27/2011 - - 27/12/2011 2/7/2012 3/25/2012 - - 3/31/2013 - Rao,Indian Adilabad

Providing Single Village Scheme (SVS) to 1 25.70 Husgul, Husgal GP, (M) D.W.S.C- 25.70 N.C.B - 12/27/2011 - - 8/2/2012 19/03/2012 - - - - 5/31/2013 - Adilabad

5 to 32 L.C.B / D.W.S.C- PROVIDING S.V.S to 68 HABITATIONsS 68 908.46 31-04-2012 5/15/2012 5/31/2012 - 6/7/2012 7/7/2012 7/30/2012 - - - - - N.C.B / C.C Adilabad

3 SVS in Batch-III

L.C.B / D.W.S.C- PROVIDING S.V.S to 75 HABITATIONS 75 6 to 32 998.99 31-06-2012 7/15/2012 7/31/2012 - 8/7/2012 9/7/2012 9/30/2012 - - - - - N.C.B / C.C Adilabad

4 SVS Batch-I in Mahabubnagar Providing SVS toSulthanpur,SULTANPUR GP,Alampur(M) 38.00 30-Sep-11 21-Dec-11 20-Jan-12 21-Jan-12 7-Mar-12 30-Jun-12 - 1 38.00 NCB - - - - - Providing SVS toAlampur X Road,PULLUR GP,Manopad(M) 6.50 30-Sep-11 19-Dec-11 30-Dec-12 28-Dec-11 9-May-12 30-Jun-12 1 6.50 LCB ------Providing SVS toVenkatonipally,JAMMICHED 19.00 30-Sep-11 26-Dec-11 20-Jan-12 21-Jan-12 7-Mar-12 31-Mar-12 - GP,Gadwal(M) 1 19.00 LCB - 15.9 - M. Balaswamy - - Providing SVS toAragidda,ARAGIDDA GP,Ghattu(M) 33.00 30-Sep-11 26-Mar-12 28-Mar-12 28-Mar-12 9-May-12 30-May-12 - 1 33.00 NCB - - - - - Providing SVS toShankar Nagar,ARAGIDDA GP,Ghattu(M) 11.50 30-Sep-11 20-Jan-11 20-Jan-12 21-Jan-12 3-Jul-12 26-Mar-12 - 1 11.50 LCB - 6.391 - U. Krishnamurthy - - Providing SVS toKarivena Tanda,GOPANPETA GP,Atmakur(M) 14.00 30-Sep-11 15-Dec-11 20-Jan-12 21-Jan-12 3-Jul-12 30-Jun-12 - 1 14.00 LCB - - - - - Providing SVS toMumpu Thanda,GOPANPETA GP,Atmakur(M) 12.00 30-Sep-11 20-Jan-12 20-Jan-12 21-Jan-12 3-Jul-12 26-Mar-12 - 1 12.00 LCB - 8.098 - T. Venugopal Reddy - - Providing SVS toAdivikhanapur,CHEGUNTA 11.00 30-Sep-11 19-Jan-12 21-Jan-12 3-Jul-12 30-Jun-12 - GP,Maganoor(M) 1 11.00 LCB - - - - - Providing SVS toKothapalle,KOTHAPALLI GP,Narva(M) 28.00 30-Sep-11 18-Jan-12 20-Jan-12 21-Jan-12 3-Jul-12 30-Mar-12 - 1 28.00 NCB - 23.718 - P. Mutyam Reddy - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toSeepur,SEEPUR GP,Narva(M) 20.00 30-Sep-11 8-Dec-11 25-Dec-11 26-Dec-11 21-Feb-12 30-Jun-12 - 1 20.00 LCB - - - - - Providing SVS toMulastambham Tanda,PEDDA ADIRYAL GP,(M) 19.35 30-Sep-11 8-Dec-11 23-Dec-11 24-Dec-11 17-Feb-12 26-Mar-12 - 1 19.35 LCB - 16.177 - Rama Chandra Reddy - - Providing SVS toKanchanpally,BHAIRAMPALLE 16.50 30-Sep-11 23-Jun-11 24-Jan-12 25-Jan-12 13-Mar-12 26-Mar-12 - GP,(M) 1 16.50 LCB - 10.475 - J. Laxman Naik - - Providing SVS toLakya Tanda H/o Sirigamdoddi,DONUR GP,Midjil(M) 22.50 30-Sep-11 - 20-Jan-12 21-Jan-12 3-Jul-12 28-Mar-12 - 1 22.50 NCB - 12.711 - J. Laxman Naik - - Providing SVS toBurgoinkuntatanda,BOMMARASIPALLE 10.00 30-Sep-11 26-Dec-11 30-Dec-12 20-Mar-12 9-May-12 30-Jun-12 - GP,Midjil(M) 1 10.00 LCB - - - - - Providing SVS toGovanpally,IPPATUR GP,Nawabpet(M) 15.65 30-Sep-11 17-Dec-11 20-Jan-12 21-Jan-12 9-Mar-12 26-Mar-12 - 1 15.65 LCB - 9.1 - P. Prabhakar Reddy - - Providing SVS toRangampally,CHOWDOOR 14.41 30-Sep-11 8-Dec-11 23-Dec-11 24-Dec-11 9-Mar-12 26-Mar-12 - GP,Nawabpet(M) 1 14.41 LCB - 13.162 - P. Mutyam Reddy - - Providing SVS toSatronipally,KOLLOOR GP,Nawabpet(M) 16.29 30-Sep-11 19-Jan-12 20-Jan-12 21-Jan-12 9-Mar-12 26-Mar-12 - 1 16.29 LCB - 9.225 - Prabhakar Reddy - - Providing SVS toBapally Tanda,BAPALLY TANDA GP,Bomraspet(M) 20.00 30-Sep-11 8-Dec-11 23-Dec-11 24-Dec-11 17-Feb-12 30-Jun-12 - 1 20.00 LCB - - - - - Providing SVS toOorenki Tanda H/o Wadicherla,WADICHERLA 14.30 30-Sep-11 19-Dec-11 23-Dec-11 24-Dec-11 17-Feb-12 30-Jun-12 - GP,Bomraspet(M) 1 14.30 LCB - - - - - Providing SVS toBomraspet,BOMRASPETA 38.00 30-Sep-11 26-Mar-12 28-Mar-12 28-Mar-12 9-May-12 30-May-12 - GP,Bomraspet(M) 1 38.00 NCB - - - - - Providing SVS toGundepally,GUNDEPALLE 29.08 30-Sep-11 12-Dec-11 25-Dec-11 26-Dec-11 22-Feb-12 30-Jun-12 - GP,Doulthabad(M) 1 29.08 NCB - - - - - Providing SVS toKowdeed H/o Neetur,NEETUR GP,Doulthabad(M) 15.80 30-Sep-11 8-Dec-11 23-Dec-11 24-Dec-11 17-Feb-12 26-Mar-12 - 1 15.80 LCB - 13.961 - P. Mutyam Reddy - - Providing SVS toEkkacheruvu Tanda H/o Parsapur,CHITLAPALLE GP,Kodangal(M) 9.89 30-Sep-11 20-Dec-11 30-Dec-12 20-Mar-12 9-May-12 30-Jun-12 - 1 9.89 LCB - - - - - Providing SVS toKhajahmedpally H/o Chitlapally,CHITLAPALLE 21.61 30-Sep-11 8-Dec-11 23-Dec-11 24-Dec-11 9-May-12 30-Jun-12 - GP,Kodangal(M) 1 21.61 LCB - - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toKadampally,KADAMPALLE 24.24 30-Sep-11 18-Jan-12 20-Jan-12 21-Jan-12 9-Mar-12 28-Mar-12 - GP,Kosgi(M) 1 24.24 NCB - 14.164 - P. Mutyam Reddy - - Providing SVS toMalreddipally,MALREDDIPALLY 17.25 30-Sep-11 8-Dec-11 23-Dec-11 24-Dec-11 9-Mar-12 26-Mar-12 - GP,Kosgi(M) 1 17.25 LCB - 12.328 - P. Mutyam Reddy - - Providing SVS toDorepally,DOREPALLE GP,Maddur(M) 68.17 30-Sep-11 13-Jun-11 24-Jan-12 25-Jan-12 13-Mar-12 30-Jun-12 - 1 68.17 LCB - - - - - Providing SVS toPeddapur H/o Veeraram,LINGALCHED GP,Maddur(M) 30.91 30-Sep-11 - 20-Jan-12 21-Jan-12 7-Mar-12 30-Jun-12 - 1 30.91 NCB - - - - - Providing SVS toAmmapur,MADHARAM GP,Hunwada(M) 18.00 30-Sep-11 23-Jun-11 12-Jun-11 13-Jun-11 6-Dec-11 30-Jun-12 - 1 18.00 LCB - - - - - Providing SVS toHunwada, GP,Hunwada(M) 50.00 9-Apr-12 24-Apr-12 26-Apr-12 1-May-12 6-Sep-12 30-Jun-12 - 1 50.00 NCB - - - - - Providing SVS toJanitha Tanda H/o Gudimalkapur,GUDDIMALAKAPUR 24.50 30-Sep-11 8-Dec-11 23-Dec-11 24-Dec-11 17-Feb-12 26-Mar-12 - GP,Hunwada(M) 1 24.50 NCB - 18.219 - P. Mutyam Reddy - - Providing SVS toKodur Tanda,KODUR GP,Mahabubnagar(M) 16.88 30-Sep-11 8-Dec-11 23-Dec-11 24-Dec-11 17-Feb-12 26-Mar-12 - 1 16.88 LCB - 13.268 - Rajendra Goud - - Providing SVS toLalnayakal Tanda,ZAINALLIPUR 22.74 30-Sep-11 8-Dec-11 23-Dec-11 24-Dec-11 17-Feb-12 26-Mar-12 - GP,Mahabubnagar(M) 1 22.74 LCB - 17.763 - P. Rajender Goud - - Providing SVS toOblaipally Tanda,OBLAIPALLE 14.46 30-Sep-11 8-Dec-11 23-Dec-11 24-Dec-11 17-Feb-12 30-Jun-12 - GP,Mahabubnagar(M) 1 14.46 LCB - - - - - Providing SVS toKalwaragudiselu,KAMSANIPALLE 13.00 30-Sep-11 8-Dec-11 23-Dec-11 24-Dec-11 17-Feb-12 30-Jun-12 - GP,Damaragidda(M) 1 13.00 LCB - - - - - Providing SVS toDamaipally Tanda,DAMMAIPALLY GP,(M) 9.00 30-Sep-11 27-Dec-11 30-Dec-12 20-Mar-12 9-May-12 30-Jun-12 - 1 9.00 LCB - - - - - Providing SVS toMedhi Tanda H/o Modipur,MODIPUR GP,Koilkonda(M) 33.00 30-Sep-11 8-Dec-11 25-Dec-11 26-Dec-11 9-Mar-12 26-Mar-12 - 1 33.00 NCB - 25.328 - Mutyam Reddy - - Providing SVS toVeerampally Tanda,ACHARYAPUR GP,Koilkonda(M) 19.83 30-Sep-11 8-Dec-11 25-Dec-11 26-Dec-11 9-Mar-12 26-Mar-12 - 1 19.83 LCB - 16.364 - N. Maschandar Nath - - Providing SVS toChowdammagutta Tanda,KISHAN NAGAR 16.30 30-Sep-11 15-Dec-11 23-Dec-11 24-Dec-11 9-Mar-12 28-Mar-12 - GP,(M) 1 16.30 LCB - 15.069 - P. Prabhakar Reddy - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toAlwal,ALWAL GP,Keshampet(M) 29.00 30-Sep-11 18-Jan-12 21-Jan-12 7-Mar-12 30-Jun-12 - 1 29.00 NCB - - - - - Providing SVS toDharmya Tanda,GALIGUDA GP,(M) 14.75 30-Sep-11 17-Dec-11 20-Jan-12 21-Jan-12 7-Mar-12 26-Mar-12 - 1 14.75 LCB - 10.283 - N. Maschandar Nath - - Providing SVS toMakthaguda, GP,(M) 22.63 30-Sep-11 23-Jun-11 24-Jan-12 25-Jan-12 13-Mar-12 27-Mar-12 - 1 22.63 LCB - 19.874 - M. Balreddy - - Providing SVS toBudda Tanda H/o Hajipur,HAZIPUR GP,Achampet(M) 19.75 30-Sep-11 12-Dec-11 25-Dec-11 26-Dec-11 22-Feb-12 26-Mar-12 - 1 19.75 LCB - 16.635 - J. Laxman Naik - - Providing SVS toDubba Tanda H/o Inole,INOLE GP,Achampet(M) 31.50 30-Sep-11 15-Dec-11 20-Jan-12 21-Jan-12 7-Mar-12 30-Jun-12 - 1 31.50 NCB - - - - - Providing SVS toPathiya Tanda H/o Mannevaripally,MANNEVARI PALLY 31.50 30-Sep-11 26-Mar-12 28-Mar-12 28-Mar-12 5-Sep-12 30-May-12 - GP,Achampet(M) 1 31.50 NCB - - - - - Providing SVS toVatavarlapally, VATTAVARLA PALLY 56.00 30-Sep-11 24-Dec-11 25-Dec-11 26-Dec-11 22-Feb-12 30-Jun-12 - GP,Amrabad(M) 1 56.00 NCB - - - - - Providing SVS toAyyawaripally Tanda H/o Perativanipally,PERATWANIPALLY 12.00 30-Sep-11 19-Jan-12 20-Jan-12 21-Jan-12 7-Mar-12 30-Mar-12 - GP,Uppununthala(M) 1 12.00 LCB - 8.238 - A. Reddy - - Providing SVS toNerellakollu Tanda,VASUDEVAPUR GP,Amangal(M) 12.00 30-Sep-11 8-Dec-11 25-Dec-11 26-Dec-11 22-Feb-12 26-Mar-12 - 1 12.00 LCB - 7.385 - J. Laxman Naik - - Providing SVS toSatya Sai Colony,MARCHAL GP,(M) 18.00 9-Apr-12 24-Apr-12 26-Apr-12 1-May-12 6-Sep-12 30-Jun-12 - 1 18.00 LCB - - - - - Providing SVS toVittaipally H/o Kalakonda,KALAKONDA GP,(M) 25.00 9-Apr-12 24-Apr-12 26-Apr-12 1-May-12 6-Sep-12 30-Jun-12 - 1 25.00 NCB - - - - - Providing SVS toGattu ,GATTU IPPALAPALLE GP,(M) 49.94 30-Sep-11 26-Dec-11 20-Jan-12 21-Jan-12 7-Mar-12 30-Jun-12 - 1 49.94 NCB - - - - - Providing SVS toYerravalli Tanda H/o Gokaram,GOKARAM GP,Veldanda(M) 28.00 9-Apr-12 24-Apr-12 26-Apr-12 1-May-12 6-Sep-12 30-Jun-12 - 1 28.00 NCB - - - - - Providing SVS toSalkarpet Tanda,SALKARPET GP,Bijinepally(M) 12.50 30-Sep-11 - 25-Dec-11 26-Dec-11 22-Feb-12 28-Mar-12 - 1 12.50 LCB - 8.425 - Md. Quaiser - - Providing SVS toVattem,VATTEM GP,Bijinepally(M) 50.00 30-Sep-11 26-Dec-11 20-Jan-12 21-Jan-12 7-Mar-12 28-Mar-12 - 1 50.00 NCB - 28.751 - C. Ranchandra Reddy - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toVemula,VEMULA GP,Addakal(M) 25.50 30-Sep-11 26-Mar-12 28-Mar-12 28-Mar-12 5-Sep-12 30-May-12 - 1 25.50 NCB - - - - - Providing SVS toMaddigatla,MADDIGATLA 49.00 30-Sep-11 18-Jan-12 20-Jan-12 21-Jan-12 7-Mar-12 28-Mar-12 - GP,(M) 1 49.00 NCB - 35.88 - J. Srinivas Sagar - - Providing SVS toPallamarri,PALLAMARRI GP,C.C.kunta(M) 17.50 30-Sep-11 28-Dec-11 20-Jan-12 21-Jan-12 7-Mar-12 30-Mar-12 - 1 17.50 LCB - 6.04 - Venu Gopal Reddy - - Providing SVS toAnkaipally Tanda,PEDDAMANDADI 19.50 30-Sep-11 8-Dec-11 23-Dec-11 24-Dec-11 17-Feb-12 - GP,Peddamandadi(M) 1 19.50 LCB - - - - - Providing SVS toAppireddipally,SALKALAPUR 27.00 30-Sep-11 8-Dec-11 25-Dec-11 26-Dec-11 22-Feb-12 26-Mar-12 - GP,Ghanpur(M) 1 27.00 NCB - 20.203 - I. Srinivas Reddy - - Providing SVS toBunyadpur,BUNYADPUR GP,Pebbair(M) 29.00 30-Sep-11 29-Dec-11 20-Jan-12 21-Jan-12 7-Mar-12 26-Mar-12 - 1 29.00 NCB - 19.462 - J. Srinivas Sagar - - Providing SVS toChandrakal,CHANDRAKAL 19.00 30-Sep-11 15-Dec-11 20-Jan-12 21-Jan-12 7-Mar-12 26-Mar-12 - GP,Peddakothapally(M) 1 19.00 LCB - 7.306 - M. Narsimha - - Providing SVS toDondaipally Tanda,DONDAIPALLY GP,Pangal(M) 17.00 30-Sep-11 16-Dec-11 23-Dec-11 24-Dec-11 17-Feb-12 30-Jun-12 - 1 17.00 LCB - - - - - Providing SVS toGudem,BEKKEM GP,Weepanagandla(M) 32.50 30-Sep-11 8-Dec-11 23-Dec-11 24-Dec-11 17-Feb-12 26-Mar-12 - 1 32.50 NCB - 20.357 - P. Mutyam Reddy - - Providing SVS toKistagiri,KISTAGIRI GP,Wanaparthy(M) 12.00 30-Sep-11 8-Dec-11 25-Dec-11 26-Dec-11 22-Feb-12 26-Mar-12 - 1 12.00 LCB - 6.822 - C. Ramchandra Reddy - - Providing SVS toKonnur,KONNUR GP,(M) 25.50 30-Sep-11 27-Dec-11 20-Jan-12 21-Jan-12 7-Mar-12 30-Jun-12 - 1 25.50 NCB - - - - - Providing SVS toKoukuntla,KOUKUNTLA GP,Deverkadra(M) 104.00 30-Sep-11 13-Jun-11 24-Jan-12 25-Jan-12 13-Mar-12 30-Jun-12 - 1 104.00 NCB - - - - - Providing SVS toMolachintalapally,MOLACHINTHALAP 49.50 30-Sep-11 11-Jan-12 20-Jan-12 21-Jan-12 7-Mar-12 30-Jun-12 - ALLY GP,Kollapur(M) 1 49.50 NCB - - - - - Providing SVS toNarsaipally,NARSAIPALLY 49.75 30-Sep-11 22-Dec-11 20-Jan-12 21-Jan-12 7-Mar-12 30-Jun-12 - GP,Kodair(M) 1 49.75 NCB - - - - - Providing SVS toSanjeevapur,CHANDRAKAL 10.00 30-Sep-11 8-Dec-11 30-Dec-12 20-Mar-12 9-May-12 30-Jun-12 - GP,Peddakothapally(M) 1 10.00 LCB - - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toYenmanbetla,YENMANBETLA 34.00 30-Sep-11 11-Jan-12 20-Jan-12 21-Jan-12 9-Mar-12 31-Mar-12 - GP,Kollapur(M) 1 34.00 NCB - 21.788 - M. Narsimha - - 5 SVS in Batch-II Providing SVS toKruvapalli,YAPADINNE GP,Ieeza(M) 17.07 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 5-Sep-12 28-Sep-12 - 1 17.07 LCB 13.656 - - - - Providing SVS toRangapur Thanda,UMITHYAL GP,Dharoor(M) 14.71 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 14.71 LCB 11.768 - - - - Providing SVS toBasaracheruvu- II,BASWACHERU GP,Gadwal(M) 14.71 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 14.71 LCB 11.768 - - - - Providing SVS toNandiagraharam,YENKAMPET 17.66 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Gadwal(M) 1 17.66 LCB 14.128 - - - - Providing SVS toMarlapally,KAKULARAM 25.00 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Gadwal(M) 1 25.00 NCB 20 - - - - Providing SVS toBingidoddi Thanda,ALOOR GP,Ghattu(M) 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.83 LCB 7.064 - - - - Providing SVS toGangimandoddi,GORLAKHANDODDI 14.71 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Ghattu(M) 1 14.71 LCB 11.768 - - - - Providing SVS toNallakunta Thanda,ALOOR GP,Ghattu(M) 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.83 LCB 7.064 - - - - Providing SVS toJinnaram Tanda,JINNARAM GP,Narva(M) 9.42 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 9.42 LCB 7.536 - - - - Providing SVS toGundyal Tanda,HEMAJIPUR GP,Balanagar(M) 19.80 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 19.80 LCB 15.84 - - - - Providing SVS toChedughattu,BIRAMPALLE 11.78 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Midjil(M) 1 11.78 LCB 9.424 - - - - Providing SVS toJaknalapalle,JAKANALAPALLE 23.35 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Midjil(M) 1 23.35 NCB 18.68 - - - - Providing SVS toRahamankunta Tanda,MASIGUNDLAPALLE 17.72 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Midjil(M) 1 17.72 LCB 14.176 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toKomatikunta Tanda,KOLLOOR GP,Nawabpet(M) 12.71 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 12.71 LCB 10.168 - - - - Providing SVS toVenkateshvara Tanda,KOLLOOR GP,Nawabpet(M) 18.03 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 18.03 LCB 14.424 - - - - Providing SVS toMerugoni Palle,KOLLOOR GP,Nawabpet(M) 14.78 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 14.78 LCB 11.824 - - - - Providing SVS toAmsanpalle,AMSANPALLE 14.20 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Bomraspet(M) 1 14.20 LCB 11.36 - - - - Providing SVS toBojana Tanda,METLAKUNTA GP,Bomraspet(M) 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.36 LCB 6.688 - - - - Providing SVS toBurry Tanda,METLAKUNTA GP,Bomraspet(M) 8.74 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.74 LCB 6.992 - - - - Providing SVS toCettupally Tanda,CHILMALMAILWAR 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Bomraspet(M) 1 8.36 LCB 6.688 - - - - Providing SVS toDeepalanaik Tanda,REGADMAILWAR 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Bomraspet(M) 1 8.36 LCB 6.688 - - - - Providing SVS toEkkacheruvu Tanda,CHILMALMAILWAR 8.71 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Bomraspet(M) 1 8.71 LCB 6.968 - - - - Providing SVS toGate Tanda,METLAKUNTA GP,Bomraspet(M) 8.74 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.74 LCB 6.992 - - - - Providing SVS toGubbadi Tanda,METLAKUNTA GP,Bomraspet(M) 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.36 LCB 6.688 - - - - Providing SVS toJeedigadda Tanda,KOTHUR GP,Bomraspet(M) 8.74 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.74 LCB 6.992 - - - - Providing SVS toKothur,KOTHUR GP,Bomraspet(M) 16.90 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.90 LCB 13.52 - - - - Providing SVS toMadaimadugu Tanda,MAHANTHIPUR GP,Bomraspet(M) 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.36 LCB 6.688 - - - - Providing SVS toMaisamma Gadda tanda,LAGCHERLA GP,Bomraspet(M) 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.36 LCB 6.688 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toMedichetu Tanda,NAMDARPUR GP,Bomraspet(M) 8.74 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.74 LCB 6.992 - - - - Providing SVS toMysoni Vamu Tanda,BAPALLY TANDA 8.74 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Bomraspet(M) 1 8.74 LCB 6.992 - - - - Providing SVS toNamyanaik Tanda,CHILMALMAILWAR 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Bomraspet(M) 1 8.36 LCB 6.688 - - - - Providing SVS toNamyanaik Tanda,ERLAPALLY GP,Bomraspet(M) 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.36 LCB 6.688 - - - - Providing SVS toPolkampally,CHILMALMAILWAR 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Bomraspet(M) 1 8.36 LCB 6.688 - - - - Providing SVS toRaktamaisamma Tanda,DUDYAL GP,Bomraspet(M) 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.36 LCB 6.688 - - - - Providing SVS toSomalanaik tanda,DUDYAL GP,Bomraspet(M) 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.36 LCB 6.688 - - - - Providing SVS toWadicherla,WADICHERLA 10.30 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Bomraspet(M) 1 10.30 LCB 8.24 - - - - Providing SVS toYenkepally,YENKEPALLY 13.06 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Bomraspet(M) 1 13.06 LCB 10.448 - - - - Providing SVS toBandaragudiselu,CHANDRAKAL 7.06 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Doulthabad(M) 1 7.06 LCB 5.648 - - - - Providing SVS toMamidikunta,YAMKI GP,Doulthabad(M) 7.15 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 7.15 LCB 5.72 - - - - Providing SVS toChandrakal,CHANDRAKAL 8.53 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Doulthabad(M) 1 8.53 LCB 6.824 - - - - Providing SVS toRavulapally,RAVALPALLY 17.66 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Kodangal(M) 1 17.66 LCB 14.128 - - - - Providing SVS toRudraram,RUDRARAM GP,Kodangal(M) 26.04 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 26.04 NCB 20.832 - - - - Providing SVS toBharikunta Tanda,GUNDMAL GP,Kosgi(M) 8.39 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.39 LCB 6.712 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toChenwar,CHANWAR GP,Maddur(M) 11.48 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 11.48 LCB 9.184 - - - - Providing SVS toDuppatghat,DUPPATGHAT 11.86 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Maddur(M) 1 11.86 LCB 9.488 - - - - Providing SVS toEkkamade,LINGALCHED GP,Maddur(M) 12.89 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 12.89 LCB 10.312 - - - - Providing SVS toOntigundu Tanda,DOREPALLE GP,Maddur(M) 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.83 LCB 7.064 - - - - Providing SVS toYerrakunta Tanda,RENVATLA GP,Maddur(M) 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.83 LCB 7.064 - - - - Providing SVS toChennaram Tanda H/o Gundimalla,GUDDIMALAKAPUR 14.02 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Hunwada(M) 1 14.02 LCB 11.216 - - - - Providing SVS toLinganpalle H/o Gundyal,GUNDYALA GP,Hunwada(M) 26.18 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 26.18 NCB 20.944 - - - - Providing SVS toNaginonipally,NAGINONIPALLE 27.89 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Hunwada(M) 1 27.89 NCB 22.312 - - - - Providing SVS toShaikpally,SHAIK PALLE GP,Hunwada(M) 23.63 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 23.63 NCB 18.904 - - - - Providing SVS toBandameedi Palle, BANDAMEEDI PALLE 30.54 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Mahabubnagar(M) 1 30.54 NCB 24.432 - - - - Providing SVS toHousing Colony,YEDIRA GP,Mahabubnagar(M) 20.19 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 20.19 LCB 16.152 - - - - Providing SVS toMarlu,CHRISTAMPALLE GP,Mahabubnagar(M) 11.95 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 11.95 LCB 9.56 - - - - Providing SVS toPalakonda,PALAKONDA GP,Mahabubnagar(M) 23.13 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 23.13 NCB 18.504 - - - - Providing SVS toMekea Banda Tanda,CHARLAPALLY GP,Dhanwada(M) 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.83 LCB 7.064 - - - - Providing SVS toKalyanagar Tanda,ANKILLA GP,Koilkonda(M) 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.83 LCB 7.064 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toKhushmhammadpalle, YELLAREDDI 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - PALLE GP,Koilkonda(M) 1 8.83 LCB 7.064 - - - - Providing SVS toNallagutta Tanda,RAMPUR GP,Koilkonda(M) 7.06 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 7.06 LCB 5.648 - - - - Providing SVS toPerikiveedu Tanda,PERIKIVEEDU GP,Koilkonda(M) 14.71 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 14.71 LCB 11.768 - - - - Providing SVS toSeripally,ABHANGAPATNAM 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Koilkonda(M) 1 8.83 LCB 7.064 - - - - Providing SVS toAkkaipalle,RAMPUR GP,Koilkonda(M) 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.83 LCB 7.064 - - - - Providing SVS toKondanaguda,KONDANNAGUDA 27.82 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Farooqnagar(M) 1 27.82 NCB 22.256 - - - - Providing SVS toLokya Tanda,JAKARAM GP,Kondurg(M) 15.29 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 15.29 LCB 12.232 - - - - Providing SVS toTallaguda,CHEGUR GP,Kothur(M) 27.62 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 27.62 NCB 22.096 - - - - Providing SVS toChakalidanigutta Tanda,RANGAPUR GP,Kothur(M) 22.63 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 22.63 LCB 18.104 - - - - Providing SVS toKodonipally,PADARA GP,Amrabad(M) 8.24 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.24 LCB 6.592 - - - - Providing SVS toMaddimadugu,MARADUGU 8.24 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Amrabad(M) 1 8.24 LCB 6.592 - - - - Providing SVS toSri Sailam Project(w), VATTAVARLA PALLY 25.89 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Amrabad(M) 1 25.89 NCB 20.712 - - - - Providing SVS toOld Dhararam,DHARARAM GP,Lingal(M) 17.66 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 17.66 LCB 14.128 - - - - Providing SVS toBommalagudeselu,THURKALAPALLE 8.09 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Vangoor(M) 1 8.09 LCB 6.472 - - - - Providing SVS toVangoor,VANGOOR GP,Vangoor(M) 33.31 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 33.31 NCB 26.648 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toMarripally Tanda,CHARAKONDA GP,Vangoor(M) 7.33 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 7.33 LCB 5.864 - - - - Providing SVS toChoukalagudiselu,POLEPALLE 13.44 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Amangal(M) 1 13.44 LCB 10.752 - - - - Providing SVS toDayyalagodu Tanda, MEDDIGADDA TANDA 17.07 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Amangal(M) 1 17.07 LCB 13.656 - - - - Providing SVS toGate Tanda,RAMANUTHULA GP,Amangal(M) 15.31 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 15.31 LCB 12.248 - - - - Providing SVS toRajeevnagar Tanda,VASUDEVAPUR GP,Amangal(M) 16.50 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.50 LCB 13.2 - - - - Providing SVS toVankarai Tanda,KARKALPAHAD GP,Amangal(M) 15.65 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 15.65 LCB 12.52 - - - - Providing SVS toJanagareddipally, JANGAREDDY 21.63 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - PALLY GP,Kalwakurthy(M) 1 21.63 LCB 17.304 - - - - Providing SVS toPanjugul Tanda,PANJU GAL GP,Kalwakurthy(M) 15.24 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 15.24 LCB 12.192 - - - - Providing SVS toRaghupathipeta,RAGHUPATI PET 35.02 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Kalwakurthy(M) 1 35.02 NCB 28.016 - - - - Providing SVS toTharnikal,THARNIKAL GP,Kalwakurthy(M) 46.03 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 46.03 NCB 36.824 - - - - Providing SVS toSilarpally,KALWAKURTHI 26.59 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Kalwakurthy(M) 1 26.59 NCB 21.272 - - - - Providing SVS toJangu Tanda,KHYBYA TANDA GP,Madgul(M) 16.01 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.01 LCB 12.808 - - - - Providing SVS toKeshya Tanda,GIRIKOTHAPALLE GP,Madgul(M) 16.17 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.17 LCB 12.936 - - - - Providing SVS toMadgul Tanda,MADGUL GP,Madgul(M) 16.37 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.37 LCB 13.096 - - - - Providing SVS toJangavalya Tanda,IRWIN GP,Madgul(M) 16.28 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.28 LCB 13.024 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toChandradana,CHANDRADANA 32.52 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Talakondapally(M) 1 32.52 NCB 26.016 - - - - Providing SVS toCheerlakunta Tanda,TALAKONDAPALLE 15.97 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Talakondapally(M) 1 15.97 LCB 12.776 - - - - Providing SVS toChennaram,CHUKKAPUR 19.72 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Talakondapally(M) 1 19.72 LCB 15.776 - - - - Providing SVS toGarvipally,KHANAPUR GP,Talakondapally(M) 17.37 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 17.37 LCB 13.896 - - - - Providing SVS toJangareddipally, JANGAREDDY PALLE 25.13 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Talakondapally(M) 1 25.13 NCB 20.104 - - - - Providing SVS toSangaipally Tanda,CHUKKAPUR 15.71 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Talakondapally(M) 1 15.71 LCB 12.568 - - - - Providing SVS toKuppagandla,KUPPAGANDLA 30.76 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Veldanda(M) 1 30.76 NCB 24.608 - - - - Providing SVS toNarayanpur Tanda,CHERKUR GP,Veldanda(M) 18.50 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 18.50 LCB 14.8 - - - - Providing SVS toPadamati Tanda,SERIAPPAREDDIPALLE 15.97 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Veldanda(M) 1 15.97 LCB 12.776 - - - - Providing SVS toPochamma Tanda,POTHEPALLE GP,Veldanda(M) 16.58 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.58 LCB 13.264 - - - - Providing SVS toDhansing Tanda,GOURARAM GP,Bijinepally(M) 15.12 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 15.12 LCB 12.096 - - - - Providing SVS toChoullatanda,KARVENNA 13.74 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Bhoothpur(M) 1 13.74 LCB 10.992 - - - - Providing SVS toKummarikunta Tanda,BHOOTHPUR GP,Bhoothpur(M) 7.06 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 7.06 LCB 5.648 - - - - Providing SVS toNehru nagar,TATIKONDA GP,Bhoothpur(M) 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.83 LCB 7.064 - - - - Providing SVS toDasarpalle,THIRUMALAPUR 10.59 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,C.C.kunta(M) 1 10.59 LCB 8.472 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toGopyanaik tanda,FAREEDPUR GP,C.C.kunta(M) 7.06 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 7.06 LCB 5.648 - - - - Providing SVS toJamulunaik Tanda,FAREEDPUR GP,C.C.kunta(M) 7.06 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 7.06 LCB 5.648 - - - - Providing SVS toMalyanaik Tanda,FAREEDPUR GP,C.C.kunta(M) 5.89 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 28-Sep-12 - 1 5.89 LCB 4.712 - - - - Providing SVS toUndyal Tanda,UNDIYALA GP,C.C.kunta(M) 7.06 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 7.06 LCB 5.648 - - - - Providing SVS toNarlonikunta,BASWAPUR 14.71 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Deverkadra(M) 1 14.71 LCB 11.768 - - - - Providing SVS toMiraspally Stage,MIRASPALLY GP,Kothakota(M) 7.06 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 7.06 LCB 5.648 - - - - Providing SVS toNatavelli Pedda Tanda,NATAVELLI GP,Kothakota(M) 7.06 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 7.06 LCB 5.648 - - - - Providing SVS toWilliamkonda Tanda,MIRASPALLY GP,Kothakota(M) 7.65 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 7.65 LCB 6.12 - - - - Providing SVS toKanaipally,KANAIPALLY 5.89 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 28-Sep-12 - GP,Kothakota(M) 1 5.89 LCB 4.712 - - - - Providing SVS toYellur,YELLUR GP,Kollapur(M) 18.42 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 18.42 LCB 14.736 - - - - Providing SVS toShakapur Tanda,SHAKAPUR GP,Pangal(M) 3.94 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 28-Sep-12 - 1 3.94 LCB 3.152 - - - - Providing SVS toTellarallapally Tanda,TELLARALLAPALLY 11.18 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Pangal(M) 1 11.18 LCB 8.944 - - - - Providing SVS toAgaram,AGARAM GP,Ghanpur(M) 41.70 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 41.70 NCB 33.36 - - - - Providing SVS toBakka Tanda,MAMIDIMADA GP,Ghanpur(M) 4.71 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 4.71 LCB 3.768 - - - - Providing SVS toGhanpur Tanda,GHANPUR GP,Ghanpur(M) 4.71 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 4.71 LCB 3.768 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toJangamaipally,JANGAMAIPALLY 11.77 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Ghanpur(M) 1 11.77 LCB 9.416 - - - - Providing SVS toSolipur,SOLIPUR GP,Ghanpur(M) 11.77 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 11.77 LCB 9.416 - - - - Providing SVS toKamaluddinpur,KAMALUDDINPUR 11.77 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Ghanpur(M) 1 11.77 LCB 9.416 - - - - Providing SVS toMungamandinne,JANUMPALLY 4.71 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - GP,Pebbair(M) 1 4.71 LCB 3.768 - - - - Providing SVS toRangapur,RANGAPUR GP,Pebbair(M) 5.89 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 5.89 LCB 4.712 - - - - Providing SVS toAmmapally,MADDIGATLA 11.77 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Peddamandadi(M) 1 11.77 LCB 9.416 - - - - Providing SVS toBoyagudiselu Tanda,MADDIGATLA 3.53 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - GP,Peddamandadi(M) 1 3.53 LCB 2.824 - - - - Providing SVS toGatlakhanapur,GATLAKHANAPUR 31.11 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Peddamandadi(M) 1 31.11 NCB 24.888 - - - - Providing SVS toManigilla Tanda,MANIGILLA GP,Peddamandadi(M) 2.94 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 2.94 LCB 2.352 - - - - Providing SVS toPeddamandadi,PEDDAMANDADI 17.66 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Peddamandadi(M) 1 17.66 LCB 14.128 - - - - Providing SVS toVeeraipally,VEERAIPALLY 5.89 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - GP,Peddamandadi(M) 1 5.89 LCB 4.712 - - - - Providing SVS toBojya Tanda,GATLAKHANAPUR 10.42 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Peddamandadi(M) 1 10.42 LCB 8.336 - - - - Providing SVS toAnjangiri,KHASIMNAGAR 12.94 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Wanaparthy(M) 1 12.94 LCB 10.352 - - - - Providing SVS toAnkoor,ANKOOR GP,Wanaparthy(M) 27.59 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 27.59 NCB 22.072 - - - - Providing SVS toAppaipally Tanda,APPAIPALLY GP,Wanaparthy(M) 9.43 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 9.43 LCB 7.544 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toBanigani Tanda,RAJAPET GP,Wanaparthy(M) 4.71 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 4.71 LCB 3.768 - - - - Providing SVS toChimanguntapally,CHIMANGUNTAPAL 38.25 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - L GP,Wanaparthy(M) 1 38.25 NCB 30.6 - - - - Providing SVS toGuntha Tanda,APPAIPALLY GP,Wanaparthy(M) 9.41 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 9.41 LCB 7.528 - - - - Providing SVS toJamula Tanda,SAVAIGUDEM GP,Wanaparthy(M) 3.53 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 3.53 LCB 2.824 - - - - Providing SVS toKeerya Tanda,APPAIPALLY GP,Wanaparthy(M) 2.94 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 2.94 LCB 2.352 - - - - Providing SVS toPeddagudem,PEDDAGUDEM 46.71 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Wanaparthy(M) 1 46.71 NCB 37.368 - - - - Providing SVS toRajanagar,RAJANAGAR GP,Wanaparthy(M) 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.83 LCB 7.064 - - - - Providing SVS toSrinivaspur Tanda,SRINIVASPUR GP,Wanaparthy(M) 14.67 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 14.67 LCB 11.736 - - - - Providing SVS toKuntoni Tanda,APPAIPALLY GP,Wanaparthy(M) 10.33 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 10.33 LCB 8.264 - - - - Providing SVS toNarasimha Tanda,KHASIMNAGAR 11.50 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Wanaparthy(M) 1 11.50 LCB 9.2 - - - - 6 SVS in Batch-III Providing SVS toYayapalldevapadu,BHEEMAWARAM 14.71 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Alampur(M) 1 14.71 LCB 11.768 - - - - Providing SVS toRevulapally,CHINTHAREVULA 5.89 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - GP,Dharoor(M) 1 5.89 LCB 4.712 - - - - Providing SVS toGuramagadda,GURRAMGADDA 20.60 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Gadwal(M) 1 20.60 LCB 16.48 - - - - Providing SVS toYarrapally,PUDUR GP,Gadwal(M) 15.00 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 15.00 LCB 12 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toBaswapur,THUMMALCHERU 17.66 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Ghattu(M) 1 17.66 LCB 14.128 - - - - Providing SVS toPamireddipalle,PAMIREDDIPALLE 20.00 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Atmakur(M) 1 20.00 LCB 16 - - - - Providing SVS toPinnamcherla,PINAMCHERLA 20.00 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Atmakur(M) 1 20.00 LCB 16 - - - - Providing SVS toDonoor Tanda,DONUR GP,Midjil(M) 14.88 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 14.88 LCB 11.904 - - - - Providing SVS toRachala Palle Tanda,RACHALPALLE GP,Midjil(M) 15.00 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 15.00 LCB 12 - - - - Providing SVS toTakur Tanda,IPPAIPAHAD GP,Midjil(M) 16.81 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.81 LCB 13.448 - - - - Providing SVS toBuddi Tanda,GURUKUNTA GP,Nawabpet(M) 13.93 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 13.93 LCB 11.144 - - - - Providing SVS toKotha Deepalle,DEEPALLE GP,Nawabpet(M) 18.00 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 18.00 LCB 14.4 - - - - Providing SVS toMorrambavi,GURUKUNTA 17.49 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Nawabpet(M) 1 17.49 LCB 13.992 - - - - Providing SVS toMamidichetu Tanda,KOLLOOR GP,Nawabpet(M) 16.50 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.50 LCB 13.2 - - - - Providing SVS toChowdarpalle,CHOWDAPALLE 9.77 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Bomraspet(M) 1 9.77 LCB 7.816 - - - - Providing SVS toDupcherla,DUPCHERLA GP,Bomraspet(M) 4.80 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 4.80 LCB 3.84 - - - - Providing SVS toBokkivomula Tanda,REGADMAILWAR 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Bomraspet(M) 1 8.36 LCB 6.688 - - - - Providing SVS toApukunta Tanda,BURHANPUR GP,Bomraspet(M) 8.16 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.16 LCB 6.528 - - - - Providing SVS toEdula kunta Tanda,LAGCHERLA GP,Bomraspet(M) 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.36 LCB 6.688 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toKashyanaik Tanda,DUDYAL GP,Bomraspet(M) 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.36 LCB 6.688 - - - - Providing SVS toPulyanaik Tanda,METLAKUNTA GP,Bomraspet(M) 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.36 LCB 6.688 - - - - Providing SVS toVasyanaik Tanda,CHILMALMAILWAR 8.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Bomraspet(M) 1 8.36 LCB 6.688 - - - - Providing SVS toBichal,BICHAL GP,Doulthabad(M) 12.48 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 12.48 LCB 9.984 - - - - Providing SVS toDasaryagudem,CHANDRAKAL 7.06 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Doulthabad(M) 1 7.06 LCB 5.648 - - - - Providing SVS toThimaipalle,GUNDEPALLE 7.06 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Doulthabad(M) 1 7.06 LCB 5.648 - - - - Providing SVS toGokapasalawad,GOKAJASALAWAD 23.07 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Doulthabad(M) 1 23.07 NCB 18.456 - - - - Providing SVS toVagiya Tanda,DEVARFASLAWAD 7.00 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Doulthabad(M) 1 7.00 LCB 5.6 - - - - Providing SVS toGundla Kunta,PATHA KODANGAL GP,Kodangal(M) 14.12 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 14.12 LCB 11.296 - - - - Providing SVS toKastoorpaly,KASTOORPALLY 10.88 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Kodangal(M) 1 10.88 LCB 8.704 - - - - Providing SVS toKonddareddy pally,KONDAREDDYPALLY 13.11 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Kodangal(M) 1 13.11 LCB 10.488 - - - - Providing SVS toLaxmipally,LAXMIPALLY 14.12 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Kodangal(M) 1 14.12 LCB 11.296 - - - - Providing SVS toPatha Kodangal,PATHA KODANGAL GP,Kodangal(M) 14.12 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 14.12 LCB 11.296 - - - - Providing SVS toBijjarm,BIJJARAM GP,Kosgi(M) 14.89 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 14.89 LCB 11.912 - - - - Providing SVS toChandravancha,CHANDRAVANCHA 14.89 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Kosgi(M) 1 14.89 LCB 11.912 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toChennaram,CHENNARAM GP,Kosgi(M) 14.89 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 14.89 LCB 11.912 - - - - Providing SVS toBandarulaxmaiah Colony,MUDIREDDIPALLE GP,Kosgi(M) 8.19 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.19 LCB 6.552 - - - - Providing SVS toBuneed ,BONEED GP,Maddur(M) 19.27 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 19.27 LCB 15.416 - - - - Providing SVS toGorlonibhavi,KRISHNANAGAR 8.71 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Maddur(M) 1 8.71 LCB 6.968 - - - - Providing SVS toKommur,KOMMUR GP,Maddur(M) 19.12 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 19.12 LCB 15.296 - - - - Providing SVS toMoninapur ,MOMINAPUR GP,Maddur(M) 15.01 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 15.01 LCB 12.008 - - - - Providing SVS toNidjintha,NIDJINTA GP,Maddur(M) 19.12 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 19.12 LCB 15.296 - - - - Providing SVS toPallerla,PALLERLA GP,Maddur(M) 23.24 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 23.24 NCB 18.592 - - - - Providing SVS toRenvatla,RENVATLA GP,Maddur(M) 15.01 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 15.01 LCB 12.008 - - - - Providing SVS toOnti Hanuman Tanda,PALLERLA GP,Maddur(M) 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.83 LCB 7.064 - - - - Providing SVS toBhekyanaik Tanda H/o Kothapet,KOHTAPETA GP,Hunwada(M) 16.01 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.01 LCB 12.808 - - - - Providing SVS toChirmalkudha Tanda H/o Chinnadarpally,CHINNADHR PALLE 14.70 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Hunwada(M) 1 14.70 LCB 11.76 - - - - Providing SVS toDharmakunta Tanda H/o Kothapet,KOHTAPETA GP,Hunwada(M) 15.44 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 15.44 LCB 12.352 - - - - Providing SVS toGattumeedi Tanda H/o Gundyal,GUNDYALA GP,Hunwada(M) 15.07 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 15.07 LCB 12.056 - - - - Providing SVS toHarijanaik Tanda H/o Ayodhyanagar,AYODHYANAGAR 16.77 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Hunwada(M) 1 16.77 LCB 13.416 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toJonnalabanda Tanda H/o Shaikhpally,SHAIK PALLE 16.28 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Hunwada(M) 1 16.28 LCB 13.024 - - - - Providing SVS toYerragattu Tanda,GUNDYALA GP,Hunwada(M) 16.81 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.81 LCB 13.448 - - - - Providing SVS toJagyanaik Thanda,ZAINALLIPUR 15.48 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Mahabubnagar(M) 1 15.48 LCB 12.384 - - - - Providing SVS toMahatamagandhi Colony,YENUGONDA 17.14 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Mahabubnagar(M) 1 17.14 LCB 13.712 - - - - Providing SVS toMandula Colony,CHRISTAMPALLE 30.92 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Mahabubnagar(M) 1 30.92 NCB 24.736 - - - - Providing SVS toMansingh Tanda,BOYAPALLE 10.28 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Mahabubnagar(M) 1 10.28 LCB 8.224 - - - - Providing SVS toOotakunta, BANDAMEEDI PALLE 18.51 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Mahabubnagar(M) 1 18.51 LCB 14.808 - - - - Providing SVS toPalugu Tanda,FATHEPUR GP,Mahabubnagar(M) 17.68 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 17.68 LCB 14.144 - - - - Providing SVS toPillalamarrichettu,TIMMASANIPALLY 16.28 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Mahabubnagar(M) 1 16.28 LCB 13.024 - - - - Providing SVS toRekyanaik Tanda,ZAINALLIPUR 17.52 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Mahabubnagar(M) 1 17.52 LCB 14.016 - - - - Providing SVS toRoopsingh Tanda,DODDOLONI PALLE 16.73 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Mahabubnagar(M) 1 16.73 LCB 13.384 - - - - Providing SVS toSakanrai Thanda, BANDAMEEDI PALLE 19.42 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Mahabubnagar(M) 1 19.42 LCB 15.536 - - - - Providing SVS toSugargadda Tanda,RAMCHANDRAPUR 16.52 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Mahabubnagar(M) 1 16.52 LCB 13.216 - - - - Providing SVS toThalthippa Thanda, BANDAMEEDI PALLE 15.48 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Mahabubnagar(M) 1 15.48 LCB 12.384 - - - - Providing SVS toManipoor Tanda,RAMAKISTAIAHPALLE 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Dhanwada(M) 1 8.83 LCB 7.064 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toMulala Tanda,KISTAPUR GP,Dhanwada(M) 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.83 LCB 7.064 - - - - Providing SVS toChoudercheru Tanda,KOTHLABAD GP,Koilkonda(M) 5.89 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 5.89 LCB 4.712 - - - - Providing SVS toKaniahpally,RAMPUR GP,Koilkonda(M) 10.59 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 10.59 LCB 8.472 - - - - Providing SVS toLingalchedu,SERIVENKATAPUR 10.59 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Koilkonda(M) 1 10.59 LCB 8.472 - - - - Providing SVS toNakkalakunta Tanda,KOILKONDA GP,Koilkonda(M) 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 8.83 LCB 7.064 - - - - Providing SVS toRokatigadda Tanda,PARPALLE GP,Koilkonda(M) 7.06 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 7.06 LCB 5.648 - - - - Providing SVS toVenkatapur Tanda,SERIVENKATAPUR 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Koilkonda(M) 1 8.83 LCB 7.064 - - - - Providing SVS toJyotyatanda,DOOSKAL GP,Farooqnagar(M) 16.18 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.18 LCB 12.944 - - - - Providing SVS toSundarapur,KESHAMPETA 10.70 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Keshampet(M) 1 10.70 LCB 8.56 - - - - Providing SVS toKamla Tanda,GUDUR GP,Kothur(M) 17.03 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 17.03 LCB 13.624 - - - - Providing SVS toModellaguda,MAMIDIPALLE 1.18 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - GP,Kothur(M) 1 1.18 LCB 0.944 - - - - Providing SVS toChalivendraguda,RANGAPUR 15.81 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Kothur(M) 1 15.81 LCB 12.648 - - - - Providing SVS toFarahabad,MANNANOOR 0.00 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - GP,Amrabad(M) 1 0.00 LCB 0 - - - - Providing SVS toGhattu Thumen,GATTUTHUMMEN 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Balmoor(M) 1 8.83 LCB 7.064 - - - - Providing SVS toErlapenta,APPAIPALLY GP,Lingal(M) 6.12 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 6.12 LCB 4.896 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toSangadigundala,APPAIPALLY 0.00 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - GP,Lingal(M) 1 0.00 LCB 0 - - - - Providing SVS toDonthulagutta Thanda,THIMMAIPALLE GP,Vangoor(M) 11.18 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 11.18 LCB 8.944 - - - - Providing SVS toKamalapur,THIMMAIPALLE 14.42 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Vangoor(M) 1 14.42 LCB 11.536 - - - - Providing SVS toSaigutta Tanda, THIPPAREDDIPALLE 6.30 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Vangoor(M) 1 6.30 LCB 5.04 - - - - Providing SVS toKadiya Tanda,VASUDEVAPUR GP,Amangal(M) 17.28 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 17.28 LCB 13.824 - - - - Providing SVS toKeshya Tanda, MEDDIGADDA TANDA 15.70 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Amangal(M) 1 15.70 LCB 12.56 - - - - Providing SVS toBhagatsingh Tanda,KALWAKURTHI 19.02 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Kalwakurthy(M) 1 19.02 LCB 15.216 - - - - Providing SVS toJillella,JILLELLA GP,Kalwakurthy(M) 24.66 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 24.66 NCB 19.728 - - - - Providing SVS toThotapally,THOTA PALLY GP,Kalwakurthy(M) 36.95 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 36.95 NCB 29.56 - - - - Providing SVS toThurkalapally,THURKAL PALLY GP,Kalwakurthy(M) 23.32 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 23.32 NCB 18.656 - - - - Providing SVS toVepur,VEPUR GP,Kalwakurthy(M) 32.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 32.83 NCB 26.264 - - - - Providing SVS toNellikondi Tanda,IRWIN GP,Madgul(M) 16.30 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.30 LCB 13.04 - - - - Providing SVS toBodya Tanda,CHUKKAPUR 16.16 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Talakondapally(M) 1 16.16 LCB 12.928 - - - - Providing SVS toGansayagani Tanda,GATTU IPPALAPALLE 16.06 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Talakondapally(M) 1 16.06 LCB 12.848 - - - - Providing SVS toPoolsing Tanda,CHANDRADANA 15.88 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Talakondapally(M) 1 15.88 LCB 12.704 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toAnkamonikunta,BOLLAMPALLY 19.79 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Veldanda(M) 1 19.79 LCB 15.832 - - - - Providing SVS toDodlapally,JUPALLY GP,Veldanda(M) 17.84 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 17.84 LCB 14.272 - - - - Providing SVS toGangugutta Tanda,CHERKUR GP,Veldanda(M) 17.07 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 17.07 LCB 13.656 - - - - Providing SVS toLalu Tanda,AJILAPUR GP,Veldanda(M) 17.40 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 17.40 LCB 13.92 - - - - Providing SVS toNemaligundu Tanda,KUPPAGANDLA GP,Veldanda(M) 17.58 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 17.58 LCB 14.064 - - - - Providing SVS toPillikandla Tanda,POTHEPALLE GP,Veldanda(M) 16.32 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.32 LCB 13.056 - - - - Providing SVS toPochammagadda Tanda,CHEDURVALLI GP,Veldanda(M) 18.93 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 18.93 LCB 15.144 - - - - Providing SVS toTurpu Tanda,SERIAPPAREDDIPALLE 15.54 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Veldanda(M) 1 15.54 LCB 12.432 - - - - Providing SVS toUbbadi Gutta Tanda,SERIAPPAREDDIPALLE 17.03 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Veldanda(M) 1 17.03 LCB 13.624 - - - - Providing SVS toSelonibanda Tanda,POTHEPALLE GP,Veldanda(M) 16.75 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 16.75 LCB 13.4 - - - - Providing SVS toGudibanda,GUDIBANDA GP,Addakal(M) 14.36 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 14.36 LCB 11.488 - - - - Providing SVS toParnekunta Tanda,FAREEDPUR GP,C.C.kunta(M) 5.89 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 5.89 LCB 4.712 - - - - Providing SVS toRedya Naik tanda,KAMSANIPALLE GP,C.C.kunta(M) 5.89 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 5.89 LCB 4.712 - - - - Providing SVS toAllipur tanda,ALLIPUR GP,C.C.kunta(M) 5.89 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 5.89 LCB 4.712 - - - - Providing SVS toOragattu Tanda,NATAVELLI GP,Kothakota(M) 2.65 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 2.65 LCB 2.12 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toDhulya Naik Tanda,YELLUR GP,Kollapur(M) 9.74 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 9.74 LCB 7.792 - - - - Providing SVS toMadhavaraopally,SHAKAPUR 7.33 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Pangal(M) 1 7.33 LCB 5.864 - - - - Providing SVS toTellarallapally,TELLARALLAPALLY 8.65 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Pangal(M) 1 8.65 LCB 6.92 - - - - Providing SVS toNeelabanda Tanda,ALMAIPALLY GP,Ghanpur(M) 4.71 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 4.71 LCB 3.768 - - - - Providing SVS toThirumalaipally,THIRUMALAIPALLY 8.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Ghanpur(M) 1 8.83 LCB 7.064 - - - - Providing SVS toAlwal,ALWAL GP,Peddamandadi(M) 11.77 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 11.77 LCB 9.416 - - - - Providing SVS toJeevula Tanda,GATLAKHANAPUR 1.47 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - GP,Peddamandadi(M) 1 1.47 LCB 1.176 - - - - Providing SVS toKistya Tanda,GATLAKHANAPUR 3.53 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - GP,Peddamandadi(M) 1 3.53 LCB 2.824 - - - - Providing SVS toKothakunta Tanda,PEDDAMANDADI 11.18 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Peddamandadi(M) 1 11.18 LCB 8.944 - - - - Providing SVS toMaddigatla,MADDIGATLAGP,Peddama 8.24 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - ndadi(M) 1 8.24 LCB 6.592 - - - - Providing SVS toManigilla,MANIGILLAGP,Peddamandadi 10.59 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - (M) 1 10.59 LCB 8.472 - - - - Providing SVS toNagulakunta Tanda,GATLAKHANAPURGP,Peddamand 3.53 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - adi(M) 1 3.53 LCB 2.824 - - - - Providing SVS toPamireddipally,PAMIREDDIPALLYGP,P 11.77 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - eddamandadi(M) 1 11.77 LCB 9.416 - - - - Providing SVS toSakru Tanda,GATLAKHANAPURGP,Peddamand 3.53 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - adi(M) 1 3.53 LCB 2.824 - - - - Providing SVS toPilliguntla Tanda,PEDDAMANDADIGP,Peddamanda 15.31 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - di(M) 1 15.31 LCB 12.248 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toThurkonipally,CHINNAMANDADIGP,Pe 2.60 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - ddamandadi(M) 1 2.60 LCB 2.08 - - - - Providing SVS toAmmapally Tanda,MADDIGATLAGP,Peddamandadi( 5.89 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - M) 1 5.89 LCB 4.712 - - - - Providing SVS toSakru Tanda,PAMIREDDIPALLY 5.89 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - GP,Peddamandadi(M) 1 5.89 LCB 4.712 - - - - Providing SVS toAchutapur,ACHUTAPUR GP,Wanaparthy(M) 14.57 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 14.57 LCB 11.656 - - - - Providing SVS toAnjangiri Tanda,KHASIMNAGAR 13.30 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Wanaparthy(M) 1 13.30 LCB 10.64 - - - - Providing SVS toBottonikunta,KADUKUNTLA 14.83 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Wanaparthy(M) 1 14.83 LCB 11.864 - - - - Providing SVS toChandapur Tanda,CHANDAPUR GP,Wanaparthy(M) 2.53 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 2.53 LCB 2.024 - - - - Providing SVS toCherumeedi Tanda,SAVAIGUDEM GP,Wanaparthy(M) 9.48 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 9.48 LCB 7.584 - - - - Providing SVS toGollonirallu,CHANDAPUR 13.77 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Wanaparthy(M) 1 13.77 LCB 11.016 - - - - Providing SVS toPedda Tanda,RAJAPET GP,Wanaparthy(M) 3.53 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 3.53 LCB 2.824 - - - - Providing SVS toRajanagar Temple,RAJANAGAR GP,Wanaparthy(M) 2.94 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 2.94 LCB 2.352 - - - - Providing SVS toSavaigudem,SAVAIGUDEM 11.77 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Wanaparthy(M) 1 11.77 LCB 9.416 - - - - Providing SVS toSrinivaspur,SRINIVASPUR 26.48 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Wanaparthy(M) 1 26.48 NCB 21.184 - - - - Providing SVS toThoorpu Tanda,CHITYAL GP,Wanaparthy(M) 3.71 28-Apr-12 30-Jun-12 30-Jul-12 NA NA 30-Jul-12 - 1 3.71 LCB 2.968 - - - - Providing SVS toWaddegeri,RAJANAGAR GP,Wanaparthy(M) 9.55 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 9.55 LCB 7.64 - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing SVS toKotha Tanda,KHASIMNAGAR 10.34 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - GP,Wanaparthy(M) 1 10.34 LCB 8.272 - - - - Providing SVS toVenkatapur,ANKOOR GP,Wanaparthy(M) 7.06 28-Apr-12 30-Jun-12 30-Jul-12 2-Aug-12 11-Sep-12 28-Sep-12 - 1 7.06 LCB 5.648 - - - - 7 SVS Batch-I in Providing Drinking water supply scheme DWSC (SVS) to Ellamapally (V) of Bejjanki (M) 1 9.68 9.68 LCB ______Karimnag ar Providing Drinking water supply scheme DWSC (SVS) to Sandaiahpally (V) of Dharmapuri 1 5.30 5.30 CC _ _ _ _ 28/12/2011 27/1/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Dharmasagarpally (V) of Koheda 1 3.35 3.35 CC _ _ _ _ 21/12/2011 3/2/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ramreddypally (V) of Mustabad 1 5.00 5.00 CC _ 0 28/12/2011 _ 28/12/2012 30/1/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Mamidigudem (V) of 1 5.95 5.95 CC ______Karimnag Mahamutharam (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Nethakanipalli (V) of Eliged (M) 1 3.00 3.00 CC _ 15/3/2012 _ 31/12/2011 3/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gangereddulawada (V) of Eliged 1 5.40 5.40 CC _ 15/3/2012 _ 31/12/2011 3/2/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Rajanagar (V) of Vemulawada (M) 1 5.70 5.70 CC _ 15/3/2012 _ 31/12/2011 1/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Goskulapalli (V) of Chandurthy 1 2.35 2.35 CC ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ramalingampally (V) of 1 17.00 17.00 LCB _ 40585 15/12/2011 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gadepally (V) of Dharmapuri(M) 1 22.22 22.22 LCB _ 40585 15/12/2011 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Baviguda (V) of Dharmapuri (M) 1 14.20 14.20 LCB _ 28/11/2011 15/12/2011 _ 28/12/2011 27/1/2012 ______Karimnag Karimnagar District ar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Drinking water supply scheme DWSC (SVS) to Ramaiahpally (V) of Dharmaram 1 18.24 18.24 LCB _ 28/11/2011 15/12/2011 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Velgipur (V) of Ellanthakunta (M) 1 22.50 22.50 LCB _ _ 28/12/2011 30/1/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Desaipet (V) of Gambiraopet (M) 1 8.00 8.00 LCB _ _ 28/12/2011 30/1/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Koparnaik thanda (V) of Husnabad 1 9.35 9.35 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Roda thanda (V) of Husnabad (M) 1 16.75 16.75 LCB _ 28/11/2011 15/12/2011 _ 28/12/2011 30/1/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Turkavanikunta (V) of Husnabad 1 14.40 14.40 LCB _ 28/11/2011 15/12/2011 _ 28/12/2011 30/1/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Yamapur (V) of Ibrahimpatnam 1 17.60 17.60 LCB _ 28/11/2011 15/12/2011 _ 28/12/2011 27/1/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Erdandi (V) of Ibrahimpatnam (M) 1 22.50 22.50 LCB _ 28/11/2011 15/12/2011 _ 31/12/2011 3/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Thippannapet (V) of Jagtial (M) 1 11.59 11.59 LCB _ 28/11/2011 15/12/2011 _ 16/1/2012 17/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Mallial (V) of (M) 1 13.96 13.96 LCB _ 28/12/2011 15/12/2011 _ 16/1/2012 17/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gunded (V) of Kamalapur (M) 1 17.63 17.63 LCB _ 28/12/2011 15/12/2011 _ 16/1/2012 17/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gopalpur (V) of Kamalapur (M) 1 11.51 11.51 LCB _ 28/12/2011 15/12/2011 _ 16/1/2012 17/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Deshrajpally (V) of Kamalapur 1 11.17 11.17 LCB _ 28/12/2011 15/12/2011 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Nakkireddypally (V) of Kamanpur 1 22.05 22.05 LCB _ 28/11/2011 15/12/2011 _ 17/2/2012 12/3/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Sriramulapally (V) of Karimnagar 1 8.94 8.94 LCB ______Karimnag (M) Karimnagar District ar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Drinking water supply scheme DWSC (SVS) to Chintakunta (V) of Karimnagar 1 13.02 13.02 LCB _ 28/11/2011 15/12/2011 _ 28/12/2011 30/1/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Jadaraopet (V) of Kataram (M) 1 20.23 20.23 LCB _ 28/11/2012 15/12/2011 _ 2/1/2012 7/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Chinthalapally (V) of Kataram (M) 1 14.41 14.41 LCB _ 28/11/2011 15/12/2011 _ 30/12/2011 1/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Shalapally (V) of Kataram (M) 1 16.74 16.74 LCB _ 0 0 _ 30/12/2011 1/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Medipally (V) of Kataram (M) 1 15.33 15.33 LCB _ 0 0 _ 17/2/2012 12/3/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Srinivasa colony (V) of Kataram 1 12.04 12.04 LCB _ 0 0 _ 17/2/2012 12/3/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Sriramulapally (V) of Kodimial 1 13.27 13.27 LCB _ 28/11/2011 15/12/2011 _ 17/2/2012 12/3/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kurmapally (V) of Kodimial (M) 1 19.88 19.88 LCB _ 28/11/2011 15/12/2011 _ 28/12/2011 30/1/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kishanraopet (V) of Korutla (M) 1 21.02 21.02 LCB _ 16/12/3011 21/12/2011 _ 28/12/2011 30/1/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kistapur (V) of Mahamutharam 1 15.17 15.17 LCB _ 0 0 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Narsingapur (V) of 1 21.82 21.82 LCB _ 0 0 _ 2/1/2012 7/2/2012 ______Karimnag Mahamutharam (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Yamanpally (V) of 1 18.32 18.32 LCB _ 0 0 _ 31/12/2011 3/2/2012 ______Karimnag Mahamutharam (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ramulapally (V) of 1 22.10 22.10 LCB _ 16/12/2011 21/12/2011 _ 17/2/2012 12/3/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gollapally (V) of Manthani (M) 1 21.15 21.15 LCB _ 16/12/2011 21/12/2011 _ 17/2/2012 12/3/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Patimidi thanda (V) of Metpally 1 15.13 15.13 LCB _ 16/12/2011 0 _ 17/2/2012 12/3/2012 ______Karimnag (M) Karimnagar District ar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Drinking water supply scheme DWSC (SVS) to Turkapally (V) of Mustabad (M) 1 6.80 6.80 LCB _ 26/12/2011 28/12/2011 _ 31/12/2011 3/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Budavarampet (V) of 1 10.45 10.45 LCB _ 26/12/2011 28/12/2011 _ 30/12/2011 1/2/2012 ______Karimnag (MNT) (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Amarabad (V) of Mutharam(MNT) 1 13.32 13.32 LCB _ 26/12/2011 28/12/2011 _ 28/12/2011 30/1/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Rajarampally (V) of Pegadapally 1 22.00 22.00 LCB _ 26/12/2011 28/12/2011 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Loknaik thanda (V) of Raikal (M) 1 13.38 13.38 LCB _ 26/12/2011 28/12/2011 _ 31/12/2011 3/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kurmapally (V) of Raikal (M) 1 13.52 13.52 LCB _ 26/12/2012 28/12/2011 _ 30/12/2011 1/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kothapally (V) of (M) 1 10.60 10.60 LCB _ 26/12/2011 28/12/2011 _ 30/12/2011 1/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Nallani thanda (V) of 1 17.01 17.01 LCB _ 26/12/2011 28/12/2011 _ 28/12/2011 30/1/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Pembatla (V) of Sarangapur (M) 1 19.80 19.80 LCB _ 26/12/2011 28/12/2011 _ 30/12/2011 1/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kandlapally (V) of Sarangapur 1 17.72 17.72 LCB _ 26/12/2011 28/12/2011 _ 30/12/2011 1/2/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Subhashnagar (V) of Thimmapur 1 20.70 20.70 LCB _ 26/12/2012 28/12/2011 _ 28/12/2011 30/1/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Thimmapur (V) of Chandurthy 1 19.75 19.75 LCB _ _ 16/1/2012 17/2/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gollapalli (V) of Chandurthy (M) 1 18.90 18.90 LCB _ _ 30/12/2011 1/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Sanugula (V) of Chandurthy (M) 1 22.30 22.30 LCB _ _ 31/12/2011 3/2/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Laxmipuram (V) of Ramagundam 1 9.15 9.15 LCB ______Karimnag (M) Karimnagar District ar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Drinking water supply scheme DWSC (SVS) to Mangalapally (V) of 1 19.60 19.60 LCB _ _ 31/12/2011 3/2/2012 ______Karimnag Beemadevarapally (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Potharam (V) of Bejjanki (M) 1 16.83 16.83 LCB _ 41217 _ 27/1/2012 27/1/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Yedepally (V) of Dharmapuri (M) 1 13.52 13.52 LCB _ 41217 16/4/2012 _ 27/1/2012 27/1/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Bakkarajampalli (V) of 1 14.41 14.41 LCB _ _ _ _ 27/1/2012 27/1/2012 ______Karimnag Ramagundam (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Keechulatapalli (V) of 1 15.29 15.29 LCB _ _ _ _ 27/1/2012 27/1/2012 ______Karimnag Ramagundam (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gollapally (V) of Shankarapatnam 1 16.38 16.38 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Allipoor (V) of Sulthanabad (M) 1 17.71 17.71 LCB _ _ 16/4/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Dumala (V) of Yellareddypet (M) 1 16.30 16.30 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Sirikonda (V) of Dharmapuri (M) 1 10.02 10.02 LCB _ 41217 16/4/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kothapally (V) of Dharmapuri (M) 1 15.88 15.88 LCB _ 41217 16/4/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ananthapally (V) of Boinpally (M) 1 28.65 28.65 NCB _ 40585 15/12/2011 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ramaiahpally (V) of Dharmapuri 1 23.00 23.00 NCB _ 28/11/2011 15/12/2011 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Chinthalapally (V) of Elakathurthy 1 27.17 27.17 NCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gangadevanpally (V) of Gollapally 1 24.70 24.70 NCB _ 28/11/2011 15/12/2011 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Dhammakkapet (V) of 1 25.32 25.32 NCB _ _ 16/4/2012 16/5/2012 ______Karimnag (M) Karimnagar District ar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Drinking water supply scheme DWSC (SVS) to Vemulakurthy (V) of 1 41.55 41.55 NCB _ 28/11/2011 15/12/2011 _ 16/4/2012 16/5/2012 ______Karimnag Ibrahimpatnam (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Shanigaram (V) of Kamalapur (M) 1 37.06 37.06 NCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Arepally (V) of Karimnagar (M) 1 32.50 32.50 NCB _ 28/11/2011 15/12/2011 _ 16/4/2012 16/5/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Peddapur (V) of Korutla (M) 1 23.31 23.31 NCB _ 16/12/3011 21/12/2011 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ippalapally (V) of (M) 1 27.53 27.53 NCB _ 0 0 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kondapur (V) of Medipalli (M) 1 26.69 26.69 NCB _ 41133 _ _ 25/12/2011 27/1/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Chelgal (V) of Jagityal (M) 1 37.10 37.10 NCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Yennamavadalapally (V) of 1 28.53 28.53 NCB _ 41217 ______Karimnag Dharmapuri (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Mallapur (V) of Dharmaram (M) 1 70.00 70.00 NCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ramakistapur (V) of Kodimial (M) 1 30.72 30.72 NCB _ 41217 16/4/2012 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kaleshwaram (V) of 1 40.00 40.00 NCB _ _ _ _ 16/4/2012 16/5/2012 ______Karimnag Mahadevapoor(M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Raghavapoor (V) of Peddapally 1 34.80 34.80 NCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Mallaiahpalli(V) of Sulthanabad 1 24.83 24.83 NCB _ _ _ _ 16/4/2012 16/5/2012 ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Jaggaiahpalli (V) of Srirampoor 1 70.50 70.50 _ _ _ _ _ 16/4/2012 16/5/2012 ______Karimnag (M) Karimnagar District ar

8 SVS in Batch-II&III Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Drinking water supply scheme DWSC (SVS) to Indiranagar (V) of Elkathurthy 1 21.61 21.61 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kothulanaduma (V) of 1 22.06 22.06 LCB ______Karimnag Elkathurthy (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Shantinagar (V) of Elkathurthy 1 23.94 23.94 NCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Veeranarayanapur (V) of 1 3.66 3.66 CC ______Karimnag Elkathurthy (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Baopeta (V) of Elkathurthy (M) 1 34.70 34.7 NCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Thimmapur (V) of Elkathurthy 1 27.95 27.95 NCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gunturpally (V) of Elkathurthy 1 3.20 3.2 CC ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Saidapur (V) of Arepally (M) 1 18.07 18.07 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Yelabotharam (V) of Saidapur 1 27.80 27.8 NCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Rayakal Thanda (V) of Saidapur 1 11.84 11.84 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to S.C.Colony (V) of Saidapur (M) 1 12.53 12.53 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Lmbd thanda (V) of Bmd pally 1 10.52 10.52 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Mala Pally (V) of Bmd pally (M) 1 17.32 17.32 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gollapally (V) of Bmd pally (M) 1 17.59 17.59 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Mustafapur (V) of Bmd pally (M) 1 19.91 19.91 LCB ______Karimnag Karimnagar District ar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Drinking water supply scheme DWSC (SVS) to Gollapally (V) of Bmd pally (M) 1 2.61 2.61 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Lambadi Thanda (V) of Bmd pally 1 13.67 13.67 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Maddivani Pally (V) of Bmd pally 1 7.35 7.35 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to B.C Colony (V) of Bmd pally (M) 1 11.27 11.27 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Sc Colony (V) of Bmd pally (M) 1 0.63 0.63 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Bc Colony (V) of Bmd pally (M) 1 15.55 15.55 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Meedi Thanda (V) of Bmd pally 1 16.40 16.4 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Rangareddy Thanda (V) of Bmd 1 6.95 6.95 LCB ______Karimnag pally (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Chantaiah Pally (V) of Bmd pally 1 23.25 23.25 NCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Chemalakuntapally (V) of 1 0.46 0.46 CC ______Karimnag Bejjanki (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Maddibanda (V) of Bejjanki (M) 1 7.37 7.37 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Salepally (V) of Bejjanki (M) 1 12.57 12.57 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ramsagar (V) of Bejjanki (M) 1 10.37 10.37 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Bejjanki Crossing (V) of Bejjanki 1 13.27 13.27 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Banjarupalli (V) of 1 13.46 13.46 LCB ______Karimnag Chigurumamidi (M) Karimnagar District ar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Drinking water supply scheme DWSC (SVS) to Pusaverlapally (V) of Husnabad 1 7.76 7.76 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Lingareddypalli (V) of Husnabad 1 1.99 1.99 CC ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Devanaik Thanda (V) of 1 7.64 7.64 LCB ______Karimnag Husnabad (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Manjya Thanda (V) of Husnabad 1 16.99 16.99 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Patharlapally (V) of Jammikunta 1 1.30 1.3 CC ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kanagarthy (V) of Jammikunta 1 33.21 33.21 NCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Madipally (V) of Jammikunta (M) 1 53.38 53.38 NCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ippalapalli (V) of 1 1.46 1.46 CC ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ilabad (V) of Veenavanka (M) 1 11.76 11.76 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Dharmaram (V) of Shnkr patnam 1 0.94 0.94 CC ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Rampur (V) of Huzurabad (M) 1 1.35 1.35 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ippalanarsingapur (V) of 1 45.84 45.84 NCB ______Karimnag Huzurabad (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kannur (V) of Kamalapur (M) 1 31.75 31.75 NCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Pochampet (V) of Sarangapur (M) 1 0.73 0.73 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Chitravenigudem (V) of 1 0.59 0.59 CC ______Karimnag Sarangapur (M) Karimnagar District ar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Drinking water supply scheme DWSC (SVS) to Govindapalli (V) of Dharmapuri 1 21.44 21.44 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Beersani (V) of Dharmapuri (M) 1 10.63 10.63 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Somanpalli (V) of Jagtial (M) 1 2.46 2.46 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Thimmapur (V) of Jagtial (M) 1 2.45 2.45 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Konerupally (V) of Choppadandi 1 10.18 10.18 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Karpakulapally (V) of Ramadugu 1 9.54 9.54 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kurmapalli (V) of Ramadugu (M) 1 16.46 16.46 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Velchala (V) of Ramadugu (M) 1 9.51 9.51 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Audarpalli (V) of Ramadugu (M) 1 21.95 21.95 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Govindpally (V) of Gollapally (M) 1 18.33 18.33 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Nachupally (V) of Kodimial (M) 1 8.65 8.65 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ramaraopet (V) of Kodimial (M) 1 13.68 13.68 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Pudur (V) of Kodimial (M) 1 1.49 1.49 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Apparaopet (V) of Kodimial (M) 1 6.83 6.83 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to (V) of Kodimial (M) 1 36.94 36.94 NCB ______Karimnag Karimnagar District ar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Drinking water supply scheme DWSC (SVS) to Chepyal (V) of Kodimial (M) 1 48.03 48.03 NCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kodimial (V) of Kodimial (M) 1 12.85 12.85 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Chinthalapally (V) of Kodimial 1 1.90 1.9 CC ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kondapur (V) of Kodimial (M) 1 13.46 13.46 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Santoshnagar (V) of Kamanpoor 1 1.04 1.04 CC ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Nrsmh puri conlony (V) of 1 1.04 1.04 CC ______Karimnag Kamanpoor (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Repallewada (V) of Kamanpoor 1 12.68 12.68 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gollapalle (V) of Kamanpoor (M) 1 19.60 19.6 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Maruthinagar (V) of Kamanpoor 1 1.80 1.8 CC ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Nawabpet (V) of Kamanpoor (M) 1 0.68 0.68 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gaddampalli (V) of Kamanpoor 1 0.33 0.33 CC ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Sala Pally (V) of Kamanpoor (M) 1 3.40 3.4 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kothapally (V) of Kamanpoor (M) 1 18.87 18.87 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Besthapalli (V) of Manthani (M) 1 2.83 2.83 ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Akkepalli (V) of Manthani (M) 1 12.30 12.3 LCB ______Karimnag Karimnagar District ar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Drinking water supply scheme DWSC (SVS) to Katukupalli (V) of Kataram (M) 1 11.72 11.72 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Laxmipur (V) of Kataram (M) 1 23.51 23.51 NCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gundurathpalli (V) of Kataram 1 20.99 20.99 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Raghupalli (V) of Kataram (M) 1 16.47 16.47 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Veerapur (V) of Kataram (M) 1 0.42 0.42 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Garepalli (V) of Kataram (M) 1 3.72 3.72 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ankusapur (V) of Kataram (M) 1 5.60 5.6 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Muranabad (V) of Kataram (M) 1 10.08 10.08 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Mahadevpoor (V) of 1 13.36 13.36 LCB ______Karimnag Mahadevpoor (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Medigadda (V) of Mahadevpoor 1 18.87 18.87 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gerraigudem (V) of 1 6.96 6.96 LCB ______Karimnag Mahadevpoor (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Mutharam (V) of Maha Mtrm (M) 1 22.68 22.68 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gajarampally (V) of Maha Mtrm 1 15.32 15.32 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Anjaneyapally (V) of Maha Mtrm 1 6.43 6.43 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Singaram (V) of Maha Mtrm (M) 1 14.61 14.61 LCB ______Karimnag Karimnagar District ar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Drinking water supply scheme DWSC (SVS) to Kondampet (V) of Malharrao (M) 1 18.34 18.34 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Subhashnagar (V) of Malharrao 1 10.07 10.07 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Pochampally (V) of Malharrao 1 29.62 29.62 NCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Mainampally (V) of Malharrao 1 16.57 16.57 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kapuram (V) of Malharrao (M) 1 6.44 6.44 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Pathapalle (V) of Malharrao (M) 1 12.23 12.23 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gadampalli (V) of Malharrao (M) 1 24.04 24.04 NCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gollapalli (V) of Mtrm (MNT) 1 8.81 8.81 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ramaiahpalli (V) of Mtrm (MNT) 1 0.46 0.46 CC ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Sanderelli (V) of Mtrm (MNT) 1 10.90 10.9 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Haripur (V) of Mtrm (MNT) (M) 1 0.42 0.42 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Mutharam (V) of Mtrm (MNT) 1 18.57 18.57 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Shathrajpally (V) of Mtrm (MNT) 1 14.05 14.05 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Venkateshwarlapalli (V) of Mtrm 1 1.26 1.26 CC ______Karimnag (MNT) (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Komatikondapur (V) of 1 15.28 15.28 LCB ______Karimnag Ibrahimpatnam (M) Karimnagar District ar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Drinking water supply scheme DWSC (SVS) to Mularampur (V) of 1 0.68 0.68 CC ______Karimnag Ibrahimpatnam (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Buggarasi Thanda (V) of 1 10.26 10.26 LCB ______Karimnag Yellareddypet (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Padira (V) of Yellareddypet (M) 1 2.45 2.45 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Upperigudem (V) of 1 11.67 11.67 LCB ______Karimnag Gambhiraopet (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Mallupally (V) of Gambhiraopet 1 12.02 12.02 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Dammannapet (V) of 1 1.76 1.76 LCB ______Karimnag Gambhiraopet (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Lambadithanda (V) of 1 21.71 21.71 LCB ______Karimnag Gambhiraopet (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kollamaddi (V) of Gambhiraopet 1 0.55 0.55 CC ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Rajupet (V) of Gambhiraopet (M) 1 0.32 0.32 CC ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to (V) of Gambhiraopet 1 71.19 71.19 NCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Mucherla (V) of Gambhiraopet 1 26.44 26.44 NCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Lambadithanda (V) of 1 11.10 11.1 LCB ______Karimnag Gambhiraopet (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gudem (V) of Musthabad (M) 1 69.81 69.81 NCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Gopalpally (V) of Musthabad (M) 1 8.08 8.08 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Mohinikunta (V) of Musthabad 1 13.08 13.08 LCB ______Karimnag (M) Karimnagar District ar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Providing Drinking water supply scheme DWSC (SVS) to Babajigudem (V) of Sircilla (M) 1 15.16 15.16 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ankusapur (V) of Sircilla (M) 1 15.85 15.85 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Chinthalapally (V) of Sircilla (M) 1 13.28 13.28 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Baddenapally (V) of Sircilla (M) 1 24.29 24.29 NCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Erraguntapally (V) of Sircilla (M) 1 14.19 14.19 LCB ______Karimnag Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kistaraopally (V) of 1 10.06 10.06 LCB ______Karimnag Ellanthakunta (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Pandalapoor (V) of Ellanthakunta 1 18.21 18.21 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kesannapally (V) of 1 1.01 1.01 CC ______Karimnag Ellanthakunta (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Thallapally (V) of Ellanthakunta 1 9.95 9.95 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Ramajipet (V) of Ellanthakunta 1 0.42 0.42 CC ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Venkatapoor (V) of Ellanthakunta 1 0.42 0.42 CC ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Thallallapally (V) of 1 0.37 0.37 CC ______Karimnag Ellanthakunta (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Venkatraopally (V) of 1 0.42 0.42 CC ______Karimnag Ellanthakunta (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Nakkapally (V) of Chandurthy 1 17.99 17.99 LCB ______Karimnag (M) Karimnagar District ar Providing Drinking water supply scheme DWSC (SVS) to Kashaiahpally (V) of Vemulawada 1 9.52 9.52 LCB ______Karimnag (M) Karimnagar District ar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T SVS in Batch-III 0 Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T 9 SVS in YSR(Kadapa) Post SVS for 22 habitations Batch I CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 31/7/2012 0.00 DWSC

Chairman PSC- Providing SVS to Gurramvandla Palli GURRAMVANDLAPALLI (hab) Gurramvandla Post Palli Village,Galiveedu 1 1.4235 1.4235 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Mandal 31/7/2012 0.00 DWSC

Chairman , PSC Providing SVS to MALAPALLI ,GPWSC Mala Palli Post Village of Veera Balli 1 1.5015 1.5015 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Mandal 31/7/2012 0.00 DWSC : Chairman , PSC ,GPWSC Providing SVS to Chinnareddigari Palli CHENNAREDDIGARIPALLI (h) Gadikota Post Village Veeraballi- 1 1.677 1.677 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Mandal 31/7/2012 0.00 DWSC

Chairman , PSC Providing SVS to ,GPWSC NETANAGADDAPALLI Netanagaddapalli (h)--- Post --Settipalli(v) 1 2.0475 2.0475 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Sambepalli Mandal 31/7/2012 0.00 DWSC Chairman , PSC ,GPWSC Golla Palli(h) Keasapuram Providing SVS to GOLLAPALLI Village Post Chinnamandem- 1 2.106 2.106 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Mandal 31/7/2012 0.00 DWSC

Providing SVS to DUGGAMVANDLAPALLI Post 1 2.2035 2.2035 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 31/7/2012 0.00 DWSC

Chairman , PSC Providing SVS to ,GPWSC Gangi Reddi GANGIREDDIKOTTALU Kottalu (h) -Miduthur Post Village Khajipeta 1 2.3205 2.3205 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Mandal 31/7/2012 0.00 DWSC

Chairman , PSC Providing SVS to KOMATIPALLI ,GPWSC (Savitramma Colony) Komatipalli(h) Post Gadikota Village 1 2.3205 2.3205 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Veeraballi-Mandal 31/7/2012 0.00 DWSC Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

Chairman , PSC Providing SVS to ,GPWSC MADIGAVONDLAPALLI Madigavandla Palli (h) Post Gadikota Village 1 2.496 2.496 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Veeraballi-Mandal 31/7/2012 0.00 DWSC

Chairman , PSC ,GPWSC Odetivandla Providing SVS to ODETIVANDLAPALLI Palli(h) -Dudyala Post Village Sambe Palli 1 2.535 2.535 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Mandal 31/7/2012 0.00 DWSC

Chairman , PSC ,GPWSC Providing SVS to NAYANIVARIPALLI NayanivariPalli Post Village of Sambe Palli- 1 2.6325 2.6325 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Mandal 31/7/2012 0.00 DWSC

Chairman , PSC Providing SVS to ,GPWSC - ALIGUNTAVARIPALLI AliguntavariPalli (h)---- Post - AliguntavariPalli (v) 1 2.886 2.886 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Galiveedu Mandal 0.5 DWSC

Chairman, Procurement Sub Providing SVS to KURAVAPALLI CommitteeVillage Post Chinnamandem- 1 3.12 3.12 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Mandal GPWSC GPWSC-Kurava Palli(h)0.00 VandadiDWSC

Chairman , PSC ,GPWSC Reddivari Providing SVS to REDDIVARI PALLE palli hab of – Post T.Sundupalli village 1 3.51 3.51 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 T.Sundupalli mandal 0.00 DWSC

Chairman , PSC Providing SVS to SUNKULAGARIPALLI ,GPWSC Sunkulugari H.W. palli HW(h) - Post Yerraballi Village 1 3.588 3.588 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Mydukur Mandal 31/7/2012 0.5 DWSC Chairman , PSC ,GPWSC Vadla palli Village of Providing SVS to VADLA PALLE –Thimmasamudram Post T.Sundupalli madndal 1 3.8025 3.8025 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Mandal 31/7/2012 0.00 DWSC

Chairman PSC- GPWSC-Konda Providing SVS to KONDAPALLI Palli(h) Dudyala Post Village , Sambe Palli 1 4.2705 4.2705 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Mandal 31/7/2012 0.00 DWSC Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Chairman PSC peddagollapalli,GPWS C peddagollapalli Providing SVS to PEDDAGOLLA PALLE (hab) -peddagollapalli Post Village Sundupalli 1 4.42 4.42 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Chairman,PSC,EpilavaMandal 31/7/2012 0.57 DWSC nkavandla madiga palli ,GPWSC- Providing SVS to Epilavanka madiga EPILAVANKAMADIGAPALI palli-(hab) - Post Gorlamudiveedu- 1 4.602 4.602 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Village , Rayachoty- 31/7/2012 0.00 DWSC Chairman , PSC ,GPWSC Providing SVS to MADHVANDLA MADHAVONDLAPALLI PALLI (h) Gadikota Post Village Veeraballi- 1 5.07 5.07 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Mandal 31/7/2012 0.00 DWSC

Chairman , PSC ,GPWSC Providing SVS to LOKAYAPALLI Lokayapalli(h) -GV Post Satram Village 1 5.2065 5.2065 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 Mydukur Mandal 31/7/2012 0.00 DWSC

Chairman , PSC Providing SVS to ,GPWSC RACHAMVANDLAPALLE Rachamvandla palli Post village T.Sundupalli 1 5.9865 5.9865 CC 17/09/2011 13/12/2011 18/1/2012 * NA NA 28/2/2012 Review 30/3/2012 mandal Post 10 SVS for 18 habitations Batch I Review N.Nagi Reddy,S/o N.Nagi Reddy, Providing SVS to SUGALITHANDA D.No.13/609, Post Sainathapuram, 1 7.2735 7.2735 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 Mydukur Mandal 27/08/2012 0.00 DWSC

Pothala Subbarayudu, S/o Chinna Guravaiah, Providing SVS to PONTHAGANI HW Venkatareddy palli Post (v),Kaluvai 1 7.7415 7.7415 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 Mandal, (Dt). 27/08/2012 0.00 DWSC

Pothala Subbarayudu, S/o Chinna Guravaiah, Providing SVS to S.R.KANDRIGA Venkatareddy palli Post (v),Kaluvai 1 8.33 8.33 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 Mandal,Nellore (Dt). 27/08/2012 0.00 DWSC

Pothala Subbarayudu, S/o Chinna Guravaiah, Providing SVS to SOMAMAKULAPALLI Venkatareddy palli Post (v),Kaluvai 1 8.7165 8.7165 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 Mandal,Nellore (Dt). 27/08/2012 0.00 DWSC Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T S.Venaktesh, Providing SVS to MIDUTHUR Papireddypalli, MALAWADA Post B.Mattam 1 8.7555 8.7555 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 27/08/2012 0.00 DWSC Sri .Vigneswara constructions ,H.No Providing SVS to SIRIGIRIPALLI 25/27,sanjeeva nagar, Post Nandyal, Kurnool 1 9.15 9.15 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 district. 27/08/2012 0.00 DWSC

Pothala Subbarayudu, S/o Chinna Guravaiah, Providing SVS to GANDHINAGAR Venkatareddy palli Post (v),Kaluvai 1 10.4325 10.4325 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 Mandal,Nellore (Dt). 27/08/2012 0.00 DWSC

D.V.Narasimha Reddy, S/o Providing SVS to BOTLACHERUVU D.Narasimhareddy, 1-426, Maruthi Nagar, Post Kadapa. 1 10.49 10.49 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 . 27/08/2012 0.00 DWSC M.Esurathnam, S/ o Chinna Providing SVS to BALARAJUPALLI Polaiah,Etukula padu, Post Kasinayana Mandal 1 11.466 11.466 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 27/08/2012 0.00 DWSC B.Viswanath Reddy, S/o Malla Reddy, Providing SVS to RAMASAMUDRAM Post Boyanapalli (v),Badvel 1 12.29 12.29 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 Mandal. V.Reddaiah ,Obulareddy gari Providing SVS to AMURIVANDLAPALLI Post palli (v),Ramapuram 1 14.5 14.5 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 Mandal 27/08/2012 0.00 DWSC

Pothala Subbarayudu, S/o Chinna Guravaiah, Providing SVS to SREERAMULUPET Venkatareddy palli Post (v),Kaluvai 1 14.937 14.937 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 Mandal,Nellore (Dt). 27/08/2012 0.00 DWSC K.Lakshmi Reddy, S/o K.Venkata Subba Reddy, Chadipiralla Providing SVS to MUNELLI (v),Kamalapuram Mandal Post 1 16.15 16.15 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 27/08/2012 0.00 DWSC P.Mohan Reddy Providing SVS to Post ,Annapusasatrulapalli( SANJEEVAREDDYPALL 1 17.0235 17.0235 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 v), Duvvur mandal 27/08/2012 0.00 DWSC P.Mohan Reddy ,Annapusasatrulapalli( Providing SVS to C.BAYANAPALLI Post v), Duvvur mandal 1 19.5 19.5 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 27/08/2012 0.00 DWSC Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T B.Viswanath Reddy, S/o Malla Reddy, Providing SVS to GUNTAPALLI Post Boyanapalli (v),Badvel 1 19.7145 19.7145 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 Mandal.

Pothala Subbarayudu, S/o Chinna Guravaiah, Providing SVS to KONDLOPALLI Venkatareddy palli Post (v),Kaluvai 1 20 20 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 Mandal,Nellore (Dt). 27/08/2012 0.00 DWSC K.Lakshmi Reddy, S/o K.Venkata Subba Reddy, Chadipiralla Providing SVS to DHODIUM (v),Kamalapuram Mandal Post 1 22.698 22.698 LCB 17/09/2011 13/12/2011 18/12/2011 * 10/12/2011 20/12/2011 02/02/2012 Review 28/2/2012 27/08/2012 0.00 DWSC 11 SVS for 3 Habs Batch I Post Providing SVS to NEW GOLLAPALLI 1 12 12 LCB 17/09/2011 13/12/2011 41186 * 15/4/2012 16/5/2012 30/5/2012 Review 15/6/2012 14/12/2012 0.00 DWSC Providing SVS to Post CHINNAGOLLAPALLE 1 7.9365 7.9365 LCB 17/09/2011 13/12/2011 41186 * 15/4/2012 16/5/2012 30/5/2012 Review 15/6/2012 14/12/2012 0.00 DWSC Post Providing SVS to RAJUPALEM 1 22.0545 22.0545 LCB 17/09/2011 13/12/2011 41186 * 15/4/2012 16/5/2012 30/5/2012 Review 15/6/2012 14/12/2012 0.00 DWSC Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T 12 SVS for 2 Habs Batch I

Providing SVS to T.SAKIBANDA Post 1 38.5 38.5 NCB 17/09/2011 13/12/2011 15/2/2012 * 15/2/2012 16/3/2012 15/4/2012 Review 30/4/2012 30/10/2012 0.00 DWSC

Providing SVS to SINGARAYA PALLI Post 1 28.1 28.1 NCB 17/09/2011 13/12/2011 15/2/2012 * 15/2/2012 16/3/2012 15/4/2012 Review 30/4/2012 30/10/2012 0.00 DWSC 13 SVS for 2 Habs Batch I

Providing SVS to REDDIVARIIPALLII Post AW 1 10.00 10.00 LCB 27/03/2012 26/04/2012 26/05/2012 * 28/05/2012 27/06/2012 17/07/2012 Review 16/08/2012 13/05/2013

Providing SVS to SETTYGUNTA RAILWAY STATION Post 1 9.00 9.00 LCB 27/03/2012 26/04/2012 26/05/2012 * 28/05/2012 27/06/2012 17/07/2012 Review 16/08/2012 13/05/2013 6 SVS for 2 Habs Batch I Post Providing SVS to N.PALAGIRI 1 86.00 86 NCB 17/09/2011 29/04/2012 29/05/2012 * 31/05/2012 30/06/2012 20/07/2012 Review 19/08/2012 16/05/2013 0.00 DWSC Providing SVS to LINGA REDDY Post KOTTALU 1 98.10 98.1 NCB 17/09/2011 29/04/2012 29/05/2012 * 31/05/2012 30/06/2012 20/07/2012 Review 19/08/2012 16/05/2013 0.00 DWSC 14 SVS BATCH II 100 HABS Post SVS for BatchII 31 habitations 31 3.59 111.19 CC 27/04/2012 27/05/2012 26/06/2012 * NA NA 17/08/2012 Review 16/09/2012 15/03/2013 0.00 DWSC Post SVS for BatchII 31 habitations 31 11.00 341.04 LCB 27/04/2012 27/05/2012 26/06/2012 * 28/06/2012 28/07/2012 17/08/2012 Review 16/09/2012 15/03/2013 0.00 DWSC Post SVS for BatchII 6 habitations 6 39.45 236.71 NCB 27/04/2012 27/05/2012 26/06/2012 * 28/06/2012 28/07/2012 17/08/2012 Review 16/09/2012 15/03/2013 0.00 DWSC Post SVS for BatchII balance12 habitations 12 10.13 52.07 CC 27/06/2012 27/07/2012 26/08/2012 * NA NA 17/10/2012 Review 16/11/2012 15/05/2013 0.00 DWSC Post SVS for BatchII balance 20 habitations 20 8.60 172.07 LCB 27/06/2012 27/07/2012 26/08/2012 * 28/08/2012 27/09/2012 17/10/2012 Review 16/11/2012 15/05/2013 0.00 DWSC 15 SVS BATCH III 45 HABS Post SVS for BatchIII 12 habitations 12 3.42 41.06 CC 27/04/2012 27/05/2012 26/06/2012 * NA NA 17/08/2012 Review 16/09/2012 15/03/2013 0.00 DWSC Post SVS for BatchIII 15 habitations 15 11.07 166.02 LCB 27/04/2012 27/05/2012 26/06/2012 * 28/06/2012 28/07/2012 17/08/2012 Review 16/09/2012 15/03/2013 0.00 DWSC Post SVS for BatchIII 2 habitations 2 36.23 72.46 NCB 27/04/2012 27/05/2012 26/06/2012 * 28/06/2012 28/07/2012 17/08/2012 Review 16/09/2012 15/03/2013 0.00 DWSC Post SVS for BatchIII balance 8 habitations 8 4.19 33.48 CC 27/06/2012 27/07/2012 26/08/2012 * NA NA 17/10/2012 Review 16/11/2012 15/05/2013 0.00 DWSC Post SVS for BatchIII balance 7 habitations 7 8.99 62.93 LCB 27/06/2012 27/07/2012 26/08/2012 * 28/08/2012 27/09/2012 17/10/2012 Review 16/11/2012 15/05/2013 0.00 DWSC Post SVS for BatchIII balance 1 habitations 1 55.00 55.00 NCB 27/06/2012 27/07/2012 26/08/2012 * 28/08/2012 27/09/2012 17/10/2012 Review 16/11/2012 15/05/2013 0.00 DWSC Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

SVS in Prakasam

16 SVS for 50 habs in Batch-I

Providing SVS to Madduluru 1 54.06 NCB 6/8/2011 6/18/2011 6/22/2011 6/15/2011 8/17/2011 2/23/2012 B.Ramanjanyalu 2.97

Providing SVS to G.Mekapadu 1 51.40 NCB 6/8/2011 6/18/2011 6/22/2011 6/15/2011 8/17/2011

Providing SVS to K.Thakkellepadu 1 33.00 NCB 7/12/2011 7/22/2011 7/12/2011 7/19/2011 8/30/2011 3/8/2012 B.Hari babu 2.30

Providing SVS to Nelaturivaripalem 1 9.11 LCB 7/12/2011 7/22/2011 7/12/2011 7/19/2011 8/30/2011 2/23/2012 R.Venkateswarlu 2.47

Providing SVS to Santhravuru 1 31.00 NCB 7/12/2011 7/22/2011 7/12/2011 7/19/2011 8/30/2011 3/13/2012 Kota.Venkateswarlu 1st call 19- 07-2011 Providing SVS to Bapujicolony 2nd call non 1 10.30 LCB 7/12/2011 7/22/2011 7/12/2011 7/19/2011 8/30/2011 response

Providing SVS to Jammalamadaka 1 42.55 NCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 2/15/2012 3/13/2012 G.Prabhakar 2.41

Providing SVS to Dappalampadu 1 28.44 NCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 3/13/2012 A.V.R.Infra pvt.ltd 1.26

Providing SVS to Kothareddypalem 1 17.98 LCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 2/15/2012 3/13/2012 G.Prabhakar 3.12

Providing SVS to Mogallur 1 40.04 NCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 3/13/2012 A.V.R.Infra pvt.ltd 3.91

Providing SVS to Siddayapalem 1 22.50 LCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 3/15/2012 N.Srinivasarao

Providing SVS to Gundlapallivaripalem 1 17.50 LCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 2/15/2012 3/13/2012 Ch.Subbarao

Providing SVS to Kothuru 1 19.70 LCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 2/15/2012 3/13/2012 G.Prabhakar 1.70

Providing SVS to Budamkayalapadu 1 12.40 LCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 2/15/2012 3/13/2012 G.Prabhakar

Providing SVS to H. Gudem 1 22.40 LCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 2/15/2012 3/13/2012 G.Prabhakar 1.25

Providing SVS to Badekhanpeta 1 24.00 NCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 2/15/2012 3/13/2012 G.Prabhakar

Providing SVS to G. Venkatapuram 1 17.00 LCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 2/15/2012 3/13/2012 G.Prabhakar 0.59

Providing SVS to Cuddaparajupalli 1 27.20 NCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 3/15/2012 N.Srinivasarao

Providing SVS to DVN Colony 1 25.50 NCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 3/15/2012 N.Srinivasarao Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

Providing SVS to Garapenta 1 4.52 CC 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011

Providing SVS to P. Naidupalem 1 49.90 NCB 8/16/2011 8/26/2011 8/16/2011 8/24/2011 10/5/2011 2/15/2012 3/13/2012 G.Prabhakar 2.38

Providing SVS to Mogallur 1 35.81 NCB 8/16/2011 8/26/2011 8/16/2011 8/24/2011 10/5/2011 2/15/2012 3/13/2012 G.Prabhakar

Providing SVS to Singasanipalli Non 1 23.67 NCB 10/29/2011 12/13/2011 response

Providing SVS to P. Annsamudram 1 34.52 NCB 10/29/2011 12/13/2011 3/13/2012 S.Sambha siva rao

Providing SVS to Salakanuthala 1 9.70 LCB 10/29/2011 12/13/2011 3/13/2012 Kota.Venakteswarlu 4.39

Providing SVS to Pothavaram 1 19.60 LCB 10/29/2011 12/13/2011

Providing SVS to V. Y Colony 1 35.00 NCB 11/13/2011 11/23/2011 11/13/2011 10/29/2011 12/13/2011 3/13/2012 Kota.Venakteswarlu

Providing SVS to Alluru Non 1 40.00 NCB 10/16/2011 10/26/2011 10/26/2011 10/29/2011 12/13/2011 response

Providing SVS to Juvvaleru 1 32.00 NCB 10/16/2011 10/26/2011 10/26/2011 10/29/2011 12/13/2011 3/7/2012 B.Hari babu 4.51

Providing SVS to M. T Raju colony 1 23.00 LCB 10/16/2011 10/26/2011 10/26/2011 10/29/2011 12/13/2011 3/13/2012 Kota.Venakteswarlu 5.90

Providing SVS to Cheruvukommupalem 1 49.90 NCB 10/29/2011 12/13/2011 3/13/2012 M/S Standerd infra

Providing SVS to Pedaganjam 1 49.00 NCB 10/29/2011 12/13/2011 3/13/2012 Kota.Venakteswarlu

Providing SVS to Survereddypalem 1 48.00 NCB 10/29/2011 12/13/2011 2/15/2012 3/13/2012 B.Ramanjaneyalu

Providing SVS to Ramakrishnapuram 1 145.00 NCB 11/22/2011 12/2/2011 12/5/2011 11/23/2011 2/15/2012 3/13/2012

Providing SVS to Ramannapeta 1 62.00 NCB 11/22/2011 12/2/2011 12/5/2011 11/23/2011 2/15/2012

Providing SVS to Rajubangarupalem 1 75.55 NCB 11/22/2011 12/2/2011 12/5/2011 11/23/2011 2/15/2012 3/13/2012

Providing SVS to Kommalapadu 1 95.00 NCB 11/22/2011 12/2/2011 12/5/2011 11/23/2011 2/15/2012 1st call Providing SVS to Sunkaravaripalem 04-08- 1 54.64 NCB 11/22/2011 12/2/2011 12/5/2011 11/23/2011 2/15/2012 2011 2nd

Providing SVS to Peda Venkannapalem 1 63.20 NCB 11/22/2011 12/2/2011 12/5/2011 11/23/2011 2/15/2012 2/15/2012 3/13/2012

Providing SVS to Kothapalem 1 63.00 NCB 11/22/2011 12/2/2011 12/5/2011 11/23/2011 2/15/2012

Providing SVS to Papayapalli 1 70.00 NCB 11/22/2011 12/2/2011 12/5/2011 11/23/2011 2/15/2012 Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

Providing SVS to Thungodu Non 1 13.75 LCB 7/12/2011 7/22/2011 7/12/2011 7/19/2011 8/30/2011 response

Providing SVS to Singarakondapalem 1 27.70 NCB 8/16/2011 8/26/2011 8/16/2011 8/24/2011 10/5/2011 3/13/2012 Kota.Venkateawarlu 2.58

Providing SVS to Thammadapalli 1 11.16 LCB 8/16/2011 8/26/2011 8/16/2011 8/24/2011 10/5/2011

Providing SVS to Kothapeta 1 24.46 NCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 3/13/2012 A.V.R.Infra 2.71

Providing SVS to Pedapallipalem 1 30.87 NCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 Kota.Venkateawarlu

Providing SVS to Talluru 1 27.95 NCB 8/16/2011 10/29/2011 12/13/2011 3/4/2012 B.Ramanjaneyalu 5.82

Providing SVS to Mittapalem 1 13.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012 K.Ajay kumar Ghosh

Providing SVS to Seetharampuram 1 18.00 LCB 8/8/2011 8/18/2011 8/8/2011 8/4/2011 9/5/2011 2/15/2012 3/13/2012 G.Prabhakar 2.86

Providing SVS to Peda Irlapadu 1 36.76 NCB 8/16/2011 8/26/2011 8/16/2011 8/24/2011 10/5/2011 2/15/2012 3/13/2012 G.Prabhakar 3.43

17 SVS for 3 habs in Batch-I (balance) 3 282.00 NCB 5/25/2012 6/10/2012 6/25/2012 7/10/2012 7/20/2012 8/5/2012 8/21/2012 DWSC

18 SVS for 61 habs in Batch-II

Providing SVS to Zillelamudi

1 22.00 LCB 1/18/2012 1/28/2012 1/18/2012 2/1/2012 3/28/2012

Providing SVS to Ananthavaram

1 23.00 LCB 1/18/2012 1/28/2012 1/18/2012 2/1/2012 3/28/2012

Providing SVS to Salladivaripalem 1 21.00 LCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Guntuvaripalli 1 20.00 LCB 1/20/2012 1/31/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Bapathipalli 1 19.00 LCB 1/20/2012 1/31/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Mulevaripalli 1 18.00 LCB 1/20/2012 1/31/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to East Polinenipalem 1 34.00 NCB 1/18/2012 1/28/2012 1/18/2012 2/1/2012 3/28/2012

Providing SVS to Vankamallivaripalem 1 36.00 NCB 1/18/2012 1/28/2012 1/18/2012 2/1/2012 3/28/2012

Providing SVS to 1 36.00 NCB 1/18/2012 1/28/2012 1/18/2012 2/1/2012 3/28/2012 Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

Providing SVS to Kothuru 1 32.00 NCB 1/18/2012 1/28/2012 1/18/2012 2/1/2012 3/28/2012

Providing SVS to Tativaripalem 1 40.00 NCB 1/18/2012 1/28/2012 1/18/2012 2/1/2012 3/28/2012

Providing SVS to Punurivaripalem 1 24.00 NCB 1/21/2012 1/31/2012 1/21/2012 2/1/2012 3/28/2012

Providing SVS to Kondayapalem 1 26.00 NCB 1/21/2012 1/31/2012 1/21/2012 2/1/2012 3/28/2012

Providing SVS to Nallareddypalli 1 24.00 NCB 1/21/2012 1/31/2012 1/21/2012 2/1/2012 3/28/2012

Providing SVS to T. Salluru 1 29.00 NCB 1/21/2012 1/31/2012 1/21/2012 2/1/2012 3/28/2012

Providing SVS to Mogilicherla 1 27.00 NCB 1/18/2012 1/28/2012 1/18/2012 2/1/2012 3/28/2012

Providing SVS to G. Ummadivaram 1 16.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Gutlapalli 1 20.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Battuvaripalli 1 18.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Sudivaripalem 1 17.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Gurrapadia 1 19.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Vema Yellaiah Nagar 1 12.00 LCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to K. Agraharam 1 20.00 LCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Inamanamelluru 1 12.00 LCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Chintayagaripalem 1 15.00 LCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Idupulapadu 1 24.00 NCB 3/2/2012 1/0/1900 3/9/2012

Providing SVS to Marrichetlapalem 1 25.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Patimeedpalem 1 25.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to T. Gudipadu 1 25.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Yarragudipadu 1 25.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Peda Kothapalli 1 25.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012 Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

Providing SVS to Lingamgunta 1 25.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Gurejepalli 1 28.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Yerrajerla 1 30.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Madanagopalapuram 1 30.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Janardhanapuram 1 31.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Koniki 1 33.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Ilavara 1 34.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to B. Machavaram 1 35.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Venkatadripalem 1 35.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Nennurapadu 1 36.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Narravaripalem 1 38.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Lakshmakkapalem 1 39.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Sanampudi 1 40.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Ramayapalem 1 40.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Paidipadu 1 43.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Veerepalli ST Colony 1 45.00 NCB 2/26/2013 3/6/2012 2/26/2013 3/9/2012

Providing SVS to Baddipudi 1 45.00 NCB 2/26/2013 3/6/2012 2/26/2013 3/9/2012

Providing SVS to Vellalacheruvu 1 45.00 NCB 2/26/2013 3/6/2012 2/26/2013 3/9/2012

Providing SVS to T. Kopperapadu 1 20.00 LCB 1/18/2012 1/28/2012 1/18/2012 2/1/2012 3/28/2012

Providing SVS to Reddypalem 1 46.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Vellaturu 1 47.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS toK. Bitragunta 1 48.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012 Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

Providing SVS to Polinenicheruvu 1 15.00 LCB 1/18/2012 1/28/2012 1/18/2012 2/1/2012 3/28/2012

Providing SVS to Chatukupadu 1 49.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Chevuru 1 50.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Kothapeta 1 40.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Chatukupadu 1 27.40 NCB 7/12/2011 7/22/2011 7/12/2011 7/19/2011 8/30/2011 3/13/2012

Providing SVS to Chevuru 1 50.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Kothapeta 1 40.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Mittapalem 1 27.40 NCB 7/12/2011 7/22/2011 7/12/2011 7/19/2011 8/30/2011 3/13/2012

19 SVS for 68 habs Batch-II (balance) 68 346 NCB April, 2012 May, 2012 June, 2012 July, 201 Aug, 2012 Sep, 2012 DWSC

20 SVS for 98 habs in Batch-III

Providing SVS to Pothavaram 1 19.60 LCB 7/12/2011 7/22/2011 7/12/2011 7/19/2011 8/30/2011

Providing SVS to Ananthavaram 1 22.00 LCB 1/18/2012 1/28/2012 1/18/2012 2/1/2012 3/28/2012

Providing SVS to Pullayapalli 1 22.00 LCB 1/18/2012 1/28/2012 1/18/2012 2/1/2012 3/28/2012

Providing SVS to Brundavanam 1 21.00 LCB 1/18/2012 1/28/2012 1/18/2012 2/1/2012 3/28/2012

Providing SVS to Eadara 1 15.00 LCB 1/18/2012 1/28/2012 1/18/2012 2/1/2012 3/28/2012

Providing SVS to China Uyyalawada 1 27.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Krishnapuram 1 29.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Pedauyyalawada 1 38.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to T.S. Puram 1 27.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Obbapuram 1 33.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Sangapuram 1 28.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Batlapalli 1 24.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012 Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

Providing SVS to Kommavaram 1 39.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Pulipadu 1 27.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Chintalapalem 1 30.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Ramabadrapuram 1 28.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Turakapalem 1 44.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Boppidivaripalem 1 49.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Tammaluru 1 49.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Pulimivaripalli 1 20.00 NCB 1/20/2012 1/30/2012 1/20/2012 2/1/2012 3/28/2012

Providing SVS to Chenchireddypalli 1 19.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Tamatamvaripalli 1 15.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Thugutlavaripalem 1 16.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Ramayanakandrika 1 15.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Pothavaram 1 18.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Satyanaranayapuram 1 12.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Venkamarripalem 1 14.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Sannamuru 1 23.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Siddareddypalem 1 12.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Ramapuram 1 23.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Battuvaripalli 1 13.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Ambapuram 1 15.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to C. Kothapalli 1 23.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Mallikarjunapuram 1 13.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012 Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

Providing SVS to Pedapenta 1 13.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Nagaiahkunta 1 13.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Saibabanagar 1 19.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS toSreenivasa Nagar 1 15.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Cumbumpadu 1 23.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to K.Mudivemula 1 22.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Mittapalem 1 13.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Lingamguntla 1 23.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Adivilopalli 1 12.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Annapureddypalli 1 11.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Pillipalli 1 17.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Mylucherla 1 12.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Khambampadu 1 22.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Ramapuram 1 13.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Naidupalem 1 20.00 LCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Chimalamarri 1 22.00 LCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Puttacheruvupalem 1 16.00 LCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Nelatur 1 15.00 LCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Maddirala 1 20.00 LCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Kamepallivaripalem 1 18.00 LCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Muppalla 1 18.00 LCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012 Providing SVS to Thippalurivaripalem (Thurpupalem) 1 20.00 LCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012 Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

Providing SVS to Chodavaram 1 16.00 LCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Vennuru 1 15.00 LCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Ananthavaram 1 15.00 LCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Alakurapadu 1 24.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to China Ravipadu 1 25.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Bakkireddypalem 1 25.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Endluru 1 25.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Jagarlamudi 1 25.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Kamepalli 1 25.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Peridepi 1 25.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Gannavaram 1 25.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Yeruvaripalli 1 25.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Thiragaladinne 1 25.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Buddapalli 1 25.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Bondalapadu 1 25.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Bodapadu 1 25.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Kovilampadu 1 25.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Polavaram 1 26.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Karumanipalli 1 26.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Darga 1 26.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Tadivaripalli 1 27.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Chintaguntla 1 27.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012 Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

Providing SVS to Yadavalli 1 27.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Ganjivaripalli 1 28.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Mundlamurivaripalem 1 30.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to 1 30.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Elurupadu 1 30.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Sunkireddypalem 1 32.00 NCB 2/26/2011 06-03-201 2/26/2011 3/9/2012

Providing SVS to Yeluru 1 34.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Rudravaram 1 35.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Lingamgunta 1 35.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Pondur 1 35.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to Martur 1 40.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to R. Lakshmipuram 1 42.00 NCB 2/26/2012 3/6/2012 2/26/2012 3/9/2012

Providing SVS to P. Araveedu 1 44.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Y. Cherlopalli 1 44.00 NCB 2/22/2013 3/2/2012 2/22/2013 3/9/2012

Providing SVS to Narasapuram 1 45.00 NCB 2/26/2013 3/6/2012 2/26/2013 3/9/2012

Providing SVS toParakondapadu 1 45.00 NCB 2/26/2013 3/6/2012 2/26/2013 3/9/2012

Providing SVS to Mugachintala 1 45.00 NCB 2/26/2013 3/6/2012 2/26/2013 3/9/2012

Providing SVS to Kankanampadu 1 25.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Rajupalem 1 28.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

Providing SVS to Adavirajupalem 1 50.00 NCB 2/22/2012 3/2/2012 2/22/2012 3/9/2012

21 SVS for 21 habs in Batch-III (balance) 21 400.00 NCB April, 2012 May, 2012 June, 2012 July, 2012

SVS inVisakhapatnam Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

22 SVS for 27 habs in Batch-I Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

27.01.2012 01.03.2012 Sri. M.Dharma Rao, Providing (SVS) to Kusalawada, SC Colony & & Mummidivaram, East 1 42 42 NCB 16.06.2011 18.06.2011 07.08.2011 14.07.2011 25.08.2011 Rs.35,99,999/- Rs.35,99,999/- Godavari Dist 30.11.2012 0.26 DWSC 27.01.2012 05.03.2012 Sri. V. Rama Rao, Providing (SVS) to Chinavangali & & Vijayawada, Krishna 1 20.9 20.9 NCB 16.06.2011 18.06.2011 07.08.2011 14.07.2011 25.08.2011 Rs.20,36,828/- Rs.20,36,828/- District 04.12.2012 0.43 DWSC 27.01.2012 05.03.2012 Sri. V. Rama Rao, Providing (SVS) to Hastinapuram & & Vijayawada, Krishna 1 23.1 23.1 NCB 16.06.2011 18.06.2011 07.08.2011 14.07.2011 25.08.2011 Rs.22,09,198/- Rs.22,09,198/- District 04.12.2012 0.24 DWSC 14.02.2012 09.03.2012 Sri. M.Dharma Rao, Providing (SVS) to Janguluruvelampalem & & Mummidivaram, East 1 42 42 NCB 20.07.2011 20.07.2011 20.07.2011 17.08.2011 21.09.2011 Rs.36,36,466/- Rs.36,36,466/- Godavari Dist 08.12.2012 1.89 DWSC Sri. A.V.Jagannadha 14.02.2012 14.03.2012 Rao, Neelampeta, Providing (SVS) to Pallavooru & & Narsipatnam , 1 22.4 22.4 NCB 18.07.2011 20.07.2011 20.07.2011 17.08.2011 21.09.2011 Rs.21,07,907/- Rs.21,07,907/- Visakhapatnam Dist 13.12.2012 3.15 DWSC

17.03.2012 Providing (SVS) to villages Rajanapalem & H/o Naidupalem 17.03.2012 & Rs.17,89,441/- 1 19.3 19.3 LCB 20.07.2011 20.07.2011 20.07.2011 17.08.2011 21.09.2011 Rs.17,89,441/- DWSC 27.03.2012 Providing (SVS) to village Tarluwada, H/o 27.03.2012 & Tarluwada & 1 28.5 28.5 NCB 12.09.2011 02.12.2011 03.12.2011 09.01.2012 09.02.2012 Rs.27,13,965/- Rs.27,13,965/- DWSC 24.03.2012 Providing (SVS) to village J.Kothapatnam 24.03.2012 & , H/o J.Kothapatnam & 1 32.3 32.3 NCB 17.09.2011 02.12.2011 03.12.2011 09.01.2012 09.02.2012 Rs.30,65,622/- Rs.30,65,622/- DWSC

15.03.2012 Providing (SVS) to village Pedaguda , H/o 15.03.2012 & Pedaguda & Rs.32,15,179/- 1 34.3 34.3 NCB 17.09.2011 02.12.2011 03.12.2011 09.01.2012 09.02.2012 Rs.32,15,179/- DWSC Providing (SVS) to 24.03.2012 24.03.2012 MATCHAVANIPALEM H/o & & MATCHAVANIPALEM 1 25.7 25.7 NCB 28.11.2011 16.12.2011 21.12.2011 10.01.2012 10.02.2012 Rs.24,04,567/- Rs.24,04,567/- DWSC 19.03.2012 19.03.2012 Providing (SVS) to Kallempudi & & 1 15.3 15.3 LCB 28.11.2011 16.12.2011 23.12.2011 19.01.2012 18.02.2012 Rs.13,54,902/- Rs.13,54,902/- DWSC

17.03.2012 Providing (SVS) to BHOOPATIPALEM & H/o KODURU 17.03.2012 & Rs.14,33,988/- 1 16.7 16.7 LCB 22.11.2011 16.12.2011 23.12.2011 19.01.2012 18.02.2012 Rs.14,33,988/- DWSC 17.03.2012 Providing (SVS) to DIBBAMEDAPALEM 17.03.2012 & H/o MAMIDILOVA & 1 18.6 18.6 LCB 22.11.2011 16.12.2011 23.12.2011 19.01.2012 18.02.2012 Rs.14,68,868/- Rs.14,68,868/- DWSC Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

17.03.2012 Providing (SVS) to KALLIVANIPALEM 17.03.2012 & H/o KAPULAUPPADA & Rs.14,99,930/- 1 16.2 16.2 LCB 22.11.2011 16.12.2011 23.12.2011 19.01.2012 18.02.2012 Rs.14,99,930/- DWSC

24.03.2012 24.03.2012 Providing (SVS) to GOVINDAPURAM & & H/o ZILLEDUPUDI Rs.11,37,884/- Rs.11,37,884/- 1 12.7 12.7 LCB 28.11.2011 16.12.2011 23.12.2011 19.01.2012 18.02.2012 DWSC 28.03.2012 Providing (SVS) toBheemunipatnam, H/o 28.03.2012 & P.Mallampeta & Rs.12,66,911/- 1 14 14 LCB 28.11.2011 16.12.2011 23.12.2011 19.01.2012 18.02.2012 Rs.12,66,911/- DWSC

02.04.2012 Providing (SVS) to KOMMIKA, H/o 02.04.2012 & KOMMIKA & Rs.25,27,553/- 1 26.6 26.6 NCB 02.01.2012 06.02.2012 06.02.2012 17.02.2012 20.03.2012 Rs.25,27,553/- DWSC

02.04.2012 Providing (SVS) to PEDAUPPERGUDAM 02.04.2012 & H/o VEMULAPUDI & Rs.12,66,418/- 1 14.3 14.3 LCB 28.11.2011 16.12.2011 23.12.2011 19.01.2012 18.02.2012 Rs.12,66,418/- DWSC 02.04.2012 Providing (SVS) to KOLLIVEEDHI H/o 02.04.2012 & MUSIDIPALLI & Rs.13,38,044/- 1 16.2 16.2 LCB 28.11.2011 16.12.2011 23.12.2011 19.01.2012 18.02.2012 Rs.13,38,044/- DWSC 02.04.2012 02.04.2012 Providing (SVS) to GOLLAPETA H/o & & TENUGUPUDI 1 15.8 15.8 LCB 28.11.2011 16.12.2011 23.12.2011 19.01.2012 18.02.2012 Rs.13,36,091/- Rs.13,36,091/- DWSC Providing (SVS) to M.MAKAVARAM 1 13.2 13.2 LCB 28.11.2011 16.12.2011 23.12.2011 19.01.2012 18.02.2012 DWSC Providing (SVS) to Kumundenpeta, 1 16.5 16.5 LCB 28.11.2011 16.12.2011 23.12.2011 19.01.2012 18.02.2012 DWSC Providing (SVS) to P.S.BONANGI, 1 31.75 31.75 NCB 05.12.2011 06.02.2012 06.02.2012 17.02.2012 20.03.2012 DWSC Providing (SVS) to KILAGADA 1 41.6 41.6 NCB 02.01.2012 06.02.2012 06.02.2012 17.02.2012 20.03.2012 DWSC Providing (SVS) to village DEVAPURAM, 1 35.9 35.9 NCB 02.01.2012 06.02.2012 06.02.2012 17.02.2012 20.03.2012 DWSC Providing (SVS) to village MINDIVANIPALEM &GUMMADIVANIPALEM 1 47.7 47.7 NCB 22.11.2011 16.12.2011 06.02.2012 17.02.2012 20.03.2012 DWSC Providing (SVS) to village MOSAYYAPETA 1 51.5 51.5 NCB 04.11.2011 04.02.2012 06.02.2012 17.02.2012 20.03.2012 DWSC SVS for 38 habs in Batch-I (Balance 23 Works) 38 20.80 790.40 NCB/LCB 1-May-12 5/16/2012 31-May-12 15-Jun-12 15-Jul-12 9-Aug-12 16-Aug-12 DWSC 24 SVS for 32 habs in Batch-II (First Phase) 32 24.00 768.00 NCB/LCB 1-Jun-12 6/16/2012 1-Jul-12 16-Jul-12 15-Aug-12 9-Sep-12 16-Sep-12 DWSC 25 SVS for 62 habs in Batch-II (second Phase) 62 24.00 1488.00 NCB/LCB 1-Aug-12 8/16/2012 31-Aug-12 15-Sep-12 15-Oct-12 9-Nov-12 16-Nov-12 DWSC 26 SVS for 62 habs in Batch-II (Third Phase) 62 24.00 1488.00 NCB/LCB 1-Oct-12 10/16/2012 31-Oct-12 15-Nov-12 15-Dec-12 9-Jan-13 16-Jan-13 DWSC 27 SVS for 22 habs in Batch-III(First Phase) 22 5.50 121.00 NCB/LCB 1-Jul-12 7/16/2012 31-Jul-12 15-Aug-12 14-Sep-12 9-Oct-12 16-Oct-12 DWSC SVS for 43 habs in Batch-III( Second 28 Phase) 43 20.00 860.00 NCB/LCB 1-Sep-12 9/16/2012 1-Oct-12 16-Oct-12 15-Nov-12 10-Dec-12 17-Dec-12 DWSC 29 SVS for 43 habs in Batch-III(Third Phase) 43 20.00 860.00 NCB/LCB 1-Nov-12 11/16/2012 1-Dec-12 16-Dec-12 15-Jan-13 9-Feb-13 16-Feb-13 DWSC Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T MVS(Common & intra village facilities) in II Six Districts 22 MVS in Adilabad

MVS Batch I (1 scheme) to 25 D.W.S.C- 1 560.00 560.00 NCB ------HABITATIONS Adilabad

PROVIDING M.V.S (6 schemes) to 63 D.W.S.C- 6 200 to 400 1760.00 NCB ------HABITATIONS Adilabad

PROVIDING M.V.S (3 schemes) to 92 D.W.S.C- 3 600 to 990 2190.00 NCB ------HABITATIONS Adilabad

M.V.S ( D.B.O) to KANAPUR,23 D.W.S.C- 1 170 170.00 ------HABITATIONS Adilabad

23 MVS inMahabubnagar

Extension of CPWS Scheme to Balmoor & 396.35 NCB 20-Apr-12 30-May-12 5-Jun-12 10-Jun-12 20-Jul-12 14-Aug-12 Lingal Mandals 1 396.35 317.08 - - - - - CPWSS to Beechpally and other habitations 1121.05 NCB 20-Apr-12 30-May-12 5-Jun-12 10-Jun-12 20-Jul-12 14-Aug-12 1 1121.05 896.84 - - - - - CPWSS to shadnagar and other Habitations 1997.62 NCB 20-Apr-12 30-May-12 5-Jun-12 10-Jun-12 20-Jul-12 14-Aug-12 1 1997.62 1598.10 - - - - - CPWSS to Gadwal Constituency 2565.45 NCB 20-Apr-12 30-May-12 5-Jun-12 10-Jun-12 20-Jul-12 14-Aug-12 1 2565.45 2052.36 - - - - - Drinking water Project (MVS) to NSS & 200.00 NCB 30-Jun-12 30-Jul-12 5-Aug-12 10-Aug-12 20-Sep-12 30-Oct-12 PC1 habitations in Deverkadra (M) 1 200.00 160.00 - - - - - Extension of Achampet Project to 100.00 NCB 30-Jun-12 30-Jul-12 5-Aug-12 10-Aug-12 20-Sep-12 30-Oct-12 Wanaparthy and Ghanpur Mandal 1 100.00 80.00 - - - - - Extension of CPWSS to Pebbair Mandal 150.00 NCB 30-Jun-12 30-Jul-12 5-Aug-12 10-Aug-12 20-Sep-12 30-Oct-12 1 150.00 120.00 - - - - - CPWSS to Madgul and other habs (Phase- 400.00 NCB 30-Jun-12 30-Jul-12 5-Aug-12 10-Aug-12 20-Sep-12 30-Oct-12 III) 1 400.00 320.00 - - - - - CPWSS to Pangal and other habitations in 400.00 NCB 30-Jun-12 30-Jul-12 5-Aug-12 10-Aug-12 20-Sep-12 30-Oct-12 Pangal mandal 1 400.00 320.00 - - - - -

23 MVS in Karimnagar

Providing 4 MVS to 47 Habitations under DWSC Batch I 4 6200 1550.00 NCB ______Karimnag ar PROVIDING 6 M.V.S to 150 DWSC HABITATIONS under Batch II 6 21600 3600.00 NCB ______Karimnag ar PROVIDING 4 M.V.S to38 DWSC HABITATIONS under Batch III 4 6400 1600.00 NCB ______Karimnag ar 24 MVS in YSR(kadapa)

MVS(Common & intra village facilities) Post Batch I 2 1485.00 2970.00 NCB 30/04/2012 7/29/2012 28/08/2012 * 30/08/2012 29/09/2012 19/10/2012 Review 18/11/2012 15/08/2013 0.00 DWSC MVS(Common & intra village facilities) Post Batch II 2 0.00 NCB 30/04/2012 5/30/2012 29/06/2012 * 01/07/2012 31/07/2012 20/08/2012 Review 19/09/2012 16/06/2013 0.00 DWSC 25 MVS in Prakasam

MVS-Batch-I 2 327.96 NCB 25/05/2012 6/10/2012 25/06/2012 10/07/2012 20/07/2012 05/08/2012 21/08/2012 DWSC Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T

MVS Batch II 3 470

MVS -Batch-III 12 1177.00 26 MVS in Visakhapatnam

to be MVS in Batch-I cleared by 1 1240.00 1240.00 NCB 1-Apr-12 5/31/2012 29-Aug-12 Bank 13-Sep-12 13-Oct-12 7-Nov-12 14-Nov-12 DWSC to be MVS in Batch-II cleared by 7 245.71 1720.00 NCB 1-Aug-12 9/30/2012 29-Dec-12 Bank 13-Jan-13 12-Feb-13 9-Mar-13 16-Mar-13 DWSC Rehabilitation and Augmentation in Six III Districts 27 Augmentation in Adilabad L.C.B / C.C Rehabilitation and Augmentation of S.V.S D.W.S.C- 254 0.20 to 20 682.95 ------10/31/2012 - to 254 Habitations Adilabad

Recharge of ground water source for 90 90 1.44 CC D.W.S.C- habitations 130.00 ------31-04-2013 - Adilabad

28 Augmentation in Mahabubnagr Aug of existing SVS in Mannapur,MANNAPUR GP,Dharur(M) 15.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 15.00 LCB 13.50 - - - - - Aug of existing SVS in Ananthapur,ANANTHAPUR 12.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 GP,Gadwal(M) 1 12.00 LCB 10.80 - - - - - Aug of existing SVS in Kurvapally,PARMALA GP,Gadwal(M) 15.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 15.00 LCB 13.50 - - - - - Aug of existing SVS in Pudur,PUDUR GP,Gadwal(M) 15.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 15.00 LCB 13.50 - - - - - Aug of existing SVS in Putanpally,VEERAPUR GP,Gadwal(M) 15.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 15.00 LCB 13.50 - - - - - Aug of existing SVS in Melacheruvu,MAILCHERU GP,Gadwal(M) 15.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 15.00 LCB 13.50 - - - - - Aug of existing SVS in Veerapuram,VEERAPUR GP,Gadwal(M) 15.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 15.00 LCB 13.50 - - - - - Aug of existing SVS in Chagadona,CHAGADONA GP,Ghattu(M) 16.65 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 16.65 LCB 14.99 - - - - - Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Aug of existing SVS in Ghattu,GHATTU GP,Ghattu(M) 18.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 18.00 LCB 16.20 - - - - - Aug of existing SVS in Mittadoddi,MITTADODDI GP,Ghattu(M) 8.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 8.00 LCB 7.20 - - - - - Aug of existing SVS in Penchikalpad,PENCHIKALPAD 13.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 GP,Ghattu(M) 1 13.00 LCB 11.70 - - - - - Aug of existing SVS in Mallampally,MALLAMPALLY 12.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 GP,Ghattu(M) 1 12.00 LCB 10.80 - - - - - Aug of existing SVS in Maldakal,MALDAKAL GP,Maldakal(M) 18.70 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 18.70 LCB 16.83 - - - - - Aug of existing SVS in Yelkur,YELKUR GP,Maldakal(M) 16.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 16.00 LCB 14.40 - - - - - Aug of existing SVS in Matoor,MATOOR GP,Doulthabad(M) 7.50 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 7.50 LCB 6.75 - - - - - Aug of existing SVS in Devunigudi Tanda,IPPARAPALLE GP,Keshampet(M) 15.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 15.00 LCB 13.50 - - - - - Aug of existing SVS in Elkaguda,PADMARAM GP,Kondurg(M) 12.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 12.00 LCB 10.80 - - - - - Aug of existing SVS in Indira Nagar,INDRANAGAR GP,Kondurg(M) 12.80 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 12.80 LCB 11.52 - - - - - Aug of existing SVS in Vallur,VALLUR GP,Itikyal(M) 7.50 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 7.50 LCB 6.75 - - - - - Aug of existing SVS in Chandur,PALLEPADU GP,Manopad(M) 10.00 25-Mar-12 28-Mar-12 5-Apr-12 30-Mar-12 11-May-12 20-May-12 1 10.00 LCB 9.00 - - - - - Aug of existing SVS in Hajipally,HAJIPALLE GP,Faroooqnagar(M) 28.60 25-Apr-12 1-May-12 4-May-12 10-May-12 20-Jun-12 10-Jul-12 1 28.60 NCB 22.88 - - - - - Aug to SVS villages (97) works 230.00 25-Mar-12 30-Mar-12 30-Apr-12 97 2.371134 CC 184.00 - - - - - Aug to SVS villages (126) works 267.25 15-May-12 30-May-12 30-Jun-12 126 2.7551546 CC 213.80 - - - - - Recharging Ground Water Sources(50) Habs 50.00 30-Jun-12 30-Jul-12 10-Aug-12 16-Aug-12 30-Sep-12 20-Oct-12 50 1 NCB/LCB/CC 40.00 - - - - - 29 Augmentation in Karimnagar Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Rehabilitation and Augmentation of S.V.S DWSC to 102 Habitations 102 4.27 436.00 LCB/CC 4/2/2012 24/3/2012 23/4/2012 - 8/5/2012 7/6/2012 22/6/2012 - 1/2/2013 - - - Karimnag ar Recharge of ground water source for144 DWSC habitations 144 4.63 667.00 LCB/CC 1/9/2012 16/9/2012 15/11/2012 - 1/12/2013 1/1/2013 15/01/2013 - - - - - Karimnag ar 30 Augmentation in YSR(kadapa) Post Augmentation of Existing SVSchemes 34 3.08 104.70 CC 30/05/2012 5/30/2012 29/06/2012 * NA NA 10/07/2012 Review 25/07/2012 23/09/2012 0.00 DWSC

Augmentation of Existing SVSchemes Post 34 11.53 391.90 LCB 27/05/2012 7/26/2012 25/08/2012 * 27/08/2012 26/09/2012 16/10/2012 Review 15/11/2012 14/01/2013 0.00 DWSC 31 Augmentation in Prakasam

Improving ground water sources 33 100.00 Shopping June, 2012 DWSC

Improving ground water sources 17 50.00 Shopping June, 2012 Community Augmentation of Existing SVSchemes Contracting 132 795.00 /W9 June, 2012 July, 2012 Aug, 2012 Sep, 2012 Oct, 2012 Nov, 2012 DWSC 32 Augmentation in Visakhapatnam Augmentation of Existing SVSchemes (First NCB/Shoppi Phase) 29 16.300 472.70 ng 1-May-12 5/16/2012 31-May-12 15-Jun-12 15-Jul-12 9-Aug-12 16-Aug-12 DWSC Augmentation of Existing SVSchemes NCB/Shoppi (Second Phase) 15 16.300 244.50 ng 1-Jul-12 7/16/2012 31-Jul-12 15-Aug-12 14-Sep-12 9-Oct-12 16-Oct-12 DWSC Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T IV Environmental sanitation in Six Districts 33 Environmental sanitation in Adilabad ISLs in BPL Households 5100 5100 0.035 D.W.S.C- 178.50 CC - - - - 6/30/2013 - Adilabad Pavements, drains and SLWM in major GPs- 4 30 NCB D.W.S.C- 4 G.Ps 120.00 - - - - 6/30/2013 - Adilabad

Soak pits in project habitations-180 9000 0.01 D.W.S.C- Habitations 90.00 C.C - - - - 6/30/2013 - Adilabad

34 Environmental sanitation in Mahabubnagar Pavements, Drains, Solid and liquid waster 50.00 30-Jun-12 30-Jul-12 10-Aug-12 16-Aug-12 30-Sep-12 20-Oct-12 management in Major GPs(2) GPs 2 25 NCB/LCB/CC 40.00 - - - - - ISLs for BPL House Holds(3000) 105.00 30-Jun-12 CC CC CC CC 30-Jun-12 3000 0.035 CC 10.50 - - - - - Soak pits for BPL House Holds(40) Habs 15.50 30-Jun-12 CC CC CC CC 30-Jun-12 1550 0.01 NCB/LCB/CC 15.50 - - - - - 35 Environmental sanitation in Karimnagar ISLs in BPL Households DWSC 15257 0.035 534.00 CC 1/12/2012 16/12/2012 ------15/1/2013 - - Karimnag ar Pavements, drains and SLWM in major DWSC GPs12 12 25.5 306.00 NCB 1/6/2012 16/6/2012 ------15/1/2013 - - Karimnag ar Soak pits in project habitations- DWSC 45200Habitations 45200 0.005 226.00 CC 1/12/2012 16/12/2012 ------15/1/2013 - - Karimnag ar 36 Environmental sanitation in YSR(kadapa) Post Pavements, drains and SLWM in major GPs 1 300.00 300.00 NCB 27/09/2012 11/26/2012 26/12/2012 * 28/12/2012 27/01/2013 16/02/2013 Review 18/03/2013 13/12/2013 0.00 DWSC Under Ground Drainage(UGD) 0.00 0.00 DWSC Soak pits in habitations to be provided with Post water supply under the Project 7500 0.012 90 CC 15/07/2012 NN NN * NA NA 28/02/2013 Review NN 28/02/2013 0.00 DWSC Post ISL in BPL Households 7500 0.03 240.00 CC 15/07/2012 NN NN * NA NA 28/02/2013 Review NN 28/02/2013 0.00 DWSC 37 Environmental sanitation in Prakasam Under Ground Drainage System to Mandal Head Quarters 2 618.00 NCB DWSC

Pavements, drains and SLWM in major GPs 8 310.00 NCB DWSC Soak pits in habitations to be provided with CC(through water supply under the Project 440 226.00 benificiary) June, 2012 July, 2012 Aug, 2012 Sep, 2012 Oct, 2012 Nov, 2012 DWSC CC(through ISL in BPL Households 15310 557.00 benificiary) DWSC Environmental sanitation in 38 Visakhapatnam NCB/Shoppi Pavements, drains and SLWM in major GPs 4 38.25 153.00 ng 1-Jan-13 1/16/2013 31-Jan-13 15-Feb-13 17-Mar-13 11-Apr-13 18-Apr-13 DWSC Soak pits in habitations to be provided with CC(through water supply under the Project 77 0.465 35.81 benificiary) 1-Aug-12 8/16/2012 15-Sep-12 DWSC CC(through ISL in BPL Households 77 2.62 202.05 benificiary) 1-Aug-12 8/16/2012 15-Sep-12 DWSC V Other Components in Adilabad Description of Works Bids Banks no Estimate Banks no Pac Total Design objection Contract award Expendit No of Method of prepared and Preparation of objection Contract signed Date of Impleme Sl. kag Estimted investigation to decided Name of the ure Scheme Procureme sanctioned bid document contract (Date/Value/Cur completion to nting No. e Unit cost Cost (Rs completed bidding (Date/Value/Curre Contractor incurred Description of Works s nt (Date & (Date) Invitation Opened on award rency) contractor agency No. (Rs Lakhs) Lakhs) (Date) document ncy) to Date (Contra Value) (Date) (Date) (Date) cts) (Date)

A B C D E F G H I J K L M N O P Q R S T Rain Water Harvesting Structures a CC construction of schemes with innovative b technologies 1 450.00 450.00 NCB Other Components in Mahabubnagar Rain Water Harvesting Structures( 30) Habs 15.00 30-Jun-12 30-Jul-12 10-Aug-12 16-Aug-12 30-Sep-12 20-Oct-12 a 30 0.5 NCB/LCB/CC 8.00 - - - - - construction of schemes with innovative technologies(2) Habs 20.00 30-Jun-12 30-Jul-12 10-Aug-12 16-Aug-12 30-Sep-12 20-Oct-12 b 2 10 NCB/LCB/CC 16.00 - - - - - Other Components in Karimnagar Rain Water Harvesting Structures a CC construction of schemes with innovative b technologies NCB V Other Components in YSR(Kadapa) Post a Roof top Rain water harvesting 100 0.60 60.00 CC 6/30/2012 30/07/2012 * NA NA 30/07/2012 Review 30/08/2012 29/10/2012 0.00 DWSC Post b Innovative technology 1 450.00 450.00 NCB 30/04/2012 7/29/2012 28/08/2012 * 30/08/2012 29/09/2012 19/10/2012 Review 18/11/2012 15/08/2013 0.00 DWSC Post c Improving ground water sources 15 3.00 45.00 CC 30/06/2012 7/30/2012 29/08/2012 * 31/08/2012 30/09/2012 20/10/2012 Review 19/11/2012 17/02/2013 0.00 DWSC Other Components in Prakasam a 1-July-12 Roof top Rain water harvesting 1st Augt, 2012 DWSC 100 30.00 Shopping Onwards 30-08-2012 Sep, 2012 Oct, 2012 Nov, 2012 Nov, 2012 DWSC b Roof top Rain water harvesting 100 30.00 Shopping Sep, 2012 Oct, 2012 30-10-2012 Nov, 2012 Dec, 2012 Jan, 2012 Feb, 2012 DWSC NCB/ Innovative technology c 5 134.00 Shopping DWSC Other Components in Visakhapatnam a Roof top Rain water harvesting 20 0.28 5.59 Shopping 1-Aug-12 8/16/2012 31-Aug-12 15-Sep-12 15-Oct-12 9-Nov-12 16-Nov-12 DWSC b Innovative technology 2 32.24 64.48 NCB 1-Jan-13 1/16/2013 31-Jan-13 15-Feb-13 17-Mar-13 11-Apr-13 18-Apr-13 DWSC

Note:(1)* Using theModel document cleared by WB including Relaxations received from WB (2) LCB:W9 document (Shopping with advertaisement.

All shopping contracts shall be within the agreed threshold of $ 50000. # First two SVS contracts from each District irrespective of the value and first MVS contract shall be prior reviewed by the Bank All contracts >=$1,000,000 shall be prior reviewed by the Bank Direct Contractig : All direct contracting will require Bank prior clearance CC: Community Contracting Abbreviations:SVS - Single village Scheme, MVS -, MVS-Multi Village Scheme RURAL WATER SUPPLY APRWSS PROJECT (APRWSSP) Procurement Plan for Works upto June'2013

Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U Remarks

U

2nd Call

2nd Call

2nd Call Remarks

U

(tenders in Process)

(tenders in Process)

(revised Admin Sanction)

(revised Admin Sanction)

NCB

NCB Remarks

U Remarks

U

Non response 1st call 15- 06-2011 2nd call 1st call 15- 06-2011 2nd call 1st call 15- 06-2011 settled in 1st call 04- 08-2011 2nd call Remarks

U

1st call 15- 06-2011 settled in

1st call 19- 07-2011 2nd call responsive 1st call 19- 07-2011 2nd call responsive 1st call 19- 07-2011 2nd call responsive Remarks

U Remarks

U

1st call 19- 07-2011 2nd call Remarks

U

1st call 19- 07-2011 2nd call Remarks

U Remarks

U Remarks

U Remarks

U

DWSC Remarks

U Remarks

U Remarks

U Remarks

U

RWS&S, MBNR RWS&S, MBNR RWS&S, MBNR RWS&S, MBNR RWS&S, MBNR RWS&S, MBNR RWS&S, MBNR RWS&S, MBNR RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR

RWS&S, MBNR RWS&S, MBNR RWS&S, MBNR Remarks

U Remarks

U

RWS&S, MBNR RWS&S, MBNR RWS&S, MBNR Remarks

U

RWS&S, MBNR

RWS&S, MBNR ANDHRA PRADESH RURAL WATER SUPPLY APRWSS PROJECT (APRWSSP) Procurement Plant For Consultancy upto June'2013

Evalution No Objection REP to be by the Bank Final No objection Proposals Fianalised (Technical/ Estimate Advertising TOR/Shor Draft to from Bank to be (Technical/ Services to Unit cost Methods #Combined/ Contract Name of Sl. Packa Description of No of d Cost for Short tList be for RFP Issued Received #Combined be Exp. Incured Implementing (Rs. of Draft Numbers. Value Consultant, No. ge No. services contracts (Rs. listing Finalised forwarde TOR/Shortli (Date) by the / Draft Completed to Date agency Lakhs) Selection Contract/ and Curency Nationality Lakhs) (Date) (Date) d to the st/Final RFP Porject Contract/ (Date) Final Bank (Date) Authorities Final Contract) (Date) Contract) (Date)** (Date)**

A B C D E F G H I J K L M N O P Q R S T Consultancy services in PSU Development of 1 Web based M & 1 75 75 SS NIC, GOI, O+3 yrs PSU E Independent Construction 1-June-12 2 quality 1 40.00 40.00 QCBS H+15 I+7 L+30 M+15 N+7 PSU Onwards surveillance consultants

Consultancy for 1-July-12 3 1 20.00 20.00 CQ H+15 I+7 L+30 M+15 N+7 PSU Internal Audit Onwards Training and 4 Capcity Building4 Software Muffakham Applications in 1/0.28/INR in Jah College of a water supply & 1 0.28 0.28 19.02.2011 22.01.2011 PSU Lakhs Engg & Tech., sewerage systems Training on World Bank 1/6.265/INR in ASCI, b Procurement 1 7.02 7.02 25.03.2011 30.03.2011 PSU Lakhs Hyderabad Procedures & Systems Training on World Bank 1/4.23/INR in NIFM, New c Procurement 1 4.23 4.23 30.09.2011 Lakhs Delhi Procedures & Systems DWSC d 1 2.30 2.30 SS/FA AMR- APARD Apr-12 PSU Orientation DWSC experience e 6 2.82 16.92 SS/FA AMR- APARD Apr-13 PSU sharing and review workshop CLTS, Community action planning & f 2 4.75 9.50 SS/FA AMR- APARD Sep-13 PSU monitoring and Community Empowerment Evalution No Objection REP to be by the Bank Final No objection Proposals Fianalised (Technical/ Estimate Advertising TOR/Shor Draft to from Bank to be (Technical/ Services to Unit cost Methods #Combined/ Contract Name of Sl. Packa Description of No of d Cost for Short tList be for RFP Issued Received #Combined be Exp. Incured Implementing (Rs. of Draft Numbers. Value Consultant, No. ge No. services contracts (Rs. listing Finalised forwarde TOR/Shortli (Date) by the / Draft Completed to Date agency Lakhs) Selection Contract/ and Curency Nationality Lakhs) (Date) (Date) d to the st/Final RFP Porject Contract/ (Date) Final Bank (Date) Authorities Final Contract) (Date) Contract) (Date)** (Date)**

A B C D E F G H I J K L M N O P Q R S T Source and Catchment Protection and g 3 4.75 14.26 SS/FA AMR- APARD PSU Management of Dec – 12 Solid Waste and Waste Water Environmental

h Management 3 4.75 14.26 SS/FA AMR- APARD PSU Feb - 13 Framework Monitoring and i 3 4.14 12.42 SS/FA AMR- APARD PSU Evaluation Mar - 13 Social Accountability and Community j 3 4.14 12.42 SS/FA AMR- APARD PSU Based Jan - 13 Sustainability Monitoring Training on Establishment of O&M Planning k 1 6.84 6.84 SS/FA ESCI- HYD PSU and Management Jan - 13 Systems for SVS & MVS Training on Management and Supervision of Service Agencies l for Construction 1 6.84 6.84 SS/FA ESCI- HYD PSU Oct- 12 Supervision Works & Quality Control and Assurance Training on Water Quality m 2 7.99 15.98 SS/FA ESCI- HYD Feb-13 PSU Monitoring and Surveillance Feasibility Studies, n engineering 2 7.99 15.98 SS/FA ESCI- HYD PSU Aug - 12 survey and design and Contract o 3 6.84 20.52 SS/FA ESCI- HYD Jan-13 PSU Management Procurement and Financial Management for p 6 17.64 105.84 SS/FA ASCI - HYD Apr-13 PSU Grassroots organizations such as GPs Evalution No Objection REP to be by the Bank Final No objection Proposals Fianalised (Technical/ Estimate Advertising TOR/Shor Draft to from Bank to be (Technical/ Services to Unit cost Methods #Combined/ Contract Name of Sl. Packa Description of No of d Cost for Short tList be for RFP Issued Received #Combined be Exp. Incured Implementing (Rs. of Draft Numbers. Value Consultant, No. ge No. services contracts (Rs. listing Finalised forwarde TOR/Shortli (Date) by the / Draft Completed to Date agency Lakhs) Selection Contract/ and Curency Nationality Lakhs) (Date) (Date) d to the st/Final RFP Porject Contract/ (Date) Final Bank (Date) Authorities Final Contract) (Date) Contract) (Date)** (Date)**

A B C D E F G H I J K L M N O P Q R S T World Bank Procurement q 1 20.41 20.41 SS/FA ASCI - HYD PSU Procedures and Aug- 12 Systems

Change r 6 17.64 105.84 SS/FA ASCI - HYD Apr-13 PSU Management

s Staff Retreat 1 8.88 8.88 SS/FA PSU-HYD PSU Sep - 12

Observation study tours to t other successful 5 3.20 16.00 SS/FA PSU-HYD Feb-13 PSU RWSS Projects in

Observation study tours to u other successful 1 119.00 119.00 SS/FA PSU-HYD PSU Nov- 12 RWSS Projects abroad Consultancy services in Six Districts M&E, CS & ESA 1 in Adilabad a Engineering DWSC- Support Activities Adilabad Engineering 1 21.8000 21.8 LCS - 6/7/2011 - 3/16/2011 5/13/2011 - 6/28/2011 - AE1/02/APRWS M/S J.C.E 9/7/2011 Rs 16,75,567/- DWSC- Support Activities SP/2011- Engneerng & Adilabad SVS - I 12,Dated:07-07- Management 2011. Value Rs Services Pvt 17.8 Lakhs, Ltd,Gurgaon.Nat currency Indian ionality:Indian. Rupees Evalution No Objection REP to be by the Bank Final No objection Proposals Fianalised (Technical/ Estimate Advertising TOR/Shor Draft to from Bank to be (Technical/ Services to Unit cost Methods #Combined/ Contract Name of Sl. Packa Description of No of d Cost for Short tList be for RFP Issued Received #Combined be Exp. Incured Implementing (Rs. of Draft Numbers. Value Consultant, No. ge No. services contracts (Rs. listing Finalised forwarde TOR/Shortli (Date) by the / Draft Completed to Date agency Lakhs) Selection Contract/ and Curency Nationality Lakhs) (Date) (Date) d to the st/Final RFP Porject Contract/ (Date) Final Bank (Date) Authorities Final Contract) (Date) Contract) (Date)** (Date)**

A B C D E F G H I J K L M N O P Q R S T Engineering 1 - 20.65 LCS 9/22/2011 10/14/2011 - 3/16/2011 12/14/2011 - - MT1/APRWSSP M/S Max 5/12/2012 - DWSC- Support Activities /WB/ADB/04/20 Consulting Adilabad SVS - II 11-12, Services,Hydera Dated:14.02.201 bad.Nationality:I 2. Value Rs ndian. 11.56 Lakhs, currency Indian Rupees

Engineering 1 22.9 LCS 11/14/2011 3/13/2012 3/13/2012 4/13/2012 4/30/2012 DWSC- Support Activities Adilabad SVS III

Engineering 1 7.95 7.95 LCS 3/13/2012 3/13/2012 4/13/2012 4/30/2012 - - - - - DWSC- Support Activities Adilabad MVS - I

Engineering 1 16.35 16.35 LCS 3/14/2012 3/14/2012 4/14/2012 4/30/2012 - - - - - DWSC- Support Activities Adilabad MVS II Engineering 1 29.1 29.1 LCS 3/14/2012 3/14/2012 4/14/2012 4/30/2012 - - - - - DWSC- Support Activities Adilabad MVS III D B O Engineering 1 ------DWSC- Support Activities Adilabad

M&E, CS & ESA 5 in Mahabubnagar a Engineering DWSC- Support Activities Adilabad Providing 1 19.00 19.00 LCS 15/03/2011 7/4/2011 8/4/2011 - 8/4/2011 21/04/2011 24/05/2011 - Contact Agr. M/s. Laurel 8/9/2011 - RWS & S, Engineering & Amended No.- 4/2011-12 Consulting Mahabubnagar Support Activites ( on dated 08/7/2011, Engineers, Technical 25/03/2011 19.00 Hyderabad Consultancy Lakhs/INR Services) FOR Batch - I SVS Habitations to DPSU, APRWSSP, MBNR Evalution No Objection REP to be by the Bank Final No objection Proposals Fianalised (Technical/ Estimate Advertising TOR/Shor Draft to from Bank to be (Technical/ Services to Unit cost Methods #Combined/ Contract Name of Sl. Packa Description of No of d Cost for Short tList be for RFP Issued Received #Combined be Exp. Incured Implementing (Rs. of Draft Numbers. Value Consultant, No. ge No. services contracts (Rs. listing Finalised forwarde TOR/Shortli (Date) by the / Draft Completed to Date agency Lakhs) Selection Contract/ and Curency Nationality Lakhs) (Date) (Date) d to the st/Final RFP Porject Contract/ (Date) Final Bank (Date) Authorities Final Contract) (Date) Contract) (Date)** (Date)**

A B C D E F G H I J K L M N O P Q R S T Providing 1 49.95 49.95 LCS 27/06/2011 23/11/2011 - - 23/11/2011 26/12/2011 9/1/2012 - Contact Agr. M/s PBS 28/04/2012 - RWS & S, Engineering & Amended No.- 10/2011-12 Consultancy Mahabubnagar Support Activites ( on dated 30/1/2011, Services Technical 04/07/2011 27.77 Lakhs, Consultancy & Amended INR Services) FOR on Batch - II SVS 27/10/2011 Habitations to DPSU, APRWSSP, MBNR

Providing 1 44.65 44.65 LCS 5/11/2011 9/12/2011 - - 9/12/2011 9/1/2012 19/1/2012 - Contact Agr. M/s PBS 28/04/2012 - RWS & S, Engineering No.- 12/2011-12 Consultancy Mahabubnagar Support Activites ( dated 30/1/2011, Services Technical 27.17 Lakhs, Consultancy INR Services) FOR Batch - III SVS Habitations to DPSU, APRWSSP, MBNR

Providing 1 24 24 LCS 27/10/2011 18/11/2011 - - 19/11/2011 29/12/2011 20/01/2012 - Contact Agr. M/s NSS 30/03/2012 RWS & S, Engineering No.- 11/2011-12 Associates Mahabubnagar Support Activites ( dated 30/1/2011, Technical 14.86 Consultancy Lakhs,INR Services) FOR Batch - I MVS Habitations to DPSU, APRWSSP, MBNR

Providing 1 25.35 25.35 LCS 9/11/2011 30/12/2011 - - 30/12/2011 1/2/2012 16/02/2012 - 20/04/2012 M/s Max 20/06/2012 - RWS & S, Engineering Consultancy Mahabubnagar Support Activites ( Services Hyd Technical Consultancy Services) FOR Batch - II MVS Habitations to DPSU, APRWSSP, MBNR Evalution No Objection REP to be by the Bank Final No objection Proposals Fianalised (Technical/ Estimate Advertising TOR/Shor Draft to from Bank to be (Technical/ Services to Unit cost Methods #Combined/ Contract Name of Sl. Packa Description of No of d Cost for Short tList be for RFP Issued Received #Combined be Exp. Incured Implementing (Rs. of Draft Numbers. Value Consultant, No. ge No. services contracts (Rs. listing Finalised forwarde TOR/Shortli (Date) by the / Draft Completed to Date agency Lakhs) Selection Contract/ and Curency Nationality Lakhs) (Date) (Date) d to the st/Final RFP Porject Contract/ (Date) Final Bank (Date) Authorities Final Contract) (Date) Contract) (Date)** (Date)**

A B C D E F G H I J K L M N O P Q R S T M&E, CS & ESA 6 in Karimnagar a Engineering DWSC- Support Activities Adilabad Engineering 1 17.91 17.91 LCS _ _ _ 5/22/2011 6/6/2011 6/22/2011 _ MT1//DPSU/AP Aarvee 07.09.2011 9.89 DWSC Support Activities RWSSP/01/201 Associates Karimnagar SVS - I 1-12, Dated: Architects 8/7/2011, 16.48 Engineers and Lakhs/INR Consultants

Engineering 1 42.28 42.28 LCS 29/7/2011 8/16/2011 29/8/2011 11/4/2011 _ MT1/DPSU/AP Nss Associates, 18/01/2012 _ DWSC Support Activities RWSSP/02/201 Hyderabad Karimnagar SVS - II 1-12, Dated: 19/11/2011, 27.66Lakhs/INR

Engineering 1 34.44 34.44 LCS 11/14/2011 _ 12/4/2011 _ 12/20/2011 1/5/2012 3/2/2012 _ MT1/DPSU/AP Geocon Surveys, 16.06.2012 _ DWSC Support Activities RWSSP/03/201 Vishakapatnam Karimnagar SVS III 1-12 dated 17.04.2012,Rs 36.26 Engineering 1 10.09 10.09 LCS 11/28/2011 12/13/2011 2/15/2012 20/02/2012 3/4/2012 _ MT1//DPSU/AP Nss Associates, 12.06.2012 _ DPSU Support Activities RWSSP/01/201 Hyderabad Karimnagar MVS - I 1-12, Dated: 13/4/2011, 8.42 Lakhs/INR Engineering 1 48.32 48.32 LCS 11/30/2011 12/15/2011 2/15/2012 3/2/2012 3/4/2012 _ MT1//DPSU/AP MAX consulting 6/16/2012 _ DPSU Support Activities RWSSP/01/201 Services, Hyd Karimnagar MVS II 1-12, Dated: 17/4/2011, 25.66 Engineering 1 12.31 12.305 LCS 4/9/2012 4/21/2012 _ _ 5/21/2012 ______DPSU Support Activities Karimnagar MVS III

M&E, CS & ESA 7 in YSR(Kadapa) Engineering Support Remaining Batch a II,III habs and Augmentation 5/12 to works 3 20.0 60 LCS 07/12 Yes Given Given 1 Jun 12 30 Jun 12 7/12 NA 60 9/12 0.00 DWSC M&E, CS & ESA 8 in Prakasam Evalution No Objection REP to be by the Bank Final No objection Proposals Fianalised (Technical/ Estimate Advertising TOR/Shor Draft to from Bank to be (Technical/ Services to Unit cost Methods #Combined/ Contract Name of Sl. Packa Description of No of d Cost for Short tList be for RFP Issued Received #Combined be Exp. Incured Implementing (Rs. of Draft Numbers. Value Consultant, No. ge No. services contracts (Rs. listing Finalised forwarde TOR/Shortli (Date) by the / Draft Completed to Date agency Lakhs) Selection Contract/ and Curency Nationality Lakhs) (Date) (Date) d to the st/Final RFP Porject Contract/ (Date) Final Bank (Date) Authorities Final Contract) (Date) Contract) (Date)** (Date)**

A B C D E F G H I J K L M N O P Q R S T

Engg support Data group &IT activites 1 9.4 LCM 15/3/2011 16/4/2011 5/9/2011 904675 consulting 7/4/2011

Himavanth Engg support &Venkat activites 1 11.2 LCM 15/3/2011 16/4/2011 5/9/2011 1081350 enterprises 7/4/2011

JCE Engineering Engg support & Management, activites 1 1.75 LCM 8/20/2011 9/19/2011 9/19/2011 12/1/2011 127750 Indian 2/1/2012

JCE Engineering Engg support & Management, activites 1 6.45 LCM 8/20/2011 9/19/2011 9/19/2011 12/1/2011 470850 Indian 2/1/2012

TSS Engg support Consultants, activites 1 20.25 LCM 10/14/2011 11/3/2011 11/3/2011 12/3/2011 1549125 Indian 1/12/2012

JCE Engineering Engg support & Management, activites 1 21.7 LCM 10/14/2011 11/3/2011 11/3/2011 12/3/2011 1714300 Indian 1/12/2012

JCE Engineering Engg support & Management, activites 1 15.4 LCM 10/14/2011 11/3/2011 11/3/2011 12/3/2011 1185800 Indian 1/12/2012

Data Group & IT Engg support consulting activites 1 26.9 LCM 10/14/2011 11/3/2011 11/3/2011 12/3/2011 1835925 Services, Indian 1/12/2012 TSS Engg support Consultants, activites 1 10.25 LCM 10/15/2011 11/15/2011 11/15/2011 12/22/2011 725700 Indian 2/22/2012

JCE Engineering Engg support & Management, activites 1 3.65 LCM 10/15/2011 11/15/2011 11/15/2011 12/22/2011 302950 Indian 2/22/2012 M&E, CS & ESA in 9 Visakhapatnam Evalution No Objection REP to be by the Bank Final No objection Proposals Fianalised (Technical/ Estimate Advertising TOR/Shor Draft to from Bank to be (Technical/ Services to Unit cost Methods #Combined/ Contract Name of Sl. Packa Description of No of d Cost for Short tList be for RFP Issued Received #Combined be Exp. Incured Implementing (Rs. of Draft Numbers. Value Consultant, No. ge No. services contracts (Rs. listing Finalised forwarde TOR/Shortli (Date) by the / Draft Completed to Date agency Lakhs) Selection Contract/ and Curency Nationality Lakhs) (Date) (Date) d to the st/Final RFP Porject Contract/ (Date) Final Bank (Date) Authorities Final Contract) (Date) Contract) (Date)** (Date)**

A B C D E F G H I J K L M N O P Q R S T Providing Engineering Support Activity Sri. P. Krishna for Preparation of Prasad, Geocon DWSC/ Project DPRs for 88 Batch - Surveyors, Manager, I habitations under 21.01.2011 1 - Rs.32.84092 Madhavadhara, DPSU, APRWSSP in & Lakhs - Indian Visakhapatnam. APRWSSP, Visakhapatnam 1 32.84 32.84 CQ 24.01.2011 01.02.2011 - - - 01.02.2011 01.02.2011 - Rupees Indian 31.08.2011 30.91674 Visakhapatnam

Consultancy for Engineering Support Activity for Batch - I I SVS habitations in plain M/s R.A DWSC/ Project area mandals of 07.07.2011 Hydrogeo Manager, Visakhapatnam and its 2 - Rs.16.219 Engitech Pvt DPSU, Dist modification Lakhs - Indian Ltd., Noida, APRWSSP, (97 Habitations) 1 31.30 31.30 LCS 11.07.2011 05.08.2011 - - - 08.02.2012 08.02.2012 - Rupees India 30.06.2012 - Visakhapatnam Consultancy for Engineering Support Activity for Batch - I I SVS habitations in M/s R.A DWSC/ Project Tribal area Hydrogeo Manager, mandals of 1 - Rs.14.40 Engitech Pvt DPSU, Visakhapatnam Lakhs - Indian Ltd., Noida, APRWSSP, Dist 2 19.20 19.20 LCS 13.07.2011 08.08.2011 - - - 19.12.2011 19.12.2011 - Rupees India 05.05.2012 - Visakhapatnam

Consultancy for Engineering Support Activity for Batch - I I MVS habitations in Plain & Agency M/s WAPCOS DWSC/ Project Mandals of Limited, Manager, Visakhapatnam 4 - Rs.14.40 Saifabad, Near DPSU, Dist Lakhs - Indian Lakadikapul, APRWSSP, ( 56 Habitations) 3 17.90 17.90 LCS 18.07.2011 11.08.2011 - - - 20.01.2012 20.01.2012 - Rupees Hyderabad 04.07.2012 - Visakhapatnam Evalution No Objection REP to be by the Bank Final No objection Proposals Fianalised (Technical/ Estimate Advertising TOR/Shor Draft to from Bank to be (Technical/ Services to Unit cost Methods #Combined/ Contract Name of Sl. Packa Description of No of d Cost for Short tList be for RFP Issued Received #Combined be Exp. Incured Implementing (Rs. of Draft Numbers. Value Consultant, No. ge No. services contracts (Rs. listing Finalised forwarde TOR/Shortli (Date) by the / Draft Completed to Date agency Lakhs) Selection Contract/ and Curency Nationality Lakhs) (Date) (Date) d to the st/Final RFP Porject Contract/ (Date) Final Bank (Date) Authorities Final Contract) (Date) Contract) (Date)** (Date)**

A B C D E F G H I J K L M N O P Q R S T Consultants for Engineering Support Activities for Batch-III SVS M/s PBS DWSC/ Project Habitations in Consultancy Manager, Visakhapatnam 3 - Rs.11.42 Services, DPSU, District. Lakhs - Indian Khairatabad, APRWSSP, 4 33.65 33.65 LCS 05.11.2011 09.02.2012 16.02.2012 16.02.2012 Rupees Hyderabad 06.07.2012 - Visakhapatnam ANDHRA PRADESH RURAL WATER SUPPLY APRWSS PROJECT (APRWSSP)

Procurement Plan for Goods upto June'2013 Rs.in Lakhs.

Estimate Banks no Contract Banks no Contract Design Preparation Unit cost Estiamted prepared and objection to Bids award objection sigend Date of Sr. No of Method of investigation of bid Name of contractor, Implementing Package No. Description of goods (RS total Cost sanctioned bidding decided contract (Date/ Contract No. completion No. contracts procurement completed document Nationaliy agency Lakhs) (RS Lakhs) (Date & document (Date/Value/ award Value/ fo contract (Date) (Date) Invitation Opened on Vale) (Date) Currency) (Date) Curency) (Date) (Date) A B C D E F G H I J K L M N O P Q R S T Goods in PSU 10.05.2011/0 Awent Technology, 1 Mobile phones 1 0.08 0.08 Shopping .08/INR in 1 10.05.2011 PSU Hyderabad Lakhs

Supply & installation of Used Bank's Quotations 23.05.2011/6 M/s Navya Interiors & 30.04.2011/9.2 2 partisions, false ceiling etc. to 1 9.25 9.25 Shopping standard opened date: NA .18/INR in 2 Exteriors, Hyderabad, 13.06.2011 PSU 5 PSU office format of E-5 18.05.2011 lakhs Indian

Supply & installation of Used Bank's Quotations 23.05.2011/2 30.04.2011/3.2 M/s Om Electriclas, 3 electrical network items etc to 1 3.25 3.25 Shopping standard opened date: NA .54/INR in 3 13.06.2011 PSU 5 Hyderabad, Indian PSU office format of E-5 18.05.2011 Lakhs

Used Bank's Quotations 13.06.2011/5 Supply & installation of 13 M/s cache furniture, 4 1 6.60 6.60 Shopping 30.04.2011/6.6 standard opened date: NA .29/INR in 4 20.06.2011 PSU Nos. split Acs to PSU office Hyderabad, Indian format of E-5 08.06.2011 Lakhs

Used Bank's Quotations 13.06.2011/4 Supply & assembling of 30.04.2011/4.5 M/s cache furniture, 5 1 4.57 4.57 Shopping standard opened date: NA .27/INR in 5 20.06.2011 PSU office furniture to PSU office 7 Hyderabad, Indian format of E-5 08.06.2011 Lakhs

NA: Placed Supply and installation of Used Bank's 20.12.2011/6 18.12.2011/6.5 order on M/s Hewlett Package India 6 Computers & other associated 1 6.50 6.50 Shopping standard NA .33 6 13.03.2012 PSU 0 DGS&D Rate Sales Pvt. Ltd, Indian items format of E-5 Lakhs/INR contract Holder

Used Bank's Quotations 29.02.2012/0 Supply & intllation of vertical 06.02.2012/ M/s Universal Blinds, 7 1 0.55 0.55 Shopping standard opened date: NA .39 7 15.03.2012 PSU rollers and blinds 0.55 hyderabad format of E-5 23.02.2012 lakhs/INR

Used Bank's Quotations 29.02.2012/1 Supply & Installation of UPS 06.02.2012 M/s Pioneer Telecom 8 1 2.00 2.00 Shopping standard opened date: NA .63 8 15.03.2012 PSU & Batterries /2.00 Services, Hyderabad format of E-5 23.02.2012 lakhs/INR

Supply & Installation of Used Bank's Quotations 14.02.2012 01.03.2012/2 M/s Youdan marketing, 9 printers, scanners & 1 2.35 2.35 Shopping standard opened date: NA 9 15.03.2012 PSU /2.35 .07/INR Hyderabad projectors format of E-5 29.02.2012

Purchase of Office 1-April-12 10 equipments,stationary, Several# - 25.00 Shopping Onwards (H)+15 (I)+25 (N)+7 PSU furniture etc. of PSU Goods in Six Districts PSU

Procurenment in 1 Adilabad Estimate Banks no Contract Banks no Contract Design Preparation Unit cost Estiamted prepared and objection to Bids award objection sigend Date of Sr. No of Method of investigation of bid Name of contractor, Implementing Package No. Description of goods (RS total Cost sanctioned bidding decided contract (Date/ Contract No. completion No. contracts procurement completed document Nationaliy agency Lakhs) (RS Lakhs) (Date & document (Date/Value/ award Value/ fo contract (Date) (Date) Invitation Opened on Vale) (Date) Currency) (Date) Curency) (Date) (Date)

Tender Procurement of Office Notce No- Equipment,Furniture,Com AE1APRW GeoStat puter systems,Xerox DWSC- SSP/02/201 1 11.05 11.05 Shopping 40708 40715 40718 Yes 40721 40737 40745 - 40802 2 Technologies,Hyderaba 40802 machine,Fax machine,Air Adilabad 1- d. conditioners and other 12,Dated:24- Miscellaneous items. 06-2011.

Procurement of Air conditioners ,Computer systems,Xerox DWSC- machine,Fax 12.75 12.75 Shopping ------Adilabad machine,Office Equipment ,Stationary, Furnitureand other Miscellaneous items.

Procurenment in 2 Mahabubnagar

Providing & Supply of 13/09/2011, 20/09/2011/ Least cost Furniture and other 1 10.75 10.75 12/8/2011 19/08/2011 19/08/2011 - 12/8/2011 25/08/2011 9.83 - 9.83 - Virat Interiors, Hyd, AP 19/10/2011 DPSU, MBNR Selection equipement Lakhs/INR Lakhs/INR Infovision Hardware Providing & Supply of 25/01/2011, Least cost sales & Servides computers and other 1 4.472 4.472 27/12/2011 6/1/2012 16/1/2012 - 19/01/2012 24/01/2012 3.25 Lakhs, - 9/2/2012 - 9/1/2012 DPSU, MBNR Selection software Training, related equipement INR MBNR Providing & Supply of Least cost Furniture and other 1 1.00 1.00 30/06/2012 10/7/2012 10/7/2012 12/7/2012 20/8/2012 30/8/2012 - DPSU, MBNR Selection equipements(Acs) Providing & Supply of Least cost computers and other 1 1.50 1.50 30/06/2012 10/7/2012 10/7/2012 12/7/2012 20/8/2012 30/8/2012 - DPSU, MBNR Selection related equipement

Stationary Xerox, Binding Least cost 1 10.00 10.00 30/06/2012 10/7/2012 10/7/2012 12/7/2012 20/8/2012 30/8/2012 - DPSU, MBNR etc., Selection

Procurenment in 3 Karimnagar

Tender Procurement of Office Notce No- M/s.DhanaLaxmi Equipment & Furnture, MT//PM/DP Trading DWSC- Computer systems,Xerox 1 11.00 11.00 Shopping 21/03/2011 40648 18/04/2011 30/04/2011 16/05/2011 - 21/05/2011 2 40714 SU/SE/RWS Company,Ashok Nagar, Karimnagar. machine,Fax machine &SKRMN/2 Hyderabad other Miscellaneous items 011-12 Estimate Banks no Contract Banks no Contract Design Preparation Unit cost Estiamted prepared and objection to Bids award objection sigend Date of Sr. No of Method of investigation of bid Name of contractor, Implementing Package No. Description of goods (RS total Cost sanctioned bidding decided contract (Date/ Contract No. completion No. contracts procurement completed document Nationaliy agency Lakhs) (RS Lakhs) (Date & document (Date/Value/ award Value/ fo contract (Date) (Date) Invitation Opened on Vale) (Date) Currency) (Date) Curency) (Date) (Date)

Procurement of Air DWSC- conditiones stationary and 1 4.00 4.00 Shopping ------30/06/2013 Karimnagar. other Miscellaneous items.

Procurenment in 4 YSR(Kadapa) M/s.Sri Chakra Procurement of Office Furnitures , Rajareddy 1 3.00 3.00 Shopping 41061 41076 41086 41111 41126 41131 41136 DWSC Equipment & Furniture Street, KADAPA, YSR district.

M/s .Rajaendra Hardware,Room No.4, Procurement of Office 1 1.50 1.50 Shopping 41214 41229 41239 41264 41306 41311 41316 Balaji Complex,Madras DWSC Partitions,False ceiling road, Kadapa, YSR district. M/s Expert System& Software 2/379, 1st Procurement of , Floor, Rajck Complex, Computer Systems, Xerox 1 1.50 1.50 Shopping 41183 41198 41208 41233 41306 41311 41316 DWSC Opp.LIC of India, Machine, R.S.Road, Kadapa, YSR district M/s Sri Vinayaka Procurement of , Air Refrigeration Conditioners and other 1 2 2 Shopping 41244 41259 41269 41294 41306 41311 41316 D.No.21/522,Palem DWSC Miscellaneous items Papaiah Street, Kadapa, YSR district-516001

5 Procurenment in Prakasam

Stationery 1 6.00 6.00 Shopping 40735 41455 Indian 41455 DWSM

Computers 1 4.70 4.70 Shopping 40902 41455 Indian 41455 DWSM

Furniture 1 2.00 2.00 Shopping 40780 41455 Indian 41455 DWSM

Hiring of Vehicle 1 4.08 4.08 Quotation 40701 41445 Indian 41444 DWSM

Procurenment in 6 Visakhapatnam 01.04.2011 - 01.04.2011 - Supply Order Printing and supply of M/s LIPI Printers, #9-1- Rs.2.02 Rs.2.02 No.374/2008 Baseline Survey formats 74, New 1 2.02 2.02 Shopping ------Lakhs - - Lakhs - /APRWSSP/ 07.04.2011 DWSM of M&E Final Reports (in Resapuvanipalem, Indian Indian AEE1/dt.01.0 the 14 pages of Booklet) Visakhapatnam - Indian Rupees Rupees 4.2011 Estimate Banks no Contract Banks no Contract Design Preparation Unit cost Estiamted prepared and objection to Bids award objection sigend Date of Sr. No of Method of investigation of bid Name of contractor, Implementing Package No. Description of goods (RS total Cost sanctioned bidding decided contract (Date/ Contract No. completion No. contracts procurement completed document Nationaliy agency Lakhs) (RS Lakhs) (Date & document (Date/Value/ award Value/ fo contract (Date) (Date) Invitation Opened on Vale) (Date) Currency) (Date) Curency) (Date) (Date) P.O No.AEE3/40 Supply and installation of 23.02.2012 - 23.02.2012 - 6/DPSU/Estt/ Partitions, False ceiling Rs.3.76 Rs.3.76 APRWSSP/ Sri. P. Ramababu, etc. for new office of 1 3.76 3.76 Shopping ------Lakhs - Lakhs - Renovation Contractor, K.L Puram, DWSM Project Manager, DPSU, Indian Indian & Vizianagaram. APRWSSP Rupees Rupees Partition/201 2/dt.23.02.20 12 P.O 27.02.2012 - 27.02.2012 - No.AEE3/40 Supply of Computers and Rs.4.72080 Rs.4.72080 6/DPSU/Estt/ M/s Delta Computers, Pheripherals to DPSU, 1 4.72 4.72 Shopping ------Lakhs - Lakhs - APRWSSP/ Dondaprthi, DWSM APRWSSP Indian Indian Computers/2 Visakhapatnam Rupees Rupees 012/dt.27.02. 2012 Supply of Office 01.03.2012 - 01.03.2012 - P.O M/s Bhartratna Books Stationary to the Office of Rs.0.55689 Rs.0.55689 No.1/Acct/A & Stationary, the Project Manager, 1 0.56 0.56 Shopping ------Lakhs - Lakhs - PRWSSP/VS DWSM Dabagardens, DPSU, APRWSSP Indian Indian PM/2012/dt. Visakhapatnam Rupees Rupees 01.03.2012 P.O No.AEE3/40 24.02.2012 - 24.02.2012 - Supply and Installation of 6/DPSU/Estt/ Rs.2.20470 Rs.2.20470 Sri. Varahalaxmi Air Conditioners to APRWSSP/ 1 2.20 2.20 Shopping ------Lakhs - Lakhs - Enterprises, Allipuram, DWSM DPSU, APRWSSP Air Indian Indian Visakhapatnam Conditioners/ Rupees Rupees 2012/dt.24.0 2.2012 P.O No.AEE3/40 22.02.2012 - 22.02.2012 - 6/DPSU/Estt/ Supply of Office Furniture Rs.1.56018 Rs.1.56018 M/s Woodland, APRWSSP/ to DPSU, APRWSSP 1 1.56 1.56 Shopping ------Lakhs - Lakhs - Ramatakies, DWSM Office Indian Indian Visakhapatnam Furniture/201 Rupees Rupees 2/dt.22.02.20 12 P.O 01.03.2012 - 01.03.2012 - No.AEE3/40 M/s Sri Venkateswara Supply of Steel Furniture Rs.1.21009 Rs.1.21009 6/DPSU/Estt/ Industries, # D-21, to DPSU, APRWSSP 1 1.21 1.21 Shopping ------Lakhs - Lakhs - APRWSSP/S DWSM Industrial Estate, Indian Indian teelFurniture/ Visakhapatnam Rupees Rupees 2012/dt.01.0 3.2012 Procurenment in Six Districts

Purchase of Office 1-April-12 7 equipments,stationary,furn Several# - 50.00 Shopping Onwards (H)+15 (I)+25 (N)+7 DWSC iture etc. of DPSU Estimate Banks no Contract Banks no Contract Design Preparation Unit cost Estiamted prepared and objection to Bids award objection sigend Date of Sr. No of Method of investigation of bid Name of contractor, Implementing Package No. Description of goods (RS total Cost sanctioned bidding decided contract (Date/ Contract No. completion No. contracts procurement completed document Nationaliy agency Lakhs) (RS Lakhs) (Date & document (Date/Value/ award Value/ fo contract (Date) (Date) Invitation Opened on Vale) (Date) Currency) (Date) Curency) (Date) (Date)

#No Contract will exceed threshold limit of US $ 50,000.