Environment Clearance for Ropeway Project at Nakki Lake, ,

APPENDIX I (See paragraph – 8.9) FORM 1 I. Basic Information

S.No. Item Details 1. Name of the project/s Environment Clearance for Ropeway Project at Nakki Lake, Mount Abu, Rajasthan 2. S. No. in the schedule 7(g) 3. Proposed capacity/ area/length/ Elevation tonnage to be handled/ command UTP 1194 M MSL area/ lease area/ number of wells to LTP 1166 M MSL be drilled. Length 261 M 4. New/ Expansion/ Modernization New 5. Existing Capacity/ Area etc. 261 M 6. Category of Project i.e. ‘A’ or ‘B’ A 7. Does it attract the general Yes, Mount Abu Wildlife Sanctuary condition? If yes, please specify. 8. Does it attract the specific No condition? If yes, please specify. 9. Location Raghunath Temple to TOD Rock Plot/ Survey/ Khasra No. - Village Mount Abu Tehsil District State Rajasthan 10. Nearest railway station/ airport Abu Road Railway Station along with distance in kms.

11. Nearest Town, city, District Mount Abu and Headquarters along with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal Corporation, Mount Abu Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant Mr. Nemichand Agarwal 14. Registered Address A-9, Sai Darshan Colony, Tartoli Road, Abu Road – 307026 15. Address for correspondence: Name Mr. Nemichand Agarwal Designation (Owner/Partner/CEO) Director

Address M/s Shree Raghunath Ropeways Pvt. Ltd.

Environment Consultant: Perfact Enviro Solutions Pvt. Ltd. Page 1 of 11 Environment Clearance for Ropeway Project at Nakki Lake, Mount Abu, Rajasthan

A-9, Sai Darshan Colony, Tartoli Road, Abu Road Pin Code 307026 E-mail [email protected] Telephone No. 0294-221089 Fax no. - 16. Details of Alternative Sites Enclosed as Annexure - I examined, if any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects NA 18. Whether separate application of Not Required interlinked project has been submitted? 19. If yes, date of submission - 20. If no, reason - 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given.

(a) The Forest (Conservation) Act, NA 1980?

(b) The Wildlife (Protection) Act, Enclosed AS Annexure - II 1972? (c) The C.R.Z. Notification, 1991? NA 22. Whether there is any Government None Order/ Policy relevant/ relating to the site? 23. Forest land involved (hectares) None 24. Whether there is any litigation None pending against the project and/ or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project.

Environment Consultant: Perfact Enviro Solutions Pvt. Ltd. Page 2 of 11 Environment Clearance for Ropeway Project at Nakki Lake, Mount Abu, Rajasthan

Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in Yes Open land specially leased for land use, land cover or topography entertainment purposes for including increase in intensity of land developing terminal for ropeway use (with respect to local land use project. plan) 1.2 Clearance of existing land, vegetation No NR and buildings?

1.3 Creation of new land uses? Yes Open land will be developed for entertainment purpose. 1.4 Pre-construction investigations e.g. Yes Shall be done. bore houses, soil testing? 1.5 Construction works? Yes Shall be done later. 1.6 Demolition works? No -

1.7 Temporary sites used for construction No - works or housing of construction workers? 1.8 Above ground buildings, structures or Yes Above ground structure (LTP) will earthworks including linear be constructed. structures, cut and fill or excavations 1.9 Underground works including mining No Not Applicable or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing No Will be used only for processes? entertainment purposes. 1.14 Facilities for storage of goods or No - materials?

1.15 Facilities for treatment or disposal of Yes Solid Waste will be disposed by solid waste or liquid effluents? Environment Consultant: Perfact Enviro Solutions Pvt. Ltd. Page 3 of 11 Environment Clearance for Ropeway Project at Nakki Lake, Mount Abu, Rajasthan

OWC and liquid waste through STP. 1.16 Facilities for long term housing of No Not Applicable operational workers? 1.17 New road, rail or sea traffic during No Not Applicable construction or operation? 1.18 New road, rail, air, waterborne or No Not Applicable other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not Applicable transport routes or infrastructure leading to changes in traffic movements?

1.20 New or diverted transmission lines or No Not Applicable pipelines? 1.21 Impoundment, damming, culverting, No Not Applicable realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not Applicable 1.23 Abstraction or transfers of water No Not Applicable from ground or surface waters? 1.24 Changes in water bodies or the land No Not Applicable surface affecting drainage or run-off? 1.25 Transport of personnel or materials No Not Applicable for construction, operation or decommissioning?

1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Structure once constructed will decommissioning which could have not be demolished. an impact on the environment? 1.28 Influx of people to an area in either Yes Influx of 3215 people during visit temporarily or permanently? to ropeway. 1.29 Introduction of alien species? No Not Applicable 1.30 Loss of native species or genetic No Not Applicable diversity? 1.31 Any other actions? No Not Applicable

Environment Consultant: Perfact Enviro Solutions Pvt. Ltd. Page 4 of 11 Environment Clearance for Ropeway Project at Nakki Lake, Mount Abu, Rajasthan

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.No. Information/checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or Yes Presently both the parcels of land agricultural land (ha) open land, however the land will be developed to terminal station of ropeway project. 2.2 Water (expected source & Yes Water requirement - 53 KLD, competing users) unit: KLD Source – Municipal Supply 2.3 Minerals (MT) No Not applicable 2.4 Construction material – stone, Yes Source – Local Market aggregates, sand / soil (expected source – MT) 2.5 Forests and timber (source – MT) No Not applicable. 2.6 Energy including electricity and Yes DG Set - 300 KVA & 5 KVA fuels (source, competing users) Fuel – Diesel Generators Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use No Not applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which No Not applicable are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or No Not applicable affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by Yes Increase tourism will lead to changing living conditions? better income & living conditions 3.4 Vulnerable groups of people who No Not applicable could be affected by the project e.g. hospital patients, children, the elderly etc.,

Environment Consultant: Perfact Enviro Solutions Pvt. Ltd. Page 5 of 11 Environment Clearance for Ropeway Project at Nakki Lake, Mount Abu, Rajasthan

3.5 Any other causes No Not applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes. No Not applicable 4.2 Municipal waste (domestic and or Yes MSW waste 642 kg/day will be commercial wastes) generated which will be disposed off in OWC.

4.3 Hazardous wastes (as per Hazardous Yes 5-7 Ltr./Month of used Oil from DG Set will be Waste Management Rules) generated. 4.4 Other industrial process wastes No Not applicable

4.5 Surplus product No Not applicable 4.6 Sewage sludge or other sludge from Yes STP Sludge of about 5-6 Kg/day will be effluent treatment generated 4.7 Construction or demolition wastes No Not applicable

4.8 Redundant machinery or equipment No Not applicable 4.9 Contaminated soils or other No Not applicable 4.10 Agriculturalmaterials wastes No Not applicable 4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil Yes Emissions will be generated from fuels from stationary or mobile operation of DG Sets. Stack height sources of 2 m shall be provided. 5.2 Emissions from production No Not applicable processes 5.3 Emissions from materials handling No Not applicable including storage or transport 5.4 Emissions from construction Yes Construction of terminal stations activities including plant and will lead to generation of dust Environment Consultant: Perfact Enviro Solutions Pvt. Ltd. Page 6 of 11 Environment Clearance for Ropeway Project at Nakki Lake, Mount Abu, Rajasthan

equipment emissions; water sprinkling shall be done.

5.5 Dust or odours from handling of No Not applicable materials including construction materials, sewage and waste 5.6 Emissions from incineration of No Not applicable waste. 5.7 Emissions from burning of waste in No Not applicable open air (e.g. slash materials, construction debris). 5.8 Emissions from any other sources. No Not applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment e.g. Yes Noise will be generated at the engines, ventilation plant, crushers time of construction activities during excavation and drilling for foundation of pillars 6.2 From industrial or similar processes No Not applicable 6.3 From construction or demolition Yes Temporary increase of noise level during construction phase 6.4 From blasting or piling No Not applicable

6.5 From construction or operational No Not applicable traffic

6.6 From lighting or cooling systems No Not applicable 6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S. No. Yes/No Details thereof (with approximate quantities/rates, wherever Information/Checklist confirmation possible) with source of information data 7.1 From handling, storage, use or No Not applicable spillage of hazardous materials

Environment Consultant: Perfact Enviro Solutions Pvt. Ltd. Page 7 of 11 Environment Clearance for Ropeway Project at Nakki Lake, Mount Abu, Rajasthan

7.2 From discharge of sewage or other Yes Total waste water of the project effluents to water or the land is 53 KLD, which will be treated in (expected mode and place of STP proposed in complex. discharge) 7.3 By deposition of pollutants emitted to Yes The only source of emission in air into the land or into water air will be DG Sets of 300 kVA and 5 kVA. Adequate Stack height for both DG Sets shall be provided. 7.4 From any other sources No Not applicable 7.5 Is there a risk of long term buildup of No Not applicable pollutants in the environment from these sources? 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment.

S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc No Not applicable from storage, handling, use or production of hazardous substances 8.2 From any other causes Yes Adequate safety measures shall be followed as per IS specification such as door locks, rescue equipment. Appropriate rescue equipment shall be provided to facilitate rescue operation of passengers from Cabins of line. 8.3 Could the project be affected by No The project falls in Seismic Zone natural disasters causing IV. Proper precautions shall be environmental damage (e.g. floods, undertaken during designing of earthquakes, landslides, cloudburst foundations of Pillars and LTP & etc)? UTP.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.

S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source

Environment Consultant: Perfact Enviro Solutions Pvt. Ltd. Page 8 of 11 Environment Clearance for Ropeway Project at Nakki Lake, Mount Abu, Rajasthan

of information data

9.1 Lead to development of supporting No The Project is for entrainment of facilities, ancillary development or tourist in Mount Abu. No development stimulated by the supporting project which could have impact on facilities/development will come the environment e.g.: up due to the project.

• Supporting infrastructure (roads, power supply, waste or waste

water treatment, etc.) STP will be installed. • Housing development • Extractive industries • Supply industries • Other 9.2 Lead to after-use of the site, which No Not applicable could have an impact on the environment 9.3 Set a precedent for later No Not applicable developments

9.4 Have cumulative effects due to No Not applicable proximity to other existing or planned projects with similar effects

Environment Consultant: Perfact Enviro Solutions Pvt. Ltd. Page 9 of 11 Environment Clearance for Ropeway Project at Nakki Lake, Mount Abu, Rajasthan

II. Environmental Sensitivity

S. No. Areas Name/ Aerial distance (within 15 Identity km.) from Proposed project location boundary 1 Areas protected under Mount Abu 4 KM (East Direction) international conventions, Wildlife national or local legislation for Sanctuary their ecological, landscape, cultural or other related value

2 Areas which are important or Mount Abu 4 km

sensitive for ecological reasons - Wildlife Sanctuary Wetlands, watercourses or 10 m other water bodies, coastal Nakki Lake zone, biospheres, mountains, forests

3 Areas used by protected, No Not applicable important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or No Not applicable underground waters

5 State, National boundaries No None

6 Routes or facilities used by the Yes Stairs to access the tod rock public for access to recreation Raghunath Temple or other tourist, pilgrim areas.

7 Defense installations No Not applicable

Environment Consultant: Perfact Enviro Solutions Pvt. Ltd. Page 10 of 11 Environment Clearance for Ropeway Project at Nakki Lake, Mount Abu, Rajasthan

8 Densely populated or built-up No Scanty population in the area vicinity 9 Areas occupied by sensitive Yes Raghunath temple St. Mary School man-made land uses HG international School (hospitals, schools, places of Adarsh Vidya Mandir

worship, community facilities) JW Global Hospital

Bhamha Kumari Hospital Areas containing important, Yes Nakki Lake

10 high quality or scarce resources Mount Abu Wildlife Sanctuary (Ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

11 Areas already subjected to No Not applicable pollution or environmental damage. (Those where existing legal environmental standards are exceeded)

12 Areas susceptible to natural Yes The whole alignment falls under hazard which could cause area susceptible to the project to present Natural Hazards (including environmental problems earthquake, landslides) (Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

Environment Consultant: Perfact Enviro Solutions Pvt. Ltd. Page 11 of 11

ENCLOSURE: NAME CHANGE CERTIFICATE GOVERNMENT OF MINISTRY OF CORPORATE AFFAIRS

Office of the Registrar of Companies G/6-7, Second Floor Residency Area, , Rajasthan, India, 302001

Certificate of Incorporation pursuant to change of name [Pursuant to rule 29 of the Companies (Incorporation) Rules, 2014]

Corporate Identification Number (CIN): U92199RJ2007PTC023927

I hereby certify that the name of the company has been changed from MARS ENTERTAINMENT PRIVATE LIMITED to SHREE RAGUNATH ROPEWAY PRIVATE LIMITED with effect from the date of this certificate and that the company is limited by shares.

Company was originally incorporated with the name MARS ENTERTAINMENT PRIVATE LIMITED.

Given under my hand at Jaipur this Fifteenth day of December two thousand sixteen.

Digitally signed by Ministry of Corporate Affairs - Govt of India Ministry of DN: c=IN, o=Ministry of Corporate Affairs - Govt of India, ou=CID - 934381, postalCode=302001, st=Rajasthan, street=RESIDENCY AREA CIVIL Corporate Affairs LINES, 2.5.4.51=G-6-7 CORPORATE BHAWAN, cn=Ministry of Corporate Affairs - Govt of India Reason: I attest to the accuracy and integrity of this - Govt of India document Date: 2016.12.15 18:58:48 +05'30' ANIL YADAV Authorizing Officer Registrar of Companies

RoC - Jaipur

Mailing Address as per record available in Registrar of Companies office:

SHREE RAGUNATH ROPEWAY PRIVATE LIMITED

A-9, SAI DARSHAN COLONY, TARTOLI ROAD, ABU ROAD, Sirohi, Rajasthan, India, 307026 GOVERNMENT OF INDIA MINISTRY OF CORPORATE AFFAIRS

Office of the Registrar of Companies G/6-7, Second Floor Residency Area, Jaipur, Rajasthan, India, 302001

Certificate of Incorporation pursuant to change of name [Pursuant to rule 29 of the Companies (Incorporation) Rules, 2014]

Corporate Identification Number (CIN): U92199RJ2007PTC023927

I hereby certify that the name of the company has been changed from SHREE RAGUNATH ROPEWAY PRIVATE LIMITED to SHREE RAGHUNATH ROPEWAY PRIVATE LIMITED with effect from the date of this certificate and that the company is limited by shares.

Company was originally incorporated with the name SHREE RAGUNATH ROPEWAY PRIVATE LIMITED.

Given under my hand at Jaipur this Thirty first day of May two thousand seventeen.

Digitally signed by DS MINISTRY OF CORPORATE AFFAIRS 14 DS MINISTRY DN: c=IN, o=MINISTRY OF CORPORATE AFFAIRS, ou=CID -5266480, postalCode=302001, st=Rajasthan, street=CIVIL LINES JAIPUR, 2.5.4.51=CORPORATE OF CORPORATE BHAWAN G16-7 RESIDENCY AREA, cn=DS MINISTRY OF CORPORATE AFFAIRS 14 Reason: I attest to the accuracy and integrity of this AFFAIRS 14 document Date: 2017.05.31 17:07:50 +05'30' RAJENDER SINGH MEENA

Registrar of Companies

RoC - Jaipur

Mailing Address as per record available in Registrar of Companies office:

SHREE RAGHUNATH ROPEWAY PRIVATE LIMITED

A-9, SAI DARSHAN COLONY, TARTOLI ROAD, ABU ROAD, Sirohi, Rajasthan, India, 307026