National Mission for Clean Ganga Format for submission of Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020)

For theStateof Overall status of the State: I. Total Population: Urban Population & Rural Populationseparately:

As per Census 2011, Kerala has population of 3,37,77,386. Rural population in Kerala is 25,840,501 and urban population in the state is 79,36,885. Population projected for 2020 for rural area is 27,005,078 and for urban area is 82,94,583. The water consumption and wastewater generated are calculated based on the population projected for 2020.

II. Estimated Sewage Generation(MLD):

A draft dossier on Sewage and Sullage generation in the State of Kerala has been prepared by the Board. Based on the draft report:  Estimate Sewage and Sullage generation in Urban area - 1058 MLD (Sewage – 317 MLD, Sullage- 741MLD)  Estimate Sewage and Sullage generation in Rural area - 2917 MLD (Sewage – 875 MLD, Sullage- 2042MLD)

 Total Sewage and Sullage generation – 3975 MLD (Sewage – 1192 MLD, Sullage- 2783MLD) III. Details of Sewage TreatmentPlant:

 Existing no. of common STPs/FSTPs: 16 common STPs and 3 common FSTPs

 No. of functional common STPs in the state:15  No. of functional common septage treatment plants in the state:2  No. of common STP which has not started functioning:1  No. of common FSTP which has not started functioning:1  Total sewage treatment capacity in the state through existing common STPs: 124.42 MLD

 Total septage treatment capacity in the state through existing common FSTPs: 0.21MLD

 Sewage treatment capacity via individual STPs in establishments: 69MLD

 Treatment of sewage by septic tank- soak pit (Individual residences) -1011MLD

 Gap in treatment of sewage: 56.37 MLD

1 Details of existing STPs/ Common STPs/ common Septage treatment plants in the State:

Sl. City/Town STP location STP Process Status Utilization No Installed . capacity 1 Thiruvana Common Sewage Operation al 107 80 MLD ASP nthapura Treatment Plant, (Parameters MLD m(PRS) Muttathara,Trivandrum complied with maintained by Kerala standards Water Authority stipulatedexcept for TSS) Bio (PRS) STP at membrane Kumarichanda Operational 0.01MLD 0.01 MLD bioreactor Technolog y 2 Pathanamth Seasonally Sewage Treatment Plant 5 MLD 3.5 MLD UASB itta Operated during at Sannidhanam and festival (5MLD) SBR season(Paramet Maintained by ers complied TravancoreDevas with standards ) wom Board SewageTreatment Seasonally 3.5 MLD 3.5 MLD Coagulatio Plant at Pamba(3.5 Operated during n MLD) maintained festival by season(Paramete &settling DevaswomBoard rs complied with standards stipulated) 3 STP for Operational 0.09MLD 0.09 MLD ASP Houseboat (0.09 MLD)at Kumarakom maintained by Distric Tourism Promotion Council, Kottayam 4 Ernakulam Sewage treatment Operational 4.5MLD 3 MLD ASP unit, Kerala Water Authority, Elamkulam, (3MLD)

2 STP owned Operational 0.45ML D 0.45 MLD ASP by Greater Cochin Development Authority, Kadavanthra, (0.45 MLD) Septage Treatment Operational 0.1MLD 0.1 MLD MBBR Plant at BrahmapuramKochi Corporation, Ernakulam Septage Treatment Operational 0.1MLD 0.1 MLD MBBR Plant at Wellington Island, Kochi Corporation

STP at Operational 0.01 MLD started Market, operation Kalamassery Municipality(PRS)

5 Kannur Sewage treatment Operational 0.5MLD 0.5MLD ASP Plant at Taliparambu(0.5ML D) TaliparambuMunicipalit y,Kannur

3 6 Sewage Commissioned 3 MLD Not started ASP treatment Plant functioning at inThrissur Trial run District conducted FSTP at Completed. Not 0.01 Not started Mattampuram started functioning MLD functioning BIOLOG Permission granted ICAL to conduct trial run

7 Malappura Sewagetreatm Operational 0.03 0.03 MLD MBBR m entPlant- MLD (PRS) atMalappuram MunicipalBus stand Sewage Operational 0.045 0.045 treatment MLD MLD BIOLOG Plant-at I (fish market) CAL

8 Adimaly Sewage treatment Electro Operational 0.01 Started Grama Plant at Comfort MLD functioning coagulation Panchayat, station, Idukki Adimaly Grama Panchayat, Idukki 9 CommonSew MBBR Operational 0.1MLD 0.1MLD (PRS) age Treatment Plant at Narayana nagaram, near stadium, , Opp. New bus stand 10 Wayanad Sewage Treatment MBBR Operational 0.14 MLD 0.05 Plant atTaluk MLD Hospital,SulthanBather y , Wayanad

4 11 Thrissur Revamping of 35 KLD Operational 0.035 MLD 0.035 MLD MBBR STP at Kuriyanchira Slaughter House Corportation , Thrissur

PRS – Polluted River Stretches

Details of under construction ETPs / STPs in the State

No. Location Capacity Physical Status of I&D or House Incremental Compl of the Progress in sewer connections progress etion plant in % Time MLD line 1 STP at 0.110 95 % The work was Civil structure 15/08/2021 Pambad Completed stalled.The civil work completed. Housing was tendered without Mechanical and Colony TS. The proposal was Electrification placed in the going on. Municipality, Coordination Worked stopped Malappuram committee for due to lock down ratification. Coordination committee has decided to entrust the Executive Engineer to take valuation of the work and to do necessary actions for giving payment. The work will be Resumed within a week's time. Awaiting DPC for the approval of the spillover project. Website is not open for entering projects. Awaiting Sulekha to open

2 ETP in Fish 0.01 98 % The work was Units are 30/08/2021 Marketing Completed expected to be installed trial Ponmundam finished in March. run conducted GP , But Revised Waste water is Malappuram Estimate was allowed to flow necessary. It was not through units. prepared and Finishing works sanctioned on time. are progressing. Now RE is prepared Treated Waste and it is expected to water expected

5 be sanctioned this to be tested month and work will within February be resumed by 2021 March Revised TS issued. Awaiting for DPC 3 STP at CHC 0.01 30 % Work in progress. Construction of 31/08/2021 Cherpu BP, Completed Actions were taken civil tanks Thrissur to speed up the work going on Plastering of tank and Concreting work pipe laying work going completed. on. Work delayed due to lock down.

4 STP at 0.015 92 % Work is in progress. Civil structure 18/08/2021 Chitumala Old Completed Pipe work going on and mechanical Age Home. and also need to completed. Chitumala BP, give connections to Partition, the tank. Trial runs pipe and need to be plastering conducted. completed Work delayed due to lock down. 5 Construction 0.006 Installation of 6KLD ETP completed but the for Kumali ETP is not Slaughter functioning properly House Kumali GP, Idukki 6 Construction 0.045 work is stalled. Earthwork 30/12/2021 of 45 KLD Awaiting PCB excavation waste water clearance for Consent to completed treatment Establish Tank construction plant at Work delayed due to lock started down. Government Ayurveda Hospital DP , Wayanad 7 135 KLD 0.135 Awaiting dpc approval Tendering stage 26/12/2021 Capacity for the spillover decentralized project. Once AS is sullage approved work can be Treatment plant tendered at Town Mangalpadi,

6 8 STP at Private 0.03 Work will be Bus station, tendered once Only one tender Kothaikunnu, MCC is lifted received Going to be re tender

9 STP at Medical 5 91% Chlorination tank 31.07.2021 College - Phase I No house connections pump erection & II, envisaged works & electrical Thiruvanathapur panel works are in am progress. (AMRUT) (PRS)

10 STP at 12 2% No house Offer received for Kureepuzha- connections tree cutting has 31.12.2021 Phase I & II, envisaged been approved by Kollam the Council held (AMRUT) on 22/04/21. Tree cutting to be started. Tree cutting was started but it was stopped due to public protest. Police protection to be obtained for tree cutting & request was submitted by the ULB to the Police Dept. on 04/05/21 for the same. Police Dept. informed the ULB to wait until the lockdown due to Covid is withdrawn. 11. STP at 5 30% No house Elamkulam, connections Piling works are in 31.03.2022 Kochi envisaged progress (AMRUT) Pile cap shuttering works of filter feed tank & treated water tank are completed

7 Details of proposed ETPs/ STPs in the State

No. Location Capacity of Status of Project (at Incremental Likely the STP DPR Stage/ Under progress Date of proposed in Tendering/ Work to be Completio MLD Awarded) n 1 Taluk Hospital 0.09 At DPR Stage DPR returned to 30/12/2021 LSGI ,Thiruvalla Municipality, 2 Taluk Hospital 0.085 At DPR Stage Under Technical 30/12/2021 Pambady, Scrutiny Pambady Block panchayath , Kottayam 3 Taluk Hospital 0.060 At DPR Stage DPR returned to 30/12/2021 Adimaly LSGI ,Adimaly Block Panchayath, Idukki 4 General 0.150 At DPR Stage DPR 30/12/2021 Hospital, preparation Municipality , Thrissur (PRS) 5 District Hospital 0.200 At DPR Stage DPR 30/12/2021 Perunthalmanna returned to , District LSGI Panchayath, Malappuram 6 Taluk Hospital 0.040 At DPR Stage Under 30/12/2021 ,Neelaswaram, Technical Kasaragod Scrutiny

7 CHC Alathoor, 0.090 At DPR Stage DPR returned to 30/12/2021 Alathoor Block LSGI Panchath , 8 CHC 0.025 At DPR Stage DPR returned to 30/12/2021 Kadayiruppu LSGI ,Vadavukode Block

8 Panchayath , Ernakulam

9 CHC 0.028 At DPR Stage Under 30/12/2021 Sooranadu, Technical Sasthancotta Scrutiny Block Panchath, Kollam 10 CHC 0.096 At DPR Stage DPR 30/12/2021 , returned to Kilimanoor Block LSGI Panchayath , Trivandrum 11 CHC 0.014 At DPR Stage DPR 31/12/2021 Mangalpadi, returned to Manjeswar Block LSGI Panchayath, Kasragod 12 CHC Konni, 0.032 At DPR Stage DPR 30/12/2021 Konni Block returned to Panchayath LSGI ,Pathanamthitta 13 Sewage 0.030 At DPR Stage T.S issued 30/11/2021 Treatment plant at Private Bus stand,Thodupuzh a Thodupuzha Municipality , Idukki 14 65 KLD Sewage 0.065 At DPR Stage DPR 30/12/2021 Treatment Plant returned to at Taluk Head LSGI Quarters Hospital Vithiri,Kalpetta BP, Wayanad 15 10 KLD Sewage 0.01 At DPR Stage DPR 30/12/2021 Treatment Plant returned to at EMS LSGI Memorial Municipal Town Hall, Municipality, Kozhikkode

9 16 11 KLD effluent 0.011 At DPR Stage DPR 30/12/2021 Treatment plant returned to at LSGI Fish Market, Kuravilangad Grama Panchayath , Kottayam 17 Eco Friendly 0.06 At DPR Stage DPR 30/12/2021 waste water returned for Treatment Plant modification ( 60 KLD ) for Women and Children Hospital Municipality, Malappuram 18 Waste water 0.09 At DPR Stage DPR returned 30/12/2021 Treatment ( 90 for KLD) System modification for coastal housing and Tsunmai resettlement facility at karikuzhi mayyanad Grama Panchayath , Kollam 19 STP for 0.02 At DPR Stage DPR returned 30/12/2021 Convention for Centre,Pinaryi modification Grama Panchayath , Kannur 20 STP at CHC 0.01 At DPR Stage DPR returned 30/12/2021 Mullashery for Block modification Panchayath , Thrissur 21 Eco Friendly 0.01 At DPR Stage DPR returned 30/12/2021 waste water for

10 Treatment plant modification 10 KLD in vettam community Health centre , Tirur BP

22 Sewage 0.02 At DPR Stage 30/12/2021 Treatment Plant DPR returned to 20 KLD at LSGI Shopping Complex cum multiplex Theatre,Kallumu tti, Irutti Payam, GramaPanchaya th, Kannur

23 Sewage 0.05 At DPR Stage DPR returned to 30/12/2021 Treatment Plant LSGI 50 KLD, Angal Block Panchayath , Kollam 24 ETP 10 KLD 0.01 At DPR Stage DPR returned to 30/12/2021 Capacity, LSGI Municipality, Thiruvananthap uram 25 ETP Karavaram 0.01 At DPR Stage DPR returned to 30/12/2021 Grama LSGI Panchayath, Thiruvananthapur am 26 STP at 0.025 At DPR Stage DPR returned to 30/12/2021 Community LSGI Health Centre Payanoor Block Panchayath ,Thirssur 27 STP for 0.035 At DPR Stage DPR returned to 30/12/2021 government LSGI ayurveda hospital,

11 GP, Thrissur

28 ETP at 0.030 At DPR Stage DPR returned to 30/12/2021 Kodimatha, LSGI Kottayam Municipality 29 STP at hospital, 0.120 At DPR Stage DPR returned to 30/12/2021 Pazhayangadi, LSGI Kannur 30 ETP at Tirur 0.060 At DPR Stage DPR returned to 30/12/2021 Municipality LSGI

31 ETP for 0.030 At DPR Stage Under Technical 30/12/2021 slaughter house, Scrutiny Marakkadavu, Ernakulam 32 STP at Municipal 0.05 Civil works of tanks and Bus Stand, other physical structures Tirur(PRS) completed. Interconnections to be established. Trial run conducted on 20.10.2020. Electrification and overhead tank construction to be done.

33 FSTP at 0.25 Technical committee verified Project has been - the project. Suggested forwarded to RKI municipality, modification. DPR for funding modification is going on

34 STP at 2.5 To be retendered: Reply is awaited 31.03.2022 Decentralised The land selected falls under from Agricultural Sewerage Scheme Kole Wet Land category and Dept. regarding hence category change to be SLMC. - Thrissur made in the Govt. data bank. Corporation For this approval of SLMC is (AMRUT) (PRS) necessary. Details to be submitted to SLMC for approval were given to the Agricultural Officer on 12/03/21 & from there the same was forwarded to the Secretary, Agricultural Dept. (NCA) on 09/04/21.

Work to be retendered after The corrected approval of revised estimate & revised estimate was issuance of revised Technical submitted to CE, Sanction by CE, LSGD. In the LSGD Office on meeting held on 22/04/21 the 26/05/21 & the same

12 CE, LSGD suggested certain is under scrutiny. changes & additions in the revised estimate.

35 STP at 1.4 Selection notice issued but 31.03.2022 DecentralisedSew agreement to be executed: Contractor erageSystem Bid received (36.64% above) informed on - in the 6th tender to be 17/05/21 that they Kochi finalized. Council held on require more time 06/02/21 decided to request to complete the Corporation Div- the Govt. to exempt the formalities due to 15 (AMRUT) Corporation from bearing Covid. half of the cost due to tender excess. The 27th SHPSC held on 20/02/21 directed the Secretary to explain to the Council that 50% of cost due to tender excess has to be borne by the Corporation & get the decision in this regard.To be placed in the next Council for approval.Approval obtained from Hon' Mayor on 10/03/21. Selection notice was issued on 04/05/21. Agreement to be signed. 36 STP at 1.1 Selection notice issued but Reply is awaited from 31.03.2022 Decentralised agreement to be executed: the Contractor. SewerageSystem

13 - Bid received (25.95% Kochi above) in the 4th tender to be Corporation Div- finalized. Council held on 16 (AMRUT) 06/02/21 decided to request the Govt. to exempt the Corporation from bearing half of the cost due to tender excess. The 27th SHPSC held on 20/02/21 directed the Secretary to explain to the Council that 50% of cost due to tender excess has to be borne by the Corporation & get the decision in this regard. To be placed in the next Council for approval.Approval obtained from Hon' Mayor on 10/03/21. Selection notice was issued on 04/05/21. Agreement to be signed. 37 Decentralized 1.4 31.03.2022 Selection notice issued but SewerageSystem( Contractor informed agreement to be executed: with STP) - on 17/05/21 that they Bid received (25.92% KochiCorporation require more time to above) in the 4th tender Div- complete the to be finalized. Council 17,Perumpadappu( formalities due to held on 06/02/21 Covid STP opposite decided to request the St.Juliana Public Govt. to exempt the School, Pai Road) Corporation from (AMRUT) bearing half of the cost due to tender excess. The 27th SHPSC held on 20/02/21 directed the Secretary to explain to the Council that 50% of cost due to tender excess has to be borne by the Corporation & get the decision in this regard. To be placed in the next Council for approval.

14 Approval obtained from Hon' Mayor on 10/03/21 Selection notice was issued on 04/05/21. Agreement to be signed. 38 STP at Division 1 6.5 Awarded not started Awarded not started - - 4 under Cochin Smart City Mission 39 5 STPs are 10 To be tendered To be tendered - coming up under + 10 the KMRL’s + 2+ Integrated 5+ Water 4 transport =31 System project at Elaamkulam,Ve nn ala, Edapally, Puthukalavattom , Perandur 40 FSTP at 0.1 The ULB replied on - 28/04/21 that they Andamukkam, Cancelled: Kollam had tried to The SHPSC held on 20/02/21 implement the Corporation agreed to the suggestion of the (AMRUT) project but their Hon’ble Mayor of Kollam to efforts in this regard cancel the septage project & were thwarted due to use the amount available from public protests at the the project as well as the proposed location. unused amount till date in In order to avoid the Sewerage Sector of Kollam loss of AMRUT fund under AMRUT for set aside for the implementing the balance Septage projects sewer network (balance of they had decided to KSUDP). In the meeting cancel the Septage conducted by the Chief Plants and utilize the Secretary on 05/04/21 it was same for sewer directed that the decision to network laying cancel the Septage Plant may works (balance of be reconsidered & accordingly KSUDP) as the same letters were sent from AMRUT is necessary for to the ULB on 09/04/21 & implementing a 26/04/21. complete sewerage system in Kollam

15 Corporation along with the 12 MLD STP being implemented under AMRUT at Kureepuzha. The ULB also informed that they are searching for ideal locations for constructing Septage Plants & on finding the same they will utilize their own funds to implement the Septage Plants. 41 FSTP at The ULB replied on - Vasoorichir 0.1 28/04/21 that they a, Kollam had tried to Corporation implement the project (AMRUT) but their efforts in this regard were thwarted Cancelled: due to public protests The SHPSC held on 20/02/21 at the proposed agreed to the suggestion of the location. In order to Hon’ble Mayor of Kollam to avoid the loss of cancel the septage project & AMRUT fund set use the amount available from aside for the Septage the project as well as the projects they had unused amount till date in decided to cancel the Sewerage Sector of Kollam Septage Plants and under AMRUT for utilize the same for implementing the balance sewer network laying sewer network (balance of works (balance of KSUDP). In the meeting KSUDP) as the same conducted by the Chief is necessary for Secretary on 05/04/21 it was implementing a directed that the decision to complete sewerage cancel the Septage Plant may system in Kollam be reconsidered & accordingly Corporation along letters were sent from AMRUT with the 12 MLD STP to the ULB on 09/04/21 & being implemented 26/04/21. under AMRUT at Kureepuzha. The ULB also informed that they are searching for ideal locations for constructing Septage

16 Plants & on finding the same they will utilize their own funds to implement the Septage Plants. 42 FSTP at The ULB replied on - Karikkuzhi 0.1 28/04/21 that they Ela, Kollam had tried to Corporation implement the project (AMRUT) but their efforts in this regard were thwarted due to public protests at the proposed Cancelled: location. In order to The SHPSC held on 20/02/21 avoid the loss of agreed to the suggestion of the AMRUT fund set Hon’ble Mayor of Kollam to aside for the Septage cancel the septage project & projects they had use the amount available from decided to cancel the the project as well as the Septage Plants and unused amount till date in utilize the same for Sewerage Sector of Kollam sewer network laying under AMRUT for works (balance of implementing the balance KSUDP) as the same sewer network (balance of is necessary for KSUDP). In the meeting implementing a conducted by the Chief complete sewerage Secretary on 05/04/21 it was system in Kollam directed that the decision to Corporation along cancel the Septage Plant may with the 12 MLD STP be reconsidered & accordingly being implemented letters were sent from AMRUT under AMRUT at to the ULB on 09/04/21 & Kureepuzha. The ULB 26/04/21. also informed that they are searching for ideal locations for constructing Septage Plants & on finding the same they will utilize their own funds to implement the Septage Plants. 43 FSTP at Selection notice issued but The Application was 31.12.2021 Ramavarmapura 0.1 agreement to be executed: resubmitted by the Selection notice was issued on m, Thrissur ULB to KSPCB on 31/12/19. Agreement to be (AMRUT) 12/05/21 (5th time). signed. Council held on (PRS) 15/07/20 decided to proceed Consent to establish further with this project only dated 28/05/21 was

17 after obtaining consent to issued by the establish from KSPCB. The KSPCB. application was resubmitted (4th time) to KSPCB on 23/03/21 along with the details sought but the same was returned again by KSPCB on 13/04/21 (5th time). This time KSPCB asked for confirmation of the quality of treated water proposed to be reused 44 FSTP at 0.1 Selection notice issued but 31.03.2022 Yakkara, agreement to be executed: Reply is awaited Selection notice was issued Palakkad from Revenue on 04/08/20. Agreement to Municipality Dept. be signed. Permissive (AMRUT) sanction for the selected land is awaited from Revenue Dept. For this purpose a mutual transfer of land has to happen between the Revenue Dept. & the SC/ST Dept. Principal Secretary, Revenue informed vide letter dated 10/02/21 that they have forwarded the file to SC/ST Dept. for their comments & reply is awaited. In the meeting conducted by the Chief Secretary on 05/04/21 it was directed that the Revenue Dept. may be approached for providing the necessary permissive sanction within a fixed time frame of 3 weeks. Accordingly letters were sent on 09/04/21 & 26/04/21 from AMRUT to the Principal Secretary, Revenue Dept. 45 Work started but stalled: The ULB invited 30.09.2021 FSTP at 0.1 Legacy waste dumped at the quotations on Chellora, Kannur proposed location to be 21/05/21 for legacy Corporation cleared for starting the works waste removal (AMRUT) in full swing. The legacy equipment with waste clearance work (KSIDC 05/06/21 as last Project) had started but the date.

18 same has been stopped due to huge increase in the anticipated quantity of legacy waste. Core Committee held on 29/04/21 approved the proposal of getting the site cleared as separate work. Accordingly letter was sent from the ULB to M/s. Zonta on 30/04/21 that they shall restart the legacy waste clearance works by 10/05/21, otherwise the ULB will arrange the work separately & the cost incurred will be deducted from their project cost. 46 FSTP at 0.1 Work started but Chakkumkan dam, stalled: The ULB is 31.12.2021 Guruvayur Land filling works checking the Municipality, arestopped since Feb- possibility of Thrissur 2020 due to want of constructing the (AMRUT) permission from plant on a KWA Revenue Dept. RDO land which is informed on 29/12/20 already filled & that the land selected for near the proposed the work is coming under location. The wet land category drawing of this new &recommendation of location is being LLMC is required for prepared by the changing the category of ULB land in the databank. LLMC was convened on 15/02/21. Minutes of the meeting was given on 20/04/21 to the ULB & as per the same the selected land falls under wet land category. 47 Technical Sanction to be TS Committee held & Mobile Septage issued: on 26/05/21 decided Units- 2 nos, 0.02 48 Estimate in Price software to issue TS based on 31.12.2021 Alappuzha (0.01 *2 nos.) was prepared by the the conditions that (AMRUT) Consultant & submitted to the bids will be

19 CE, LSGD on 23/02/21. LMR invited for analysis & supporting implementing the quotations were submitted by plant (10 KLD & the Consultant on 09/04/21 & 6KLD - using any the same were forwarded to proven technology) CE, LSGD. on annuity basis & the ULB will take decision on the capacity of the plant to be constructed after getting the bids. 49 STP at General Selection notice issued but Health Dept. of 31.12.2021 Hospital, 0.24 agreement to be executed: General Hospital Alappuzha Selection notice was issued conducted auction (AMRUT) on 29/12/2020. Agreement on 10/05/21 but no to be signed. Existing offer was received. structure at the site to be Hence the Health demolished. Permission in Dept. has given this regard is awaited from permission on the Health Dept. of General 11/05/21 to the ULB Hospital. Health Dept. to go ahead with the informed on 31/03/21 that demolition works. they will also conduct an Work order for auction for demolishing the demolition work existing building & offers was issued by the that will be received will be ULB on 17/05/21. compared with the offer Agreement to be received for the same by the signed. ULB and the better offer will be finalized. 50 STP at Technical Sanction to be TS Committee held 31.03.2022 ShatabdhiMandira 0.015 issued: on 26/05/21 decided m, Alappuzha Estimate in Price software was to issue TS based on (AMRUT) (PRS) prepared by the Consultant & the condition that submitted to CE, LSGD on the bids will be 23/02/21. LMR analysis & invited for supporting quotations were submitted by the Consultant on implementing the 17/04/21 & the same were plant (using any forwarded to CE, LSGD. proven technology) on annuity basis. 51 STP at 0.05 Technical Sanction to be TS Committee held 31.03.2022 Thottumadi issued: on 26/05/21 decided Colony, Estimate in Price software was to issue TS based on prepared by the Consultant &

20 Alappuzha submitted to CE, LSGD on the condition that (AMRUT) 23/02/21. LMR analysis & the bids will be supporting quotations were invited for submitted by the Consultant on implementing the 19/04/21 & the same were plant (using any forwarded to CE, LSGD. The proven technology) estimate was returned by the CE, on annuity basis. LSGD for certain corrections on 23/04/21. The corrected estimate was submitted to CE, LSGD on 07/05/21. 52 STP at General Awarded but not Started: Electrical connection 31.12.2021 Hospital, Thrissur 0.36 Agreement was executed on shifting works by (AMRUT) (PRS) 14/10/20. Consent TCED are delayed to Establish (dated due to Covid. 11/12/20) was issued by KSPCB. Letter was sent to the Contractor on 21/12/20 asking for submissionofadditionalperfo rmance guarantee.The Contractor informed on 27/02/21 that they will submit the additional performance guarantee when the site is ready to be handed over to them. Site to be handed over to the Contractor after demolition of the existing structure at the location. Electrical connection to this building to be shifted for starting the demolition works. 53 Work started: A joint meeting is 31.12.2021 STP at District 0.27 Site clearance and survey expected to be Hospital, Palakkad have been done by the conducted in this (AMRUT) Contractor.Contractor regard by the ULB submitted the details of with the Consultant & Contractor in the 1st variations required &its week of June-2021. estimate on 12/02/21 & the same was forwarded to the Consultant. Reply was given by the Consultant on 26/02/21 & the same was forwarded

21 from the ULB to the Contractor on 01/03/21 after scrutiny.Reply isawaited from Consultant regarding increase in depth of excavation & change in manhole type to RCC. Excavation works for plant foundation has been done. Contractor is yet to start other works. A letter was sent to the Contractor from the ULB on 06/05/21 asking them to restart plant related works. The Contractor replied on 08/05/21 that they need clarifications regarding payment conditions & they are awaiting reply from the ULB regarding the technical queries raised earlier by them 54 Sewage Treatment Tendered but not KSPCB officials 31.03.2022 Plant & associated 0.8 Awarded: inspected the site on network at Bid received (18.5% above) 24/05/21. A meeting Sundaram Colony, in the 5th tender to be is expected to be Palakkad finalized. The 26thSHPSC conducted with (AMRUT) held on 17/12/2020 decided KSPCB in this to approve the tender excess regard. Selection subject to condition that half notice was issued of the cost due to tender on 17/05/21. The excess shall be borne by the Contractor Corporation informed on The Council held on 24/02/21 19/05/21 that they approved the bid received require more time (18.5% above) in the 5th tender. to complete the Application for consent to formalities due to establish was submitted to Covid. KSPCB on 20/03/21 & fee was paid on 05/05/21. 55 Sewage 2 MLD Workstarted: The ULB gave a 31.12.2021 & treatment plant Plant Site cleared & setting out letter to the 56 at Medical (with works to be started by the Contractor on College with septage Contractor. Network 14/05/21 to restart the works. Septage treatment design submitted by the Contractor treatment, ) Contractor to be discussed informed on

22 Kozhikode &1MLD & finalized by in the next 17/05/21 that they (AMRUT) plant TS Committee require more time (PRS) meeting.Structural designs to restart the work of plants were submitted due to Covid. by the Contractor on Work is expected to be restarted in 17/02/21. Contractor to the 1st week of get the same vetted by a Jun-2021. Govt. Engg College. Vetted plant designs were received from the Govt. Engg. College on 03/04/21. The same was approved by the ULB on 08/04/21.Contractor had started the sewer network laying works but the same had to be stopped due to Covid

57 STP at Sewerage 7.0 Awarded but not Started: KSPCB informed on 31.03.2022 system in Zone EIA & CRZ status reports to 23/05/21 that the A, Package A, proposed land be prepared for submitting doesn't meet the AvikkalThodu, application to KCZMA for distance criteria of Kozhikode approval. The application for KSPCB & hence (AMRUT) consent to establish was consent to establish can't be given. As (PRS) resubmitted to KSPCB along per the request of with the corrected drawing on the Hon'ble Mayor 01/02/2021.Agreements were the RO, KSPCB has signed on 24/02/21.Site was again sent the visited by KSPCB officials on proposal to HO, KSPCB on 27/05/21 25/02/21. for approval. Final EIA Report is Site was visited by KSPCB expected to be given officials on 25/02/21. KSPCB by Ultratech, returned the application on by 1st week of June-2021. Final 16/03/21 & asked to submit CRZ Status report is effluent reuse details. The expected to be given application was resubmitted by IRS, Chennai in to KSPCB on 20/03/21 the 2nd week of June-2021. along with the details sought. EE, KSPCB has forwarded the proposal to CE, KSPCB, TVPM on 27/03/21 for approval.

23 58 STP at Selection notice issued but They informed on 31.03.2022 Decentralised 1.0 agreement to be executed: 07/05/21 that they sewerage New Council held on require more time for network with 08/01/21 decided that half the same due to STP in old of the cost due to tender Covid. Kannur excess can't be borne by Municipal area, the Corporation & place Kannur agenda again in the next (AMRUT) SHPSC. The 27th SHPSC held on 20/02/21 noted that network & road restoration are part of the same project (single project ID) and hence overall expenditure is well within the AS amount. However, in case of any additional fund requirement, the ULB has to bear 50% of the same Selection notice was issued on 24/02/21.Agreement was signed (dated 26/02/21). Work to be started * Contractor has requested the ULB on 08/03/21 to provide mobilization advance (25%). In this regard a meeting was held with Contractor's officials on 24/03/21.  Contractor was asked by the ULB on 23/04/21 to complete all formalities & start the works. 59 STP at 1.50MLD DPR approved by KIIFB. DPR approved by 31.12.2022 Ottappalam Co- PCB NOC obtained. KIIFB. Consultant treatment Technical Sanction Process making corrections Municipality, including obtaining other as per technical Palakkad StatutoryClearances ongoing. committee District Placed in Technical comments. (IMPACT committee. KERALA Ltd)

24 60 STP at 1.00MLD DPR approved by KIIFB. DPR approved by 31.12.2022 Co- PCB NOC pending. PCB KIIFB Municipality, treatment had conducted a meeting Thrissur of all concerned (IMPACT stakeholders on KERALA Ltd) 01/02/2021 and have suggested corrections in DPR. Municipality yet to submitas they need redesign. 61 STP at 0.5 MLD DPR appraisal ongoing in DPR modification - Vadakara Sewage TP KIIFB. Necessary TAR ongoing Municipality, 20KLD corrections being made in Kozhikkode Septage TP the DPR by consultant. (IMPACT KERALA Ltd) (PRS) 62 STP at 250KLD Submitted to RKI for AS AS accorded - Cherthala Septage TP Placed in the HLEC of (Awaiting Municipality , RKI. proceedings) Alappuzha (IMPACT KERALA Ltd) 63 STP at 1.00MLD Puramboke land. NOC to DPR under - Wadakkancher Co- be obtained from district preparation yMunicipality, treatment collector. Thrissur (IMPACT KERALA Ltd) (PRS) 64 FSTP at 50 KLD DPR placed in Technical DPR Correction - Septage TP committee. To be ongoing as per Municipality, submitted to RKI for AS. technical Thiruvanant committee ha puram comments. (IMPACT KERALA Ltd) 65 STP at 590KLD DPR placed in Technical DPR Correction - Mayyand Co- committee for forwarding to ongoing as per GP, Kollam treatment RKI. Committee suggested technical (IMPACT modifications. Necessary committee KERALA Ltd) corrections being made in comments. the DPR by consultant. Technology being

25 reworked by consultant. To be submitted to RKI for AS. 66 STP at 18 DPR submitted to KIIFB as DPR - OttupparaMark KLD STP a partof the project Approved by KIIFB et, “ModernisationofOttupara Wadakkancher Market y Municipality, inWadakkancheryMunicipali Trissur ty”. (IMPACT KERALALtd) (PRS) 67 STP at Athani 13.9 DPR submitted to KIIFB DPR - market, KLD STP as part of the project Approved by Wadakkancher ”Modernisation of Athani KIIFB, KIIFB y Market inWadakkanchery Proceedings Municipality, Municipality”. awaited Trissur(PRS) DPR Approved by KIIFB, (IMPACT KIIFB Proceedings KERALALtd) awaited

68 STP at Fish 10 Technical committee DPR - market, KLD STP verified the project. modification is Payyannur Suggested modification. going on Municipalit DPR modification is going y, on Kannur (PRS) 69 STP at Athani, 350 Site identified. DPR DPR under - Wadakkancher KLD STP underpreparation preparation y Municipality, Trissur (PRS) 70 Sewerage system 6 Awarded but not Started: KSPCB informed on 31.03.2022 (with STP) in Zone EIA & CRZ 23/05/21 that the A, Package B, statusreports to proposed land doesn't meet the Kothi, Kozhikode beprepared for distance criteria of (AMRUT) submitting KSPCB & hence (PRS) application to consent to establish KCZMA for can't be given. As approval.The per the request of application for the Hon'ble Mayor consent to establish the RO, KSPCB has was resubmitted to again sent the KSPCB on proposal to HO,

26 20/01/21. KSPCB on 27/05/21 Agreements were for approval. Final signed on EIA Report is 24/02/21.Site was expected to be given visited by KSPCB by Ultratech, Mumbai by 1st week officials on 25/02/21 of June-2021. Final KSPCB CRZ Status report is returned the application on expected to be given 16/03/21 & asked to submit by IRS, Chennai in effluent reuse details. the 2nd week of The application was June-2021 resubmitted to KSPCB on 20/03/21 along with the details sought. EE, KSPCB has forwarded the proposal to CE, KSPCB, TVPM on 27/03/21 for approval.  Request for NoC was given to KSEB & KWA on 29/01/21 as the same is required for KCZMA approval. Reply is awaited from KSEB & KWA.  The 27th SHPSC held on 20/02/21 decided to approve the 30% tender excess subject to the condition that the Corporation will bear 50% of the additional cost due to tender excess.

27

IV. V. Details of IndustrialPollution:

 No. of industries in the State: 143990(Registered in the web portal of KSPCB)  No. of water polluting industries in the State:4629  Quantity of effluent generated from the industries in MLD: 16 8 . 7 6 8 4  Quantity of Hazardous Slude generated from the Industries in TPD:2584.572  Number of industrial units having ETPs:3786 nos  Number of industrial units connected to CETP: As per the available data-64 nos  Number and total capacity of ETPs(details of existing/underconstruction/proposed)  Compliance status of the ETPs: Out of 3715 ETPs,3685 are complying  Number and total capacity of CETPs(details of existing/underconstruction /proposed) - 7 nos of CETPs are functional (Total Capacity – 7.925MLD), 1 CETP having capacity 0.25 MLD not operational due to non availability of raw material. Proposed CETPs – 3 nos. (Total Capacity- 5.5 MLD). 1 CETP having capacity 1 MLD is under construction ( 12 CETPs- capacity- 14.425 MLD)

 Industries Dept. invited EOI for the preparation of DPR for ETP at Edayar & Industrial Area .Work awarded to KWA for Edayar & to KITCO for Aroor.  For CETP at Edayar-Discussions held, data being obtained.20% work over. Due to lockdown not able to get field data. Survey works can be completed by 15.7.2021, DPR preparation can be completed by 31/8/21

28 Details of existing/under construction/proposed CETPs in the State

CETP Utilisation capacity No. CETP location CETP Installed Operational capacity Status Kinfra Apparel Park, St. Operational Xavier’s College P.O, 1. Thumba, 4.5MLD 4.5MLD

Sea Food Park () Ltd., Operational(Par 2. 0.3 MLD Aroor, Alappuzha 0.3 MLD ameters complied with standards stipulated) SEZ, Kakkanad, Cochin Operational 3. Special Economic Zone 1.6MLD 1.6MLD Ernakulam Kinfra Small Industries Operational Park (Parameters 4. 0.4MLD Nellad, Mazhuvanoor, 0.4MLD complied with Ernakulam – 686 721 standards stipulated) Rubber Park India Private Operational(Par Limited, CommonEffluent ameters Treatment Plant, 2A, complied with 5. 0.25 MLD Kaudileeyam, Rubber 0.25 MLD standards Park, Valayanchirangara, stipulated) Ernakulam – 683556 Kinfra Techno Industrial Operational(Par Park, ameters 6. 0.675MLD KakkancheryChelambara 0.675MLD complied with P.O, Malappuram standards stipulated) Kinfra Textile Centre, Operational(Par Nadukani, Pallivayal P.O, 0.2 MLD 0.2 MLD ameters 7. Thaliparambu, Kannur – complied with 670 142 standards stipulated) - Not Operational KSIDC, Valiyavelicham, due to non 8. 0.25 MLD availability of Kannur waste water 9. 1.5 MLD - Proposed ACCEPT, Aroor Industrial Estate, Alappuzha

29 10. 1.5 MLD - Proposed CETP, Chandiroor

11. 2.5 MLD - Proposed CETP, Food Park, Cherthala

12. 1 MLD - Under CSEZ, Kakkanad, Cochin Construction Special Economic Zone Ernakulam

30 V. Solid Waste Management:  Total number of Urban Local Bodies and their Population :93 Urban Local Bodies (6 Corporation and 87 Municipalities) , Total Urban Population : 76,69,058.  Current Municipal Solid Waste Generation :3472 TPD  Processing Capacity : 2502 TPD  Gap in Solid waste management : 970 TPD  Number, installed capacity and utilization of existing MSW processing facilities in TPD (bifurcated by type of processing eg- Waste to Energy (Tonnage and Power Output), Compost Plants (Windrow, Vermi, decentralized pit composting), biomethanation, MRFetc:  The proposal for EPR Registration as per Solid Waste Management Rules, 2016 has been submitted to the State Government for approval. The main objective is to collect fee from brand owners based on the weight of packaging and to divert the fee amount to the authorized collectors of the local bodies.

31 Status of Present MSW processing facilities is given below:

Facility Type of plant Number Location and Capacity Centralised Windrow 2 plant composting Ernakulam, Kozhikode (100TPD) plants (large) Windrow 12 1. (13TPD), composting 2.NorthParavur(3TPD), 3. Chalakkudy(2TPD), plant(Small) 4. (4 TPD), 5., 6. Kunnamkulam, 7. Guruvayoor(2.TPD), 8. ChitturThathamangalam(4TPD), 9. Ottappalam (5TPD), 10. Palakkad(4TPD), 11. Thaliparambum, 12. Payyannur Communit Vermi 7 1.Attingal(0.25TPD); 2.Thodupuzha; 3. y level composting (1 TPD); 4.(1.5 plants(Smal TPD); 5. (0.5TPD); l) 6.Koothuparamba; 7.Mattannur(5TPD) Aerobins 406

Biogas plants 287

Biobins in 500+ Thiruvananthapuram, Ernakulam, Thrissur flats Material 483 Collection Facility Resource 68 recover facility Househol Pipe compost 1,34,270 Total-3,62,294 d level Kitchen bin 50,399

Biogas plant 25,255

Biocomposter, 49,730 biobin, pot bin Ring compost 20,283

Bucket 6,903 compost Compost pit 75,454 Institutional Biogas plants, aerobins, biobins level

32 SStatus of Waste- to- Energy Plants:

Sl. Plant Location Status of operation Power generation No. (MW) 1. Kozhikode Work awarded – Construction to be started

2. SulthanBathery Work awarded – work started

3. Kannur Tendering for WtE plant DPR stage completed and bidders were identified 4. Kollam Tendering for WtE plant DPR stage completed and bidders were identified 5. Palakkad Tendering for WtE plant at DPR stage completed and bidders wereidentified 6. Kochi Retendering Retendering stage

7. Thiruvananthapuram Tendering Tendering stage

8. Tendering Tendering stage

9 Thrissur Land identified

10. Malappuram Land identified

 Action plan to bridge gap between Installed Capacity and Current Utilization of processing facilities (if Gap >20%)  No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction)  Total no. of wards, no. of wards having door to door collection service, no. of wards practicing segregation at source  Details of MSW treatment facilities proposed and under construction(no., capacity, and technology):

26 Solid Waste processing facilities setup:

Sl. Composting Vermi-composting Biogas RDF/Pelletization No. 1. Centralised Community level-7 Community level- Nil windrow 287 Household composting plants– level- 2(Large);12(Small) 2. 25255 Community level- 1,193(aerobin, biobins) 3. Household level - 3,37,039

Solid Waste Processing facility operational:

Sl. Composting Vermi-composting Biogas RDF/Pelletization No. 1. Centralised Community level-7 Community Nil windrow composting level- 287 2. plants – 2(Large); Household level-

12(Small) 3. 25255 Community level- 1,193(aerobin, biobins)

Household level- 3,37,039

Solid Waste Processing facility under installation/planned:

Sl. No. Composting Vermi- Biogas RDF/Pelletisation composting

Being Being - planned/installation - planned/installation for decentralized for decentralized units units

27 A. Progress in establishing Waste to Energy plants in eightcities/towns having population above 1lakh Sl. Corporation/ Identified Area Status No Municipality site (acre) 1) Kozhikode Njaliyanpar 12.67 1.1 Waste to Energy Plant a- mbu (Govt. land)  Work awarded to Zonta Infratech Private Limited for the construction of Waste to Energy Plant at Njaliyanparambu. A company namely M/s.Malabar Waste Management Limited was formed. The Concessionaire has informed that the Financial Closure for the project has been achieved – SBI has agreed for a debt funding of Rs 146 crores.

 Consent to establish was issued to the waste to Energy plant.

 Clearing of ground for the plant is undergoing.

 Land development works are undergoing. Alternate road has been constructed on the periphery and vehicles started moving through alternate roads. The main road through the Centre for the site has now been closed. Request submitted to Social Forestry department for cutting trees in the site. Laying of water supply line to the site is nearing completion.

 M/s. MITCON Consultancy and Engineering Services has been appointed as the project management consultant for the development of the project with WtE facility at Kozhikode

28 1.2 Biomining at Njaliyanparambu

M/s Zonta Infratech Pvt Ltd started the work of clearing of legacy waste on 3rd March, 2020.

The clearing work of legacy waste resumed at the dumpsite on 4th May 2020 and 40% of legacy waste in Zone I has been removed.

The work is in progress at the site. 2) Kannur Chelora 9.7 2.1 Waste to Energy Plant (Govt. acres Land) Blue Planet Kannur Waste Solutions Private Limited was formed to take up the development of the project. Waste Characteristion study was Contucted by SPCB

SLAC directed MD, KSIDC & Secretary, Kannur Municipal Corporation to take immediate steps to execute the Lease Agreement and Concession Agreement for the project.

KSIDC has completed the tender process and the final offer along with details of the contractor, draft agreement to be executed with the Contractor and the technical proposal submitted by the Contractor has been forwarded to Kannur Corporation on 07th August 2020 for further proceedings.

KSIDC modified the Lease Deed addressing the Kannur Corporation’s concern on alienation of 9.7 acres of land at Chelora. The modified lease deed was submitted to the Secretary Corporation for execution. Further a stake holder meeting was held to explain the project details to the councilors on 24th August 2020 and all concerns raised were discussed and explained. Despite all these steps, Kannur Corporation has not leased the land at Chelora to KSIDC and a council resolution authorizing the Secretary Kannur Corporation to execute the concession agreement has not been passed. Concession agreement can be executed only on receiving land to KSIDC.

The concenssionarire has reported that the field studies including waste characterization and waste

29 quantification studies, as part of DPR preparation will be commencing next week.

2.2 Legacy waste

Govt vide GO(Rt) No. 714/2020/LSGD dated 27-3- 2020 issued direction to Kannur Municipal Corporation to hand over the 9.75 acres of the land identified at Chelora on lease basis to KSIDC for the development of Waste to Energy project and to execute MoU with KSIDC for clearing the existing legacy waste at dump site in Chelora.

Detailed waste characterization of study of dumpsite at Chelora was done by the Pollution Control Board. SLAC directed the Board to submit final study report along with remarks to KSIDC for further proceedings. The Board submitted the report to KSIDC.

Agreement has been executed with M/s Zonta Infratech Pvt Ltd, the selected bidder on 21st October for carrying out the rehabilitation of MSW dumpsite at the site. Asked Secretary Kannur Municipal Corporation to take immediate steps with the Contractor to expedite the works for rehabilitation of MSW dumpsite at Chelora. 3) Palakkad Kanjikode 15 3.1 Waste to Energy Plant (Land Blue Planet Kannur Waste Solutions Private Limited takenover was formed to take up the development of the from Kerala project. State Electricity The Concession Agreement for the project has been Board Ltd. in executed and the Concessionaire has taken steps for advance preparing the DPR for the project. The possession) Concessionaire has engaged M/s Dun & Bradstreet for preparing the DPR and that the study is in the final stages. As instructed by the Committee, modifications are incorporated in the DPR. Final DPR will be submitted by the end of February 2021.

30 Sl. Corporation/ Identifie Area Status d site No Municipality (acre)

4) Kollam Kureepuz 7.05 ha (Govt. 4.1 Waste to Energy Plant land)  M/s Venad Waste Management Solutions Pvt Ltd has submitted the draft DPR for the Integrated Solid Waste Management project with a Waste to Biogas facility of 200 TPD processing capacity.

 DPR was evaluated by the Committee and it has been modified and final DPR submitted to LSGD.  Concenssionaire has taken steps to submit applications to the concerned departments and agencies for statutory approvals and clearances. 4.2 Biomining

 For biomining the site, the Corporation informed that draft agreement to be executed with M/s.Zonta Infratech Pvt Limited is vetted by the Corporation’s Standing Counsel and the same will be placed in the next Council meeting for approval.

 SLAC directed the Secretary Kollam Corporation to take necessary steps to ensure either the Contractor follow the tender conditions or cancel the present tender and go for re-tender immediately.

Again the project has been retendered by the Corporation.

31 Sl. Corporation/ Identified Status Area No Municipality site (acre ) 5) Thiruvananthap Vizhinjam 5.1 Waste to Energy Plant

uram  Land identified for the solid waste processing plant for setting up the plant at Vizhinjam. The approval of the Board of VISL is to be obtained by the Board for the transfer of 15 acres of land on lease to KSIDC. The Board approval is to be communicated to the Port Department to issue necessary orders. The Port department informed that notification to take back the land will be submitted soon.

 KSIDC re tendered the project on Swiss Challenge mode on 27th May 2020 and 30th June was the last date for the submission of bids. The pre bid meeting as part of tender procedures was held on 08th June 2020. The last date for the submission of bids was 14th July 2020. KSIDC did not receive any challenging bids for the project.

 KSIDC directed M/s Essential Sustainability Services Incorporated to submit details regarding the technical and financial capabilities of the Consortium members and in response received certain details from them which was then evaluated

 The Bid Evaluation Committee is satisfied with the technical plan presented by the consortium, and resolved that the consortium led by M/s. Pan American Communication Services S.A. is technically qualified and recommended that the financial bid submitted by the Consortium be evaluated.

 Bid Evaluation Committee further resolved that the following details shall be obtainedfrom Consortium before the opening of thefinancial bid – Testimonials of technology use,

32 operating videos of the wte plants under this technology, Undertaking from the technology partner, Consortium members consent, analysis reports of the exhaust gas and ash. The above details were sought from the consortium and the consortium in response submitted certain details.

Directed State Pollution Control Board to evaluate the Technical proposal submitted by the Consortium for confirming the uniqueness and authenticity of the proposed technology.

6) Ernakulam Brahmap 6.1 Waste to energy plant 20 ur am acres (Govt.  KSIDC was authorized to take immediate land) steps to float an RFP for the selection of suitable concessionaire to set up Waste to Energy plant at Brahmapuram. The last date for submission of bids has been extended to 14th September 2020.

 Technical bids submitted by the Bidders needs to be evaluated by the Bid Evaluation Committee and the proposal has been submitted to Government to re constitute the Bid Evaluation Committee. It was reported by LSGD that steps have been taken to re constitute the Bid Evaluation Committee and order in this regard will be issued soon. Also expressed that a restriction can be brought in the tender conditions to prevent one particular company being awarded more than 3 WtE projects on PPP mode at a particular project development time, so as to ensure more competition and also easier financial closure.

33

6.2 Biomining  KSIDC floated e-tender to identify a suitable agency for the rehabilitation of MSW dump site at Brahmapuram. KSIDC submitted a proposal to constitute a Technical Evaluation Committee for technical evaluation of the bids. Evaluation of technical bid is in process.

 LSGD issued directions to Kochi Corporation to examine the quantity of legacy waste assessed and rate quoted by the bidder in consultation with PCB within 30 days

7) Thrissur 7.1 Waste to Energy Plant

 Thrissur Corporation identified land at Ollookkara village in Thrissurdistrict.

 Vide GO (Rt) No 111/2020/LSGD dated 13/01/2020 State Government has accorded sanction to Thrissur Municipal Corporation to purchase the identified land at Ollookkara Village in and to hand over the same on lease basis to KSIDC for the development of theproject Secretary, Thrissur Municipal Corporation to report the status of price negotiation done with the owners of the land identified. 7.2 Biomining of legacy waste

Proposal submitted to Suchitwamission for sanction.

34 Sl. Corporation/ Identified Area Status No Municipalit site (acre) y 8) Malappuram 8.09 KSIDC reported that Land Board has issued orders to District Administration Malappuram to hand over 8.09 acres of land at Kurumbathoor village in to KSIDC and that KSIDC has submitted necessary application in prescribed format to District Administration. SLAC directed to expedite the process.

35 B. Progress in establishing Waste to Energy plants in two towns having population below1lak Sl. Municipality Identified site Area Status No (acre) 9) Wayanad SulthanBat 0.5  Construction of platform completed hery (Govt.  Action to be taken on the Land) installation of machinery 10.1 Waste to Energy Plant 10) Idukki Munnar (Land 2 handed over by  Evaluated the technical bid submitted by the M/s Kannan Consortium of M/s Al Bucheeri General Devan Hills Transport Est, Pathanamthitta, M/s Al Plantations Pvt. Bucheeri Transporting Est UAE and M/s Ltd) Organic Recycling Systems Pvt Ltd, Mumbai on 19th August 2020.

 The Committee observed that the Consortium is meeting the technical and financial minimum eligibility criteria. The consortium made a detailed presentation of their technical plan before the Bid Evaluation Committee.

 SLAC after detailed discussion resolved to accord sanction to proceed with the Financial evaluation of the Bid

10.2 Biomining started at Munnar Panchyath. Macro particles like plastic, tyres, metal particles etc already finished with the help of JCB. Action for installing machinery for further process is going on for turning it into briquests for construction purpose.

36

 No. and area (in acres) of uncontrolled garbage dumpsites and SanitaryLandfills: Disposal of solid waste:  Landfill sites identified : 2 (One at the regional level at Ernakulum)  Landfill constructed : Nil  Landfill under construction : 1 For Regional Sanitary Landfill, land (25 acre) has been identified at sit e of FACT at Ambalamedu, Ernakulam and action is being taken for take over.

Solid Waste Dumpsites : . Total number of existing dumpsites :51 . Dumpsites reclaimed :9 . Biomining started at Njalianparmbu dumpsite and work awarded at Kureepuzha Kollam. Tendering stage at Kottayam, Bhramapuam, Chelora.. . Proposal for co-incineration facility at Malabar cements is under consideration. Monitoring at Waste processing/Landfills sites

Sl. Name of facilities Ambient Groundwater Leachate Compost VOCs No. air Windrow composting Yes Yes Yes No No 1. plant, Kozhikode

2. Windrow Yes Composting plant, Brahmapuram  No.and area(inacres)oflegacywastewithin1kmbuffer of both side of the rivers:  No.ofdrainsfallingintoriversandno.ofdrainshavingfloatingracks/screens installed to prevent solid waste from falling into therivers:

37 Status of ULB wise Management of Solid Waste

Percentage of D2D As reported by Collection(Dry localbodies waste) Quantity of Non-Bio Site Auth Quantity Waste Institution Annual Population Projected Waste No of Community Household Degrada identified orizat Authori Sl.N Local of waste treatment al level Dump sites report District as per 2011 population generated collect Level SWM Level SWM Centralized ble for ionA zation o body processe technology SWM identified (Form Census (2019) based on ors Plants Plants Waste Sanitary pplie granted population d(TPD) used Plants Manage IV) land fill d (TPD) Non- Quantity Quantity ment Househ residen of waste of waste old (%) tialpre Collected processed mises (TPD) (TPD) (%)

Material Collection Land identified for the solid Pipe compost- Facility in waste processing plant for 87000 Nos., 54 Biogas Plant (50,000 setting up the plant at locations 18 Nos of working) of Vizhinjam. The approval of Resource 12 Regional 18.4TPD 43.5TPD the Board of VISL is to be Recovery Thiruva De Biobin landfill 3 (Of which Under service Aerobin(Thu obtained by the Board for Unit - 4 1 Thiruvanth 958000 996204 456 19.4 92.1 42.95 242.23 222 centralized Kitchen Bin- site one Yes processi Yes nthapura provide 109 of 15 the transfer of 15 acres of numbers apuram management mboormuzhi 19000Biocom identified dumpsite ng m City rs TPD landonleasetoKSIDC.The Plastic facility model)53No poster-15833 at Kochi cleared) Board approval is to be s Biogas plant- Shredding having 12 3982 Nos of communicated to the Port Units - 2 TPD 2.39TPD; Department to issue Nos other units- necessary orders. Tendering Bailing 109 has been done for the Unit - 1 WtEplant Number

32

1(Kureepuzh a) • For Letter of Intent (LOI)issued biomining to the consortium by M/s. the site, the Zonta Infratech Pvt Ltd.,the Corporation successful bidder of the Material informed project on 12-3-2020 and Biogas plant- collection that draft consortium accepted the 1273 Nos. facility agreement to LOI and the Consortium has 13 biogas (working)of (200 sq Regional be executed De taken steps to incorporate plants of 2.5 TPD; ft)-one landfill with 2 Kollam Kollam 397000 412832 183 59.9 48.9 124 10.5 10.5 147 centralized Not the SPV and reserved Yes Yes No 5.6TPD; Pipe compost - Plastic site M/s.ZontaIn City management reported Venad Waste Management 13aerobins 462 (working) shredding identified fratechPvt facility Private Limited as the name of 3.9TPD of 1 TPD; 720 machine at Kochi Limited is oftheSPVwiththeMinistry biocomposter, (150 sq vetted by the of CorporationAffairs. biopot of1.5 ft) - one Corporation’ Consortium requested for an TPD number s Standing extension of time for the Counsel and incorporation of SPV due to the same will current lock down be placed in announced as part of Covid the next 19 pandemic Council meeting for approval.

33

Centralized Biodegradable waste in Regional 1(Retendering treatment - Biogas plant- dumping yard at landfill of Under Windrow Kochi Not 60 Brahmapuram . Windrow MCF- 8, site biominingof processi 3 Ernakulam 677000 703999 352 90 60 1200 308 215 304 composting Nil Yes Yes City reported Compost pits- composting. Retenderingof RRF-5 identified dumpsite at ng at 1212 waste to energy plant at at Kochi Brahmapura Brahmapur Brahmapuram m) am

Thrissur Corporation identified land at Ollookkaravillage in Thrissur district. Total Vide GO (Rt) No quantity of Organic Biogas plant- 111/2020/LSGD dated Material Regional biodegrada Waste 632;Compost 13/01/2020 State ble Converter-2 pit- 20118;50 Government has accorded collection landfill Thrissur Decentralis managed- Nos of 4 and biocomposter, sanction to Thrissur facility-8 site 4 Thrissur City 317526 330189 153 23.3 19.7 145 103 103 114 ed facility 1 (Laloor) No No Yes 6.71TPD 8TPD biobin and Municipal Corporation to Resource identified recovery Non Biogas plant- four other purchase the identified land at Kochi biodegrada 9 units at Ollookkara Village in facility-3 ble Thrissur district and to hand 0.7TPD over the same on lease basis to KSIDC for the development of the project.The matter is being placed before the Council for approval and further proceedings.

34

Windrow Composting. Work awarded to Zonta Infratech Private Limitedforthe construction of Wasteto Energy Plant at Njaliyanparambu. A company namely M/s.Malabar Waste Management Limited was formed and they applied for Centralized registration in KeralaSingle Biogas plant treatment - Biogas-261 Window Clearance Portal Regional 1(Njaliyanpar Non- Material Windrow at public Pipe compost- (KSWIFT) and to individual landfill ambu) 5 Kozhikode Kozhikod 550000 571934 300 66.4 69.3 602 98 95 140 biodegrada collection Yes Yes Yes composting utility place- 10250 departments forclearance. site Biomining e ble- 4Nos facility-2 started at The company obtainedNOC identified 0.75TPD Aerobins-28 Njaliyanpra from State Environmental at Kochi mbu Impact Assessment Authority. Suchitwa Mission submitted the proposal to Ministry of Housing and Urban Affairs for approval of their sharein the VGF for theproject. Clarification on the points was called for by the Ministry and the same is being processed.

35

M/s Organic Recycling Systems Private Limitedand M/s. Blue Planet Environment SolutionsIndia Limited have completed the incorporation of SPVs inthename of Blue Planet Kannur Waste Solutions Private Limited to take up the development oftheproject. Consortium has selected Kitchen bin- Material 1(Chelora)M agency for the preparationof 102 collection Regional oU with DPR, waste quantification Biomethanatio Biogas - facility-2 landfill KSIDC for Under 6 Kannur Kannur 356000 370197 109 63.5 89.3 44 15 15 107 LandFilling Not and characteristic study in Yes Yes n of 0.25 40(working) Plastic site clearing the processi reported and the TPD Pipe Compost shredding identified existing ng agency could notcommence Trenching 1682(working unit at at Kochi legacy waste due to lock downannounced ) Chelora-1 at dump site in connection with Covid19 in Chelora pandemic. Govt vide GO(Rt)No. 714/2020/LSGD dated 27-3- 2020 issued direction to Kannur Municipal Corporation to hand over the 9.75 acres of the land identified at Chelora on lease basis to KSIDC for the development of Waste to Energy project and to execute MoU with KSIDC for clearing the existing legacy waste at dump site in Chelora.

36

Biogas Resource Windrow Plant(Dheen Recovery composting abandhu) plant of Facility - 6 Nos with SWM 13TPD, capacity of Biogas Plant Plant, 1TPD Chudukad Centralised 6 Nos - 3.25 Windrow composting plant, Under Biogas Biogas Plant u anddecentra TPD vermic composting plant, processi 7 Attingal 37648 39150 17 48.5 100 43 16 16 17 plant 407 Nos- Yes 1 Yes Yes lised and biogas plant ng (Portable) Vermi 0.85TPD Plastic systems 5 Noswith Compost 1 Shredding

capacity of No wih Machine-

107.5 capacity of SWM

kg/day 0.25 TPD Plant, Chudukad u

Decentralise Aerobins-37 Biogas plant- At Neduma Ring MCF-1; regional 8 60161 62561 25 6.2 62.5 22 1.5 1.5 8 d 200 Nil Nil No No Yes ngad compost -15 Kitchen bin- RRF-1 level treatment Thiruvanat 2617

hapuram

Biogas plant- At Neyyatti Decentralise Boiogas Aerobins 21 104 regional 9 nkara 70850 73676 30 48 18.3 88 3 3 10 d plant-20 Biogas plant Compost pit- Nil MCF- 1 level Nil No No Yes treatment 10 14360

37 Compost (Thumboorm uzhi Model)

33 bins at 33 Biogas Plant - locations Decentralise 200 Nos Pipe At with capacity MCF-3; 10 Varkala 40048 41646 17 69 88 18 4.8 4.8 9 d Compost - Nil regional Yes -one Yes Yes Yes of 33 RRF-1 treatment 2500 level Cubicles Biogas Plant 1 No- 100Kg

2.9TPD of biodegrada

ble waste Biogas plant- At Decentralise Compost pit, Karunag and 21 MCF-1; regional 11 47483 49377 21 29.4 20.6 35 7 1 6 d Vermicompost Nil Nil Yes Yes Yes apally 0.3TPDof Compost pit- RRF-1 level treatment ing. biodegrada 8521 ble waste is managed.

Biogas Plant - 1 No - Taluk Biogas Plant Hospital 1 No - Biogas Plant - Market, Decentralise 106 Nos At Biogas Chandamukk 12 Kottaraka 31256 32503 13 66.6 20.1 58 1.34 1 4 d Ringcompost- Nil MCF-29; regional Nil Yes Yes Yes Plant u ra treatment RRF-1 level (Portable) Aerobic 250 1 No- compost - 8 Pipe Compost Kollam Boys HSS 28 Total -16 biogas plants

Decentralise 8 biogas Pipecompost- At Under 13 Paravur 36798 38266 15 100 100 32 2 2 5 d 10 biogas plant,Aerobi 162 Nil MCF regional Nil Yes processi Yes (South) treatment plant ns-4 Biogas plant- level ng 121

38

39 Material Aerobic Collection compost -2 Biogas-1250 Facility - Decentralise bins at 2 Pipe Compost- 233sq ft - At 14 48648 50589 20 100 100 127 20 10.5 20 Not Nil Nil Yes Yes Yes d locations 5000 233 regional reported treatment withcapacity Compost pit - locations level of 12 6500 Small cubicles collection facilities)

1.4TPDof Pipe compost- At

Decentralis biodegrada Aerobins- 6 1010 MCF-1; regional 15 29171 30335 12 0 3.5 4 1 0.8 4 Nil Nil No No Yes ed ble waste bins 3 unit s RRF-0 level treatment is Ring compost managed - 250

At Pandala Decentralise 0.89TPD Compost bins regional 16 m 41604 43264 17 60 0 1.5 1.5 5 d of waste is 2650 Nil Not given Nil No No Yes level treatment managed

40

Pathanamt

hitta 0.92TPD of biodegrada Biogas plant - At Under Pathanam Decentralise blewaste Biogas Plant 400 MCF-3; regional processi 17 thitta 38002 39518 16 28 8 17 1 1 5 d and 2 Nos Compost pits- Nil RRF-1 level Nil Yes ng Yes treatment 0.35TPD Aerobin-5 520 of non biodegrada blewaste managed

Biogas Plant 4.79TPD 2 with of capacity of Biogas Plant - biodegrada 350kg 170Nos At Thiruvall Decentralise ble waste regional 18 52883 54992 22 100 100 55 1.4 12 Nil MCF-1 Nil No No Yes a d and Biogas Plant Pipe Compost level treatment 1.5TPD of 1 with 2360 Nos non capacity of biodegrada 750Kg blewaste

Biogas Plant- Aerobic 1964Nos. Decentralise Compost At 1 Under 19 Alappuzh 174000 180953 72 94 82 76 58 25.15 21 d Not given (Thumboorm Pipe compost- Nil MCF-23; regional (Sarvodayapur Yes processi Yes a treatment uzhi Model) 1263Nos. RRF-3 level am) ng 29 units Biobin- 6000 Nos

41

Aerobic Compost At Under Decentralis (Thumboorm Chengan regional process 20 23456 24393 10 13 60 25 0.5 0.85 3 ed Not given uzhi Model) - Nil MCF-1 Nil Yes Yes nur level i ng treatmen 12 bins at 1 t location

42

Aerobic Composting Compost At Under Decentralise units-90 Cherthal (Thumboorm Biogas plant- MCF-1 regional processi 21 45827 47658 19 74 98 35 0.6 0.6 6 d Not given Nil Nil yes Yes a uzhi Model) - RRF - 1 level ng treatment 350 26 bins at 2 Compost pits- locations 850

Alappuzha Composting Plastic units-783 At Under Decentralis 2.02TPD Aerobic unit Shredding Biogasplants- regional processi 22 Haripad 15588 16211 13 93 77 30 1 1 5 ed is 5 Nil Machine - Nil Yes Yes 87 level ng treatment managed 1 Number Compost pits- 1579

Material Biogas Plant Composting Collection Aerobic unit-1431 Facility - compost Biogas plant- 1location At Under Decentralis 0.06 TPD Kayamku (Thumboorm 364 regional processi 23 lam 71376 74228 30 31 40 9 2.72 2.5 10 ed is Nil Nil Yes Yes uzhi Model4 Compost pits- Resource level ng treatment managed bin) 4450 Recovery Location Pipe Compost Facility withcapacity 1950 1 location of 24 kg/day

Aerobic Compost Decentralis (Thumboorm Biogas plant- At Under 24 Mavelik 26421 27477 11 69 85 6 1.3 3 ed Not given uzhi Model) 242 Nil MCF-1 regional Nil Yes processi Yes ara treatment 12 bins at 1 RRF - 1 level ng location with Pipe Compost capacity of 165 10kg/day

43

8800 Ring compost 1800 Decentralis Aerobins -36 At Biobin unit 25 Changan 127987 133102 54 21 0 Not 3 20 ed Not given treating Nil MCF-1 regional 1 No No Yes included in assery given treatment 2TPD RRF - 1 level 2019-20 project and is under process

Aerobic 750 biobin

composting included in At Decentralise (Thumboorm 2019-20 Erattupet 2 3 7 MCF-1 regional 1 26 29675 30861 13 78 62 3.5 d Not given uzhi mode) - project and Nil No No Yes ta RRF - 1 level treatment 24 bins will supply from march Biogas plant: 2020 28 nos

Biogas Plant Ring Compost Decentralise at location - 450 Nos At Ettuman MCF-1 27 26423 27479 11 10 57 56 4 d Not given withcapacity Nil regional Nil No No No oor Bucket RRF - 1 treatment of 500kg level Compost- 150 Nos

Aerobic Compost (Thumboormu Biogas plant - Decentralise zhi Model)- 1400 Nos At 1 Kottaya MCF-1 28 136812 142279 57 104 18 d Not given 62 Nil regional (Vadavathoo No No No Kottayam m RRF - 1 treatment Pipe Compost- level r) Biogas Plant 2300 Nos 52

44

Biobin - 43 Aerobic Nos Compost Vermi (Thumboorm Compost - 26 uzhi Model) - Nos 6 bins at 1 Biodigester At Decentralis location with Pot - 4 Nos MCF-1 regional 29 Pala 123000 127915 52 35 21 14 2 7 26 ed Not given capacity of Ring Compost Nil level Nil No No Yes treatment 30kg - 59 Nos Bucket Biogas Plant Compost -170 1 location Nos withcapacity Pipe Compost 100 Kg 5162 Nos

Aerobic compostin g (Thumboor Aerobic muzhi At composting Decentralise mode)-4 Biogas Plant - regional 30 23234 24162 10 64 3 (Thumboorm Nil MCF-1 Nil No No No d bins at 2 135 level treatment uzhi mode)- locations 3 bins at1 location Biogas Plant - 1 bin at 1 location

Composting MCF-1 unit-1505 At Decentralise Nos Kattapan Biogas plants- regional 31 42646 44350 18 77 98 82 3.24 3.24 11 d Not given Not given Nil RRF-1 Nil No No Yes a 345 level treatment No Compost pit- 450

Idukki

45

Biogas Plant MCF- 2 2 Nos 1 Nos Tonne Resource At Decentralise Biogas Plant - Thodupuz Recovery regional 32 52045 54125 22 67 1 81 4 4 10 d Not given 928 Nil Nil No No Yes ha Vermi Facility level treatment compost - 7 (300s ft)- bin at 1 1 No location

Centralised Kitchen bin - At Not Centralisedt 10 Centralised plant at 33 24110 25073 10 43 23 given 7.84 Not given 3 reatment Not given plant at Brahmapuram RRF - 1 regional Nil No No Yes Brahmapura Pipe compost level m 43

RRF-2 Nos; Decentralise Biogas - 504 MCF-1; At 34 Angama 33465 34802 14 0 0 Not 0.5 0 4 d Aerobins-2 Biogas plant Nos Biodigest regional Nil No No Yes ly given treatment 1No Pipe compost er bins- level 979 300Nos SWAP shop-1 No.

46

Biogas Aerobic

Plant - Compost Biogas Plant - Hospitals, (Thumboorm 310 Nos At Decentralis Hotels, uzhi Model) 35 regional 31468 32726 14 36 91 81 0.87 0.87 5 ed TCC 4 bins at 4 Nil MCF-1 Nil No No Yes Biodigester level treatmen Canteen locations Pot - 350 Nos t with capacity 1TPD

47

Centralised Biogas plant-9 At

Kalamas Centralised plant at Compost pit- Centralised plant at MCF-1; regional 36 71038 73877 30 42 40 19 Not given Not given 9 Not given 1 No No Yes sery treatment Brahmapura 800 Brahmapuram MRF-1 level m

Biogas Plant At Decentralis 1 No with Koothatt Not regional 37 17942 18659 8 0 2 0.8 0 3 ed Not given capacity Biogas 16 Nil Nil Nil No No Yes ukulam given level treatment 150kg

Biogas plant-

202 At Decentralis Windrow Kotham Compost pit- MCF-1; regional 38 114574 119153 48 62 52 25 6 6 14 ed Not given compost Nil 1 No No Yes angalam 2303 MRF-1 level treatment plant Kitchen bin 10000

Biogas Plant - 166 Nos

Biodigester

Pot - 215 Nos

At

Centralised Centralised plant at MCF-4; regional 39 44704 46490 19 12 7 66 0 0 6 Not given Not given Bucket Nil No No Yes treatmen Compost - Brahmapuram RRF-1 level t 2330 Nos

Pipe Compost 940 Nos

48

Composting - Ernakulam At Decentralis 5 bins at 1 Muvattu Kitchen bin regional 40 30397 31612 13 7 3 28 7 ed Not given location (not Nil MCF-1 1 No No No puzha 24 level treatment working)

Biogas Plant

1 bin with

Aerobic capacity compostin 100kg (not g working) (Thumboo

rmuzhi Vermi Biogas Plant -

model) -1 Compost - 1 25 Nos At Decentralis North bin at 1 bin with MCF-1; regional 41 31503 32762 14 100 89 185 2 2 7 ed Nil 1 No No Yes Paravur location capacity 1 Pipe compost RRF-1 level treatment with TPD 2500 Nos capacity 4 Cubic (Not Windrow Operating) Compost - bin with 3 TPD Capacity

0.75TPD Biogas Plant - of 161 Nos biodegrada

ble waste Biodigester is Bio-gas, Pot - 1500 At Decentralis managed Perumba aerobic Nos MCF-1; regional 42 28110 29233 12 29 0 12 2.32 1 8 ed 0.75TPD Nil Nil No No Yes voor compost, RRF-1 level treatment of non MRF Ring Compost biodegrada - 1000 Nos ble waste Pot compost- is 894 managed

49

At Decentralis Biogas -150 MCF-1; regional 43 Piravam 27229 28317 12 41 100 66 2.04 2.04 5 Not given Not given Nil Nil No No Yes ed Pipe compost- RRF-1 level treatment 874

At 44 Thrikkak 77319 80409 33 80 100 124 7 7 10 Centralized Not given Not given Biogas 31 Centralised plant at Nil regional Nil No No Yes kara treatment Brahmapuram level

Aerobic compostin Material g 1.62TPD of Collection (Thumboo biodegradabl Biogas Plant - Facility - rmuzhi e waste is 300 Nos 1 No model) -2 managed (Non bins at 2 0.124 non Biodigester Operation Decentralis locations biodegradable Pot - 125 Nos At Thripunit Centralised plant at ) regional 45 92522 96219 39 87 86 46 Notgiven Not given 14 ed with waste is Nil No No No hura Brahmapuram level treatment capacity managed. Bucket Plastic 14 unit& Thumbur Compost - Shredding 8 unit muzhimodel 2400Nos Machine at 1 No Biogas Anapparamb Pipe Compost Plant - 1 u -41 ward 10000Nos Baling No with Machine 100 kg 1 No capacity

50

Thumburmu zhimodelat Anapparamb At Under Decentralise 5 SWM u (41 ward 83 SWM 46 Chalakku 49525 51504 21 100 60.5 54 5 5 10 Windrow composting MRF-1; regional Nil Yes processi Yes d Plants(50k )Vermicomp Plants(207.5 dy (2tpd) RRF-1 level ng treatment gcapacity) osting kg capacity) Biogas - 3(33kg/day)

Biogas Plant - Decentralise Vermico 614Nos At 47 Chavakka 39098 40660 17 42 100 31 4 Not given 14 d Not given mposting Nil MCF-1; regional 1 No No Yes d treatment 1.5TPD Pot Compost - RRF-1 level 548Nos

Biogas Plant- 400 At Decentralise Biogas Bio Composting Guruvay MCF-1; regional 48 70012 72810 29 32 96 58 4 4 15 d Plant(3.5tp organic units-2545 Windrow Compost (2TPD), Nil No No Yes ur RRF-1 level treatment d) management Compost pits- 1899 Kitchen Gardening

51

Biogas Plant - 382 Nos At Decentralis Thrissur Irinjalak SWM plt- SWM- Composting MCF-2; regional 49 62532 65031 26 47 86 130 5.51 1.5 12 ed Nil 1 No No Yes uda 2 (600KG) 2(600kg) units-2577 RRF-1 level treatment Compost pits- 5702

Non bio degradab l Aerobic e waste Compost segragate (Thumboo d at Biogas Plant - rmuzhi source 650Nos Model)-6 level and At Decentralis bins at 3 Aerobic collected Kodung Pipe Compost Windrow Compost -1No- regional 50 94883 98675 40 70 80 84 10 9 22 ed locations composting and Nil No No Yes allur 2600 Nos with capacity of 4TPD level with handed treatment Compost pits- capacity of over to 4840 10kg/day Clean Composting Kerala units-455 Company andother private agencies for

composting

plant

Bio bin -1628 1.889TPD Aerobic Nos Biodegradabl Windrow Composting Plant- At 51 Decentralis compost Biogas-73, Kunnam e waste 4.5 TPD; 5 Acres of land is MCF-1; regional 54071 56232 23 100 100 6 3 3 10 ed (Thumboo Compost pits- Nil No No Yes kulam managed, available with the llocal RRF-1 level treatment r Mozhi 2906, 0.81 TPD bodies for waste model) Compost unit- Non processing. 508 biodegradabl

52

1.93TPD waste Compost units At Decentralise Vadakka 1918, Biogas- MCF-2; regional 52 15674 16300 23 34 100 40 1.6 Nil 9 d managed( Nil 1 No No Yes nchery 100,Compost RRF-1 level treatment Bio&Nonb iodegradab pits-4471 le)

0.482 TPD Pipe Compost biodegrada 1000 Nos ble waste Decentralise 1.43 TPD At Under managed, 53 Cherupl 30730 31958 13 58 89 22 0.2 1.2 4 d Nonbiodegra Biogas Plant - Nil MCF-1; regional Nil Yes processi Yes 0.427 TPD assery treatment dablewaste 200 Nos RRF-1 level ng Non managed. Composting biodegrada units-1050 ble waste managed.

Biogas Plant - 55 Nos

Biogas Aerobic bin Bucket At Under Chitttur- Decentralise Plant - 5 (Thumboorm Aerobic Windrow Compost - MCF-7; regional processi 54 Thattam 33000 34319 14 100 100 56 Nos 2 7 d bins at 5 uzhi) - 8 bins Composting Plant -1 bin Nil Yes Yes 1168 Nos RRF-1 level ng angalam treatment locations at location with capacity 3 Tons/day

with capacity Ring Compost 50kg/day/bin - 239Nos Composting units-1407

Pipe compost- Decentralise 40;biogas At Mannar Not 55 39463 41040 17 84 58 0 0 6 d Not given Not given plant -20; Nil MCF-1 regional Nil No No Yes kadu given treatment Biocomposter- level 315

53

Palakkad Biogas plant- Decentralise 58 At 56 Ottapala 53792 55942 23 81 89 56 1.4 8 d Not given Not given Pipecompost Windrow compost MCF-1; regional 1 No No Yes m treatment 182 RRF-1 level

Windrow composting is in operation. 15 Acres of land Decentralise Pipe compost- is available at Kanjikodefor At Under 57 Palakka 131000 136235 55 40 11 156 0.2 1 29 d Not given Biogas plant 2500; Ring setting up solid waste MCF-7; regional 1(BPL Yes processi Yes d treatment 1 compost-60 processing plant. Tendering RRF-1 level Koottupatha) ng process is going on. Asper annual report 2.1 Hectre of land is available.

Open At Under Decentralise composting Biogas plant- MCF-1; regional processi 58 28632 29776 12 0 0 20 1 3 Not given Nil Yes Yes d in trench 69 RRF-1 level ng treatment

At Decentralise MCF-1; regional 59 Shornur 43533 45273 19 100 82 65 4.5 2.8 6 d Not given Biobin Biogas 276 Nil Nil No No Yes RRF-1 level treatment

Pipe compost- 420; Biogas At Kondott Decentralise plant- regional 60 28794 29945 12 80 12 160 0.12 0.12 4 Not given Not given Nil MCF-1 Nil No No No y d 18(45kg/day); level treatment Ring compost- 123

54

Material

Recovery

Fcaility - 3 number Biogas Plant - 1 Plastic number Shredding with Machine -

capacity of 1 number Incinerator. At Decentralis 250kg/day Aerobic 61 Kottakk MRF,MCF,SWAP SHOP, regional 44382 46156 18 13 26 15 1.2 1.2 5 ed ( not compost - Not given Baling Nil No No Yes al BIOBIN, Ring compost level treatment working) 12 bins Machine - under construction) Aerobic 1 bin number, compost- Reuse 10bins (Swap shop, Repair shop, Recycling industrie s ) -1 unit

62 Biogas plant- At Under Decentralis Malappu 31; 1 Hectre land is available for MCF3; regional process 101000 105036 43 80 27 24 2.2 2.2 13 ed Not given Composting Nil Yes Yes ram Composting waste processing RRF-1 level i ng treatment units-1061

55

Aerobic Compost

(Thumboorm

uzhi model)-

8 binsat

ward33

Biogas Plant At Under Decentralis Pipe Compost Biogas-1 at ward 14 Windrow Compost-1 TPD regional process 63 Manjeri 97104 100984 41 0 44 16 3 1 15 ed 2844 Nos MCF-3 1 Yes Yes (1000kg) Trenching Ground-1 ton level i ng treatment Vermi Compost- Trenching Ground-

500kg

Biogas Plant - At Decentralis 71 Nos. Pipe Malappura Nilambu Not Temporar regional 64 46366 48219 20 37 29 0.3 0.3 8 ed Not given Not given compost-135; Nil Nil No No Yes m r given y level treatment Biocomposter- 75

Biogas Plant - At Decentralis 200 Nos Parappa MCF-1; regional 65 35243 36651 15 100 53 90 1 1 4 ed Not given Not given Nil Nil Yes No Yes nangadi RRF-1 level treatment Biodigester Pot - 300 Nos

56

Material Bio bin - 1000 Recovery Nos Facility -

1No Biogas Plant -

Windrow 480 Nos At Under Decentralis Plastic Perinthal Compost - 1 regional process 66 49723 51710 21 38 34 52 6 6 12 ed Not given Nil Shredding Nil Yes No manna No Biodigester level i ng treatment Machne - Pot - 1189 1No Nos Baling Pipe Compost Machne 700 Nos - 1 No

Pipe

compost- At Decentralis One (Private parties 364; Biogas MCF-8; regional 67 Ponnani 90491 94107 38 80 70 49 4 4 15 ed Not given Aerobin -1 property used for Nil No No Yes plant-22; RRF-1 level treatment landfilling) Biocomposter- 686; Bucket compost-235 Pipe Compost

200 Nos Biogas At 68 Decentralis Plant in 4 MCF-1; regional Thanoor 44973 46770 19 29 79 0 0.3 0.3 6 ed Not given ODF Latrine - Nil Nil No No Yes locations RRF-1 level treatment 400 Nos Ringcompost- 67

At 69 Decentralis Pipe Compost Thiroora regional 56632 58895 24 45 25 28 1.4 1.4 10 ed Not given Not given 1850 Nos 86 Cents of land is available MCF-1 Nil No No Yes ngadi level treatment

Pipecompost- 230(0.21TPD) At 70 Decentralis ; Kitchen bin- MCF-1; regional Tirur 56058 58298 24 100 100 38 1.7 1.1 8 ed Not given Aerobin Nil 1 No No Yes 1480(1.2TPD) RRF-1 level treatment ; Biogas plant-

57

Biogas plant- At Decentralise Valanch Biogas 28; regional 71 35795 37225 15 100 30 13 0.04 0.04 5 d Not given Nil MCF - 1 Nil No No Yes ery plant -14 Composting- level treatment 230

At Decentralise Aerobin-1 Pipe compost regional 72 Faroke 32122 33406 14 48 5 18 2 2 6 d Not given (50 kg/day) 1550; Biogas Nil MCF-1 Nil No No Yes level treatment plant-50;

72 At Under Decentralis Koduvall (Harith regional processi 73 48678 50623 21 100 100 0.6 0.6 7 ed Not given Not given Not given Nil MCF-1 Nil Yes Yes y a level ng Karma treatment Sena

1. Material Collection Facility - 1. Thumboor 1. Portable 2 muzhi model At Decentralis biogas 250 2. MRF - Koyilan regional 74 71873 74745 30 60 8 100 10 2.5 11 ed Not given composting - nos Nil 1 Nil No No Yes dy level treatment 11 unit 2. pipe, ring 3. plastic 2. biogas and vermi shredding plant - 500 compost - mechine- kg per day 1933 nos 2 4. Bailing Kozhikode Mechine 1

At Mukka Decentralis Kitchen bin regional 75 m 40670 42295 17 90 91 38 0.525 0.525 5 ed Not given Not given 301 Nil MCF-1 level Nil No No Yes treatment

58

Pipe compost At Decentralise Not 100 regional 76 Payyoli 23576 24518 10 100 0.25 0.25 3 d Not given Not given Nil Not given Nil No No Yes given Kitchen bin level treatment 300

At Ramanat Decentralise Ring Compost regional 77 tukara 35937 37373 15 100 100 Nil 0.01 0.2 4 d Not given Not given - 320 Nos Nil Not given Nil No No Yes level treatment

Pipe Compost

520 Nos, Ring Compost- 20, compost-615, At Decentralise Vadakar Biogas- 100, MCF-13, regional 78 75295 78304 32 89 100 63 7 10 18 d Thumboor Not given 1 No No Yes a Bucket RRF-2 level treatment muzhi-1, Ring compost- compost-1 450,Biobin- 150

0.508 TPD Biodegrad 1.3 TPD 0.4 TPD able waste Biodegradabl Biodegradable Decentralise At Under managed,0 e waste waste 79 Kalpetta 31580 32842 14 60 81 32 6 6 4 d 8 Acres of land is available MCF-1; regional 1 Yes processi Yes .561TPD managed, managed, 0.11 treatment in VellaramkunnuKalpetta. RRF-1 level ng Non 0.869TPD TPD biodegrada Nonbiodegra Nonbiodegradabl ble waste dable waste e waste managed. managed. managed

Wayanad Vermico 1.7401 Decentralise TPD mposting At Mananth 80 34663 36048 15 40 47 26 0.2 0.2 4 d Biodegrad 317 MCF-1 regional Nil No N0 Yes avady level treatment able waste Biogas 217 Managed. Pipe compost 4100

59

0.5 Acres of land is At Decentralise Sulthanb Biogas plant - available in Sulthanbathery regional 81 23333 24265 10 0 0 23 0.5 9.1 14 d Not given MCF-1 1 No No Yes athery 192 construction of the plant is level treatment going on.

Aerobic Compost Material (Thumboo Collection rmuzhiMo Facility - del ) - 6 (40m2) - units at3 1No; locations Plastic with Biogas Plant - Shredding At Decentralise capacityof 179 Nos Machine - regional 82 36290 37740 16 100 98 28 1 1 5 d 2000 Not given Ring Compost Nil 1No; Nil No No Yes level treatment kg/bin; - 3033 Nos Baling Biogas Machine - Plant - 1 1No; unit with Reuse capacity strategy(S 40kg/day WAP Shop, Repair shop etc.) Swap shop -10

Windrow Compost - 1 Biogas plant5 At Under Decentralise bin with Pipe compost regional processi 83 40369 41982 17 98 65 39 2.5 2.25 7 d capacity of 110 Nil MCF-1 Nil Yes Yes level ng treatment 5TPD (Not Ring compost working ) 341

60

Aerobic Compost Vermi Material (Thumboo composting Collection rmuzhi andtrenchin Facility - Model ) - g 310 sqft At Decentralis 5 Bins Koothup Pipe compost regional 84 29619 30803 13 100 90 64 2 0.5 13 ed Nil 1 No No Yes arambu Aerobic 2752 Nos Material level treatment Compost Recovery (Thumboorm Facility - uzhi Model ) 4000 sqft - 21 Bins

Biogas Plant

1 bin with capacity MCF-1; Kannur 250kg/day Ring compost RRF-1; At Decentralis 2500 Nos. Mattan Plastic regional 85 47078 48959 20 96 69 52 13 13 7 ed Not given Vermi Nil Nil No No Yes u r Shredding level treatment Compost -1 Pipe Compost Machine - bin with 1500 Nos. 1number capaciy 5TPD

Kitchen bin At Decentralis and ring regional 86 17438 18135 8 60 26 40 2.5 0 2 ed Not given Not given Nil Nil Nil No No Yes compost - level treatment 1200

Pipe MCF- At Under Decentralis Payyanu Windrow compost- 1;RRF-1; regional process 87 72111 74993 30 100 71 44 6 6 15 ed Not given Nil 1 Yes Yes r composting 1750;Kitchen Plastic level i ng treatment bin-645;other shredding

units-1440

61

Road side Vermi locked Compost - bins for bin with At collecting Sreekant Decentralise capacity -1 Ring Compost regional 88 17630 18335 8 100 88 30 0.5 3 Not given Nil non Nil No No Yes apuram d TPD(Not - 125 Nos level biodegrad treatment working ablewaste since2007) - 20 locations

Biogas Plant 3 bins at 3 Biogas Plant - At Under Thalasse Decentralise locations 1021Nos regional processi 89 ry 92558 96257 39 51 1 97 5 5 20 d Not given withcapacity Nil MCF-1 level 1 Yes ng Yes treatment of 1Ton Pipe Compost 5200Nos

At Decentralise Thalipar Windrow Composting MCF-1; regional 90 72465 75361 31 87 19 34 1.5 1.5 11 d Not given Nil Nil No No Yes ambu Composting units-4800 RRF-1 level treatment

Material

Collection

Facility -

Aerobic (1000sqft

Compost Aerobic )- 1No

(Thumboo Compost Biogas-2220 rmuzhiMo (Thumboorm Resource Ring compost- At Decentralise del )- 9 uzhiModel ) Recovery Kanhanga 2500, regional 91 73536 76475 31 100 28 43 8 20 11 d bins at 2 - 20 bins at 3 0.5 Hectre land is avaiilable. Facility - 1 Yes Yes Yes d Kitchen Bin- level locations locations 1000sqft - treatment 17400, Pipe with withcapacity 1No compost- capacityof of 3222. 1000 1000 kg/bin Plastic

kg/bin Shredding Machine - Kasaragod 1No. Baling Machine - 1No.

62

Pipe compost- At Under Decentralise 800, Biogas- Kasarag MCF-4; regional processi 92 131000 136235 55 86 32 17 3 3 20 d Not given Not given 13, Ring Nil 1 Yes No od RRF-1 level ng treatment compost- 8244

Biogas-44, Thumboor Aerobic Biogas-2840 Decentralise muzhi (4 compost Pipe Compost At 93 Nileshwar 40802 42433 17 100 100 30 1 8 8 d unit (21bin 1 unit, 2840 Nos, 80 Cents land is available. MCF-1; regional Nil Yes Yes Yes am treatment having2 4bin 1unit, Ring compost- RRF-1 level bins),(1 3bin 2 unit) 1998, Biobin- unit 3350 having4

3521 880 932 1837

63

VI. BBio-medical WasteManagement: As per Annual Report in the whole state for the year 2019-2020:  Total Bio-medical generation: 42932kg/day  No. of Hospitals and Health CareFacilities:13869  Status of Treatment Facility/ CBMWTF: The Common Bio Medical Waste Treatment Facility in Kerala is IMAGE situated at Kanjikkode, Palakkad which treated about 36852.931 kg/day of Bio-Medical Waste.

VII. HHazardous Waste Management: As per Annual Report in the whole state for the year 2019-2020:  Total Hazardous Waste generation: 314488.2 MetricTonne/year  No.ofIndustriesgeneratingHazardouswaste:1617  TreatmentCapacityofallTSDFs:90MetricTonne  Avg.QuantityofHazardouswastereachingtheTSDFsandTreated:43.732MetricTonne  Details of on-going or proposed TSDF :Nil VIII. PPlastic Waste Management:  Total Plastic Waste generation: 1,31,400TPA(as per annual report in the whole State for the year 2019-2020.  Treatment/ Measures adopted for reduction or management of plastic waste: Ban of single use plastic items including plastic carry bags irrespective of thickness in the State w.e.f 01/01/2020 vide G.O.(Ms)No.6/2019 Env dated 27/11/2019;G.O.(Ms) No. 2/2020 /ENVT dated 27-1-2020 and vide GO no G.O.(Ms) No.4/2020 Envtdated16/02/2020

Material Collection Facility - 837; Resource Recovery Facility-151; Recyclable plastics (hard and soft plastics) are taken by rag pickers for recycling in the State and outside the State; Clean Kerala Company collected 655.59 T of plastic(soft) in the year 2019-2020. Tarring of 308.92 km of PWD roads and 764.8 km of LSGD roads was done during the year 2019-20. Almost all the brand owners who obtained registration from the Central Pollution Control have not furnished reports to the State Pollution Control Board and hence it is not possible to quantify or verify the quantity of plastic waste if any taken back by them.

As per the direction in GO(Ms) No 6/2019/Envt Dated 27.11.2019 officials from District Pollution Control Board inspected various shops and market places through out the state and identified 93 number of violators. Notice imposing and mahasar were issued to the violators. Notice imposing Rs 10,000/- issued as fine to each violators.

64

IX. Details of Alternate Treatment Technology being adopted by the State/UT:

Electro coagulation method is being adopted for sewage treatment in STPs. Consent for the same is being issued by the SPCB subject to certain conditions such as safe disposal of sludge uninterrupted power supply, regular maintenance of electrodes, etc.

X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment:

Polluting sources including drains contributing to river pollution were already identified and according to that action plans were prepared and submitted to CPCB. STPs were proposed in the action plans wherever necessary. Measures for management of waste were also incorporated in the action plans. In situ primary treatment were proposed for the river stretches Bharathapuzha and Pamba in the action plans. As part of the Cochin Metro Rail Limited’s Integrated water transported system project 5 STPs are proposed at Elamkulam, Vennala, Edapally, Puthukalavattom and Perandur for treating the water coming through drains and discharging treated water to water bodies.

XI. Details of Nodal Officer appointed by Chief Secretary in the State/UT: Vide G.O.(Rt)No.93/2020/WRD dated 28.01.2020 nominated Deputy Secretary (Projects),Water Resource Department as the nodal authority, Government of Kerala for monitoring the compliance of the directions in the order on fortnightly basis and to maintain record ofprogressandtoactasanaccountablepersontotheChiefSecretaryforthepurpose.

Vide G.O.(Rt)No.223/2020/WRD dated 12.03.2020 Government of Kerala appointed a monitoring committee comprising of Additional Chief Secretary, Water Resources Department as Chairperson and Principal Secretary, LSGD, Principal Secretary, Environment, Secretary, Water Resources DepartmentandStaffofficertoChiefSecretaryasnodalofficers&members.

XII. Details of meetings carried under the Chairmanship Chief of Secretary inthe State/UT: Regarding OA 514/2019 (Solid Waste Management) Chief Secretary convened meetings on 22.09.2020 and 25.09.2020 Regarding OA 804/17 (Implementation of Hazardous and Other Waste Management Rules, 2016) Chief Secretary convened meeting of 16/10/2020. Additional Chief Secretary Labour Department had convened 1st meeting on the same for Chief Secretary on 09/10/2020. Meeting of State Level Advisory Committee (SLAC) on Waste Management, chaired by Chief Secretary is being conducted in the State regularly to discuss the various matters. 38 such meetingswereconductedinKeralasofar.LastSLACmeetingwasconductedon12.02.2021. Meetings were held by the Chief Secretary on 11-12-2020, 30-03-2021 and 05-04-2021 with the Stake holder Departments/ Authorities, to review the progress in implementation of the projects taken up on the basis of orders of the Hon’ble National Green Tribunal in O.A. No. 673 of 2018(PZ).

XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river: Latest Monthly Progress Report, Analysis report of 21 Polluted River Stretches & Overall Status of Water Quality Analysis as per May 2021are attached as Annexure I.

XIV. Groundwaterregulation:AspertheconsolidatedreportsubmittedinO.A.No.496/2016,

65 the Ground water Department is implementing a “Scheme for Ground water Conservation and Recharge”. Under thisscheme, rain water collected from the roof-top is harvested for recharging the aquifer through dug wells and recharge pits. The recharging of deep aquifers through bore wells are also being experimented. The total budget outlay during the period 2019- 2020 was 450 lakhs. It is estimated that there are about 65Lakhs dug wells in Kerala and the ground water extractions by means of traditional dug wells are prevalent source of fresh water. There are number of public dug wells left abandoned and needs renovation. These dug wells can be considered as suitable stretches to recharge ground water. The Central Groundwater Board has prepared a Block wise master plan in 2015 to take up artificial groundwater recharge to groundwater. The same can be used as a guideline to stream line groundwater recharge activities of theDepartment. The State Government has enacted the Kerala Groundwater (Control and Regulation) act 2002 to provide for the conservation of groundwater and for the regulation and control for its extraction and its use in Kerala. The State Groundwater Authority has been constituted on 16.01.2004 to notify the area where groundwater abstraction is to be regulated. As per the Act Groundwater User’ refers to the person who are using ground water from a pumping well (> 1.5 HP for Open dug wells and > 3 HP for BW/TW) for any purpose including domestic purpose. In notified blocks of the state, permission required for the construction of new groundwater abstraction structures.

The Groundwater Department has been conducting mass awareness programmes to public., students, people’s representatives, government officials etc. on groundwater conservation and management in all Districts under the Plan Scheme “Control and Regulation of Groundwater Exploitation for the effective groundwater management. During the last 4 years, the department has conducted more than 100 numbers of awareness programmes across the State.

66

The Ministry of Water Resources ,River Development &Ganga Rejuvenation (Central Groundwater Authority) has recently issued a new guide lines to regulate and control groundwater extraction in the country in pursuance of the directions of Hon’ble National Green Tribunal and the powers conferred under section 5 of the Environment (Protection) act, 1986 (29 of 1986) dated 24thDecember2020. XV. Good irrigation practices being adopted by the State: Irrigation in Kerala is classified into two schemes. 1) Major Irrigation and Medium Irrigation 2) Minor Irrigation As per the classification followed by the department, schemes having a cultivable command area upto2000ha are treated as minor irrigation works. Medium irrigation works are those with irrigable command area of more than 2000 ha, but less than 10,000 ha. Those schemes above 10,000 ha are classified as Major irrigation schemes. Surface flow irrigation method is currently practiced in Kerala. As the department is more focusing on effective utilization of available water for irrigation as well as for its efficient use, new types of irrigation methods like micro/community irrigation for cash crops and horticrop are proposed under this scheme. 1) Major Irrigation and Medium Irrigation The Irrigation department develops and maintains major and medium irrigation schemes/projects across the state. The primary activity of the Department is providing irrigation facility to the farmers of the State through its system comprising reservoirs, main canals, branch canals, feeder canals and other related infrastructure. The department maintains water distribution through the canal system. Water distribution is being carried out based on the cropping pattern of a particular area and a water distribution calendar prepared and approved by a committee headed by the District Collector with members of farming community, other stake holders and department officials. For proper distribution and maintenance of the canals Water Users Association (WUA)/ Farmers Association plays an important role.

67

2) Minor Irrigation Minor Irrigation schemes are divided into Class-I and Class-II

depending on the ayacut served. Schemes serving above 50Ha up to

2000Ha are classified as MI Class-I. Lift irrigation schemes are also Minor irrigation schemes serving at least 40Ha.Aims to Construct RCBs, SWECBs, ponds, VCBs, check dams, salt water barriers, storage weirs, cross bars, and protection worksetc. a) MI Class-I schemes Minor works like improvements to tanks and rivulet, construction of check dams, sluices, regulators, bunds, vented crossbars, salt water barriers, layout of channels and drainage structures etc are usually undertaken under MI Class-I schemes. b) MI Class-II Schemes Minor irrigation works including construction of vented cross bars, canals, improvements to natural drains etc are taken up under this scheme. c) Lift Irrigation  Lifting of water is required for irrigating fertile land at a higher elevation where gravity flow of stored water is not possible. Although mechanical lifting is required, these schemes are very useful and serve the marginal farmers of the State.  Optimum utilization of water by supplying designed quantity  Works involving lifting of water with a command area not less than 40 hectares come under this category.  This will increase in the ground water table in high altitude areas, Ensure water availability to farmers before the cropping period.

 This will reduce agricultural loss in high altitude areas due to water scarcity, their by reducing distress to farmers.  At present the Irrigation Department has under its control 450 Lift Irrigation Scheme (LI schemes) with a total Ayacut of43170ha. d) MicroIrrigation  Micro-irrigation system is a modern method of irrigation in which water is delivered slowly. Usually in the form of discrete droplets, continuous drops, streams, etc. Micro-irrigation system is popular these days for its

68

low cost and water-efficiency.  The benefits of micro irrigation and precision farming are well demonstrated with an average increase in yield by three times. Pepper as a case in point shows enhancement from 1.9 kg/wine to 6/wine on precision agriculture. also shows increase in productivity to 150 nuts per plant as against 45 without precision irrigation support.  In the coming year department is planning to implement atleast one micro irrigation scheme in each district with the coordination of line departments and farmers. Steps are initiated to identify the location as well as crops in coordination with the agriculture department. XVI. Rain Water Harvesting: In compliance with the Hon’ble NGT Order dated 11.09.2019 in O.A. No. 496/2016, the consolidated report of Kerala State regarding the present status of the implementation and action plans on rain water Harvesting for conservation of water was submitted by the KeralaStateGovernmenton27.11.2019.ThesameisattachedasAnnexureII.

The State Groundwater Department has been implementing a scheme for Groundwater Conservation and Recharge under plan fund made available since 2004-05. The project component includes roof top rainwater harvesting for groundwater recharge through dug wells, recharge pits, bore wells and recharge shafts and construction of subsurface dykes and small check dams un micro water shed basis. The recharge schemes are being implemented as a long term measures to achieve sustainable groundwater development in the State. The Department is engaged in recharging groundwater through roof top rain water harvesting in public buildings and government schools and giving priority to implement such structures in notified blocks. The Department has successfully implemented roof top rainwater harvesting through recharge pits to enhance groundwater levels of dug wells in the Kattakkada Constituency of Thiruvananthapuram District. The Constituency was officially declared in November 14th 2019 as the first assembly constituency in Kerala to implement artificial groundwater recharging structures in all Government schools and offices. The State Groundwater Department has implemented 169 nos of recharge pit/direct dug well recharge schemes, 4 check dams and one sub surface dyke during the 12th plan period. In the 13th plan period as on October 2020, theDepartmenthascompleted370nosofrechargepit/dugwell recharge

69

schemes and 18 nos of bore well recharge schemes.

The Department has also taken initiatives to implement roof top rainwater harvesting structures in order to replenish the aquifer system in Chittur (Over- Exploited ), Malampuzhaand Kasaragod (Critical) blocks under Jal Shakti Abhiyan Programmeby Ministry of Jal Shakthi Government of India.

XVII. Demarcation of Floodplain and removal of illegalencroachment a. Kerala receives about 90% of the annual rainfall during the monsoon months from June to August and from October to November. The remaining period from December to May is practically dry. Most of the rain water received during monsoon period flows to sea within 48 hours of rainfall due to the character of the geographic terrain of the state.

b. State Disaster Management plan 2016 was prepared by National Centre for Earth Science Studies in 1:50,000 scale using satellite images. c. Based on the request of central water commission, Government of Kerala constituted Regional Committee for scientific assessment of Flood prone areas in Kerala. d. Flood-level marking for the flood affected rivers has been carried out. Steps have been taken for conducting the studies regarding Flood plain Zoning. Due to the peculiar topography and dense population, evacuation of people from these zones is difficult.

XVIII. Maintaining minimum e-flow ofriver. a. As per order of the Hon’ble NGT dated 9/8/2017 in OAno 498/2015 it is mandatory to maintain 15% - 20% of average lean seasonflow.  For lean flow calculation the process of data collection for the last 25 years of all 44 rivers during summer months ie. from January to May is been undertaken.  Study of individual rivers needs to considered for maintaining e- flow during lean season. Storage structures/diversion structures needs to proposed at certain locations to regulate thee-flow.

70

XIX. Plantation activities along therivers: Proposal submitted by Irrigation Department. Waiting for approval. XX. Development of biodiversitypark: As per the action plan for Kallai River,a bio park in Kozhikode district is proposed by Irrigation Department and as per the action plan of Karamanariver, Bio diversity park at Karamana is implemented by Irrigation Department and 96% work is now completed and remaining work is in progress. Also, for other action plans of polluted river stretches, proposals are submitted by Irrigation Department and action is initiated.

As stipulated by the Biological Diversity Act 2002, Biodiversity Management Committees (BMC) are mandated with conservation of Biodiversity in their localities. In Kerala BMCs has being established at all 3 tiers of local bodies. As part of the 13thfive year plan, KSBB had started a project to empower Local Self Government Biodiversity Management Committee (BMC) as Model BMC to conserve Biodiversity by providing a minimal assistance of Rs 5.00 lakh. The lists of various projects relating to river bank conservation by planting suitable species/ biodiversity parks in the river banks being undertaken by BMCs during the last two years are given below: 1. Ayiroor Grama panchayat, Pathanamthitta– Planting of Homonoiaripariaalong the banks of PambaRiver 2. AyarkunnamGrama panchayat, Kottayam - Conservation of Homonoiariparia along the banks of MeenachilRiver. 3. MariyapuramGrama panchayat, Idukki - Harithapuram park- Eco restoration and conservation of PeriyarRiver bank severely damaged due toflood. 4. KotturGramapanchayat, Kozhikode - (a) Establishment of Biodiversity Park near Kuttiyadi river (b) Biodiversity gardens (50 units) 5. VanimelGramapanchayat, Kozhikode - Conservation of Vanimelriverbank 6. KurumathurGrama panchayat, Kannur – (a) Afforestation along tributaries of river banks of Kuttikol river, Valapattanamriver (b) Planting of Pandanus along canalbanks 7 .MuzhakunnuGramapanchayat, Kannur - PuzhayoraOushada

71

SughandhaUdyanam along the banks of Aralam river.

As part of Rebuild Kerala Initiative a project on Riverine Biodiversity Rejuvenation of Pambafor an amount of Rs 200 crore is being undertaken. The project aims at Protecting riverbanks and conservation of riparian vegetation using locally available plants. The major activities ongoingare: 1. Restoration of riparian vegetation on degraded river banks in selected 10 Grama Panchayats (Ayiroor, Cherukol, Kozhenchery, - Angadi, Ranni- Pazhavangadi, Ranni, Ranni-Perunad, Vadasserikkara, VechoochiraandNaranammoozhi) belonging to three Block Panchayats viz., Elanthoor, Koipuram and RanniinPathanamthittadistrict 2. About 77,000 saplings of 93 species of riparian plants are being planted along a stretch of 93km. 3. Ensure sustainable livelihood for the local people through providing training for developing microenterprises and establishing nursery of native species. Develop a sustainable community based management model

of conservation of aquatic ecosystems. 4. To create awareness and sensitize local population and students for promotion of riparian ecosystem services.

XXI. RRise of TreatedWater: Possibility of utilizing the treated effluent for irrigation, gardening, industries, construction and recharge are being explored. The DPR for tertiary treatment of effluents of STP at Muttathara is ready and in TS stage.

XXII. ModelRiverbeingadoptedbytheState&ActionProposedforachievingthe bbathing quality standards: Tirur-Ponnai river, Malappuram

XXIII. Status of Preparation of Action Plan by the 13 Coastal States: As per the NGT order in O.A 829/2019 dated 22.06.2020 regarding the remedial action to restore sea water quality along the Indian Coastal areas, the Hon’ble NGT ordered that “All States/UTs through their concerned departments such as Urban/Rural Development, Irrigation &Public Health, Local Bodies, Environment, etc. may ensure formulation and execution of plans for sewage treatment and

72

utilization of treated sewage effluent with respect to each city, town and village, adhering to the timeline as directed by Hon'ble Supreme Court. STPs must meet the prescribed standards, including fecal coliform. CPCB may further continue efforts on compilation of River Basin-wise data. Action plans be firmed up with Budgets/Financial tie up.” In compliance with the order, CPCB instructed that the State PCB shall associate National Centre for Coastal Research, Chennai under Ministry of Earth Science for monitoring and assessment of coastal water within the jurisdiction of the Kerala State up to 5 km from shore and to evolve strategies for protection of the coastal areas in association with Coastal Zone Management Authority in the State and Prepare time bound comprehensive action plan along with implementing agency in consultation with Kerala State Coastal Zone Management Authority for control of coastal pollution in Kerala State. Also the State Government has instructed the Board to prepare action plan by consulting CUSAT .Based on this, the Member Secretary of Kerala State Pollution Control Board has conducted meeting with officials of CUSAT, National Centre for Coastal Research, Kerala State Coastal Zone Management Authority and also with the field level officers through video conferencing.. Coastal Action Plan prepared has been forwarded to the concerned Stakeholder Departments for their remarks.

XXIV. RRegulation of Mining Activities in theState/UT:

Indian parliament has enacted the Mines & Minerals (Development &Regulation) Act, 1957 and it stipulates for the conservation, prudent and discriminate exploitation of minerals with a view to secure maximum benefit to the community. In exercise of powers conferred by section 13 of Mines and Minerals (Development & Regulation) Act 1957, the Central Government has framed the Mineral concession Rules, 1960. The Central Government has also framed the Mineral Conservation and Development Rules, 1988 in exercise of the powers conferred by section 18 of the Act. These Rules are applicable to all minerals except coal, atomic minerals and minor minerals. The powers of framing rules for minor minerals have been delegated to the State under section 15 of the

73

mines Act. In exercise of the powers conferred by section 15 (1) of the Act the State has framed the Kerala Minor Mineral Concession Rules 2015 and Kerala Minerals (Prevention of Illegal Mining, Storage and Transportation) Rules 2015 for the regulation and extraction of minor minerals. The Central Government in exercise of powers conferred by section 18 of the Act has also framed the Granite Conservation and Development Rules, 1999 for conservation & systematic development and scientific mining of the granite resources. The grantof reconnaissance permit, prospecting license or mining lease are governed by the central Act. The State with the prior approval of the Government of India grants permission for reconnaissance permit, prospecting license or mining lease for major minerals. The state Government issue quarrying permits and leases for minor Minerals based on the Kerala Minor Mineral Concession Rules, 2015. Other Acts and Rules which govern the mineral administration of India applicable to the State are the following: 1. The Mines Act, 1952 (Act 35 to 1952) 2. The Mines Rules, 1955 (35 of 1952) 3. The Metalliferous Mines Regulations, 1961 4. The Mines Rescue Rules, 1985 5. Mines Vocational Training Rules, 1966 6. Payment of wages (Mines Rules , 1966) 7. Payment of undisbursed wages (mines rules, 1989) 8. The Indian Explosive Act, 1884 9. Air (Presentation & Control of Pollution) Act, 1981( 14 of 1981) 10. Environment (protection) Act, 1986 (29 of 1986) 11. Indian Registration Act, 1908 (Central Act of Act 16 of 1908) 12. Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 13. Kerala paddy field and wetland conservation Act, 2008. 14. Kerala Panchayath Act.

There is no largescalemining activity in Kerala as in other parts of the country. Almost all the mines are open cast and limited in areal extent. The important mines of major minerals are china clay, laterite/bauxite, limestone and lime shell. Mineral sands andsilica sand are excavated by scooping and quartz is being extracted by taking trenches and pits. The important minor minerals in the state 74 are granite, building stones, dimension stone, laterite, tile/brick clay and ordinary sand. The state owns mineral deposits like placers, china clay (kaolin), limestone, silica sand, bauxite, graphite, iron ore, granite etc. The major mineral based industries like Indian Rare Earths Ltd. (), KeralaMineralsnadMetalsLtd. (Chavara), Malabar cements (Walayar), Travancore cements Ltd. (Kottayam), Kerala ceramics () Travancore Titanium products Ltd. And English Indian Clays Ltd, Thiruvananthapuram, Excel Glass Industry, Alappuzha, KeralaClays

and Ceramic Products Ltd. (Pazhayangadi) are some of the mineral based industries working in the State since several years. A number of tile based industries are also functioning mainly in Thrissur and Kozhikide districts. In exercise of the powers conferred by section 15(1) of the Mines and Mineral (Development &Regulation) Act, 1957, the State hasframedthe Kerala Minor Mineral Concession Rules 1967 for regulating the extraction of minor minerals. The State with prior approval of the Govt. of India grants permission for reconnaissance permit, prospecting license or mining lease for the first schedule minerals on first cum first served basis. In addition to EIA requirements as stipulated by the Central Govt, an EIA report is insisted on all mining activities before granting mining lease. No quarrying permits or leases are granted in the State unless there is a Mining plan duly approved by the competent authority. Afforestation of the reclaimed areas is promoted. Environment Rehabilitation is insisted in all mining projects. The Kerala District Mineral Foundation Rules 2018 has been formed with an objective to work for the interest and benefit of persons and area affected by mining related operations. The permissible activities under District Mineral Foundation includes among other things, developing sources of irrigation, development alternate sources of energy and rain water harvesting, conservation measures of biodiversity of the affected areas.

75

Draft #3 of File KWA/WASCON/AEEII/NGT-PR/716/2021 Approved by Chief Engineer (Sewerage,PPD & Wascon) on 10-Jun-2021 12:24 PM - Page 1 M S A 2 2 2 2 2 2 N ...... h C o a 1 1 1 1 1 1 . o ...... i T 6 5 4 3 2 1 n r I t t O e

a o i c A s N R E M K K A – p D s E M p I p 5 S n c o e b S o R S b p E K n t P A T n n e N n o e t h r v u u l e f x y f e u a m n a u r n e e T n a u c a e G e a t a u u s r e e a M e o n w a i m m w m m t a m c n r c t w c n m

g c s h P t t n r d i a a s r P i n T i a r t m v h h h i a o n y t c n n o L a a n r e t m n a f p p p e i . y i p o p i l h a n l o a a a n o a s L t g n a a n l D r b e o b r c a j i v i s i l a y i o u , a z n a n y t e a l k t k g a n k n e n m m p S s i s A a w w e t r h e t l h r m p k g k l g k M t l g i n g F . i e e e s s , i e

n r t l M s K o i

y m m a a a a ( w N a , , a a s M e e p t e h c a o w p

w m s H u n a u o n l l l t l i t e t c n u e s w a o o a n t o n r l

i t e

w u l

a r r o i i c a o F u t d t m t s n m i l n b l o i m m

p a e a n l r a d a d g y h P e t n - n , g i e

e O o a i l i c

g d t a s a t T a l , a p e a o

l / u h i ’ h w i P s f l c n a t u d t o e b t t a

v

w i

R

h - n a m a a o a n h

o

d a l e

p n

a l e d l f t a g s t a l l l u r g i n C e o

t

t o r l

a i g p f , s a n i a a R r m o e - t t r

p r t

s T

o

d e A o r b

r e a n m f o P e P N t l n s n n R t u a l

i i I p h m e a l o r t f d r r S a m o t o c V

e a l a t G

t u m d h

u a I e a a a q t h w

R

t r n V a u r t , t e m t g a l o

E c t g n e n t l T t u o a y p t

i v i

a E o o b a n a a a t o i y h t u e o l

o

g a e d n t t R i o i i e j o o n t n n o a n R e o n i m h n a s a o o o o t r r t n o u t t n i i N r n r d o d d n e n d o l g d n o d e e y

i s l j

r f r , , f , t t f , , i i K

K s a e t A K A K A K A K A K A K a I m h A s A t g c u e u e u e u e u e u e i e i R o e p t r t r t r t r t r t r k o R h h h h h h

a a a a a a n l n m A i e n o o o o o o l l l l l l n A c a a a a a a a m M

r r r r r r a y g o

l i i i i i i M t t t t t t t

e A W W W W W W y y y y y y f M

t o

n e A N M a a a a a a i t r f s i N A t t t t t t

n o e e e e e e o e s , g n A r r r r r r f

i x T o

M 2 M M M M T D t O i , h H n s

0 i e K a a a a a m A l 2

t I c y y r y y y f R i

E 0 e c o n

N 2 P U 2 2 2 2 h r R g l 0 o 0 0 0 0 i

r V n C o 2

. A 2 2 2 1 s A e 6 0 l g 0 0 0 9 e e 7 L N r a 3 w e A A 1 2 5 5 A o T M t P n / h s 2 0 0 % % % e N r h r

a e s - a o G 0 % % a r T

r

n g M a 1 R l c a m H i n r y 8 h g n e o e A a o

o - e p s g d n 2 l o n P s

o a a t 0 r n t U

h 1 h t r 2 e e t R l 0

1

y d t b o % i A n w

f P y 0 M 6 0 5 3 0 5 2 o m i P o

n R 6 S % % % % 5 % 0 f r

o r

. o t % 2 - 1

k n a g

A 1 2 M t t r p h . e e t 2 a r h s s i 0 y l e / s - 1 U

3 0 0 3 0 0 2 o m i P 1 9 n T 1 % % % % % 0 f 4 r )

o s o s 2 % n

g t 1 t r M h e t h a s e s y 7 9 1 % 4 9 9 9 5 0 0 0 0 0 3

% % 0 w % % % % % o r k s

c o m p l e t e d c u K D K T p d W D a m l W c I N m g F i c D 3 l p P P E o n o n o o o n u i n e 1 r a u S o u u x E e o G r t s c a s e h o o m m m e d m p d n . n r r m m

t p k

R p o b b a n n 7 e r g i C a

c e e e y n d k e p p e p s f . . . p u t . A n r p p i t l

a a r c i r 2 p a l o c e e o l l l c o l s i a u

a r y e e e n t i c D a m 2 t a 3 l p d d c g e c b C 7 t n c r 1 r n t w s t t s c n a 5 o

e n w h l n s

a o t o t t o t s f o o ) o o g l n P ) 1 r i ) r x ) a e . m s o k i o e y e e o

n 0 c e t n d e e I a i d e o i G i r g o r p n m i o f m t n d . n l . t d p u

r E k s m d a d d r n

s p

a i . d l P t

i 7 m

s e s g o r

n

i r t n h w t

s t r

o % . r d t m n e

t N . e o r

a p u p t o

e e e . r

r i i r t o o p b e s b

a e i 2 1 w e n t 2 w o h o e o g e l n s i o c l m l

a

l a r a o P E

p t l s g e l e y

y i

s b .

c g 1 a p w c e e r a

s v e n r t s a s o n r 1 r l d n i

o f x r o t k t p o t s p s e c

o .

a - i g u s t S l t 3 s r l s g e c e w p f . i e n . d i l d p l e s a o

a o o r

o u h u a i S a a

2 s n e t e t a m o 0 e . d n e d r a s . n c i A s

a i e a d l r E n n

m n m

a n

t n o

o n T r l t n l m . n s . g p

o

n e c o i a a L D r i s c E l p p e

6 d

o b x g m d d t g n l d e l e e . P

p e o

m d o

p a w 9 t t o e b i

t p i

m p . p u x

N m n 2 y n

K

i r

e e n u c r a

2 r r m

o

f s b t

c d o n V u f e p r R a l

e a e

1 p i

T i o a t d r u o g e o e u d a

3 1 n e o o a

n k e p i . v e e t o s E e e g

c t

p o

. l C g t m

i r h

n t n a y i

1 d e . g o t n v i

e l r o u s w r n e f t c c i e n

n

i l n

a r p y

a

c y e n t a C e

. o t

r

. r m

t t t e i l i e t

-

7 e l c f

c

s t

a n y t

e e r e l o

t d y d d l o t

w m a o

i (

- i

s i o h o r e o

e . d y s C

o E t n p g d

d d s 3

c u

l

2 t e t r s h - s n i

a g a l c d m v

a

o

n

c n s o e n i t 5

o o e t

1 b c

n y . a o f o e k r l t . o

M i

l l e

i b i m e j . i

w m

n t o o u

p

n . y d e

e n

a

o w r n k

n h n i p

M t t L

t e f p s o

c d l g u b u s x o

g s k o f a r i b p E E d s e p e

3 o p

r i

b r t

d n k p s p e

n k . d e e L

p

l

s e t l

o a l t x r 0 r e

i S e

e r d e w e

i a h r b f e n d i e a

D k t f u

o

p m c u n v . o d

o

r t

o i T t E d r u l e 6 e s c

t

c v e w n c e m o o e n y e

) c c g r s i o .

g p

w R c u

t n n P x t a . i a w o

l

d

m o m t d c n

e e

i 2 l

r i r p o e , p o

e d s t v n n n m p f o C

t

e a o m o g d h l c 1 h o

i e m p p t d l e n y

e m

r f n

.

r

s s g a v o C

e e p r

o

d

l l p

a c

t r e g s a

e e P c

p

r l m l o

b r u w a

t l

l g

a E

t

o l E d 2 i e e x P

e h h

a c t e r e

n l e

u

e g v t e e r y

e f d R f e p i n l s s t l e d e o a w i a t x v

e t d

l e h m e y e t n h i t d e o d

t o

s l u c l w n d .

K i e m e t l e

c a

d

c e s e d s

a

t

d w u

e p t g

r t d o I t a r s t a w e a

t i

a t a l o

l b r i e

r t e t l

i

i i a

t N .

o . o b n n n e n e e n

i b

n b i v b b

b t e e t b e c s c d o

i i i o b o n r e d g g y n n d d d n d

e

d o y s y y y l a m e a ) r - , . f

l e s

l l l Draft #3 of File KWA/WASCON/AEEII/NGT-PR/716/2021 Approved by Chief Engineer (Sewerage,PPD & Wascon) on 10-Jun-2021 12:24 PM - Page 2

2 2 2 2 2 . . . . . 1 1 1 1 1 2 . . . . . 1 1 9 8 7 .

1 0 L T l d i a m m s P a T I a t n E t ( T f d a s n R H G t D R o t s r o s P D d i n ( n e h h e 7 o e o n e e e t i r r r e o n i f v i 2 h r x i e a e i i i i o v o v a a c z e i e r e n 5 l a g v v s o r e w n s w e n t t 4 a o t d w r a e h e h e p v i c w e R e e c a a N c h c d a a . t n d r N p p e e n r g m e r h n p a h h n S h f r r . u s

o a l y S o t t e e t l o

p r r S t K g i

r o i i e e e o b a e s e e r c i r

n c r d j a c a r r n w e T o . l i a f S e e e c t a . k i d k d n w r d l ) h s i i i l a l e o y g h

) a n m w f e n l g i l j

h e d a m c r o e

a

u p i o i n l a s

s n e e

t g m a l e a t e i l g o a d o w y r n e n r r e e o e n s a e a ( e

t / m N x n

k m o o g

a

o 5 c n n a s

c a w d l a a t t s d r a n (

f i i s h g l e a s v e o i e

o e e N n 3 t i a n d s g

a 3 s t n o e

c

W

o r t u

g . f w n a P a g N n d

t e o i m i g g e o

r n o n t u o r n a y s n s

a s

o e

o . o e l e s m i u f g s

s ) f e a i a r e n e

e T m

i

K r b g s r b n

.

e c e z p t d s w

i s o a p ) k c n q w c / b h n l e a e l y e a w t s e O h s i r h i t r o s u s e r l e n i

s h n r i r o

d o h s n

a e o o a a u c a

a i n r e h r e l i e e p g c a n

s s l h

a a n l h e g n n m t g l w a l l

m r r m k e e

e l i

r s y

a o e f e l a d n

o n v e s r a a a d w i w i i a r

n e v t b l e o i i e n n s b g n b n b b e g e n n

e i e e i t n o e o m i i w i n s n g g e g n o e g e e d e n s a d y s r r r t f f A K A K A K A W K A K u e u e u e u e u e a t r t r t r t r t r h h h h t h a a a a a e o o o o o l l l l l a a a r a a r r r r r

i i i i i t t t t t W W W W y y y y y a a a a t t t t e e e e r r r r M c C M M o o a a a m m y r y

p

2 p 2 2 l 0 e l 0 0 e 2 t 2 2 t e e 0 0 0 d d 3 0 3 % % % 3 0 3 % % % 1 0 a T 1 o % % r % r

a n g b e e d S c ( T 8 S 1 T 9 1 1 0 R r o o 2 . 1 0 0 % t t . 8 a a s ) % % 0 0 1 t t . % e e b

b c %

e r e

p p . c

) c l l o a a

o a

m a n n

m r

r - - r

p r 5 3

a p

a l

n e l

n e

g t

g e t

e e

e d

d d

d

5

3

N

o

N

s

o .

.

7

. (

8

R

8

s

5

.

A a . a s C a a A I S c W E O 3 a S 3 I S A 1 W w W t R i R . 3 3 r c t E E 2 n D E n M A n M W o e e t r a n n n c 1 n , 3 1 1 0 S M t x t t M s x o h e e a u c .

n x a M o a a o o t i 4 q n ) p d d d p L . d L . K . t p . 2 r o e . l l i h h g t p p b a 1 8 7 i 1 d u l R t r t t R r c r e

u m c e e r A A e 1

e R e e r a n k k k a a e o r . . e h o 0 9 . 2 e d o S c k e 2 i U U l r

c c 2 c - o s s r d s b b o . U f a c n . c . r e w t s e g A p A p 2 a l a t t O . t p e T w o m i 2 1 2 g i i T T l e e i i c o t e s 3 3 r t e o t e e c d r l T l l l 2 D D m m o e e l i s w n C a a ) i i 1 . 1 r

r d k a n - e - a o r d t t

d a n e d

e c - e r t d 4 a a w

c e F n F n i . d

. o i o e C s a n e n i 5 7 n

s k n e t o

a s m d o d 2 t i t d

- - o i s / / o f m n n - t s

d , i i

n t r x s m S 1 S 2 r r n c w o o .

m a , i a 3 i w o r w

h a

n a

o e p o a c d

g – o 0 4 d t D D p n n k w T t t . o p r a h t i e m n - r p n t e e P u o –

t m t s

e e l B w e c o n f 6 F r F h E o l e i s e p . o l e

e r t

o e a o k

e s

a o H o h c e t e k r w o

p - - t

x

t f d o

6 h r t l N o o e

E k t 1 3

s

e

f f

e e e

p b

l S e e w 1 o s f

N e s e h

r s G d

t o x i s c c

d d b e e

s e s d t i w

e t r c a

t a a s .

s o p s a . o a w o o

p k

o e . e c e t

d

o o w

d

s s o a i

. e g ( m n m

t m r i t v d

o n

, m f n s

R

e

e a r m o e c

c

e d f L t

r

o o a ( k

- a b p p e

d a o n r g r t s

k h . p R

a

s

a

e e f f p r

m e l a l r 1

t m d . ) T r f

e

e i l a l a n

s e p s

d i g i p e

e e S l 1

c n e 1 t l t S i e n n

d 1 .

e p p i

h s t i r i d s n ( e t e

e r o 3 o i – c o g

8 a a

1 t x l r

o s

e a

e 4 d

o

n . n o a t i

v e

i n t

)

r t n 9 n f d i r t s t . e

o o

e a r v r s e e d e d e d 3 w

q 3 7 3 t

o e b

n e

3 n i c c d

u m

1 N d

6

n u 1

1 c o m v

e t S e q o d 1 . c

P e a

s 9

c h g a o . . o i r i

b r o i u t

s 6 . 1 0 t t u

f

r l k

( f v e

i n t 5 . a . a t t . c

S o f e y f i 1 i t e 9 0 ) 3

e s b e e )

n s i

o c . t o n c p

r

d ) a . N 2 . . . e d m r d i a

e

2 2

t a m

i

t 1

( i p

c . S h n o b B

l t h o 1 2 p t i R

- w t o t i p e e o . o

t o P r o y n o 2 o l

A a

a a s e m l

o a t v

a n a f . n e r 0

n i M

. t n T o

c e f e

v

e e r D l

t 1 p i d

e i N a - r e c d y s w

n R

s 9 l 1

i

L

n a s e

d e w w

s a e t P 3 o n ( U - a r a t a d t t t

n g R 2

o . i o r a l i r i e r n n g a o 2 n T o e b t k i a 0 e r r i s c l w i g d n e n n 4 d - n r y k s y s k r - - . t

Draft #3 of File KWA/WASCON/AEEII/NGT-PR/716/2021 Approved by Chief Engineer (Sewerage,PPD & Wascon) on 10-Jun-2021 12:24 PM - Page 3 p T o t b n f *

3 3 3 3 3 3 3 h u

r f a e h ...... e l e O 1 1 1 1 1 1 1 l l t i y a w r p e ...... u e u / 7 6 5 4 3 2 1 n a P x o t n v c T A s o P b N R B P c a t E t E t E L i

r r a s o o o a t a e k e o f l r o i o d r l r x x x o r e e t o r e n o e t o o

i t w r N B B t t t n e d n f i t t h 2 i c i q p e e e a c o a

a c w v s a g

l l i e g e k a 3 k u o n o n o n n t n u i s w l t l i o d l r

w b

h o a i r s c s c s y t t r A a A w p A a

r i e h o a e i e s i k i k i n n l v k l o o o g y m

r

i r a a f m t c e

m t

a a t g t

d i m

n H n F n e o a o o o a p r o D w a i e l 1 s o d l e s E

t s

n f n u v a

d o o o S P n t i E 0 e

t

y m s u n o e o e o

d r i b d f f f t T 0 n r R s

a

t n w s n r

n a l e e s s s s G t

e R v P p e m f

e e t t e g e e e a d i o

i w

u h d n

z

m r w e w w w r r s

b r c o

m e

, a a

e e m

u

p o u f

w e e e C

g r

q q d

p r r a T s t

d r r r a

i e e o

o

u e u t a a a

y s

h s i h t h

s r

g n e i s s h g g t g i s r

i p

a o r r i

r t x e t i e e e y p g e

e u s o e i s e l u i n

m

s

s r n d e

n v r m b s s s s s o

t t a n s a w s a e e

y y e y i e p n

T

t

e . n s s s n m n : l

e i a o t g o i h e a t t t a c n t r r e e e s

n i d n a e e n i r e m m m n , u s d g

t

d t h

v

e o A m a a

f S b p o f n o A K a I

a e m u r

a d g u e

c

r n h i p e p i t r a e f l h t a a i i r n l m t h c s e e o y l s c a a t a m . p r

a

y

t

p C i i a t W b F e b o y u o r l o n e n i r e a s r a r t e

p d t h i

i n e m n o n . 3 i n g r

r

T 5

g a l o i

h C e

t W i b e o u o s t

a n

r e a 3 7 2 ( R A 1 6 1 1 1 l o p o R r . w i 0 0 0 4 0 0 0 0 m e

n d n o f s F 0 0 0 7 0 0

e q e s g r o . t 0 o a r i u

d h

n u a C t r ( t i

e e r n i

g o C e r p

r B t u e o n c m d r r n l

e h o r , o 4 e d

p a r s c m 2 e s e y a k n

) r e s s r g

T T y i t w a

n e e e F R h i s a g

m m a u

r i K r

n e r t e d D r

I o s

e e

s f P d

l s o i ( ( R n e R

r G a e m

) B / r

D o u e l o d o F t P v E n h

g e t c e e r R . c e r o s k

n b o a

i

s g m g v r o f v p

u r o i n e f s h e o A

a r

r a y s

n

r e o K r g

s y t e t d f a h e

o e

h i

n n r s

d o a a a e d

E f b l t r w

a o

e i f l )

e o i ) a

t c m P

r a r s o a

r a a t o

t v o i g n o h r n e g o e e d n e t r r f h e

s o s f

M i n a t r h c e h

c % o

m w o p r l e k t s e d g s a e R C t o u P p C r D h e u o p x f n r r e o o e a e m o r i i p c s h r n t n t v p p j a p h o o t e a a s e g u i a i o e v n i c u i l b y n n s r r e o r g t a l

i i

t

a t i n l T r n o n e

i a m t e t g R a h g f . d i n o d

w t i w

e t r i n

o u D a p o o s

n v n o r y e r w k a k d r s t

t s a n t a

e a i a r t l f f m n e h d n o o o i d d e s s - r r , f

STATE WATER MONITORING PROGRAMME (SWMP) 2021 Analysis Report for the month of MAY­2021

Name of River KARAMANA Date and Time of Sample collection 5/5/2021 Method of analysis SAMPLE ID Sl no. Parameters Peppara Aruvikkara Mangatukadavu Pallathukadavu Thiruvallom Moonnattumukku 1 Temperature,degree celsius 26 27 26 26 26 26 2 pH 6.5 6.5 6.8 7.1 7.4 7.3 3 Turbidity,NTU 1.7 3.5 4.2 5.8 6.8 6.9 4 Electrical Conductivity, 53 82 87 138 248 336 5 DO,mg/l 6.7 6.5 4.7 3.6 2.5 1.6 6 BOD,mg/l 0.8 1.3 3.5 6 7.2 8.4 7 NH3N,mg/l BDL BDL BDL BDL BDL BDL 8 Nitrate,mg/l BDL BDL BDL BDL BDL 1.2 9 Chloride,mg/l 3 7 8 11 30 46 10 Phosphate,mg/l BDL BDL BDL BDL BDL BDL 11 Total Alkalinity,mg/l 20 29 29 51 76 88 12 Total Hardness,mg/l 27 36 37 61 85 104 13 Calcium,mg/l 20 26 28 45 65 82 14 Magnesium,mg/l 7 10 9 16 20 22 15 Sodium,mg/l 1.8 3.8 4.3 5.8 16 24 16 Potassium,mg/l 0 1 1.2 1.5 4.3 5.1 17 Boron,mg/l 0 0 0 0 0 0 18 SAR 0.088158 0.160358 0.030696 0.18883 0.444613 0.606986 19 TC,cfu/100ml 400 400 900 1600 4800 17600 20 FC,cfu/100ml 100 100 400 600 1600 4600 21 Faecal Streptococci ND ND ND ND ND ND

Assistant Scientist National Mission for Clean Ganga

Format for Submission of Monthly Progress Report by States/UTs (Hon’ble NGT in the matter of OA No.673/2018 dated 06.12.2019) RIVER PAMBA, PATHANAMTHITTA S. Activity to be monitored Timeline Submission of progress by State/UT-Compliance No status . 1 Ensure 100% treatment of sewage at least in-situ remediation Commencement of setting up of STPs and connecting all the drains and other sources of generation of sewage to the STPs must be ensured 2 Timeline for completing all steps of action plans including completion of setting up STPs and their Commissioning 5 Chief Secretaries may set up appropriate monitoring mechanism at state level • Specifying accountability of nodal authorities not below the Secretary level • Chief Secretaries may have an accountable person attached in their office for this purpose

• Monitoring at State level must take place 6 Progress report may be furnished by the State/UTs to • Secretary,Ministry of Jal Shakti • Member Secretary,CPCB 6.1 Progress Report may be comprised of details along with completion timelines on: (I) Identification of polluting sources including drains contributing to river pollution and action as per NGT order on in-situ treatment.

(II) Status of STPs, I&D and sewerage networks Details of Existing Infrastructure,Gap Analysis, Proposed along with completion timeline

(III) Status of CETPs Details of Existing CETP and ETP Infrastructure,Gap Analysis, Proposed along with completion timeline, No. of industries and complying status

(iv)Status of Solid Waste Management & Details of Processing Facilities Details of Existing Infrastructure,Gap Analysis, Proposed along with completion timeline

(v)Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river;

(vi)Preventing dumping of waste and scientific waste management including bio-medical waste, plastic waste and decentralizing waste processing, including waste generated from hotels, Ashrams, etc.

(vii)Ground water regulation

(viii) Adopting good irrigation practices

(ix) Protection and management of food plain Zones (FPZ)

(x) Rain water harvesting

(xi)Maintaining minimum Environmental flow of river

(xii) Plantation on both sides of the river

(xiii)Setting up biodiversity parks on flood plains by removing encroachment ACTION PLAN FOR RIVER PAMBA, KERALA

No. Activity Implementing Time line Progress in the month of Progress in the monthof % works Details of works agency April 2021 May 2021 completed remaining (as per Action Plan)

A(a) No industries ------

A(a) Monitorng of river water Kerala State Continuing quality Pollution project Control Board C(ii) Establishment of de- Mannar 31.03.2021 Construction of 2 Construction of 2 100% Inauguration of centralized solid waste Panchayat, aerobic compost units aerobic compost units functioning. treatment facility Kadapra/ completed (One each in completed (One each in Niranam Grama Panchayat Office Grama Panchayat Office Panchayath compound and near compound and near Mannar Private Bus Mannar Private Bus Stand. The work was Stand. The work was executed by M/s Floret executed by M/s Floret Technologie Technologies, Thiruvananthapuram. Thiruvananthapuram. An amount of Rs. An amount of Rs. 13,60,000/- was 13,60,000/- was allocated in the annual allocated in the annual plan of Mannar GP for plan of Mannar GP for this projects this project Kadapra Panchayath has Kadapra Panchayath has resolved to identify all resolved to identify all polluting sources polluting sources involved in pollution of involved in pollution of river resources and river resources and initiation of penal action initiation of penal action against them against them

Niranam Niranam Gramapanchayat Gramapanchayat is an is an upper Area upper kuttanad Area . So . So no such dry land no such dry land suitable suitable for solid waste for solid waste treatment treatment plant is plant is available. Door available. Door to door to door collection of collection of solid waste solid waste ny haritha ny haritha karmasena is karmasena is ongoing ongoing and segregate and segregate and and handed over to clean handed over to clean Kerala Company. Kerala Company.

C Establishment of Material Mannar 31.03.2021 Collection of Non- Collection of Non- 100% Construction of Collection Facility Panchayat, biodegradable plastic biodegradable plastic permenant MCF Kadapra/ materials from houses materials from houses building, Niranam and institutions is and institutions is collection and Panchayath conducted by Haritha conducted by Haritha transportation of Karma Sena(HKS). Non- Karma Sena(HKS). Non-bio biodegradable plastic Collection, segregation degradable materials has and transportation of Materials to RRF bCollection, segregation non-biodegradable for processing. and transportation of plastic materials is non- continuing. About 4.5 biodegradableplastic tonnes of plastic materials is continuing. materials handed over About 4.5 tonnes of to Clean Kerala plastic materials handed Company(CKC) so far. over to Clean Kerala About 3 tonnes of Company(CKC) so far. plastic materials is kept About 3 tonnes of ready for transportation. plastic materials is kept Socio-Economic Unit ready for trasportation. (SEU) has been selected Socio-Economic Unit as implementing agency (SEU) has been selected for the construction of as implementing agency Two mini MCFs in each for the construction of ward in all the 18 wards Two mini MCFs in each of Mannar GP. ward in all the 18 wards of Mannar GP Material Collection Facility is fully functional Material Collection in Kadapra Grama Facility is fully functional Panchayath in Kadapra Grama Panchayath In Niranam grama panchayath MCF IS In Niranam grama constructed and 13 panchayath MCF IS mini MCf s constructed constructed and 13 mini MCf s constructed

C Resource Recovery Facility Mannar 31.03.2021 As there is no RRF in As there is no RRF in 100% Collection and Panchayat, Block Mavelikkara Block transportation of Kadapra/ Panchayat in which Panchayat in which Non-bio Niranam Mannar GP belongs, Mannar GP belongs, degradable Panchayath nearby nearby Chengannur Materials to RRF Block Panchayat has Block Panchayat has for processing agreed to receive the agreed to receive the plastic materials plastic materials collected and collected and transported by Mannar transported by Mannar GP. Mannar GP has GP. Mannar GP has started stockpiling of started stockpiling of plastic waste materials plastic waste materials collected through HKS collected through HKS in a hall above the in a hall above the Vridhdhasadanam Vridhdhasadanam owned by GP and owned by GP and segregated and segregated and transported to Clen transported to Clen Kerala company Kerala company.

Resource recovery Resource recovery facility is working as a facility is working as a centralized centralized arrangement at Block arrangement at Block Panchayath level in Panchayath level in Kadapra Grama Kadapra Grama Panchayath Panchayath

It will be suitable if It will be suitable if RRFf is Established at RRFf is Established at Blocklevel in Niranam Blocklevel in Niranam Grama Panchayath Grama Panchayath

C Installing household and Mannar 31.03.2021 Collection of Non- Collection of Non- 100% Construction and community level solid waste Panchayat biodegradable plastic biodegradable plastic operation of management units materials from houses materials from houses Aerobic and institutions is and institutions is compost unit. conducted by Haritha conducted by Haritha Karma Sena(HKS). Karma Sena(HKS). Collection, segregation Collection, segregation and transportation of and transportation of non-biodegradable non-biodegradable plastic materials is plastic materials is continuing. About 4.5 continuing. About 4.5 tonnes of plastic tonnes of plastic materials materials handed over to Clean Kerala Company(CKC) so far. About 3 tonnes of plastic materials is kept ready for trasportation.Socio- Economic Unit (SEU) has been selected as implementing agency for the construction of Two mini MCFs in each ward in all the 18 wards of Mannar GP. C Door to door collection and Mannar 31.03.2021 Collection of Non- Collection of Non- 100% The process has transportation of municipal Panchayat biodegradable plastic biodegradable plastic to be repeated solid waste materials from houses materials from houses throught the and institutions is and institutions is year. conducted by Haritha conducted by Haritha Karma Sena(HKS). Karma Sena(HKS). Collection, segregation Collection, segregation and transportation of and transportation of non-biodegradable non-biodegradable plastic materials is plastic materials is continuing. About 4.5 continuing. About 4.5 tonnes of plastic tonnes of plastic materials handed over materials handed over to Clean Kerala to Clean Kerala Company(CKC) so far. Company(CKC) so far. About 3 tonnes of About 3 tonnes of plastic materials is kept plastic materials is kept ready for ready for trasportation.Socio- trasportation.Socio- Economic Unit (SEU) Economic Unit (SEU) has been selected as has been selected as implementing agency implementing agency for the construction of for the construction of Two mini MCFs in each Two mini MCFs in each ward in all the 18 ward in all the 18 wards of Mannar GP wards of Mannar GP.

C Construction of small sewage Kadapra 31.12.2020 The Panchayath has by The Panchayath has by Not applicable treatment plant with Panchayat its resolution considered its resolution that Sewage treatment screening, septic tank and considered that disinfection to the storm plant is currently not Sewage treatment water drain of Town needed within Panchayath area around plant is currently not Parumala needed within Panchayath area around Parumala C Construction of small sewage Mannar 31.12.2020 Due to the lack of space Due to the lack of Not applicable treatment plant with Panchayat and fund, construction space and fund, of small STP is not screening, septic tank and construction of small disinfection to the storm included in the annual STP is not included in water drain of Mannar Town plan of Mannar Grama Panchayat. It will be the annual plan of suitable if the Govt . Mannar Grama takes necessary steps in Panchayat. It will be this matter. suitable if the Govt . takes necessary steps in this matter. C Construction of compound Irrigation 31.03.2021 Detailed project report Detailed project report wall with fencing department for the Holistic for the Holistic rejuvenation of the rejuvenation of the C Removing light jungle and Irrigation 31.03.2021 reaches is prepared and muddies from river courses department submitted to reaches is prepared Government and submitted to C Electrical-Light Irrigation 31.03.2021 Government arrangementsand Surveillance department cameras

C Regualting activites in flood Irrigation 31.03.2021 plain zone, protection and department management of flood plain zone Greenery Irrigation 31.03.2021 developmentPlantation plan. department Plantation on both sides of the river, setting up biodiversity parks on flood plains by removing encroachment C (b) (ii) Green Protocol Mannar, 31.05.2020 Green Audit was Green Audit was 100% Continuation of implementation in all Offices Kadapra/ conducted in Mannar GP conducted in Mannar Green Protocol . institution & Public function Niranam Office and other 13 GP Office and other 13 Panchayat Government Offices Government Offices within the Panchayat within the Panchayat Area. 11 offices were Area. 11 offices were certified to have fulfilled certified to have Green Audit parameters. fulfilled Green Audit Certificates were parameters. awarded to the Certificates were successful offices and awarded to the Suchitwa Padavi successful offices and Declaration in Mannar Suchitwa Padavi GP was conducted Declaration in Mannar 26/01/2021. GP was conducted 26/01/2021.

Green protocol has been Green protocol has been implemented inKadapra implemented in Public Gramapanchayath Main offices of Kadapra office.All public Gramapanchayat functions by this office also follow the protocol.

Necessary instructions Necessary instructions are given to all offices are given to all offices and institution to strictly and institution to strictly comply with the green comply with the green protocol and is regularly protocol and is regularly monitored in Niranam monitored in Niranam grama panchayath grama panchayath D(a) Issues relating to E-flow, Irrigation 30.11.2020 Detailed project report Detailed project report maintaining minimum department for the Holistic for the Holistic environmental flow of river rejuvenation of the rejuvenation of the (by having watershed reaches is prepared reaches is prepared management provisions) and submitted to and submitted to Government Government D (b) Irrigation practices Irrigation 30.04.2020 department E Awareness programmes for Kerala State 31.05.2020 sections of public Pollution Control Board C Management of municipal, LSGD 31.03.2021 Draft by-law of Plastic Draft by-law of Plastic plastic, hazardous, biomedical Waste Handling has Waste Handling has been passed by the and electrical waste been passed by the Grama panchayat Committee on Grama panchayat 05/02/2021. Collection, Committee on segregation and 05/02/2021. transportation of non- Collection, segregation biodegradable plastic materials is continuing. and transportation of About 4.5 tonnes of non-biodegradable plastic materials handed plastic materials is over to Clean Kerala continuing. About 4.5 Company(CKC) so far. About 3 tonnes of tonnes of plastic plastic materials is kept materials handed over ready for to Clean Kerala trasportation.Socio- Company(CKC) so far. Economic Unit (SEU) has been selected as About 3 tonnes of implementing agency plastic materials is kept for the construction Two ready for mini MCFs in each ward trasportation.Socio- in all the 18 wards of Mannar GP.For the Economic Unit (SEU) management of has been selected as electrical, electronic and implementing agency hazardous waste, the for the construction Grama Panchayat has reached in an Two mini MCFs in each agreement with Clean ward in all the 18 Kerala Company. wards of Mannar Collection and handing GP.For the over of electrical, management of electronic and hazardous waste will electrical, electronic start. Biomedical waste and hazardous waste, is being collected from the Grama Panchayat source and transported has reached in an for processing by IMAGE (IMA Goes + Eco- agreement with Clean friendly), an initiative Kerala Company. run by IMA (Indian Collection and handing Medical Association. over of electrical,

electronic and In Kadapra Grama hazardous waste will Panchayath, start. Biomedical waste these types of waste is being collected from materials are being processed with the help source and transported of Clean Kerala for processing by Company IMAGE (IMA Goes + Eco-friendly), an initiative run by IMA (Indian Medical Association).

ACTION BY GROUND WATER DEPARTMENT

Sl. No. Ref para item Activity Progress in the Progress in the % works Details of works remaining nos as per month of April 2021 month of completed NGT Order May 2021 no.673/2018 dated 20.09.2018 1 B(i) Ground Water NOC has not been Not submitted Demand based 1.As per the GEC estimation all resources and issued to industries the blocks in the District has regulation of ground for Ground Water beencategorized as SAFE. water extraction by extraction during 2.Provisions of GW (control industries particularly March 2021 &Regulation) Act 2002 is in over exploited as implementing strictly for critical zones/blocks regulating extraction of GW resource in the district 2 B(ii) Ground water Work Completed Not submitted All the blocks in the district is recharging / rain categorized as SAFEas water harvesting per GEC estimation. Kadapra-Niranam Area is not feasible for Ground WaterRecharge. However, GW recharging programme is taken up in some pockets in the midland area including Manimala basin. Where seasonal GW level fluctuation is noticed.

3 B(iii) Periodic ground waste Groundwater sample Not submitted Periodical (i)Maintaining a network of quality assessment collection during the assessment(Regular observation wells in various and remedial actions month of March from programme) hydrogeomorphic units in case of monitoring wells Chemical throughout the district from contaminated ground (borewells and open analysis result which water level and water water tube wells/bore wells) collected and ofgroundwater samples have been collected wells or hand pumps sent to Analytical Lab samples collected periodically and analysed. Thiruvananthapuram during November- (ii)generally groundwater quality for chemical analysis 2020 reveals that is good and potable soon.Result awaited the gw quality is . good and potable.

4 B(iv) For regulating use of - - Continuing i)Borewell/tube well ground water for programme construction is regulated in the irrigation purpose, district by insisting permit of adopting good local bodies based on the irrigation practices feasibility report of GWD ii) Promoting conjunctive use of groundwater and surface water for irrigation purpose. iii)Awareness programmes organised to the public to adopt rainwater harvesting measures

MONTHLY ANALYSIS REPORT OF POLLUTED RIVER STRETCHES MAY- 2021

STATION : MANNAR

SAMPLING DATE : 04.05.2021

SI.NO PARAMETERES ITTINARAKADAVU KOTTAKAL KADAVU PARUMALA MANNAR BRIDGE BRIDGE BRIDGE BRIDGE KUTTAMPEROOR KORATTIKADAVU 1 Temp. (ºC) 29 29 29 29

2 pH 7.1 7.3 7.0 7.2

3 Conductivity 78.89 38.81 42.71 38.23 (µS/cm)

4 DO (mg/L) 6.1 6.7 6.5 6.9

5 BOD (mg/L) 0.8 0.5 0.6 0.4

6 COD (mg/L) 3.2 3.2 3.2 3.2

7 TDS (mg/L) 40 18 30 28

8 TC (CFU/100ml) 430 210 140 90

9 FC (CFU/100ml) 140 70 50 30

National Mission for Clean Ganga

Format for Submission of Monthly Progress Report by States/UTs (Hon’ble NGT in the matter of OA No.673/2018 dated 06.12.2019) RIVER PAMBA, PATHANAMTHITTA S. Activity to be monitored Timeline Submission of progress by State/UT- No. Compliance status 1 Ensure 100% treatment of sewage at least in-situ NA remediation Commencement of setting up of STPs and connecting all NA the drains and other sources of generation of sewage to the STPs must be ensured 2 Timeline for completing all steps of action plans including NA completion of setting up STPs and their Commissioning 5 Chief Secretaries may set up appropriate monitoring NA mechanism at state level  Specifying accountability of nodal authorities not below the Secretary level  Chief Secretaries may have an accountable person attached in their office for this purpose  Monitoring at State level must take place NA 6 Progress report may be furnished by the State/UTs to Monthly NA  Secretary,Ministry of Jal Shakti (preferably th  Member Secretary,CPCB before 20 of every month 6.1 Progress Report may be comprised of details along with 2019-2020 Drains contributing to river pollution were completion timelines on: Identified- The drains are seasonal and water (I) Identification of polluting sources including drains quality is above the required limit, no in-situ treatment is required contributing to river pollution and action as per NGT order on in-situ treatment.

(II) Status of STPs, I&D and sewerage networks Details of Existing Infrastructure,Gap Analysis, Proposed along 2020-2021 with completion timeline

(III) Status of CETPs Details of Existing CETP and ETP Infrastructure,Gap Since the area does not contain any industry Analysis, Proposed along with completion timeline, and so do not require any CETP, this action No. of industries and complying status point is revised

(iv)Status of Solid Waste Management & Details of The adjoining local bodies are in the stage of developing and establishing adequate solid Processing Facilities waste management facilities. Also, the solid Details of Existing Infrastructure,Gap Analysis, waste dumping issues were not identified in Proposed along with completion timeline the stretch during the field visit held during past one year (v)Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in Water quality analysis results of MAY 2021 is the catchment of polluted river; 2019-2021 enclosed

(vi)Preventing dumping of waste and scientific waste 2019-2021 Awareness campaign to be initiated management including bio-medical waste, plastic waste and decentralizing waste processing, including waste generated from hotels, Ashrams, etc.

(vii)Ground water regulation 2020 -2021 No ground water pollution is noted in the area so action yet to be initiated Adopted (viii) Adopting good irrigation practices 2020-2021

(ix) Protection and management of food plain Zones (FPZ) 2020-2021 Action will be initiated

(x) Rain water harvesting 2020-2021 Action will be initiated

(xi)Maintaining minimum Environmental flow of river 2020-2021 Action will be initiated

(xii) Plantation on both sides of the river Action will be initiated

(xiii)Setting up biodiversity parks on flood plains by 2020-2021 Action will be initiated removing encroachment ACTION PLAN FOR RIVER PAMBA, KERALA

No. Activity Implementing agency Time line Progress in the Progress Progress in the % works Details of month of March in the month of May completed works (as per 2021 month of 2021 remaining Action April 2021 Plan)

A(a) No industries ------

A(a) Monitorng of river water quality Kerala State Pollution Continuing Result attached Result Result attached 100% NIL Control Board project attache d C(ii) Establishment of de-centralized Mannar Panchayat, 31.03.2021 Construction of 2 Constru Construction of 100% Inaugura solid waste treatment facility Kadapra/ Niranam aerobic compost ction of 2 aerobic tion of units completed Panchayath 2 compost units functioni (One each in Grama Panchayat aerobic completed ng. Office compound compos (One each in and near Mannar t units Grama Private Bus Stand. complet Panchayat ed (One Office each in compound and Grama near Mannar Panchay Private Bus at Office Stand. The compou work was nd and executed by near M/s Floret Mannar Technologies, Private Thiruvanantha Bus puram. An Stand. amount of Rs. 13,60,000/- was allocated in the annual plan of Mannar GP for this project. C Establishment of Material Mannar Panchayat, 31.03.2021 Second Phase of Collecti Collection of 100% Construc Collection Facility Kadapra/ Niranam collection of non- on, Non- tion of biodegradable Panchayath segregat biodegradable permena plastic materials is completed, ion and plastic nt MCF segregated and transpor materials from building. transported to tation houses and Clean Kerala of non- institutions is Company(CKC). A total quantity of 2 biodegr conducted by tonnes is adable Haritha Karma transported to plastic Sena(HKS). CKC so far. material Non- s is biodegradable continui plastic ng. materials has About bCollection, 4.5 segregation tonnes and of transportation plastic of non- material biodegradable s plastic handed materials is over to continuing. Clean About 4.5 Kerala tonnes of Compan plastic y(CKC) materials so far. handed over to About 3 Clean Kerala tonnes Company(CKC) of so far. About 3 plastic tonnes of material plastic s is kept materials is ready kept ready for for trasportation. trasport Socio- ation. Economic Unit Socio- (SEU) has been Econom selected as ic Unit implementing (SEU) agency for the has construction of been Two mini MCFs selected in each ward in as all the 18 implem wards of enting Mannar GP. agency for the construc tion of Two mini MCFs in each ward in all the 18 wards of Mannar GP. C Resource Recovery Facility Mannar Panchayat, 31.03.2021 As there is no RRF As there As there is no 100% Collectio Kadapra/ Niranam in Mavelikkara is no RRF in n and Block Panchayat Panchayath RRF in Mavelikkara transport in which Mannar GP belongs, Mavelik Block ation of nearby kara Panchayat in Non-bio Chengannur Block Block which Mannar degradab Panchayat has Panchay GP belongs, le agreed to receive the plastic at in nearby Materials materials which Chengannur to RRF collected and Mannar Block for transported by GP Panchayat has processin Mannar GP. Mannar GP has belongs, agreed to g started stockpiling nearby receive the of plastic waste Chenga plastic materials nnur materials collected through Block collected and HKS in a hall Panchay transported by above the at has Mannar GP. Vridhdhasadanam owned by GP and agreed Mannar GP has segregated and to started transported to receive stockpiling of Clen Kerala the plastic waste company. plastic materials material collected s through HKS in collecte a hall above d and the transpor Vridhdhasadan ted by am owned by Mannar GP and GP. segregated and Mannar transported to GP has Clen Kerala started company. stockpili ng of plastic waste material s collecte d through HKS in a hall above the Vridhdh asadana m owned by GP and segregat ed and transpor ted to Clen Kerala compan y. C Installing household and Mannar Panchayat 31.03.2021 Construction of 2 Collecti Collection of 100% Operatio community level solid waste aerobic compost on, Non- n of units completed management units segregat biodegradable Aerobic (One each in ion and plastic compost Grama Panchayat unit. Office compound transpor materials from and near Mannar tation houses and Private Bus Stand. of non- institutions is Second Phase of collection of non- biodegr conducted by biodegradable adable Haritha Karma plastic materials is plastic Sena(HKS). completed, material Collection, segregated and transported to s is segregation Clean Kerala continui and Company(CKC). A ng. transportation total quantity of 2 About of non- tonnes is transported to 4.5 biodegradable CKC so far. tonnes plastic of materials is plastic continuing. material About 4.5 s tonnes of handed plastic over to materials Clean handed over to Kerala Clean Kerala Compan Company(CKC) y(CKC) so far. About 3 so far. tonnes of About 3 plastic tonnes materials is of kept ready for plastic trasportation.S material ocio-Economic s is kept Unit (SEU) has ready been selected for as trasport implementing ation.So agency for the cio- construction of Econom Two mini MCFs ic Unit in each ward in (SEU) all the 18 has wards of been Mannar GP. selected as implem enting agency for the construc tion of Two mini MCFs in each ward in all the 18 wards of Mannar GP. C Door to door collection and Mannar Panchayat 31.03.2021 Second Phase of Collecti Collection of 100% The transportation of municipal collection of non- on, Non- process biodegradable solid waste segregat biodegradable has to be plastic materials is completed, ion and plastic repeated segregated and transpor materials from throught transported to tation houses and the year. Clean Kerala of non- institutions is Company(CKC). A biodegr conducted by total quantity of 2 adable Haritha Karma tonnes is plastic Sena(HKS). transported to CKC so far. material Collection, s is segregation continui and ng. transportation About of non- 4.5 biodegradable tonnes plastic of materials is plastic continuing. material About 4.5 s tonnes of handed plastic over to materials Clean handed over to Kerala Clean Kerala Compan Company(CKC) y(CKC) so far. About 3 so far. tonnes of About 3 plastic tonnes materials is of kept ready for plastic trasportation.S material ocio-Economic s is kept Unit (SEU) has ready been selected for as trasport implementing ation.So agency for the cio- construction of Econom Two mini MCFs ic Unit in each ward in (SEU) all the 18 has wards of been Mannar GP. selected as implem enting agency for the construc tion of Two mini MCFs in each ward in all the 18 wards of Mannar GP. C Construction of small sewage Kadapra Panchayat 31.12.2020 treatment plant with screening, septic tank and disinfection to the storm water drain of Parumala Town C Construction of small sewage Mannar Panchayat 31.12.2020 Due to the lack of Due to Due to the lack 0% Not treatment plant with space and fund, the lack of space and applicabl construction of screening, septic tank and of space fund, e small STP is not disinfection to the storm water included in the and construction of drain of Mannar Town annual plan of fund, small STP is not Mannar Grama construc included in the Panchayat. It will tion of annual plan of be suitable if the Govt . takes small Mannar Grama necessary steps in STP is Panchayat. It this matter. not will be suitable included if the Govt . in the takes annual necessary plan of steps in this Mannar matter. Grama Panchay at. It will be suitable if the Govt . takes necessa ry steps in this matter.

C Construction of compound wall Irrigation department 31.03.2021 with fencing

C Removing light jungle and Irrigation department 31.03.2021 muddies from river courses C Electrical-Light arrangements and Irrigation department 31.03.2021 Surveillance cameras

C Regualting activites in flood plain Irrigation department 31.03.2021 zone, protection and management of flood plain zone Greenery developmentPlantation Irrigation department 31.03.2021 plan. Plantation on both sides of the river, setting up biodiversity parks on flood plains by removing encroachment C (b) (ii) Green Protocol implementation in Mannar, Kadapra/ 31.05.2020 Green Protocol is Green Green Audit 100% Continua all Offices institution & Public Niranam Panchayat strictly observed in Audit was conducted tion of Mannar GP and function was in Mannar GP Green other offices as well as public functions . conduct Office and Protocol . Strict instruction in ed in other 13 writing is given to Mannar Government owners of GP Offices within auditoriums , assembly halls, etc Office the Panchayat to comply with and Area. 11 Green protocol while conducting other 13 offices were ceremonies. Rs. Govern certified to 1,50,000/- has been ment have fulfilled allocated for a project for the Offices Green Audit setting up of cloth within parameters. bag/paper bag unit the Certificates so that use of plastic Panchay were awarded carry bags can be discouraged. at Area. to the 11 successful offices offices and were Suchitwa certified Padavi to have Declaration in fulfilled Mannar GP Green was conducted Audit 26/01/2021. paramet ers. Certifica tes were awarde d to the successf ul offices and Suchitw a Padavi Declarat ion in Mannar GP was conduct ed 26/01/2 021. D(a) Issues relating to E-flow, Irrigation department 30.11.2020 maintaining minimum environmental flow of river (by having watershed management provisions) D (b) Irrigation practices Irrigation department 30.04.2020

E Awareness programmes for Kerala State Pollution 31.05.2020 An online Webinar Webinar were 17 sections of public Control Board training series were conducted on WEBINAR for mentoring higher secondary conduct all saturdays WERE school ed on all CONDUCTE students/college saturda D students to ys encourage them in environmental conservation activities and to transform them as environmental leaders in order to transform as a whole. The webinar is conducted weekly on Saturday evenings from 7:00 PM to 08:30 PM in association with Higher Secondary Career Guidance Center, District Administration, Haritha Keralam Mission, Suchitwa Mission, Team for Clean Alleppey and Education Department. C Management of municipal, LSGD 31.03.2021 As for municipal Draft Draft by-law of 100% The plastic, hazardous, biomedical and plastic waste, by-law Plastic Waste process first phase door- and electrical waste of Handling has is to be to-door collection using Haritha Plastic been passed by repeated Karma Sena is Waste the Grama periodica completed, Handlin panchayat lly. segregated and g has Committee on transported to Clean Kerala been 05/02/2021. Company(CKC). A passed Collection, total quantity of 2 by the segregation tonnes is Grama and transported to CKC so far. For the panchay transportation management of at of non- electrical, Commit biodegradable electronic and tee on plastic hazardous waste, the Grama 05/02/2 materials is Panchayat has 021. continuing. reached in an Collecti About 4.5 agreement with on, tonnes of Clean Kerala Company. segregat plastic Collection and ion and materials handing over of transpor handed over to electrical, tation Clean Kerala electronic and hazardous waste of non- Company(CKC) will start. biodegr so far. About 3 Biomedical waste adable tonnes of is being collected plastic plastic from source and transported for material materials is processing by s is kept ready for IMAGE (IMA Goes continui trasportation.S + Eco-friendly), an ng. ocio-Economic initiative run by IMA (Indian About Unit (SEU) has Medical 4.5 been selected Association). tonnes as of implementing plastic agency for the material construction s Two mini MCFs handed in each ward in over to all the 18 Clean wards of Kerala Mannar GP.For Compan the y(CKC) management so far. of electrical, About 3 electronic and tonnes hazardous of waste, the plastic Grama material Panchayat has s is kept reached in an ready agreement for with Clean trasport Kerala ation.So Company. cio- Collection and Econom handing over ic Unit of electrical, (SEU) electronic and has hazardous been waste will selected start. as Biomedical implem waste is being enting collected from agency source and for the transported for construc processing by tion IMAGE (IMA Two Goes + Eco- mini friendly), an MCFs in initiative run each by IMA (Indian ward in Medical all the Association). 18 wards of Mannar GP.For the manage ment of electrica l, electron ic and hazardo us waste, the Grama Panchay at has reached in an agreem ent with Clean Kerala Compan y. Collecti on and handing over of electrica l, electron ic and hazardo us waste will start. Biomedi cal waste is being collecte d from source and transpor ted for processi ng by IMAGE (IMA Goes + Eco- friendly) , an initiativ e run by IMA (Indian Medical Associat ion).

ACTION BY GROUND WATER DEPARTMENT

Sl. Ref para item nos as Activity Progress in Progress in the Progress in % works Details of No. per NGT Order the month month of the month completed works no.673/2018 dated of December of January remainin 20.09.2018 November 2020 2021 g 2020 1 B(i) Ground Water resources and regulation of ground water extraction by industries particularly in over exploited as critical zones/blocks 2 B(ii) Ground water recharging / rain water harvesting 3 B(iii) Periodic ground waste quality assessment and remedial actions in case of contaminated ground water tube wells/bore wells or hand pumps 4 B(iv) For regulating use of ground water for irrigation purpose, adopting good irrigation practices

Analysis Result of Drains Joining to Mannar-Thakazhi Stretch of Pamba River (2021-2022) Parameters Sl. Electrical No Name of Drain pH Conductivity (µS/cm) BOD (mg/l) COD (mg/l) TC (Nos/100 ml)

Months MAR APR MAY MAR APR MAY MAR APR MAY MAR APR MAY MAR APR MAY

1 Parumala Drain NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA Mannar Town NA 6.9 NA NA 36.42 NA NA 1.1 NA NA 8 NA NA 800 NA 2 Drain Kuriyathkadavu 3 6.8 NA 6.9 39.74 NA 34.21 0.8 NA 0.3 4 NA 12 0 NA 200 Thodu 4 7.1 6.8 7.1 34.66 30.91 32.1 0.9 1.2 0.2 8 8 4 0 500 Karuvelil Thodu 100 5 Nochithodu 7.6 6.9 6.9 403 63.79 60.15 3.8 1.8 1.6 16 8 8 1000 800 1500 Pattaparambil 52.5 0.5 8 200 6 Thodu 7.1 6.9 6.9 31.2 50.61 0.4 0.9 4 4 100 100 Kappiyarissery 7 6.8 6.9 6.9 34.1 37.89 30.41 0.3 0.8 0.6 4 8 4 2000 800 200 Thodu 8 Kombankery Thodu 7.4 NA 7.1 410.4 NA 38.2 5.4 NA 0.8 24 NA 8 2600 NA 100 9 Perackal thodu 7.1 7.1 6.9 29.57 44.33 40.28 1.6 1.4 1.1 8 8 4 300 500 200 10 Erathodu 6.9 6.9 7.2 237.4 51.68 42.52 2.1 1.3 1.1 8 4 8 300 400 100 11 Kolarayaru 7.1 6.8 6.9 30.06 32.54 30.82 1.5 1.6 1.2 8 8 4 300 300 300

National Mission for Clean Ganga

Format for Submission of Monthly Progress Report by States/UTs (Hon’ble NGT in the matter of OA No.673/2018 dated 06.12.2019) RIVER MANIMALA, ALAPPUZHA S. Activity to be monitored Timeline Submission of progress by State/UT- No. Compliance status 1 Ensure 100% treatment of sewage at least in-situ 31.03.2021 NIL remediation Commencement of setting up of STPs and connecting all 31.03.2020 NIL the drains and other sources of generation of sewage to the STPs must be ensured 2 Timeline for completing all steps of action plans including 22.01.2020 NIL completion of setting up STPs and their Commissioning 5 Chief Secretaries may set up appropriate monitoring NIL mechanism at state level 22.01.2020  Specifying accountability of nodal authorities not below the Secretary level  Chief Secretaries may have an accountable person attached in their office for this purpose  Monitoring at State level must take place 22.01.2020 NIL 6 Progress report may be furnished by the State/UTs to 22.01.2020 NIL  Secretary,Ministry of Jal Shakti  Member Secretary,CPCB

6.1 Progress Report may be comprised of details along with Fortnightly completion timelines on: commencin g (I) Identification of polluting sources including drains 21.12.2019 Drains contributing to river pollution were identified. The drains are seasonal contributing to river pollution and action as per NGT and water quality is above the require order on in-situ treatment. limit, no insitu.

(II) Status of STPs, I&D and sewerage networks Details of 2020-2021 Existing Infrastructure,Gap Analysis, Proposed along Proposal for setting up an FSTP by

with completion timeline Chenganppr municipality is initiated. (III) Status of CETPs Details of Existing CETP and ETP Infrastructure,Gap Since the area does not contain any Analysis, Proposed along with completion timeline, industry no requirement of any CETP, No. of industries and complying status this action Plan revised. (iv)Status of Solid Waste Management & Details of Processing Facilities The adjoining local bodies are in the Details of Existing Infrastructure,Gap Analysis, stage of developing and establishing Proposed along with completion timeline adequate solid waste management

facilities also the solid waste during

(v)Latest water quality of polluted river, its tributaries, issues were not identified in the stretch 2019-2020 during field visit held during past 1 year. drains with flow details and ground water quality in the catchment of polluted river; Water quality analysis result of the

stretch up APRIL 2021 is enclosed. (vi)Preventing dumping of waste and scientific waste

management including bio-medical waste, plastic

waste and decentralizing waste processing, including waste generated from hotels, Ashrams, etc. Awareness campaigns initiated.

(vii)Ground water regulation 2020 - 2021 No ground water pollution is noted in the area action yet to be initiated (viii) Adopting good irrigation practices 2020-2021 Action will be initiated.

(ix) Protection and management of food plain Zones (FPZ) Action will be initiated. (x) Rain water harvesting Action will be initiated. (xi)Maintaining minimum Environmental flow of river Action will be initiated. (xii) Plantation on both sides of the river Action will be initiated. (xiii)Setting up biodiversity parks on flood plains by removing encroachment Action will be initiated.

ACTION PLAN FOR RIVER MANIMALA, KERALA

No. Activity Implementing agency Time line Progress in Progress in the % works Details of the month of month of completed works (as per Progress in the March 2021 April 2021 remaining Action month of May Plan) 2021

A(a) Monitorng of river water quality Kerala State Pollution Continuing Result Result attached Result attached 100% NIL Control Board project attached A(b) Rendering Plant at Eraviperoor or Eraviperoor/ Thiruvalla 31.03.2021 NIL NIL NIL 0% Work to be Thiruvalla local body initiated C(ii) Fencing of bridges, desilting, Irrigation department 31.03.2021 NIL NIL NIL 0% Work to be dredging and protection works, initiated surveillance cameras at vantage points C Preventing illegal discharge of Panchayath, Police , 31.05.2020. NIL NIL NIL 0% Work septage and other waste water KSPCB pending due into the river. Formation of River to COVID Protection Group pandemic C Greenery developmentPlantation Irrigation department 31.05.2021 NIL NIL NIL 0% Yet to be on both sides of the river, setting in association with intiated up biodiversity parks in flood panchayath plains and removing encroachment C(b)(ii) Green Protocol implementatio n Kalloopara, 31.05.2021 NIL NIL NIL 100% NA in all offices, institution & public Eraviperoor, functions Puramattom, Kaviyoor, Peringara, Kuttoor panchayaths

D(a) Issues relating to E-flow, Irrigation department, 31.05.2021 Work to be maintaining minimum Hydrographic survey initiated environmental flow of river (by department having watershed management provisions) C(ii) Establishment of decentralized Kalloopara, 31.05.2020 MCF Local protest work stopped 0% 100% solid waste treatment facilities Eraviperoor, (agreement against Puramattom, Kaviyoor, executed) construction Peringara, Kuttoor panchayaths C Installing household & community Kalloopara, 31.05.2020 Tendered 93 Completed 1 Completed 1 15 mini 91 soak pit level solid and domestic sewage Eraviperoor, soak pit soak pit, 1 soak pit, 1 MCF, 2 91 compost 93 compost waste management Puramattom, Kaviyoor, compost pit 8 compost pit, 7 soak pit, 2 pits, 1 mini pit Peringara, Kuttoor 16 mini mini MCF mini MCF compost MCF panchayaths MCF’s pits C Door to door collection of solid Kalloopara, 31.05.2020 HKM started stopped due to started door waste & Material Collection Eraviperoor, door to door lack of MCF to door collect Facilities (MCF) & Resource Puramattom, Kaviyoor, collection Revcovery Facilities (RRF) Peringara, Kuttoor panchayaths ACTION BY GROUND WATER DEPARTMENT

Sl. Ref para item nos Activity Timeline Progress in Progress in % works Details of No as per NGT Order the month the month of complet works no.673/2018 dated of March 2021 Progress in ed remainin 20.09.2018 February the month g 2021 April of 2021 1 B(i) Ground Water resources and regulation of ground 31.05.2021 water extraction by industries particularly in over exploited as critical zones/blocks 2 B(ii) Ground water recharging / rain water harvesting in 31.05.2021 Govt offices

3 NGT order in O.A NGT order in O.A no.496/2016 Identification of 31.05.2021 no.496/2016 illegal bore wells in the catchment area. Identification of illegal bore wells in the catchment area.

ANALYSIS REPORT OF DRAINS OF MANIMALA BETWEEN KALLOOPARA AND THONDRA May-21

BOTTLE TC SI NO NO. Name of Drains PH BOD COD

1 TK1 Panayampalathodu 6.5 1.6 4 100

2 TK2 Padathupalam Thodu 6.8 1 4 800

3 TK3 Thottappuzha 6.8 2.2 4 900

4 TK4 Kuttapuzha under Kattodubridge 6.8 1 8 1000

5 TK5 Kadavumbara 6.7 0.6 8 1000

6 TK6 Drain under Varappalam Bridge 6.9 1.2 8 1200

7 TK7 Drain under kallupalam Bridge 6.8 2.4 4 400

8 TK8 Komalamthodu 6.8 2.1 4 800

9 TK9 Vennikulam Valiyathodu 6.9 2 8 1200

10 TK10 Paduthodu 6.8 1.6 4 600

11 TK11 Mallappally Valiyathodu 6.9 3.4 8 800

National Mission for Clean Ganga

Format for Submission of Monthly Progress Report by States/UTs (Hon’ble NGT in the matter of OA No.673/2018 dated 06.12.2019) RIVER PERIYAR. ERNAKULAM S. Activity to be monitored Timeline Submission of progress by State/UT- No. Compliance status 1 Ensure 100% treatment of sewage at least in-situ remediation Commencement of setting up of STPs and connecting all the drains and other sources of generation of sewage to the STPs must be ensured 2 Timeline for completing all steps of action plans including completion of setting up STPs and their Commissioning 5 Chief Secretaries may set up appropriate monitoring mechanism at state level • Specifying accountability of nodal authorities not below the Secretary level • Chief Secretaries may have an accountable person attached in their office for this purpose • Monitoring at State level must take place 6 Progress report may be furnished by the State/UTs to • Secretary,Ministry of Jal Shakti • Member Secretary,CPCB 6.1 Progress Report may be comprised of details along with completion timelines on: (I) Identification of polluting sources including drains contributing to river pollution and action as per NGT order on in-situ treatment.

(II) Status of STPs, I&D and sewerage networks Details of Existing Infrastructure,Gap Analysis, Proposed along with completion timeline

(III) Status of CETPs Details of Existing CETP and ETP Infrastructure,Gap Analysis, Proposed along with completion timeline, No. of industries and complying status

(iv)Status of Solid Waste Management & Details of Processing Facilities Details of Existing Infrastructure,Gap Analysis, Proposed along with completion timeline

(v) Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river;

(vi)Preventing dumping of waste and scientific waste management including bio-medical waste, plastic waste and decentralizing waste processing, including waste generated from hotels, Ashrams, etc.

(vii)Ground water regulation

(viii) Adopting good irrigation practices

(ix) Protection and management of food plain Zones (FPZ)

(x) Rain water harvesting

(xi)Maintaining minimum Environmental flow of river

(xii) Plantation on both sides of the river

(xiii)Setting up biodiversity parks on flood plains by removing encroachment

ACTION PLAN FOR RIVER PERIYAR, KERALA SHORT TERM MEASURES

No. Activity Implementing Time line Progress in the month of Progress in the months of % works Details of works agency March 2021 April & May 2021 completed remaining (as per Action Plan)

1.A(b) Augmentation and Revamping Aluva Dec 2019 Project regarding renovation Chairman has given of existing STP at near Adwaitha Municipality of STP has been handed over instructions to Ashramam and to increase the to the Project Engineering prepare detail capacity of STP so as to treat section of Municipality estimate. A letter more sewage generated in the was forwarded to municipality the accredited agency of Suchitwa mission regarding this. 2.A(b) Augmentation and Revamping Aluva 2021 As the plant is As the plant is of exisiting ETP at Aluva Market Municipality under the under the and to increase the capacity of ownership of ownership of ETP so as to treat more sewage Fisheries Fisheries generated in the municipality Department, a Department, a request was already request was already sent to Fisheries sent to Fisheries Department, but no Department, but no action taken from action taken from the said Dept. the said Dept. This Instructions were matter had been given to Municipal put forward to the Secretary to submit District Collector in the copy of letters the DLMC meeting. that were given to Fisheries department. The committee decided to take further actions. 3.A(b) Discharge of sewage from Aluva 2020 Inspections and Inspections and township to the River through Municipality further actions are further actions are drain near Periyar Hotel shall be going on going on. stopped. 4.A(b) Identification of the Aluva 2020 Inspection was Inspection was establishments/commercial Municipality, completed and completed, complexes/flats/houses/hotels KSPCB surveillance is going surveillance is going etc who is discharging the on. on and also fine was sewage to the public drain and imposed. to collect fine based on polluter pay principle 5.A(a)(iv) Periodical inspection in the KSPCB Periodical Routine inspection Routine inspection Industries, Flats, hotels is going on is going on monitoring of STP,ETP 6.C(ii) Installation of modern abattoirs Aluva March 80% of work is A letter has been Municipality 2021 completed. forwarded to Structural work is Suchitwa mission. completed. In 80% work is order to obtain completed. Counsel consent from PCB has decided to the proposition of prepare DPR for the Shuchitva Mission is work completion. required. 7.A(b) Procurement of sewer cleaning Aluva March Cleaning Cleaning machines and equipment Municipality 2020 equipment’s were equipment’s were maintenance bought and cleaning bought and cleaning process going on. process going on. 8.E Installation of cameras at the Aluva 2020 Currently cameras Currently cameras waste dumping spots Municipality are installed by are installed by several residence several residence associations. No associations. No dumping site in dumping site in aluva municipality’s aluva municipality’s jurisdiction.. jurisdiction.. 9.A(b) Construction of retaining wall Kalamassery Sept 2019 Construction of retaining Construction of with HDPE liner at Kalamassery Municipality wall is completed. retaining wall is dumping yard in order to prevent 50% of compound completed. 50% of the leachate discharge from the wall construction is compound wall yard to Thoombungal Thodu completed.. construction is completed..

10.C(ii) Installation of plastic shredding Kalamassery June 2019 One plant is already One plant is already unit Municipality installed and functioning. installed and functioning. 11.A(a)(i Constitution of squads for night Kalamassery 2020 NAD has informed that NAD has informed v) surveillance for finding the Municipality, actions were started for that actions were unauthorized dumping of Police the installation of cameras. started for the department sewage at NAD wet lands Night Squads has collected installation of Kalamassery fine from those who are cameras. Night dumping waste at night. Squads has Till now Rs. 2,56,000 /- collected fine from were collected as fine. those who are dumping waste at night. Till now Rs. 2,62,000 /- were collected as fine. 12.A(b) Installation of common STP for Kalamassery Decemb Reply was given to Steps were taken Kalamassery Municipality and Municipality er 2019 the notice issued by for the installation ETP at Municipal Market PCB related to the of ETP in market. functioning of ETP and further necessary actions were taken.

13.A(a)(i Monitoring and surveillance of KSPCB 2019 Routine Surveillance Routine Surveillance v) industries in Kalamassery is going on. Rs. is going on. Rs. Industrial Estate in order to 2,32,010/- has been 2,32,010/- has been prevent unauthorized discharges collected as fine collected as fine to Muttar River from the violators from the violators 14.C(ii) Installation of modern abattoirs Kalamassery 2021 Site not identified Site not identified including poultry and meat Municipality, for the installation for the installation rendering plants. Industries of modern abattoirs of modern Department abattoirs. (for land allotment) 15.A(b) Identification of the Kalamassery 2020 Notice given to 25 Notice given to 25 establishments/commercial Municipality establishments for the establishments for complexes/flats/houses/hote ls discharge of sewage to the discharge of etc who is discharging the common drainage. 10 sewage to common sewage to the public drain establishments had given drainage. 10 reply for the notice. The establishments had replies were not satisfactory given reply for the so inspection will be notice. The replies conducted again were not satisfactory so inspection will be conducted again 16.E Installation of cameras at the Kalamassery 2020 Currently 10 Currently 10 waste dumping spots Municipality surveillance surveillance cameras are cameras are installed. Out of 10, installed. Out of 10, 6 are working and 4 6 are working and 4 cameras does not cameras does not have current have current connection. 2 connection. 2 movable cameras movable cameras are purchased and are purchased and will be installed will be installed soon. soon.

17.A(b) Identification of sources of Eloor 2020 Regular inspections Regular inspections sewage discharged to drain near Municipality, are going on. are going on. Pathalam bridge and action to KSPCB (for Notice was given to Notice was given to monitoring) stop the discharge which reach the shops. Outlets the shops. Outlets river Periyar from hotels, labour had been already had been already camps etc In case the quantity of closed. Septic tank - closed. Septic tank - sewage generated is assessed to soap pit were made soap pit were made be more STP need to be installed mandatory for new mandatory for new establishments. establishments. 18.E Installation of cameras at the Eloor 2020 Rectification in visuals Rectification in visuals 90% waste dumping spots Municipality was informed to was informed to KELTRON and the KELTRON and the change in software to be change in software to be done. Inspection from done. Inspection from KELTRON was done and KELTRON was done but the work to be still have technical completed in 2 weeks. errors. 19.A(a)( Periodical inspection in the KSPCB periodical Routine Surveillance Routine Surveillance iv) Industries, Flats, hotels for is going on along is going on along monitoring of STP,ETP located in with Night with Night Cochin corporation surveillance. surveillance. 20.A(a) Inventory of sources of pollution Kochi 3 months Inspection is going Inspection is going through a rapid study/Study for Municipal on. Further actions on. Further actions identification of pollution Corporation are taken. are taken. sources at Edapallythodu

21.E Issuing notice to the defaulters Kochi 4 months . Inspection is going . Inspection is going Municipal on. Further actions on. Further actions Corporation are taken. are taken.

22.A(a)(i Periodical inspection in the flats, Kochi periodical Inspection is going Inspection is going Being carried v) hotels, shops located along the Municipal on. on. out periodically river Corporation 23.A(b) Identification of natural Irrigation 2 years 4 drainages are 4 drainages are drains/thodu reaching river department identified and the identified and the Periyar and cleaning of weeds, estimate for cleaning estimate for grasses etc is submitted cleaning is submitted. 24.C(iii) Clearing of weeds, grasses at the Irrigation 3 years Actions were taken Actions were taken river bank in order to ensure the department to maintain the flow to maintain the flow smooth flow of water of river. Some of river. Some works under SDRF works under SDRF are completed. are completed. Desilting works are Desilting works are progressing at progressing at various places. And various places. And the fund is to be the fund is to be sanctioned. sanctioned.

25.D(a) Maintaining of Minimum flow in Irrigation 3 years Regulators are Regulators are river during lean period and department functioning properly functioning properly periodical operation of and the level is and the level is Regulators at River in-order to maintained. As per maintained. As per maintain minimum flow. the decision in the the decision in the previous meeting, A previous meeting, A letter showing the letter showing the difficulties for the difficulties for the above has to be above has to be given to PCB but the given to PCB but the letter has not letter has not submitted.. submitted.. 26.A(b) Common Effluent Treatment Industries 2022 A combined 2 Acre land of Plant at Edayar Industrial Estate department meeting regarding Periyar chemicals is CETP construction found for the was held on construction of 9/4/2021 by DIC, Common Effluent KSPC,KWA. Treatment Plant. As 2 Acre land of letter regarding the Periyar chemicals is Lease was send to found for the the Collector. The construction of owner of land has Common Effluent filed a case Treatment Plant. As regarding the letter regarding the cancellation of Lease was send to Lease at Hon’ble the Collector. The High Court. Details owner of land has were provided by filed a case KSPCB to KWA regarding the which is the Govt cancellation of appointed authority Lease at Hon’ble for the CETP High Court. project. 27.A(b) Construction of internal roads Industries 99% of work is 99% of work is and proper drainage in Edayar department completed. completed. industrial estate currently 3.5 km of currently 3.5 km of road construction is road construction is completed. The completed. estimate required Instructions to PWD for completing the were given to rest 6 km is to be prepare the prepared and the estimate required fund is to be for completing the sanctioned by the rest 6 km and the government. fund is to be Drainage sanctioned by the construction is government. progressing. Drainage construction is progressing. 28.A(b) Installation of common discharge Industries 3 years In order to take action In order to take pipe line at downstream of department, over the proposal of the action over the Pathalam Regulator Bridge Irrigation common pipeline, proposal of the department meeting that includes common pipeline, Irrigation Department meeting that and KSPCB, DIC, KWA includes Irrigation was held and decided to Department and include the project KSPCB, DIC, KWA study in the DPR of CETP was held and . KITCO proposal was decision were taken sent for approval to to include the Directorate (DIC). project study in the DPR of CETP . In the present scenario KWA has the responsibility regarding this work. 29.E Installation of Night vision KSPCB 2020 Currently 9 surveillance Currently 9 surveillance cameras at the River cameras are installed. surveillance Bank side Proposal given for more cameras are cameras and are included installed. Proposal in plan scheme. And given for more actions were taken for cameras and are replacing ordinary included in plan cameras to night vision scheme. And cameras actions were taken for replacing ordinary cameras to night vision cameras

30.A(a)(i Periodical Monitoring of Eloor, KSPCB 2020 Routine Surveillance is Routine Surveillance v) Edayar, Kalamassery Industrial going on along with is going on along belts Night surveillance with Night surveillance 31.A(a)(i Monitoring of quality of water at Kerala Water 2020 Status not reported Status not reported v) various intake point Authority 32.A(a)(i Installation of additional KSPCB 2022 Currently an online Currently an online v) continuous online River water water quality water quality monitoring station monitoring station monitoring station is installed below is installed below Pathalam Bund. Pathalam Bund. proposal given for proposal given for new station. new station 33.A(b) Identification of the Kadungallur 2020 Notice were given to Notice were given to 20% 7 Establishment. establishments/commercial Panchayath 7 Establishment. complexes/flats/houses/hotels Replies are not etc who is discharging the received and further Replies are not actions are being sewage to the public drain received and further taken. actions are being taken. 34.E Installation of cameras at the Kadungallur 2020 Discussions for Letter were 0 implementation waste dumping spots Panchayath installing cameras forwarded to PWD are proceeding. for the preparation of Estimate. PWD informed that they will submit it by next week. 35.A(b) Identification of the Choornikkara 2020 Notices were given to Unauthorised pipelines 100 Identification establishments/commercial Panchayath industrial units for the from industries were is over complexes/flats/houses/hote ls discharge of sewage to caught and removed which etc who is discharging the common drainage. The were installed to discharge sewage to the public drain replies were not yet sewage to river. received. 36.E Installation of cameras at the Choornikkara 2020 8 cameras are installed and 8 cameras are installed and 90 waste dumping spots Panchayath monitoring is going on. Fine monitoring is going on. Fine amount of Rs 2000/- are amount of Rs 2000/- are collected from those who collected from those who dump waste dump waste

LONG TERM MEASURES

No. Activity Implementing Time Progress in the Progress in the % Details of works (as per agency line month of month of March works remaining Action February 2021 2021 compl Plan) eted 1.A(b) Construction of walkway, ring roads etc at the Irrigation 4 Proposal and Proposal and Periyar River bank at industrial belt. department years Investigation Investigation estimates are estimates are prepared and prepared and submitted to submitted to government government authority. authority. Financial Financial Sanction Sanction is to be is to be obtained. obtained. 2.C(i) Fencing of the river banks along the stretches of Cochin 1-2 Status not Status not waste disposal (Edamula stretch) Municipal years reported. reported. Corporation

3.C(iii) Beautification of the river stretches (Edamula Cochin 1-2 DPR has been DPR has been The work of stretch) Municipal years approved. KMRL approved.Wet land rejuvenation of Corporation have not clearance is Edapallythodu is attended the obtained. CRZ included under monthly clearance need to the IURWTS meeting and E1A be obtained for project of Kochi clearance of KMRL project. Metro Rail KMRL work too Three public Limited. If any be obtained. hearing had taken civil works are Public hearing is place regarding initiated by done on March this. Tendering can Corporation it 16th. Tendering only be done if will have to be actions are clearance is given. dismantled when taken. Tendering carrying out the can only be done work of river if clearance is widening by given KMRL

ACTION BY GROUND WATER DEPARTMENT

Sl. No. Ref para item nos Activity Progress in Progress in the Progress in % works Details of as per NGT Order the month of month of the month of completed works no.673/2018 August September October 2020 remaining dated 20.09.2018 1 B(i) Ground Water resources and regulation of ground water extraction by industries particularly in over exploited as critical zones/blocks 2 B(ii) Ground water recharging / rain water harvesting 3 B(iii) Periodic ground waste quality assessment and remedial actions in case of contaminated ground water tube wells/bore wells or hand pumps 4 B(iv) For regulating use of ground water for irrigation purpose, adopting good irrigation practices

National Mission for Clean Ganga

Format for Submission of Monthly Progress Report by States/UTs (Hon’ble NGT in the matter of OA No.673/2018 dated 06.12.2019) RIVER KARUVANNUR, THRISSUR S. Activity to be monitored Timeline Submission of progress by State/UT- No. Compliance status 1 Ensure 100% treatment of sewage at least in-situ Yes remediation Commencement of setting up of STPs and connecting all 2 treatment plants are proposed: 1)100 kld the drains and other sources of generation of sewage to STP at Government Hospital, Irinjalakuda, 2) the STPs must be ensured 2kld ETP at Evening market, Irinjalakuda. DPR has been prepared. Irinjalakuda Municipality is implementing the above work. 2 Timeline for completing all steps of action plans including Process is going on completion of setting up STPs and their Commissioning 5 Chief Secretaries may set up appropriate monitoring NA mechanism at state level • Specifying accountability of nodal authorities not below the Secretary level • Chief Secretaries may have an accountable person attached in their office for this purpose • Monitoring at State level must take place 6 Progress report may be furnished by the State/UTs to NA • Secretary,Ministry of Jal Shakti • Member Secretary,CPCB 6.1 Progress Report may be comprised of details along with completion timelines on: (I) Identification of polluting sources including drains STP implementation is going on contributing to river pollution and action as per NGT order on in-situ treatment.

(II) Status of STPs, I&D and sewerage networks Details of Existing Infrastructure,Gap Analysis, Proposed along “ with completion timeline

(III) Status of CETPs Details of Existing CETP and ETP Infrastructure,Gap “ Analysis, Proposed along with completion timeline, No. of industries and complying status

(iv)Status of Solid Waste Management & Details of Processing Facilities Details of Existing Infrastructure, Gap Analysis, Thumboormuzhi plant is running. Windrow Proposed along with completion timeline Compost plant having 4 ton capacity, construction completed, presently functioning well and produce Bio manure.

(v) Latest water quality of polluted river, its tributaries, NA drains with flow details and ground water quality in the catchment of polluted river;

(vi)Preventing dumping of waste and scientific waste As per Municipal Janakeeyasoothranam management including bio-medical waste, plastic project, we are implementing household waste and decentralizing waste processing, including waste treatment units like ring compost and waste generated from hotels, Ashrams, etc. kitchen bin with subsidy

(vii)Ground water regulation

(viii) Adopting good irrigation practices

(ix) Protection and management of food plain Zones (FPZ)

(x) Rain water harvesting

(xi)Maintaining minimum Environmental flow of river

(xii) Plantation on both sides of the river

(xiii)Setting up biodiversity parks on flood plains by removing encroachment

ACTION PLAN FOR RIVER KARUVANNUR, KERALA SHORT TERM MEASURES

No. Implemen % works Details of Activity Time line Progress in the Progress in the Progress in (as per ting completed works month of month of April the month of Action agency remaining Plan) March 2021 2021 May 2021 Thirukuzhythodu

A(a)(iv) Surveillance to restrict dumping of wastes Vallachira Camera will ongoing ongoing ongoing Partially 50 into river and its branches Panchayat install in this completed with the help place for of Police surveillance during this year. Project for installation of Camera will implement within three months. E Cleaning and desilting of canal Irrigation Departme nt

E Cleaning and desilting of canal Vallachira 4months Panchayat nil nil nil 100 0 Thodu near Kadalassery bridge

A(b) Identification of pollution sources and Vallachira, 1 month Ongoing Ongoing Ongoing 75 25 surveillance to restrict dumping of wastes Pudukad & NenmanikkarCamera will install in this a Panchayats place for survellience during this year.Project for installation of Camera will implement within three months. E Cleaning and desilting Vallachira 4months nil nil nil 100 nil Panchayat

E Cleaning and desilting Irrigation Department

Neerolithodu

E Cleaning and desilting Irrigation 4months Department Work submitted in CMDRF. FS not obtained. Painkilikayal thodu

E Cleaning and desilting Irrigation 4months NA NA NA NA Department Not and belongs to Vallachira vallachira Panchayat Kadathodu

A(b) Identification of pollution sources and Vallachira & 1 month ongoing ongoing ongoing 75 25 surveillance to restrict the dumping of Nenmanikkar Camera will wastes a Panchayats install in this place for surveillance during this year. Project for installation of Camera will be implemented within three months.

E Cleaning and desilting Irrigation 4months 0 0 0 0 Department

Main Stream –along Karuvannur

A(a)(iv) Periodic Surveillance to restrict the dumping Irinjalakkuda Inspection Night squad Night squad of waste into river and imposing Fine Municipality, ongoing – arranged for arranged for

Police Dept. dumping of inspecting inspecting waste into river waste dumping waste not reported at into the river. dumping into present But issues are the river. not noticed Presently no specific issues. A(b) Sanitation Survey Irinjalakkuda 3 Months 100% Municipality completed

A(b) Closing of all unauthorized outlets leading to Irinjalakkuda Inspection on Inspection on Inspection the river Municipality going – no going – no on going – unauthorized unauthorized no outlets outlets unauthorize leading to the leading to d outlets river at the the river at leading to present the present the river at the present A(b) Closing of all un authorized outlets in the Irinjalakkuda Nil No No No drain leading to the river Municipality unauthorized unauthorized unauthorize outlets in the outlets in d outlets in drain leading the drain the drain to the river. leading to leading to the river. the river. E Boards to display slogans against littering Irinjalakkuda 6 months Installed boards Installed Installed waste in various Places other IEC Activities Municipality along boards along boards along Like posters, notices and classes Karuvannur Karuvannur Karuvannur river side river side river side against littering against against waste and littering littering animal bath in waste and waste and the Karuvannur animal bath animal bath river. Board in the in the installation Karuvannur Karuvannur process river. Board river. Board ongoing in installation installation various places process process of municipal ongoing in ongoing in area various various places of places of municipal municipal area area Monitoring A(a)(iv) River water quality monitoring KSPCB Ongoing; monthly frequency A(b) Inspection & effluent quality monitoring of KSPCB Ongoing the Flats, industrial units, service stations, hospitals,hotels etc Long Term Plan

Sewage treatment facilities to all house holds Vallachira 1 yr 1( No of soak 2(No of soak 3( No of 111( No Grama pits) pits) soak pits of soak 75( No of Panachayat pits) soak pits

Construction of FSTP Irinjalakkud 2 years Municipal Municipal DPR has and STP a Council Council been Municipalit approved approved prepared. y agencies for agencies for preparing DPR preparing DPR Setting up of a modern crematorium at Vallachira 2 years NIL NIL NIL 0 100 Mandarakkadavu, Arattupuzha Grama Panachayat In Mandarakadavu water will raise during Monsoon season.So construction of crematorium is not practical in this place.We have a convenient place for crematorium at Pallissery Ilamkunnu.The Estimate for this construction nearly upto 45 lakhs.Due to lack of sufficient amount dropped that project.Panchay ath decided to request amount from MLA Fund

Solid waste treatment facility Vallachira 2 years Harita Harita Harita 60 40 Grama Karmasena Karmasena Karmasena Panachayat takeall solid takeall solid takeall solid wastes into wastes into wastes into MCF MCF MCF Construction of Windrow composting plant Irinjalakkuda 2 years Windrow Windrow Windrow Municipality Compost plant Compost plant Compost plant having 4 ton having 4 ton having 4 ton capacity, capacity, capacity, construction construction construction completed, completed, completed, presently presently presently functioning well functioning well functioning and produce Bio and produce Bio well and manure. manure. produce Bio manure.

Rejuvenation of Kanathodu Irrigation 1 year Department

Installation of CCTV for Surveillance to prevent the Irinjalakkuda 2 years Police Police Police dumping of waste in to the river Municipality Department Department Department installed CCTV installed installed CCTV NEAR CCTV NEAR NEAR Karuvannur Karuvannur Karuvannur bridge bridge bridge ACTION BY GROUND WATER DEPARTMENT

Sl. Ref para item nos Activity Progress in Progress in % works Details of No. as per NGT Order the month of the month completed works no.673/2018 April 2021 of May 2021 remaining dated 20.09.2018 1 B(i) Ground Water resources and regulation of ground According to According to water extraction by industries particularly in over the latest GEC the latest exploited as critical zones/blocks report there is GEC report no critical / there is no over exploited critical / over blocks in exploited Thrissur Dt. blocks in Thrissur Dt. 2 B(ii) Ground water recharging / rain water harvesting 3 B(iii) Periodic ground water quality assessment and Water samples remedial actions in case of contaminated ground collected from water tube wells/bore wells or hand pumps selected observation stations and dispatched to RAL, Ernakulam for analysis. 4 B(iv) For regulating use of ground water for irrigation Suggestions Suggestions purpose, adopting good irrigation practices given to given to farmers for farmers for Rain water Rain water harvesting to harvesting to recharge recharge aquifers. aquifers.

ACTION PLAN BY GRAMAPANCHAYATH

No. Activity Implementin Time line Progress in the month % Details of (as per g agency of Progress in the Progress in works works Action March 2021 month April of the month compl remainin Plan) 2021 May of 2021 eted g C MANALIPUZHA RIVER Vallachira 1 year 900 m NIL NIL 6 600M PROTECTION -Jalaraksha Grama 0 Jeevaraksha - Manalipuzha Panchayath conservation C Setting up of Nursery for MGNREGS 31.03.2020 Suitable land Suitable land Suitable land 0 100 Bamboo seedlings in not available not available not available Kadalassery for setting up for setting up for setting up of nursery of nursery of nursery C Side protection of MGNREGS 31.03.2020 Work did not Work did not Work did 0 100 Manalippuzha with organic implemented due to implemented not materials available locally greater depth of the due to greater implemente river depth of the d due to river greater depth of the river C Side Protection of MGNREGS 31.03.2020 nil nil nil 1 0 Manalippuzha with Bamboo 0 plants 0 C Deepening & Protecting MGNREGS 31.03.2020 nil nil nil 1 0 Muttikkal Thodu by Spreading 0 Geo Textiles 0 C Cluster 2-Kurumaly puzha sub 1 year Documentation Documentation Documentatio 1 Documen river bed -Project document Panchayath completed completed n completed 0 tation preparation 0 complete d C Manalippuzha River Nenmenikkara 31.03.2020 3.5km Two sides of Kodakara Protection-Jala Raksha, Jeeva Grama survey(out of national block Raksha , Survey and Tree Panchayat 7km)have been highway panchaya Plantation completed and near B.R.D. th nodel survey posts car world officer's have been have been meeting fixed. cleaned and has barriers & decided speed to make breaker net fence camera have in the been fixed two sides by National of N.H. in highway order to authority avoid waste dumping in National Highway C Manalipuzha River protection MGNREGS 31.03.2020

A(b) Protection and reconstruction MGNREGS 31.03.2020 and protection of Paliyekkara Kayalathod A(b) Reconstruction and MGNREGS 31.03.2020 protection of Paliyekkara Karama Thodu

KARUVANUR 24.05.2021 SL. NO PARAMETER UNIT KT MRK KND MDK THR KRV 1 pH 6.8 7.3 7 7.2 7.3 7.1 2 EC µ/cm 51.7 54.6 63.7 65.2 56.5 58.1 3 BOD mg/L 0.7 2 1.4 0.68 1.2 1.4 4 DO mg/L 7.9 6.8 6.8 7.9 6.8 7.9 5 COD mg/L 4 12 8 4 8 4

Microbiological parameters could not be analysed due to technical reasons.

KT - KANAKKAN KADAVU, KARUVANNUR MRK - NEEROLI THODU, KARUVANNUR KND - KANATHODU, KARUVANNUR MDK - MUTTIKKAL DAM, KARUVANNUR THR- THIRUKUZHI, KARUVANNUR KRV - PAINKILIKAYAL THODU, KARUVANNUR

National Mission for Clean Ganga

Format for Submission of Monthly Progress Report by States/UTs (Hon’ble NGT in the matter of OA No.673/2018 dated 06.12.2019) RIVER KECHERY, THRISSUR, MAY 2021 S. Activity to be monitored Timeline Submission of progress by State/UT- No. Compliance status 1 Ensure 100% treatment of sewage at least in-situ Administrative sanction obtained from KIIFB remediation 31.12.2021 for Modern Market with STP at Ottupara (18 KLD) & Athani (14.9 KLD). Further process ongoing for getting TS. Another STP has been proposed and topographical survey has been completed. Site identified and report submitted before Hon. District Collector for getting land. The above works are implemented by Wadakkanchery municipality.

Commencement of setting up of STPs and connecting all Not started. the drains and other sources of generation of sewage to 31.12.2021 the STPs must be ensured 2 Timeline for completing all steps of action plans including 31.12.2021 Not started. completion of setting up STPs and their Commissioning 5 Chief Secretaries may set up appropriate monitoring N.A. mechanism at state level • Specifying accountability of nodal authorities not below the Secretary level • Chief Secretaries may have an accountable person attached in their office for this purpose • Monitoring at State level must take place N.A. 6 Progress report may be furnished by the State/UTs to Applicable at • Secretary,Ministry of Jal Shakti State Level • Member Secretary,CPCB 6.1 Progress Report may be comprised of details along with completion timelines on: Polluting Sources & Illegal outlets were (I) Identification of polluting sources including drains identified by Wadakkanchery Municipality, contributing to river pollution and action as per NGT Ongoing notice issued as per Kerala Municipal Act and order on in-situ treatment. Process removed. Doing regular inspection.

(II) Status of STPs, I&D and sewerage networks Details of Existing Infrastructure, Gap Analysis, Proposed along 31.12.2021 Administrative sanction obtained from KIIFB with completion timeline for Modern Market with STP at Ottupara (18 KLD) & Athani (14.9 KLD). Further process (III) Status of CETPs ongoing for getting TS. Another STP has been Details of Existing CETP and ETP Infrastructure, Gap proposed and topographical survey has been Analysis, Proposed along with completion timeline, completed. Site identified and report No. of industries and complying status submitted before Hon. District Collector for getting land. (iv)Status of Solid Waste Management & Details of Processing Facilities Nil Details of Existing Infrastructure, Gap Analysis, Proposed along with completion timeline

September Bio-waste: 2021 Presently using Biogas plant. Collecting Bio- degradable waste from houses and commercial establishments through Kudumbasree Unit – “Bhumi Mithra”

Construction of windrow compost plan 90% work completed

(v) Latest water quality of polluted river, its tributaries, Non-Bio waste: drains with flow details and ground water quality in Door to door collection from houses and the catchment of polluted river; commercial establishments ongoing through Harithakarma sena. The collected waste (vi)Preventing dumping of waste and scientific waste handing over to Clean Kerala Company. management including bio-medical waste, plastic waste and decentralizing waste processing, including Tributaries Akamala Ottupara Thodu waste generated from hotels, Ashrams, etc. Drains-2 Wadakkanchery & Ottupara.

Bio-medical waste collected by IMAGE. Two (vii)Ground water regulation MRF were setup at Aryampadam and Kumbalangad. Plastic waste handing over to Clean Kerala Company. RRF constructed. Bailing machine installed and work started. (viii) Adopting good irrigation practices Construction of 1726 rain pits for ground water recharge completed in the year 2019- 2020 under Ayyankali Urban Employment Scheme.

Good irrigation practices will implement in co- (ix) Protection and management of food plain Zones (FPZ) operation with Agriculture and Irrigation department. (x) Rain water harvesting Ongoing process Irrigation canal cleaning completed after 2018 flood.

Not yet started.

Guaranteed the construction of Rain water (xi)Maintaining minimum Environmental flow of river harvesting facility for residential building above 150m2. Occupancy certificate issued only after verification of the above. (xii) Plantation on both sides of the river

(xiii)Setting up biodiversity parks on flood plains by Not yet started. removing encroachment

Around 1000 Bamboo trees planted along 6.5km of Wadakkanchery River on both sides in co-operation with KFRI.

Recovered 10.5 Acres of encroached land along Wadakkanchery River. Will prepare Project as per Municipal Council Decision, for setting up of bio-diversity Parks. ACTION PLAN FOR RIVER KECHERY, KERALA

No. Activity Implementing Time line Progress in Progress in % works Details of (as per agency the month the month Progress in complete works Action of March of April the month d remaining Plan) 2021 2021 of May 2021 WADAKKENCHERY RIVER -SHORT TERM MEASURES

A(b) Identification of illegal outlets from houses and Wadakkanchery Completed shops/other establishments in town and imposing Municipality, fine Ayyakali Urban Employment Guarantee Scheme & health squad

E Installation of CCTV s on the bank of river in town Wadakkanchery December Work not Municipality 2021 started due to scarcity of Municipal fund C(ii) Material recovery facility Wadakkanchery Completed Municipality

C(ii) Resource recovery facility Wadakkanchery Completed Municipality

C(ii) Renovation of existing biogas plant Wadakkanchery Presently Municipality functioning well

Monitoring A(a)(iv) River water quality monitoring KSPCB Monthly Monitoring in progress A(b) Inspection & effluent quality monitoring of the Flats, KSPCB Ongoing industrial units, service stations, hospitals,hotels etc Long Term Plan

E Identification and cleaning of polluted drains Irrigation Dept 30-03-2022 reaching Wadakkancheri river

A (b) Common STP Wadakkanchery December Site for one Municipality, 2021 STP Kerala identified. Infrastructure Applied for Investment Fund NOC from Board District Collector (Land is Puzha Puramboke and Irrigation Department Canal Puramboke) C(iii) Windrow composting at Kumbalangad yard Wadakkanchery June 2021 90% work Municipality completed

C(ii) Modern slaughter House Wadakkanchery December Lack of Municipality, 2021 suitable site Kerala for the Infrastructure project Investment Fund Board E Forestation, desilting & deepening of Wadakkanchery desilting Fitting river Wadakkanchery river and fitting river side with Municipality deepening of side with Coir coir geo net Wadkanchery Geo Net. River 3 km in Awaiting Municipal Municipal area Council completed Decision for 7655m3 fund desilt allocation removed

Rain water harvesting Wadakkanchery Ongoing work Municipality

Ground water recharge Wadakkanchery Ongoing work Municipality

River survey Wadakkanchery Ongoing work Municipality

Short term plan (Kecheri river)

E Installation of CCTV in different locations along PWD Electronic river side division

E Fixing Boards Choondal Grama 30/06/2022 Included In Panchayat 2021-22 Annual Plan A(a)(iv) Surveillance to prevent flow of sewage /effluent to Choondal Grama Ongoing Action taken river Panchayat

A(b) Stoppage of effluent from residential apartment Choondal Grama Action Taken Stop Memo (Shajan’s flat) and pig farm into the river Panchayat Had been Given to Concerned persons

Long TermPlan (Kecheri river) E Side protection by fixing coir geo nets Choondal Grama March Not Panchayat 2021 starte d E Survey process of Kechery river portion belong to Revenue compl Choondal Grama Panchayat to mark the boundary Department eted and encroachment E Laying of survey station Choondal Grama completed compl Panchayat eted

E Digital maping and seminar on pollution control Forestry College, 31/05/2020 Not started Vellanikkara

IRRIGATION DEPARTMENT

Sl. Activity to be monitored Timeline Submission of Progress for the No. progress by month May 2021 State/UT- Compliance status 1 NGT-Desilting of tributaries of river Kechery puzha and 2 years - Estimate submitted Wadakkancherypuzha in Thrissur District. for fund

SHORT TERM MEASURES

No. Activity Implementi Time line Progress in the Progress in the % works Details of works ng agency month of April month of May completed remaining

NIL

LONG TERM WORKS

No. Activity Implementi Time line Progress in the Progress in the month % works Details of works ng agency month of April of May completed remaining 1 NGT-Desilting of tributaries of river Keechery puzha Irrigation 2 years - - - Estimate and Wadakkancherypuzha in Thrissur District. Department submitted for fund

ACTION BY GROUND WATER DEPARTMENT

Sl. Ref para item Activity Progress in the month of Progress in the month of % works Details No. nos as per NGT April 2021 May 2021 completed of Order works no.673/2018 remain dated 20.09.2018 ing 1 B(i) Ground Water resources and According to the latest GEC report there According to the latest GEC regulation of ground water is no critical / over exploited blocks in report there is no critical / extraction by industries Thrissur Dt. over exploited blocks in particularly in over exploited Thrissur Dt. as critical zones/blocks 2 B(ii) Ground water recharging / rain water harvesting 3 B(iii) Periodic ground water Water samples collected from selected quality assessment and observation stations and dispatched for remedial actions in case of analysis. contaminated ground water tube wells/bore wells or hand pumps 4 B(iv) For regulating use of ground Suggestions given to farmers for Rain Suggestions given to farmers 100 0 water for irrigation purpose, water harvesting to recharge aquifers. for Rain water harvesting to adopting good irrigation recharge aquifers. practices ACTION PLAN BY GRAMAPANCHAYATH

No. Activity Implementing Time line Progress in Progress in % works Details No. (as per agency the month of the month of complet of (as per Action Plan) Action March 2021 April 2021 ed works Plan) remaini ng C Punarjani Kecherri river Choondal Grama (completed ) Panchayat Flood Wastes from the river has been removed and made water flow easily which reduced chances of flood . C(ii) Surveying of river side, eviction and planting trees Choondal Grama 31.03.2021 Survey completed Panchayat

C Side Protection Choondal Grama Completed Panchayat

C Bio fencing related to river bank protection – MGNREGS Not started water and soil Conservation project ward 3,4,7

KECHERI RIVER Date of sampling - 25.05.2021 SL. NO PARAMETER UNIT VAD1 VAD2 1 pH - 6.9 7.5 2 Electrical Conductivity µ/cm 220.5 255 3 BOD mg/L 1.3 1.4 4 DO mg/L 8.1 6.8 5 COD mg/L 8 8

Microbiological parameters could not be analysed due to technical reasons.

VAD1 - WADAKKANCHERY PUZHA (WADAKKANCHERY BRIDGE), KECHERY VAD2 - WADAKKANCHERY PUZHA(CHALIPPADAM ROAD), KECHERY

National Mission for Clean Ganga

Format for Submission of Monthly Progress Report by States/UTs (Hon’ble NGT in the matter of OA No.673/2018 dated 06.12.2019) RIVER PUZHAKKAL, THRISSUR S. Activity to be monitored Timeline Submission of progress by State/UT- No. Compliance status 1 Ensure 100% treatment of sewage at least in-situ 27.05.2021 In progress remediation Commencement of setting up of STPs and connecting all 27.05.2021 In progress the drains and other sources of generation of sewage to the STPs must be ensured 2 Timeline for completing all steps of action plans including In progress completion of setting up STPs and their Commissioning 1.10 kld FSTP completed at Mattampuram. Permission granted by PCB to conduct trial run. 2.Tendered and awarded 360 kld STP at district hospital. PCB consent obtained and Construction to be started 3. 100 kld STP at Ramavarmapuram PCB consent obtained and Construction to be started. 4. 2.5 Mld STP PCB consent Application to be to be submitted The above works are implemented by Thrissur Corporation.

5 Chief Secretaries may set up appropriate monitoring mechanism at state level • Specifying accountability of nodal authorities not below the Secretary level • Chief Secretaries may have an accountable person attached in their office for this purpose • Monitoring at State level must take place NA 6.1 Progress Report may be comprised of details along with Out of 91530 houses and 122 completion timelines on: establishments, 381 illegal outlets were (I)Identification of polluting sources including drains identified and notice issued, out of which contributing to river pollution and action as per NGT 312 were closed. 69 outlets yet to be order on in-situ treatment. closed.

(II) Status of STPs, I&D and sewerage networks Details of Existing Infrastructure, Gap Analysis, Proposed along with completion timeline 1) Mattampuram (Vilvattom Zonal) PCB consent obtained. Trial run to be started. 2. Snehaveedu (Vilvattom Zonal) Agreement not executed 3. District Hospital Thrissur. Agreement Signed. Initial PCB NOC has (III) Status of CETPs been got. Details of Existing CETP and ETP Infrastructure, Gap Water Analysis, Proposed along with completion timeline, quality No. of industries and complying status monitoring 70 percentage of industries installed ETPs. of polluted Notice were issued to remaining (iv)Status of Solid Waste Management & Details of river stretch establishments Processing Facilities is done Details of Existing Infrastructure, Gap Analysis, periodically, Existing infrastructure Proposed along with completion timeline (Report attached.) 1. MCF - 12 number (v) Latest water quality of polluted river, its tributaries, 2. RRF – 3 Number drains with flow details and ground water quality in the 3. OWC Plant - 2 Number – catchment of polluted river; Commissioned - capacity of 12 tpd. (vi)Preventing dumping of waste and scientific waste 4. 8 Biogas plants 6 numbers of total management including bio-medical waste, plastic waste capacity 2 ton. and decentralizing waste processing, including waste 5.20 Vehicles (4 truck, 5 tractors, 8 generated from hotels, Ashrams, etc. commercial utility vehicles, Tractor with Riverside trailer 5, 33 Pettiauto) (vii)Ground water regulation protection 6.Aerobic bins – 23 numbers. work for a 7. 23 Harithakarmasena groups (140 (viii) Adopting good irrigation practices stretch of members) 500m has 8.Door to Door collection from 60000 (ix) Protection and management of food plain Zones (FPZ) been houses & 15000 commercial institutions completed. (x) Rain water harvesting Construction New proposals of second 1.New OWC plant Kovilakathumpadam is (xi)Maintaining minimum Environmental flow of river stretch of started. 450m is 2. MRF at Kuriachira. (xii) Plantation on both sides of the river ongoing 3. 5 No of commercial utility vehicle will be purchased for door to door collection (xiii)Setting up biodiversity parks on flood plains by 4.New Bailing machine for RRF will be removing encroachment purchased. Tender process is going on. 5.New building for segregation yard is planned and worth Rs:40 Lakhs are ear marked. 6.100% door to door collection can be achieved within 3 months. 90% is covered and rest 10% will be covered within 3 months. VII 1. To prevent dumping Corporation is indenting to collect the waste from 100% door. 90% is covered. 2.No.of dumping site could be reduced by the continuous monitoring & observations 3. Biomedical waste is processed by IMAGE .This year Corporation earmark Rs.1 crore for the construction of new biomedical incinerator at corporation hospital. 4. Plastic waste is collected segregated and sent to recycling system. Multi layer plastics are shredded and used for road construction through Clean Kerala Company. Non-recyclable plastic wastes are sent to KEIL through Clean Kerala Company. Corporation made a negotiation with ACC cement factory for co-processing of non recyclable plastic waste. 5. Bulk waste generators (hotels and Asrams) process their wastes in their own premises. They use biogas plant and aerobic compost bin.

ACTION PLAN FOR RIVER PUZHAKKAL, KERALA SHORT TERM MEASURES

No. Activity Implementing Time line Progress in Progress in the % works Details of (as per agency the month month of May completed works Action of April 2021 remaining Plan) A(b) Identification of illegal outlets into the Panchikkal Thrissur 3 months 0 100% thodu and subsidiary drains Corporation

A(b) Stoppage of discharge of wastewater from the Thrissur 6 months 12 82 69 outlets to surrounding houses and institutions to the drains Corporation be closed which leads to Panchikkal thodu A(b) Ensure adequate treatment facility is provided for Adat Grama 100% wastewater and solid waste generated from Sri Panchayat Dharma Sastha temple situated on the banks of the river E Desilting of Karakattuchal Irrigation 4 months The Thrissur Department Corporation has informed that it has started the work of removing the sludge deposited in the Karakkattucha l thodu and an amount of Rs. 2.49 lakh has been allotted for this. E Desilting of Panchikkal thodu Irrigation 4 months The Thrissur Department Corporation has started the work of removing the sludge deposited in the Panchikkal thodu and an amount of Rs. 12 lakh has been allotted for this. E Desilting of Kurinjikkal thuruth Irrigation 4 months The Thrissur Department District Soil Conservation Officer has informed that the Administrativ e Sanction has been received to include the work of Kurinjikkal thodu in the Rebuild Kerala Project and the work will start once the TS is obtained. E Desilting of Muppuzha Irrigation 4 months Desilting work Department 1860 metre completed as per pre- monsoon activity E Side protection, desilting and deepening work of Thrissur 3 months Side Vanchikulam Thodu at Poothole of length about 40 Corporation protection km (work in progress). 1.89 kilometer completed. Disilting and deepened work done by irrigation department. E Annual desilting, cleaning of main drains and Thrissur 3 months Among 178 canals within the Corporation area (work in Corporation canals 91 progress). numbers desilting, cleaning works completed. Others 70% works completed. Monitoring A(a)(iv) River water quality monitoring KSPCB Ongoing; monthly frequency A(b) Inspection & effluent quality monitoring of the KSPCB Ongoing Flats, industrial units, service stations, hospitals, hotels etc

Long Term Plan A(b) Ensuring installation of treatment facilities for at Thrissur 18 months least 50% of the identified establishments Corporation

A(b) 100% completion of treatment facilities for Thrissur 24 months targeted institutions/ buildings Corporation

A(b) Construction of a drain 40 km with covering slabs Thrissur 24 months 24.01 KM to avoid the direct disposal of waste in to the open Corporation completed. drain Selection memo issued A(b) Construction of a drain 9000 m with covering slabs Thrissur 24 months Construction to avoid the direct disposal of waste in to the open Corporation works in- drain progress A(b) Construction of sewage treatment plant of 100 KLD Thrissur 24 months PCB approval and 360 KLD at Ramavarmapuram and District Corporation for 100 KLD Hospital, Thrissur in Amrut Project and 360 KLD STPs obtained. Construction to be started. A(b) Constructing decentralised sewerage scheme at Thrissur 24 months Revision Vachikulam covering most populated 7 divisions of Corporation estimate as per Thrissur Corporation and more than 10000 houses & structural institutions veting submitted for revised TS at Chief Engineers Office TVM.

ACTION BY GROUND WATER DEPARTMENT

Sl. Ref para item Activity Progress in the month of Progress in the month of % works Details No. nos as per NGT April-2021 May-2021 completed of Order works no.673/2018 remain dated 20.09.2018 ing 1 B(i) Ground Water resources and According to the latest GEC report there According to the latest GEC regulation of ground water is no critical / over exploited blocks in report there is no critical / extraction by industries Thrissur Dt. over exploited blocks in particularly in over exploited Thrissur Dt. as critical zones/blocks 2 B(ii) Ground water recharging / rain water harvesting 3 B(iii) Periodic ground waste No water quality issues reported in the Water samples collected from quality assessment and GWD water level monitoring wells. selected observation stations remedial actions in case of and dispatched to RAL, contaminated ground water Eranakulam for analysis. tube wells/bore wells or hand pumps 4 B(iv) For regulating use of ground Suggestions given to farmers for Rain Suggestions given to farmers water for irrigation purpose, water harvesting to recharge aquifers. for Rain water harvesting to adopting good irrigation recharge aquifers. practices

ACTION PLAN BY GRAMAPANCHAYATH

No. Activity Implementing Time line Progress in Progress in the Progress in % works Details of (as per agency the month of month of the month completed works Action March 2021 April 2021 May of remainin Plan) 2021 g C Removing weeds in Puzhakkal River Adat 31.03.2020 100 Gramapanchayath %

C(ii) Removing waste from all wards through KUDUMBASREE 31.03.2020 100 Kudumbasree %

C water conservation projects-- tree plantation MGNREGS 31.03.2020 65 under GA in18 wards 100000/ each

C ward 14 pachthurthu construction Haritha Keralam 31.03.2020 100 Mission %

C side protection to water bodies coir geo textile MGNREGS 31.03.2020 65

PUZHAKKAL Date of sampling -25.05.2021 SL. NO PARAMETER UNIT SBA KTH PTU MP 1 pH 7 6.9 6.7 7.2 2 EC µ/cm 180.3 265.6 340.2 147 3 BOD mg/L 1.02 0.95 0.68 1.9 4 DO mg/L 7.8 6.4 6.1 6 5 COD mg/L 8 8 4 12

Microbiological parameters could not be analysed due to technical reasons.

SBA - NEAR SOBHA CITY, KIZHAKKUMMURI ROAD , PUZHAKKAL KTH - KURINJAKKAL THODU, PUZHAKKAL PTU - PANCHIKKAL THODU, PUZHAKKAL MP - MUPPUZHA, PUZHAKAL

Kerala State Pollution Control Board, District Office, Kozhikode NATIONAL MISSION FOR CLEAN GANGA

Format for submission of monthly progress report by state/UTs

( Hon’ble NGT in the matter of OA.No. 673/2018 dated 6/12/2018 )

For the month of MAY 2021 – Kallai polluted river stretch

Sl Activity to be monitored Timeline Submission of progress by state/UT- No complinance status

1 Ensure 100% treatement of sewage at least in-situ remediation 2 Commencement of setting up of 28.02.2021 Construction of 2 MLD, 1 MLD STP STPs and other sources of plant of Calicut medical college generation of sewage to the STPs started must be ensured 3 Timeline for completing all steps 31.03.2022 Proposal for 13 MLD STP (6 MLD STP of action plans including plant proposed at Kothi, 7 MLD STP completion of setting up STPs and plant proposed at Avikkal) – their commissioning Tendering in progress

4 Chief secretaries may set up NIL appropriate monitoring mechanism at state level  Specifying accountability of nodal authorities not below the secretary level  Chief secretaries may have an accountable person attached in their office for this purpose  Monitoring at state level Fortnightly commencing NIL must take place 21.12.2019 5 Progress report may be furnished Monthly NIL by the state/UTs to (preferably before 20th of  Secretary,ministry of jal every month) shakti  Member secretary,CPCB 5.1 Progress report may be comprised of details along with completion timeline on:

(i) identification of polluting Action continuing Drains identified. Pollution load source including drains calculated. Action plan prepared. contributing to river Joint squad of PCB and Corporation pollution and action as per inspection in action. Issued notice to NGT order on insitu 92 units during the period 2019. treatment . 30 units installed treatment facilities.

During Jan-Mar 2020 joint squad of

PCB and corporation inspected 82

units. Issued notice to 56 units. In 16

units installation of treatment units Effluent treatment facilities are under

progress.Issued notice to 36 units and a fine of Rs.18500/- was imposed for

the month of September

2020..Monthly progress report

submitted by Kozhikode corporation attached as Annexure 1

31.03.2021 Dredging of Kallayi river from Kaduppini to Kothi -DPR submitted to SE,INC,KKD on 16.10.2019for Rs 773.05 lakhs(7.30 crores for desilting of river and 43.05 lakhs for fencing of

5 bridges) under action plan of Kallayi river and fencing of sides of the river. 31.07.2019 Work entrusted to KWIL – Dredging ,Desilting and removal of weeds fro EK canal -11.2 Km

Submitted by Irrigation department

(ii) status of STPs, I&D and 31.12.2020 ,work in (i)Construction of 2 MLD, 1 MLD STP sewage networks details progress plant of Calicut medical college of existing started.-10% work completed infrastructure,proposed along with completion (ii)Proposal for 13 MLD STP (6 MLD timeline 31.03.2021 STP plant proposed at Kothi, 7 MLD STP plant proposed at Avikkal) – Tendering in progress.

(iii)STP of 13 MLD proposed at Kotooli.About 12% of sewer lines were laid by KWA – Honble NGT

stayed the project (OA no. 215/2016).

(iv)Individual septic tank and soak pit

system provided for house hold, units like bakery, cool bars small restaurants with less seating capacity. Individual STPs for high rise building, hotels, Restaurants, Commercial buildings.

(iii) status of CETPs details of No CETP proposed existing CETP and ETP No specific proposal infrastructure ,Gap analysis,proposed along with complying status Kozhikode corporation

(iv) status of solid waste (i) Existing centralized waste disposal management & details of facility of 100 MT/DAY at Functioning processing facilities details Njeliyanparamba(windrow

of existing infrastructure, composting)

Gap analysis,proposed along with completion

timeline (ii) Proposal of 450 TPD waste to 30/06/2021. Work in energy plant at Njeliyanparamba progress implementation in progress. Caping

work started.

Functioning (iii) Chicken waste rendering plant of 40TPD functioning in

170 chicken stalls of Kozhikode

corporation are disposing off the waste through this rendering plant. Work in progress Rendering plant construction for chicken stall waste – Perumanna . Peruvayal

Functioning. And work (iv) 3 MRF facilities existing ( At progressing Njeliyamparamba(Super MRF) 3TPD- with plastic shredding unit, west hill industrial estate -2TPD --with plastic shredding unit,Near Jayanthi nagar colony) -70% completed

Functioning (v) 24 units of aerobic compost facilities existing ( Tagore hall, S K Pottakkad hall, Jubilee hall, Mofusil bus stand,T.B. Clinic,Circle office). Functioning (vi) 350 ring compost and 150 Biogas plants installed in house holds.-kkd Corporation 26 biogas plant complete –peruvayal 190 ring compost complete –mavoor

Functioning (vii) Community level biogas plant- 3nos(Mental Hospital 1TPD, ITI Functioning Malikadav -1TPD, Juvine home- 1TPD) Functioning (viii) 3 Biogas plants in market (Central market 2TPD, Vegitable Functioning market 2TPD, New bus stand,2TPD) (ix)Treatment facility for waste in Central Market – Tendering in Progress (x) Establishment of slaughter house-

30/03/2021 Mavoor Panchayath MCF 1 nos,ring compost,compost pit- Completed and functioning 31/12/2022 Perumanna Panchayat Compost pit and MCF with baling machine (1 nos) -Work in progress Peruvayal Panchayat 31.03.2021 Compost pit,mini MCF 2 nos,bio gas plant- Work in progress MCF-1 nos temporarly functioning 31.03.2021 Panchayat MCF-1 completed Mini MCF -3 Work in progress MRF -1 In block

(v) latest water quality of Analysis report of Kallayi river stretch polluted river, its for the month of September 2020 tributaries, drains with Attached as Annexure 2 flow details and ground

water quality in the

catchment of polluted

river;

(vi) preventing dumping of Same as Item no. 5.1(v) waste and scientific waste Fine of 32 Lakhs imposed for illegal management including dumpinh of solid wastes into rivers bio-medical waste plastic and public places.Instalation of CCTV. waste and decentralizeing Biomedical waste from Hospital,labs waste processing, ,clinics collected through image, including waste generated plastic waste disposal through from hotels, ashrams,etc. recyclers. Individual solid waste processing facilities like bio gas plant, bio bins in high rise building, hotels,

restaurants etc.

Fencing proposed by irrigation

department.

(vii)ground water NIL regulation

(viii) adopting good NIL irrigation practices

(ix) protection and Flood prone mapping- Proposed by management of flood irrigation department

plain zones(FPZ),

(x) Rain water harvesting 31/03/2021 Mavoor Panchayat Well recharging-Estimate under preparation 31/03/2021 Peruvayal Panchayat Well recharging-Work in progress 31/03/2021 Olavanna Panchayat Well recharging-Work in progress

(xi) Maintaining minimum Initiated environmental flow of Perumanna Panchayat river 31/03/2021 Cleaning of Mampuzha river-Work in progress

Perumanna Panchayat 31/03/2021 Cleaning of Mampuzha river-Ongoing Olavanna Panchayat Cleaning of Mampuzha river- Completed Completed

(xii)Plantation on both sides Completed Mavoor Panchayat of the river 3500units completed

(xiii) Setting up biodiversity parks on flood Bio park in Kozhikode district- plains by removing Proposed by irrigation department encroachment

(Hon’ble NGT in the matter of OA No.673/2018 dated 06.12.2019) ACTION PLAN FOR RIVER KALLAYI, KERALA

Kozhikode Corporation No Activity Implementing Time line Progress in Progress in Progress in Progress % works Details . agency the month the month of the month in the completed of works of march 2021 of april month of remainin february 2021 may g 2021 2021 1 Identification of Kozhikode 30.12.2020 3 notices 5 notice On going work illegal outlets into Corporation issued file issued storm water drain imposed fine and issue Notice to 1500 imposed such units 3750 4 Notice Issued. 2 Waste to energy KSIDC 30.06.2021 40 % of On going On going project proposed at Legacy Njeliyamparamba waste clearing completed . 3 Establishment of Kozhikode Completed Work Work Work Work 100% Aerobic compost Corporation Completed Completed Completed Complete units d

24 units established functioning in 6 sites 4 Segregation of solid Kozhikode 30.06.2019 Work Work Work Work waste at source Corporation completed Completed Completed Complete level and treatment d of house hold wastes

300 ring compost and 150 biogas Work plant installed completed

5 Setting up of Fresh cut agency on trial run 100% chicken 100% 100% rendering waste chicken chicken treatment plant for collected waste waste chicken stall wastes collected collected and and treated treated

Installed in Thamarassery panchayath. Now waste is collected 100% from 170 units chicken

waste collected Completed

6 Implementation of Kozhikode 30.06.19 Completed Complete Complet Green protocol unit Corporation Complete d ed d 100% 7 Setting up of common STP of (13 Selection Selection MLD) notice notice Selection issued.PCB issued.PC notice and B and issued.PCB KCZMA KCZMA 7.1 At Kothi bridge- and KCZMA applicatio applicatio 6 MLD plant application for n for NOC n for NOC proposed NOC

Constru 7.2 At Avikkal -7 ction of MLD plant proposed Negotiatio 6 & MLD n with the STP s bidders Total station and 98 completed survey stared KMS . Market s and 15kms sewer analysis of completed line. rates in progress 8 Cleaning of Canoli Kozhikode 20.07.2019 Special Special Special Special canal Corporation Cleaning Cleaning Drive Cleaning Cleaning Drive Scheduled in Drive Drive Scheduled March 2021 Scheduled Schedule Kwil in Feb in APRIL d in MAY Work on 2021 2021 2021 0% going 9 Purchasing of Solar Kozhikode 31.03.2020 NA NA Boat for Canoli Corporation Project canal cleaning NA Dropped 10 Installation of CCTV Kozhikode 31.03.2020 NA NA NA Camera for the Corporation Identification and monitoring of illegal activities Project NA Dropped 11 Establishment of Kozhikode 31.03.2020 NA NA NA Mobile Septage Corporation Project Units NA Dropped 12 Action taken against Kozhikode Continuing 12 Notice 12 Notice 10 dumping of wastes Corporation Issued Issued Notice into river and public 8500 fine Issued places imposed 7000

12 Notice Issued On going work 13 Cleaning of B.K Kozhikode 31.03.2020 Railing work in Railing Fencing Cleanin canal Corporation bridges work in fixed g of bridges tributar ies Retaining 100m. wall of F length i 50m has x been i constructe n d. g Slit removed Work for 50m completed o f

f e n c i n g 14 Establishment of Kozhikode 31.03.2020 Estimate Approval of Approval 2 MLD treatment plant at Corporation revised. revised of revised network Medical college (3 Revised drawing and drawing started MLDplant) drawing estimate and 150m Tender over and pending with estimate excavatio estimate the technical pending n 14.1 -2 MLD plant presented committee with the complete proposed before LSGD technical d .pipe 14.2- 1 MLD plant technical SITE.clearence committee inspectio proposed committee s process LSGD SITE n LSGD. laying of complete Suggested network to d and 2 corrections be MLDSTP

. Meeting initiated site to be this month cleared.S scheduled TP 3 KMs for foundatio of pipe presenting n works 5% laying the started. corrected estimate 15 Construction of Kozhikode 31.03.2020 Re Work 300 m drains at Y.M.RC Corporation approved started , strom Ayyankar colony from LSGD a report water work to chief draina ongoing at technical site examiner ge has been constr sent. uction and 1000m canal 58% side wall constr RE pending uction with CE Re approved are LSGD. Silt from LSGD removal in work ongoing pendin progress at site g. 16 Implementation of Kozhikode Now stay order has been lifted. Additional fund is required STP at Corporation Kottooli (13.5 MLD)

17 Treatment facility Kozhikode EOI Process EOI Process for waste water in Corporation Ongoing Ongoing Central market EOI Process Ongoing 18 Establishment of Kozhikode comfort stations Corporation 5 comfort 5 comfort station work station work completed completed 60% 19 Provide facility for Suchitwa Neliyanparam Neliyanparam 30 70% Mission ba work ba work % completed. completed. Others on going Others on going MRF,RRF, Super Neliyanpa MRF ramba 3 units existing work

19.1 completed Njeliyanparamb . Others on 19.2 Industrial going estate

19.3

Meyorbhavanjayant

hinagar colony 20 Identification of Kozhikode On going On going On going illegal outlets from Corporation process process process house to storm water drain and issue Notice to such On going Houses process 21 Establishment of Kozhikode On going Project process started Plastic shredding Corporation On going unit process 100%

22 Establishment of Kozhikode Submitted to Impact Kerala for KIFB Aid –Got Initial Approval. Final Document slaughtering unit Corporation Preparation going on 23 Cleaning of drains in Kozhikode On going On going On going On going Kozhikode Town Corporation process process process process

Perumanna Grama Panchayath No. Activity Implementing Time line Progress in Progress in the Progress in the % works Details of works agency the month month of APRIL month of MAY completed remaining Progress in of MARCH 2021 2021 the month of 2021 FEBRUAVARY 2021 1 Outlets into strom water drain and issue Perumanna G Continues 4 notice 6 notice 6 notice issued 6 notice issued On going notice P process issued issued 2 Establishment of six aerobic compost units in Perumanna G Mar-21 Work started Work Work started Work started 1 80 % work 5 units will be panchayat P started 1 completed started if public place is available

3 Collection and segregation of solid waste in Perumanna G Continues 73 % work the river P process in completed every year 4 Setting up of residential treatment plant for Perumanna G Continues Resolution Resolution Resolution Resolution 90% chicken stall waste P process passed by passed by passed by passed by Panchayat Panchayat Panchayat board Panchayat board board to board to to execute an to execute an execute an execute an agreement with agreement with agreement agreement Fresh Fresh with Fresh with Fresh cut,thamarassery cut,thamarassery cut cut kkd kkd

5 Setting up of 360 soak pit plant in all houses Perumanna G Mar-21 110 nos 110 nos 110 nos 119 nos Remaining near the river area and panchayat P MGNREGS completed completed completed completed work has been suspended as lack of personal days for current year 6 implimentation of 360 compost unit near Perumanna G Mar-21 110 nos 110 nos 110 nos 126 nos Remaining river side and panchayat P MGNREGS completed completed completed completed work has been suspended as lack of personal days for current year 7 Implementation of water flow project Perumanna G Mar-21 Estimate Tender has (aluvangal thazham perumbatta P, Kozhikode under been done elamanapadam,valiyapadam.mampuzhthode block preparation naveekarana project no 260/2021 project panchayat, (AE project) cost 16.67 lakhs) . it is a joint venture project Kozhikode by grama,block and jilla panchayat jilla panchayat

8 Cleaning of mampuzha river (project name : Distric 2018-19 Completed Completed Completed by Completed by 25 lakhs Work is on going mampuzha water flow restoration,project no panchayat by panchayat by panchayat panchayat transferred by district 01/2018-19 Kozhikode panchayat to district panchayat panchayat ,kozhikode

9 Establishment of 18 nos of mini MCF in Perumanna G Mar-21 10 nos 11 nos 11 nos 100 % 7 units not different wards including payyadimetal P MGNREGS completed completed completed started where the river is flowing 10 Collection of plastic waste from the river Perumanna G Continous Three time Three time completed Three time NA Process will P process completed completed be done every year

Peruvayal Grama Panchayath No. Activity Implementing Time line Progress in Progress in Progress in Progress in % works Details of works remaining agency the month the month the month the month of completed of Februry of march of April May 2021 2021 2021 2021 1 Outlet in Peruvayal G P Continuous 20 notice 9 notice 9 notice 5 notice On going storm water process issued issued issued issued drain and issued notice 2 Establishment Peruvayal G P 4/2021 TO WORK WILL WORK WILL WORK WILL WORK WILL NA of 5b units through 03/2021 COMMENCE COMMENCE COMMENCE COMMENCE anaerobic MGNREGS ON THIRD ON THIRD ON THIRD ON composed WEEK OF WEEK OF WEEK OF unit in DECEMBER MARCH MARCH panchayat. 2020 2021 2021

3 Setting up of Peruvayal G P Continuous Commence Commence COMMENCE 100% rentering process on Commence on ON plant for 18/09/2020 on 18/09/2020 18/09/2020 chicken solid 18/09/2020 waste 4 Setting up of Peruvayal G P 04/2020 to On going On going On going ON GOING Nil 170 will be finished within march 2021 379 soak pit 03/2021 plant in all houses

5 Cleaning of District 2017-18 Completed Completed Completed COMPLETED 25 lakhs Ongoing mambuzha panchayat by by by BY transferred river (project Kozhikode panchayat Panchayat Panchayat PANCHAYATH to district name panchayat mambuzha renovation) project no : 190/2017-18 6 Establishment Peruvayal G P 4/2020 TO 2 mini MCF 4 mini MCF 4 mini MCF 6 mini MCF 80% 4 will started immediately of 8 numbers through 2021 completed completed completed Completed of mini9 MCF MGNREGS 7 Collection of Peruvayal G P Continuous 3 times 3 times 3 times 100% Continuous process plastic waste process collected collected collected from the river 8 Collection Peruvayal G P Continuous 3 times 3 times 3 times 3times Continuous process and process collected collected collected collected segregation of solid waste in the river 9 Establishment Peruvayal G P 2020-21 26 numbers 26 numbers 26 numbers 26 number 70% Work will be completed by the end of of Bio gas completed completed completed completed february 2021 plant

10 Well recharge Peruvayal G P 2020-21 63 63 numbers 63 numbers 78 number 82% Work will be completed by the end of through numbers completed completed completed february 2021 MGNREGS completed

Mavoor Gp N Activity Imple Time line Progress in Progress in Progress in Progress in the % Work Details of work remaining o mentin the month of the month of the month of month of May complet g February 2021 March 2021 April 2021 2021 ed agency 1 MCF Mavoo 31.03.201 Completed Completed Completed Completed and 100% Nil r Gp 9 and and and functioning functioning functioning functioning 2 Fish Mavoo 31.03.201 Completed Completed Completed Completed and 100% Nil market r Gp 9 and and and functioning construc functioning functioning functioning tion 3 Ring Mavoo 31.03.201 Completed Completed Completed Completed and 100% 190 units compost r Gp 9 and and and functioning functioning functioning functioning 4 Tree Mavoo Completed Completed Completed Completed Completed 100% 3500 units plantati r Gp on in river side 5 Compos Mavoo Completed Completed Completed Completed completed 100% 1000 units t pit r Gp 6 Well Mavoo 31.03.202 Estimate Estimate Estimate Estimate under 2 units (Buds school, Ayurveda recharg r Gp 1 under under under preparation dispensary) e preparation preparation preparation 7 Bucket Mavoo 31.03.202 Ongoing Ongoing Ongoing Ongoing 50% 502 units compost r Gp 1 8 Collectio Mavoo Throughou Ongoing Ongoing Ongoing Ongoing n of non r Gp t the year biodegr adable waste 9 Transpo Mavoo Throughou Completed Completed Completed Completed 100% 31805KG rtation r Gp t the year of waste material to refinem ent unit

OLAVANNA GRAMAPANCHAYAT PROGRESSI PROGRESSI PROGRES PROGRESSIN N THE NG THE SING THE % WORKS IMPLIMENTING No ACTIVITY TIMELINE THE MONTH OF MONTH OF MONTH OF MONTH COMPLET DETAILS OF REMAINING WORK AGENCY FEBRUARY 2021 MARCH APRIL 2021 OF MAY ED 2021 2021 Collection of Olavanna Continous 2 times 2 times 2 times 1 plastic waste from gramapanchay 2 times collected 100% Process continuing process collected collected collected the river at Collection of Olavanna segregation of Continous 2 times 2 times 2 times 2 gramapanchay 2 times collected 100% Process continuing solid waste in the process collected collected collected at river Olavanna 2 Mini Establishment of 2 Mini 2 Mini gramapanchay 4/2020 To 2 Mini MCF MCF 3 Mini MCF in all MCF MCF Remaining will started immediately at through 3/2021 Completed Complete wards Completed Completed MGNREGS d Cleaning of District 4 2018/19 Completed Mambuzha river Panchayat Olavanna 8 No's gramapanchay 4/2020 To 8 No's 8 No's 8 No's Work will be completed by the end of March 5 Well recharge complete at through 3/2021 completed completed completed 2021 d MGNREGS Olavanna Setting up of 48 No's gramapanchay 4/2020 To 48 No's 48 No's 48 No's Work will be completed by the end of March 6 300sockpit plant in complete 15% at through 3/2021 completed completed completed 2021 houses d MGNREGS Action taken Olavanna Continous 7 against dumping of gramapanchay 100% Continuing process waste into river at

Irrigation Department

No. Activity Implementing Time line Progress in the month of September Progress in % works Details of (as per agency 2020 the month complet works Action of October Progress in ed remaining Plan) 2020 the month of November 2020 Desilting of Kallayi river Irrigation 31.03.21 DPR submitted to SE,INC,KKD on 16.10.2019 for Rs 1 from Kaduppini to Kothi in department 773.05 lakhs (7.30 crores for desilting of river and 43.05 lakhs for fencing of bridges) under action Kozhikode Corporation plan of kallai river 2 Provide fencing on the Irrigation 31.03.21 sides of the Bridge department 3 Irrigation Work entrusted to kerala waterways & Dredging, Desilting & removal 31.07.19 of weeds from E K Canal (11.2 department infrastructure Ltd (KWIL) km) 4 Irrigation Land for the proposed bio park is to be demarcated by Bio Park in Kozhikode department the revenue authorities after necessary boundary District survey and subsequent bio cover work are to be done by the social forestry department

5 Flood Prone Mapping in Irrigation Acton to be taken by the hydrology wing of irrigation Kozhikode District department department as this needs data collection, scientific analysis and modeling

Kerala State Pollution Control Board

No. Activity Implementing Time line Progress in Progress in Progress in % works Details of (as per agency the month the month the month completed works Action of of October of remaining Plan) September 2020 November 2020 2020 1 River water quality monitoring- Kallayi river KSPCB Ongoing; National Water Quality Monitoring monthly Programme(NWMP) frequency River water qualitymonitoring– Kallayi rivers KSPCB Ongoing. 2 State Water Monitoring Programme, KSPCB fund (SWMP) Seasonal monitoring – pre- monsoon, monsoon, post- monsoon 3 Inspection and effluent quality monitoring of the KSPCB Ongoing flats, industrial units, service stations, hospitals, Interval: hotels etc . in Malappuram Municipal area Red– 1month. Orange – 3 months.

Green – 6 months .

SuchitwaMission

No. Activity Implementing Time line Progress in Progress in Progress in % works Details of (as per agency the month the month the month completed works Action of of October of remaining Plan) September 2020 November 2020 2020 1 Board displaying messages against dumping to Suchitwa Mission 15.07.19 Est be placed in river banks im ate pr ep are d

Action Plan by Ground WaterDepartmen

No. Activity Implementing Time line Progress in Progress in Progress in % works Details of (as per agency the month the month the month completed works Action of of October of remaining Plan) September 2020 November 2020 2020 B(i) Ground Water resources and regulation of Ground Water Nil Nil Nil ground water extraction by industries Department particularly in over expolited as critical zones/blocks (Earlier status: As per Groundwater resources of Kerala, 2017 estimate ,Kozhikkode Block comes under the Kallai river basin and the block is safe with stage of groundwater extraction 68.49%) B(ii) Ground Water Nil Nil Nil Ground water recharging / rain water Department harvesting

(Earlier status : The average pre-monsoon groundwater level is 7.23mbgl. Groundwater Department has implemented 3 no of dug well recharge schemes at Kozhikkode block) B(iii) Periodic ground waste quality assessment and Ground Water Nil Nil Nil remedial actions in case of contaminated Department ground water tube wells/bore wells or hand pumps (Earlier status - Groundwater Department has 1 observation piezometer (BW)in the river stretch.) B(iv) For regulating use of ground water for Ground Water Nil Nil Nil irrigation purpose, adopting good irrigation Department practices (Earlier status - The total irrigation draft in the block area is 488.76 ha.m.)

Action plan by irrigationDepartment

No. Activity Implementing Time line Progress in Progress in Progress in % works Details of (as per agency the month the month the month completed works Action of of October of remaining Plan) September 2020 November 2020 2020 E Dredging and desilting Irrigation Dept 3 years

E E-flow (by micro water shed Irrigation Dept 3 years management)

E Flood plain zone (protection and Irrigation Dept 3 years management)

E Greenery development (plant in trees Irrigation Dept 3 years on thebanks)

Kerala State Pollution Control Board, District Office, Kozhikode NATIONAL MISSION FOR CLEAN GANGA

Format for submission of monthly progress report by state/UTs

( Hon’ble NGT in the matter of OA.No. 673/2018 dated 6/12/2018 )

For the month of MAY 2021– polluted river stretch

Sl Activity to be monitored Timeline Submission of progress by No state/UT-complinace status

1 Ensure 100% treatement of Nil sewage at least in-situ remediation 2 Commencement of setting up of Nil STPs and other sources of generation of sewage to the STPs must be ensured 3 Timeline for completing all steps Nil of action plans including completion of setting up STPs and their commissioning 4 Chief secretaries may set up Not applicable appropriate monitoring mechanism at state level  Specifying accountability of nodal authorities not below the secretary level  Chief secretaries may have an accountable person attached in their office for this purpose

 Monitoring at state level Nil must take place 5 Progress report may be furnished Monthly Nil by the state/UTs to (preferably before 20th of  Secretary,ministry of jal every month) shakti  Member secretary,CPCB

5.1 Progress report may be comprised of details along with completion timeline on:

(i) identification of polluting Primary STP (Oil and Grease Drains identified. Pollution source including drains trap with grit chamber) load calculated. Action plan contributing to river prepared. Notices issued by pollution and action as per concerned Panchayath NGT order on insitu Will be implemented by Secretaries to individual treatment 31/3/2021 units. Action under progress by individual units.

Monthly progress report of Kuttiady, Maruthomkara, Cheruvannur, Changaroth,, Kavilumpara, Velom Panchayaths,Chakittapara, Payyoli, Thurayoor, Irrigation department, Water Authority, Shuchitwa mission for the month of October 2020 is attached as Annexure 3.

(ii) status of STPs, I&D and Mostly rural area. No sewage networks details common STP proposed. of existing Individual septic tank and infrastructure,proposed soak pit system provided along with completion for house hold, units like timeline bakery, cool bars small restaurants with less seating capacity. Individual STPs for high rise building, hotels, Restaurants, Commercial buildings.

(iii) status of CETPs details of No CETPs proposed existing CETP and ETP --- infrastructure ,Gap analysis,proposed along with complying status

Kuttiyadi Panchayth (iv) status of solid waste 31/03/2021 Construction started for management & details of block level MRF for 7 processing facilities details panchayath in the Kuttiyady of existing infrastructure, block. Gap analysis,proposed Completed and functioning MCF of Kuttiyadi along with completion Panchayath set up with timeline shredding unit- work completed and functioning. Completed and functioning Mini MCF set up in all wards of Kuttiyadi panchayath. Kavilumpara panchayath Completed and functioning 3 MCFs are functioning. Maruthomkara Panchayath Completed and functioning MRF completed and functioning. Biogas plant work completed. Velom Panchayath – 31/103/2021 Community level – Biogas plant.Work under construction(80% work completed). 50 nos of Biogas plant for house hold- Completed and functioning 31/10/2021 Perambra Panchayath MCF- Tendering in progress Mini MCF – work completed.

Changaroth Panchayath 31/03/2021 Project for setting up MCF approved. Site to be identified soon. Biogas plant and Ring compost for house hold proposed. Plastic shredding unit proposed. Completed and functioning Chakkittapara Panchayath MCF-Completed Payyoli Municipality 31/03/2021 2000units of ring compost,500units of biogas plant,5000units of bio bin- Work in progress

(v) latest water quality of Water quality monitoring polluted river, its result for the month of tributaries, drains with October 2020 is attached flow details and ground as Annexure-4 water quality in the catchment of polluted river;

(vi) preventing dumping of Same as Item no. 5.1(v) waste and scientific waste Biomedical waste from management including Hospital,labs ,clinics bio-medical waste plastic collected through image, waste and decentralizeing plastic waste disposal waste processing, through recyclers.Individual including waste generated solid waste processing from hotels, ashrams,etc. facilities like bio gas plant, bio bins in high rise building, hotels etc. Fencing proposed by irrigation department.

(vii) ground water NIL regulation

(viii) adopting good NIL irrigation practices

(ix) protection and management of flood plain zones(FPZ),

(x) Rain water harvesting Work in progress Velom panchayath 22527 rain water pit , well 31/03/2021 recharge – 1500 houses Kavilumpara panchayath well recharge – 160 houses

Maruhtonkara panchayath

Well recharge- Action plan

and TS approved

Cheruvanoor panchayath Well Recharge – Project in progress Chakkittapara Panchayath Well recharging through MGNREGS

(xi) Maintaining minimum Kavilumpara panchayath environmental flow of Adopted steps to remove river sands and rock dumped durig rain flood Maruthonkara panchayah 74 works ongoing under MGNREGS(RWH, soil conservation). Kavilumpara panchayath 5 works ongoing under MGNREGS for protection of river sides Chakkittapara Panchayath Removal of pebbles and renovation of Kuttiady river through MGNREGS Payyoli Municipality Rejuvation/cleaning of Naivarani thodu by removing slit and other solid wastes-Work in progress

(xii) Plantation on both sides of the river

(xiii) Setting up biodiversity parks on flood plains by removing encroachment

(Hon’ble NGT in the matter of OA No.673/2018 dated 06.12.2019)

ACTION PLAN FOR RIVER KUTTIYADI, KERALA

KuttyadiGrama Panchayath

No. Activity Implementing Time line Progress in Progress in Progress in Progress in % works Details of (as per agency the month the month the month the month of completed works Action Plan) of of MARCH of APRIL MAY 2021 remaining FEBRUARY 2021 2021 2020 D Geo textiles at river bed MGNREGS 31.03.2018 Nil Nil Nil Nil Nil Na E Haritha sahayastapana Kuttyadi 31.03.2020 Completed Completed Completed Completed 100% Na agreement Grama Panchayath C(ii) Removal of Non bio Kuttyadi 31.03.2020 Completed Completed Completed Completed 100% Na degradable waste Grama Panchayath C(ii) Clean green kuttyadi Kuttyadi 31.03.2020 96% 98% 99% 99% 99% Plastic Grama collection Panchayath from home A(b) Community toilet Suchitwa 31.03.2020 100% 100% mission C(ii) MRF Block 31.03.2020 Nil Nil Nil Ni Nil panchayath C(ii) MCF Kuttyadi 31.03.2019 100% 100% Grama Panchayath A(b) Sanitary latrine Kuttyadi 31.03.2019 Nil Nil Nil 50% 50% 50% Grama Panchayath B(ii) Well recharging MGNREG 31.03.2019 Nil Nil Nil Nil Nil E Camera surveillance Kuttyadi completed 100% completed Grama

Panchayath

E Rejuvenation of MGNREGS 31.03.2020 Nil Nil Nil 50% 50% Kuttiyadi river C(ii) Disposal of non Kuttyadi 31.03.2020 97% 98% 99% 99% 99% Collection degradable bio waste Grama for MCF Panchayath E Clean Village Kuttyadi 31.03.2020 Nil 95% 98% 98% 95% Grama Panchayath C(ii) MRF Block 31.03.2020 Na Na Na Na Na completed Panchayat C(ii) MCF Kuttyadi 31.03.2020 100% 100% 100% 100% 100% Grama Panchayath C(ii) Retrofitting Kuttyadi 31.03.2020 96% 97% 98% 99% 99% Grama Panchayath Nil

VelamGramaPanchayath

No. Activity Implementing Time line Progress in Progress in % works Details of agency the month Progress in Progress in the month of completed works (as per of the month the month MAY 2021 remaining Action FEBRUARY of MARCH of APRIL Plan) 2021 2021 2021 Govardhian Biogas plant Velam GP 31.03.2020 40 Well, Road

C(ii) MCF Suchitwa 31.03.2020 90 Well, Water C(ii) mission

Biogas plant 50 No.s Suchitwa 31.03.2020 mission C(ii) Well recharge 1500 MGNREGS 31.03.2020 Nil B(ii) houses Installation of Biogas Socio 31.12.2019 6 0 plant for individual Economic unit benefic iaries Foundation

C(ii) C(ii) Installation of Ring Socio 31.12.2019 11 0 compost Economic unit Foundation C(ii) Making compostpit MGNREGS 31.0.2020 4 5 20

Maruthomkara GramaPanchayath

No. Activity Implementing Time line Progress Progress in the Progress in the % works Details of agency in the month of month of MAY complete works month of APRIL 2021 2021 d remaining Progress in MARCH the month 2021 (as per of Action FEBRUARY Plan) 2021 C(ii) MRF Block 2019-2020 Completed Complete Completed Completed 100 Complete panchayath d d

C(ii) Biogas plant Maruthomkara 2019-2020 Completed complete Completed Completed 100 Complete GP d d

B(ii) Well recharge Maruthomkara 2019-2020 Completed complete Completed Completed 100% 160 GP d Complete d A(b) Sanitary Maruthomkara 2019-2020 Completed complete Completed Completed 100% Concrete complex GP d Complete d E Haritha Maruthomkara 2019-2020 Completed complete Completed Completed 100% Complete sahayathapana GP d d agreement C(ii) Biogas plant Maruthomkara 31.03.2020 GP A(b) Sanitary Maruthomkara 31.03.2020 Complex GP

PerambraGrama Panchayat

No. Activity Implementin Time line Progress in the Progress in % works Details of g agency month of the month of complete works (as APRIL 2021 MAYl 2021 d remaining per Progress in Actio the month of Progress in the n FEBRUARY month of Plan) 2021 MARCH 2021 E Haritha Perambra 31.03.202 HSS identified HSS identified HSS identified HSS identified sahayasthapan grama 0 a agreement panchayath C(ii) Solid waste Perambra 31.03.202 Continued Being 90% completed complete Fortnight removal grama 0 continued d collection of panchayath non biodegradabl e waste from houses is being continued

Zero waste Perambra 31.03.202 Completed Completed Completed Completed 100% Perambra grama 0 panchayath C(ii) A(b) Publictoilet Perambra 31.07.201 Commissione Commissione Commissioned Commissioned 100% grama 9 d d panchayat

MCF Perambra 31.10.201 Commissione Commissione Commissione Commissione 95% Electrification grama 9 d d d d tender panchayat C(ii) C(ii) Fish market Perambra 31.10.201 Finishing work Finishing work Finishing work Finishing 95% Electrification construction grama 9 work tendered panchayat

Kavilumpara GramaPanchayath

No. Activity Implementing Time line Progress in Progress in % works Details of Progress in agency the month the month completed works the month Progress in of APRIL of MAY remaining of the month 2021 2021 FEBRUARY of MARCH 2021 2021 (as per Action Plan) E Haritha sahayasthapana Kavilumpara 31.03.2020 Completed Completed Completed Completed 100% NA agreement GP Completed

Collection of non- Kavilumpara 31.03.2020 1.5 ton 1.5 ton 1.5 ton 1.5 ton 60 % 40 % work biodegradable waste GP Completed in progress C(ii) MCF Kavilumpara 31.03.2020 Completed Completed Completed Completed 100% NA GP Completed C(ii) Well recharge MGNREGS 31.03.2020 Work Work Work Work NIL Work Started Started Started Started Started B(ii) D River cleaning Kavilumpara 31.03.2020 Completed Completed Completed Completed 100% NA GP Completed

Chakkittapara Grama Panchayat No. Activity Implementing agency Time line Progress Progress Progress Progress in % Details of in the in the in the the month of works works (as month month of month of MAY compl remainin per of MARCH APRIL 2021 eted g Actio FABRUA 2021 2021 n RY Plan) 2021 D Removal of pebbles MGNREGS 31.03.2020 Nil Nil Nil Nil Nil dumped if any E Harithasahayastapan ChakkittaparaGramaPanchayat 31.03.2020 Complet Complete Complete Completed 100% Nil a agreement h ed d d

C(ii) Removal of Non bio ChakkittaparaGramaPanchayat 31.03.2020 Complet Complete Complete Completed 100% Nil degradable waste h ed d d

A(b) Community toilet Suchitwa mission 31.03.2020 100% Nil C(ii) MCF ChakkittaparaGrama 31.03.202 100% Nil Panchayath 0

A(b) Sanitary latrine ChakkittaparaGrama 31.03.2020 80% 85% 85.5% 85.5% 85.5% Panchayath

B(ii) Well recharging MGNREG 31.03.2020 35% 36% 36.4% 36.4% 36% E Rejuvenation of MGNREGS 31.03.2020 Nil Nil Nil Nil Nil Nil Kuttiyadi Puzha C(ii) Disposal of non ChakkittaparaGrama 31.03.2020 80% 81% 81.3% 81.3% 81.3% Collectio degradable bio waste Panchayath n from

MCF E Clean Village ChakkittaparaGrama 31.03.2020 25% 31% 31.2% 31.2% 31.2% Panchayath

C(ii) MCF ChakkittaparaGramaPanchayat 31.03.2020 100% Nil h

CheruvannurGramaPanchayth No. Activity Implementing Time line Progress in Progress in Progress in Progress in % works Details of (as per agency the month the month the month the month of completed works Action of of MARCH of APRIL MAY 2021 remaining Plan) FEBRUARY 2021 2021 2021 E Haritha Cheruvannur 31.03.2020 Functioning Functioning Functioning Functioning 100% Na SahayaSthapana GP properly properly properly properly agreement Collection of Cheruvannur 31.03.2019 Functioning Functioning Functioning Functioning N100 % Na plastic waste GP properly properly properly properly

C(ii)

A(b) Repairing of Cheruvannur 31.03.2020 Na NA NA NA 100% Na households toilets GP A(b) Construction of Cheruvannur 31.03.2020 WORK WORK WORK WORK 50% Roof and Community toilet GP PROGRESS PROGRESS PROGRESS PROGRESS finishing work at Nirappam Stadium B(ii) Well recharging Grama 31.03.2019 COMPLETED COMPLETED COMPLETED COMPLETED Na Na panchayath & MGNREGS A(b) Latrine Grama 31.03.2019 NA NA NA NA 100% Na Construction panchayath & MGNREGS new Take a break toilet Cheruvannur 31.03.2021 TS Accorded 0 Construction cum relaxation GP on work centre new Thumbur moozhi Cheruvannur 31.03.2021 TS Accorded 0 Construction Aerobic bin GP on work compost

Koorachund Grama Panchayat No. Activity Implementing Time line Progress in Progress Progress in Progress in % works Details of agency the month in the the month the month completed works (as of month of of APRIL of MAY remaining per FEBRUARY MARCH 2021 2021 Action 2021 2021 Plan) Setting up of MCF Koorachund 31/11/2020 Piller Roof completed completed 80% Ongoing GP casted completed Collection of non Koorachund Through out Collected collected collected collected 80% Ongoing degradable waste GP the year harithakarma sena Transportation of clean kerala Through out Ongoing ongoing ongoing ongoing 80% Ongoing waste material to mission the year clean kerala mission 896 Renewal/construction Koorachund Through out Roof ongoing ongoing 100% nil of public toilet GP MGNREGS the year Pillar completed casted

859 Brook cleaning Koorachund 07-01-2020 Ongoing ongoing ongoing ongoing 75% nil GP MGNREGS

1211 Setting up of mini Koorachund Through out Ongoing ongoing ongoing ongoing 65% Ongoing MCF GP MGNREGS the year 199 Well recharge Koorachund Through out Progress in 65% Ongoing GP MGNREGS the year the month of January 2021

Thiruvallur Grama Panchayat

No. Activity Implementing Time line Progress in Progress in Progress in % works Details of Progress in the month the month of the month completed works agency the month of January March 2021 of April remaining (as per of 2021 2021 Action February Plan) 2021 1 Thiruvallur 2020-21 Completed Completed Completed Completed 100% Nil drainage cleaning GP 2 haritha sahaya Thiruvallur 2020-21 Completed Completed Completed Completed 100% Nil sthabana agreement GP 3 Removal of non bio Thiruvallur 2020-21 Completed Completed Completed Completed 100% Nil degradable waste GP 4 Community toilet suchitwa 2020-21 nil nil nil nil Project will mission be prepared after election 5 MCF Thiruvallur 2020-21 started started Not started started Due to social GP assault work temporarily stopped.MCF functioning in a rental building

6 non recyclable Thiruvallur 2020-21 Nil Nil Negotiation Nil Negot iation inorganic waste hand GP completed on progress over to clean kerala agreement company to be

executed with clean kerala company. 7 Waste management Thiruvallur 2020-21 Nil Nil Annual plan Nil Letter send project to veterinary GP for waste to AE ,LSGD hospital management for preparing exists. deep burial pit

8 Renovation of various Thiruvallur 2020-21 completed completed Work completed 100% Nil canals GP progressing 9 Toilet to schools, Thiruvallur 2020-21 Nil Started Toilet to Started Work anganvadies and bus GP schools completed stand completed up to lintel toilet at bus level bus stand to be stand started. building construction project started Thurayur Grama Panchayat

No. Activity Implementing Time line Progress in Progress in Progress in the % works Details of Progress in the month the month month of MAY completed works agency the month of MARCH of APRIL 2021 remaining (as per of 2021 2021 Action FEBRUARY Plan) 2021 Removal of pebbles Nil Nil Nil Nil Nil dumped if any Nil Haritha sahaya Thurayur GP 31.03.2020 Completed Completed Completed Completed 100% Nil sthabana agreement Removal of non Thurayur GP 31.03.2020 Completed Completed Completed Completed Nil bio degradable waste

Community toilet SUCHITWA 31.03.2020 Nil Nil Nil Nil 100% DPC approved MISSION after technical sanction and tender is under process

MCF Thurayur GP 31.03.2020 basement completed (b) Sanitary latrine Thurayur GP 31.03.2020 Nil Nil Nil Nil Nil Ii ) Well recharge MGNREGS 31.03.2020 Nil Nil Nil Nil Nil Rejuvation of MGNREGS 31.03.2020 Nil Nil Nil Nil Nil kuttiadi river

Disposal of non Thurayur GP 31.03.2020 60% 70% 70% 70% 70% Collection degradable bio directly from waste houses Clean village Thurayur GP 31.03.2020 Nil Nil Nil Nil Nil Ii ) MCF Thurayur GP 31.03.2021 partial Basement completed

Maniyur Grama Panchayat

No. Activity Implementing Time line Progress in Progress in Progress in % works Details of Progress in the month the month the month of completed works agency the month of MARCH of APRIL MAY 2021 remaining (as per of 2021 2021 Action FEBRUARY Plan) 2021 15 innovation of canals MGNREGS 2020-21 15 Canals 15 canals 15 canals 15 canals 100% Nil innovation innovation innovation innovation completed completed completed completed 68 innovation of streams MGNREGS 2020-21 17 streams 17 17 17 streams 25% 51 innovation streams streams innovation completed innovation innovation completed completed completed

2 innovation of streams Maniyur GP 2020-21 2 streams 2 streams 2 streams 2 streams 100% Nil innovation innovation innovation innovation completed completed completed completed 21 building up of mini MGNREGS 2020-21 Work of 6 Work of 7 Work of 9 Work of 9 43% 12 MCF mini MCF mini MCF mini MCF mini MCF completed completed completed completed 21 collection of non bio Harithakarmasena 2020-21 waste in waste in waste in waste in 19th 90% Waste in 2 th wards degradable waste Maniyur GP five wards five wards 19 wards wards was wards was was was removed in removed in removed removed February december in in month 2020 month december February 2020 month month 2020 2020 Well recharge MGNREGS 2020-21 86% 1

CHANGAROTH GRAMAPANCHAYATH No. Activity Implementing Time line Progress in Progress in Progress in Progress in the % works Details of works agency the month the month the month month of MAY 2021 completed remaining (as of of MARCH of APRIL per FEBRUARY 2021 2021 Action 2021 Plan) C(ii) Setting up of Changaroth Sep-19 Completed Completed Completed Completed Completed Completed MCF GP

C(ii) Collection of Haritha throughout - - - - ongoing ongoing non- karma sena the year biodegradable waste

C(ii) Bio gas plants Changaroth Nov-19 Completed Completed Completed Completed Completed Completed for house hold GP C(ii) Ring compost Changaroth Completed Completed Completed Completed Completed Completed unit GP Dec-19 C(ii) Plastic Changaroth Mar-20 Dropped Dropped Dropped Dropped Dropped- Dropped shredding unit GP A(b) House hold Changaroth Jan-20 Ongoing Ongoing Ongoing Ongoing ongoing ongoing sanitary units GP

C(ii) Transportation Changaroth Sep-19 Completed Completed Completed Completed Completed ongoing of waste GP material to refinement unit C(ii) Bamboo MGNREGS 31.03.2020 No No No No progress Ongoing Unavailability Cultivation progress progress progress of bamboo river banks plants

PAYYOLI MUNCIPALITY

No. Activity Implementing Time line Progress in Progress in the % works completed Details of agency the month of month of MAY works (as FEBRUARY 2021 remaining per 2021 Progress in Progress in Actio the month the month n of MARCH of APRIL Plan) 2021 2021 Included in the Payyolimunicipali 31.12.20 Preparing the Preparing Preparing Preparing the NA Work in water shed area ty,Irrigation 21 estimate the the estimate estimate progress based department estimate development master plan.A municipal level committee formed for monitoring Establishment of Payyoli 31.03.20 NA NA NA NA NA Work in 2000units of ring municipality 21 progress compost Establishment of 31.03.2021 NA NA NA NA NA NA Work in 500 units of bio gas progress plant Establishment of Payyoli 31.03.20 NA NA NA NA NA Work in 5000units of bio municipality 21 progress bin

A contract Fresh cut organic 04.09.20 100% chicken 100% 100% 100% chicken 100% Completed agreement has pvt ltd 20 waste chicken chicken waste collected been signed collected waste waste between collected collected municipality and fresh cut organic pvtltd,arentering plant functioning at Ambayathode,Tha marassery for the scientific treatment of chicken stall waste generated Implementation of Payyoli 30.06.20 Completed Completed Completed Completed 100% Completed green protocol municipality 20 Rejuvation/cleanin Payyoli 31.3.202 Work in g of municipality 1 progress Naivaranithodu by removing slit and other solid wastes Collection of Harithakarmasen Ongoing Collection Collection Collection Collection 25% NA plastic/non bio a started in started in started in started in degradable house 13wards 13wards 13wards 13wards hold waste Action taken Payyoli Continuin 20notice 20notice 20notice 20notice NA against littering in municipality g issued.Fined issued.Fine issued.Fined issued.Fined - public places -Rs.30190/- d - -Rs.30190/- Rs.30190/- Rs.30190/-

Irrigation Department

No. Activity Implementing Time line Progress in the Progress in Progress in the % works Details of (as per agency month of the month of month of completed works Action September October 2020 November remainin Plan) 2020 2020 g E Salt water Extrusion - Construction of RCB upstream Irrigation Dept July 31 of Perincherikadavu across Kuttiady river 2022 (Gulikapuzha) in Kozhikode District

C(ii) Fencing the sides of Bridges to prevent dumping of Irrigation Dept July 31 wastes - 5 no’s 2022

National Mission for Clean Ganga

Format for Submission of Monthly Progress Report by States/UTs (Hon’ble NGT in the matter of OA No.673/2018 dated 06.12.2019) RIVER , KASARGOD S. Activity to be monitored Timeline Submission of progress by State/UT- No. Compliance status 1 Ensure 100% treatment of sewage at least in-situ remediation Commencement of setting up of STPs and connecting all the drains and other sources of generation of sewage to the STPs must be ensured 2 Timeline for completing all steps of action plans including completion of setting up STPs and their Commissioning 5 Chief Secretaries may set up appropriate monitoring mechanism at state level • Specifying accountability of nodal authorities not below the Secretary level • Chief Secretaries may have an accountable person attached in their office for this purpose

• Monitoring at State level must take place 6 Progress report may be furnished by the State/UTs to • Secretary,Ministry of Jal Shakti • Member Secretary,CPCB 6.1 Progress Report may be comprised of details along with completion timelines on: (I) Identification of polluting sources including drains contributing to river pollution and action as per NGT order on in-situ treatment.

(II) Status of STPs, I&D and sewerage networks Details of Existing Infrastructure,Gap Analysis, Proposed along with completion timeline

(III) Status of CETPs Details of Existing CETP and ETP Infrastructure,Gap Analysis, Proposed along with completion timeline, No. of industries and complying status

(iv)Status of Solid Waste Management & Details of Processing Facilities Details of Existing Infrastructure,Gap Analysis, Proposed along with completion timeline

(v) Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river;

(vi)Preventing dumping of waste and scientific waste management including bio-medical waste, plastic waste and decentralizing waste processing, including waste generated from hotels, Ashrams, etc.

(vii)Ground water regulation

(viii) Adopting good irrigation practices

(ix) Protection and management of food plain Zones (FPZ)

(x) Rain water harvesting

(xi)Maintaining minimum Environmental flow of river

(xii) Plantation on both sides of the river

(xiii)Setting up biodiversity parks on flood plains by removing encroachment ACTION PLAN FOR RIVER MOGRAL, , KERALA MONTHLY PROGRESS REPORT FOR THE MONTH OF MAY 2021 RIVER MOGRAL, KASARGOD

No. Activity Implementing Time Progress in the Progress in the Progress in Progress in the Progress in the Progress in % works Details of works (as agency line month of month of the month of month of month of April the month of completed remaining per December January 2021 February 2021 March 2021 2021 May 2021 Action 2020 Plan) C Material March Completed. Completed. completed completed completed completed 100 % NA collection Grama 2020 facility Panchayath C Waste Mogral Puthur March Not started Not started Not started NIL NIL NIL 0 % collection Grama 2020 including Panchayath vehicle hire charge to collect waste. E Installation of Mogral Puthur June Ongoing Not completed Ongoing Ongoing Ongoing Ongoing 0% camera Grama 2020 Panchayath

A Drainage Mogral Puthur 2019 Completed Completed Completed Completed Completed Completed 100 % NA Cleaning at Grama (b) Ballor, Panchayath Kottakkunn u, Majal, Neerchal, Blarkode, Goovathad ka, Pernadka, Shankra, Eriyal,KK Puram Arjal Vishnu Temple

C(ii) Haritha Mogral Puthur On- NIL NIL Started Started Started Not collected 75% Karmasen Grama going due to LOCK a Activity/ Panchayath DOWN Collecting Non Bio degradabl e materials including Plastics from households C(iii) Bamboo Mogral Puthur On- Completed Completed Completed Completed Completed Completed 100 % NA Capital Grama going Bamboo Panchayath Planting - aiming water conservati on and raising water levels thus preventing solid erosion, waste dumping in public places E River cleaning Mogral Puthur 2019 Completed Completed Completed Completed Completed Completed 100 % NA Grama Panchayath

C(iii) Bamboo Madhur grama 2019 Report not Not completed 18500 being 18500 being 18500 being 18500 being 100 % NIL Plantation of Panchayath provided maintained by maintained by maintained by maintained by Madhur NREGA NREGA NREGA NREGA

C(ii) Viability Gap Madhur grama 2019 Total amount Total amount Total Amount Total Amount Total Amount Total Amount 25% NIL Funding for Panchayath Rs.1,00,000/- Rs.1,00,000/- Rs1,00,000/- Rs1,00,000/- Rs1,00,000/- Rs1,00,000/- Haritha expenditure expenditure Expenditure Expenditure Expenditure Expenditure Karmasena Rs.25300/ Rs.25300/ RS25300 RS25300 RS25300 RS25300

C(ii) Material Madhur grama 2019 Completed Completed Completed Completed Completed Completed 100% Completed recovery Panchayath facility centre C(ii) Construction Madhur grama 2019 Completed Completed Completed Completed Completed Completed 100 % Completed of Plastic Panchayath Shredding Machine building C(ii) Purchase of Madhur grama 2019 Yet to float Yet to float Project No 234 Project No 234 Project No 234 Project No 234 - Yet to float Plastic Panchayath tender tender Amount Rs Amount Rs Amount Rs Amount Rs tender shredding 6,00,000/-yet 6,00,000/-yet to 6,00,000/-yet to 6,00,000/-yet machine to tender tender tender to tender

C Tying of net Irrigation 2019- DPR submitted DPR submitted to DPR submitted DPR DPR DPR - Work still under on both Department 2020 to Chief Chief Engineer, to Chief submitted to submitted to submitted to process. sides of the Engineer, I & I & A (PRICE ID: Engineer, I & Chief Chief Chief bridge A (PRICE ID: 2019/10715/IA A (PRICE ID: Engineer Engineer Engineer 2019/10715/I ) for approval 2019/10715/ (Price ID: (Price ID: (Price ID: 2019/10715/I 2019/10715/I 2019/10715/ A ) for IA ) for A) for A) for IA) for approval approval approval. approval. approval.

A(a) Water KSPCB Being Water quality is being monitored by KSPCB, Kasaragod regularly. quality done monitoring regularly

Sd/-

Environmental Engineer - MOGRAL BRIDGE (Existing NWMP Station) MOGRAL RIVER - PUZHAKKARA (Proposed NWMP Station)

Sampling Point Mogral Bridge Sampling Point Puzhakkara

NWMP Station Code 2304 Distance from existing NWMP Station 3.25 km

Latitude 12˚33’36.5”N Latitude 12˚33’58.1”N

Longitude 74˚57’21.0”E Longitude 74˚58’43.7”E

Date of Sampling 25.05.2021 Date of Sampling 25.05.2021 Medium flow, water level Water level decreased, medium Nature and flow of the river Nature and flow of the river decreased flow Sl.No Parameters Unit Mogral Bridge Sl.No Parameters Unit Puzhakkara

1 Temperature ˚C 28 1 Temperature ˚C 28

2 pH - 7.76 2 pH - 7.33

3 Conductivity µmhos/cm 14440 3 Conductivity µmhos/cm 258

4 Turbidity NTU 1.2 4 Turbidity NTU 0.5

5 BOD mg/l 1.19 5 BOD mg/l 1.06

6 Dissolved Oxygen mg/l 6.86 6 Dissolved Oxygen mg/l 5.3

7 Total Coliforms cfu/100ml 290 7 Total Coliforms cfu/100ml 180

8 Feacal Coliforms cfu/100ml 96 8 Feacal Coliforms cfu/100ml 36

9 Feacal Streptococcus cfu/100ml 20 9 Feacal Streptococcus cfu/100ml 10

10 Chlorides mg/l 4400 10 Chlorides mg/l 63

11 Total Alkalinity mg/l 64 11 Total Alkalinity mg/l 35

12 Total Hardness mg/l 1650 12 Total Hardness mg/l 47

13 Calcium Hardness mg/l 870 13 Calcium Hardness mg/l 25

14 Magnesium Hardness mg/l 780 14 Magnesium Hardness mg/l 22

15 Calcium mg/l 348 15 Calcium mg/l 10

16 Magnesium mg/l 189.5 16 Magnesium mg/l 5.3

17 Total Dissolved Solids mg/l 8243 17 Total Dissolved Solids mg/l 152

18 Sodium mg/l 2467 18 Sodium mg/l 33.54

19 Potassium mg/l 230 19 Potassium mg/l 5

Sd/- Assistant Scientist National Mission for Clean Ganga

Format for Submission of Monthly Progress Report by States/UTs (Hon’ble NGT in the matter of OA No.673/2018 dated 06.12.2019) RIVER UPPALA, KASARGOD S. Activity to be monitored Timeline Submission of progress by State/UT- No. Compliance status 1 Ensure 100% treatment of sewage at least in-situ remediation Commencement of setting up of STPs and connecting all the drains and other sources of generation of sewage to the STPs must be ensured 2 Timeline for completing all steps of action plans including completion of setting up STPs and their Commissioning 5 Chief Secretaries may set up appropriate monitoring mechanism at state level • Specifying accountability of nodal authorities not below the Secretary level • Chief Secretaries may have an accountable person attached in their office for this purpose

• Monitoring at State level must take place 6 Progress report may be furnished by the State/UTs to • Secretary,Ministry of Jal Shakti • Member Secretary,CPCB 6.1 Progress Report may be comprised of details along with completion timelines on: (I) Identification of polluting sources including drains contributing to river pollution and action as per NGT order on in-situ treatment.

(II) Status of STPs, I&D and sewerage networks Details of Existing Infrastructure,Gap Analysis, Proposed along with completion timeline

(III) Status of CETPs Details of Existing CETP and ETP Infrastructure,Gap Analysis, Proposed along with completion timeline, No. of industries and complying status

(iv)Status of Solid Waste Management & Details of Processing Facilities Details of Existing Infrastructure,Gap Analysis, Proposed along with completion timeline

(v) Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river;

(vi)Preventing dumping of waste and scientific waste management including bio-medical waste, plastic waste and decentralizing waste processing, including waste generated from hotels, Ashrams, etc.

(vii)Ground water regulation

(viii) Adopting good irrigation practices

(ix) Protection and management of food plain Zones (FPZ)

(x) Rain water harvesting

(xi)Maintaining minimum Environmental flow of river

(xii) Plantation on both sides of the river

(xiii)Setting up biodiversity parks on flood plains by removing encroachment ACTION PLAN FOR RIVER UPPALA, KASARAGOD DISTRICT, KERALA MONTHLY PROGRESS REPORT FOR THE MONTH OF MAY 2021 RIVER UPPALA, KASARGOD

No. Activity Implementing Time Progress in the Progress in Progress in the Progress in the Progress in the Progress in the % works Details of (as agency line month of the month of month of month of March month of April month of May completed works per December 2020 January 2021 February 2021 2021 2021 2021 remaining Actio n Plan) C(ii) Material 2019 Activity Activity Activity Activity Activity Activity 100% Completed Grama collection Panchayath continuing continuing continuing continuing continuing continuing facility. Operation C Waste Mangalpady 2019- Work being Work being Work being Work being Work being Work being - Approval for managemen Grama 2020 carried out carried out carried out carried out carried out carried out purchase of t including Panchayath/ regularly regularly regularly regularly regularly regularly vehicle not purchase of Green Space sanctioned vehicle to collect Private company from waste. Government. E Installation of Mangalpady March Project dropped camera Grama 2020 Panchayath

C Electrification Manjeshwaram 2019- Completed in Completed in Completed in Completed in Completed in Completed in 100% Completed Grama of material Panchayat 2020 November 2019 November November November 2019 November 2019 November 2019 collection and MCF 2019 and 2019 and MCF and MCF and MCF and MCF facility inaugurated on MCF inaugurated on inaugurated on inaugurated on inaugurated on 16.09.2020 inaugurated 16.09.2020 16.09.2020 16.09.2020 16.09.2020 on 16.09.2020 C Transportation Manjeshwaram March 995m3 Waste 995m3 Waste 995m3 Waste 995m3 Waste No further No further Work yet to of collected Grama 2020 collected from collected from collected from collected from process. process. be waste Panchayat various public various public various public various public completed. places and River places and places and River places and River sides and River sides and sides and sides and transported to transported to transported to transported to Disposal center in Disposal center Disposal center Disposal center in March and 338m3 in March and in March and March and 338m3 Waste collected in 338m3 Waste 338m3 Waste Waste collected in June 2020. collected in collected in June 2020. June 2020. June 2020. Waste is being Waste is being collected from Waste is being Waste is being collected from Manjeshwaram collected from collected from Manjeshwaram near Railway Manjeshwaram Manjeshwaram near Railway Station, Manjeshwaram near Railway near Railway Station, Town near Station, Station, Manjeshwaram Surumathodu, Manjeshwaram Manjeshwaram Town near Hosangadi Town near Town near Surumathodu, town, NH 66 Surumathodu, Surumathodu, Hosangadi town, near checkpost, Hosangadi Hosangadi NH 66 near check Mada, Karoda, town, NH 66 town, NH 66 post, Mada, Kunjathur, Thumminadu, near checkpost, near checkpost, Karoda, 10th mile. Mada, Karoda, Mada, Karoda, Kunjathur, Kunjathur, Kunjathur, Thumminadu,10th Thumminadu, Thumminadu, 10th mile. 10th mile. mile.

CLEAN CLEAN MANJESHWAR CAMPAIGN - CAMPAIGN - Waste collected Waste collected from various from various places across places across the the panchayath panchayath and N and N H on H on 28/02/2021 28/02/2021 and and disposed at disposed at MCF MCF Gerukkatte Gerukkatte using bio capping using bio facility capping facility

E Installation Manjeshwaram March CC Camera CC Camera CC Camera CC Camera CC Camera CC Camera Tendered of camera Grama 2020 installed at installed at installed at installed at installed at installed at Panchayat Karoda, National Karoda, Karoda, Karoda, National Karoda, National Karoda, National Highway, National National Highway, Highway, Highway, Suramathodu, and Highway, Highway, Suramathodu, Suramathodu, Suramathodu, and Near Suramathodu, Suramathodu, and Near and Near Near Manjeshwaram. and Near and Near Manjeshwaram. Manjeshwaram. Manjeshwaram. 2020-21 Project Manjeshwaram Manjeshwaram. 2020-21 Project 2020-21 Project 2020-21 Project 58/2020-21 CC . 2020-21 2020-21 Project 58/2020-21 CC 58/2020-21 CC 58/2020-21 CC camera Project 58/2020-21 CC camera camera camera installation at 58/2020-21 CC camera installation at installation at installation at Uppala riverside. camera installation at Uppala riverside. Uppala riverside. Uppala riverside. installation at Uppala Uppala riverside. 2020-21 Project sent a letter sent a letter riverside. 58/2020-21 through email to through email to 2020-21 Project forwarded work project project 58/2020-21 order to contractor director,NH director,NH forwarded work of CC Camera project project order to installation at implementation implementation contractor of CC Uppala river side. unit 34/743 b , unit 34/743 b , Camera As per the behind populer behind populer installation at direction from NH vehicle maruthi vehicle maruthi Uppala river Kasaragod, sent a showroom, civil showroom, civil side. Sent a letter through station, kozhikode station, kozhikode letter through email to project to allot the to allot the email to director permission for permission for National Kozhikode to allot installation of cc installation of cc Highway the permission for camera. reminder camera. reminder Authority installation of CC letter sent on letter sent on Kasargod to camera. 17.04.2021 17.04.2021 allot the through email and through email and permission for registered post registered post installation of (copy to PCB) (copy to PCB) CC camera. C Tying of net Irrigation 2019- Estimate for DPR submitted DPR submitted DPR submitted DPR submitted DPR submitted - Work still on both sides Department 2020 fencing work on to Chief to Chief to Chief to Chief to Chief under of the bridge both sides of Engineer, I & Engineer, I & A Engineer (Price Engineer (Price Engineer (Price process. Uppala NH Bridge A (PRICE ID: (PRICE ID: ID: ID: ID: proposed for 2019/10825/I 2019/10825/IA 2019/10825/IA 2019/10825/IA 2019/10825/IA) Rs.47.00 lakhs. ) for approval. ) for approval. for approval. A ) for ) for approval. Estimate approval. submitted to Chief Engineer through PRICE 2019/10825/IA dated 15.11.2019 for approval

Estimate for fencing work on both sides of Uppala NH Bridge proposed for Rs.47.00 lakhs. Estimate submitted to Chief Engineer through PRICE 2019/10825/IA dated 15.11.2019 for approval

E Continuous Police Completed Completed Completed Completed Completed Completed 100% Completed Department vigil on waste dumping on roads A(a) Water KSPCB Being Water quality is being monitored by KSPCB, Kasaragod regularly. quality done monitoring regularly

Sd/-

Environmental Engineer

File No.WS-B2/222/2019-WRD 155 I/3932197/2019

Time-limit By Speed post

GOVERNMENT OF KERALA Water Respources (WS-B) Department No.B2/222/219/WRD 27/11/2019,Thiruvananthapuram

From Secretary to Government To Dr.M.Dhinadhayalan Adviser (PHEE) Nirman Bhawan, Ministry of Housing and Urban Affairs ,Government of India New Delhi - 110032.

Sri.A.Sudhakar DH,WQM-I Division, Central Pollution Control Board, Parivesh Bhawan, East Arjun Nagar, New Delhi - 110032. Sir, Sub: Water Resources Department - Hon'ble NGT order dtd 11.09.2019 passed in O.A.No.496/2016 in the matter of News item published in Hindusthan Times dtd 19.06.2015 - Consolidated Report of the State of Kerala - submitting of - reg Ref: a.Letter No.Q-1514/1/216-CPHEEO dated 25/1/219 of the Ministry of Housing and Urban Affiars, New Delhi b)Letter F.No.A-14011/325-2015/2019-WQM-II dated 24.10.2019 of the Central Pollution Control Board. With reference above, I am directed to forward herewith consolidated report of State of Kerala regarding the present status of the implementation and aciton plans on Rain Water Harvesting for Conservation of Water for the purpose of filing a combined report before Hon'ble NGT in compliance with the judgment dated 11.09.2019. File No.WS-B2/222/2019-WRD 156 I/3932197/2019

Yours Faithfully, GOPAKUMARAN B ADDITIONAL SECRETARY

For Secretary to Government.

125 4027429/2019/WRD(OS) 126 4027429/2019/WRD(OS) 127 4027429/2019/WRD(OS) 128 4027429/2019/WRD(OS) 129 4027429/2019/WRD(OS) 130 4027429/2019/WRD(OS) 131 4027429/2019/WRD(OS) 132 4027429/2019/WRD(OS) 133 4027429/2019/WRD(OS) 134 4027429/2019/WRD(OS) 135 4027429/2019/WRD(OS) 136 4027429/2019/WRD(OS) 137 4027429/2019/WRD(OS) 138 4027429/2019/WRD(OS) 139 4027429/2019/WRD(OS) 140 4027429/2019/WRD(OS) 141 4027429/2019/WRD(OS) 142 4027429/2019/WRD(OS) 143 4027429/2019/WRD(OS) 144 4027429/2019/WRD(OS) 145 4027429/2019/WRD(OS) 146 4027429/2019/WRD(OS) 147 4027429/2019/WRD(OS) 148 4027429/2019/WRD(OS) 149 4027429/2019/WRD(OS) 150 4027429/2019/WRD(OS) 151 4027429/2019/WRD(OS) 152 4027429/2019/WRD(OS) 153 4027429/2019/WRD(OS) 154 4027429/2019/WRD(OS)