www.vikingpark.co.uk

THOR VIKING PARK

50,000 sq ft to 250,000 sq ft

Manufacturing and distribution build THto suit opportunitiesOR VIKING PARK

Viking Park, THOR VIKING PARK

THOR VIKING PARK VIKING PARK the best logistics location in the North West

St Helens 10

21a

M62 M6 A49 Halton Borough Council M57 will find and train your 1 7 workforce 6 M62 A57 In 2010 Halton Employment Partnership undertook the recruitment of new staff for Tesco at Viking Park. The project A568 involved a dedicated enquiry line A5300 A50 and a dedicated team that:

A562 e • Processed 7,000 expressions of interest n li in • Organised 1,250 interviews a M st • Helped Tesco appoint 422 new staff a o Widnes C This outstanding service will be available st e A562 W to all new occupiers at Viking Park. A56

A49 A561 A533 A558

Runcorn HGV Drive Times M56 27 mins KEY A557 Stobart Park Manchester 40 mins Rail Network Leeds 1 hr 15 mins Motorways A533 A Roads Birmingham 1 hr 37 mins Mersey 12 Gateway Port M4 Corridor 2 hrs 49 mins Mersey Central London 3 hrs 38 mins Gateway Bridge All times are approximate. Source: UKHaulier.co.uk THOR VIKING PARK Option A

50,000 sq ft to 250,000 sq ft THOR ManufacturingVIKING and PARK distribution build to suit opportunities

DC250 250,000 sq ft Warehouse

INDICATIVE LAYOUT OPTIONS

THOR VIKING PARK

DC50 Option B 50,000 sq ft THOR Warehouse VIKING PARK

CONTAINER PORT

DC145 145,000 sq ft Warehouse THOR VIKING PARK

50,000 sq ft to 250,000 sq ft Manufacturing and distributionTHOR build to suit opportunities VIKING PARK

WEST COAST MAINLINE

Phase 1

Future Phase M62 J6 5.6 MILES

NEW 600M LONG SPINE ROAD

THOR NEW ROUNDABOUT INTO VIKING PARK VIKING PARK AND NEW Phase 2 PORTS ENTRANCE SLIP ROAD

THOR Future Phase VIKING PARK

A533

• Outline planning • Over £6 million • Build to suit Phase 1 consent granted of infrastructure packages are for a further works have been available to 1.4 million sq ft undertaken to suit occupiers’ of B2/B8 units prepare the site individual with up to 40m for immediate requirements M62 J6 5.7 MILES eaves height delivery on a freehold or leasehold basis THOR VIKING PARK

• Established • Sustainable • Multi-modal

NOW UNDER CONSTRUCTION THOR VIKING PARK

The new Mersey World-class location

CONTAINER PORT Gateway Bridge meets world-class retailer Thor at Viking Park offers occupiers direct access to Immediately adjacent to the the new Mersey Gateway Bridge, due to open in 2016. region’s leading container port. This £431 million project will: • Cross the river around 1 mile to the east of the iconic • Linked directly to West Coast Mainline Viking Park offered Tesco a clean slate for a tailored • The port can accept up to twelve trains per day regional distribution centre and unrivalled transport • Provide three lanes across the Mersey in each direction • Construction of four new rail reception sidings will links to maximise the efficiency of its transport • Further enhance supply chain resilience for operators increase capacity to SIXTEEN trains per day network. The chilled distribution facility, comprising a based at Viking Park total of 528,000 sq ft, was delivered in just 12 months • 12 minute vehicle turn around – the fastest in the UK and sold to L&G. • 1,100 vehicles handled per day • 24 hour operation 5 days per week “This new modern facility has allowed us to greatly enhance the service • Secure storage for over 6,000 containers to our stores and customers across • Four rail-mounted cranes with automated container the North West of England.” positional and recovery system and advanced GPS planning and tracking system Juliette Bishop, Corporate Affairs Manager, Tesco THOR VIKING PARK

THOR VIKING PARK

M6

S T

Satnav: WA8 0PE M57 M62 M N I R L A562 C OO H Q A1 UEEN M A D A562 SW 1 E E R A 7 L EK Y S SP M62 To 6 R ASHLEY A57 M62 J6 D A562 WAY W A5080 A562 DITTON RD To M6 A5080 A533 M62 J7 CONTAINER DESO Leeds A5300 PORT TO RD E

A562 A568

M62 A568 M62 FUTURE PHASE M M58 Manchester A C D Warrington M60 A628 Doncaster A562 E Liverpool R Q M62 M U O E T E T N THOR Sheffield THOR THOR R S VIKING PARK VIKING PARK VIKING PARK D W M56 A558 A A533 Y M6 THOR THOR A533 THOR VIKING PARK VIKING PARK VIKING PARK A533 Stoke-on-Trent M1 A557 A533 To Derby 12 A50 M56 J12 Nottingham A5 M56 M54 Bridge

M42 Leicester A1

Misrepresentation Act: Particulars contained in this brochureA6 have been produced in good faith, are set out as a general guide and do not constitute Birminghamthe whole or part of any contract. All liability in negligence or otherwise, arising from use of Contact the agents: these particulars are hereby excluded. www.vikingpark.co.uk

M40 M1

A development by: 0161 834 7187 M5 [email protected] [email protected]

[email protected] [email protected] reachmarketing.co.uk 22889 07/14

London

Sheerness