City of Leander RFQ #20-052 Engineering Services Pool - Drainage Systems

Bid Info: City of Leander

Engineering Service Pool - Drainage Systems

Solicitation No. S20-052

Opening: 9/3/2020

EVALUATION CRITERIA Max Points Relevant Qualifications and Availability 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20

Legal Name of Firm: George Butler Legal name of firm: KCI Technologies, Inc. Associates, Inc. Legal Firm Name: K Friese & Associates, (KCI) Legal name of firm: Kimley-Horn and Legal Name of Firm: Bleyl Interests, Inc. Inc. Legal Name of Firm: GarzaEMC, LLC Associates, Inc. DBA Bleyl Engineering. Texas Engineering Board Firm Registration Business description: 100% employee- LEGAL NAME OF FIRM: KFW Management #: 4242 TBPE Firm Registration Number: F-6535 owned, sub-chapter S corporation Texas Engineering Board firm Registration LLC, dba KFW Engineers & Surveying Texas Engineering Board firm registration Firm Registration: State of Texas Firm No. LEGAL NAME OF FIRM: Cobb, Fendley & Legal name of firm: Doucet & Associates, Legal name of firm: Freese and Nichols, Inc. No.: F-14629 number: #F-000928 678 Associates, Inc. Inc. Location of office that shall conduct work: Location of Office to Conduct Work: 710 Firm registration numbers: KCI’s TBPE firm Legal name of firm: Civil & Environmental TEXAS ENGINEERING BOARD FIRM TEXAS ENGINEERING BOARD:Texas Texas Engineering Board firm registration Leander, Texas Hesters Crossing, Ste 120, Round Rock, TX registration number is 10573 and the firm’s Founded 1980. Adams Consulting Legal Name of Firm: Consultants, Inc. Location of Office to Conduct Work: Legal Name of Firm: Huitt-Zollars, Inc. (HZ) REGISTRATION NUMBER: 9513 Location of office that shall conduct work: Support for the City of Leander will be CLGann, LLC Board of Professional Engineer and TBPE firm registration number: F-3937 number: F-2144 TBPLS number is 10194365 Engineers, Inc. Black & Veatch Corporation North Austin Texas Engineering Board Firm Registration 10814 Jollyville Road, Avallon IV, Suite 200, provided primarily out of our Austin TBPE Firm No. 20717, 3708 Norman Loop, Land Surveyors (TBPELS Engineering Firm Contact persons: Eric Sierra-Ortega, PE, Contact Person: Ruth Haberman, PE, CFM, Texas Engineering Board -Firm Registration Texas Engineering Board Firm Registration Texas Engineering Board firm registration Foresite Group, LLC dba Foresite Consulting 9442 N. Capital of Texas Highway Number: F-761 LOCATION OF OFFICE THAT SHALL Austin, TX, 78759 • Legal name of firm; office with additional support from our Bryan Round Rock, TX 78664; Contact Persons: No. 274) Location of Office: 7401 B Hwy 71 West, Group of Texas, LLC TEXAS ENGINEERING Location of office that shall conduct work: Project Manager; Jim Jarrett, PE, Principal- Project Manager Location of office that shall conduct work: Number Number: number: F-38 Plaza One, Suite 315 Location of Office Conducting Work: 3701 CONDUCT WORK: 162 W. Mill Street, New • Texas Engineering Board firm registration number; and Conroe locations Clay E. Gann, PE President & Laura Gann LOCATION OF OFFICE CONDUCTING Suite 160, Austin, Texas 78735 BOARD FIRM REGISTRATION NUMBER: Austin, Texas in-Charge 512.338.1704 | [email protected] 11900 West Parmer Lane, Suite 105 in F-1002 F-258 Austin, Texas 78759 Executive Center Drive, Ste. 101; Austin, Braunfels, Texas and 3421 Paesanos Contact person: Brian Boecker, P.E.: | • Location of office that shall conduct work CEO; Drainage Design and Analysis & WORK Legal Firm Name: EDGE Engineering, #12878; Jim Clements, PE, Senior Project Cedar Park, TX Address of the office that will be providing Location of Office Conducting Work: Location of office that shall conduct work: Texas 78731 Parkway, San Antonio, Texas. [email protected] | • Contact persons; Primary contact will be Project Manager Complex Hydrology and Hydraulics 505 E. Huntland Drive, Suite 100, Austin, TX Main Point of Contact: Colin Slagle, PE, PLLC Manager; Local Address/Project Offices: Contact person: Drew Hardin, PE | 512-567- Legal Business Description Corporation Legal Business Description: S-Corporation services 4009 Banister Lane, Suite 412 | Austin, TX Austin, TX Contact Person(s): Contact Person: Rey Gonzalez, PE; (512) 512.418.4533 • Legal business description; (Individual, Partnership, Kenny Watkins, PE, • Roadway Design / Signing, Pavement CONTACT PERSON: Julie Hastings, PE, CFM TBPE Firm #: 20690 3000 E Cesar Chavez Street, Suite 300, Austin, 2800 | [email protected] Contact person: Melinda Luna, PE, CFM Austin Office-13785 Research Blvd,Suite 78704 Texas 78702 John Pelham, PE 231-1119; [email protected] CONTACT PERSONS: The City of Leander [email protected], and Marking and Channelization LGPP - [email protected] Phone: 512.583.2680 Office Location: 4404 E Hove Loop, Austin, List of services the firm offers: • Roadway List of services the firm offers: Drainage [email protected] // (512) 640-1840 Corporation, Joint Venture, etc.) 125 Contact Persons: Contact persons: James Massaro - Headquarters: Project Principal, Senior Vice President Legal Business Description: Corporation. will have two (2) points of contact: Chris Legal business description: Corporation Regional Manager Steve Ihnen, PE, • ADA, Bicycle and Pedestrian Facility LEGAL BUSINESS DESCRIPTION: Email: [email protected] TX 78749 Legal business description: Corporation design • Traffic analysis and engineering • Systems Analysis, Planning + Design, • List of services the firm offers Austin, TX 78759 Joe Aillet | [email protected] | 210-274-2371 [email protected] 3740 Davinci Court, Suite 100, Peachtree (512) 298-3284 Services provided: Streets/Thoroughfares, Otto, PE, CFM | Contractual Maters [email protected] Development Corporation Project Manager: Chad Cormack, PE, CFM Storm water design and management • Roadway Design, Transportation Planning, List of services the firm offers: KCI’s Wastewater Alex Kuzovkov | [email protected] | 678- Corners, GA 30092. civil engineering, [email protected] Storm Drainage/Erosion Analysis, Burt Wellmann, PE | Day to Day Project List of services the firm offers: • Civil Site Development / Erosion and LIST OF SERVICES:traffic engineering, Legal business description: S Corporation Firm Offerings: Traffic Engineering, Water treatment and Water + Wastewater Planning + Design, professional staff of engineers, planners, Thoroughfare Design 654-2063 Legal business description: Corporation landscape architecture, structural engineering, Hydrology and Hydraulics, Architecture, Management Transportation Planning and Traffic Legal Business Description: S-Corporation Sediment Control roadway design, water and traffic engineering, fiber/broadband engineering, Roadway Design, Water/Wastewater distribution • Sewage collection and Aviation Planning + Design, General Civil scientists, surveyors, and construction Storm Drainage Legal Business Description: Legal Business Description: Limited Liability Water/Wastewater, Bridges and Structures, Operations (TPTO), Transportation • Construction Support wastewater design, drainage systems Services Offered: Transportation, Water and wireless services. Planning and Design, Drainage System treatment • Bridge design and inspections Engineering Services, Channel Stabilization managers offer a broad range of Parking Lot Design Corporation (Employee-Owned). Services Services offered: Air Quality, Civil Corporation Traffic Engineering and Parks and LEGAL BUSINESS DESCRIPTION: Limited Systems, Management, and Operations, Services include Public Works, Hydrology & • Subsurface Utility Engineering and Design design and analysis, Infrastructure, H&H/Drainage, Public Works, Design and Analysis, Small, Multi- • Lake and dam design & restoration • + Erosion Control, Permitting, engineering services, including Underground Utilities offered: Water and Wastewater Design Engineering, Environmental Engineering & Recreation. Liability Corporation Roadway/Bridge Design, Hydraulics, Transportation land surveying, and other general Land Disciplinary Services Building design and space planning • Environmental Regulatory Agency wireless/communications infrastructure, Sciences, Surveying, Water Resources List of Services Offered: Water/Wastewater Design, Development Engineering, Construction Services, Land & engineering services for Development, and Construction Business and industrial parks • HVAC Interactions, Hydrologic and Hydraulic civil, structural, transportation, - Civil Engineering - Water and Wastewater - LIST OF SERVICES: Civil Engineering, Services, Landscape Architecture, Site Development, and the following multi-disciplinary projects Management systems • Energy studies and retrofit (H&H) Modeling, CAD Drafting, GIS environmental, hazardous waste, Drainage Design and Analysis - Traffic Land Surveying, GIS Services, Geological & Community Planning, Community Specialized Services: Aerial • Utility studies and systems • Fire Analysis/Mapping, Cost Estimating, mechanical, electrical, telecommunications, Engineering - Construction Administration - Environmental Services Resiliency, Energy, Environmental Imagery and Geographical Information protection and life safety • Park and Constructability Reviews, Construction and soils. Engineering is not all we do. We Project Management Engineering/Planning, Parking, Technology, Systems (GIS). recreation facilities • Residential Management, Water Utility Operations also provide cultural and environmental Transit development • Hazardous waste Support resource management services, land management planning and landscape architecture, Statement of availability provided.

In order to ensure a responsive team, GarzaEMC has assigned four Team Statement of availability provided. Statement of availability provided. Leads that report directly to the Project Statement of availability provided. Statement of availability provided. Manager, all falling under the Statement of availability provided. Statement of availability provided. Project Manager, Ms. Julie Hastings, PE, Statement of availability provided. Mr. Slagle will serve as the single point of Project Principal. LGPP is available and eager to serve on Chris Otto, PE, CFM | Principal in Charge; Project Principal |Brian Boecker, PE; Quality PROJECT DIRECTOR Statement of availability provided. contact for the City and will interface directly Statement of availability provided. Our project manager, Ms. Luna, will Kenny Watkins, PE - Project Manager this project assignment. Ms. Hastings has Statement of availability provided. Burt Wellmann, PE | Project Manager Control Quality Assurance |Steve Galloway, JOE AILLET, QA/QC MANAGER DAVID with the City’s PM for all Drainage Systems Project Principal, John Pelham, PE; Senior communicate with the team leads/lead Derek Wind, PE, CFM - QA/QC/ H&H the capacity to take on City projects and Statement of availability provided. P.E., CFM, AP; Drainage | Carolyn TIMMERMANN, PROJECT MANAGER Adam Mehevec, PE – Project Principal; Design & Analysis project assignments. Mr. Project Manager, Chris Randazzo, PE, Project Manager, Ruth Haberman, PE, engineers as necessary to complete the Advisor dedicate the time necessary to successfully Drew Hardin will be the main point-of- KFW typically recommends a conference Cox, P.E., CFM (PM); Drainage Support ALEX K UZOVKOV, ENGINEERING James Massaro, PE – Project Manager; Slagle will coordinate directly with task LEED AP; QA/QC Manager, Darren CFM; Project Principal, Karen Friese, PE; task assignments. Each team lead will Steve Ihnen, PE - Regional Manager launch the project team and coordinate all contact for the City and will coordinate with Eric Sierra-Ortega, PE: Project Manager & call every two (2) weeks, and if possible, an |Larry Clendenen, C.F., PWS, ISA, CA Statement of availability provided. POC is MANAGER CHRIS DORMIER. PM Project Greg Lewis, PE – Project QA/QC Principal; leaders and ensure that the project meets Huckert, PE, LEED AP; Site Development QA/QC Lead, Abe Salinas, PE, CFM communicate with their support staff. When Transportation - David Besly, PE resources. Jim Clements, PE - Project Director and the team to select the appropriate Project Point of Contact; Jim Jarrett, PE: Principal- in-person meeting once a month to ensure (USACE Waters of the U.S. Support), Chris Provide a statement on the availability, interest, and Jack Garner | Director of Operations; Robert experience: North Harris County Regional Jennifer Garcia, PE – Project QA/QC the City’s goals within the project budget and Permitting, Julia Mrnak, PE; Water and working on a City of Leander project, each Bleyl EIT & CAD Support Statement of availability provided. CLAY POC; John Rhodes, PE PIC; Brett Basquin, Manager based on the proposed project in-Charge & QA/QC; Katie Handley Stucky, proper communication between the client, MacLauren, P.E. (PES), Greg Mosier, commitment of the firm, its principal(s) and assigned Adams PE, President; Lenwood Adams, Water Authority | State Highway 249 Principal; Seth Bonner, PE – Project Civil and schedule. Mr. Altman will serve as the Wastewater, Kelley Fowler, PE; Drainage Statement of availability provided. Project Communication with the City will be through team lead will communicate issues or GANN, PE, CFM City of Leander staff will be an integral part PE QA/QC; Craig fletcher, PE Senior assignment. Once a project is assigned, our PE, CFM, ENV SP: Deputy Project stakeholders, and project team. Given the RPLS, P.G. (Survey) professionals to undertake the project, reporting responsibilities PE, CFM and David Riddle PhD, PE, Regional Pump Station (SH 249 RPS); Engineer. Project Principal, advising Mr. Slagle as Statement of availability provided. and Roadways, Brett Larson, PE Manager Rey Gonzalez, PE, Principal-in- Ms. Haberman, giving the City a single point progress from the team members back to The Bleyl Team will coordinate with the PROJECT MANAGER; PROJECT of our project team and will be included in Project Engineer; Alan Neal, PE Hydrology discipline-specific project managers will Manager; Beth Fry, PE, CFM: Senior current state of affairs, KFW is conducting CPESC & CPSWQ Environmental Houston, TX; Gulf Coast Authority of Texas | needed and ensuring that all resources and Charge, Greg Wine, PE, of contact. Ms. Haberman will conduct Ms. Luna daily. She will communicate with and how the firm will interface with the City of Leander’s Project primary engineer, sub-consultants, internal ENGINEER; all specific project assessments and key Specialist; Jason Weckerly, RLA Landscape serve as the main point of contact for that Engineer; Todd Trotter: Environmental video conference meetings in lieu of in- Brian and Project Manager Carolyn Cox, Engineering. Unclear who PM would be. Blackhawk Wastewater Treatment Adam Mehevec, PE will be the primary personnel are available to complete the While it is likely that there will be multiple biweekly calls with task leads to discuss the City of Leander’s Project Manager as Manager. staff, and utility companies. Bleyl will ensure decisions. Ms. Hastings is dedicated to Architect project and Drew will primarily serve in a Permitting; Frank Phelan, PE: Local Liaison, person meetings. The communication plan P.E., CFM, will maintain consistent dialogue Assuming Jack Garner. Plant Aeration System Upgrades interface for the City of Leander Project project. Regularly scheduled (e.g., individuals working on an assignment, the progress, potential schedule or technical needed (on a weekly basis at a minimum). backup representatives remain available to accomplishing the City’s objectives. She project director role to make sure the City’s Jay Engineering can be adjusted based on project scope as with the City’s project manager via Evaluation; Friendswood, TX; City of Manager and City staff, and will be available biweekly) and as-needed project meetings City’s Project Manager issues, and opportunities for saving time. Ms. Luna will communicate progress and accommodate project requirements for understands the importance of well-timed needs are met, proper resources are needed, as projects that are more complex meetings, telephone calls, and emails. Brian Houston | 69th Street WWTP by phone or email as needed, as well as in with Mr. Slagle, the City’s PM, and will need only communicate with Frequency of progress meetings will vary by other issues to the City’s Project Manager. client meetings. Bleyl purposefully cross- coordination with the appropriate City assigned and the quality process is being may require more frequent meetings. Every will follow-up meetings with meeting Improvements; Houston, TX; City of Humble person to the extent required by the City additional personnel (as appropriate) may GarzaEMC’s Project Manager, although all project phase to optimize communication Project meetings will be held on a weekly trains each EIT and PE on roadways, personnel and welcomes your valuable conducted per FNI standards. meeting will have a clear scope and minutes to document discussion and action | Wastewater System Expansion; Humble, Project Manager. be held virtually using the City’s preferred Project Leads will be available and budgetary efficiency. basis with all the team members via web utilities, pedestrian facilities, drainage and input. Ms. Hastings will be available for agenda, provided to clients and items. Brian plans to communicate with you TX; communication tool(s) or in-person in as needed. Our Project Manager will conference or in person if preferred by the traffic regular stakeholders, at least 24 hours before the regularly on the overall project status via accordance with all applicable guidelines oversee the overall project deliverables, City. progress and coordination meetings, as well proposed meeting. regular status reports. and regulations. while the scope-specific Team as emergency meetings as required Leads will be responsible for their area (site development/permitting, drainage/roadway, water/wastewater, QA/QC). Proposed Staff 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 JULIE HASTINGS, PE, LGPP PROJECT Drew Hardin, PE | Client Liaison; Mike PROJECT MANAGER: Ruth Haberman, Melinda Luna PE, CFM | Project Manager | Chris Otto, PE, CFM | Principal in Charge | Project Principal | Brian Boecker, PE | WATER TREATMENT FACILITIES MANAGER; DAN WARTH, PE PROJECT Nichols, PE | Principal-in-Charge; Chris PE, CFM | Round Rock, TX; PROJECT Cedar Park, TX; Nicole Deskus, PE, PMP | San Antonio, TX ; Burt Wellmann, PE | John D. Bleyl, PE - Principal & CEO Eric Sierra-Ortega, PE: Project Manager & Austin, TX; Quality Control Quality Nick Burns, 50% | Matt Richart, 60% | PRINCIPAL; LARISSA PRINCE, PE Trevino, PE, CCM | Transportation Project PROJECT PRINCIPAL: John Pelham, PE PRINCIPAL: Karen Friese, PE | Austin, TX; Drainage Systems Design | Cedar Park, TX; Project Manager | New Braunfels, TX; (Conroe Office) Steve Ihnen, PE - Regional Point of Contact (Austin, TX); Jim Jarrett, Assurance |Steve Galloway, P.E., CFM, Monica Stiggins, 50%, WATER & QUALITY ASSURANCE (QA) MANAGER; Manager; Anne Hoskins, PE | Water and South Austin, TX; SENIOR PROJECT QA/QC REVIEWER: Abe Salinas, PE, CFM Cynthia Landez, PE | Drainage Systems Teresa A. Seidel, RPLS | Project Manager | Manager (Austin Office) Derek Wind, PE, PE: Principal-in-Charge & QA/QC (Lenexa, LEED AP | Dallas, TX; Drainage | Carolyn WASTEWATER MASTER PLANNING Adam Mehevec, PE – Project Principal CARRIE JAEGER, PE TRAFFIC Project Principal - Duke Altman, PE, CFM Chad Cormack PE - PM; Travis Kaatz, PE - Wastewater Project Manager; Kim Patak, MANAGER: Chris Randazzo, PE, LEED AP PIC Greg Wine, PE; Project Manager Rey | San Antonio, TX; HYDRAULICS + Design | San Antonio, TX; David Russell, San Antonio, TX; Rick Gray, PE, CFM | CFM - QA/QC and H&H Advisor (Conroe KS); Katie Handley Stucky, PE, CFM, ENV Cox, P.E., CFM (PM) | Dallas, TX; Drainage Kelly Loyd, 50%, WATER DISTRIBUTION & (Austin Office); James Massaro, PE – ENGINEERING SERVICES LEAD; Austin, TX, Project Manager - Colin Slagle, Drainage Analysis; Leigh Ruhnau, PE - PE, CFM, ENV SP | Stormwater Project North Austin, TX; QA/QC: Darren Huckert, Gonzalez, PE; QA/QC Tony Sosebee, PR, ROADWAY DRAINAGE: Alexis Woff enden, PE | Small Roadway & Utility Design Asst. Project Manager | San Antonio, TX; Office)Kenny Watkins, PE - Project SP: Deputy Project Manager (Lenexa, KS); Support |Larry Clendenen, C.F., PWS, ISA, WASTEWATER COLLECTION Project Manager (Austin Office); Greg ALFONSO CASIO, PE ROADWAY DESIGN PE, CFM Austin, TX, H&H Modeling - Tom Drainage Design; Luis Vazquez, EIT & Manager; Bregger Garrison, PE | Roadway; PE, LEED AP Houston, TX; SITE DBIA; Drainage Systems Design and PE, CFM | Task Lead | Austin, TX, Support | San Antonio, TX; John Mudd, PE | Nick Reynolds, PE, CFM | Asst. Project Manager (Austin Office) PM Experience: • CLAY GANN, PE, CFM Beth Fry, PE, CFM: Senior Engineer CA (USACE Waters of the U.S. Support) | Matt Richart, 60%, WATER & Lewis, PE – Project QA/QC Principal LEAD; KRISTEN VAN HOOSIER, PE Hegemier, PE, D.WRE, CFM Austin, TX, Haley Wightman, EIT - Production Staff. Sean Barry, PE, ENV SP | Roadway; Eddie DEVELOPMENT & PERMITTING: Julia Analysis Rusty Parr, PE and James Ortega, PE | Support Staff | Round Rock, Drainage Systems Design | Houston, TX; Manager | New Braunfels, TX; Ryan City of Rollingwood Edgegrove, Drive 12” PROJECT MANAGER; PM; PROJECT 165 staff: 26 Professional Engineers [PE] (Lenexa, KS); Todd Trotter: Environmental Fort Worth, TX, Chris MacLauren, P.E. WASTEWATER REGULATORY (Austin Office); Jennifer Garcia, PE – WATER AND WASTEWATER DESIGN H&H Modeling - Alex Chan, PE, CFM PM Project Experience: UBCWCID ON- Haas, AICP | Impact Fee Studies; Jessica Mrnak, PE South Austin, TX; WATER / Mangles EIT. PM project experience: City TX; HYDROLOGY + URBAN DRAINAGE Cody Condron, RPLS, CP, CMS | Survey Oxenreiter, CFM, EIT | Project Engineer | Waterline • Johnson Ranch MUD, Utility ENGINEER; project experience: IH35 @ • 19 Engineers-in-Training [EI/EIT] Permitting (Lenexa, KS); Frank Phelan, PE: (PES) | Frisco, TX, Greg Mosier, RPLS, COMPLIANCE & PERMITTING Project QA/QC Principal (Austin Office); LEAD; MICHAEL SANTANGELO, PE Austin, TX, Drainage Design - Tom Curran, CALL ENGINEERING SERVICES| Vassar, PE | Water/Wastewater Planning WASTEWATER: Kelley Fowler, PE South of Leander CR 280 Drainage Study & DESIGN: Paul Shattuck, PE, CFM | Austin, Manager | Houston, TX San Antonio, TX; Kara Lara | Lead GIS • Names and roles of key personnel proposed to work on this Infrastructure Design • Vista Ridge US183, Travis County - TxDOT Austin • 45 CAD Drafters/Designers Local Liaison, Jay Engineering (Leander, P.G. (Survey) | San Antonio, TX Lauren Gonzalez, 30%, WASTEWATER Seth Bonner, PE – Project Civil Engineer DRAINAGE SYSTEMS DESIGN AND PE Austin, TX, Drainage Design - Zhipeng Williamson County, TX; DRAINAGE and Modeling; Charles Kucherka, PE, CCM Austin, TX; ROADWAY / DRAINAGE: Brett Planning – Leander, Texas; Spicewood TX; FLOOD MITIGATION + DETENTION Analyst | San Antonio, TX effort and their office locations. Subdivision Leander, Multiple Utility District*.; SH 45SW PS&E, Travis and Hays • 20 GIS Database Engineering Analysts TX) 38 Total employees; 5 Landscape AE; 16 TREATMENT FACILITIES (Austin Office); Frank Funk, Lead Surveyor ANALYSIS LEAD; BILL WARRICK, RPLS Xing, PE, CFM Austin, TX, Drainage Design MASTER PLAN | Liberty Hill, TX; BRUSHY | Stations | Storage Tanks; Erin Larson, PE San Antonio, TX Springs Road & Low Water Crossing POND DESIGN: Claire Ramirez, PE, CFM | PM Experience: FM 1626 Culvert Crossing • Include resumes for all key personnel and indicate any Systems Design • Guy Herman Center for Counties – CTRMA*; Sessom at Academy • 4 Landscape Architects [3 RLAs] PM Experience: Texas Street Channel Engineers, 6 Admin., 11 Designers. Jack Andrew Shaw, ENV SP, BVEE, PhD, 50% | (Austin Office) LAND SURVEYING LEAD; Candyce Ward, - David Clark, PE Austin, TX CREEK DETENTION FEASIBILITY STUDY Flanagan, PE, BCEE | Water Treatment; Improvements – Austin/Travis County, San Antonio, TX; ANALYSIS SUPPORT: Analysis, Travis County, TX; SH 30 (36- PM Experience: Lost Creek Subdivision individuals who have had previous experience on similar Mental Crisis Care, Site Improvements and Drainage Improvements Project – City of • 2 Traffic/Transportation Engineers PM Experience: City of Georgetown, DB Drainage Analysis, Richardson, TX; Garner PM project experience: Tessera on Laura Stratton, 50% | PE, GISP, CFM Support; David Rogers, | Leander, TX; ON-CALL DRAINAGE Coby Gee, PE, ENV SP | Wastewater - Registered Professional Engineers with Texas; Thoroughbred Farms Drainage Carolina Lara | Round Rock, TX; DESIGN 7IDP5094), Texas Department of Sewer - San Antonio, TX; Northside ISD, projects. Utility System Design • Shadowridge San Marcos*.; Georgetown Inner Loop @ • 3 Structural Engineers Wood Road at Fire Station No. 5 Parkdale Drive at Forney Branch, Dallas, Lake Travis, Lago Vista, TX; Bridgeport Carlos Chavez, 50%, ELECTRICAL PM Experience: • Kerrville 970-foot Water Support Registered Civil Engineers (22), Surveying REVIEW | Various Cities, TX; HEC-RAS 2D Treatment; Garrett Johnston, PE, CFM, the State of Texas: 18 - Project Engineers: Improvements – Austin/Travis County, SUPPORT: Vanessa Molina, EIT | Round Transportation. Houston, TX; Fourth Ward Valley Hi Elementary School Drainage Crossing, Utility Infrastructure Design • Wilco Way – Williamson County*.; Seton • 3 Telecom Subject Matter Experts PM Roadway Improvements | Georgetown, TX TX; Monte Carlo Bridge at Tickey Creek, • Provide staffing size by areas of expertise. EDC - Phase 2 Infrastructure, Bridgeport, DESIGN Line Extension • Lehigh Kyle Floodplain Staff (21), Drafting Technicians (17), TRAINING | City of Austin & San Antonio GISP | Modeling; George Fowler, PE | 14 - CAD Technicians: 6 - Administration Texas; City of Austin East Martin Luther Rock, TX Street Reconstruction Project Phase II, Design - San Antonio, TX; Northside ISD, Cambridge Estates, Pflugerville (Water, Parkway, Williamson County – City of Experience: CITY OF CHINA GROVE CITY Princeton, TX; Princeton On-Call Services, • Provide staff availability to perform services. TX; Bentley Ridge, Burnet County, TX; Wanda Luper, 30%, INFORMATION Study, Texas Lehigh Cement Company PM Experience: Taylor Lane Roadway Additional Personnel (24), Certified River Authority, TX; COERS DRIVE Stream Restoration; Will Huff, PE, CFM | Support: 7 King Jr. Boulevard/FM 969 Corridor Fourth Ward Street Redevelopment Clark High School Drainage Improvements - Wastewater, Drainage Utility Systems Round Rock*.; IH 35, McClennan County – ENGINEER China Grove, TX; EXPERT Water/Environmental Staff: 45 | Registered Princeton, TX; Drainage and Floodplain • Provide the proposed Project Manager’s experience with Canyon West, Burnet County, TX; SOLUTIONS/GIS (TLCC) • Shumaker Floodplain Drainage Widening, Travis County, Texas; East Floodplain Managers (8) DRAINAGE IMPROVEMENTS | San Stormwater; Trey Shanks, CFM, IAM | Drainage Improvements – Austin, Texas; PM Experience: BRUSHY CREEK Authority. Houston, TX; SL 378 PS & E San Antonio, TX; Posey Road Detention - Design) • CARTS, Hwy 71 Vehicle TxDOT Waco District*; New Hope Road, WITNESS SERVICES Texas; CITY OF SAN Professionals: 32 | Design Technicians: 17 | Review Assistance Services, Fort Worth, similar size/types of tasks. Rob Wachal, GISP, WATER & Study • Bunton Branch Creek Relocation • Pflugerville Parkway Reconstruction, City of Marcos, TX; OAK BLUFF DRAINAGE Rate/Fee Studies PM Experience: City of Hutto, Municipal Randolph/Crestway Drainage Study & Letter REGIONAL DETENTION STUDY | Leander, TxDOT, San Angelo, TX; I 85 at Rocky San Marcos, TX; Tranquil Dawn Extension, Maintenance Facility • Housing First Oak Cedar Park – City of Cedar Park*; Cameron ANTONIO STORM WATER ENGINEERING Field Technicians: 4 | Construction TX; Panther Creek MDP, Frisco, TX; WASTEWATER CONDITION North Lakeway Village • Anderson High Pflugerville, Texas; Winters Mill Parkway PM Experience: Blanco Gardens CDBG- ANALYSIS & DESIGN | Round Rock, TX; Complex - Hutto, Texas; Village at Kyle of Map Revision (LOMR) – San Antonio, TX; TXDOT DESIGN DIVISION, Creek, Greenville, SC Major Drainage Crossing – San Antonio, TX Springs, 52-Unit Housing Site • City of Road, Travis County, Texas*; SH 130, REVIEW TEAM DIVISION MANAGER San Observers: 4 | Flowpath 38 MDP, El Paso, TX; Bell South ASSESSMENT & REHABILITATION School Applied Technology Building Improvements, Hays County, Texas; Safe DR Drainage & Roadway Improvement TXDOT 2D MODELING GUIDELINES | PM Experience: W/WW Capital Regional Detention Pond - Kyle, Texas; Kyle Texas; City of Cedar Park Buttercup Creek HYDRAULICS BRANCH - STORMWATER Sunrise Beach Extension of Water Utility Austin, Texas*; RM 1431, Austin, Texas; FM Antonio, TX Permitting: 1 Airfield, Fort Worth, TX Leigh Cerda, PUMP STATIONS & Routes to School – Lago Vista Middle Project; Caldwell County CDBG-DR TxDOT Design Division; HUGHES Improvement Program (2019 to 2024) | New Parkway & Seton Parkway - Kyle, Texas; Drainage Study & Planning, Cedar Park, MANAGEMENT GUIDANCE AND Total staff: 1,665; Administrative 87; CADD 26 Licensed Professional Engineers; 2 GIS Service to Island Lot 973, Travis County and others. STORAGE CEC has a staff of 53 employees at the School, City of Lago Vista, Texas; Sorento Engineering Services, Caldwell County, GARDEN STORM DRAIN Braunfels Utilities; Phase 2 Regional Raw Round Rock Downtown Streets & Drainage Texas; City of Buda Interstate Drive TRAINING | Austin, TX; TXDOT AUSTIN Technician 11; Civil Engineer 90; Technicians; 10 Administrative Staff; David Besly, PE - Transportation (Bryan Not listed in the key personnel is a staff of 80 TPTO PERSONNEL, 89 ROADWAY Lou Portillo, LIFT STATIONS & FORCE Austin location and 1,168 employees Wastewater Interceptor, City of Pflugerville, Texas IMPROVEMENTS | Copperas Cove, TX; Water System – Preliminary Design | Improvements - Round Rock, Texas; Drainage Improvements – Buda, Texas and DISTRICT WATER QUALITY POND Communications Engineer 9; Construction 2 Environmental Scientists; 3 Registered Office) Additional staff may be included as over 300 additional professionals ready to PERSONNEL, 88 WATER/WASTEWATER MAINS nationwide. Texas; Stein Falls Wastewater System KENSINGTON POND | ROUND ROCK, TX Brushy Creek Regional Utility Authority; San Westlake Drive Extension - Austin, Texas; others. ASSET MANAGEMENT | Austin, TX; CITY Inspector 363; Construction Manager 85; Professional Land Surveyors; 6 Survey CAD needed to meet specific project deadlines. provide necessary redundancy and backup PERSONNEL, 15 DRAINAGE Alex Kuzovkov, Improvements, Guadalupe-Blanco Regional Gabriel Parkway | City of Leander; 2020 Waller Creek Floodplain Modification Trinity OF AUSTIN DAM BREACH ANALYSIS | Designer 173; Draftsmen 7; Electrical Technicians; 23 EITs & CAD Technicians; 1 Bleyl has a staff of 94, including 25 if needed to assist with project deliverables PERSONNEL I&C/SCADA/PROGRAMMING Water Authority (GBRA), Guadalupe Street Maintenance Program | City of Alamo to 15th Street - Austin, Texas Austin, TX; TXDOT SH 99 GRAND Engineer 12; Environmental Engineer 30; Construction Administrator; 9 Survey Field professional engineers and to ensure deadlines are met. Chad Morris. County, Texas Heights; Hidalgo St. and Roosevelt Dr. | PARKWAY SEGMENTS H&I | Houston, TX Environmental Scientist 60; Fire Protection Crews; 1 Field Crew Coordinator City of Seguin, TX; Grandview Pump Station Engineer 3; Foundation/Geotechnical Project Experience 30 20 20 20 20 20 20 20 20 20 20 20 20 30 30 20 20 20 Founded 1894. 900+ staff across all of our CEC can implement design professionals 26 offices in Texas, Louisiana, Florida, from a variety of disciplines for civil, CobbFendley was formed in Houston in , New Mexico, North Carolina and structural …(include others), and 1980 to provide professional civil GarzaEMC has provided professional civil Oklahoma. Put clients, teaming partners Founded 1980. Firm services large portion environmental engineering, in-house. We engineering and land surveying services. Doucet & Associates, Inc. (Doucet) was and traffic engineering services, as well as and staff first to build long-term of Southeast and Central USA. Sample can access design and permitting With over 40 years of providing services, founded by Amy and John Doucet in 1992 40 project completed in Williamson County, Texas. water, wastewater, and roadway design for 19 regional offices in USA, established relationships that are often measured in projects include: Canyon West Bentley Bleyl was founded in 1997 in Conroe, Texas assistance as well as consultation from CobbFendley has a full-time staff of more with a mission to build a civil engineering On call experience: • DeWitt County, TX Drainage various municipalities throughout the state 1975. 450 professional and technical staff Founded in 2003, K Friese + Associates District No. 1 Civil Engineering & GIS Services (2020- decades. FNI provides a broad range of Kimley-Horn has been providing Ridge Burnet County, TX; Bentley Ridge by CEO John D. Bleyl, PE, with two many offices, for second, or even third, than 550 employees and land surveying firm that creates a of Texas. Our Firm has grown a notable plus 300 additional engineering and design GBA has more than 50 years of drainage (KFA) is headquartered in Austin, with offi Established in 2006, KFW started as a Present) services to plan, design and manage public Founded in 1955, KCI is a 100-percent professional engineering services since our a. Provide an overview and brief history of the firm. Burnet County, TX; Mixed-Use Planning employees and a heart to serve his opinions desired by City Staff. This can across 19 offices and 120 employees in the positive difference in the lives of our clients, portfolio of these types of projects and staff. Texas staff 298. Rey Gonzalez, PE design experience. Our multidisciplined ces in Round Rock, Houston, and San small civil engineering firm with a handful of • City of China Grove, TX City Engineer (2020- infrastructure projects. employee-owned engineering, consulting founding in 1967. Our permanent staff b. Provide verifiable examples of at least three (3) projects in each Marble Falls EDC; Conceptual Downtown community. eliminate delays caused by seeking out an Central Texas Region. employees and communities we serve. Present) gained a keen understanding of public and Project Manager Austin 75%+ engineering staff can quickly organize Antonio, Texas. employees. Over 14 years, it steadily Established in 1915, Black & Veatch is an and construction firm serving clients includes almost 4,300 professionals category of experience completed in the last five (5) years by the Improvements Marble Falls, TX; Old David Memorial Drive – Phase 1 expert in an unanticipated discipline with • City of Tucker, GA Traffic Studies and Landscape stakeholder participation, and having Gregory R. Wine, PE Principal-in-Charge teams with the specialized experience attracted growth through proactive employee owned firm with 11,000 Architecture On-Call (2018 - Present) WILLIAMS DRIVE EXTENSION STUDY | throughout the United States. Our roughly firmwide, with ample technical resources to prime firm, including: Noonday Road Improvements | Tyler, TX; Shenandoah, TX (2017) little or no notice. Such advantages may SPICEWOOD SPRINGS ROAD Guadalupe River Bank Restoration at the Founded 2019. 5 employees. Firm project multiple project funding sources. Houston 25%+ necessary to successfully design a project, BRUSHY CREEK REGIONAL DETENTION leadership and employee-centric company employees. ƒ Zebra Mussel Mitigation • City of Cumming, GA On-Call Civil Engineering City of Corpus Christi | 2019 | $49,955; 1,700 employee-owners operate out of 54 serve clients responsively from more than • Project name and location; Earl Campbell Parkway | Tyler, TX; TxDOT Ed English Water & Sanitary Sewer allow faster decision-making and resolution Founded 2019; number of employees and CORRIDOR ANALYSIS | CITY OF AUSTIN, City Park / 2019 / $350,000 (Victoria, TX); experience: RM 1431 Pond #1 Tony Sosebee, PE, DBIA QA / QC Austin no matter the size. STUDY | Leander, Texas | 2019 | Study; culture. Project, Emergency Backup Power, Water Services (2019 - Present) TRAFFIC STUDY US 277 AT GRAND offices in 20 states – as well as the District 100 different office locations. • Services provided; Transportation Enhancement Program | Improvements - City of Shenandoah (2019, to potential conflicts. CEC has over 20 staff uncelar. SH 45SW, Austin, TX, Travis TEXAS (2017, $.3M);NORTH AUSTIN Stormwater Planning & Subdivision Rehabilitation - Cedar Park; Williamson • Gwinnett County Department of Community Services CITY OF CIBOLO LOWER 25%. MIDTOWN DRAINAGE IMPROVEMENTS | Resources Integration Program, Martin Hill CANAL ROAD | City of San Angelo | 2017 | of Columbia. The firm has seven offices • Information whether the respondent was the prime professional or a Tyler, TX; and others. Drainage $.46M) offices nationwide, that have local & Hays Counties, CTRMA; H35 and US183 COMPLEX TRAFFIC IMPACT ANALYSIS | Regulations / 2019 / $25,000 (Williamson County Flood Monitoring System - Demand Design Services (2010-Present) HAECKERVILLE ROAD | Cibolo, TX | 2018 Russell A. Parr, PE, CFM Drainage 6200 Nieman Storm, Street & Channel San Marcos, Texas | Ongoing | $2M; WEST CITY OF SHAVANO PARK MASTER Transmission Main - • City of Sandy Springs, GA On-Call Landscape $36,678; COLLINS ROAD TRAFFIC throughout Texas. DRAINAGE AND FLOODPLAIN REVIEW subconsultant; improvement projects: • City of Tyler, TX Gun Range & West Summerlin - City of experience and availability to serve the City Interchange, Austin, TX, Travis County, TEXAS FACILITIES COMMISSION (TFC) | County, TX); City of Georgetown TWDB Williamson County; Slaughter Lane Corridor | $2.2M; BEXAR COUNTY FISCHER ROAD Systems Design Analysis Austin 75%+ Improvements | Shawnee, Kansas | 2019 | LAKE HILLS COMPREHENSIVE DRAINAGE PLAN | SHAVANO PARK, Segment C, North Acres Wastewater Architecture (2016-Present) STUDY AND UPDATE | Town of Sunnyvale ASSISTANT SERVICES, FORT WORTH, • Project status; • City of Garland, TX Conroe (2020 Design-Estimated, $.5M) when additional tasks or effort are required. TxDOT AUSTIN, TEXAS (2020, $.1M); TAYLOR Flood Protection Planning Studies / 2018 / Segment C2 - City of Austin; TxDOT RECONSTRUCTION | Austin, TX | 2018 | James Mangles, EIT Drainage Systems $1.05M; New Century Parkway Stormwater DRAINAGE STUDY | West Lake Hills, TEXAS | 2017 | $50,000; CITY OF CIBOLO Interceptor; Walnut Creek Tertiary Filters • City of Johns Creek, GA Task Order Contract - | 2017 | $52,000; SAN GABRIEL PARKWAY Fourth Ward Drainage System, Houston, TX | On-going;TICKEY CREEK MDP AND • Total cost; • City of Lavon, TX Fish Creek Thoroughfare Expansion - This flexibility and reserve design staff can Austin District; Inner Loop Safety LANE ROADWAY WIDENING | TRAVIS $1.1 M (Georgetown, TX); McNeil Drive Low Hydraulic Design Manual Updates - K Landscape Architecture and Sidewalk Design (2016- $2.3M; SAWS BELFAST & JANDA Design Analysis Austin 75%. Relevant firm Improvements | New Century, Kansas | Texas | 2017 | Study; FOREST NORTH TOWNE CREEK DRAINAGE ANALYSIS | Upgrades & Modifications, Northern Region DESIGN IMPROVEMENTS | City of Leander Texas | Ongoing | $6.2M; Carmona Hills, LOMR, PRINCETON, TX | • Client name and contact person; • City of Mt. Pleasant, TX Montgomery County (2018, $2.2M) eliminate the need for additional Improvements, Williamson County; COUNTY, TEXAS (Est. 2022, $14M); EAST Water Crossing Upgrade / 2020 / $4 M Friese & Associates; RM 1431 Pond #2 Present) SUSAN DRAINAGE | San Antonio, TX | experience: HOWARD & CRESTVIEW 2020 | $281,339; On-Call Collection System DRAINAGE IMPROVEMENTS, PHASE II | CIBOLO, TEXAS | 2019 | $1,500; W. Basin Assessments, Northbelt WWTP • City of Norcross On Demand Services - Landscape | Ongoing | $1M; NORTH LAMAR San Antonio, Texas | 2018 | $339,845; 2019;PARKDALE DRIVE AT FORNEY, • History of meeting schedules; and • Tyler EDC, Tyler, TX 2017 Drainage Hotspots Utility District No. 4 authorization for professional services that PFLUGERVILLE PARKWAY (Austin, TX); SH 99 Grand Parkway Rehabilitation - City of Cedar Park; 2016 | $469,003; CITY OF ROUND ROCK STATION DRAINAGE STUDIES & Emergency Assistance | Kansas City, Williamson County, Texas | 2017 | $2.8M; MILITARY & WESTMAR AREA DRAINAGE Improvements; GIS Implementation & GIS Architecture, Civil Engineering, and Structural BOULEVARD PRELIMINARY Caroline Street Reconstruction Project, DALLAS, TX | 2017 | $669,404;MONTE • History of accomplishing services within established budget, • JML Architects (April Sound) (2019, $.3M) could delay the critical path of a project. RECONSTRUCTION | CITY OF Sections H & I Drainage Review / 2020 / SETTLERS CROSSING LIFT STATION | CHANNEL IMPROVEMENTS | Austin, Kansas | Ongoing | Cost varies by Project; KENSINGTON DETENTION + CHANNEL | SAN ANTONIO, TEXAS | In Progress | Hosting Project. Engineering ENGINEERING | City of Austin | 2019 | Houston, Texas | 50% complete | $12.38M; CARLO BOULEVARD, PRINCETON, TX | including planned vs. actual. • First Baptist Church, Tyler, TX Freedom Boulevard - City of Conroe PFLUGERVILLE, TEXAS (2019, $4.2M); $430,000 (Houston, TX); Caldwell County (2014-Present) Round Rock, TX | 2018 | $201,169; CITY OF Texas; THOROUGHBRED FARMS MS4 Permit Water Quality Monitoring | IMPROVEMENTS | Round Rock, Texas | $8.52M $66M; US BUSINESS 77 CORRIDOR Grant Road Reconstruction & Widening 2020 | $2.4M • Lowe’s Companies, Inc., (2018,$1.4M) Water Wastewater Design (Leander, TX, STEIN FALLS WASTEWATER SYSTEM CDBG-DR Drainage Infrastructure Projects • Georgia Institute of Technology Task Order Contract - BUDA GARLIC CREEK LIFT STATION | DRAINAGE IMPROVEMENTS | Johnson County, Kansas | Ongoing | 2017 | $1.005M; ATHENS STREET STUDY | City of Waco | 2016 |$185,000; (Precinct 4), Houston, Texas | 2017 | $1.2M • Citizens National Bank, Walden Road Widening - Montgomery On-going), City of Austin Commons Ford IMPROVEMENTS | GUADALUPE-BLANCO & County Engineering Services / Current / Landscape Architecture and Civil Engineering (2016- Buda, TX | 2015 | $1.65M; CITY OF BUDA Austin/Travis County, Texas; FAIRVIEW $197,419; PRELIMINARY DRAINAGE ANALYSIS | Present) STORMWATER POND SAFETY • William Graves Architect, County (2018, $12M) Ranch Metro Park (Austin, TX, September RIVER AUTHORITY (GBRA) | $1.2 M (Caldwell County, TX); City of Austin MUNICIPAL COMPLEX DRAINAGE | Buda, DRAINAGE MASTER PLAN | Fairview, Castroville, Texas | 2020 | Study • Georgia Department of Natural Resources Task PROGRAM | City of Austin | 2019 | $5M; • Broadway Crossing, Ltd., 2015 (Design phase), ongoing), National GUADALUPE COUNTY, TEXAS (Est. 2021, 3rd Street Roadway, W/WW & Drainage Order Contract (2011-2012; 2017 - Present) TX | 2015 | $24.4M; RIATA VISTA Texas. STORMWATER MASTER PLAN AND • Sam’s Wholesale Club, Guard-Camp Mabry Building 75 Renovation $18M); BISHOP STREET IMPROVEMENTS Improvements / 2015 / $1.4M (Austin, TX) CORPORATE OFFICE CAMPUS | Austin, UTILITY RATE STUDY | City of Cedar Park (Austin, TX, May 2019), Kerrville 970-foot | CITY OF SAN MARCOS, TEXAS (Est. TX | 2016 | $ confidential | 2019 | $259,975; MLK TRANSIT Water Line Extension (Kerrville, TX, June 2022, $7.5M) ORIENTED DEVELOPMENT DRAINAGE 2020) STUDY | City of Austin | 2018 | $8M Methodology and Approach 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20

Explain how the proposed team will approach, develop, and Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. manage the project

TOTAL: 100 90 90 90 90 90 90 90 90 90 90 90 90 100 100 90 90 90 AWARD AWARD City of Leander RFQ #20-052 Engineering Services Pool - Drainage Systems

20 20 20 20 20 20 20 20 20 20 20 20

Legal Name of Firm: Lockwood, Andrews & LEGAL NAME OF FIRM: Volkert, Inc. LEGAL NAME OF FIRM: Walter P Moore Newnam, Inc. and Associates, Inc. LEGAL NAME: WSB & Associates, Inc. Legal name of firm: S & B Infrastructure, TEXAS ENGINEERING BOARD FIRM DBA Texas Engineering Board No.: F-2614 Ltd. REGISTRATION NUMBER: F-12679 TEXAS ENGINEERING BOARD FIRM WSB Engineers and Surveyors, Inc. REGISTRATION NUMBER: #16839 Legal Name of Firm: Walker Partners, LLC BUSINESS TYPE: S-Corporation Offices Performing the Work: Legal name of firm: MRB Group, P.C. Legal name of firm: MWM Design Group, Legal Name: Pape-Dawson Engineers, Inc. Texas Engineering Board firm registration LOCATION OF OFFICE THAT SHALL Name of Firm: M&S Engineering, LLC TBPE: FRM-F-16849 8911 N. Capital of TX Hwy Inc. Legal Name of Firm: Scheibe Consulting, number: F-1582 CONDUCT WORK: 801 East Old Settlers LOCATION OF OFFICE TO CONDUCT Company Registration: TBPE No. 8053 ADDRESS: 1221 S. MoPac Expressway, Building 2, Suite 2300 Texas Engineering Board firm registration TBPE #470 | TBPLS #10028800 LLC Blvd., Suite 120 | Round Rock, TX 78664 WORK: Austin, TX Firm License: F-1394 TBPLS No. 10032500 (Waco) / 10194317 Suite Austin, TX 78759 number: F-10615 Texas Engineering Board firm registration Location of office that shall conduct work: (Austin) 355, Austin, TX 78746 number: TBPE F-1416 | TBAE 1452 | Location of Office Conducting Work: Texas Engineering Board Firm Registration 1705 S. Capital of Texas Highway, Ste. 402 CONTACT PERSON: Arnold Gonzales Jr, CONTACT PERSONS: Charles Penland, Legal Business Description: Corporation S & B INFRASTRUCTURE, LTD. POINT OF CONTACT: Jay Kennedy, PE Contact Persons: Location of office that shall conduct TBPLS 10065600 10801 North Expressway, Suite 200 | Austin, Number: 13880 | Austin, TX 78746 PE, CFM, LEED Green Associate PE, LEED AP|Principal-in- 1705 S. CAPITAL OF TEXAS HIGHWAY, Office Locations Performing the Work: 823 Alternative Project Delivery | Biogas | Travis Michel, PE | Project Manager | work:8834 North Capital of Texas Highway, TX 78759 Charge|[email protected], Location of office that shall conduct work: SUITE 402 Washington Avenue, Suite 100 | Waco, Bridges & Structures | City Engineering | 512.338.2745 | [email protected] Suite 147 Austin, Texas 78759 Location of office that shall conduct work: Location of office that shall conduct work: Contact persons: Daniel O. Rios, PE LEGAL BUSINESS DESCRIPTION: S- Susan Turrieta, PE|Project Manager| 376 Landa Street; New Braunfels, TX 78130 AUSTIN, TX 78746 Texas 76701; 804 Las Cimas Parkway, Community Planning | Constructability Steve Widacki, PE | Deputy Project Austin, TX Primary Point of Contact: Scott Dukette, 11612 Bee Cave Rd., Bldg. 1, Ste. 240 | |President, Principal-In-Charge | Corporation [email protected] DANIEL O. RIOS, PE Suite 150 | Austin, Texas 78746 Review | Manager | 512.338.2751 | SDWidacki@lan- Contact persons: Justin Scarth, P.E. | P.E. LGPP | [email protected] | Austin, TX 78738 512.542.7400 | [email protected]; Frank Primary Contact: PRESIDENT & PIC Construction Materials Testing & Inspection inc.com [email protected]; Gil Gregory | Contact persons: Tony Buonodono | 512-468-2331 Duran, PE, CFM | Project Manager | LIST OF SERVICES THE FIRM OFFERS: LEGAL BUSINESS DESCRIPTION: Jerod Mott, PE, CFM | [email protected] JASON P. GARZA, PE, OR FRANK Primary Contact Person: George E. “Jed” | Contractor Modeling | Drinking Water | [email protected] 512.992.2969 | Contact Person(s): Mr. Eric C. Scheibe, PE, 512.542.7418 | [email protected] Planning & Environmental: Complete Corporation |(830) 228-4155 DURAN PE & DAVID SPEICHER PE Walker, Jr., PE | (254) 714-1402 | Economic Development | Environmental Legal Business Description: Corporation [email protected] Legal Business Description: Subchapter S CFM / President (TBPE # 98357) Streets/Bike Pedestrian Environmental PROJECT MANAGER [email protected] Compliance Legal business description: Private Corporation Legal business description: Multi-Discipline Studies & Permitting, Grant Assistance & LIST OF SERVICES THE FIRM OFFERS: List of services the firm offers: • Traffic Texas Engineering Board firm registration | Geohazard Risk Management | Geospatial List of services the firm offers: » Roadway Corporation Legal business description: Corporation Legal Business Description: LCC, S- Engineering Firm Management, Real Estate & Land Civil Engineering: Utility System Design, Engineering Services • Roadway Design • number F-1582 Legal Business Description: Limited Liability | Geotechnical Engineering | GIS Services | Design: Major/Minor Street Design, Open Services Offered: Hydrology and Corporation Acquisition, Survey, Transportation & Urban Master Planning, Land and Site Water and Wastewater Design • Drainage Company Grants & Funding | Health & Safety Roads Modeling, Pavement Design, Traffic List of services the firm offers: Stormwater, List of services the firm offers: CIVIL Hydraulics, Water and Wastewater, List of services the firm offers: Planning; Design & Engineering: Bridge Development, Roadway Design; Water Systems Design and Analysis • Land Compliance and Signals, Bike/Ped Design, ROW Water, Wastewater, Roads, Construction ENGINEERING | SURVEYING | Transportation, Surveying, Environmental, List of Services the Firm Offers: Drainage Environmental, Hydrologic Analyses, Inspection, Bridge & Structure Design, Resources Engineering: Water Supply, Surveying • General Engineering Services Our Services: Civil Engineering, Surveying, | Intelligent Transportation Systems | Acquisition » Water & Wastewater Design: Phase Services, GIS Services, Municipal ARCHITECTURE | LANDSCAPE | Land Development, GIS, Construction Systems Design and Analysis Roadway Design, Hydraulic Design & Coastal Resilience, Green Infrastructure, Floodplain Management, Storm Water for small, multi-disciplinary projects and Construction, Management and Investigation & Remediation | Land Water Supply, Transmission & Services, Grant Services PERMITTING Management Analysis, Bridge Design, Project Landscape Architecture, Lighting & Services;Traffic, ITS, and Transportation Inspection Development | Landscape Architecture | Distribution Systems, Hydraulic, & Management, Traffic Engineering, Electrical Design, Ports & Airports, Road & Planning: Transportation Planning, Traffic Managed Services Transient Modeling, Wastewater Collection, Operations Studies and Design, Highway Design, Site Development, Traffic Engineering Studies, Traffic Engineering Pipeline | Project Management & and Treatment, Master Planning, Condition Construction Management Engineering, Water Resources & Recovery; Design, Intelligent Transportation Systems; Construction Administration Assessment, Trenchless Engineering, » Program & Construction Management: Transportation Engineering: Drainage Systems Design & Analysis: Alternative Delivery & Owner Services, Highways/Toll Roads/Roadways,

Statement of availability provided.

Our Principal in Charge, Charles Penland, PE, LEED AP, will be accountable for the Statement of availability provided. overall contract execution and client Statement of availability provided. satisfaction. Our Project Manager, Susan Travis Michel will serve as the LAN Project Statement of availability provided. Statement of availability provided. Statement of availability provided. Turrieta, PE, will oversee the day-to-day Manager and will be the primary Point of Statement of availability provided. Justin Scarth, P.E., is our proposed Project Statement of availability provided. operations of project delivery. Contact with the City’s Project Manager, Daniel O. Rios, PE |President, Principal-In- Statement of availability provided. Jed Walker, PE | Project Manager Manager, and will lead the team on any Eric Scheibe, PE, CFM | Project Manager. Communication with the City of Leander’s Statement of availability provided. Jay LAN staff, and subconsultants. Project manager, Jerod Mott, PE, CFM will Statement of availability provided. Charge | 512.542.7400 | project assigned under this contract. Justin Project manager, Steven Dean, P.E., CFM, Mr. Scheibe will be the primary point of Project Manager will include monthly project Kennedy, PE prepare a staffing [email protected] Volkert’s dedicated project manager, Arnold Daily interaction and communication will update the city and the Project Principal, will be available either in-person or virtually contact on all projects and will act as the status reports and periodic design review CLIENT REPRESENTATIVE, Earth Evans, Periodic progress meetings will be held with plan based on the scope of work, manpower Tony Buonodono, PE, PMP | Project Daniel O. Rios, PE - PIC; Frank Duran, PW Gonzales, will serve as point-of-contact for internally and with Leander’s Project Mr. James J. Oberst, P.E., LEED AP, of all as needed. Scott Dukette, P.E., LGPP, our Project Manager on any task orders meetings. The meetings will be followed up PE the City’s PM to review project requirements, and project schedule. Jerod Manager PM; Michael Riojas, PE - QA/QC; David Project Manager, Jason Garza, PE, will all city staff and will be responsible for Manager, Wayne Watts, as necessary. We major project activities, contractual issues project principal, is equally committed to assigned. Mr. Scheibe will communicate with a meeting summary and list of action PROJECT MANAGER & HYDROLOGY/ status, accomplishments to date, ongoing will check in frequently with the City and Speicher, PE DPM; Drainage System conduct meetings with the City’s staff and developing project scopes, fees, contracts, understand and appreciate that City staff that may arise, and budget and schedule support Mr. Dean with Pape-Dawson between all subconsultants and Team items, responsible party, and due date. The HYDRAULICS/MODELING work, and scheduled activity for the other project partners to monitor progress With our location approximately 30 minutes Design and Analysis: Jerry Zhou, PE; Emily the S & B Team to ensure that all project management, deliverables, and has multiple tasks they are managing. progress. As a principal and the Executive resources to meet any project requirements, members throughout this project. Mr. monthly reports will include a brief summary Brandon Nguyen, PE next period. The frequency of progress and flow of work. As work progresses, we from the project sites, MWM can provide a Harthoot; EIT; deliverables are met by the City’s deadlines. close-out in accordance with city policies Therefore, we work hard to strike a balance Vice President / Chief Operating Officer with whether in expertise or staff. The City’s Scheibe will manage scheduling and project for City Council updates followed by a ROADWAY DRAINAGE meetings will depend on the phase of the will apply judgment, reprioritize tasks, and quick response to any project S & B has a well renowned tracking system and procedures. of resolving issues internally with elevating MRB Group, Jim will address all contractual project manager will have access to their responsibilities between all Team members detailed report describing progress made, Alison Harwood project, level of activity, and necessity for adjust our team’s organization and challenges. that we implement to assign deliverables. issues to the proper City staff member at the issues on behalf of the company and will cell numbers for calling and texting to ensure everyone understands their work to be completed and a list of WETLANDS; exchange of information. Such coordination individual assignments to meet the City’s Our Project Manager and Principal-In- proper time. Furthermore, we are willing to independently monitor project performance whenever needed. unique role and responsibility within the questions/action items that need to be is an important part of the overall project needs. Charge will always be available to address take the leadership role to keep issues through contact with Justin and directly with greater project goals. addressed by responsible party and date. management process to keep the project any of the City’s comments and concerns. moving until they reach resolution. the City’s Project Manager. Most importantly, our Project Manager will moving, and LAN and the City’s adequately have a continued open dialog with the City informed. to ensure that project expectations are being met at all times and that all parties are in agreement with project direction and progress.

30 30 30 30 30 30 30 30 30 30 30 30 Project Manager/Principal | Travis Michel, Tony Buonodono, PE, PMP | Project Steven Dean, P.E., CFM | VP-Water Daniel O. Rios, PE |Principal In Charge | Arnold Gonzales, Jr., PE | Point-of-Contact PROJECT MANAGER: Jed Walker, PRINCIPAL-IN-CHARGE: Charles Penland, PE, LGPP | Austin, TX; Transportation Manager | Civil Engineering; Eduardo O. Resources | Project Manager | San Antonio, Project Manager | Eric Scheibe, PE, CFM | Houston, TX; Michael Riojas, PE | QA/QC and Project Manager, Round Rock, TX; PE|Waco, TX; ENGINEERING DESIGN PE, LEED AP (Houston), PROJECT Justin A. Scarth, P.E. | Project Manager; Task Lead | Steven Widacki, PE | Austin, Mendez, RPLS | Surveying; Steve Zobal, PE TX; Scott Dukette, P.E., LGPP | Practice Austin, TX; H&H Modeling Team| Daniel Manager | San Antonio, TX; Frank Duran, Travis Falls, PE | Engineering Operations TEAM: Alan Munger, PE, CFM|Roadway MANAGER: Susan Turrieta, PE (Austin), Anthony D. Beach, PE, CFM | Civil TX; Roadway |Ben Jenschke, PE | Austin, Project Manager | Jerod Mott, PE, CFM | | Civil Engineering | Drainage & Utility Leader | Principal-in-Charge | Austin, TX; Harris, PE, CFM | Austin, TX, Nicole PE, CFM | Project Manager | Austin, TX; Manager, Austin, TX; Trevor Reed, PE | Design (Task Lead)|College Station, TX, DRAINAGE SYSTEMS DESIGN AND Engineer; Logan Proctor, P.E., CFM | Civil TX; Pavement | Dr. Hossein Roshani, PE | New Braunfels; Improvements; Rajan Devkota, PE, CFM | Dennis Rion, P.E., LEED AP BD+C | Velarde, EIT | Austin, TX, Juan Andrade, David Speicher, PE | Deputy Project Transportation Project Manager, Rockwall, Jacob Bell, PE|Roadway Design|Waco,TX, ANALYSIS: David Lundberg, PE (Austin), Engineer; Gilbert P. Gregory | Construction Daniel O. Rios, PE San Antonio, TX; Traffic | Mark Mathis, PE | Roadway Design | Craig Wilson, PE | New Drainage & Utility Improvements; Anali Executive Vice President | QA/QC | San EIT | Austin, TX; Design Team | Erin Manager | San Antonio, TX; Jose Castro, PE TX; Adeliza Ramirez, PE | Transportation Joe Jenkins, PE|Water & Wastewater WATER RESOURCES: Andres Salazar, Phase Services / Inspection; Jerry Landes | Principal In Charge Fort Worth, TX; Structures |Jason Martwig, Braunfels; Drainage System Design and Martinez Gonzalez, EIT | Utilities & Antonio, TX; Robert Solari, P.E. CFM | Hostetler, PE, CFM | Austin, TX | General Engineering | San Antonio, TX; Project Engineer, Austin, TX; Mohammad Design (Task Lead)|Austin,TX, Aaron PhD, PE, D WRE (Houston), CIVIL Project Coordinator; Thomas L. Brown | 20%; Michael Riojas, PE QA/QC Manager Jay Kennedy 50%; Earth Evans 45%; PE | Fort Worth, TX; Water/Wastewater Analysis | Jerod Mott, PE, CFM | New Transportation; Jason Bass, PE, LEED Principal Engineer| Drainage Project Design Guillermo Arratia, PE | Water & Wastewater Rajani, PE | Transportation/Traffic Project Archer, PE|Water Infrastructure ENGINEERING: Paulina Cristoforo, EIT Financial Affairs San Antonio 40%; Brandon Nguyen 45%; Alison Harwood Task Lead | Dan Dow, PE | Austin, TX; Braunfels; Bridge/Structural Engineering | BD+C | Land Development | Civil and Analysis | San Antonio, TX; Luke Reed, PM Experience: City of Taylor MDUS, Design |McAllen, TX; Gerardo Carmona, PE Engineer, Rockwall, TX; Chris Wickham, Design|Austin,TX, Jason Christensen, (Austin), Sanyukta Bhaskar, EIT (Austin), Frank Duran, PE, CFM Project Manager 55%. Municipal Services 77 Wastewater Treatment | Paul Wood, PE | Amy Stone, PE | New Braunfels; Water- Engineering P.E., CFM Taylor, TX | Valley Ditch Channel | Roadway Design | Houston, TX; Frank PE | Transportation Project Manager, PE|Wastewater Infrastructure DIAGNOSTICS: Matt Heringer, PE, PEng PM Experience: Water/Wastewater Austin 70%; David Speicher, PE Water/Wastewater 12 Houston, TX; Modeling | Hunter Hanson, PE Wastewater Design Utility Coordination | | Associate Vice President| Storm Drain Improvement Project, Killeen, TX | Duran, PE,CFM | Drainage System Design Austin, TX; Chris White, PE | Bridge Design Design|Austin, TX, David Smith, PE, (Austin) Treatment Plants – Expertise in plant Deputy Project Manager San Antonio 45%; Transportation/Structures 85 | Austin, TX; Pipelines/Lift Stations | Greg Brady Kosub, PE | New Braunfels; Site PM Experience: Capitol Complex Utility Design | San Antonio, TX; Vamshi Konduru, Blockhouse Creek Channel Improvement & Analysis | Austin, TX; Manching Wei, PE | Project Manager, Austin, TX; Brian CFM|Drainage System Design & Analysis assessment and upgrading efficiencies; Jose Castro, PE General Construction Services 150 Sarychev, PE | Austin, TX; Trenchless Design/Construction Inspection | Blake Improvements, Texas Facilities Commission P.E., CFM | Principal Engineer | Floodplain Project, Cedar Park, TX | Shoal Creek Structural/Bridge Design | Houston, TX; Huntsinger, PE | Construction Management (Task Lead)|Austin,TX, Jared Niermann, PM Experience: · City of Rollingwood Infiltration and Inflow Reduction (I&I) – Engineering San Antonio 66%; Guillermo Environmental/H&H 46 Engineering | Greg Henry, PE | Houston, TX Allison, PE | New Braunfels, Sandy Garza | | Water and Wastewater Utility Relocation Modeling and Mapping | San Antonio, TX; Modeling and Mapping Project, City of Barbara Castille | Environmental/Public Operations Manager, Austin, TX; Frank Cox, PE|Drainage System Design & Drainage Study and Culvert Improvements, Team leader on projects with municipalities Arratia, PE Water & Geotech/Materials 19 Drainage Task Lead | Laura Casset, PE, New Braunfels For MLK TOD Phase 1, City of Austin | Brian Allen, P.E., CFM | Project Manager | Austin, TX | Bull Creek Modeling and Involvement |Houston, TX PE | Transportation Project Manager, Analysis|Austin,TX, Jonathan Cannon, Rollingwood, TX · City of Sunset Valley to reduce storm water induced I&I into their Wastewater Design McAllen 70%; Gerardo Landscape Architecture 9 CFM, CPESC | Austin, TX; Floodplain Cherrywood Street Reconstruction and Roadway Design Support | Austin, TX; Mapping Project, City of Austin, TX | Houston, TX; Maurice Pittman, PE | PE|Drainage System Design & Flood Mitigation Study, Sunset Valley, TX · sewage collection systems; Reclaimed Carmona, PE Roadway IS/GIS/Visualization 21 Detention | Tom Mountz, PE, D.WRE, CFM | PM Experience: Ventura Blvd Storm Drain Improvements, City of Austin | Deepa Thankavel, P.E., CFM, LGPP | Wharton County Master Drainage Plan, PM Experience: • Cameron Lane Roadway Transportation Project Manager, Rockwall, Analysis|Waco,TX; SUPPORT TEAM: Lynn Action Baseball Drainage and Development Water – Strong skills in planning, reviewing, Design Houston 60%; Frank Duran, Marketing/Business Services 14 Austin, TX; Water Quality | Dr. Ka-Leung Reconstruction – City of Selma; Alves Lane Meredith St. Storm Drain Improvements, Senior Project Manager| Utility Design and Wharton County, TX | Gilleland Creek Design, LaSalle County, TX • State Highway TX Simpson, RPLS|Land Surveying (Task Permit, Cedar Park, TX · Landscapes USA and designing reclaimed water systems; PE,CFM Drainage HR/Finance 18 Lee, PE, CFM, CPSWQ | Austin, TX Improvements – City of New Braunfels; East City of Austin | Manor Circle Erosion Control Coordination Support | San Antonio, TX; Modeling and Mapping Project, Austin, TX | 365 Hydrology and Hydraulics design, Lead)|Austin,TX, Kevin Hessel, RPLS|Land Drainage, Water Quality Development PDES/TPDES/TLAP Permitting – System Design & Analysis Registered Engineers 112. PM Project Street Roadway Improvements – City of Design, City of Austin | Hills of Hays Valerie Collins, AICP | Associate Vice City of Georgetown Drainage Master Plan, Hidalgo, TX • Martinez Park Drainage PM Experience: US 183/183A Surveying|Waco,TX, Mark Permit, Travis County, TX · Applied Prepared numerous wastewater permits for Austin 75%; Manching Wei, PE Experience: Krienke Ranch Road (CR 272) PM Experience: Bullick Hollow Bicycle Leander; Geronimo Creek Flood Study – Drainage Study, City of San Marcos | President | Environmental and Permitting Georgetown, TX | Mopac Intersections Design, Cotulla, TX • Espejo Gates INTERSECTION IMPROVEMENTS, Rudloff|Construction Management| Waco, Materials North Campus Water and discharge to waters of the state and land Structural / Bridge Creek Crossing | Cedar Park, TX; City-Wide Safety Improvements – Travis County; Guadalupe Country Greenlawn and Parkside Stormwater Support | San Antonio, TX; Karissa Basse, Tollway Improvements, N. of Roadway Design, Webb County, TX • City CTRMA, LEANDER, TX; KELLAM ROAD TX Wastewater Services Extension application. Design Houston 63%; Barbara Castille Atlas 14 Analysis | Woodbury, MN; Bullick Hollow Left-Turn Lane at RM 2769 – Improvements, City of Round Rock | Ph.D., RPA | Principal Investigator| Slaughter Ln. to S. of La Crosse Ave., of El Paso, Storm Water Master Plan, (MAHA LOOP/ELROY ROAD EXTENSION) Request, Austin, TX · City of Leander Environmental / Public Involvement Houston Travis County; Main Street / FM 967 Right- 200 full time staff with five offices throughout Colorado Street Storm Drain Phase 1 and 2 Archaeology | Austin, TX; Parker Graham, Austin, TX (TxDOT) | Travisso Subdivision Project for El Paso Water Utilities, El Paso, CENTRAL TEXAS REGIONAL MOBILITY PM Experience: Flat Creek Interceptor & CR269/Hero Way Water Line MRB Group has more than 100 X 72% Turn Lane – Buda, Texas; Brodie Lane Texas. (3rd - 7th and 7th - 10th), City of Austin | RPLS | Survey Department Manager | Land Regional Detention / WQ Facility Design, TX • State Highway 365 Hydrology and AUTHORITY (CTRMA), AUSTIN, TX; 119 Reclaimed Waterline Waco, TX, Highway Improvements, Leander, TX professionals: engineers, architects, Right-Turn Lane – Sunset Valley, Texas; Harris Hill Drainage Study, Hays County Surveying Task Leader | Austin, TX Leander, TX Hydraulics design, Hidalgo, TX • Harris EXTENSION, WILLIAMSON COUNTY, 84 Water & Wastewater Improvements planning experts, GIS specialists, and utility Coers Drive Drainage and Road Harris Hill Road Drainage Improvements, County Flood Control District (HCFCD), HUTTO, TX; LAKELINE BOULEVARD. Waco, TX, West Disaster Zone Administrative 112, Building Envelope 9, operations experts Improvements – San Marcos, Texas; Pillow Hays County | Elam Creek Flood Control PM Experience: City of New Braunfels – Excavation of the Little York, and Hopper EXTENSION, WILLIAMSON COUNTY, Infrastructure Improvements West, TX, CADD Technician 49, Civil Engineers 35, Road Reconstruction – Sunset Valley, Channel Improvements, City of Azle Drainage Area Master Plan, New Braunfels, Road, Stormwater Detention Basins, and LEANDER, TX; 3RD STREET Bristol and Esther Drainage Improvements Designers 76, Field Representatives 2, GIS 20 20 20 20 20 20 30 20 20 20 20 20 Founded in 1935, LAN provides complete George E. “Jed” Walker, Jr., PE, founded Founded in 1931, our 700+ professionals engineering, planning, project management, M&S Engineering, LLC is a multi-discipline Walker Partners 16 years ago with the work across 21 U.S. offices and five MWM DesignGroup (MWM) is an Austin- program management, and construction engineering firm offering civil, electrical, Volkert, Inc. is an employee-owned desire to build upon existing relationships international locations. Walter P Moore is an based corporation providing a Scheibe Consulting has specialized management services. Specific areas of mechanical-electrical-plumbing (M.E.P.), infrastructure engineering firm serving state and to form new lifelong partnerships by international company of engineers, comprehensive multi-disciplined approach experience in drainage system design and expertise include water and wastewater and structural engineering services. S & B Infrastructure, Ltd. (S & B) has and federal agencies, local and municipal employing the best professionals in the architects, innovators, and creative people to public infrastructure projects. analysis. Our firm specializes in drainage infrastructure, stormwater management and Providing municipal engineering and Founded in San Antonio in 1965, Pape- proudly been serving our clients since 1994 governments, private industry and select engineering field and delivering the highest who solve some of the world’s most master plans, floodplain modeling, drainage water quality, roadway design and serving as a city engineer of record has Dawson is a full-service engineering as part of S & B Holdings, Ltd., one of the international clients. Founded in 1925, quality projects. Jed believes that great complex structural, technological, and Martin Luther King Blvd. TOD Phase 1 | design, culvert/bridge improvements, transportation planning, sidewalks and ADA become one of the core businesses of M&S. consulting firm providing professional civil largest privately-owned engineering firms in Volkert’s growth from a regional engineering projects result from a team of dedicated infrastructure challenges. Providing MRB Group provides complete engineering Austin, TX | 2018 | $74,646; Cottonwood stormsewer design, 2D drainage modeling, improvements, and bidding and engineering in the areas of transportation, the State of Texas, which has been in firm has matured to include a national and professionals who share this vision. structural, diagnostics, civil, traffic, parking, services with a wide range of expertise. Wastewater Interceptor Phase C2 | Cedar dams, levees, pump stations, detention construction phase services. N. EAST STREET IMPROVEMENTS | CITY environmental, water and wastewater, H&H, business since 1967. Today, S & B is part of global client base. transportation, enclosure, technology More importantly, our goal is to protect the park, TX | 2018 | $2M; Hills of Hays | San ponds, streambank stabilization, and water OF LEANDER | $3.9M; RIVERY land development, surveying, geospatial, Founded 1984. 8,000 Employees. Firm an organization that employs over 8,000 CITY OF HARKER HEIGHTS WARRIORS consulting, and construction engineering interests of our clients and help them Marcos, TX | 2019 | $79,425; Cherrywood quality pond design services. Our firm is River Ranch County Park Road | Williamson BOULEVARD T.I.A. IMPROVEMENTS | GIS, and construction management. In project examples: HCFCD – Excavation of people, including more than 200 employees Capital Express North from US 290 to SH PATH RECONSTRUCTION|2020|$2.27M, services, we design solutions that are cost- Founded 1995. 450 employees. Project contain costs. Street Reconstruction and Storm Drain local, and our expertise includes numerous County, TX | 2020 | $3.5M; Goforth Road CITY OF GEORGETOWN | 2018 | $578K; 2005, Pape-Dawson established Austin as the Little York and Hopper Rd. Stormwater within Infrastructure, and has grown to 45N (Travis County) | On-going | $400M; CITY OF WACO RITCHIE ROAD and resource-efficient, forward-thinking, and experience: Krienke Ranch Improvements | Austin, TX | 2011 | successful projects throughout the central Improvements | Kyle, TX | 2017 | $7M; ALVES LANE IMPROVEMENTS | CITY OF the home of our first branch office. Detention Basins and Channel Conveyance become one of the largest and most RM 652 Widening and Reconstruction Orla, IMPROVEMENTS|$5M, CITY OF help support and shape communities Road (CR 272) Creek Crossing of Brushy City of Hillsboro Master Drainage Plan; City $398,200; State of Texas Capitol Complex Texas area Coers Drive Improvements | San Marcos, NEW BRAUNFELS | Ongoing | $8.6M; 2019 Improvements, successful multi-discipline engineering firms TX (Odessa District) | $18.6M; IH 35 at SH BASTROP ANNUAL STREETS worldwide. Creek | City of Cedar of Waco Storm Water Master Plan; City of Improvements | Texas Facilities TX | 2020 | $1.7M; Oak Bluff Drainage STREET MAINTENANCE PROGRAM | Drainage Systems Design and Analysis | Harris County, Texas; Mud Creek Tributary in the State of Texas. 123 Reconstruction in San Marcos, TX PAVEMENT MAINTENANCE Park, TX; RM 967 Widening | Hays County, Granger Pecan St. Culvert Replacement | Commission | Austin, TX | 2019 | $2M; Blanco Gardens Drainage Improvement Improvements | Round Rock, TX | 2019 | CITY OF FLORESVILLE | 2019 | $405K; City of New Braunfels – Drainage Area A Drainage Project, City of San Antonio (Hays County) | $107M; FM 2100 Widening PROGRAM|$1.2M, CITY OF WACO Kirkwood Paving, Utility, and Drainage TX; Broadway 2017; City of Hillsboro Elm Street Roadway Mason Creek Greenway Trail | Leander, TX Project, San Marcos, TX | On-going – Final $1.8M; Cottonmouth Creek Riparian HICKORY HILL ROAD Master Plan, New Braunfels, TX | 2020 | San Antonio, Texas; Raymondville Drain – HCFCD – Excavation of the Little York and from FM 1960 to Huffman-Cleveland Rd HIGHWAY 84 CORRIDOR WASTEWATER Improvements|Houston, Texas| 2021|$14M, Street Paving & Drainage | City of Houston, Reconstruction & Drainage Improvements; | 2017 | $380,000; RM 620 Trail | Bee Cave, Design Due Dec. 2020; Construction to start Restoration | Austin, TX | 2020 | $1.8M; RECONSTRUCTION | CITY OF KIRBY | $73.5K; San Antonio River Authority – San Flood Control, Cameron, Hidalgo, Kenedy, Hopper Rd. Stormwater Detention Basins (Harris County) | In Design | Project Design SYSTEM IMPROVEMENTS (PHASES 2B & Fort Hood Unmanned Aerial Systems TX; Atlas 14 Risk Analysis, Woodbury, MN City of Hillsboro Old Brandon Road TX | 2018 | $550,000; Charles Austin May 2021 | $1.6M (Engineering Fee); $9M Purgatory Creek Channel Improvements | 2019/Ongoing | $421K; CONSOLIDATED Pedro Creek Culture Park Storm Drains, Starr and Willacy Counties, Texas and Channel Conveyance Improvements, Fee $3M/Construction Cost Estimate $55M; 3A)|$3.9M, CITY OF WACO RIVERSIDE Maintenance Hanger|Fort Hood, Improvements & Drainage Improvements; Crosswalk |Texas State University | San (Construction Fee); Travisso Dam San Marcos, TX | 2019 | $20M; North LBJ MAINTENANCE FACILITY REGIONAL San Antonio, TX | Ongoing | $225M; Harris Harris County, TX | Complete | $6.35M; Mud IH 35 at SH 123 Reconstruction in San WTP TO GHOLSON PUMP STATION Texas|2014|$35M, Downtown Drainage, City of Hillsboro Franklin Ave. Roadway Marcos, TX | 2019 | $24,972; US183 Improvement Project, Lift Station Improvements | San Marcos, TX DETENTION POND / ECKHARDT County Flood Control District – Willow Creek Tributary A Drainage Project, City of Marcos, TX (Hays County) | $107M; RM 652 WATER TRANSMISSION LINE|$9.1M, Utility, and Vandergriff Drive Reconstruction & Drainage Improvements; Bergstrom Expressway Utility Relocation | Leander, TX | 2020 | $220,000 (Engineering | 2016 | $1.7M; ARWA Phase 1A & 1B CHANNEL IMPROVEMENTS | CITY OF Creek Modeling, Assessment, and San Antonio San Antonio, TX | Complete | Widening and Reconstruction Orla, TX CITY OF AUSTIN ROSEDALE WATER Reconstruction|Carrollton, central texas regional mobility authority | Fee); $3M (Construction Fee); Greenslopes Programs | Hays and Caldwell Counties, TX FREDERICKSBURG | 2016 | $300K; Awareness Project (MAAPnext), Houston, $1.4M; Raymondville Drain – Flood Control, (Odessa District) | $18.6M; SH 6 DeLeon in AND WASTEWATER Texas|2019|$1.2M, Almeda Road Paving Austin, TX | 2016 | $743M; Anderson Mill Detention Pond PER, Round Rock, TX | | 2018/2019 | $1.72M/$3.87M; Spicewood BARONS CREEK FLOOD STUDY | CITY TX | Ongoing | $600K; Cameron, Hidalgo, Kenedy, Starr and DeLeon, TX (Comanche County) | $10.6M; IMPROVEMENTS|$6M, CITY OF CEDAR and Drainage Improvements|Houston, Road Improvements - Regional Mobility | PER Completed July 2019 | $57,000 Springs Pump Station Improvements | OF FREDERICKSBURG | 2015; Willacy Counties, TX | Ongoing | $208.3M US 183 in Breckenridge, TX (Stephens PARK LONE STAR DRIVE WASTEWATER Texas|2017|$12.5M, BNSF Railroad Right- Austin, TX | 2017 | $99,362; West 9th Street (Engineering Fee); No Construction Austin, TX | 2017 | $6.5M; Bullick Hollow WIEDERSTEIN ROAD County) | $8.4M; US 59 at IH 20 (Harrison IMPROVEMENTS|$2.35M, CITY OF of-Way Drainage Improvements Study and Water and Wastewater Replacement | Planned (To-Date) Road Left Turn Lane | Austin, TX | 2020 | RECONSTRUCTION AND WIDENING County) | $9.9M GEORGETOWN BERRY CREEK Design|Plano, Texas|2016|$310,000, Austin, TX | 2019 | $142,334 $240K; Wells Branch Median Improvements PROJECT | CITY OF SELMA | 2018 | $2.4M WASTEWATER INTERCEPTOR|$20.5M, Memorial Park East Loop Road and | Austin, TX | 2020 | $190K; Rosewood CITY OF WACO CHIMNEY HILL AREA Improvements (Eastern Glades Phase 20 20 20 20 20 20 20 20 20 20 20 20

Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach. Detailed and thorough approach.

90 90 90 90 90 90 100 90 90 90 90 90 AWARD