Post Tensioning Manual

Total Page:16

File Type:pdf, Size:1020Kb

Post Tensioning Manual Post-Tensioning Tendon Installation and Grouting Manual Version 2.0 May 2013 FHWA-NHI-13-026 This Page Intentionally Left Blank. Technical Report Documentation Page 1. Report No. FHWA-NHI-13-026 2. Government Accession No. 3. Recipient’s Catalog No. 4. Title and Subtitle Post-Tensioning Tendon Installation and Grouting Manual 5. Report Date May 2013 6. Performing Organization Code: 7. Author(s) John Corven, P.E. and Alan Moreton, P.E 8. Performing Organization Report No. 9. Performing Organization on Name and Address Ideation, Inc. 14150 Parkeast Circle Chantilly, VA 20151 10. Work Unit No. (TRAIS) 11. Contract or Grant No. DTFH61-11-D-00026 12. Sponsoring Agency Name and Address Office of Bridge Technology, HIBT-10 Federal Highway Administration 400 7th Street, SW Room 3203 Washington, DC 20590 13. Type of Report and Period Covered Final Document 14. Sponsoring Agency Code 15. Supplementary Notes 16. Abstract: This Manual includes state-of-the-art information relative to materials, post-tensioning systems, construction practices and grouting of post-tensioning tendons for bridges. The Manual is targeted at Federal, State and local transportation departments and private company personnel that may be involved in the design, inspection, construction, or maintenance of bridges that contain post-tensioning tendons. This Manual will serve as a reference and guide to designers, inspectors and construction personnel for post-tensioning materials, installation and a grouting of bridge tendons. The document is part of the Federal Highway Administration’s national technology deployment program and may serve as a training manual. 17. Key Words Bridges, post-tensioning, tendons, grout, grouting, strands, bars, protection, ducts, inlets, outlets, tests, prestressed concrete, pretensioning, stressing, post-tensioning operations, prestressing steel, concrete, bleed. 18. Distribution Statement This manual can be obtained from the Office of Bridge Technology, Federal Highway Administration, 400 7th Street, SW, Room 3203, Washington, DC 20590. 19. Security Classification (of this report) Unclassified 20. Security Classification (of this page) Unclassified 21. No of Pages 184 22. Price Form DOT F 1700.7 (8-72) Reproduction of completed page authorized Federal Highway Administration Post-Tensioning Tendon Installation and Grouting Manual Federal Highway Administration Post- Tensioning Tendon Installation and Grouting Manual Preface This Manual includes state-of-the-art information relative to materials, post-tensioning systems, construction practices and grouting of post-tensioning tendons for bridges. The Manual is targeted at Federal, State and local transportation department and private company personnel that may be involved in the design, inspection, construction or maintenance of bridges that contain post-tensioning tendons. This Manual will serve as a reference and guide to designers, inspectors and construction personnel for post-tensioning materials, installation and grouting of bridge tendons. The document is part of the Federal Highway Administration’s national technology deployment program and may serve as a training manual. Version 2.0 May 2013 Page i Federal Highway Administration Post-Tensioning Tendon Installation and Grouting Manual This Page Intentionally Left Blank. Version 2.0 May 2013 Page ii Federal Highway Administration Post-Tensioning Tendon Installation and Grouting Manual Table of Contents Chapter 1 - Introduction ............................................................................................................. 1 1.1 Objective ...................................................................................................................... 1 1.1.1 Benefits of Post-Tensioning .................................................................................. 1 1.1.2 Principle of Prestressing ....................................................................................... 1 1.1.3 Post-Tensioning Operations ................................................................................. 2 1.1.4 Post-Tensioning Systems ..................................................................................... 3 1.2 Permanent Post-Tensioned Applications ..................................................................... 6 1.2.1 Cast-in-Place Bridges on Falsework ..................................................................... 6 1.2.2 Post-Tensioned AASHTO, Bulb-T, and Spliced Girders ........................................ 6 1.2.3 Precast Segmental Balanced Cantilever Bridges .................................................. 8 1.2.4 Cast-in-Place Segmental Balanced Cantilever Bridges ........................................16 1.2.5 Precast Segmental Span-by-Span Bridges ..........................................................18 1.2.6 Precast Segmental Progressive Cantilever Bridges .............................................21 1.2.7 Transverse Post-Tensioning of Superstructures ..................................................22 1.2.8 Post-Tensioning of Substructures ........................................................................25 1.3 Temporary Longitudinal Post-Tensioning (Bars) – Typical Applications ......................31 1.3.1 Erection of Precast Cantilever Segments .............................................................31 1.3.2 Closure of Epoxy Joints in Span-by-Span Erection ..............................................33 Chapter 2 – Post-Tensioning System Materials and Components .............................................. 1 2.1 Prestressing Steel ........................................................................................................ 1 2.1.1 Strands and Bars .................................................................................................. 1 2.1.2 Shipping, Handling and Storage............................................................................ 3 2.1.3 Acceptance ........................................................................................................... 3 2.2 Anchorages and Associated Hardware ........................................................................ 5 2.2.1 Anchorages .......................................................................................................... 5 2.2.2 Post-Tensioning Bars Anchor Systems ................................................................. 7 2.2.3 Permanent Grout Caps ......................................................................................... 8 2.3 Ducts ........................................................................................................................... 8 2.3.1 Duct Size .............................................................................................................. 9 2.3.2 Ducts for Tendons ................................................................................................ 9 2.3.3 Shipping, Handling and Storage of Ducts .............................................................15 Version 2.0 May 2013 Page iii Federal Highway Administration Post-Tensioning Tendon Installation and Grouting Manual 2.3.4 Acceptance of Duct Materials ..............................................................................15 2.3.5 Acceptance of Post-Tensioning System ...............................................................15 2.4 Grout...........................................................................................................................16 2.4.1 Purpose ...............................................................................................................16 2.4.2 Cement and other Pozzolans for Grout ................................................................16 2.4.3 Admixtures ...........................................................................................................17 2.4.4 Pre-bagged Grouts ..............................................................................................17 2.4.5 Thixotropic vs. Non-Thixotropic Grout ..................................................................18 2.4.6 Laboratory Tests ..................................................................................................18 2.4.7 Shipping, Handling, Storage and Shelf-Life ..........................................................22 2.4.8 Acceptance ..........................................................................................................22 2.4.9 Field Mock-Up Tests ............................................................................................23 2.5 Other PT System Qualification Tests ..........................................................................23 Chapter 3 – Post-Tensioning Duct and Tendon Installation ........................................................ 1 3.1 Shop Drawings ............................................................................................................ 1 3.1.1 Drawings and Details ............................................................................................ 1 3.1.2 Stressing Calculations .......................................................................................... 4 3.2 Tendon Testing On Site ..............................................................................................14 3.2.1 Friction .................................................................................................................14 3.2.2 Modulus of Elasticity ............................................................................................16 3.3 Anchor
Recommended publications
  • Design and Uses of Prestressed Concrete Columns by Raymond Itaya*
    PROCEEDINGS PAPER Design and Uses of Prestressed Concrete Columns by Raymond Itaya* SYNOPSIS At the present time, criteria for the design of prestressed concrete columns are not included in the PCI Building Code Requirements nor the ACI Build- ing Code Requirements for Reinforced Concrete. The PCI Prestressed Con- crete Column Committee has been studying the behavior of prestressed concrete columns for nearly two years. This paper attempts to summarize the knowledge to date and outline an approach to the design of prestressed concrete columns. INTRODUCTION cant when bending predominates9 Since columns are generally con- (Fig. 1) . Prestressing yields a homo- sidered as members under compres- geneous member with reliable buck- sion, it might first appear that there ling capacity which is important for is no justification for putting com- slender columns. For precast col- pression into the concrete by pre- umns subjected to transportation and stressing. Upon closer examination, erection stresses, prestressing sup- however, columns are very often sub- plies a higher resistance to cracking jected to tensile stresses when bend- during handling. It is therefore clear ing moments due to wind and earth- that prestressed concrete columns quake forces, eccentric loads, or will be found useful under many frame action are applied to columns. conditions. Figs. 2 and 3 illustrate Prestressing columns then can be the use of such columns where con- considered as an extension of ordi- ventional reinforced columns would nary reinforced concrete columns have been uneconomical, if not im- where reinforcing steel is used to possible. Several possible types of pre- resist tension. Prestressing introduces additional stressed concrete columns should be advantages to concrete columns.
    [Show full text]
  • Prestressed Concrete Girders Achieve Record Lengths Tacoma, Washington
    THE CONCRETE BRIDGE MAGAZINE FALL 2019 www.aspirebridge.org WSDOT inspects 223-ft-long, 247-kip lightweight concrete girder Prestressed Concrete Girders Achieve Record Lengths Tacoma, Washington BRIDGES OF THE FOOTHILLS PARKWAY Great Smoky Mountains National Park DWIGHT D. EISENHOWER VETERANS MEMORIAL BRIDGE Anderson, Indiana MARC BASNIGHT BRIDGE Dare County, North Carolina COURTLAND STREET BRIDGE Atlanta, Georgia Permit No. 567 No. Permit Lebanon Junction, KY Junction, Lebanon Postage Paid Postage Presorted Standard Presorted OVER NEW I-35W BRIDGE I-91 BRATTLEBORO BRIDGE MINNESOTA 40 VERMONT YEARS PENOBSCOT NARROWS BRIDGE & OBSERVATORY HONOLULU RAIL TRANSIT PROJECT MAINE HAWAII 4TH STREET BRIDGE COLORADO AIRTRAIN JFK 410 NEW YORK SARAH MILDRED LONG BRIDGE MAINE/NEW HAMPSHIRE AWARDS FOR OUR CUSTOMERS ACROSS THE UNITED STATES I-280 VETERANS’ GLASS CITY SKYWAY VICTORY BRIDGE OHIO NEW JERSEY DAUPHIN ISLAND BRIDGE ALABAMA FOUR BEARS BRIDGE Creating Bridges As Art® NORTH DAKOTA www.figgbridge.com | 1 800 358 3444 NEW WINONA BRIDGE MINNESOTA VETERANS MEMORIAL BRIDGE TEXAS US 191 COLORADO RIVER BRIDGE I-76 ALLEGHENY RIVER BRIDGE UTAH PENNSYLVANIA I-275 SUNSHINE SKYWAY BRIDGE BLUE RIDGE PARKWAY VIADUCT FLORIDA NORTH CAROLINA SENATOR WILLIAM V. ROTH, JR. BRIDGE NATCHEZ TRACE PARKWAY ARCHES SOUTH NORFOLK JORDAN BRIDGE DELAWARE TENNESSEE VIRGINIA CONTENTS Features “A Shot in the Arm” 6 Armeni Consulting Services helps many clients address 10 estimating and scheduling challenges as the array of delivery and construction methods grows. Bridges of the Foothills Parkway 10 Dwight D. Eisenhower Veterans Memorial Bridge 14 Marc Basnight Bridge 18 Courtland Street Bridge 24 Departments Photo: Eastern Federal Lands Highway Division of the Federal Highway Administration.
    [Show full text]
  • Alphabetical Price List April 2020 SKU SKU Description Status Retail Whl
    Alphabetical Price List April 2020 SKU SKU Description Status Retail Whl Break 1 Break 1 Break 2 Break 2 Break 3 Break 3 Break 4 Break 4 10003 10003-Emb NYLT A 4.99 3.29 12 2.99 48 2.79 0 0 0 0 100 100-Applique Embd FDL 4pk A 2.99 2.24 12 1.99 48 1.59 0 0 0 0 1013 1013-Giftcard TrailsEndPrgrm 013 N 13 11.05 0 0 0 0 0 0 0 0 101 101-Pin FDL Silvertone 5/8"@ A 3.99 2.99 24 2.79 0 0 0 0 0 0 10202 10202-Emb Ptrl Antelope A 2.49 1.79 12 1.69 300 1.29 0 0 0 0 10206 10206-Emb Ptrl Beaver A 2.49 1.89 12 1.69 48 1.29 0 0 0 0 10209 10209-Emb Ptrl Bobwhite A 2.49 1.89 12 1.69 48 1.29 0 0 0 0 10211 10211-Emb Ptrl Dragon A 2.49 1.89 12 1.69 48 1.29 0 0 0 0 10212 10212-Emb Ptrl Eagle A 2.49 1.89 12 1.69 48 1.29 0 0 0 0 10213 10213-Emb Ptrl Flaming Arrow A 2.49 1.89 12 1.69 48 1.29 0 0 0 0 10215 10215-Emb Ptrl Fox A 2.49 1.89 12 1.69 48 1.29 0 0 0 0 10221 10221-Emb Ptrl Lightning A 2.49 1.89 12 1.69 48 1.29 0 0 0 0 10223 10223-Emb Ptrl Owl A 2.49 1.89 12 1.69 48 1.29 0 0 0 0 10226 10226-Emb Ptrl Pheasant N 0.39 0.39 0 0 0 0 0 0 0 0 1022 1022-Giftcard TrailsEndPrgrm 022 N 22 18.7 0 0 0 0 0 0 0 0 10230 10230-Emb Ptrl Rattlesnake A 2.49 1.89 12 1.69 48 1.29 0 0 0 0 10233 10233-Emb Ptrl Scorpion A 2.49 1.89 12 1.69 48 1.29 0 0 0 0 10234 10234-Emb Ptrl Shark A 2.49 1.89 12 1.69 48 1.29 0 0 0 0 10237 10237-Emb Ptrl Viking A 2.49 1.89 12 1.69 48 1.29 0 0 0 0 10239 10239-Emb Ptrl Wolf A 2.49 1.89 12 1.69 48 1.29 0 0 0 0 10240 10240-Emb Ptrl Blnk A 2.49 1.89 12 1.69 48 1.29 0 0 0 0 10302 10302-Emb Merit Camping A 2.79 2.39 12 2.19 144 1.89 0 0 0 0 10303 10303-Emb
    [Show full text]
  • Thermal Properties of Conventional and High-Strength Concrete
    MATEC Web of Conferences 245, 06005 (2018) https://doi.org/10.1051/matecconf/201824506005 EECE-2018 Thermal Properties of Conventional and High- strength Concrete Tatiana Musorina1,*, Alexsander Katcay1, Mikhail Petrichenko1 and Anna Selezneva1 1Peter the Great St. Petersburg Polytechnic University, Polytechnicheskaya 29, St. Petersburg, 195251, Russian Federation Abstract. Important characteristics for the Nordic countries: a freeze-thaw resistance and an ability of a material to keep heat inside the building. This paper aims to define the thermophysical properties of a high-strength concrete, compare the discovered performance with the conventional concrete properties. With this object in mind two experiments in cold chamber "CHALLENGE 250" have been conducted and followed by analysis. In these experiments, the insulation of facades is beyond the framework of the investigation. Only the thermophysical properties of concrete are taken into account. The samples were affected by temperature fluctuations. Results from the experiments show that strength characteristics of a material are in indirect ratio to accumulation properties of a structure. This conclusion is directly related to porosity of material and additives. During 70 minutes, with outside temperature being below zero, the temperature inside the concrete dropped to an average. As the outside temperature increases significantly to more than zero, the temperature inside the concrete has become below average (continued to decline) in 70 minutes. The more strength of material, the better thermophysical properties. High- strength concrete is less susceptible to temperature fluctuations, therefore more heat-resistant. As mentioned in the paper below, the material has one disadvantage: this is a large cost per cubic meter. 1 Introduction The application of a high grade concrete allows to reduce the self-weight of structures and the concrete area, to create a higher, bigger and smarter constructive form of the elements.
    [Show full text]
  • IJA Enewsletter Editor Don Lewis (Email: [email protected]) Renew at Http
    THE INTERNATIONAL JUGGLERSʼ ASSOCIATION December 2011 IJA eNewsletter editor Don Lewis (email: [email protected]) Renew at http:www.juggle.org/renew IJA eNewsletter Contents: Happy Holidays IJA eZine ! Teaching the Cascade Recycling - Build Green Clubs Stagecraft Corner 2011 Festival Video AMS System Update Rain Ending... an 8 year run 7 Doigts on Time Top 10 List Rola Bola 2 Feeding the Inner Juggler Turbo Fest 2012 Regional Festivals Best Catches Juggling Festivals: Waidhofen, Austria Quebec, QC, Canada North Goa, India Seattle, WA Madison, WI Sydney, Australia Atlanta, GA The holiday cartoon above originally appeared in Heerien, Netherlands the November 1979 IJA newsletter. Regardless St. Paul, MN of what holiday youʼre celebrating this season, Austin, TX have a happy and safe one. Don Lewis, Editor Bath, UK Arcata, CA Bali, Indonesia Southend on Sea, UK Winston-Salem, NC IJA Festival 2012 Marion, IN Winston-Salem, NC July 16 - 22, 2012 Save the dates! WWW.JUGGLE.ORG Page 1 THE INTERNATIONAL JUGGLERSʼ ASSOCIATION December 2011 eZine ? Coming January 1, 2012 http://ezine.juggle.org Celebrate the New Year with the IJAʼs new eZine! WWW.JUGGLE.ORG Page 2 THE INTERNATIONAL JUGGLERSʼ ASSOCIATION December 2011 Teaching the Cascade, by Don Lewis Hereʼs the scenario: You go to a seasonal party at a stem from anxiety - trying to go too fast. Just stand in friend or relativeʼs place. Perhaps you only see them front and do two throws as slow as you can. Get them to once a year. Someone will have received a set of juggling copy you. This rarely takes more than a couple of balls as a gift, which are sitting unused because they keep minutes.
    [Show full text]
  • Flying Disc Illustrated V1n4 Summer84contributor
    ‘“j£“j“‘ 11111‘T‘ CHAMPION DISCS INC. KEH PERFORMANCE DEPENDABLE UNBREAKABLE EASY TO THRGN P. D.G.A. APPROVED These Terms combined cdn only describe one compony’s flying discs, iNNOVA””— CHAMPION DISCS INC. We are The folkswho brought you The AERO ond The AV|AR”‘flying discs. We hope you enjoy them. TM INNOVA"”—CHAMP|ONDISCS, INC. FILE?HN@ 1IDH@@ flll IIPHIITI FDI has decided to expand the scope of its coverage. As a result of strong support we have received from around the world, we have so much material to print, that it has become incumbent upon us to increase the number of pages in our issue. Many of our readers have also PAGE'1 PAGE14 PAGE11 submitted pictures for publi- cation. Unfortunately, most of CONTENTS: 1984 the pictures that we receive are in color. Although we hope to SWEDEN: OVERSEAS UPDATE 4 eventually print in color, our SANTA BARBARA CLASSIC 4 present finances dictate that we LETTERS 6 print in black and white at least FRANCE: INTERNATIONAL TOURNAMENT 6 for the time being. l984 U.s. OPEN: LA MIRADA 7 In addition, in upcoming FOOTBAG: SACK SECTION 10 issues we will be including a SENIOR WORLDS 10 special footbag department. As a INTERVIEW: DAN RODDICK l2 result of having experienced PDGA 13 first hand the Hacky Sack and ROCKY MOUNTAIN NATIONALS: BOULDER 10 Frisbee Festival held here in San ROCKY MOUNTAIN NATIONALS: FT. COLLINS 12 Diego On July 7th, the unique INSTRUCTIONAL CORNER: BODY ROLLS 14 bond between footbag and disc has FPA WORLDS: MINNEAPOLIS 17 become increasingly apparent.
    [Show full text]
  • The Juggler of Notre Dame and the Medievalizing of Modernity. Volume 6: War and Peace, Sex and Violence
    The Juggler of Notre Dame and the Medievalizing of Modernity. Volume 6: War and Peace, Sex and Violence The Harvard community has made this article openly available. Please share how this access benefits you. Your story matters Citation Ziolkowski, Jan M. The Juggler of Notre Dame and the Medievalizing of Modernity. Volume 6: War and Peace, Sex and Violence. Cambridge, UK: Open Book Publishers, 2018. Published Version https://www.openbookpublishers.com/product/822 Citable link http://nrs.harvard.edu/urn-3:HUL.InstRepos:40880864 Terms of Use This article was downloaded from Harvard University’s DASH repository, and is made available under the terms and conditions applicable to Other Posted Material, as set forth at http:// nrs.harvard.edu/urn-3:HUL.InstRepos:dash.current.terms-of- use#LAA The Juggler of Notre Dame and the Medievalizing of Modernity VOLUME 6: WAR AND PEACE, SEX AND VIOLENCE JAN M. ZIOLKOWSKI THE JUGGLER OF NOTRE DAME VOLUME 6 The Juggler of Notre Dame and the Medievalizing of Modernity Vol. 6: War and Peace, Sex and Violence Jan M. Ziolkowski https://www.openbookpublishers.com © 2018 Jan M. Ziolkowski This work is licensed under a Creative Commons Attribution 4.0 International license (CC BY 4.0). This license allows you to share, copy, distribute and transmit the work; to adapt the work and to make commercial use of the work providing attribution is made to the author (but not in any way that suggests that he endorses you or your use of the work). Attribution should include the following information: Jan M. Ziolkowski, The Juggler of Notre Dame and the Medievalizing of Modernity.
    [Show full text]
  • Problem Statement 1-4-1. Portland Cement Concrete Pavement Mix Design System Integration Stage 1: Volumetrics-Based Mix Design (Mix Proportioning)
    Long-Term Plan for Concrete Pavement Research and Technology—The Concrete Pavement Road Map (Second Generation): Volume II, Tracks PUBLICATION NO. FHWA-HRT-11-070 JULY 2012 Research, Development, and Technology Turner-Fairbank Highway Research Center 6300 Georgetown Pike McLean, VA 22101-2296 FOREWORD The concrete paving industry has experienced many changes in the last 15 years. In order for concrete pavement to achieve its full potential in the 21st century, the industry has identified trends that call for dramatic, even revolutionary, improvements. Aiming for a holistic approach, the improvements can best be implemented through a carefully developed and aggressively implemented strategic plan for research and technology transfer known as the Long-Term Plan for Concrete Pavement Research and Technology (CP Road Map). This is volume II of two volumes. It provides the background and summary information on the effort that led to the CP Road Map. Jorge E. Pagán-Ortiz Director, Office of Infrastructure Research and Development Notice This document is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The U.S. Government assumes no liability for the use of the information contained in this document. This report does not constitute a standard, specification, or regulation. The U.S. Government does not endorse products or manufacturers. Trademarks or manufacturers’ names appear in this report because they are considered essential to the objective of the document. Quality Assurance Statement The Federal Highway Administration (FHWA) provides high-quality information to serve the Government, industry, and the public in a manner that promotes public understanding.
    [Show full text]
  • Fire Performance Art Permit
    Policy Grants Pass Department of Public Safety 4XX Fire Policy Manual Fire Performance Art Permit 4XX.1 PURPOSE AND SCOPE The purpose of this policy is to provide guidelines to advise fire performance venues and artists of safety considerations and practices consistent with fire and life safety codes and public assembly safety concerns. 4XX.2 POLICY This policy applies to all acts of fire performance art occurring within all areas in which Grants Pass Department of Public Safety has authority. Fire art refers to performances or demonstrations such as fire breathing, fire juggling, fire dancing, etc. Not included: pyrotechnics and flame effects (these are addressed in a different policy and require a separate permit). The business owner, event coordinator and the fire performer are responsible for all aspects of fire and life safety. Failure to possess a current permit and follow the minimum requirements set forth in this document may result in revocation of permit, future permits and/or issuing of citation(s). Fire performance artists shall: 1. Be at least 18 years of age. a. EXCEPTION: Performers age 16 to 18 may be allowed at the discretion of the Fire Marshal’s Office with written consent from a parent or legal guardian. They must be under the direct supervision of an adult fire performance troupe leader or instructor. 2. Have valid, state issued identification and Fire Performance Permit readily accessible at each performance. 3. Audience: It should be recognized that audiences, especially youthful ones, may not fully understand the dangers associated with fire performance art. Every effort should be made to emphasize the safety precautions and dangers of such activity.
    [Show full text]
  • Idioms-And-Expressions.Pdf
    Idioms and Expressions by David Holmes A method for learning and remembering idioms and expressions I wrote this model as a teaching device during the time I was working in Bangkok, Thai- land, as a legal editor and language consultant, with one of the Big Four Legal and Tax companies, KPMG (during my afternoon job) after teaching at the university. When I had no legal documents to edit and no individual advising to do (which was quite frequently) I would sit at my desk, (like some old character out of a Charles Dickens’ novel) and prepare language materials to be used for helping professionals who had learned English as a second language—for even up to fifteen years in school—but who were still unable to follow a movie in English, understand the World News on TV, or converse in a colloquial style, because they’d never had a chance to hear and learn com- mon, everyday expressions such as, “It’s a done deal!” or “Drop whatever you’re doing.” Because misunderstandings of such idioms and expressions frequently caused miscom- munication between our management teams and foreign clients, I was asked to try to as- sist. I am happy to be able to share the materials that follow, such as they are, in the hope that they may be of some use and benefit to others. The simple teaching device I used was three-fold: 1. Make a note of an idiom/expression 2. Define and explain it in understandable words (including synonyms.) 3. Give at least three sample sentences to illustrate how the expression is used in context.
    [Show full text]
  • HENRYS’ Own Production Only
    Professional Juggling Equipment GB 2016 Juggling Foreword Dear readers, Books Our last catalogue was showing articles from HENRYS’ own production only. We are now presenting our latest catalogue showing articles by other manufacturers. We are glad to be in a position to offer a great variety of products for juggling, acrobatics, unicycling and leisure. We are focussing on articles which meet the current requirements of our customers, and which are practical supplements of our own product range. Henrys GmbH Production and Trading of We offer products by Play (Italy), Beard (England), Bravo Juggling (Hungary), Spotlight (Holland), Filzis Jonglerie (Austria), Juggling Props and Toys La Ribouldingue (France), Goudrix (Canada), Mystec (Germany), Flairco (USA), Anderson & Berner (Denmark), Active People (Switzerland), Kendama Europe (Germany), Qualatex (USA), Pappnase (Germany), Tunturi (Holland), Superflight (USA), In den Kuhwiesen 10 Discraft (USA), WhamO (USA), New Games (Germany), Discrockers (Germany), TicToys (Germany), BumerangFan (France), D-76149 Karlsruhe QU-AX (Germany), Slackstar (Germany), and Kryolan (Germany). Product pictures and table arrangements help to keep the track and also to decide one way or the other. Most of the technical Fon ++49 (0) 721-78367-61|62|63 specifications are based on manufacture's data, differences caused by conversion of production possible! Fax ++49 (0) 721-7836777 E-mail [email protected] Enjoy reading and have fun browsing through the pages! Internet www.henrys-online.de Your HENRYS-Team Opening Hours 9.00 - 16.00 Mo-Tu 9.00 - 14.00 Fr Make-Up Activity Unicycles ᕍᕗ JugglingFlow Balls Juggling Beanbags Kids ᕃ ᕃ Beanbags made of synthetic leather with millet ice white silver red pink yellow green purple blue black orange Weight 00 01 02 03 04 05 06 07 08 12 13 g Code Rec.
    [Show full text]
  • Fire Producer E-28 Fire Performer E-29
    FIRE DEPARTMENT ● CITY OF NEW YORK STUDY MATERIAL FOR THE EXAMINATION FOR CERTIFICATE OF FITNESS FOR Fire Producer E-28 Fire Performer E-29 © 12/2015 New York City Fire Department - All rights reserved 1 Table of Contents NOTICE OF EXAMINATION ............................................................................. 4 ABOUT THE STUDY MATERIAL ...................................................................... 9 Introduction .................................................................................................. 11 a. Worst Case Scenario .......................................................................... 12 b. Definitions ......................................................................................... 13 Class of Flammable and Combustible Liquids Reference Chart ................ 17 Part I. General Information............................................................................ 17 1. Permits .............................................................................................. 17 2. General requirements for Fire Effects ................................................. 18 3. Fire Performances .............................................................................. 19 Part II. Safety, Handling and Use................................................................... 20 1. Clothing, Costumes, Makeup ............................................................. 21 a. Fiber content ..................................................................................... 21 b. Characteristics
    [Show full text]