MOIRA PLANNING SCHEME

21.04 SETTLEMENT 02/11/2006 C20 (Part 1)

21.04-1 Key Issues and Challenges 02/11/2006 C20 (Part 1) The key planning issues and challenges facing the Moira Shire relating to settlement include: ƒ The facilitation of the orderly development of its townships; ƒ Facilitating the development of a diverse range of housing options for the Shire’s existing and future population; and ƒ Controlling future development of housing in rural areas to ensure that it is responsive to a demonstrated need and will not prejudice the long-term sustainability of farming.

An overview of these issues and challenges are described below.

Orderly Development of Towns Moira Shire is a predominantly rural municipality. The Moria Shire has four principle townships (, Yarrawonga, and Nathalia) and a number of smaller townships that support the rural and lifestyle activities of residents. An analysis of Council's housing permit data for the period 1998 - 2001 indicates that a total of 680 house permits have been issued within the Shire's towns during this four year period. The fastest growing urban centres in the municipality include Yarrawonga with 246 house permits issued in the past 5 years, Numurkah 135, Cobram 134, Bundalong 29 and Nathalia with 23. In addition, residential development is taking place in the corridor between Yarrawonga and Bathumi. Council is keen to promote the orderly development of its townships, both large and small, and to promote their unique character and roles. Council seeks to consolidate residential uses in townships and in identified rural lifestyle areas around townships, where there is no adverse impact on rural activities. New residential development is particularly encouraged in the Shire's four key townships, so as to attract and support expanding populations that will, in turn, stimulate the economic and social development of these centres. Developers are encouraged to assist in the funding of new works, services and facilities required by the expanding residential population, particularly in the Shire's four major townships and on land within the Yarrawonga-Bundalong Corridor. With regard to the development of the Yarrawonga- Bundalong Corridor, it is important that future development within the corridor does not impact adversely on Lake Mulwala and the Lower Ovens River. Intensive animal industries and activities are discouraged from locating within, or in proximity to, existing and future urban growth areas so as to avoid urban-rural conflicts. Council is also concerned to protect residential amenity in all towns and therefore encourages responsible animal ownership. The existing settlement pattern in the Shire includes a number of very old townships and groups of crown allotments that have not been developed. It is acknowledged that the future development prospects of these towns needs detailed analysis and investigation.

Housing Diversity

The population of the Moira Shire is ageing. Increased options for housing this population will be required, particularly in the four large urban centres of Cobram, Yarrawonga, Numurkah and Nathalia where there is greater access to both physical and social services. Affordable housing needs to be provided within walking distance to facilities or transport to such facilities. Alternative forms of housing, such as smaller one and two bedroom units, will be required if objectives for affordability and accessibility are to be met. Diversity in housing options is also important in maintaining a diverse population mix within the Shire. In particular, the provision of accommodation to suit the housing needs of young people will be vital to retaining a balanced population mix.

MUNICIPAL STRATEGIC STATEMENT - CLAUSE 21.04 PAGE 1 OF 13 MOIRA PLANNING SCHEME

Housing in Rural Areas Housing in rural areas requires careful consideration so as to protect farming as the dominant activity in rural areas and as the major source of economic activity in the municipality. In particular, rural residential living on small lots needs to be based on a demonstrated need and evidence that the dwelling will not prejudice the long-term sustainability of farming.

21.04-2 Settlement Goal

02/11/2006 C20 (Part 1) Council’s Settlement Goal is to ensure that the majority of future residential growth and development occurs within the Shire's existing townships and that such growth is accommodated for in a planned, rather than ad hoc manner. Rural lifestyle opportunities are to be provided in identified and appropriately zoned areas rather than being dispersed throughout the rural areas of the Shire in order to protect agricultural land for agricultural uses, avoid urban-rural conflicts and to facilitate efficient servicing.

21.04-3 Settlement Objectives

02 /11/2006 C20 (Part 1) ƒ To promote future development in the key townships of Numurkah, Nathalia, Cobram and Yarrawonga in accordance with the Settlement Strategies (Refer 21.04-4) and Town Structure Plans for each township (Refer 21.04-5); ƒ To promote the orderly development of the Yarrawonga to Bathumi Corridor in accordance with the Yarrawonga to Bathumi Future Land Use Strategy and the Yarrawonga to Bathumi Structure Plan (Refer 21.04-5 Map 6); ƒ To consolidate urban and township areas; ƒ To provide sufficient diversity of housing opportunities within and on the fringes of towns; ƒ To maximise infrastructure investment; ƒ To levy contributions on an equitable basis for the provision of new works, services and facilities within the Shire's four major townships and within the corridor between Yarrawonga and Bundalong; ƒ To consolidate retail precincts within townships with appropriate car parking; ƒ To control unsewered urban development resulting in the pollution of the environment; ƒ To preserve the amenity of current and future residents in residential areas; ƒ To protect residential amenity in townships from the effects of intensive animal industries; ƒ To restrict housing opportunities in rural areas other than in identified areas on the town fringes; ƒ To protect the use of agricultural land for agricultural purposes and to ensure that housing in rural areas minimises the impact on the environmental and economic sustainability of the Shire’s agricultural resources; and ƒ To restructure old and inappropriate townships and groups of crown allotments.

21.04-4 Settlement Strategies 02/11/2006 C20 (Part 1) General ƒ Promote a wide range of housing opportunities in urban areas that respond to the housing needs of the population through all stages of the lifecycle; ƒ Promote alternative forms of supported housing such, as nursing homes, in existing urban centres with a high degree of accessibility to community and social infrastructure; ƒ Encourage the consolidation of residential development in existing urban centres; ƒ Avoid inappropriate encroachment of residential/rural residential development onto industrial and rural industrial areas; ƒ Discourage stand-alone retail outlets remote from town centres; ƒ Areas of non-conforming and incompatible industrial uses within residential areas are encouraged to relocate to identified industrial / business estates; ƒ Improve the urban image of the major town entries (ie. Numurkah, Nathalia, Yarrawonga and Cobram) through improved gateway treatment and urban design works; ƒ Promote residential development that is responsive to the character of the area;

MUNICIPAL STRATEGIC STATEMENT - CLAUSE 21.04 PAGE 2 OF 13 MOIRA PLANNING SCHEME

ƒ Require new development to relate to the physical context within which it sits in regard to siting, height, bulk, materials and general context; ƒ Discourage new residential development in areas significantly affected by flooding; ƒ Encourage the use of environmentally sensitive design and ensure all new development conforms to best practice environmental management (BPEM) guidelines to minimise its impact on the environment; ƒ Protect residential amenity in townships from the effects of non-residential activities by requiring the consideration of their potential adverse amenity impacts; ƒ Discourage intensive animal activities from locating within, or in proximity to, existing or future urban growth areas in the Shire's townships; and ƒ Prepare Development Contribution Plans for the Shire's four key townships and for the corridor between Yarrawonga and Bundalong.

Cobram

ƒ Future development of the township of Cobram will be generally in accordance with the Cobram Town Structure Plan (Refer 21.04-5); ƒ Short and medium term residential development will be directed towards areas currently zoned for residential purposes; ƒ Long term residential development will be directed to the south east of the town in accordance with the outcomes of the Cobram Outline Development Plan 2002; ƒ Medium density housing will be encouraged around the commercial fringe areas to promote a greater diversity of housing within walking distance to the town centre; ƒ Low Density Residential development will be limited to those areas with existing and appropriate zoning; ƒ Long term Low Density Residential development will be directed to the south west of the town; ƒ Industrial development will be focused to the north west of the township. A mix of large and small lots will be retained for long term manufacturing and service industrial expansion; ƒ An integrated open space plan inclusive of connections to the town and access along the river frontage will be developed; ƒ An urban design framework will be developed to address business amenity, and pedestrian, traffic and streetscape improvements; and ƒ Discourage the expansion of existing Caravan Park to the west of town.

Yarrawonga

ƒ Future development of the township of Yarrawonga will be generally in accordance with the Yarrawonga Town Structure Plan (Refer 21.04-5); ƒ Encourage the more effective use of the rear of Belmore St shops. Pedestrian access to the rear of these sites will enable more opportunity for use of car parking at the rear of sites; ƒ Promote an integration of tourism, retailing and residential uses at the interface of Lake Mulwala and the Town Centre through redevelopment of land adjacent to the northern end of Belmore Street; ƒ Implement the recommendations of the Yarrawonga Urban Design Framework (2000); ƒ Encourage the integration of Kennedy Park with the Lake Mulwala foreshore and the northern end of Belmore Street; ƒ Accommodate complementary business uses at the southern end of Belmore Street; ƒ Promote mixed use development within the area bounded by Hunt St, Lynch St, Witt St, and Hume St; ƒ Investigate urban renewal and redevelopment options for the land bounded by the rail line, Belmore Street and the Murray Valley Highway; ƒ New Residential development will be focused within existing zoned land, providing a mix of housing types. Smaller housing units will be particularly encouraged in areas with proximity to the town centre;

MUNICIPAL STRATEGIC STATEMENT - CLAUSE 21.04 PAGE 3 OF 13 MOIRA PLANNING SCHEME

ƒ Short term Low Density Residential development will be promoted in areas already zoned for Low Density Residential development to the west and south of the township. Additional zoning of land will be based on demonstrated demand for additional development. Long-term demand is directed to the south east of the township as identified in the Yarrawonga Town Structure Plan; ƒ Industrial development is focused to the south-west of the town on land currently zoned for the purpose; ƒ Development adjacent to Lake Mulwala will be in accordance with the Lake Mulwala Management Plan; ƒ The existing use and future development of the Yarrawonga Aerodrome should be protected from and not impeded by the urban development of Yarrawonga; ƒ Development of the Yarrawonga Aerodrome will promote the commercial sustainability of the facility as a regionally significant transport link and leisure facility. Business and tourist development that can link with the airport will be encouraged; and ƒ Development to the east of the township will be generally in accordance with the recommendations of the Yarrawonga to Bathumi Development Plan 2002. ƒ Implement the recommendations of the Moira Rural Living Strategy 2004.

Numurkah

ƒ Future development of the township of Numurkah will be generally in accordance with the Numurkah Town Structure Plan (Refer 21.04-5); ƒ New conventional residential development will be encouraged to the north, northwest and northeast of the township through infill development within existing residential areas; ƒ Long term residential expansion will occur to the north of existing zoned areas; ƒ Smaller housing units and medium density housing will be encouraged near the town centre where walking access to town services is possible; ƒ Investigate urban renewal and redevelopment options for the land bounded by the rail line and the Goulburn Valley Highway; ƒ Medium density residential developments that are appropriately designed that are within close proximity to the centre of the town will be promoted in order to increase opportunities for living within walking distance to town centre functions; ƒ Areas of non-conforming and incompatible industrial use within residential areas, particularly to the west of the township, will be encouraged to relocate into industrial and business estates; ƒ In the short to medium term industrial development will be directed west of the Goulburn Valley Highway on land currently zoned for that purpose. Significant land is already available in small parcels, suiting service industrial development. Rural industry development is encouraged to develop in the area identified for potential rural living opportunities to the north of the township; ƒ Development abutting the highway will meet the requirements of VicRoads in relation to setback, access and advertising. Particular attention will be given to promoting development that provides good visual presentation to the highway; ƒ Development of the retail precinct will be sympathetic to the historic buildings and streetscape; ƒ Open Space along the Broken Creek will be maximised as a passive open space spine; ƒ New residential and industrial development will include pedestrian and bicycle links to and along this open space spine; ƒ Development along Broken Creek will be restricted to areas considered acceptable by the Goulburn Broken Catchment Management Authority (CMA); ƒ No further large parcels of land will be rezoned for Low Density Residential development in the short to medium term. Land zoned as Low Density Residential south of Broken Creek is regarded as an important area for interflows between Broken Creek and Nine Mile Creek, and any subdivisions in this area would need to ensure that obstructions to flows for this area are minimised;

MUNICIPAL STRATEGIC STATEMENT - CLAUSE 21.04 PAGE 4 OF 13 MOIRA PLANNING SCHEME

ƒ The retail focus of Numurkah is to service the town and local rural area. Design improvements to Melville Street are to be in accordance with the Numurkah Streetscape Strategy 2001.

Nathalia

ƒ Future development of the township of Nathalia will be generally in accordance with the Nathalia Town Structure Plan (Refer 21.04-5); ƒ The strengths of the town centre, with open space, historic buildings and proximity to Broken Creek, and the entries to the town will be developed and enhanced through the continued staged implementation of the 1994 Streetscape Plan as funding permits; ƒ Gateway treatments at town entries will promote the local identity of the town; ƒ Residential development will occur through infill development and development of new housing at a variety of densities to the west of the township; ƒ Business development will consolidate the retail precinct and will be sympathetic to the heritage buildings and streetscape; ƒ Industrial development will be focused north of the town in existing zoned areas; and ƒ Frontage to the Broken Creek will be maximised as a recreation and tourist feature.

Yarrawonga to Bathumi Corridor

ƒ Future development of the corridor between Yarrawonga and Bathumi will be generally in accordance with the Yarrawonga to Bathumi Future Land Use Strategy and the Yarrawonga to Bathumi Structure Plan (Refer 21.04-5 Map 6); ƒ Future development within the Yarrawonga to Bathumi Corridor should not adversely impact on Lake Mulwala; ƒ Development at town entrances to Yarrawonga should present a consistent visual theme; ƒ Within Precinct A of the Yarrawonga to Bathumi Corridor Structure Plan: - Promote short to medium term residential development only on existing residentially zoned land; ƒ Within Precinct B of the Yarrawonga to Bathumi Structure Plan: - Consideration should be given to the creation of 'superlots' as a pre-cursor to urban residential development; - Direct access to the highway should be strongly discouraged; - Rezoning of land to R1Z should not occur until the residential land supply at Yarrawonga falls below a 10 year supply; - Rezoning within Precinct B should eventually proceed in a staged manner from its Western edge; - Upgrade highway intersection at Bott's and Hogans Roads as traffic levels increase; and - Treatment of Lake Mulwala foreshore and private land abutting the lake to be informed by the Lake Mulwala Management Plan. ƒ Within Precinct C of the Yarrawonga to Bathumi Structure Plan: - Promote infill development; and - Treatment of Lake Mulwala foreshore to be informed by the Lake Mulwala Management Plan. ƒ Within Precinct D of the Yarrawonga to Bathumi Structure Plan: - Discourage residential development at conventional urban densities due to the areas distance from Yarrawonga and lack of interface with Lake Mulwala; and ƒ Within Precinct E of the Yarrawonga to Bathumi Structure Plan: - Rezone land to Residential in accordance with the recommendations of the Moira Rural Living Strategy. ƒ Within Precinct F of the Yarrawonga to Bathumi Structure Plan: - Discourage residential development at conventional urban densities due to the areas distance from Yarrawonga; - Implement a Restructure Plan for Old Titles and Rezone to Rural in short term; and

MUNICIPAL STRATEGIC STATEMENT - CLAUSE 21.04 PAGE 5 OF 13 MOIRA PLANNING SCHEME

Rural Areas

ƒ Ensure that rural residential living is focused toward rural villages where a limited range of social and physical infrastructure can be provided. Settlements which can be viewed as rural residential villages include , , , Bundalong, , , , and St. James as well as around larger urban settlements; ƒ Ensure that housing in rural areas is primarily for the purpose of housing persons actively engaged in agricultural pursuits; ƒ Require the consideration of housing in rural areas to include any potential adverse impact on the ability to effectively farm surrounding lots due to potential urban rural conflicts, including dust, chemical drift, machinery noise, irrigation channel management, domestic animal and weed invasion, amongst others.

MUNICIPAL STRATEGIC STATEMENT - CLAUSE 21.04 PAGE 6 OF 13 MOIRA PLANNING SCHEME

21.04-5 Town Structure Plans 02/11/2006 C20 (Part 1)

MUNICIPAL STRATEGIC STATEMENT - CLAUSE 21.04 PAGE 7 OF 13 MOIRA PLANNING SCHEME

MUNICIPAL STRATEGIC STATEMENT - CLAUSE 21.04 PAGE 8 OF 13 MOIRA PLANNING SCHEME

MUNICIPAL STRATEGIC STATEMENT - CLAUSE 21.04 PAGE 9 OF 13 MOIRA PLANNING SCHEME

MUNICIPAL STRATEGIC STATEMENT - CLAUSE 21.04 PAGE 10 OF 13 MOIRA PLANNING SCHEME

MUNICIPAL STRATEGIC STATEMENT - CLAUSE 21.04 PAGE 11 OF 13 MOIRA PLANNING SCHEME

21.04-6 Settlement Implementation

02/11/2006 C20 (Part 1) The Settlement objectives and strategies will be implemented by: Zones and Overlays ƒ Apply the Residential 1 zone to established urban residential areas; ƒ Apply the Low Density Residential Zone to existing rural residential areas; ƒ Apply the Rural Living zone (with a 2ha minimum lot size) to identify rural lifestyle opportunities around townships; ƒ Apply the Mixed Use zone to areas within Yarrawonga which have been identified as having mixed use potential; ƒ Apply the Township Zone to residential areas in smaller townships; ƒ Apply the Business 1 zone to the retail centres of the four major towns; ƒ Apply the Business 4 zone to areas where highway business activity is encouraged; ƒ Applying the Industrial 1 Zone for the majority of industrial land within the Shire; ƒ Applying the Industrial 2 Zone to sensitive industrial areas at the Peechelba Abattoirs; ƒ Applying the Industrial 3 zone to existing light industrial development; ƒ Rationalise the residential zonings east of Yarrawonga in accordance with the Yarrawonga to Bathumi Land Use Strategy; ƒ Apply the Development Plan Overlay to areas identified for future urban use, where particular issues of design and development need to be resolved; ƒ Apply the Restructure Overlay to all undeveloped old townships; and ƒ Apply the Airport Environs Overlay to areas affected by the Yarrawonga Aerodrome.

Policy and Exercise of Discretion

ƒ Use Local Policy to promote appropriate levels of car parking in commercial areas (Car Parking Policy - Clause 22.05) ƒ Use Local Policy to guide the location of dwellings in rural areas. (Housing in Rural areas Policy- Clause 22.02)

21.04-7 Further Strategic Work 02/11/2006 C20 (Part 1) A range of studies/investigations are recognised by Council as being required to assist in the development of appropriate planning scheme responses to a number of settlement issues and challenges facing the Shire. The following list of further strategic work reflects those tasks that have been identified as being required as matters of high and longer-term priority. Council is committed to completing those tasks listed as being high priority by mid 2006, pending the ability to secure funding support from other agencies as necessary. Other tasks identified will be undertaken as funding opportunities become available.

High Priorities

ƒ Prepare Development Contributions Plans for the Shire’s four major townships as well as the corridor between Yarrawonga and Bundalong (Prime Responsibility – Council); ƒ Investigate and implement recommendations of a Town Centre Business Land Strategy and Urban Design Framework incorporating an Integrated Open Space Plan for Cobram; ƒ Investigate and prepare a Strategy Plan/Town Structure Plan for Bundalong in consultation with land owners and key agencies (Prime Responsibility - Council); ƒ Undertake Urban Renewal/Development Investigations for areas identified in the Town Structure Plans for Yarrawonga and Numurkah. (Prime Responsibility – Council); ƒ Conduct an audit of all Council owned parkland (Prime Responsibility - Council); and ƒ Review the Goulburn Valley Highway Environs Policy (Clause 22.04) (Prime Responsibility – DSE in consultation with VicRoads and affected Councils).

MUNICIPAL STRATEGIC STATEMENT - CLAUSE 21.04 PAGE 12 OF 13 MOIRA PLANNING SCHEME

Longer Term Priorities

ƒ Develop Town Entrance Plans for the Shire's main townships (Prime Responsibility - Council).

MUNICIPAL STRATEGIC STATEMENT - CLAUSE 21.04 PAGE 13 OF 13