A20 Thursday, January 16, 2020 Pipestone Flyer www.pipestoneflyer.ca

PUBLIC NOTICE OPPORTUNITY FOR TEMPORARY EMPLOYMENT NOTICE OF COMPLETION OF MUNICIPAL WORKS IN 2019 POSTING #2020/01 Pursuant to Section 534 of the Municipal Government Act, being Chapter M-26 of the Statutes The Position: of , 2000, the County of No. 10 hereby gives notice that the construction of The County of Wetaskiwin is seeking to fill the position of a Nine (9) month seasonal Light the following municipal works has now been completed: Equipment Operator/Sprayer Operator. Reporting to the Agricultural Services Foreman, the CONSTRUCTION PROJECTS: Completion Date: November 30, 2019 successful candidate will be responsible for operating the County’s spray truck, light duty • Clay Cap, Shoulder Pull & Ditching (4 miles) - TWP RD 472 from RGE RD 232 to HWY 814 equipment such as tractor, or skid steer, performing minor equipment repairs and ongoing • Shoulder Pull - TWP RD 480 from RGE RD 280 to RGE RD 275 regular maintenance of equipment including shop maintenance. This is a nine (9) month seasonal • Battle Lake Trail; Guardrail - TWP RD 462AB from TWP RD 462 to Battle Lake Trail position working 40 hour per week; anticipated start date March 1, 2020 with end date of • Battle Lake Trail - TWP RD 462 from RGE RD 14 to RGE RD 15A November 30, 2020. Hours of work are 8:00 a.m. to 4:30 p.m., Monday to Friday or as required. • Shoulder Pull/Subgrade Stabilization (1.75m) RGE RD 241 from TWP RD 460 to 461.75 Required Skills: MAINTENANCE WORK: The successful candidate will: Crack Sealing - Completion Date: June 30, 2019 • Hold a valid Class 5 Drivers license • (0.8km) • Hold a Pesticide Applicator’s license Agricultural and Industrial designations or ability to obtain. • RGE RD 63 and Lakeshore Drive Buck Lake (12km) • must have a cellular phone • County Administration Office parking lot (0.8km) • must be able to meet the physical demands of the position • Ganske Subdivision (0.8km) • demonstrate excellent interpersonal skills • RGE RD 10 Mulhurst Bay (10km) Salary is in accordance with the International Union of Operating Engineers Collective Agreement • RGE RD 240 north of HWY 613 (0.8km) with the County of Wetaskiwin No. 10 for a Sprayer Operator position set at $25.44 to $28.27/ • RGE RD 243 west of TWP RD 473A (0.8km) hr and Light Equipment Operator position set at $27.47 to $30.52/hr. • TWP RD 470 between HWY 2 and HWY 2A (14km) • TWP RD 464 from HWY 2A to RGE RD 244 South (3.2km) Qualified candidates are asked to submit their resume by 12:00 Noon, Friday February 7th, • TWP RD 470 from HWY 771 to RGE RD 31 (9.6km) 2020 to: • TWP RD 470 from HWY 771 to RGE RD 15 (1.6km) Barb Wolter, Executive Assistant, County of Wetaskiwin No. 10 • TWP RD 475 from RGE RD 242 to RGE RD 243 (1.6km) Box 6960, Wetaskiwin, AB, T9A 2G5 • RGE RD 242 from HWY 814 south to TWP RD 473A (2.4km) (780) 352-3486 (fax) / (780) 352-3321 (phone) • Village at (0.95km) Email: [email protected] Online: www.county.wetaskiwin.ab.ca • Winfield —2 Ave East and 5 Ave East (1.9km) The County of Wetaskiwin would like to thank all applicants for their interest, however only the Line Painting — Completion Date: October 15, 2019 candidates selected for interviews will be contacted. • Alder Flats (0.8km) • RGE RD 63 and Lakeshore Drive - Buck Lake (12km) • RGE RD 10 Mulhurst Bay (4.75km) • Provincial Park Road (1.6km) • RGE RD 240 north of HWY 613 (0.8km) • TWP RD 464 from HWY 2A to RGE RD 244 South (3.2km) • TWP RD 470 from HWY 771 to RGE RD 23.5 (4km) • TWP RD 475 from RGE RD 242 to RGE RD 243 (4km) • TWP RD 470 between HWY 2 and HWY 2A (14km) • (.5km) • RGE RD 12 from HWY 13 South (0.8km) • Winfield - 2 Ave East and 5 Ave East (1.9km) BRIDGE WORK: • Various Bridge Maintenance Projects under the 2019 Bridge Maintenance Contract Claims made pursuant to Section 534 shall be filed with the Chief Administrative Officer, Rod Hawken, at the County of Wetaskiwin No. 10, Box 6960, Wetaskiwin, Alberta, T9A 2G5, within 60 days after the notice is published in the newspaper. The first date of publication is January 16, 2020. The last day on which a claim may be filed is March 17, 2020.