TENDER-WISE DETAILS/STATUS OF PENDING EMD ( FOR FINANCIAL YEAR 2013-14) Name of Area : Area Department : Civil Status as on : 30.09.13 Tender Description Date of finalisation of Date of Date of Name of bidder depositing EMD SN Tender No. contract/issue refund of Remarks opening EMD Value of purchase EMD order Installation of 5 Nos. Hand Pumps Shri Ashok Kumar Singh 2,792/‐ including Construction of 125 mm / 115 1 7/20.04.13 mm dia x 55 M (Avg.) drilled tube well at 03.05.13 12.07.13 Sondimra Panchayat of Gola Block under M/s. Ratan Constn 2,792/‐ CSR Scheme 12-13 of Rajrappa Area

Installation of 5 Nos. Hand Pumps including Shri Ashok Kumar Singh 2,792/‐ Construction of 125 mm / 115 mm dia x 55 M 2 7/20.04.13 (Avg.) drilled tube well at Kander Panchayat 03.05.13 12.07.13 of Block under CSR Scheme 12‐13 of M/s. Ratan Constn 2,792/‐ Rajrappa Area Annual cleaning of toilet, doors, windows , H.R. Construction 3,324/‐ surrounding area and other required works in 3 8/02.05.13 premises of VIP Rest House & Officer’s Club 15.05.13 15.05.13 M/s. Arbind Enterprises 3,324/‐ under Rajrappa Area ( For 12 Months )

Replacement of damaged conveyor gallery H.R. Construction 2,154/‐ 4 8/02.05.13 from SILO to Loading Hopper at Rajrappa 15.05.13 06.08.13 Washery Project M/s. Arbind Enterprises 2,154 M/s. Diamond Power Projects Annual Operation & Maintenance of 15,472/‐ Pvt. Ltd. 510/02.05.13 Domestic Effluent Treatment Plant (DETP) 22.05.13 12.07.13 under GM Unit, Rajrappa Area Shri Gopal Choudhary 15,472/‐ Replacement of damaged GI Sheet roofing in M/s. Pawan Enterprises 4,911/‐ PS‐5 building at 52 Mtrs. Level and 35 Mtrs. 6 13/20.06.13 01.07.13 26.07.13 Level north side at Rajrappa Washery Project Shri Kundan Prasad 4,911/‐

Construction of YATRI SHED at Rajrappa Shri Arun Kumar Thakur 1,074/‐ 7 18/27.06.13 Temple under CSR Scheme 2012‐13 of 04.07.13 06.08.13 Shri Balram Kumar 1,074/‐ Rajrappa Area Provision of 3 Nos. EXTRA DEEP Hand Pump Shri Rajkumar Agarwal 4,920/‐ including construction of 200 x 150 x 125 M (Avg.) depth deep drilled Tube Well at 8 17/21.06.13 04.07.13 10.09.13 Dhawaiya Panchayat Gomia Block under M/s. Ratan Construction 4,913/‐ CSR Scheme 12‐13 of Rajrappa Area

8 Nos. Hand Pumps including Construction of 125 mm / 115 mm dia x 55 M (Avg.) drilled Shri Rajkumar Agarwal 4,470/‐ tube well at (1) Lari – 2 Nos. (2) Hesapora (3) 9 17/21.06.13 Near Rajrappa Temple (4) Mael (5) Koihara (6) 04.07.13 07.09.13 Jorakath (7) Bhuchungdih under CSR Scheme 12‐13 of Rajrappa Area M/s. Ratan Construction 4,467/‐

3 Nos. EXTRA DEEP Hand Pump including Shri Rajkumar Agarwal 4,920/‐ construction of 200 x 150 x 125 M (Avg.) depth deep drilled Tube Well at (1) Gola Bus 1017/21.06.13 04.07.13 07.09.13 Stand (2) Sirka (3) Soso, Panchayat Gola Block Shri Ashok Kumar Singh 4,913/‐ under CSR Scheme 12‐13 of Rajrappa Area