SOUTH COAL BLOCK SUMMARY

PART A

Sr. Features Details No. 1. Location Coal Block Mandla South Latitude 22 012 ’23 ” to 22 015 ’ E Longitude 78 052 ’39 ” to 78 054’ N Topo Sheet No. 56 J/16 Coalfield Pench Kanhan Valley Coalfield Villages Bichhuwa, , Mandla and Mandli Tehsil/ Taluka District State 2. Connectivity with Block Nearest Railway Siding Rawanwara Colliery – at a distance of 7km Road 1. All weather road from Khirsadoh to Shivpuri Mine 2. Parasia town is about 14 km from the block

Airport 3. Area Geological Block Area 5.6 SQ. KM Mining Lease Area 560 Ha (as per Environment Clearance) Project Area 560 Ha Forest Area 210.8 Ha Non -Forest Area 349.2 Ha 4. Climate and Topography Average Annual Rainfall 1200mm Temperature (Min. – Max.) NA Local Surface Drainage Through two seasonal nallas flowing from north to south Channels Rivers 5. Exploration Status Explored Exploration Agency MECL Total Number of Boreholes 57 Boreholes, Borehole Density 10.18 per sq. km General Dip of Seams 40 to 12 0 General Strike Direction East - West

6. Coal Seams & Reserve (As Considered in Mining Plan) Number of Coal Seams Thickness Range Geological Extractabl Grade Mining (m) Reserve e Reserve Method (MT) (MT) (UG/OC) 1. Seam IC 1.37 – 4.99 14.42 2. Seam II/IIB 10.67 0.8 – 3.6 UG 13.35 C to E 3. Seam IIIB 0.39 – 2.34 6.54 4. Seam VA/A2 0.11 – 3.58 5.70

PART B

Sr. No. Features Details 1. Previous Allocation Name and Address of Allocatee MP State Mining Corporation Ltd. 2. Mine Capacity as per Mining 0.30 MTY Plan 3. Status of Clearances/Approvals Mining Plan / Mine Closure Plan Approved Forest Clearance Obtained Environmental Clearance Obtained Mining Lease Lease granted by State Govt. Lease execution deed is not available Land Acquisition Forest Land acquired. 17.981 Ha land acquired 4. No. of PAFs as per 16 Environmental Clearance 5. Surface Infrastructure already 1. Approach road to mine site has been built built, if any. 2. Acquired land has been labelled and fenced 3. Base camp covering accommodation for employees and administrative office has been established

Note: The above data is compiled from Geological Report, Mining Plan, Mine Closure Plan, Environmental Clearance and Forest Clearance and the data furnished by the prior allottee in Annexure-I/II