SOUTH ROAD SUPERWAY TRAFFIC CHANGES Night time traffic detours - South Road

Construction Update Night time traffic conditions

Construction activity on the South Road Superway has Segment lifting is now only taking place north of Grand progressed during the past few months. In March, the Junction Road, however finishing work continues on last segment south of the Grand Junction Road / South the elevated roadway south of Grand Junction Road in Road intersection was put into place by the launching preparation for use by traffic. truss (pictured below). The truss has made its way north of Grand Junction Road and will begin lifting segments in this To undertake this work, there will be on-going changes to area from early April. traffic flow on South Road each night between 6.30pm and 6.30am until the end of June 2013. These changes are There are currently full-time traffic detours in place for shown overleaf and include: South Road north of Grand Junction Road and this will allow the truss to lift segments during the day, as well as • The closure of southbound traffic on South Road at night, from April. Motorists are reminded that this may from to Days Road. It is be distracting for drivers and care should be taken when suggested motorists use Hanson Road from the travelling through the area. Expressway to travel south.

In February, traffic on South Road was moved to the • Northbound traffic, north of Cormack Road is western side of the carriageway between Grand Junction detoured to Hanson Road. Road and Days Road to enable work on the upgrade of roadway beneath the elevated structure. This work is on • Northbound traffic is detoured from South Road target for completion at the end of May and then work will to Kateena Street and Wirriga Street. Access is begin on the upgrade of the western side of the roadway. maintained to the BP Service Station just south of Angle Road. The Days Road intersection was recently upgraded which will improve traffic flow through the intersection. The local • Angle Road is closed at South Road from 6.30pm service road, which provides access to the side streets of (except for Thursdays when it remains open until Taminga, Aruma, Camira and Tikalara was also completed 7.30pm for access to the Greyhound Racing Club). in March, including placing the final layer of asphalt. • Northbound traffic on South Road is detoured In April, asphalt crews will be working to place the final at Grand Junction Road to Davis Street. Access layers of asphalt on the main roadway between Days Road to the Caltex Service Station is maintained from and Regency Road. This work will continue from April 10 Francis Road. until Wednesday April 24. • No left turns from Grand Junction Road to South Road between 6.30pm and 6.30am.

• No right turns from Grand Junction Road to South Road between 6.30pm and 6.30am.

There are several electronic message boards in place which display the status of the roadway at night. Please drive with care throught the area and follow the instructions of all traffic controllers on site. Your patience during this work is appreciated.

For more information about these traffic changes or any other aspect of the South Road Superway please contact us on 1300 638 79 or email [email protected]. au

Urban Superway, comprising John Holland Pty Ltd and Leed Engineering and Construction Pty Ltd, is the design and construction contractor delivering the $842 million Australian and South Australian government funded South Road Superway with the Department of Planning,Transport and Infrastructure. 10042013 SOUTH ROAD SUPERWAY TRAFFIC CHANGES Night time traffic detours - South Road

Construction Area ON RAMP CLOSED DRY CREEK

PORT RIVER EXPRESSWAY SALISBURY HWY

N Southbound carrigeway Northern interchangeW E HINES RD work area closed at night S DETOUR NORTH TCE WING ST WING ST N

South Road W E

NINTH TCE WINGFIELD RD WINGFIELD

HANSON RD HANSON closed at night

PHILLIS ST PHILLIS

SOUTH ROAD SOUTH

MILLERS RD MILLERS STAITE ST STAITE

HANSON RD HANSON in this area S SOUTH TCE SOUTH TCE SOUTH TCE

CORMACK RD CORMACKCORMACK RD RD CORMACK RD DETOUR DETOUR DETOUR Southbound carrigeway closed at night

Northbound traffic 328 c HAKKINEN RD detours to Hanson Road SENNA RD

PLYMOUTH RD 40 Vest Logo Shirt Logo

T WINGFIELD oll People

DAVIS ST DAVIS Toll People left turn 1300 769 875

DAVIS ST DAVIS Access to and from only

WINGFIELD RD WINGFIELD Caltex maintained

BOWYER RD BOWYER

ALBION ST ALBION CAPELLI RD CAPELLI

FRANCIS RD FRANCIS ROAD FRANCIS RD JOHANSSON RD HANSON RD HANSON

SIXTH ST Right turn restriction

LAFITTE RD LAFITTE JOHANSSON RD RD JOHANSSON FIFTH ST removed at night only 40 NORTH RD CHURCHILL

EXIT ROSBERGROSBERG RD RD ROSBERG RD FOURTH ST PLYMOUTH RD ENTRY MORGAN ST DETOUR THIRD ST Area closed to allow

DAVIS ST DAVIS STREIFF RD SECOND ST Northbound traffic detoured to night time segment

DAVIS ST DAVIS erection

FIRST ST Davis Street during night time DUNSTAN RD DUNSTAN

HILL RDHILL

WINGFIELD RD WINGFIELD segment lifting

PRODUCTION RD

GRAHAM ST PENLEY AVE PENLEY

GRANDGRAND JUNCTION JUNCTION RDGRAND JUNCTION RD RD GRAND JUNCTION JUNCTION RD RD DETOUR INDAMA ST JOHN ST No right or left turns from Grand Junction RdANGLE to South Road 40

HENRY ST HENRY between 6.30pm - 6.30am ONE WAY RICHARD ST FREDERICK ST RICHARD ST RICHARD PARK

DUDLEYDUDLEY ST ST DETOUR ST OPALA WIRRIGA ST ANGLE RD WIRRIGA ST WIRRIGA ST REGENCY DETOUR

DETOUR HANSON RD HANSON At times Angle Rd KATEENAPARK ST CARDIGAN ST will close (open until 7.30pm Thurs) KATEENAKATEENAAt times ST northbound ST

traffic will detour to RD NAWEENA WILSON ST

TRAFFORD ST TRAFFORD Kateena St, Birralee

Rd & Wirriga St BIRRALEE RD

COWAN ST DR GALLIPOLI GALLIPOLI DR DETOUR TAMINGA ST Access to businesses TAMINGAand ST side streets must

use left lane DAYS RD DAYS

TRAFFORD ST

RIDLEY GROVE RIDLEY GROVE DETOUR

ARUMAARUMA ST STST CHURCHILL RD CHURCHILL This map shows traffic managementFERRYDEN plans which will be implemented at nightPARK

until June 2013 for construction activities CAMIRACAMIRA ST ST along South Road between Port River RD NAWEENA NAWEENA RD NAWEENA Day time RD NAWEENA Expressway and Regency Road. asphalt work

LIBERTY GROVE LIBERTY area Alternative TIKALARATIKALARA ST ST For further information about these traffic routes to bypass HANSON RD HANSON FIRST AVE changes please call 1300 638 789. COKER ST the South Road

WOODVILLE DETOUR Superway GDNS roadworks REGENCY ROAD REGENCY ROAD DETOUR * This map is indicative only and not to scale

Urban Superway, comprising John Holland Pty Ltd and Leed Engineering and Construction Pty Ltd, is the design and construction contractor delivering the $842 million Australian and South Australian government funded South Road Superway with the Department of Planning,Transport and Infrastructure.