COMPANY PROFILE
AUGUST 2019
Head Office | 94 Toepfers Road | WYEE NSW 2259 | P 02 4357 1112 | E [email protected]
Company Profile
TABLE OF CONTENTS
1 INTRODUCTION ...... 3
2 ADMINISTRATION ...... 4
3 PERSONNEL ...... 5
4 PROJECTS ...... 5
5 GENERAL METHODOLOGY ...... 7
6 REFERENCES ...... 8
T.R.E.E.S. P/L 2 Company Profile
1 INTRODUCTION
The Company commenced operations on 1st September 1996 due to the initiative and foresight of the Late Phillip Toepfer who was the Managing Director of this successful Company (ie Winner of Awards for ‘Outstanding Business Growth’ in relation to ‘Fastest 100 Growing Hunter Companies 2001, 2003, 2004, 2005, 2006 & 2007’).
T.R.E.E.S. P/L has established a reputation as an industry leading company specialising in Environmental Consulting predominantly in the field of Erosion and Sediment Control.
T.R.E.E.S. P/L has been engaged on projects in NSW, Queensland, Victoria, ACT and Tasmania. Additionally, T.R.E.E.S. P/L is a member of the International Erosion Control Association (IECA). The Company is the Soil Conservationist on the Lendlease Bouygues Joint Venture team which recently won the ‘International Green Apple Award’ for Environmental Best Practice on the NorthConnex Project in North Western Sydney and also on the Lendlease Bouygues Joint Venture team which was ‘Highly Commended’ at the International Erosion Control Association (IECA) Awards for Environmental Excellence on the NorthConnex Project in North Western Sydney. In 2010, the Company was a member of the Abigroup Contractors team which won the ‘Environmental Achievement Category’ of the IECA Awards for Construction of the Woomargama Bypass on the Hume Highway.
In 2000, the Company together with Thiess Pty Ltd won the ‘Environmental Achievement Grand Award’ from the IECA for ‘Excellence in Natural Resource Conservation and Environmental Protection through the Application of Effective Erosion and Sediment Control Policies, Practices or Public Education’ on the Bulahdelah to Coolongolook Freeway.
T.R.E.E.S. P/L has been a ‘key’ team member in many other Environmental Awards (eg Case Earth, Banksia, and Master Builders Association).
The Company policy is ‘value for money’ and professionalism in all aspects of operation, as demonstrated by winning the Environmental Services Category of the ‘2003 Newcastle Environmental Achievement Awards - Business and Government Enterprise’.
The Company has been a significant contributor to the NSW Blue Book publications: ‘Managing Urban Stormwater, Soils and Construction, Volume 2D, Main Road Construction (DECC – 2008). Managing Urban Stormwater, Soils and Construction, Volume 2C, Unsealed Roads (DECC – 2008).
Primarily, the Company provides expert advice and management support for Environmental, Soil and Water Management issues to government, major contractors and the broader construction industry. Our experience extends across a wide variety of construction, including main road construction, rail construction, major infrastructure developments, state significant urban construction projects (e.g. included several Olympic sites), mining and quarrying operations, commercial and residential subdivisions and rural practices.
T.R.E.E.S. P/L 3 Company Profile
2 ADMINISTRATION
Offices and locations are as follows:
Head Office – Address: 94 Toepfers Road, Wyee NSW 2259 (near Wyong) Phone: 02 4357 1112 Fax: 02 4357 1095 Email: [email protected]
Karen Toepfer – Managing Director P: 02 4357 1112 E: [email protected] Jeff Rout – Commercial Manager M: 0414 487 363 E: [email protected]
Southern NSW Office – Barellan (near Temora) John Wright – Senior Soil Conservationist E: [email protected]
Hunter Valley & Newcastle Office – Woodville (north of Maitland) Grant Fletcher – Environmental Consultant & CPESC No:7556 E: [email protected]
Mid North Coast Office – Coffs Harbour Clive Wightwick – Environmental Consultant E: [email protected]
T.R.E.E.S. P/L is a registered company in New South Wales/ACT. Specific details include: Trading Name – T.R.E.E.S. P/L (Toepfers Rehabilitation, Environmental & Ecological Services Pty Ltd). ABN – 27 395 515 089. ACN – 074 648 712.
T.R.E.E.S. P/L has a Management Systems Document covering Safety, Quality and Environmental Policies and Procedures.
T.R.E.E.S. P/L is a ‘Registered Contractor’ of RMS – Category S1 (Erosion, Sedimentation & Soil Conservation Consultancy Services).
T.R.E.E.S. P/L has a current Safe Work Method Statement & Risk Assessment (SWMSRA) document. A site specific SWMSRA can be supplied upon request.
T.R.E.E.S. P/L has certificates of currency available upon request for the following insurance policies: Public Liability. Professional Indemnity. Workers Compensation. Motor Vehicles.
T.R.E.E.S. P/L employs Soil Conservationists under an Employment Contract which has DEEWR Approval.
T.R.E.E.S. P/L 4 Company Profile
3 PERSONNEL
The team at T.R.E.E.S. P/L has been involved with a range of projects providing their personnel with intimate knowledge and experience over many regions to give a ‘balanced and practical’ approach to erosion and sediment control and environmental issues.
John Wright (Senior Soil Conservationist) and Grant Fletcher (Environmental Consultant & CPESC) head our team with Clive Wightwick (Environmental Consultant) as support.
John Wright has been with the Company since its inception in 1996 and specialises in Erosion and Sediment Control.
Grant Fletcher is a recent addition to our team and brings extensive experience in environmental issues which T.R.E.E.S. P/L wishes to pursue.
All personnel are equipped with the necessary PPE Safety equipment (eg hard hat, safety vest, safety boots etc) and access to any other relevant equipment (eg UHF radio etc).
The following is a list of the major activities in which T.R.E.E.S. P/L personnel have been involved: Preparation of Scope of Work documents. Preparation of Tender documents. Review of Environmental documentation. Preparation and review of Design Plans. Preparation and review of Specifications. Risk Management Assessment. Presentation of Training seminars. Preparation of Erosion & Sediment Control Plans (Primary & Progressive). Review of Erosion & Sediment Control Plans (Primary & Progressive). Provision of advice during Drainage Design and early project set-up stage (eg location and design of sediment basins). Recommendation and monitoring in relation to implementation of erosion and sediment control measures during construction (eg separation of ‘clean’ and ‘dirty’ runoff). Provision of Rehabilitation advice. Supervision of Rehabilitation of sites. Monitoring of Rehabilitation progress.
4 PROJECTS
T.R.E.E.S. P/L has obtained continuous work from many clients (eg RMS Professional Service Contracts, Lendlease (Abigroup & Baulderstone), CPB Contractors (Thiess), BMD, ARTC, John Holland Group, McConnell Dowell, Seymour Whyte, Fulton Hogan, Georgiou, Daracon Group, Robson Civil, and NACE). The majority of our work originates from satisfaction delivered to our clients, our industry standing and positive reputation.
T.R.E.E.S. P/L 5 Company Profile
A cross-section of T.R.E.E.S. P/L current and former projects/clients include: Sydney Metropolitan – The Northern Road Upgrade Stage 5 & 6 (RMS). Western Sydney Airport (WSA EE CPBLL JV). The Northern Road Upgrade Stage 4 (Georgiou & Ertech JV). The Northern Road Upgrade Stage 3 North (Lendlease). The Northern Road / Bringelly Road Upgrade Stage 2 (RMS). WestConnex M4 Widening (CPB Rizzani). M4 Smart Motorway (Fulton Hogan). Jordan Springs East (Lendlease). Narellan Road Upgrade (Seymour Whyte). The Northern Road – Stage 1 (Georgiou). Schofields Road – Stage 3 (BMD). NorthConnex (Lendlease). Northwest Growth Centre (Abigroup). M5 West Widening (Abigroup). Hoxton Park Road Upgrade in Sydney (RMS). Lawson Alliance Project in Blue Mountains (RMS & Abigroup). Southern Sydney to Holroyd 33kV Upgrade (BB-UGL). Southern Sydney Freight Line (Arenco). Windsor Bridge Replacement (Baulderstone). Port Botany Expansion (Baulderstone). Windsor Road Upgrade (Baulderstone).
Hunter/Central Coast – The Main North Line at Kangy Angy - New Intercity Fleet Management Facility (John Holland). Rutleys Road Subdivision at Wyee Point (Adventist Senior Living). Tourle Street JV at Newcastle (WBHO). Pacific Highway & Manns Road Upgrade Design – Narara to Lisarow (SMEC). M1 Productivity Package – Tuggerah to Doyalson (M1 Pacific Highway Widening), Kariong to Somersby (M1 Pacific Motorway Upgrade) & other works – (RMS). MR108 Duplication of Tourle Street & Cormorant Road, Kooragang – (RMS). Newcastle Inner City Bypass – Rankin Park to Jesmond – (Aurecon). Pacific Highway & Wyong Road Upgrade, Tuggerah – (RMS). Fitzgerald Bridge Replacement – Aberdeen (RMS Hunter). Central Coast Highway Upgrade Stages 1 & 2 (RMS Central Coast). Hunter Expressway Alliance – Eastern Section (Thiess). Hunter Expressway Design and Construction – Western Section (Abigroup). Hunter Expressway Alliance – Shortland to Sandgate (Thiess). Hunter8 Alliance – Third Track Construction Stages 1 & 2 (John Holland). Greta Train Support Facility (Abigroup). Ravensworth Mine (Daracon). Mt Thorley Warkworth (Riotinto). Mardi Dam (Baulderstone).
T.R.E.E.S. P/L 6 Company Profile
Southern Region – Old Cooma Road at Queanbeyan (WBHO). Ellerton Drive Extension at Queanbeyan (WBHO). Dignams Creek project south of Narooma (Fulton Hogan). Lachlan Valley Way (Kangiara Creek) project near Boorowa (RMS). Newell Highway Realignment – Grong Grong (Georgiou). Princes Highway (West) – Armytage to Warncoort in Victoria (BMD). Riverina Highway - Stage 2 Bethanga Bridge to Lake Hume Village (RMS). M.R.279 Upgrade – Gocup Road between Gundagai and Tumut (RMS). Kapooka Bridge, Wagga (BMD). Majura Parkway in Canberra (Fulton Hogan). Woomargama Bypass north of Albury (Abigroup). Holbrook Bypass (Abigroup). Peninsula Link Project in Victoria (Abigroup). Southern Hume Alliance (Abigroup/RTA).
Northern Region – Pacific Highway Upgrade – W2B Glenugie to Tyndale (Seymour Whyte). Pacific Highway Upgrade – W2B Northern & Shark Creek Bridge (BMD). Pacific Highway Upgrade – W2B Pimlico to Teven (Georgiou). New England Highway Upgrade – Bolivia Hill (Georgiou). Pacific Highway Upgrade – Oxley Highway to Kundabung (Lendlease). Pacific Highway Upgrade - Woolgoolga to Halfway Creek (OHL York JV). Pacific Highway Upgrade - Kundabung to Kempsey (McConnell Dowell). Pacific Highway Upgrade - Nambucca Heads to Urunga (Abigroup). Pacific Highway Upgrade - Frederickton to Eungai (Thiess). HW10 Bulahdelah Bypass Upgrade (Baulderstone). Pacific Highway Upgrade - Devils Pulpit Upgrade (John Holland). Pacific Highway Upgrade - Herons Creek to Stills Road (BMD). Nambucca Shire – Bowraville Off-River Storage (Haslin Constructions). SH10 Karuah to Bulahdelah Stage 1 (Baulderstone). SH10 Bundacree Creek to Possum Brush, Nabiac (Baulderstone).
Also, T.R.E.E.S. P/L currently holds the contract for ‘Advice & Assistance on Erosion & Sediment Control Matters – Gosford & Wyong Local Government Areas, Contract No 07.2912.0527 PSC 04/001’.
5 GENERAL METHODOLOGY
Methodology generally depends on: Requirements of Client. Size of project. Sensitivity of project (eg wetlands, endangered flora & fauna species, marine park, National park). Soil type, topography and climate conditions. Location of project in relation to watercourses and water bodies etc.
T.R.E.E.S. P/L 7 Company Profile
6 REFERENCES
Owen Clark Senior Environment Officer RMS - Western Sydney Program Office 0476 837960
Glen Bolton NSW Environmental Manager Georgiou 0428 949 019
Rebecca Grant Environmental Manager Lendlease (Victoria) 0400 815 094
Hari Corliss Environmental Manager Lendlease Engineering 0419 124 277
Chris Bourne NSW Environment & Sustainability Manager Lendlease Construction & Infrastructure 0420 996 257
Nicola Fraser Senior Environmental Manager Seymour Whyte 0400 675 298
Adam Noonan Environmental Manager Formally CPB Construction 0402 825 885
T.R.E.E.S. P/L 8