WA Bicycle Network Grants 2018-19 Awarded Projects This document includes details of projects from both regional and metropolitan areas of Western Australia that successfully applied for funding through the Regional Bicycle Network and Perth Bicycle Network grants programs respectively in 2018-19.
2018-19 Awarded Projects Perth Bicycle Network Grants
14 local governments have been successful recipients of funding from the Department of Transport‘s Perth Bicycle Network Grants Program in 2018-19.
The 16 projects to be delivered with $3.03 million committed over two years include:
• 12 shared paths; • Three protected bike lanes; and • One intersection upgrade
Project Schedule # Project Scope Railway Avenue Red Asphalt Shared Path $329,291 in 2018-19 1 $329,291 committed for 2019-20 Construction of 1.53km of shared path
City of Armadale Rockingham Road Protected Bike Lanes $50,000 in 2018-19 2 Detailed design of 3km protected bike lanes
City of Cockburn BP Bike Way Design $5,000 in 2018-19 3
City of Cockburn Queen Victoria Street/ Parry Street/ Adelaide Street Intersection Upgrade 4 $175,000 in 2018-19 (Pre-committed) Construction of intersection upgrade
City of Fremantle
Beach Road Shared Path $25,000 in 2018-19 5 Detailed design of 1.3km of shared path
City of Joondalup
Welshpool Road East Shared Path $15,000 in 2018-19 6 $135,000 committed for 2019-20 Design and construction of 580m of shared path
City of Kalamunda
Murdoch Drive Shared Path 7 $491,000 in 2018-19 (Pre-committed) Construction of 1.2km of shared path
City of Melville
Brockway Road Shared Path $10,000 in 2018-19 8 $140,000 committed for 2019-20 Design and construction of 1.02km of shared path
City of Nedlands Thomas Road Shared Path $30,000 in 2018-19 9 Detailed design of 3.55km of shared path
Shire of Serpentine Jarrahdale Curtin to Canning Protected Bicycle Lane $20,000 in 2018-19 10 Detailed design of 2km of shared path
City of South Perth Salvado Road Shared Path $174,179 in 2018-19 11 $134,179 committed for 2019-20 Construction of 1.38km of shared path
City of Subiaco Gnangara Road Shared Path $200,000 in 2018-19 (Pre-committed) 12 Construction of 2km of shared path
City of Swan Goodwood Parade Shared Path $200,000 in 2018-19 13 Construction of 660m of shared path
Town of Victoria Park Rutland Avenue Shared Path $342,500 committed for 2019-20 14 Construction of 1.5km of shared path
Town of Victoria Park Loftus Street Shared Path $210,000 in 2018-19 15 Construction of 630m of shared path
City of Vincent Wanneroo Road/ Pinjar Road Shared Path $15,000 in 2018-19 16 Detailed design of 2.4km of shared path
City of Wanneroo
2018-19 Awarded Projects Regional Bicycle Network Grants
20 local governments have been successful recipients of the Department of Transport grants program in 2018-19.
23 projects are to be delivered with $3.13 million committed over two years.
Project Schedule # Project Scope
Goldfields Esperance Fisheries Road – Bandy Creek Road Link $112,500 in 2018-19 1 Construction of 1.5km of shared path
Shire of Esperance Forrest Street connection $65,000 in 2018-19 2 Design and construction of 460m of shared path
City of Kalgoorlie-Boulder Great Southern Mt Elphinstone Shared Path (Stage 2) $295,000 in 2018-19 (Pre-committed) 3 Construction of 1.29km of shared path
City of Albany Central Area Cycle Links (Stage 1) $20,000 in 2018-19 4 $190,000 committed for 2019-20 Design and construction of 840m of shared path
City of Albany
Mid-West
Chapman Road Cycle Concept $20,000 in 2018-19 Feasibility and concept design of a 4km cycle 5 connection City of Greater Geraldton
Kalbarri Foreshore Bicycle and Pedestrian Pathway 6 $171,728 in 2018-19 Construction of 1.6km of shared path
Shire of Northampton Millard Drive to Slaughter Street Shared Path $30,000 in 2018-19 7 Construction of 420m of shared path
Shire of Three Springs
Peel
Sutton Street to Murray Bend Shared Path $125,000 in 2018-19 (Pre-committed) 8 Construction of 3.1km of shared path
Shire of Murray
Pinjarra Road Staged Link to Freeway $25,000 in 2018-19 9 $200,000 committed for 2019-20 Design and construction of 2.98km of shared path
Shire of Murray
Pilbara
Millstream Road Shared Path (Stage 2) $172,520 in 2018-19 10 $172,520 committed for 2019-20 Construction of 1.37km of shared path
City of Karratha
South West
Shared Path to Margaret River Education Campus 11 $45,000 in 2018-19 Construction of 160m of shared path
Shire of Augusta Margaret River Estuary Drive Shared Path $85,000 in 2018-19 12 Construction of 550m of protected bicycle lane
City of Bunbury Dunsborough to Cape Naturaliste $275,000 in 2018-19 (Pre-committed) 13 Construction of 2.5km of shared path
City of Busselton Bussell Highway Shared Path $63,607 in 2018-19 (Pre-committed) 14 Construction of 1.21km of shared path
Shire of Capel Collie River Shared Path $125,000 in 2018-19 $100,000 committed for 2019-20 15 Design and construction of 2.02km of shared path
Shire of Collie
Meldene Estate Pathway Link $12,500 in 2018-19 16 Design of 2.15km of shared path
Shire of Donnybrook-Balingup Weir Road Shared Path Project $20,000 in 2018-19 17 $205,000 committed for 2019-20 Design and construction of 1.95km of shared path
Shire of Harvey Latham Avenue Shared Path $50,000 in 2018-19 18 $40,000 committed for 2019-20 Construction of 510m of shared path
Shire of Manjimup Club Road/ Pumphill Road/ Swimming Pool Road Shared Path $46,250 in 2018-19 19 Design and construction of 380m of shared path $31,250 committed for 2019-20
Shire of Manjimup
Wheatbelt Muchea Residential connection to Bike Park $95,151 in 2018-19 20 $95,151 committed for 2019-20 Design and construction of 1.5km of shared path
Shire of Chittering Corrigin Town Site East-West Link $2,000 in 2018-19 21 $30,045 committed for 2019-20 Design and construction of 280m of shared path
Shire of Corrigin Jurien Bay School Connection $67,500 in 2018-19 22 $82,500 committed for 2019-20 Construction of 1.5km of shared path
Shire of Dandaragan Bike Plan Shared Paths $32,812 in 2018-19 23 $31,500 committed for 2019-20 Construction of 640m of shared path
Shire of Wongan Ballidu