TENDER INVITATION the Water Utilities Corporation Invites Companies to Tender for the Construction of the Corporation’S Requirements For

Total Page:16

File Type:pdf, Size:1020Kb

TENDER INVITATION the Water Utilities Corporation Invites Companies to Tender for the Construction of the Corporation’S Requirements For TENDER INVITATION The Water Utilities Corporation invites companies to tender for the construction of the Corporation’s requirements for: 1. A SERVICE CONTRACT FOR PROVISION OF A TRANSACTIONAL ADVISORY SERVICES FOR CHOBE ZAMBEZI WATER TRANSFER SCHEME PROJECT AS A PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECT- PANDAMATENGA TO MMAMASHIA/GABORONE (CONTRACT 2) – TENDER NO. WUC 041 (2021) Bidding companies must be registered with PPADB in Code: 303 - (Civil Engineering Services) Sub-Code: 03-(Infrastructure), Sub-code: 08 (Irrigation) or Sub-Code: 04 (Civil /Structural Engineering); OR Code: 311 (Project Management Services), Sub-Code: 01 (General Project Management) or Sub-Code: 02 (Construction Project Management); OR Code: 314 (Finance Related Services), Sub-Code: 01 (Finance Management), Sub Code 07: (Accounting Services) or Sub Code 06 (Auditing Services); OR Code: 317 Management and Business Consultancy Services: Sub code (01) Management Consultancy Services; OR Code: 318 (Legal Services), Sub-Code: 01 (Legal Services). International companies must provide equivalent company registration certificates from their countries of registration. In cases of bidding as a partnership, at least one of the partners must be registered for one or more of the aforementioned PPADB codes (or equivalent for International companies) and not necessarily that each partner should have all the required Codes. The tender will be conducted through International Competitive Bidding (ICB) process in accordance with the Laws of Botswana and is open to all eligible bidders. The price of each of the above tenders shall be P5,000.00 (Non-refundable). Compulsory site visits will take place as follows: • On 7 September 2021: The site visit will cover from Mmamashia Water Treatment Works to Moralane Break Pressure Tank (near Palapye). Bidders are to assemble at Mmamashia Water Treatment Works at 0900hrs Botswana time (GMT+2). (Tenderers should arrive at or before 10:00 hours.) • On 8 September 2021: The site visit will cover from Dukwi Water Treatment Works (after Dukwi cordon fence along Francistown - Nata road) to Pandamatenga and to Kazungula River Intake. Bidders are to assemble at Dukwi Water Treatment Works coordinates (-20.5338882,26.4341993) at 10:00hrs Botswana time (GMT+2). (Tenderers should arrive at or before 10:00 hours.) A further compulsory pre- bid meeting shall be held online on the 09 September 2021 at 0900hrs, Botswana Time (GMT+2) through Microsoft Team. Tender documents shall be obtained by visiting web address https://www.wuc.bw/wuc- tenders-new. Bidders are to process payment on the website. Online documents will be available for purchase as of from 24th August 2021. Tenders should reach this office not later than 14:00 hrs on 07 October 2021 at which time public opening of the tenders will commence. Tenders should be hand delivered in sealed envelopes and clearly marked with the tender number and addressed to; The Corporation Secretary Water Utilities Corporation Sedibeng House Recreation Hall Plot 17530 Luthuli Road Old Industrial Site Gaborone Enquiries: send to [email protected] or call Senior Buyer at 360 4455 .
Recommended publications
  • Botswana Environment Statistics Water Digest 2018
    Botswana Environment Statistics Water Digest 2018 Private Bag 0024 Gaborone TOLL FREE NUMBER: 0800600200 Tel: ( +267) 367 1300 Fax: ( +267) 395 2201 E-mail: [email protected] Website: http://www.statsbots.org.bw Published by STATISTICS BOTSWANA Private Bag 0024, Gaborone Phone: 3671300 Fax: 3952201 Email: [email protected] Website: www.statsbots.org.bw Contact Unit: Environment Statistics Unit Phone: 367 1300 ISBN: 978-99968-482-3-0 (e-book) Copyright © Statistics Botswana 2020 No part of this information shall be reproduced, stored in a Retrieval system, or even transmitted in any form or by any means, whether electronically, mechanically, photocopying or otherwise, without the prior permission of Statistics Botswana. BOTSWANA ENVIRONMENT STATISTICS WATER DIGEST 2018 Statistics Botswana PREFACE This is Statistics Botswana’s annual Botswana Environment Statistics: Water Digest. It is the first solely water statistics annual digest. This Digest will provide data for use by decision-makers in water management and development and provide tools for the monitoring of trends in water statistics. The indicators in this report cover data on dam levels, water production, billed water consumption, non-revenue water, and water supplied to mines. It is envisaged that coverage of indicators will be expanded as more data becomes available. International standards and guidelines were followed in the compilation of this report. The United Nations Framework for the Development of Environment Statistics (UNFDES) and the United Nations International Recommendations for Water Statistics were particularly useful guidelines. The data collected herein will feed into the UN System of Environmental Economic Accounting (SEEA) for water and hence facilitate an informed management of water resources.
    [Show full text]
  • Botswana North-South Carrier Water Project Field Survey
    Botswana North-South Carrier Water Project Field Survey: July 2003 1. Project Profile & Japan’s ODA Loan Angola Zambia Botswana Zimbabwe Namibia Maun Francistown Ghanzi Palapye Mamuno Maharapye South Africa Gaborone Tshabong Project location map Mmamashia Water Treatment Works 1.1 Background Botswana is a landlocked country that is situated in the Kalahari Basin on the plains of southern Africa (average altitude: approximately 900 meters); it is bordered by the Republic of South Africa, Zimbabwe, Namibia, and Zambia. Its territory is generally flat and covers an area of 582 thousand square meters or approximately one-and-a-half times the size of Japan. It has a sub-tropical climate, with much of the country being arid or semi-arid. Annual rainfall averages 400mm nationwide, with southwestern regions seeing the least precipitation (250mm) and southeastern areas the most (600mm). Rainfall levels are seasonally affected and unstable. Botswana has few surface water resources in consequence of its topographical and geographical features and sources the majority of its water from groundwater fossil resources. At the time of appraisal, the water supply rate was 100 percent in urban areas centered around the capital, Gaborone, but in view of the fact that demand was growing at exponential rates, large-scale development of underground water was problematic and water resources around the capital had been developed, the country was considering water transmission from other regions. In addition, Gaborone was importing water on a regular basis from South Africa and the country harbored a long-cherished wish to develop independent national water resources. By contrast, the water supply rate in the regions was 50 percent and reliant on groundwater.
    [Show full text]
  • Daily Hansard (Parliamentary Debates)
    HANSARDYOUR VOICE IN PARLIAMENT DAILY HANSARD (PARLIAMENTARY DEBATES) TTHEHE SECONDFIRST MEE MEETINGTING O FOF THE THE SECOND SECOND SESSIO SESSIONN OOFF THE ELEVENTH PARLIAMENT HANSARD NO. 181182 TUESDAY 1 MARCH 2016 DISCLAIMER Unofficial Hansard This transcript of Parliamentary proceedings is an unofficial version of the Hansard and may contain inaccuracies. It is hereby published for general purposes only. The final edited version of the Hansard will be published when available and can be obtained from the Assistant Clerk (Editorial). NATIONAL ASSEMBLY ENGLISH VERSION THE NATIONAL ASSEMBLY SPEAKER The Hon. Gladys K. T. Kokorwe MP. DEPUTY SPEAKER The Hon. Kagiso P. Molatlhegi, MP Gaborone South Clerk of the National Assembly - Ms B. N. Dithapo Deputy Clerk of the National Assembly - Dr R.D. Dingalo Ag. Learned Parliamentary Counsel - Mr S. Chikanda Assistant Clerk (E) - Mr R. Josiah CABINET His Excellency Lt. Gen. Dr. S. K. I. Khama PH, FOM, - President DCO, DSM, MP. His Honour M. E. K. Masisi, MP. (Moshupa-Manyana) - Vice President Minister of Foreign Affairs and International Hon. Dr. P. Venson-Moitoi, MP. (Serowe South) - Cooperation Minister of Local Government and Rural Hon. S. Tsogwane, MP. (Boteti North) - Development Minister of Infrastructure, Science and Hon. N. E. Molefhi, MP. (Selebi Phikwe East) - Technology Hon. S. Kgathi, MP. (Bobirwa) - Minister of Defence, Justice and Security Minister of Minerals, Energy and Water Hon. O. K. Mokaila, MP. (Specially Elected) - Resources Hon. P. M. Maele, MP. (Lerala - Maunatlala) - Minister of Lands and Housing Hon. E. J. Batshu, MP. (Nkange) - Minister of Labour and Home Affairs Hon. D. K. Makgato, MP. (Sefhare - Ramokgonami) - Minister of Health Hon.
    [Show full text]
  • E-Government and Democracy in Botswana: Observational and Experimental Evidence on the Effects of E-Government Usage on Political Attitudes
    A Service of Leibniz-Informationszentrum econstor Wirtschaft Leibniz Information Centre Make Your Publications Visible. zbw for Economics Bante, Jana et al. Working Paper E-government and democracy in Botswana: Observational and experimental evidence on the effects of e-government usage on political attitudes Discussion Paper, No. 16/2021 Provided in Cooperation with: German Development Institute / Deutsches Institut für Entwicklungspolitik (DIE), Bonn Suggested Citation: Bante, Jana et al. (2021) : E-government and democracy in Botswana: Observational and experimental evidence on the effects of e-government usage on political attitudes, Discussion Paper, No. 16/2021, ISBN 978-3-96021-153-2, Deutsches Institut für Entwicklungspolitik (DIE), Bonn, http://dx.doi.org/10.23661/dp16.2021 This Version is available at: http://hdl.handle.net/10419/234177 Standard-Nutzungsbedingungen: Terms of use: Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Documents in EconStor may be saved and copied for your Zwecken und zum Privatgebrauch gespeichert und kopiert werden. personal and scholarly purposes. Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle You are not to copy documents for public or commercial Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich purposes, to exhibit the documents publicly, to make them machen, vertreiben oder anderweitig nutzen. publicly available on the internet, or to distribute or otherwise use the documents in public. Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, If the documents have been made available under an Open gelten abweichend von diesen Nutzungsbedingungen die in der dort Content Licence (especially Creative Commons Licences), you genannten Lizenz gewährten Nutzungsrechte.
    [Show full text]
  • Wednesday 11Th August, 2021)
    BOTSWANA NATIONAL ASSEMBLY O R D E R P A P E R (WEDNESDAY 11TH AUGUST, 2021) QUESTIONS HRS/MINS 1400 – 1445 1. DR. K. GOBOTSWANG, MP. (SEFHARE-RAMOKGONAMI): To ask the Minister (627) of Employment, Labour Productivity and Skills Development: (i) to state the number of foreigners issued work permits at the following companies; (a) Kwena Concrete; (b) Steelbase; (c) Dynamic Road services; (d) EL&L Companies; (ii) the nature of jobs that they are employed to perform; (iii) how many Batswana with the relevant qualifications are unemployed to perform the required tasks; and (iv) why the Ministry is issuing work permits for jobs that Batswana are qualified to do. 2. MR. G. KEKGONEGILE, MP. (MAUN EAST): To ask the Minister of Finance (628) and Economic Development to brief this Honourable House on the Ministry targets and clear intended outcomes from budget allocations to departments mandated to undertake women and children protection programmes and to further clarify: (i) if the Ministry is satisfied with the outcomes from the departments in relation to investment; if not, why not and if so, why; (ii) if the budgets for women and children protection departments have increased or decreased in the past five (5) years and by what percentage; and (iii) the Ministry’s strategy in enabling these departments to reach maximum impact through adequate budget allocations. 1 3. MR. D. SALESHANDO, MP. (MAUN WEST): To ask the Minister of Tertiary (631) Education, Research, Science and Technology to brief this Honourable House on provision of accommodation for tertiary students and to further state the following: (i) total number of tertiary students in Gaborone; (ii) total number of available institutional housing units for tertiary students in Gaborone; (iii) total number of students admitted to tertiary institutions in Gaborone whose parents or guardians reside outside greater Gaborone; (iv) the magnitude of accommodation shortage for tertiary students; and (v) plans to construct student villages in Gaborone and how they will be funded.
    [Show full text]
  • Major Villages Sanitation Project
    Our Ref: WUC 014 (2021) 18 June 2021 TO: All Tenderers Dear Sir / Madam SUPPLY OF WATER TREATMENT CHEMICALS - TENDER NO WUC 014 (2021) ADDENDUM No. 2 The tenderer must note and consider the amendments and/or additions to the Tender Document issued under the above-mentioned tender constitutes Addendum 2 that should be duly incorporated in the Tender Document. Clarification on the above tender refers: 1. Bidders wishing to tender for Supply of Water Treatment Chemicals under the flocculant category are advised as follows: Question 1 Is it compulsory to submit Jar test results at tender stage? In other would we be disqualified if we do not submit them? Response: Please refer to Item 4.2.2.2 Flocculants in the Tender Document - TENDER NO WUC 014 (2021) “All flocculants must be accompanied by the standard specifications as indicated out below at the time of tendering. At the time of delivery, certificates of analysis, which include both physical and chemical parameters, should accompany the chemicals. The Tenderer shall carry out laboratory jar-tests on all raw water supplies in the presence of the Water Utilities Corporation, or other method deemed necessary by the Corporation to evaluate chemical optimum performance”. The statement above requests compulsory testing by the Tenderer of the flocculant they are tendering to supply and obtain performance results which they will share with the Corporation. Refer to response to 6 a. below for further information on contact people and venues for sample collection. Question 2 We wish to request to visit the various sites for raw water sample collection.
    [Show full text]
  • Water Supply Has Resulted in an Increase in Migration from Rural Settlements Leading to an Increase in the Populations of Many Cities Globally
    SURFACE WATER DEMAND AND SUPPLY OF GABORONE CITY AND SURROUNDING AREAS: RESPONSE TO CLIMATE CHANGE AND POPULATION INCREASE Bosa Mosekiemang1, G. Mengistu Tsidu1 1Department of Earth and Environmental Sciences, Botswana International University of Science and Technology, Palapye, Botswana ABSTRACT The adequate supply of the ever-increasing demand of fresh water continues to be a challenge in parts of the globe. This challenge has been aggravated due to increasing population and climate change. The anticipation for better lifestyles and improved water supply has resulted in an increase in migration from rural settlements leading to an increase in the populations of many cities globally. This study therefore investigates the variability and trends in the surface water demand and supply of the city of Gaborone and surrounding areas in response to population growth and climate change using the Water Evaluation and Planning (WEAP) model for future scenarios. The study includes analysis of population trends, water production and consumption rates, hydrological of the study area as well as projected climate data at a high spatial resolution of 1 km2. The current General Circulation (GCM) or Regional Climate (RCM) models are not able provide such data. Therefore, the climate data for existing GCMs is statistically downscaled using the high resolution Worldclim data to spatial resolution of 1 km2 and bias corrected against Global Climatology Precipitation Center (GPCC) precipitation. The GCM data for the mid-range Concentration Representative Pathways (RCP4.5) and high emission RCP 8.5 future scenarios of Coupled Model Inter-comparison Project Phase 5 (CMIP5) are employed in the study. Under both RCP4.5 and RCP8.5 scenarios, the reservoir inflow indicates that the level of reservoirs at Foresthill, Diremogolo, Gabane hill, Oodi hill and Mabutswe will be reduced during 2081-2097 period.
    [Show full text]
  • DAILY HANSARD 12 November 2020
    DAILY YOUR VOICE IN PARLIAMENT THETHE SECOND FIRST MEETING MEETING OF THE O FSECOND THE FIFTH SESSION SESSION OF OF THETHE ELEVEN TWELFTHT HPARLIAMENT PARLIAMENT THURSDAY 12 NOVEMBER 2020 MIXED VERSION HANSARDHANSARD NO: NO. 200 193 DISCLAIMER Unocial Hansard This transcript of Parliamentary proceedings is an unocial version of the Hansard and may contain inaccuracies. It is hereby published for general purposes only. The nal edited version of the Hansard will be published when available and can be obtained from the Assistant Clerk (Editorial). THE NATIONAL ASSEMBLY SPEAKER The Hon. Phandu T. C. Skelemani PH, MP. DEPUTY SPEAKER The Hon. Mabuse M. Pule, MP. (Mochudi East) Clerk of the National Assembly - Ms B. N. Dithapo Deputy Clerk of the National Assembly - Mr L. T. Gaolaolwe Learned Parliamentary Counsel - Ms M. Mokgosi Assistant Clerk (E) - Mr R. Josiah CABINET His Excellency Dr M. E. K. Masisi, MP. - President His Honour S. Tsogwane, MP. (Boteti West) - Vice President Minister for Presidential Affairs, Governance and Public Hon. K. N. S. Morwaeng, MP. (Molepolole South) - Administration Hon. K. T. Mmusi, MP. (Gabane-Mmankgodi) - Minister of Defence, Justice and Security Hon. Dr L. Kwape, MP. (Kanye South) - Minister of International Affairs and Cooperation Hon. E. M. Molale, MP. (Goodhope-Mabule ) - Minister of Local Government and Rural Development Hon. K. S. Gare, MP. (Moshupa-Manyana) - Minister of Agricultural Development and Food Security Minister of Environment, Natural Resources Conservation Hon. P. K. Kereng, MP. (Specially Elected) - and Tourism Hon. Dr E. G. Dikoloti MP. (Mmathethe-Molapowabojang) - Minister of Health and Wellness Hon. T.M. Segokgo, MP. (Tlokweng) - Minister of Transport and Communications Hon.
    [Show full text]
  • ANNUAL REPORT 2015/16 Water for People, Water by People ANNUAL REPORT
    ANNUAL REPORT 2015/16 Water for People, Water by People ANNUAL REPORT REPORT ANNUAL 2015/16 2015/16 ANNUAL REPORT WATER FOR PEOPLE, WATER BY PEOPLE GABORONE HEAD OFFICE, SEDIBENG HOUSE Plot 17530, Luthuli Road P/Bag 00276, Gaborone Tel: 360 4400 | Fax: 397 3852 E-mail: [email protected] 1 A newly introduced pre-paid public stand pipe in Mogoditshane 2 ANNUAL REPORT 2015/16 Water for People, Water by People VISION TO BE A WORLD CLASS WATER UTILITY MISSION To provide sustainable water and wastewater management services in a cost effective and environmentally friendly manner to the economy. 01 Batho Pele/ People First We understand and exceed expectations by putting the customer first. Botho WeTITLE display aARTI strongCL Lorem ipsum dolor sit,t Kgetsi ya workconsectetur ethic adipiscing and Donel et. c respectsit amet euismod Seden Tsie/ 05 gravidatortor sedrate vulputate, forquis varius people odio alt Team Work VALUES We believe in working together to 02 accomplish more Botswerere/ Quality We provide a high quality of products and service Therisanyo/ Consultation delivery to our customers TITLE ARTICL WeLorem value ipsum open dolor and free sit,t ameconsectetu exchangeadipiscing of views Donec elit. and sit amet euismo ideasSed gravidatortor sed erat vulputate, qu varius odio alt 04 03 3 TABLE OF CONTENTS Performance Highlights ......................................................................................................... 5 Five Year Performance at a Glance ........................................................................................................
    [Show full text]
  • Water Accounts of Botswana (1992-2003)
    Water accounts of Botswana (1992-2003) Prepared by the Department of Environmental Affairs in association with the Centre for Applied Research July 2006 Botswana Water Accounts Report Table of contents List of Tables 4 List of Figures 5 Acronyms 6 Acknowledgements 7 Executive Summary 9 1 Background 11 1.1 Introduction 11 1.2 Water scarcity 11 1.3 Surface and groundwater resources 12 1.4 Wastewater resources 19 2 Water and wastewater management and planning 20 2.1 Introduction 20 2.2 Water planning and management 20 2.3 Wastewater planning and management 21 3 Framework for water accounts and data sources 23 3.1 Introduction 23 3.2 Type of accounts 23 3.3 Classification of water supply 24 3.4 Classification of water users 25 3.5 Data sources and major data problems 25 4 Water resources and use in the period 1990-2003 28 4.1 Introduction 28 4.2 Stock accounts 28 4.3 Water use accounts 30 4.4 Wastewater accounts 32 5 Economic aspects of water supply and use 36 5.1 Introduction 36 5.2 Water supply costs 36 5.2.1 Water Utilities Corporation 36 5.2.2 Department of Water Affairs 38 5.2.3 District Councils and self providers 40 5.3 Wastewater treatment costs 40 5.4 Unaccounted for water and supply losses 41 5.5 Value added per unit of water 42 5.6 Benefits of wastewater re-use 43 6 Policy implications and further work 46 References 49 Appendix 1: Definition of terms 51 Appendix 2: Methodological details 52 2 Botswana Water Accounts Report Appendix 3: Details of the water accounts 54 Appendix 4: Features of current wastewater treatment works 59
    [Show full text]
  • North-South Carrier Water Project
    Botswana 50 North-South Carrier Water Project A The project’s objective was to provide safe water supplies to southeastern districts of Botswana where demand for water was B becoming increasingly strained by developing water resources in C the northeast of the country and constructing dams and water D treatment plants, etc., and thereby contribute to economic development and improvements in public hygiene. Loan Amount/Disbursed Amount: 4,685 million yen/4,685 million yen Loan Agreement: December 1995 Terms and Conditions: Interest rate, 2.5%; Repayment period, 25 years (grace period, 7 years); General untied Final Disbursement Date: February 2001 External Evaluator: Akira Maekawa (INTEM Consulting Inc.) Field Survey: July 2003 Evaluation Result 6,029 (fiscal 2001), and the project is helping to promote commercial and industrial activities by securing service water, Water treatment plants, pump stations and tanks were etc. There are no problems with the technical, institutional or essentially constructed almost as planned. By contrast, financial capabilities of the Water Utilities Corporation - the implementation was delayed due to leakage from pump project’s executing agency. Over-spending continues to be a connections, damaged pump station valves and various other problem in consequence of loan repayments, including those technical problems when the conduit pipes constructed using for the water resources development component, but tariff NDF funding (Nordic Development Fund) were put into revenues are increasing annually. operation. Project costs also ran over budget because of the need to deal with the aforementioned problems and inflation. Third-Party Evaluator’s Opinion Against a water supply target of 43 million cubic meters for the target area in fiscal 2001, 23.3 million cubic meters was This project’s objective is to link a dam and major wellfields actually supplied, or 54% of the planned level.
    [Show full text]
  • State of the Nation Address by His Excellency Lt
    STATE OF THE NATION ADDRESS BY HIS EXCELLENCY LT. GEN. SERETSE KHAMA IAN KHAMA, PRESIDENT OF THE REPUBLIC OF BOTSWANA, TO THE FIRST SESSION OF THE ELEVENTH PARLIAMENT - “MOVING BOTSWANA FORWARD” INTRODUCTION 1. Madam Speaker, before we begin may I request that we observe a moment of silence for those of our citizens who have departed from us during the past year. Thank you. 2. Honourable Members, it is my pleasure to once more present an updated assessment of how Government intends to move Botswana forward by seizing opportunities to secure our future. 3. As this is the first session of the 11th Parliament, let me preface my remarks by welcoming the newly elected members of this Assembly. Let me further congratulate you Madam Speaker on your own election. 4. Today's gathering is an outcome of our 11th consecutive general election. As is our tradition, the ballot was conducted in a peaceful, free and fair manner. For this we can once more thank Batswana in general, as well as the Independent Electoral Commission (IEC) and other individuals and organisations that helped to ensure the poll’s success. 5. In any democracy elections are the means to the greater end of forming a Government capable of translating the popular will into public service delivery. We who have the honour of sitting in this House are accountable to the hundreds of thousands who entrusted us with their votes. Although divided in their choices, the voters were united by a shared desire for a better future. It is, therefore, our responsibility to ensure that together we deliver that future by at all times putting the national interest before our own.
    [Show full text]