LNG as marine fuel Steadily becoming a reality Poseidon Med II Conference 2016 - Thursday 8th December 2016
Dionysios Antonopoulos General Manager, Marine Solutions Sales Wärtsilä Greece S.A.
1 © Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece OUR EXPERTISE IN THE GAS VALUE CHAIN
LNG terminal & Regasification Distribution & transport (FSRU/JRU) Power generation
Small-scale LPG/LEG/LNG tanker LNG plants
LNG receiving LNG liquefaction terminal & terminal
LNG carrier LNG fuelled vessels LNG fuelled LNG bunkering vessels & barges Production Oil tanker FPSO with VOC Flare recovery Oil separation Exploration & development Receiving Distribution & Exploration & Production & Transport & terminals & transport to the Drilling liquefaction storage regasification users • LNG fuel gas • On- & Offshore small • LNG fuel gas systems • Jetty & Floating • Gas/LNG systems for OSVs scale liquefaction • LPG, LEG & LNG regasification distribution/logistics • Antiflaring/VOC cargo handling • Bunkering & barges • Feed gas to Power • Oil separation • Receiving terminals plants
2 © Wärtsilä PUBLIC • Gas FPSO Poseidon Med II - 2016 - Wartsila Greece LAST POSEIDON MED
• During last conference in Zappeio (held November 2015), LNG conversions have been discussed.
3 © Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece WÄRTSILÄ LNGPAC ON BOARD
BACKGROUND
• 2009 LNGPac™ fuel gas handling development begins
• 2010 First LNGPac™ order
• 2011 Bit Viking conversion to gas
• 2012 Harvey Gulf orders more LNG fueled PSVs
• 2013 Viking Grace – first cruise ferry on gas with LNGPac™
• 2014 The new upgraded LNGPac™ is revealed • 2015 Wärtsilä Svanehøj ECA Fuel Pump launched • 2016 Market and innovation leader with 80 LNGPac™ orders
4 © Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece LNGPAC - REFERENCES – OVERVIEW / STATISTICS
Total number of vessels equipped with Wartsila LNGPac™: 66 Distribution trend of LNG fuel gas vessels fitted with Wärtsilä LNG Fuel gas system
Total number of LNGPac™: 80 33 35 30 25 18 Total volume: 20580 m³ 20 15 10 5 5 2 2 Number of vessels in operation: 18 5 1 0 Number of vessels confirmed and/or under construction: 48 2011 2012 2013 2014 2015 2016 2017 + Delivery year Owner country Application Cumulative distribution of LNG fuel gas vessels Belgium 4 Dredger 3 Canada 14 Fish Feeder 1 fitted with Wärtsilä LNG Fuel gas system 70 Germany 2 Offshore special 1 66 60 Norway 15 Passenger 1 50 Sweden 3 Product Tanker 5 40 UAE 1 PSV 12 30 RoPax 20 USA 8 20 UK 17 RoRo 4 10 Finland 1 Tug 4 0 Special vessels 15 2011 Spain 1 2012 2013 2014 2015 2016 2017 + NOTE: Includes also LNG fuel gas tank deliveries of Hamworthy Year
5 © Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece ORIGINAL LNGPAC™ & GVU CONFIGURATION
6 © Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece Upgraded LNGPac - Efficient space utilisation Easy installation - Enclosed GVU
7 © © Wärtsilä Poseidon Med II - 2016 - Wartsila Greece Wärtsilä PUBLIC Upgraded LNGPac - Reduced installation cost Fewer interfaces - Integrated GVU
8 © © Wärtsilä Poseidon Med II - 2016 - Wartsila Greece Wärtsilä PUBLIC Upgraded LNGPac Maximised LNG storage volume Efficient space utilisation Fewer interfaces Reduced installation and Operating cost Increased reliability
9 © Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece TYPE C - MULTILOBE
Membrane • For certain applications with strict volume restrictions, a Type C, multilobe tank can be a better solution Type A & B
Wärtsilä Type C - multilobe
Type C - single lobe
Type C – bilobe
Type C - multilobe
10 © Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece WÄRTSILÄ 31 – EFFICIENT, FLEXIBLE AND ENVIRONMENTAL FRIENDLY
Top efficiency (over 50% thermal efficiency) 10V31 SG 10V31 DF Low pressure gas admission (<12bar)
Multi fuel engine offering flexibility 8V31 20V31 SG IMO Tier III on gas (no need for after treatment devices)
Optimized maintenance costs Wärtsilä 31DF Ready to Sail!
11 © Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece WÄRTSILÄ 31 – LNGPAC ON BOARD
EFP Variable LNGPac Process Automation & Safety Gas Valve Unit Engine control Frequency Drive System system
LNG NG
FUEL GAS TREATMENT SKID
Engine load dependent flow control
12 © Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece NEW REFERENCE
Vessel: RoPax Ferry Wärtsilä scope of supply: Owner: Balearia (Spain) ¾ 2x LNGPac™ 440m³ Yard: Construcciones Navales del Norte SL (LaNaval) Horizontal, double-shell tank with vacuum-perlite insulation + Tank Connection Space with integrated Air Lock Number of vessels: 1 (new building) 2x Bunkering Station, 430m³/hr each, with local monitoring Classification: BV panel Process Control Automation & Safety System Delivery: 2019 Nitrogen generator Main vessel characteristics: Length: 232 m Speed: 22 kts
Passengers / Cars 1700 / 331 ¾ 4x 8L50DF (4S, 7800 kW) ¾ 3x 9L20DF (4S, 1440 kW) ¾ 4x DN100 + 3x DN50 GVUs ¾ 2x gearboxes ¾ 2x transverse thrusters ¾ 2x CPP propellers
13 © Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece REFERENCES – VAST NUMBER OF DUAL REFERENCES
>1,500 engines Æ >16,000,000 running hours
MERCHANT CRUISE & FERRY LNG Carrier 204 vessels CruiseFerry 1 vessel LPG Carrier 11 vessels ROPAX 3 vessels Tankers 14 vessels Ferries 12 vessels Containers 4 vessels Bulk Carrier 3 vessels Car Carrier 2 vessels 881 engines 66 engines
OFFSHORE DF CONVERSION Platform 2 vessels FPSO 4 vessels FSO 2 vessels Chemical tanker 1 vessel FPSO 6 vessels RORO 2 vessels Jack-up Rig 1 vessel Ferries 3 vessels OSV 24 vessels IWW 1 vessel 132 engines 36 engines
SPECIALS DF POWER PLANT Hopper Dredger 1 vessel Plants 82 Tugs 6 vessels Output 5031 MW Navy 1 vessel Online since 1997 Icebreaker 1 vessel IWW 16 vessels Guide ship 1 vessel Cable Layer 1 vessel 46 engines 376 engines
14 © Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece Thank you!
15 © Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece