Puyallup Station Access Improvement Project

Phase 1: Final Report Identifying Access Improvements

Summer 2014 Amended with Board Action dated August 28, 2014

LEASED SURFACE LOT SOUND TRANSIT EXISTING SURFACE LOT SOUND TRANSIT EXISTING SURFACE LOT LEASED PROPOSED SURFACEPROPOSED LOT GARAGE PARKINGPROPOSED ## OFSPACES ## OFSPACES ## OFSPACES State Fair Lot Red Eagles Garage

(4 Levels) 7TH ST NW Eagles Surface Lot Eagles Surface +80 W PIONEERAVE W MEEKER W MAIN AVE 100 Pedestrian Bridge 420

5TH ST SW

3RD ST SW

W STEWART AVE STEWART W 4TH AVE SW AVE 4TH Pedestrian Bridge

S MERIDIAN N MERIDIAN ¼ M IL 2ND ST SE E R A 2ND ST NE D IU 3RD ST SE S

½ M IL E R A E PIONEERAVE D E MAIN AVE IU S

5TH ST NE Project Identification Executive Summary lmprovement Project) the Puyallup Station Access of accessimprovementsfor (ldentifying thepreferredpackage Motion #2014-64 Document? What’s InsideThis Parking Option Puyallup Preferred 82814

1 –20 i –iv

Puyallup Station Access Improvement Project Phase 1: Identifying Access Improvements

D Executive Summary What is the Purpose of this Document? This report summarizes the work Sound Transit has done with stakeholders to develop a package of access improvement investments that will benefit Sounder riders and the local community in Puyallup. The Sound Transit Board will identify a preferred alternative, or package, of the six described in this document. The preferred package will be advanced for further environmental study and design. What is the Problem? Over 1,000 people ride a Sounder train or ST Express bus from the Puyallup Station each day. Nearly two-thirds of Sounder riders drive and park at the Puyallup Station or other lots. Another twenty percent use local bus services to access the Puyallup Station. Many of these riders find it difficult to access the Puyallup Station because parking is full by the second morning train before 6 am. Traffic congestion creates delays at intersections around the station, similarly affecting both drivers and buses. Sound Transit is expanding its Sounder rail service, which is planned to include three new round trip trains by 2017. Sound Transit is also predicting a 70 percent increase in ridership by 2035 - approximately 600 new riders in Puyallup alone. Additional parking and congestion management will be required to meet this growing ridership demand. Similarly, additional bicycle and pedestrian amenities will expand non-motorized access to the station.

What is the Project? The Puyallup Station Access Improvement Project will provide a set of the capital investments approved by voters in the 2008 Sound Transit 2 (ST2) ballot measure. This project will: • Build pedestrian and bicycle improvements; • Provide up to 600 additional parking stalls, either in a lot and/or structure; • Make traffic congestion improvements What is the Project Timeline? WE ARE HERE 2000 2013 2014 2015 2016 2018

• Sounder Service Leadership Alternatives Begins (2000) Working Development Groups • ST2 Funding Input on Approved (2008) improvement Developed options. Environmental Preliminary Final Design Construction project goals Review Design • Sounder Stations Used feedback and evaluation Access and Demand on options to Right-of-Way/Property criteria for develop Study (2010 – 2012) alternatives. Acquisition and multi-modal Permitting packages.

Sounder service begins

Sound Transit Board Identifies Preferred Package of Improvements (August 2014)

Executive Summary – i Puyallup Station Access Improvement Project Phase 1: Identifying Access Improvements

Who Did Sound Transit Talk to and What Did We Hear? Sound Transit recognizes that parking, pedestrian and bicycle improvements to the station need to work for the community in which they are located. In order to develop improvements that support the community, Sound Transit met regularly with Puyallup City staff, elected officials and other community stakeholders to develop and review proposed improvements. During this process, general themes emerged from different stakeholders, including: • Sounder riders – Want parking close to the station, with reliable, fast, and comfortable access. • Residents – Primarily from residents that are not Sounder riders, there are concerns regarding an increase in traffic and congestion, and the desire to preserve quality of life and the community character. • Businesses – Want to preserve access and parking for employees and customers while improving Sound Transit rider exposure to local businesses. How Did Sound Transit Group or Package the Improvements? Parking alternatives were developed to reflect the range of issues and concerns voiced by project stakeholders and vary by parking location, surface lot versus parking garage, and parking space count at each location. Non-motorized improvements are the same in each package. The packages can be found in the fold-out of page iii of this Executive Summary titled “Parking Packages Considered for Sound Transit Board Action.” What Were the Parking Preferences for Each Package? Each package of access improvements includes pedestrian, bike, and traffic improvements within the station area, as listed on the fold-out of page iii of this Executive Summary. The majority of project stakeholders supported these improvements. Project stakeholder opinions differed by proposed parking location, as summarized below. Puyallup City Council – Desire for less concentrated parking (vs. 600 in one location) • Proposed Mid-sized Eagles Garage and remainder surface parking at Red Lot or expansion of existing Eagles Surface Lot (Modified Package C with smaller garage) • Small Transit Center Garage + Red Lot – second choice after Modified Package C (Package E) • Shaw Road and Cornforth/Campbell sites (Packages A, B, D, and F) Stakeholder Roundtable – Desire for shared-use parking for downtown businesses and Puyallup High School • Proposed Mid-sized Transit Center Garage and remainder surface parking at Red Lot (Modified Package E with larger garage) • Large Eagles Garage (Package C) • Shaw Road and Cornforth/Campbell sites (Packages A, B, D, and F) General Public and Riders – Keep parking close and convenient to the Puyallup Station • Transit Center Garage (Package D) • Large Eagles Garage (Package C) • Small Transit Center Garage (Package E) • Shaw Road and Cornforth/Campbell site (Packages A, B, D, and F) What Happens After the Sound Transit Board Identifies a Preferred Package? Once a preferred package is identified, Sound Transit will begin design, engineering, and environmental documentation. This will include: • Continued stakeholder outreach • Environmental review • Preliminary engineering and architectural design ii – Executive Summary Puyallup Station Access Improvement Project

Phase 1: Identifying Access Improvements St SW iu Existing Sound Transit surf(#a scepace lots) d Ra e Existing Sound Transit surface lot (# spaces) 512 il Note: All packages include traffic and non-motorized improvements as shown on the followingExisting Soun page.d Transit leased su(#rfa spaceces) lot N M Shaw Road lot ½ 400 N Existing Sound Transit surface lot (# spaces) Existing Sound Transit leased surface lot (# spaces) 7th Ave SW Parking Packages Considered for Sound Transit Board Action * This project does not include funds to support shuttle bus service. Shaw Road and Gold LotPot willen tialrequire parking garage (2.15 miles from station) Existing Sound Transit leased surface lot (# spaces) Potential parking garage Existing Sound Transit surf(#a scepace lots) Existing Sound Transit surface lot (# spaces) E Main Ave shuttle service to Puyallup Station. No shuttle service has been identified for these sites. Potential surface lots Puyallup Potential parking garage Potential surface lots Red lot Existing Sound Transit leased surface lot (# spaces) 219 S Existing Sound Transit leased su(#rfa spaceces) lot Potential leased surface lots 200 Station h What WhatparkingWhat parking parking options options options are being are are beingconsidered? being considered? considered? aw What parking options are being considered? 9th Ave SW Existing Sound Transit surface lot (# spaces) Potential surface lots Potential leased surface lots R 4thSt NW Potential parking garage d 4thSt NW 4thSt NW 4thSt NW 4thSt NW 4thSt NW 4thSt NW Potential parking garage E 4thSt NW 4thSt NW Pedestrian/bicycle access bridge 4thSt NW 7th St 7th NW 7th St 7th NW 7th St 7th NW 7th St 7th NW 7th St 7th NW (# spaces) Potential leased surface lots 7th St 7th NW 7th St 7th NW Existing Sound Transit leased surface lot

7th St 7th NW PotentialPedestrian/bicycle surface lots access bridge

7th St 7th NW Potential surface lots

7th St 7th NW

e

v

A

r

e

e

n

o Potential parking garage i P

Package A Package Potential leaPedestrian/bicyclesed surface lots access bridge Potential leased surface lots E PackagePackage APackage A Shaw Road A + Red Lot* ($45 M) PackagePackage B Red Lot + Gold Lot + Eagles Surface Lot* ($39 M) PackagePackagePackageC C Package LargeC Eagles Garage ($50 M) Package Package A PackagePackage BPackage B B B PotentialPackage surface lots C Pedestrian/bicycle access bridge D Package Pedestrian/bicycle access bridge Potential leased surface lots N Meridian N Meridian N Meridian N Meridian N Meridian N Meridian N Meridian N Meridian N Meridian Pedestrian/bicycle access bridge N Meridian a 5th St NE 5th a 5th St NE 5th a a a 5th St NE 5th 5th St NE 5th a 5th St NE 5th a 5th St NE 5th 5th St NE 5th a 5th St NE 5th a 5th St NE 5th a 5th Ave NE 5th Ave NE St NE 5th 5th Ave5th AveNE NE 5th Ave NE 5th 5thAve AveNE NE 5th Ave NE 5th Ave NE 5th Ave NE Eagles surface lotEaglesEagles surface surface lot lot +80 Eagles surface lot +80+80 +80 Transit Center garage W St W 4-½ stories - 750 total ewart W StWew Stew W Stewar W StW Ste W Stew 600 (net) 68 Ave art Aart A Stewa 68 t Ave ewartwart W Stew art A 3rd Ave NW 5th St NW 68 v v rt A A a 68 v 68 e e A 3rd Ave NW 5th St NW 68 68 v ve rt 3rd Ave NW e W 5th St NW

e 5th St NW 3rd Ave3rd AveNW NW 5th St NW v A 3rd Ave NW S 68 5th St NW t e 3rd Ave NW 5th St NW v 3rd Ave NW e 6th St NW 3rd Ave NW 68 e 3rd Ave NW w 5th St NW

3rd Ave NW 6th St NW a

5th St NW r 6th St NW 3rd Ave NW 3rd Ave NW t 6th St NW Av 62 6th St NW Eagles garage 68 e 62 62 62 62 62 Eagles garageEagles garage 62 3rd Ave NW 5th St NW 3rd Ave NW 62 62 6th St NW 62 2nd Ave NE 2nd 2ndAve AveNE NE 2nd Ave NE 3-½ stories - 600 3-½ stories -3-½ 600 stories - 600 2nd Ave NE 2nd Ave NW 2nd Ave NW 2nd Ave NW 2nd Ave2nd NE Ave NW 2nd Ave NW 2nd2nd Ave AveNE NE 2nd Ave2nd NE Ave NW 2nd Ave NW 2nd 2ndAve AveNW NW Pu2ndyall Aveup NW 302 512 512512 2nd 2ndAve AveNW NW Pu2ndyall Aveup NW 2nd Ave NW 512 512 512 2nd Ave2nd NW2nd Ave AveNW NW 512 PuyallPuyallup up302 302 Puyallup 512 302 PuyallPuyallup up 302 512 512 2nd Ave NW Puyallup 302 2nd Ave NW 2nd Ave NE Station 302 Station 302 Puyallup 302 2nd Ave NW 512 2nd Ave NW W Main Ave StatiStation on Station W Main Ave StatiStation on Station Station Puyallup 302 W MainW Main Ave Ave W Main Ave W MainW Main Ave Ave W Main Ave W Main Ave W Main AveW Main Ave Station Puyallup W Main Ave PuyallPuupyall up Puyallup PuyallPuupyall up Puyallup

2nd St SW 2nd St Puyallup

2nd St SW 2nd St Puyallup 3rd StSW 3rd 5th St SW 4th St SW 2nd St SW 2nd St 2nd St SW 2nd St 3rd StSW 3rd 2nd St SW 2nd St 5th St SW 4th St SW 2nd St SW 2nd St 2nd St SW 2nd St High School StSW 3rd 5th St SW 4th St SW 3rd StSW 3rd 3rd StSW 3rd 5th St SW 4th St SW 2nd St SW 2nd St 3rd StSW 3rd 5th St SW High School 4th St SW 5th St SW 4th St SW 3rd StSW 3rd 5th St SW 4th St SW High School SW 2nd St

High School StSW 3rd High School 5th St SW 4th St SW High School Puyallup

High School StSW 3rd 5th St SW High School High School 4th St SW 2nd St SW 2nd St 3rd StSW 3rd 5th St SW W Pioneer Ave W Pioneer Ave High School 4th St SW W PioneerW Pioneer Ave Ave W Pioneer Ave W PioneerW Pioneer Ave Ave W Pioneer Ave W Pioneer Ave W PioneerW Ave Pioneer Ave us s s s s s i u u s iu us u s u W Pioneer Ave d di di iu d i i iu i Ra a a d a d ad d ad us e R R a R Ra R a R i il le ile e R ile e le R le ad M Mi M il M Mil Mi ile Mi R ¼ ¼ ¼ ¼ M ¼ ¼ ¼ M ¼ ile 4th Ave ¼ M 7th St SW 4th Ave 4 7th St SW SW 4 th Ave 7th St SW ¼ 7th St SW th Ave S 4th 4th 7th St SW W 4 Ave 7th St SW Ave th 7th St SW S Ave 7th St SW SW W 4th Ave 7th St SW S S 7th St SW SW W 4th Ave W SW 7th St SW SW 4th St SW Ave 7th St SW SW t SW t SW t SW t SW t SW t SW s s u s s s t SW t SW s iu u i u s i iu i is u i s i ui i i d i d i iu d d d diu i d u d di d d Existing Sound Transit surf(#a scepace lots) a d a d d a a a ad d a i a ad a a s R a R a a R R R Ra a R d R Ra R R iu R e R R e e eR R e a R e e d ile 512512e ille il le il iel e il R ile ilee il il a Existing Sound Transit leased su(#rfa spaceces) lot 512 Shaw512 512il M Roadi lotShawShaw RoadShaw Roadi lRoade lot Road lot lotShaw lot Road lot i Mil il M le il M M R N N M ShawM MRoad lot Shaw512Shaw Road RoadN lotlot N NN N M M M M M i N N N N M MM e NN N ½ ½ 400 400 M400400 N 400Shaw RoadNN lot ½ ½ ½ ½ ½ M N N N ½ ½ ½ ½ il ½ ½ ½ 400 400 400 N GoldGold lot lot GoldGold lot lot Gold½ ½ lot ½ ½ M 7th Ave SW 7th Ave SW (2.15 miles from station)(2.15 miles(2.15(2.15(2.15 frommiles miles fromstation) from station) from station)(2.15 station) miles from station) 7th Ave SW 7th Ave7th SW Ave SW 7th Ave SW GoldGold lot lot Gold lot 7th Ave SW 7th Ave SW N N Potential parking garage 7th Ave7th AveSW SW (2.15 miles from station) (2.15 miles from station) 7th Ave SW 7th Ave SW 320320 320 320 320 7th Ave SW 7th Ave SW ½ 7th Ave SW (2.15 miles from station) (2.15 miles from station) 7th Ave SW 7th Ave SW 320 320 320 7th Ave SW E Main AvEe MEain M ainAve Ave E Main Ave 7th Ave SW Existing Sound Transit surf(#a scepace lots) Potential surface lots E Main Ave E MainE MAainve Ave Puyallup PuPuyallyallupup E Main Ave Red lot Red lot PuyallPuyallup up Puyallup RedRed lot lot 219219Red lotRed lot219 219 Red lot 219 219 219 219Existing Sound Transit219 surfa(# scepace lots) Red lot S S 219 Red lot S S Red lot 219 219 S Red lot Red lot Station h 219 h 219 Station h h 219 200 S Red lot Existing Sound Transit leased su(#rfa spaceces) lot Potential leased surface lots 200 Station h S 250 250 250 250 219 aw Puyallup Station Access Improvements Project (# spaces) Station h aw 250S Existing Sound Transit surface lot 219 aw aw 200 Station h 200 219 aw 250 Station h 200 200 w aw 219 w aw 200 Existing Sound Transit leased surf(# spaceaces) lot aw

Existing Sound Transit surfa(# scepace lots) 9th Ave SW R R R 9th Ave SW Existing Sound Transit surfa(# scepace lots) R R R 9th Ave SW 9th Ave9th SW Ave SW 9th Ave SW 9th Ave SW 9th Ave SW R 9th Ave SW 9th Ave SW 9th Ave SW 9th Ave SW d 9th Ave SW d d d d R d 9th Ave SW (# spaces) R Existing Sound Transit leased surface lot d 9th Ave SW 9th Ave SW

4thSt NW 9th Ave SW d R 9th Ave SW Puyallup Station Access Improvements Project d (# spaces) Potential parking garage E Existing Sound Transit surface lot E E E Potential parking garage Puyallup Station Access Improvements Project E E d Existing Sound Transit surfa(# scepace lots) E

(# spaces) E Pedestrian/bicycle access bridge Existing Sound Transit leased surface lot E 9th Ave SW (# spaces) E 4thSt NW 4thSt NW 4thSt NW 4thSt NW 4thSt NW Existing Sound Transit leased surface lot 4thSt NW 4thSt NW 4thSt NW 4thSt NW 4thSt NW 4thSt NW 4thSt NW 4thSt NW Potential parking garage 4thSt NW 4thSt NW 4thSt NW 7th St 7th NW Potential parking garage

Potential parking gar4thSt NW age Existing Sound Transit lease4thSt NW d su(#rfa spaceces) lot 7th St 7th NW Existing Sound Transit leased su(#rfa spaceces) lot Potential surface lots St 7th NW 7th St 7th NW St 7th NW St 7th NW 7th St 7th NW 7th St 7th NW 7th St 7th NW St 7th NW St 7th NW 7th St 7th NW Existing Sound Transit surface lot Existi St 7th NW ng Sound Transit surface lot 7th St 7th NW 7th St 7th NW 7th St 7th NW Existing Sound Transit surfPot St 7th NW aencetial lot surface lots Existing Sound Transit suPotrfaceen lottial surface lots Existing Sound Transit surface lot Existing Sound Transit surface lot

7th St 7th NW

Pot St 7th NW ential surface lots Potential surface lots Potential surface lots Potential surface lots

e e

e

e e

v v

v v v

A A

A

A A

e

r r

v

r

r r

e e

A

e e e

e e

e

r

e e

n n

e e n

n n

o o

v

e i i

o

o o

i

i i

A

e n

P P

P

P P

v

r

o

i E E A

e E

E

E

P

r e

e e E n

v e

o

i

A n

P

r

o

i e E

P

e

E

Potential leased surface lots n

Existing Sound Transit leased surface lot Existing Sound Transito leased surface lot

Potential leased surface lots i Potential leased surface lots P

Existing Sound Transit leased surface lot E Existing Sound Transit leased surface lot What parking options are being4thSt NW Exi sconsidered?ting Sound Transit leased surface lot Potential leased surface lots Existing Sound Transit leased surface lot Potential leased surface lots Package C Package PackageD D Potential leaWhatsed surface We lots ’ve HeardWhat We’ve Heard Potential leaWhatsed surface We lots ’ve HeardWhat We’ve Heard What We’ve Heard What We’ve Heard 4thSt NW

Package St 7th NW Package Package Package 4thSt NW 4thSt NW Package PackagePackage PackagePackage Package Package FF F F F

Potential parking garage Pedestrian/bicycle access bridge Potential parking garage Pedestrian/bicycle access bridge 4thSt NW 4thSt NW 4thSt NW D What parking options are being considered?PackagePackagePotential par kingPackageD garDage Large Transit D CenterPedestria Garagen/bicycle a($50ccess bridgM) e PackagePackage EPackageE E PackageE E EPotSmallential par TransitkingE garag Centere Garage + Red PedLotes ($39trian/bi M)cycle access bridge PackagePackagePotPackageential parking ga ragFe Package Cornforth/CampbellF Ped estria Garagen/bicycle a+ccess Eagles bridge Garage ($52 M) Potential parking garage Pedestrian/bicycle access bridge E Support for this package. St 7th NW Moderate support for this package. Strongest public support for this 7th St 7th NW Pedestrian/bicycle access bridge What parking options St 7th NW are being considered? Little public support for Support for this package. 7th St 7th NW 7th St 7th NW Potential surface St 7th NW lots Little public support for Potential surface lots Package Potential surface lots 4thSt NW Potential surface lots Potential surface lots F Potential surface lots 4thSt NW Package Potential leased surface lots N Meridian this package. C package (over twice as many 7th St 7th NW N Meridian this package. Benefits: Benefits: 7th St 7th NW Potential leased surface lots Potential leased surface lots N Meridian Potential leased surface lots Potential leased surface lots Benefits: Package Potential leased surface lots N Meridian N Meridian N Meridian N Meridian N Meridian C N Meridian N Meridian N Meridian N Meridian

C C N Meridian

C C N Meridian Pedestrian/bicycle access bridge N Meridian N Meridian Package B N Meridian respondents supported this package). N Meridian Package Package N Meridian • Reduces traffic impacts• Reduces within traffic impacts within • All parking close to station. Benefits: Benefits: N Meridian Pedestrian/bicycle access bridgPede estrian/bicycle access bridge Package PackagePedestria n/bicycle access bridgPede estrian/bicycle access bridge Pedestrian/bicycle access bridge downtown core. N Meridian eidian N Meri N Meridian Package B Benefits: a downtown core. eidian N Meri N Meridian

Package N Meridian

5th St NE 5th B

a • Keeps traffic impacts out of • Height of 3 ½ stories, consistent

a • Keeps traffic impacts out of a a a a a a a a a a 5th St NE 5th 5th St NE 5th 5th St NE 5th St NE 5th St NE 5th 5th St NE 5th 5th St NE 5th St NE 5th St NE 5th 5th St NE 5th 5th St NE 5th a a 5th St NE 5th • Convenient location for 5th St NE 5th 5th St NE 5th a a a 5th St NE 5th 5th St NE 5th 5th St NE 5th N Meridian a a 5th St NE 5th 5th St NE 5th • Some parking near station. with surrounding buildings. 5th Ave NE 5th Ave NE downtown core.N Meridian downtown core. • Some parking near station. 5th St NE 5th a a 5th St NE 5th 5th St NE 5th

a 5th Ave NE t t NE St 5th 5th Ave NE a t t NE St 5th 5th Ave NE 5th Ave NE 5th Ave NE 5th Ave NE 5th Ave NE Sounder riders. 5th Ave NE 5th Ave NE 5th Ave NE 5th5th 5thAveAve Ave NENE NE 5th Ave5th NE Ave NE 5th Ave 5thNE Ave NE 5th Ave NE 5th Ave NE 5th Ave NE Concerns: Concerns: Concerns: 5th Ave NE • Not considered to be in 5th Ave NE 5th St NE 5th a a

5th St NE 5th Concerns: 5th St NE 5th 5th St NE 5th a a 5th St NE 5th 5th St NE 5th • Potential shared use benefit with Transit Center garageTransit Center garage • Long walk for some riders. Eagles surface lot historic downtown. 5th Ave NETransit• RequiresCenter garage 5thshuttle Ave NE •bus 5th Ave NE 5th Ave NE • Long walk for some riders. Transit Center garageTransitRequires Center garage shuttle bus +80 downtown businesses. 4-½ stories - 750 total 4-½4-½ stories stories - -750 750 total total W Stewar Eagles surface lot 4-½ stories (unfunded). - 750 total 4-½ stories - 750 total • Requires shuttle bus• Requires services shuttle bus68 servicest Ave • No displacement of Sounder parking W St Eagles surface lot (unfunded). 5th St NW W W ewar +80600 (new) 600600 (net) (new) Stewart Stewar 68 t Av 600 (new)+80 600 (new) Eagles garage 62 68 Ave 68 t Ave • Rider exposure to local businesses. 5th St NW e W S W W W W W W W W 3rd Ave NW W W W 3rd Ave NW 5th St NW 3rd Ave NW 5th St NW tewart W Stew Stew W W S Stetw • Perceived as inconvenient for Ste Swtew StewW SWte wSt Stew (unfunded). (unfunded).3-½ stories - 600 Stew Stew Stew Stew during construction. 6th St NW 68 Ave art A art Stew ewaartr A W St • Perceived as inconvenient for arta rt a rStt ewaerwt ar War tS t art 2nd Ave NEW Stew art art art Eagles garage 5th St NW 68 ve Av 68 W ar t v ew 68 68AvAv Avar A t Aew Av a Av A 62 A 62 5th St NW 68 e Ste t A Ae W ar W St 68 e e68 e t A68veA vear e rt e 512ve ve 5th St NW v e v 5th St NW 5th St NW Eagles garage 68 w W 68 5th St NW 5th St NW 5th St NW 3rd Ave NW t 3rdw Ave NW 5th St NW t A 5th St NW 5th St NW 62 3rd Ave NW 68 ar v e Stew A 3rd3rd Ave Ave NW NW 3rd Ave3rd NW Avea rNW 3rd Ave NW Ste 68 v e A 3rd3rd Ave Ave NW NW 3rdPu Aveyall3rdup NW Ave302 NW 3rd Ave NW 5th St NW v 5th St NW 5th St NW 3rd Ave NW t e 68 a v 3rd Avet NW wa 5th St NW e 68 v 2nd Ave NE 3rd Ave NW e 2nd Ave NE 3-½ stories - 600 2nd Ave NE 5th St NW A 5th St NW 3rd Ave NW 6th St NW r e 3rd Ave NWA r e 3rd Ave NW Eagles garage 68 ve t 68 v t 3rd Ave NW 5th St NW Concerns: 62 5th St NW A e A 5th St NW 3rd Ave NW 3rd Ave NW 3rd 6th St NW Ave NW 5th St NW 6th St NW 6th St NW Eagles garage 3rd Ave NW 62 68 v 3rd Ave NW 5th St NW 68 v 62 62 e 6th St NW e 2nd Ave NW 2nd Ave NW 5th St NW 3-½ stories - 600 3rd Ave NW 62 62 Sounder riders. Sounder riders. 3rd Ave NW 5th St NW Station 512 Concerns: 512 512 2nd Ave NW 2nd Ave NE 3-½ stories - 600 3-½ stories - 600 2nd Ave NE 2nd Ave NE 62 Eagles garage 62 62 62 62 62 62 n Ave 62 62Puyallup62 302 62 Puyallup 302 512 2nd Ave NW 512 Puyallup 512 62 512 62 Eagles62 garage 62 62 62 62Station Station • 4 ½ stories necessary in order to Puyallup 302 2nd Ave NE 302 2nd Ave NE Puyallup 302 2nd Ave NW 2nd Ave2nd NE Ave NE 2nd Ave 2ndNE Ave NE 3-½ stories - 600 3-½ stories - 600 2nd Ave NE 2nd Ave NE2nd2nd Ave Ave NE NE 2nd Ave2nd NE Ave NE 2nd Ave NE W Main Ave 2nd Ave NE 2nd Ave2nd NE Ave NE 2nd Ave NE W Main Ave 5122nd Ave NW2nd Ave NW 2nd Ave NW 2nd 2ndAve AveNE NE 2nd2nd Ave2nd AveNW Ave NE NW 2nd Ave NW2nd Ave NW2nd Ave NW 2nd Ave NW 2nd2nd Ave AveNE NE 2nd Ave2nd NE AvePu yallNWup 2nd Ave NW 2nd Ave NW 2nd Ave NW 2nd Ave NE 2nd AveStati NWon 2nd AveStati NWon 512 Puyallup 302 512 5122nd Ave512512 NW 2nd Ave2nd NW 2ndPuAveyall AveNWup NW302 2nd Ave NW 512 512 512 5122nd Ave NW 2nd2nd Ave Ave NW NW 2nd Ave NW • Requires relocation512 of Eagles and 512 2nd Ave NW 302 Puyallup 302 512 512 2nd512 Ave NW Puyallup 512 512 2nd Ave2nd512 NW Ave NWSW 2nd St 512 512 Ave 302 Puyallup 302 StSW 3rd 5th St SW Station Ave Pu2ndyall Aveup NW Puyallup 302 512512 PuPu2ndyallyall Aveupup NW302 302 PuyallPuupyallPu 302yallup up302 Puyallup 302 512 512Hig512h School 4th St SW Pu2ndyall Aveup NW 302 PuyallPuupyall 302up 302 Puyallup 302 512 replace surface parking with net W Main Ave SPutatiyallon up 302 SPutatiyallon up 302 Stati512on Station Puyallup 302 302 Puyallup 302 512 PuyallPuyallupup 302 Puyallup 2nd St SW 2nd St 2nd St SW 2nd St

W Main Ave StSW 3rd 3rd StSW 3rd 5th St SW W Main Ave 4th St SW 5th St SW Station W Main AveStation W Main Ave StatiStationon StationStation Station eer Ave Eagles garageEaglesStati garageon StatiHigonh SSchootatil on Station removal of their building. High School 4th St SW Puyallup Puyallup StatiStation on Station StatiStation on Station EaglesEagles garage garageStatiEagleson garage 2nd St SW 2nd St s 600 spaces.

W MainStSW 3rd Ave W Main Ave W WMain Main Ave Ave W Main Ave W WMain Main Ave Ave W Main Ave 2nd St SW 2nd St 5th St SW 4th St SW W Main Ave W Main Ave W Main Ave W Main Ave

High School W MainStSW 3rd Ave W Main Ave W Main Ave 5th St SW High School W Main4th St SW Ave Puyallup Puyallup W Main Ave W 3-½Main stories Ave - 300 iu 3-½ stories3-½W - 300Pioneerstories - Ave 300 3-½ stories - 300 W Pioneer Ave Puyallup W Main Ave Puyallup Puyallup W Main Ave s d 3-½ stories - 300 2nd St SW 2nd St 2nd St SW 2nd St Transit Center garage a s s 3rd StSW 3rd Transit CenterTransit garage Center garage 3rd StSW 3rd 2nd St SW 2nd St 5th St SW 4th St SW 2nd St SW 2nd St 5th St SW 4th St SW Transit Center garageTransit Center garage u

3rd StSW 3rd Transit Center garage

High School StSW 3rd 5th St SW eer Ave 4th St SW High School 5th St SW 4th St SW Transit Center garage i R • u Possible need for pedestrian bridge u 2nd St SW 2nd St eer Ave High School High School Transit Center garage i i 3rd StSW 3rd 5th St SW 4th St SW d e High School Pus yallup Puyalls up PuyallPuyallup up PuyallupPu yall4-½up4-½ stories stories Puyall4-½up stories 4-½ stories 4-½ stories a Puyallup il PuyallupPu yallup Puyallup ad d • Relocation of existing parking iu W Pioneer AvePuyallPuuupyall up W Pioneer AvePuyallup W Pioneer Ave PuyallPuupyall up Puyall4-½up stories4-½ stories 4-½ stories R M Puyallup R Ra 2nd St SW 2nd St 2nd St SW 2nd St SW 2nd St i SW 2nd St W Pioneer Ave ¼ d SW 2nd St SW 2nd St 2nd St SW 2nd St 3rd StSW 3rd 3rd StSW 3rd StSW 3rd 3rd StSW 3rd e e 5th St SW 4th St SW 5th St SW 5th St SW s 4th St SW 4th St SW 5th St SW 4th St SW

d StSW 3rd StSW 3rd between garage and station. 2nd St SW 2nd St s l 5th St SW 5th St SW s 4th St SW 4th St SW l s StSW 3rd 5th St SW 4th St SW a High School High School HigHigh Schooh School l High Schoo460460 totall total 350 350 (net) (net) 460 total 350 (net) High School High School SW 2nd St i i 2nd St SW 2nd St s

3rd StSW 3rd s 5th St SW u a 4th St SW High School High Schoo460 totall 350 (net) 460 total 350 (net) High School High School High School u High School 460 total 350 (net) StSW 3rd 5th St SW u 4th St SW R StSW 3rd M 5th St SW W Pioneer Ave i iu HigR h School i 4th St SW u i High School u460 total 350 (net) 4th Ave High School M during construction. d e High School i i High School 460 total 350 (net) 7th St SW SW ¼ ¼ a ad il ile ad d ad d s R WR Pioneer Ave¼ M W Pioneer Ave M R Ra W WPioneer Pioneer Ave Ave W Pioneer Ave R Ra W WPioneer Pioneer Ave Ave W Pioneer Ave 4th Ave 4th 7th St SW Ave u W Pioneer Ave¼ e W PioneerW Pioneer Ave Avee W Pioneer Ave W WPioneer Pioneer Ave Ave W Pioneer Ave SW 7th St SW SW i W Pioneer Ave W Pioneer Ave il ile W Pioneer Aveil W Pioneer Aveile W Pioneer Ave s • Limited rider exposure to d 4th Ave s M s M M M s s s s s u s Cornforth/Campbells s Cornforth/Campbell garages garage 7th St SW SW 4th Ave ¼ s ¼ s i • Located in historic district. a 7th St SW SW u s u ¼ s ¼ u u u s u us Cornforth/Campbell garage i u i u i i i iuu u iu s s d i i iu Cornforth/Campbelliu s garageCornforth/Campbell garage s R 4th Aved i d i u 4th d d d i i u u a d 4-1/2 storiesdiu - 460 total local businesses.4-1/2 storiesu - 460 total u 7th St SW Ave SW 4th Aved i 7th St SW SW 4th d d d i i R d 4-1/2 stories - 460d totali i 7th St SW Ave e d SW 7th St SW SW d 3-1/2 stories - 300 total il s s a aa d a a a a a a d d e a ad a a d 3-1/2 stories - 300 total d M iu u R a RR a R R R Ra R R a a il R Ra 350 (new)R R 350a (new) a d ei Re R e e e R R R M e eR 350 (new) R R • Most traffic impacts. ¼ s s a ild e ille s s s il il il s lee le le le il il le le e e iu u R Ma ilM i iu le u iu M uiil i i le 512 i ½ le i • Limitedi sharedil use with downtown il d i R M M d i i d M M MMi M M i M Shaw Road lot M Mi M M M M 4th Ave a d le ¼ e ¼¼ a M d ¼a ¼ ¼ ¼ d¼ ¼ M N ¼ ¼ M ¼ ¼ N 7th St SW SW R a i il ¼ R ¼ a ¼ a ¼ ½7th Ave SW 400 ¼ ½ ½ e R M M R R R Gold lot il le ½ 4th Ave 4th ile e 4th4th Ave le 4th e 4th 47thth Ave SW businesses due to distance 7 Ave l 7 7th St SW Ave i Ave l Ave Ave 7th St SW 7th St SW 7th St SW 512Shaw Road Lot i Red Lot ½ 4th Ave i Red Lot 7th St SW Eagles4th 4Ave thLot Ave 4th Ave Gold Lot 4th Ave 4th Ave 7 7 7th St SW 7th St SW 7th St SW M Shaw Road512Shaw lot Road Lot SW Red4th Ave Lot SSWW 4 Red Lot SWSW7th St SW 4thS WAve SWiSW Eagles4SW Lot Gold Lot SW SW SW SW 7th Ave SW M NShaw Road lot SW th M Ave SW M N M SW M th Ave SW Eagles Garage Site Transit Center Site s ½ ½7th Ave SW N ½ ½ N ½ ½ from the downtown core. iu d s s s s s s s s s 4th 4th St SW 4th St SW 5th 5th St SW 5th St SW 3rd SW St 2ndSt SW 3rd SW St 2ndSt SW 4th 4th St SW 4th St SW 5th 5th St SW 5th St SW a iu 3rd SW St 2ndSt SW 3rd SW St iu 2ndSt SW iu iu iu iu iu iu iu R d d d d d d d d d e a a a a a a a a a il R R R R R R R R R M le e e e e e e e e N ½ i il il il il il il il il N M N N N M M M M N N M M M M 7th Ave SW ½ N N ½ ½ ½ ½ N N ½ ½ ½ ½ 7th Ave SW 7th Ave SW 7th Ave7th SW Ave SW 7th Ave SW 7th Ave SW 7th Ave7th SW Ave SW 7th Ave SW

219 Existing Sound Transit surfa(# scepace lots) Puyallup Station Access Improvements Project Existing Sound Transit surfa(# scepace lots) Existing Sound Transit leased surf(# spaceaces) lot 219 Puyallup StationPuyallup Access Improvements Station Access Project Improvements Project Red lot Red Redlot lot Red lot 219 219 219Existing Sound Trans219it surfa(# scepaceE lotxis)s ting Sound Transit surfa(# scepace lots) 219 219 9th Ave SW Existing Sound Transit leased su(#rfa spaceces) lot 250 200 250 219 200 219 Potential parking garage Existing Sound Transit leased su(#rfa spaceces) lot (# spaces) Existing Sound Transit surfa(# scepaceE xilots)sti ng Sound Transit surfa(# scepace lots) Existing Sound Transit leased surface lot Poten9thtial parAveking SW garage 9th Ave SW 9th Ave9th SW Ave SW 9th Ave SW 9th Ave SW 9th Ave9th SW Ave SW 9th Ave SW 4thSt NW Potential parking garage Potential parking garage Potential parking garage Potential parking garage (# spaces) (# spaces)

Existing Sound Transit surface St 7th NW lot Existing Sound Transit surface lot Existing Sound Transit surface lot Existing Sound Transit surface lot Potential surface lots Potential surface lots Potential surface lots Existing Sound Transit surfPotaceen lottial surface lots Potential surface lots Existing Sound Transit surface lot Potential surface lots

What parking options are being4thSt NW Exi sconsidered?ting Sound Transit leased surface lot Potential leased surface lots Existing Sound Transit leased surface lot Potential leased surface lots Existing Sound Transit leased surface lot Existing Sound Transit leased surface lot Potential leased surface lots What We’ve Heard What parkingWhat options Whatparking We’v eare Heardoptions being are considered? beingExisti ngconsidered? Sound Transit leaPotseden sutialrfa celea lotsed surface lots Potential leaseWhatd surface lotsWe ’ve HeardWhat We’ve Heard Existing Sound Transit leased surface lot Potential leaseWhatd surface lotsWe ’ve HeardExecutiveWhat We Summary’ve Heard – iii 4thSt NW 7th St 7th NW 4thSt NW 4thSt NW Potential parking garage Pedestrian/bicycle access bridge Potential parking garage Pedestrian/bicycle access bridge Potential parking garage Pedestrian/bicycle access bridge Poten4thSt NW tial parking garage Pedestrian/bicycle access bridge 4thSt NW Potential parking garage Pedestrian/bicycle access bridge Poten4thSt NW tial parking garage Pedestrian/bicycle access bridge 4thSt NW 7th St 7th NW Moderate support for this package. Strongest public support for this 4thSt NW Moderate support for this package. Some support for this package. 7th St 7th NW 7th St 7th NW Moderate support for this package. St 7th NW Some support for this package. 7th St 7th NW Package F St 7th NW PotenPottialen leatialse surfd surfacea lotsce lots Potential surface lots St 7th NW Potential surface lots Potential surface lots Package C Benefits: package (over twice as many St 7th NW Potential surface lots Potential surface lots Package Potential leased surface lots Benefits: Benefits: Potential leased surface lots Benefits: Benefits: Pedestrian/bicycle access bridge C Package C Potential leased surface lots

Package N Meridian B • All parking close to station. respondentsPackage supported C thisPackage package). C Package B Package B • Slightly fewer benefits than Package C • Close proximity to station.

N Meridian • Slightly fewer benefits than • Close proximity to station. Pedestrian/bicycle access bridge Potential leased surface lots Potential leased surface lots Pedestrian/bicycle access bridgPede estrian/bicycle access bridge N Meridian Benefits: Package D. N Meridian N Meridian Package D. N Meridian

• Height of 3 ½ stories, consistent N Meridian N Meridian • Potential shared use benefit with

N Meridian • Potential shared use benefit with

Pedestrian/bicycle access bridge N Meridian a

5th St NE 5th • Convenient location for Pedestrian/bicycle access bridge a with surroundingSt NE 5th buildings. Concerns: Concerns: downtown businesses. downtown businesses. 5th St NE 5th a a 5th St NE 5th 5th Ave NE St NE 5th 5th St NE 5th a a 5th St NE 5th Sounder riders. St NE 5th 5th St NE 5th a a 5th St NE 5th 5th St NE 5th a 5th Ave NE St NE 5th • Same as Package D with less a 5th Ave NE • Not considered to be in 5th Ave NE St NE 5th 5th Ave NE • Same as Package D with less 5th Ave NE • Rider exposure to local• Rider businesses. exposure to local businesses. • Potential shared use benefit with 5th Ave NE 5th Ave NE 5th Ave NE Eagles surface lot historic downtown. 5th Ave NE traffic impacts. traffic impacts. +80 Eagles surface lot Eagles surface lot Concerns: downtown businesses. +80 Concerns: W Stewar •+80 Additional parking at Red Lot but 68 t Ave • No displacement of Sounder parking • Additional parking at Red Lot but 5th St NW W W Stewart Stewar W W • Cornforth/Campbell• siteCornforth/Campbell is a prime site is a prime Eagles garage 62 68 Ave 68 t Ave • Rider exposure to local businesses. Stewar putsW S pressure on existing transit Stewar W S

5th St NW t t 3rd Ave NW during construction. 3rd Ave NW 5th St NW W Stew 68 Ave ewart puts pressure on existing transit 68 t Ave tewart 5th St NW 3-½ stories - 600 2nd Ave NEW art W Stew 3rd Ave NW 68 Ave 3rd Ave NW 5th St NW 68 Ave

S 5th St NW tew 62 Eagles garage 62 68 Ave art 3rd Ave NW 3rd Ave NW 5th St NW location for mixed use art 512 5th St NW 68 Ave Eagles garage location for mixed use 5th St NW 62 2nd Ave NE Puyallup 302 Ave 2nd Ave NE 3-½ stories - 600 2nd Ave NE service – buses62 quite full – and long Eagles garage62 62 3rd Ave NW 5th St NW Concerns: Eagles garage2nd Ave NE service – buses quite full – and long3-½ stories - 600 Station 512 2nd Ave NW Concerns: 512 2nd Ave NW 512 Eagles garage62 2nd Ave NE 62 2nd Ave NE 3-½ stories - 600 2nd Ave NE Puyallup 302 Puyallup 302 3-½ stories - 600 512 2nd Ave2nd NW Ave NE 2nd512 Ave NE 2nd Ave NW 2nd512 Ave NE redevelopment. redevelopment. n Ave 62 3-½ stories - 600 512 2nd Ave2nd NW AvePu yallNE up 302 walkPuyall forup others. 512 2nd Ave NWPuyallup 302 Puyallup 512 Station Station • 4 ½ stories necessary in order Putoyall up 302 512 512 302 walk for others. 302 W Main Ave 2nd Ave NE W Main Ave Puyallup 302 Station Station Station Station Puyallup • Requires relocation of Eagles and Station W Main Ave W Main Ave W Main Ave • Remediation may be required at 2nd Ave NW SW 2nd St Station W Main Ave 3rd StSW 3rd 5th St SW 4th St SW Ave • Remediation may be required at 512 High School PuyallPuyallupup 512 Puyallup replace surface parking with netAve • Constrained parking during 302 Puyallup • Constrained parking during Puyallup 2nd St SW 2nd St 2nd St SW 2nd St 3rd StSW 3rd 3rd StSW 3rd 5th St SW 4th St SW 5th St SW High School removal of their building. High School 4th St SW Puyallup Puyallup Cornforth/Campbell site. eer Ave SW 2nd St 2nd St SW 2nd St 3rd StSW 3rd 3rd StSW 3rd 5th St SW Puyallup 4th St SW 5th St SW 4th St SW Cornforth/Campbell site. High School SW 2nd St Eagles garage Station High School SW 2nd St 3rd StSW 3rd 3rd StSW 3rd 5th St SW 600 spaces. Puyallup 4th St SW 5th St SW s . 4th St SW 2nd St SW 2nd St High School High School 3rd StSW 3rd 5th St SW u 4th St SW Washington State Fair. i W Pioneer Ave W Pioneer Ave High School SW 2nd St

W Main Ave StSW 3rd 5th St SW s ad 3-½ stories - 300 s s High School 4th St SW W Pioneer Ave W Pioneer Ave iu R • u Possible need for pedestrian bridge u er Aves W Pioneer Ave s W Pioneer Ave s • Premium cost for two garages. d e i i iu er Aves u s u s • Premium cost for two garages. a il ad ad • Relocation dof existing parking iu s i u i u R M Puyallup R R d iu s ad i ad i ¼ le between garage and station. le d iu R ad R ad 2nd St SW 2nd St i i a d e R e R 3rd StSW 3rd 5th St SW 4th Ave High School 4th St SW M M during construction. R a il e il e 7th St SW SW ¼ ¼ M l l ile e R ¼ Mi ¼ M Mi 4th Ave 4th M il ¼ ¼ 7th St SW Ave SW 7th St SW SW ¼ M W Pioneer Ave s • Limited rider exposure to ¼ iu • Located in historic district. d s Cornforth/Campbell garage s a u s s iu R i local4-1/2 businesses. stories - 460 totaliu iu d d d d a ile a a a R R 350 (new) R R • Most traffic impacts. le M e e e 512 i Shaw Road lot ½ il • Limited sharedil use with downtown il 7th M Ave SW N M M N M Eagles Garage SiteEagles GarageCornforth/Campbell Site Cornforth/Campbell ½ 400 ¼ Gold businesseslot ½ due to distance ½ Red Lot Red Lot Transit Center SiteTransit Center Site 7th Ave SW Site Eagles Garage Site from the downtown core. Transit Center Site Site Puyallup Station Access Improvement Project Phase 1: Identifying Access Improvements What Improvements Are Common to All Packages? Six different multi-modal access improvement packages were developed for the project. The packages differ only by parking type and location. Every package includes pedestrian, bike and bus/traffic management investments. Specific improvements will be detailed during project design in the next phase of the project. The figure below identifies where strategic pedestrian, bike, and traffic improvements are proposed within the station area. Pedestrian improvements will be focused within 0.25 miles of the station and bike improvements within 0.5 miles of the station. AREA FOR PEDESTRIAN, BIKE, AND TRAFFIC IMPROVEMENTS

167 7th St NW 4th NW St

161 N Meridian N 5thSt NE 5th Ave NE W Stewa rt Ave Legend of Improvements 3rd Ave NW 2nd Ave NE 2nd Ave NW Puyallup Strategic bus access and tra c Station W Main Ave s management improvements within u Puyallup i d 512 0.25 miles of the Sounder Station 2nd StSW2nd 3rd St SW St 3rd High School SW 4th St a R Bike route improvement W Pioneer Ave e il M Potential bike route extension ¼ Sidewalk and ADA curb ramp improvements

7thSW St 4th Ave SW (locations and type TBD) 5th 5th St SW s iu d Bike storage (location TBD) a R ile 7th Ave SW M Pedestrian/bicycle access bridge ½ Station area lighting N 9th Ave SW

All packages include the following improvements: • Pedestrian/bike bridge over railroad tracks • Bike route improvements on W Stewart Ave, W at station Main Ave, 7th Ave SW, 5th Street SW/4th • Station area traffic signal improvements Street NW

• Station area intersection, sidewalk and lighting • Added bike storage at station improvements for pedestrians • Total investments: approximately $11 M (included in cost totals for packages)

Executive Summary – iv PUYALLUP STATION What is the Project? About the Puyallup Station Access Improvement Project In the Sound Transit 2 (ST2) ballot measure (from 2008), voters approved funding to improve access at Sounder stations. This program provided $52 million to make station access improvements in Puyallup, Washington. The Puyallup Station Access Improvement Project is evaluating potential capital investments to improve access to the Puyallup Station for pedestrians, bicyclists and drivers. Sound Transit is planning to construct all improvements by 2023. What’s Inside this Document? This report summarizes the work Sound Transit has done with stakeholders to develop a package of access improvement investments that will benefit Sounder riders and the local community in Puyallup. The report answers key questions about the project and is organized around the following themes: • Project description: What is the project? Why are we doing the project? • Project definition: What are the project goals? What is the project timeline? How did we develop and evaluate different alternatives to include in the project? • Project development: Who did Sound Transit talk with? What did Sound Transit hear? What types of improvements were considered? How were parking improvements identified? Were bus service improvements identified? Did Sound Transit consider co-development at parking locations? What improvements are common to all packages? How did Sound Transit group or package the improvements? • Project identification: What are the packages? What were the community preferences for individual packages? How were the packages evaluated? What are the evaluation results? How much does each package cost? What happens next? Additional reference materials have been attached to this report, including: Appendix A - Phase I Public Involvement Summary Appendix B - Preliminary Traffic Analysis 1 Puyallup Station Access Improvement Project Phase 1: Identifying Access Improvements Why Are We Doing the Project? Nearly two-thirds of Sounder 64% car 21% riders drive and park at the bus Most riders drive, and Sound Transit Puyallup available parking fills Station, as shown in Figure 1. 11 % up early. Most riders come from within drop off the Puyallup City limits and South Hill area. Many riders 2.5% find it difficult to access the station because nearby parking is bike full by the second morning train at 6 am. The next closest 1.5% all-day parking lot is located at the Washington State Fair Red walk Lot, which is 0.5 miles from the station. Sound Transit leases FIGURE 1: RIDERSHIP MODE SPLIT 219 spaces at the Red Lot, which is up to 90% full during Source: Observation data collected in 2010 for Puyallup Station weekday use. Access and Demand Study, consolidated with ridership data provided by Sound Transit in 2013.

Traffic congestion already creates delays at many Traffic congestion intersections within the is already affecting downtown area during access to the station. morning and evening commuter hours. Sounder riders who drive and park or ride the bus to the station experience delays from the congestion. As population growth continues, traffic congestion will increase substantially on local roadways. CONGESTION IN DOWNTOWN PUYALLUP

Over 1,000 people ride a Puyallup Station Ridership Forecast Sounder train or ST Express 500,000 bus from the Puyallup More riders and trains 400,000 Station each day. Ten round- are coming. Sounder Service Begins trip Sounder trains stop at 300,000

the Puyallup Station each 200,000 weekday. Sound Transit plans to add 3 more roundtrips 100,000 by 2017 and predicts a 70 percent increase in ridership by 0 2000 2005 2010 2015 2020 2025 2030 2035 2035. This is approximately 600 new riders at the Puyallup Puyallup Station Ridership, per year Station. In the future, most riders are still expected to drive and park near the station although additional bicycle and TABLE 1: PUYALLUP STATION RIDERSHIP FORECAST pedestrian amenities will ensure greater accessibility in the Source: Annual Ridership Volumes collected for Sounder Stations vicinity of the station. Access and Demand Study consolidated with ridership data provided by Sound Transit in 2014.

2 What Are the Project Goals? PROJECT GOALS EVALUATION CRITERIA Provide improved Provides capacity for existing and future riders Sound Transit worked with city staff, access to Sounder Provides safe, multi-modal access and reliable travel riders community leaders and stakeholders to form times to the Puyallup Station area for riders a Leadership Working Group. The purpose Benefit the local Supports community character, vision, plans and policies of the Leadership Working Group was to community for the station area, including historic downtown inform Sound Transit’s understanding of the Supports access to parking for downtown businesses larger political and community context in and residences within the station area which the project will be built. This resulted Minimizes additional congestion and impacts to in development of a set of project goals and neighborhood traffic within the station area evaluation criteria for the project. These Support Sound Is cost-effective and financially sustainable Transit’s regional goals provide a framework for developing Supports plans and policies from Sound Transit and commitments access improvements. The evaluation criteria regional policies were used to help assess the effectiveness of Builds on the access improvements identified in the proposed improvements in meeting Sounder Stations Access and Demand Study those goals. Maintain a healthy Minimizes potential adverse impacts to the natural and environment built environment What is the Project Timeline? Sound Transit’s Puyallup Station opened in 2000, providing Sounder train and ST Express Bus service north to . Sounder service between Puyallup and Seattle has experienced substantial growth, and parking facilities are either at or near capacity. In November 2008, the voter-approved ST2 Plan included funding for parking, pedestrian and bike access improvements to the Puyallup Station. While refining projects in the ST2 plan, the Sound Transit Board responded to community concerns by calling for a Sounder Stations Access and Demand Study. The study evaluated potential access improvements at eight existing Sounder stations including the Puyallup Station. The study provided a range of potential access improvement projects that Sound Transit could implement in full or in part that would improve riders’ ability to use alternative modes of travel to the Puyallup Station. The Puyallup Station Access Improvement Project builds on the results of the Sounder Stations Access and Demand Study. The project began in January 2013 with establishment of project goals by the Leadership Working Group. In the remainder of 2013 and early 2014, Sound Transit identified various improvement options, and then assembled the options into different packages or alternatives. Each package interprets the different preferences and concerns of riders and community stakeholders. The Sound Transit Board is being asked to identify a preferred package. After identification of a preferred package, Sound Transit will begin conceptual engineering and environmental review. Following approval of the environmental documents, preliminary design will be advanced. FIGURE 2: PROJECT TIMELINE WE ARE HERE 2000 2013 2014 2015 2016 2018

• Sounder Service Leadership Alternatives Begins (2000) Working Development Groups • ST2 Funding Input on Approved (2008) improvement Developed options. Environmental Preliminary Final Design Construction project goals Review Design • Sounder Stations Used feedback and evaluation Access and Demand on options to Right-of-Way/Property criteria for develop Study (2010 – 2012) alternatives. Acquisition and multi-modal Permitting packages.

Sounder service begins

Sound Transit Board Identifies Preferred Package of Improvements (August 2014) 3 Puyallup Station Access Improvement Project Phase 1: Identifying Access Improvements How Did We Develop and Evaluate Different Alternatives to Include in the Project? Six different multi-modal access improvement packages were developed for the project. Figure 3 below illustrates, in more detail, the alternatives development process that has occurred over the past year. FIGURE 3: ALTERNATIVES DEVELOPMENT PROCESS

Leadership Working Group

PROJECT GOALS ‚‚ Provide improved access Spring 2013 ‚‚ Benefit the local community Provide improved access Leadership Working Group convened to identify to Sounder riders ‚‚ Support Sound Transit’s regional issues important to the community, culminating in commitments ‚‚ Maintain a healthy environment development of project goals and evaluation criteria.

161

167 7th St NW 4th NW St N Meridian N 5thSt NE 5th Ave NE Summer/Fall 2013

3rd Ave NW W Stew art Ave Conducted outreach to community stakeholders 2nd Ave NW Puyallup 2nd Ave NE Station W Main Ave including city staff, City Council, business owners, Puyallup s iu 512 2nd StSW2nd 3rd St SW St 3rd

High School SW 4th St d a R e W Pioneer Ave il M riders, residents, and other interested parties to ¼ identify a list of multi-modal access 5th SW 5th St 7thSW St 4th Ave SW

s improvement options. iu ad R le Mi 7th Ave SW ½ N 9th Ave SW February 2014 Open House and Web-Based Shared improvement options with wider Questionnaire community and gained understanding of community preferences and concerns. Develop and evaluate alternative packages of improvements

A P B P Spring 2014 Based on results of community feedback, developed six packages of improvement options C P D P that include a range of parking options from satellite lots to parking garages. E P F P

May 2014 Open House and Survey Gathered feedback from riders and the community on the various packages.

Refine packages of improvements

P Summer 2014 Results of Open House and feedback from City Sound Transit Board identifies preferred alternative Council and other stakeholders inform Sound Transit Board. Identification of package improvements.

4 Who Did Sound Transit Talk With? Sound Transit recognizes that parking, pedestrian and bicycle improvements to the station need to work for the community in which they are located. In order to develop improvements that support the community, Sound Transit met regularly with Puyallup City staff, elected officials and other community stakeholders to develop and review proposed improvements. Leadership Working Group (LWG) – In early 2013, Sound Transit convened a Leadership Working Group (LWG) comprised of ST Executive leadership, ST Board members and City elected officials. The LWG developed a set of goals to frame development of access improvements. Puyallup City Council – Multiple presentations were made to the Puyallup City Council to review and discuss improvement options under consideration. Discussions began in fall of 2013 and continued through the spring of 2014. Technical Advisory Committee (TAC) – Consisting of City of Puyallup staff from Community Development and Public Works, this group provided planning and local context for proposed improvements. Conversations with members continued through the entire planning process, from 2013 through 2014. Stakeholder Roundtable – This community-based forum Sound Transit has developed options to improve pedestrian, consisted of stakeholders representing the City Planning OPEN HOUSE bike and parking access to the Puyallup Station Access Improvements Sounder train station in Puyallup Commission, Sound Transit riders, Puyallup residents, and we want your feedback. Please join us to let us know what downtown business owners, Historic Preservation Design you think about: n Bicycle and pedestrian access improvement plans Review Board members, and the Puyallup School District. n Potential new parking lots or garages

Give your feedback online! This group reviewed and offered insights and feedback as Take our questionnaire at: soundtransit.org/puyallupimprovements access packages were being assembled. Groups met from fall For more information visit soundtransit.org/puyallupimprovements 2013 through spring 2014. Sign up for email updates about Puyallup Station improvements at soundtransit.org/subscribe. Public and Sounder Riders – Two open house meetings TOP AND CENTER: PUBLIC OPEN HOUSE (FEBRUARY 2014) for the general public and transit riders were held in BOTTOM: POSTCARD INVITATION TO FEBRUARY OPEN HOUSE February and May of 2014. These forums were held over 3-hour windows in buildings close to the station and during peak ‘stop-by’ opportunities for commuters. In addition to thousands of residential and business mailings and posters within a 5-mile radius of the station, notifications also included web announcements, social media, and press releases in the Puyallup Herald and Tacoma News Tribune. In addition to open houses, web-based surveys were made available through the Sound Transit website, and briefings were given to community groups and local business associations. Local Businesses – Prior to the open houses, Sound Transit staff mailed postcards and hand-delivered posters to local businesses and property owners, inviting them to attend the open houses and share their opinions. Prior to the second open house, comments were collected. Affected Property Owners – Sound Transit contacted property owners of potential sites for access improvements. Sound Transit will continue to work with potentially affected property owners for the length of the project. 5 Puyallup Station Access Improvement Project Phase 1: Identifying Access Improvements What Did Sound Transit Hear? Input from the public was incorporated throughout the development of the project. Feedback was used to identify access improvement options and create packages to represent different stakeholder interests. Based on the feedback, general themes emerged, including: Public and Community Groups • Majority of stakeholders support more station parking close to the station. Comments regarding the type and location of parking are included under the “What We’ve Heard” box with specific package descriptions starting on page 12. • Desire to create pedestrian access over the railroad tracks. • Desire to increase local transit connections (Sound Transit, being a regional transit provider, does PREFERENCES FOR PEDESTRIAN / BICYCLE IMPROVEMENTS, AS VOICED AT FEBRUARY 2014 OPEN HOUSE not provide local service). • Concerns regarding an increase in traffic and congestion in the vicinity of the station. Preliminary traffic analysis of key intersections in the vicinity of the station found that traffic delays are similar for all of the project alternatives, regardless of the location of the parking. More detailed information is presented in Appendix B. Additional community interests included the size, height and architectural elements of a new parking garage. City residents and staff desire any parking garage to be compatible with the scale and character of the nearby buildings and streetscape. As a result, Sound Transit evaluated multiple locations and architectural designs. Specific designs for parking facilities will occur in the next phase of the project. Local Businesses General themes emerged during this process, including: • Improvements should improve a rider’s exposure to local businesses. There is concern that train riders do not patronize downtown businesses. If they do, it is mostly on the weekends. • Improvements must preserve local businesses’ employee and customer parking. Businesses do not want long-term commuter parking consuming existing shorter-term parking. • There is general concern about the current traffic and congestion; satellite parking is preferred if the improvements will exacerbate this issue. DOWNTOWN PUYALLUP AND LOCAL BUSINESSES

6 What Types of Improvements Were Considered?

Pedestrian and Bicycle Improvements These improvements make it easier for pedestrians and cyclists to access the station. Pedestrian access improvements are focused within 0.25 miles of the station and bicycle access improvements are focused within 0.5 miles of the station. These include: • New or improved crosswalks • Bike lanes and pedestrian pathways • Curb ramps • Pedestrian bridge(s) • Lighting

EXAMPLE OF PEDESTRIAN BRIDGE Congestion Improvements Traffic improvements would address vehicle congestion near the station for car and bus access. These include tools to manage traffic flow and capacity improvements to existing roadways and/or intersections. More traffic analysis and evaluation will be included in the preliminary design phase of this project. The SR 410 / Traffic Avenue interchange is a key access point for Sounder riders. It experiences congestion, particularly during peak commuting hours. Sound Transit is exploring potential partnership opportunities with Washington State Department of Transportation CONGESTION IN DOWNTOWN PUYALLUP and local jurisdictions to make pedestrian, bike and traffic improvements to the bridge over SR 410. These improvements would help address congestion in Puyallup near Shaw Road and would substantially improve access to the for both Sumner and Puyallup residents.

Parking Improvements Parking structures or lots identified within 0.5 miles of the station would make access to the station easier and more reliable, especially as ridership continues to grow.

7 Puyallup Station Access Improvement Project Phase 1: Identifying Access Improvements Were Bus Service Improvements Identified? Currently 21% of Sounder riders reach the station by bus; almost all bus riders park at the South Hill Park & Ride or the Red Lot. Some of the improvement packages include a new satellite parking area at Shaw Road or at the Gold Lot that would require shuttle bus service to the station to be viable. However, shuttle service operation costs are not included in the voter-approved ST2 plan. No other entity has offered to fund the shuttle service. How Were Parking Improvements Identified? Currently there are 651 official parking spaces for the Puyallup Station (Transit Center and Red Lot). These spaces are nearly 100% utilized. Sound Transit estimates up to 600 additional parking spaces will be needed to keep up with demand at the Puyallup Station in the future. Options to purchase or lease the surface parking lots were considered. For commuter convenience, locating parking close to the station is preferred. This requires careful consideration of the surrounding buildings and land uses when siting any parking facility, particularly a garage. Figure 4 below depicts two parking garage examples. Both configurations accommodate the same number of cars but the taller garage could be constructed on a smaller piece of land. However, the height may not be compatible with the surrounding neighborhood. The shorter garage requires a larger piece of land and may be at the same height as surrounding buildings.

FIGURE 4: PARKING OPTIONS

P P P

Surface lot Parking garage • One or more surface lots • Minimum size of 120 feet by 220 • Leased and/or purchased feet • $6,500 per space • $30,000 per space to construct to construct

8 Did Sound Transit Consider Co-development at Parking Locations? Sound Transit has a policy to support transit-oriented development, such as multi-family housing, close to its facilities. In support of this policy, Sound Transit conducted a preliminary market analysis to assess the demand for multi-family housing at two sites near the Puyallup Station – the existing Puyallup Station lot and the Cornforth/Campbell property. It was assumed parking would be located on a portion of each proposed site, but the exact configuration of the garage was not determined. Preliminary results indicate an emerging market for transit-oriented development with the strongest market support for mid-rise apartments, a four-story wood-frame apartment with elevator access and surface parking. Co-development of a site containing a parking garage requires early coordination with the partner agency. A development partner must be identified prior to any design work. No developer has been identified at this time. What Improvements Are Common to All Packages? Six different multi-modal access improvement packages were developed for the project. The packages differ only by parking type and location. Every package includes the same pedestrian, bike, and bus/traffic management investments. Specific improvements will be detailed during project design in the next phase of the project. Figure 5 below identifies where strategic pedestrian, bike, and traffic improvements are proposed within the station area. Pedestrian improvements will be focused within 0.25 miles of the station and bike improvements within 0.5 miles of the station. FIGURE 5: AREA FOR PEDESTRIAN, BIKE, AND TRAFFIC IMPROVEMENTS

167 7th St NW 4th NW St

161 N Meridian N 5thSt NE 5th Ave NE W Stewa rt Ave Legend of Improvements 3rd Ave NW 2nd Ave NE 2nd Ave NW Puyallup Strategic bus access and tra c Station W Main Ave s management improvements within u Puyallup i d 512 0.25 miles of the Sounder Station 2nd StSW2nd 3rd St SW St 3rd High School SW 4th St a R Bike route improvement W Pioneer Ave e il M Potential bike route extension ¼ Sidewalk and ADA curb ramp improvements

7thSW St 4th Ave SW (locations and type TBD) 5th 5th St SW s iu d Bike storage (location TBD) a R ile 7th Ave SW M Pedestrian/bicycle access bridge ½ Station area lighting N 9th Ave SW

All packages include the following improvements: • Pedestrian/bike bridge over railroad tracks • Bike route improvements on W Stewart Ave, W at station Main Ave, 7th Ave SW, 5th Street SW/4th Street NW • Station area traffic signal improvements • • Station area intersection, sidewalk and lighting Added bike storage at station improvements for pedestrians • Total investments: approximately $11 M 9 Puyallup Station Access Improvement Project Phase 1: Identifying Access Improvements How Did Sound Transit Group or Package the Improvements? Parking alternatives were developed to reflect the range of issues and concerns voiced by project stakeholders and vary by parking location, surface lot versus parking garage, and parking space count at each location. Figure 6 illustrates all parking options included in the packages described below. Packages A and B keep proposed additional parking out of downtown and reflect a concern by some project stakeholders that downtown parking facilities would have an adverse effect on the area, especially traffic congestion and parking availability for patrons of downtown businesses. Packages C and D reflect an interest by some project stakeholders to keep the parking as close to the station as possible. Packages E and F reflect an interest by some project stakeholders to disperse traffic with a combination of relatively close-in parking facilities. The Shaw Road parking site in Package A is more than 2 miles from the Puyallup Station and would require shuttle bus service. ST2 did not provide funding for shuttle bus service or any other operational improvements. No other service provider or funding source has been identified for the required shuttle service for Package A. While all parking options accommodate up to 600 vehicles, combinations of surface lots and/or garages in different locations result in varying costs, ridership accessibility, and impacts to the community character and traffic network. Further consideration of transit improvements, such as signal synchronization, was included based on parking locations. The following is a summary of packages developed for consideration: Package A Package B Package C Shaw Road and Red Lot Red and Gold Surface Lot Eagles Garage • Shaw Road surface lot: 400 spaces • Gold lot surface lot: 320 spaces • Eagles garage (3-½ stories): • New access street to Shaw Road lot • Bus shuttle from Gold lot 600 spaces • Additional pedestrian bridge across • Bus service from Shaw Road lot (service provider not identified) 5th Street NW (unfunded and service provider • Red lot lease expansion: Additional not identified) 200 spaces (no additional • Red lot lease expansion: Additional bus service) 200 spaces (no additional • Eagles surface lot: Add 80 spaces bus service) Package D Package E Package F Large Transit Center Garage Small Transit Center Garage Cornforth/Campbell Garage • Transit Center garage • Transit Center garage (4-½ stories): +Eagles Garage (4-½ stories): total 750 spaces total 460 spaces (350 net) • Cornforth/Campbell garage (600 net) • Red lot lease expansion: Additional (3-½ stories): 300 spaces 250 spaces (no additional • Eagles garage (3-½ stories): bus service) 300 spaces • Additional pedestrian bridge across 5th Street NW Pages 12 through 17 show the parking packages summarized above. Each package includes pedestrian, bike, and traffic improvements shown on page 9. The “What We’ve Heard” box for each package includes feedback from a variety of stakeholders, and more details are included on page 18.

10 W FIGURE 6: COMPOSITE MAP OF ALL PARKING OPTIONS N Meridian a 5th St NE 5th 5th Ave NE Eagles surface lot (additional 80 spaces) Transit Center garage (460 - 750 total spaces) W Stewa rt Ave

3rd Ave NW 5th St NW Eagles garage 6th St NW 2nd Ave NE 2nd Ave NW(300 - 600 spaces) 2nd Ave NW Puyallup 512 Station W Main Ave

Puyallup 2nd St SW 2nd St 3rd StSW 3rd 5th St SW High School 4th St SW W Pioneer Ave us di Cornforth/Campbell garage Ra ile (300 total spaces) ¼ M 4th Ave 7th St SW SW

s iu d a R ile M N Gold lot* ½ 7th Ave SW (320 spaces)

Red lot (200 - 250 spaces) Existi9thng SounAve dSW Transit surfa(# scepace lots)

Existing Sound Transit leased surf(# spaceaces) lot 4thSt NW Potential parking garage 7th St 7th NW Existing Sound Transit surface lot Potential surface lots PackageExisting Sound TransDit leased surface lot Potential leased surface lots 512 Shaw Road lot* Pot4thS ential parking garage Pedestrian/bicycle access bridge (400 spaces) 7 Potential surface lots (2.15 miles from station) E Main Ave * This project does not include funds to support shuttle bus service. Shaw Road Puyallup

S and Gold Lot will require shuttle service to Puyallup Station. No shuttle service Station h

aw

provider has been identified for this. R

d

E

11 Puyallup Station Access Improvement Project Phase 1:What Identifying Access Whatparking Improvements parking options options are being are beingconsidered? considered? 4thSt NW 4thSt NW 4thSt NW 4thSt NW

Package A: Shaw Road St 7th NW + Red Lot 7th St 7th NW 7th St 7th NW 7th St 7th NW • Only parking is shown below. Pedestrian and bicycle improvements listed on page 9 are included with eachPackage package. Package A A PackagePackage B B PackagePackage C N Meridian N Meridian N Meridian N Meridian a 5th St NE 5th a 5th St NE 5th a 5th St NE 5th a 5th St NE 5th 5th Ave NE 5th Ave NE 5th Ave NE 5th Ave NE

Eagles surface lotEagles surface lot +80 +80 W Stewart W Stew W Stewar W St 68 Ave art A 68 t Ave ewart 3rd Ave NW 5th St NW v A 68 e 3rd Ave NW 5th St NW 68 ve 3rd Ave NW 3rd Ave NW 5th St NW 5th St NW

6th St NW 3rd Ave NW 3rd Ave NW 62 6th St NW 62 62 62 Eagles garage 2nd Ave NE 2nd Ave NE 3-½ stories - 600 2nd Ave NW 2nd Ave NW 2nd Ave NE 2nd Ave NW 2nd Ave NE 2nd Ave NW 2nd Ave NW Puyallup 302 512 512 2nd Ave NW Puyallup 2nd Ave NW 512 2nd Ave NW Puyallup 302 302 Puyallup 302 512 Station Station Station Station W Main Ave W Main Ave W Main Ave W Main Ave W Main Ave Puyallup Puyallup Puyallup Puyallup 2nd St SW 2nd St 2nd St SW 2nd St 3rd StSW 3rd 5th St SW 4th St SW 2nd St SW 2nd St 3rd StSW 3rd 5th St SW 4th St SW

High School SW 2nd St 3rd StSW 3rd 5th St SW 4th St SW High School 3rd StSW 3rd 5th St SW High School High School 4th St SW W Pioneer Ave W Pioneer Ave W Pioneer Ave W Pioneer Ave W Pioneer Ave us s s i u iu us d di d i Ra a Ra ad ile e R le R M il Mi ile ¼ ¼ M ¼ ¼ M 4th Ave 7th St SW 4th Ave 7th St SW SW 4th Ave S 7th St SW 7th St SW W 4th Ave SW 7th St SW SW s s iu s u s d iu i iu a d d d R a a a R R R le e le 512 i 512 il i ile N M ShawM Road lot Shaw Road lot M M N ½ 400 N N ½ N ½ 400 Gold lot Gold lot ½ 7th Ave SW (2.15 miles from station) 7th Ave SW 7th Ave SW (2.15 miles from station) 7th Ave SW 320 320 E Main Ave E Main Ave Puyallup Red lot Red lot Puyallup Red lot 219 219 219 S Red lot 200 219 Station h S 250 Station h 200 aw 200 Existing Sound Transit surfa(# scepace lots) aw 9th Ave SW R 9th Ave SW 9th Ave SW d R 9th Ave SW Puyallup Station Access Improvements Project d Existing Sound Transit surfa(# scepace lots)

E

Existing Sound Transit leased surf(# spaceaces) lot E 4thSt NW 4thSt NW Potential parking gar4thSt NW age 4thSt NW Existing Sound Transit leased su(#rfa spaceces) lot 7th St 7th NW

Existing Sound Transit surface lot Existi St 7th NW ng Sound Transit surface lot

7th St 7th NW Pot St 7th NW ential surface lots Potential surface lots

e

v

A

r

e

e

e n

v

o

i A

P r

e E

e

n

o i P

PackageExisting Sound Tra nsitD leased surface lot Potential leased surface lots What We’ve Heard E Existing Sound Transit leased surface lot Potential leased surface lots What We’ve Heard 4thSt NW Poten4thSt NW tial parking garage Pedestrian/bicycle access bridge Package Potential parking garage Pedestrian/bicycle access bridge PackagePackage F What parking options are being considered?Package D PackageE E Support for this package. 7th St 7th NW 7th St 7th NW Little public support for Potential surface lots Potential surface lots 4thSt NW this package. 7th St 7th NW Package A proposesPotential a lea totalsed surf oface 600lots additional surface parking spacesN Meridian - Potential leased surface lots Benefits:

C C N Meridian N Meridian Package N Meridian • Reduces traffic impacts within 400 spaces on anPedes undevelopedtrian/bicycle access br siteidge near Shaw Road and 200 leased Benefits: Pedestrian/bicycle access bridge Package Puyallup’s downtown core. eidian N Meri N Meridian Package B spaces at the Washington State Fair’s Red Lot. a • Keeps traffic impacts out of a 5th St NE 5th 5th St NE 5th a a 5th St NE 5th 5th St NE 5th 5th Ave NE N Meridian Puyallup’s downtown core. • Some parking near station. a t t NE St 5th 5th Ave NE 5th Ave NE 5th Ave NE This package would require5th Ave NE Sound Transit to purchase land for the Concerns: Concerns: 5th St NE 5th a a 5th St NE 5th Transit Center garage St NE 5th parking site and build an access road to the site. Because the Shaw5th Ave NE • Requires shuttle bus (unfunded) 5th Ave NE • Long walk for riders parking Transit Center garage at Red Lot. Road parking site is over 2 miles away from the Puyallup4-½Eagles Station, stories surface - 750 totallotshuttle4-½ stories - 750 total for Shaw Road parking. +80600 (new) 600 (new) bus service wouldW Stewa rbe required to access thisW proposedStew parkingW site. • W Stew W • Gold Lot would require 68 t Ave art Stew Perceived as inconvenient for art Stew 5th St NW 68 Ave W Stew art A W Ste 68 Ave art A 5th St NW 3rd Ave NW 68 art ve 3rd Ave NW wart 5th St NW 68 ve 3rd Ave NW Eagles garage 62 3rd Ave NW 68 5th St NW Ave 68 3rd Ave NWAve 5th St NW shuttle bus services 3rd Ave NW 5th St NW 3rd Ave NW 62 Sounder riders. 3rd Ave NW 5th St NW Shuttle3-½ stories - 600 service operation costs are not included2nd Ave NE in the voter-approved62 62 512 62 Eagles garage 62 62 2nd Ave NE Puyallup 302 2nd Ave2nd NE Ave NE 3-½ stories - 600 2nd Ave NE 2nd Ave NE (unfunded). ST2 plan. No2nd otherAveStati NWon entity has512 offered2nd toAve NWfund the shuttle service. • Long walk for 2ndriders Ave NEparking512 at 2nd Ave NW2nd Ave NW 512 2nd Ave NE 2nd Ave NW n Ave 2nd Ave NW Puyallup 302 Puyallup 302 512 2nd PuAveyall NWup 302 Puyallup 512 2nd Ave NW SPutatiyallon up 302 512 Station 302 Puyallup 302 512 W Main Ave Red Lot. W Main Ave Puyallup Station Station Station Station 2nd St SW 2nd St

W MainStSW 3rd Ave W Main Ave W Main Ave 5th St SW Sound Transit currently4th St SW has a long term lease High School W Main Ave Puyallup Puyallup W Main Ave 2nd St SW 2nd St 2nd St SW 2nd St

3rd StSW 3rd Transit Center garage 3rd StSW 3rd 5th St SW 4th St SW 5th St SW eer Ave High School High School 4th St SW Transit Center garage Pus yallup Puyallup 4-½ stories for the 219 existing spaces it usesiu at the WRed Pioneer AvePuyallup W Pioneer Ave Puyallup 4-½ stories

d 2nd S

s S 3rd 5th S 4th S a High School 2nd s High School s 460 total 350 (net) 3rd 5th iu R High School 4th u u High School 460 total 350 (net) d le di di Ra Lot and would amend this existingMi lease to a a W Pioneer Ave¼ e R W Pioneer Ave e R W Pioneer Ave W Pioneer Ave Mil W Pioneer AveMil add 200 more parking4th A spaces. us ¼ s ¼ us s di iu di iu

Shaw Road Site Red Lot Eagles Surface Lot Gold Lot 12 What Whatparking parking options options are being are beingconsidered? considered? 4thSt NW 4thSt NW 4thSt NW 4thSt NW 7th St 7th NW

Package B: St 7th NW Red Lot + Gold Lot + Eagles Surface Lot 7th St 7th NW 7th St 7th NW Package A • Only parking is shown below. Pedestrian and bicycle improvements listed on page 9 are includedPackage with Package A PackageeachPackage B package. B PackageC N Meridian N Meridian N Meridian N Meridian a 5th St NE 5th a 5th St NE 5th a 5th St NE 5th a 5th St NE 5th 5th Ave NE 5th Ave NE 5th Ave NE 5th Ave NE

Eagles surface lotEagles surface lot +80 +80 W Stewart W Stew W Stewar W St 68 Ave art A 68 t Ave ewart 3rd Ave NW 5th St NW v A 68 e 3rd Ave NW 5th St NW 68 ve 3rd Ave NW 3rd Ave NW 5th St NW 5th St NW

6th St NW 3rd Ave NW 3rd Ave NW 62 6th St NW 62 62 62 Eagles garage 2nd Ave NE 2nd Ave NE 3-½ stories - 600 2nd Ave NW 2nd Ave NW 2nd Ave NE 2nd Ave NW 2nd Ave NE 2nd Ave NW 2nd Ave NW Puyallup 302 512 512 2nd Ave NW Puyallup 2nd Ave NW 512 2nd Ave NW Puyallup 302 302 Puyallup 302 512 Station Station Station Station W Main Ave W Main Ave W Main Ave W Main Ave W Main Ave Puyallup Puyallup Puyallup Puyallup 2nd St SW 2nd St 2nd St SW 2nd St 3rd StSW 3rd 5th St SW 4th St SW 2nd St SW 2nd St 3rd StSW 3rd 5th St SW 4th St SW

High School SW 2nd St 3rd StSW 3rd 5th St SW 4th St SW High School 3rd StSW 3rd 5th St SW High School High School 4th St SW W Pioneer Ave W Pioneer Ave W Pioneer Ave W Pioneer Ave W Pioneer Ave us s s i u iu us d di d i Ra a Ra ad ile e R le R M il Mi ile ¼ ¼ M ¼ ¼ M 4th Ave 7th St SW 4th Ave 7th St SW SW 4th Ave S 7th St SW 7th St SW W 4th Ave SW 7th St SW SW s s iu s u s d iu i iu a d d d R a a a R R R le e le 512 i 512 il i ile N M ShawM Road lot Shaw Road lot M M N ½ 400 N N ½ N ½ 400 Gold lot Gold lot ½ 7th Ave SW (2.15 miles from station) 7th Ave SW 7th Ave SW (2.15 miles from station) 7th Ave SW 320 320 E Main Ave E Main Ave Puyallup Red lot Red lot Puyallup Red lot 219 219 219 S Red lot 200 219 Station h S 250 Station h 200 aw 200 Existing Sound Transit surfa(# scepace lots) aw 9th Ave SW R 9th Ave SW 9th Ave SW d R 9th Ave SW Puyallup Station Access Improvements Project d Existing Sound Transit surfa(# scepace lots)

E

Existing Sound Transit leased surf(# spaceaces) lot E 4thSt NW 4thSt NW Potential parking gar4thSt NW age 4thSt NW Existing Sound Transit leased su(#rfa spaceces) lot 7th St 7th NW

Existing Sound Transit surface lot Existi St 7th NW ng Sound Transit surface lot

7th St 7th NW Pot St 7th NW ential surface lots Potential surface lots

e

v

A

r

e

e

e n

v

o

i A

P r

e E

e

n

o i P

PackageExisting Sound Tra nsitD leased surface lot Potential leased surface lots What We’ve Heard E Existing Sound Transit leased surface lot Potential leased surface lots What We’ve Heard 4thSt NW Poten4thSt NW tial parking garage Pedestrian/bicycle access bridge Package Potential parking garage Pedestrian/bicycle access bridge PackagePackage F What parking options are being considered?Package D PackageE E Support for this package. 7th St 7th NW 7th St 7th NW Little public support for Potential surface lots Potential surface lots 4thSt NW this package. 7th St 7th NW N Meridian Benefits: Potential leased surface lots Package B proposesPotential lea ase totald surfa ceof lots 600 additional surface parking spaces - an C C N Meridian N Meridian Package N Meridian • Reduces traffic impacts within Pedestrian/bicycle access bridge Benefits: Pedestrian/bicycle access bridge Packageadditional 80 surface spaces over the current 68 at the Fraternal Order of Puyallup’s downtown core. eidian N Meri N Meridian Package B a • Keeps traffic impacts out of Eagles lot, an additional 200 leased spaces at the Washington State Fair’s Red a 5th St NE 5th 5th St NE 5th a a 5th St NE 5th 5th St NE 5th 5th Ave NE N Meridian Puyallup’s downtown core. • Some parking near station. a t t NE St 5th 5th Ave NE Lot and 320 leased spaces at the Washington5th Ave NE State Fair’s5th Ave Gold NE Lot. 5th Ave NE Concerns: Concerns: 5th St NE 5th a a 5th St NE 5th Transit Center garage St NE 5th 5th Ave NE • Requires shuttle bus (unfunded) Because the Gold Lot5th Ave is NE more than a half mile from the Puyallup Station, • Long walk for riders parking Transit Center garage at Red Lot. 4-½Eagles stories surface - 750 totallot 4-½ stories - 750 total for Shaw Road parking. shuttle bus service would be required to access this proposed parking site. +80600 (new) 600 (new) W Stewar W Stew W • W Stew W • Gold Lot would require 68 t Ave art Stew Perceived as inconvenient for Shuttle service operation costs areart not included Stew in the voter-approved ST2 5th St NW 68 Ave W Stew art A W Ste 68 Ave art A 5th St NW 3rd Ave NW 68 art ve 3rd Ave NW wart 5th St NW 68 ve 3rd Ave NW Eagles garage 62 3rd Ave NW 68 5th St NW Ave 68 3rd Ave NWAve 5th St NW shuttle bus services 3rd Ave NW 5th St NW 3rd Ave NW 62 Sounder riders. 3rd Ave NW 5th St NW 3-½ stories - 600 2nd Ave NE 62 plan. No other entity has offered to fund the62 shuttle service. 512 62 Eagles garage 62 62 2nd Ave NE Puyallup 302 2nd Ave2nd NE Ave NE 3-½ stories - 600 2nd Ave NE 2nd Ave NE (unfunded). 2nd AveStati NWon 512 2nd Ave NW • Long walk for 2ndriders Ave NEparking512 at 2nd Ave NW2nd Ave NW 512 2nd Ave NE 2nd Ave NW n Ave 2nd Ave NW Puyallup 302 Puyallup 302 512 2nd PuAveyall NWup 302 Puyallup 512 2nd Ave NW SPutatiyallon up 302 512Sound Transit currentlyStation has a long 302 Puyallup 302 512 W Main Ave Red Lot. W Main Ave Puyallup Station Station Station Station 2nd St SW 2nd St

W MainStSW 3rd Ave W Main Ave W Main Ave 5th St SW High School 4th St SW W Main Ave Puyallup termPu leaseyallup for theW Main219 Aveexisting 2nd St SW 2nd St 2nd St SW 2nd St

3rd StSW 3rd Transit Center garage 3rd StSW 3rd 5th St SW 4th St SW 5th St SW eer Ave High School High School 4th St SW Transit Center garage Pus yallup Puyallup 4-½ stories iu W Pioneer AvePuyallup W Pioneer Avespaces it uses at the Red Lot andPu yallup 4-½ stories d 2nd S s S 3rd 5th S 4th S a High School 2nd s High School s 460 total 350 (net) 3rd 5th iu R High School 4th u u High School 460 total 350 (net) d le di di Ra Mi a would amend this existing leasea W Pioneer Ave¼ e R W Pioneer Ave e R W Pioneer Ave W Pioneer Ave Mil W Pioneer AveMil 4th A us ¼ s to add 200 more spaces¼ and 320 us s di iu di iu spaces at the Gold Lot.

Shaw Road Site Red Lot Eagles Surface Lot Gold Lot 13 St SW iu Existing Sound Transit surf(#a scepace lots) d Ra e 512 il Existing Sound Transit leased su(#rfa spaceces) lot N M Shaw Road lot ½ 400 N Potential parking garage 7th Ave SW (2.15 miles from station) Puyallup Station Access Improvement Project Existing Sound Transit surf(#a scepace lots) Potential surface lots E Main Ave Phase 1: Identifying Access Improvements Red lot Puyallup 219 S Existing Sound Transit leased su(#rfa spaceces) lot Potential leased surface lots 200 Station h aw

9th Ave SW R

d 4thSt NW Potential parking garage Package C: Large Eagles Garage Pedestrian/bicycle access bridge E 4thSt NW 7th St 7th NW Potential surface lots

• Only parking is shown below. Pedestrian and bicycle improvements listed on page 9 are included with St 7th NW

e

v

A

r

e

e

n

o i P

eachPackage package. C Potential leased surface lots Package D PackageE Pedestrian/bicycle access bridge N Meridian N Meridian a 5th St NE 5th a 5th Ave NE St NE 5th 5th Ave NE

Transit Center garage 4-½ stories - 750 total W Stewar 600 (net) 68 t Ave W 3rd Ave NW 5th St NW Stew 6th St NW ar 68 t Ave Eagles garage 62 3rd Ave NW 5th St NW 3rd Ave NW 6th St NW 62 3-½ stories - 600 2nd Ave NW 2nd Ave NE 512 2nd Ave NW Puyallup 512 2nd Ave NE 302 2nd Ave NW 2nd Ave NW 2nd Ave NW Station Puyallup 302 512 W Main Ave Station W Main Ave Puyallup 2nd St SW 2nd St 3rd StSW 3rd 5th St SW High School 4th St SW Puyallup 2nd St SW 2nd St 3rd StSW 3rd 5th St SW W Pioneer Ave High School 4th St SW us W Pioneer Ave di s Ra iu ile ad ¼ M e R Mil 4th Ave ¼ 7th St SW SW 4th Ave 7th St SW SW s iu d s a iu R d e a il R N M ile ½ M 7th Ave SW N ½ N 7th Ave SW

219 Existing Sound Transit surfa(# scepace lots) Puyallup Station Access Improvements Project Existing Sound Transit surfa(# scepace lots) Existing Sound Transit leased surf(# spaceaces) lot 219 9th Ave SW Existing Sound Transit leased su(#rfa spaceces) lot Potential parking garage Poten9thtial parAveking SW garage 4thSt NW

Existing Sound Transit surface St 7th NW lot Potential surface lots Existing Sound Transit surface lot Potential surface lots

What parking options are being4thSt NW Exi sconsidered?ting Sound Transit leased surface lot Potential leased surface lots What We’ve Heard Existing Sound Transit leased surface lot Potential leased surface lots What We’ve Heard 4thSt NW 7th St 7th NW

Potential parking garage Pedestrian/bicycle access bridge Poten4thSt NW tial parking garage Pedestrian/bicycle access bridge

7th St 7th NW Moderate support for this package. Strongest public support for this Package F St 7th NW Package C PotenPottialen leatialse surfd surfacea lotsce lots Potential surface lots package (over twice as many Package C proposes a total of 600 additional parking spaces in Benefits: Potential leased surface lots Pedestrian/bicycle access bridge Package C Package B N Meridian • All parking close to station. respondents supported this package). a 3 ½ story garage to be locatedN Meridian at the current locations of the Pedestrian/bicycle access bridge

N Meridian Benefits: Fraternal Order of Eagles and Snider Oil. This would require • Height of 3 ½ stories, consistent N Meridian a

5th St NE 5th • Convenient location for a with surroundingSt NE 5th buildings. 5th St NE 5th a a 5th St NE 5th relocation of the Eagles5th Ave NEorganization. The property owned by St NE 5th Sounder riders. 5th Ave NE 5th Ave NE • Not considered to be in 5th Ave NE Snider Oil is currently vacant. In addition to purchasing the Eagle’s • Potential shared use benefit with Eagles surface lot historic downtown. and Snider Oil properties, this package would require the+80 vacation downtown businesses. W Stewar 68 t Ave • No displacement of Sounder parking 5th St NW W Stewar W Stewar ofEagles a block garage of 3rd Ave NW62 between 5th Street NW and68 6th Streett Ave 68 t Ave • Rider exposure to local businesses. 5th St NW 3rd Ave NW 3rd Ave NW 5th St NW 3-½ stories - 600 2nd Ave NEW St during construction. ewart 512 62 Eagles garage 62 NW. The2nd Ave City NE Pu ofyall Puyallupup 302 has given an initial approval Ave of this 2nd Ave NE 3-½ stories - 600 2nd Ave NE 3rd Ave NW 5th St NW Concerns: Station 512 2nd Ave NW Concerns: 512 2nd Ave NW 512 n Ave Puyallup 302 Puyallup 302 62Station Station street vacation. W Main Ave W Main Ave • 4 ½ stories necessary in order to Puyallup • Requires2nd Ave relocation NE of Eagles and

2nd Ave NW SW 2nd St 3rd StSW 3rd 5th St SW 512 High School 4th St SW PuyallPuyallupup 302 512 Puyallup replace surface parking with net 2nd St SW 2nd St 2nd St SW 2nd St 3rd StSW 3rd 3rd StSW 3rd 5th St SW 4th St SW 5th St SW eer Ave High School removal of their building. High School 4th St SW s Eagles garage Station 600 spaces. W Main Ave iu W Pioneer Ave W Pioneer Ave s ad 3-½ stories - 300 s s iu R • iu Possible need for pedestrian bridge iu ad ile d d • Relocation of existing parking R M Puyallup Ra Ra ¼ le between garage and station. le

2nd St SW 2nd St i i 3rd StSW 3rd 5th St SW 4th Ave High School 4th St SW M M during construction. 7th St SW SW ¼ ¼ 4th Ave 4th 7th St SW Ave SW 7th St SW SW W Pioneer Ave s • Limited rider exposure to iu s Cornforth/Campbell garage • Located in historic district. s d s s iu a iu local businesses.u u d R 4-1/2 stories - 460 totali i a le d d d R i a Ra a • Most traffic impacts. e M R 350 (new) R 512 il ½ ile • Limited sharedile use with downtown ile M Shaw Road lot N M M N M ½7th Ave SW 400 ¼ Gold lot ½ ½ 7th Ave SW businesses due to distance Eagles Garage Site from the downtown core. Transit Center Site 14 St SW iu Existing Sound Transit surf(#a scepace lots) d Ra e 512 il Existing Sound Transit leased su(#rfa spaceces) lot N M Shaw Road lot ½ 400 N Potential parking garage 7th Ave SW (2.15 miles from station) Existing Sound Transit surf(#a scepace lots) Potential surface lots E Main Ave Red lot Puyallup 219 S Existing Sound Transit leased su(#rfa spaceces) lot Potential leased surface lots 200 Station h aw

9th Ave SW R

d 4thSt NW Potential parking garage Pedestrian/bicycle access bridge E Package D: Large Transit Center4thSt NW Garage

7th St 7th NW Potential surface lots

7th St 7th NW

e

v

A

r

e

• Only parking is shown below. Pedestrian and bicycle improvements listed on page 9 are included with e

n

o i P

Potential leased surface lots E Package C eachPackage package. D Package Pedestrian/bicycle access bridge N Meridian N Meridian a 5th St NE 5th a 5th Ave NE St NE 5th 5th Ave NE

Transit Center garage 4-½ stories - 750 total W Stewar 600 (net) 68 t Ave W 3rd Ave NW 5th St NW Stew 6th St NW ar 68 t Ave Eagles garage 62 3rd Ave NW 5th St NW 3rd Ave NW 6th St NW 62 3-½ stories - 600 2nd Ave NW 2nd Ave NE 512 2nd Ave NW Puyallup 512 2nd Ave NE 302 2nd Ave NW 2nd Ave NW 2nd Ave NW Station Puyallup 302 512 W Main Ave Station W Main Ave Puyallup 2nd St SW 2nd St 3rd StSW 3rd 5th St SW High School 4th St SW Puyallup 2nd St SW 2nd St 3rd StSW 3rd 5th St SW W Pioneer Ave High School 4th St SW us W Pioneer Ave di s Ra iu ile ad ¼ M e R Mil 4th Ave ¼ 7th St SW SW 4th Ave 7th St SW SW s iu d s a iu R d e a il R N M ile ½ M 7th Ave SW N ½ N 7th Ave SW

219 Existing Sound Transit surfa(# scepace lots) Puyallup Station Access Improvements Project Existing Sound Transit surfa(# scepace lots) Existing Sound Transit leased surf(# spaceaces) lot 219 9th Ave SW Existing Sound Transit leased su(#rfa spaceces) lot Potential parking garage Poten9thtial parAveking SW garage 4thSt NW

Existing Sound Transit surface St 7th NW lot Potential surface lots Existing Sound Transit surface lot Potential surface lots

What parking options are being4thSt NW Exi sconsidered?ting Sound Transit leased surface lot Potential leased surface lots What We’ve Heard Existing Sound Transit leased surface lot Potential leased surface lots What We’ve Heard 4thSt NW 7th St 7th NW

Potential parking garage Pedestrian/bicycle access bridge Poten4thSt NW tial parking garage Pedestrian/bicycle access bridge

7th St 7th NW Moderate support for this package. Strongest public support for this Package F St 7th NW Package C PotenPottialen leatialse surfd surfacea lotsce lots Potential surface lots package (over twice as many Benefits: Potential leased surface lots Pedestrian/bicycle access bridge PackagePackage C D proposes a total of 600 additional parking spaces Package B N Meridian • All parking close to station. respondents supported this package). N Meridian through constructionPedestrian/ ofbicycl a e4 a ccess½ story bridge garage at the Puyallup Station.

N Meridian Benefits: • Height of 3 ½ stories, consistent Parking improvements couldN Meridian be constructed entirely on a

5th St NE 5th • Convenient location for a with surroundingSt NE 5th buildings. 5th St NE 5th a a 5th St NE 5th 5th Ave NE Sound Transit property. St NE 5th Sounder riders. 5th Ave NE 5th Ave NE • Not considered to be in 5th Ave NE • Potential shared use benefit with Eagles surface lot historic downtown. +80 downtown businesses. W Stewar 68 t Ave • No displacement of Sounder parking 5th St NW W Stewar W Stewar Eagles garage 62 68 t Ave 68 t Ave • Rider exposure to local businesses. 5th St NW 3rd Ave NW 3rd Ave NW 5th St NW 3-½ stories - 600 2nd Ave NEW St during construction. ewart 512 62 Eagles garage 62 2nd Ave NE Puyallup 302 Ave 2nd Ave NE 3-½ stories - 600 2nd Ave NE 3rd Ave NW 5th St NW Concerns: Station 512 2nd Ave NW Concerns: 512 2nd Ave NW 512 n Ave Puyallup 302 Puyallup 302 62Station Station W Main Ave W Main Ave • 4 ½ stories necessary in order to Puyallup • Requires2nd Ave relocation NE of Eagles and

2nd Ave NW SW 2nd St 3rd StSW 3rd 5th St SW 512 High School 4th St SW PuyallPuyallupup 302 512 Puyallup replace surface parking with net 2nd St SW 2nd St 2nd St SW 2nd St 3rd StSW 3rd 3rd StSW 3rd 5th St SW 4th St SW 5th St SW eer Ave High School removal of their building. High School 4th St SW s Eagles garage Station 600 spaces. W Main Ave iu W Pioneer Ave W Pioneer Ave s ad 3-½ stories - 300 s s iu R • iu Possible need for pedestrian bridge iu ad ile d d • Relocation of existing parking R M Puyallup Ra Ra ¼ le between garage and station. le

2nd St SW 2nd St i i 3rd StSW 3rd 5th St SW 4th Ave High School 4th St SW M M during construction. 7th St SW SW ¼ ¼ 4th Ave 4th 7th St SW Ave SW 7th St SW SW W Pioneer Ave s • Limited rider exposure to iu s Cornforth/Campbell garage • Located in historic district. s d s s iu a iu local businesses.u u d R 4-1/2 stories - 460 totali i a le d d d R i a Ra a • Most traffic impacts. e M R 350 (new) R 512 il ½ ile • Limited sharedile use with downtown ile M Shaw Road lot N M M N M ½7th Ave SW 400 ¼ Gold lot ½ ½ 7th Ave SW businesses due to distance Eagles Garage Site from the downtown core. Transit Center Site 15 t SW t SW i i t SW t SW i i d d d d a a a a R R R R ile ile ile ile Shaw Road lotShaw Road Nlot N M M N N M M 400 Gold lot Gold½ lot ½ ½ ½ (2.15 miles from station)(2.15 miles from station) 7th Ave SW 7th Ave SW 320 320 7th Ave SW 7th Ave SW PuyallupE Main Ave Station Access Improvement Project Phase 1: Identifying Access ImprovementsRed lot 219 Red lot 219 219 219 S h 250 250 aw

w

R R 9th Ave SW 9th Ave SW 9th Ave SW 9th Ave SW d d

E E

Package E: Small Transit Center4thSt NW Garage4thSt NW + Red Lot 4thSt NW 4thSt NW

7th St 7th NW St 7th NW St 7th NW 7th St 7th NW

e e

v v

A A

r r

e e

e

• Only parking ise shown below. Pedestrian and bicycle improvements listed on page 9 are included with

n n

o o

i i P P

E eachPackage package. PackageE E E PackagePackage F F N Meridian N Meridian N Meridian N Meridian a a a a 5th St NE 5th 5th St NE 5th St NE 5th St NE 5th 5th Ave NE 5th Ave NE 5th Ave NE 5th Ave NE

W Stewar W Stewar W Stewar W Stewar 68 t 68Ave t Ave t Ave t Ave 5th St NW 5th St NW 3rd Ave NW 3rd Ave NW 3rd Ave NW 3rd Ave NW 5th St NW 5th St NW 6th St NW 6th St NW 62 62 62 62 2nd Ave NE 2nd Ave NE 2nd Ave NE 2nd Ave NE 2nd Ave NW 2nd Ave NW 2nd Ave NW 2nd Ave NW 2nd Ave NW 2nd Ave NW 512 512 Puyallup 302 Puyallup 302 512 512 Puyallup 302 Puyallup 302 512 512 Station Station Eagles garageEaglesStati garageon Station W Main Ave W Main Ave W Main Ave W3-½ Main stories Ave - 300 3-½ stories - 300 Transit Center garageTransit Center garage Puyallup Puyallup 4-½ stories 4-½ stories Puyallup Puyallup 2nd St SW 2nd St SW 2nd St 3rd StSW 3rd StSW 3rd 5th St SW 5th St SW High School High Schoo460 totall 350 (net) 460 total 350 (net) High School High Schoo4th St SW l 4th St SW W Pioneer Ave W Pioneer Ave W Pioneer Ave W Pioneer Ave s s s Cornforth/Campbells garage iu iu iu 4-1/2 storiesiu - 460 totalCornforth/Campbell garage d d d d 3-1/2 stories - 300 total Ra Ra Ra Ra 350 (new) ile ile ile ile ¼ M ¼ M ¼ M ¼ M 4th Ave 4th Ave 4th Ave 4th Ave 7th St SW 7th St SW 7th St SW 7th St SW SW SW SW SW

s s s s 4th 4th St SW 4th St SW 5th 5th St SW 5th St SW 3rd SW St 2ndSt SW 3rd SW St 2ndSt SW iu iu iu iu d d d d a a a a R R R R ile ile ile ile M M M M N N ½ ½ N N ½ ½ 7th Ave SW 7th Ave SW 7th Ave SW 7th Ave SW

Puyallup Station Access Improvements Project Red lot Red lot 219 219 Existing Sound Transit surfa(# scepace lots) 250 219 200 219 Existing Sound Transit leased su(#rfa spaceces) lot Existi9thng Soun Ave dSW Transit surfa(#9th scepace lotAves) SW 9th Ave SW 9th Ave SW Potential parking garage Potential parking garage (# spaces) Existing Sound Transit surface lot Potential surface lots Existing Sound Transit surface lot Potential surface lots What parking options are beingExisti ngconsidered? Sound Transit leased surface lot Potential leased surface lots What We’ve Heard Existing Sound Transit leased surface lot Potential leased surface lots What We’ve Heard 4thSt NW Potential parking garage Pedestrian/bicycle access bridge Poten4thSt NW tial parking garage Pedestrian/bicycle access bridge

4thSt NW Moderate support for this package. Some support for this package. 7th St 7th NW 7th St 7th NW

7th St 7th NW Potential surface lots Potential surface lots Benefits: Benefits: Package E proposes a total of 600 additional parking spaces - 350 Package Potential leased surface lots Package C Package B • Slightly fewer benefits than C • Close proximity to station. spaces (net) in aPot 4en ½tial leastorysed surf garageace lots at the Puyallup Station and 250 Package D. Pedestrian/bicycle access bridge N Meridian N Meridian • Potential shared use benefit with spaces at the WashingtonPedestrian/bicycl Statee accessN Meridian brFair’sidge Red Lot. Concerns: downtown businesses. 5th St NE 5th a a 5th St NE 5th 5th St NE 5th a 5th St NE 5th • Same as Package D with less Sound Transit currently has a long term lease for the 219 existing 5th Ave NE 5th Ave NE • Rider exposure to local businesses. 5th Ave NE traffic impacts. spaces it uses at the Red Lot and would amend this existingEagles surface lease lot Concerns: to add 250 more spaces. +80 • Additional parking at Red Lot but W • Cornforth/Campbell site is a prime Stewar puts pressure on existing transit W Stewar W Stew 68 t Ave 68 t Ave 5th St NW ar 3rd Ave NW 3rd Ave NW 5th St NW 68 t Ave location for mixed use 5th St NW 62 service – buses quite full – and long Eagles garage 62 Eagles garage2nd Ave NE 62 2nd Ave NE 3-½ stories - 600 2nd Ave NE 3-½ stories - 600 512 2nd Ave2nd NW Ave NE 512 2nd Ave NW 512 redevelopment. 512Puyallup 302 walk for others. Puyallup 302 Puyallup 302 Station Station Station W Main Ave W Main Ave • Remediation may be required at Ave • Constrained parking during Puyallup Puyallup Cornforth/Campbell site. 2nd St SW 2nd St 2nd St SW 2nd St 3rd StSW 3rd 3rd StSW 3rd 5th St SW Puyallup 4th St SW 5th St SW High School Washington State Fair. High School 4th St SW 2nd St SW 2nd St 3rd StSW 3rd 5th St SW High School 4th St SW W Pioneer Ave W Pioneer Ave s er uAve us s • Premium cost for two garages. di s i iu iu ad ad ad R R R ile ile ile ¼ M ¼ M ¼ M

Red Lot Transit Center Site Eagles Garage Site Cornforth/Campbell Site

16 t SW t SW i i t SW t SW i i d d d d a a a a R R R R ile ile ile ile Shaw Road lotShaw Road Nlot N M M N N M M 400 Gold lot Gold½ lot ½ ½ ½ (2.15 miles from station)(2.15 miles from station) 7th Ave SW 7th Ave SW 320 320 7th Ave SW 7th Ave SW E Main Ave Red lot 219 Red lot 219 219 219 S h 250 250 aw w

R R 9th Ave SW 9th Ave SW 9th Ave SW 9th Ave SW d d

E E

4thSt NW 4thSt NW Package F: Cornforth/Campbell4thSt NW 4thSt NW Garage + Eagles Garage

7th St 7th NW St 7th NW St 7th NW 7th St 7th NW

e e

v v

A A

r r

e e

e

e • Only parking is shown below. Pedestrian and bicycle improvements listed on page 9 are included with

n n

o o

i i P P

E PackagePackageE E E PackageeachPackage package.F F N Meridian N Meridian N Meridian N Meridian a a a a 5th St NE 5th 5th St NE 5th St NE 5th St NE 5th 5th Ave NE 5th Ave NE 5th Ave NE 5th Ave NE

W Stewar W Stewar W Stewar W Stewar 68 t 68Ave t Ave t Ave t Ave 5th St NW 5th St NW 3rd Ave NW 3rd Ave NW 3rd Ave NW 3rd Ave NW 5th St NW 5th St NW 6th St NW 6th St NW 62 62 62 62 2nd Ave NE 2nd Ave NE 2nd Ave NE 2nd Ave NE 2nd Ave NW 2nd Ave NW 2nd Ave NW 2nd Ave NW 2nd Ave NW 2nd Ave NW 512 512 Puyallup 302 Puyallup 302 512 512 Puyallup 302 Puyallup 302 512 512 Station Station Eagles garageEaglesStati garageon Station W Main Ave W Main Ave W Main Ave W3-½ Main stories Ave - 300 3-½ stories - 300 Transit Center garageTransit Center garage Puyallup Puyallup 4-½ stories 4-½ stories Puyallup Puyallup 2nd St SW 2nd St SW 2nd St 3rd StSW 3rd StSW 3rd 5th St SW 5th St SW High School High Schoo460 totall 350 (net) 460 total 350 (net) High School High Schoo4th St SW l 4th St SW W Pioneer Ave W Pioneer Ave W Pioneer Ave W Pioneer Ave s s s Cornforth/Campbells garage iu iu iu 4-1/2 storiesiu - 460 totalCornforth/Campbell garage d d d d 3-1/2 stories - 300 total Ra Ra Ra Ra 350 (new) ile ile ile ile ¼ M ¼ M ¼ M ¼ M 4th Ave 4th Ave 4th Ave 4th Ave 7th St SW 7th St SW 7th St SW 7th St SW SW SW SW SW s s s s 4th 4th St SW 4th St SW 5th 5th St SW 5th St SW 3rd SW St 2ndSt SW 3rd SW St 2ndSt SW iu iu iu iu d d d d a a a a R R R R ile ile ile ile M M M M N N ½ ½ N N ½ ½ 7th Ave SW 7th Ave SW 7th Ave SW 7th Ave SW

Puyallup Station Access Improvements Project Red lot Red lot 219 219 Existing Sound Transit surfa(# scepace lots) 250 219 200 219 Existing Sound Transit leased su(#rfa spaceces) lot Existi9thng Soun Ave dSW Transit surfa(#9th scepace lotAves) SW 9th Ave SW 9th Ave SW Potential parking garage Potential parking garage (# spaces) Existing Sound Transit surface lot Potential surface lots Existing Sound Transit surface lot Potential surface lots What parking options are beingExisti ngconsidered? Sound Transit leased surface lot Potential leased surface lots What We’ve Heard Existing Sound Transit leased surface lot Potential leased surface lots What We’ve Heard 4thSt NW Potential parking garage Pedestrian/bicycle access bridge Poten4thSt NW tial parking garage Pedestrian/bicycle access bridge

4thSt NW Moderate support for this package. Some support for this package. 7th St 7th NW 7th St 7th NW

7th St 7th NW Potential surface lots Potential surface lots Benefits: Benefits: PackagePackage F proposesPotential a lea totalsed su rfaofce 600 lots additional parking spaces in two Package C Package B • Slightly fewer benefits than C • Close proximity to station. Potential leased surface lots Package D. separate garagesPed -es 300trian/bi spacescycle access in bridg a e3 ½ story garage at the current N Meridian N Meridian • Potential shared use benefit with Pedestrian/bicycle accessN Meridian bridge Fraternal Order of Eagles location, and 300 spaces in a 3½ story Concerns: downtown businesses. 5th St NE 5th a a 5th St NE 5th garage at the current Cornforth/Campbell site,St NE 5th owned by the a 5th St NE 5th • Same as Package D with less 5th Ave NE 5th Ave NE • Rider exposure to local businesses. 5th Ave NE traffic impacts. City of Puyallup. This would require relocation of the Eagles Eagles surface lot Concerns: +80 • Additional parking at Red Lot but organization. Both garage sites would require land purchase. W • Cornforth/Campbell site is a prime Stewar puts pressure on existing transit W Stewar W Stew 68 t Ave 68 t Ave 5th St NW ar 3rd Ave NW 3rd Ave NW 5th St NW 68 t Ave location for mixed use 5th St NW 62 service – buses quite full – and long Eagles garage 62 Eagles garage2nd Ave NE 62 2nd Ave NE 3-½ stories - 600 2nd Ave NE 3-½ stories - 600 512 2nd Ave2nd NW Ave NE 512 2nd Ave NW 512 redevelopment. 512Puyallup 302 walk for others. Puyallup 302 Puyallup 302 Station Station Station W Main Ave W Main Ave • Remediation may be required at Ave • Constrained parking during Puyallup Puyallup Cornforth/Campbell site. 2nd St SW 2nd St 2nd St SW 2nd St 3rd StSW 3rd 3rd StSW 3rd 5th St SW Puyallup 4th St SW 5th St SW High School Washington State Fair. High School 4th St SW 2nd St SW 2nd St 3rd StSW 3rd 5th St SW High School 4th St SW W Pioneer Ave W Pioneer Ave s er uAve us s • Premium cost for two garages. di s i iu iu ad ad ad R R R ile ile ile ¼ M ¼ M ¼ M

Red Lot Transit Center Site Eagles Garage Site Cornforth/Campbell Site 17 Puyallup Station Access Improvement Project Phase 1: Identifying Access Improvements What Were the Community Preferences for Individual Packages? Preferences for the different packages were expressed by project stakeholders through formal letters or during other outreach activities. These letters, as well as the public outreach summaries from the Open Houses, can be found in Appendix A of this report. The preferences are generally summarized as follows: Puyallup City Council • Proposed Mid-sized Eagles Garage and remainder surface parking at Red Lot or expansion of existing Eagles Surface Lot (Modified Package C with smaller garage) • Small Transit Center Garage + Red Lot - second choice after Modified Package C (Package E) • Shaw Road and Cornforth/Campbell sites (Packages A, B, D, and F) Key Comments Received • “… clear community sentiment to not endorse any option which would house ST2’s targeted 600 new parking stalls within a single large parking structure…” • “…first preference for medium-sized garage [420 net new spaces or less] on the ‘Eagles’ site… second choice would be garage of similar net new spaces at the Sounder Station south parking lot…” • “We support the balance of targeted ST2 parking … in surface parking lots… closer to the station… and ‘Red Lot’.” Stakeholder Roundtable • Proposed Mid-sized Transit Center Garage and remainder surface parking at Red Lot (Modified Package E with larger garage) • Large Eagles Garage (Package C) • Shaw Road and Cornforth/Campbell sites (Packages A, B, D, and F) Key Comments Received • We would like some parking stalls in the garage to be available to the community during evening and weekends, when not in use by commuters.” • “If surface parking is needed in addition to a garage …[to] achieve the necessary number of parking stalls, we support Sound Transit leasing additional stalls at the Red Lot.” General Public and Riders • Transit Center Garage (Package D) • Large Eagles Garage (Package C) • Small Transit Center Garage (Package E) • Shaw Road and Cornforth/Campbell site (Packages A, B, D, and F) Key Comments Received • Bike route improvements and a pedestrian/bike bridge over the railroad crossing at the Puyallup Station are strongly favored. • “…the garage [must be] integrated into the downtown architecturally and not look like a big concrete box at the side of the street.”

18 How Were the Packages Evaluated? Packages were evaluated based on quantitative or qualitative metrics that correspond to each evaluation criterion and project goal. Ratings were developed based on input received from the public and City and Sound Transit staff and are summarized in Table 2. Evaluation criteria and associated metrics are defined as follows: Travel time and reliability –The time it takes a rider to get from parking to the station platform and the number of travel modes required to get to the station. Comfort, security and convenience – The overall parking to platform experience considering street crossings, security, protection from elements and close proximity to platform. Neighborhood compatibility • Traffic – Amount of congestion and neighborhood cut through traffic. • Neighborhood parking – Amount of new parking spaces within 0.5 mile radius area of the station. • Community character – How package fits within the existing community character and aesthetics by matching adjacent land uses, how it is sized relative to adjacent structures, and how it relates to historic downtown features. Supports City’s plans for station area – How the package conforms with existing City plans and policies including comprehensive and/or downtown plans. Maintains a healthy environment – The number of parcel acquisitions and housing/business displacements; impacts/displacements to historic properties, parks and community facilities; minimizes proximity of parking adjacent to residential homes; minimizes additional impervious surfaces and avoids natural areas. What Are the Evaluation Results? Each package was evaluated in relative comparison to the other packages. TABLE 2: EVALUATION RESULTS

Goal Evaluation Criteria PackageA PackageB PackageC PackageD PackageE Package F

All Surface with All Surface - Gold Eagles Garage Transit Center Transit Center Small Eagles Shaw Road B, WITH Lot, Red Lot, Eagles (no surface parking) Garage Garage Garage unfunded bus (WITH unfunded (no surface parking) + Red Lot + Small Cornforth/ service + Red Lot bus service) Campbell Garage

Travel time and reliability Provide improved access to Sounder riders Comfort, security and convenience

Neighborhood compatibility: • Traffic • Neighborhood parking Benefit the local • Community character community* Supports City’s plans for the station area

Maintain a healthy Property, historic, parks, environment and natural resources

Support Sound Transit’s regional commitments

*Results based on impacts/benefits to the station area

Lower performing Higher performing 19 Puyallup Station Access Improvement Project Phase 1: Identifying Access Improvements How Much Does Each Package Cost? Capital construction and bus operation costs are summarized for each package in Table 3. Capital construction costs include preliminary planning, design, environmental permitting, property acquisition and construction of improvements and are in $2014. Bus operation costs are for bus shuttle services required for some packages and assume 50 years of vehicle maintenance and operations. ST2 did not provide funding for shuttle bus service or any other operational improvements. No other service provider or funding source has been identified for required shuttle services.

TABLE 3: COST OF PACKAGES $60,000,000 ST2 Cost Estimate: $55 M (2014) $52 M $50 M $50 M $50,000,000 $45 M $39 M $39 M $40,000,000 $22 M $11 M $41 M $30,000,000 $39 M $39 M $28 M $20,000,000 $17 M $12 M

$10,000,000 $11 M $11 M $11 M $11 M $11 M $11 M $0 Package A Package B Package C Package D Package E Package F

Common to all packages: Parking and garage Bus operation costs (not included in pedestrian, bike and – specic pedestrian ST2 ballot measure) bus/tra c improvements improvements Cost estimates are preliminary and include the following: • Soft costs, such as environmental permitting, • 50 years of parking land lease costs, converted to design, and construction administration. net present values (Packages A , B, and E). • Land and land acquisition fees, as required for • A 35% contingency, as a percent of each package. construction costs. • Road, intersection, and signal improvements specific to each package. Which package was selected? The Sound Transit Board of Directors met on August 28, 2014 to identify a preferred package of access improvements to advance into conceptual design and environmental review. Motion 2014-64 recommended a modified Package C to develop a transit center garage at the Eagles site, construct surface parking along the north side of 3rd Avenue NW, and obtain additional leased parking at the Red Lot. See map and final motion on the following pages which further describe the location and conditions for the preferred package. Next steps in the project development will include: • Continued stakeholder outreach • Conceptual and preliminary engineering • Detailed traffic analysis • Environmental review • Architectural design and community design workshops

20 LEASED SURFACE LOT SOUND TRANSIT EXISTING SURFACE LOT SOUND TRANSIT EXISTING SURFACE LOT LEASED PROPOSED SURFACEPROPOSED LOT GARAGE PARKINGPROPOSED ## OFSPACES ## OFSPACES ## OFSPACES Washington State Fair Lot Red Eagles Garage

(4 Levels) 7TH ST NW Eagles Surface Lot Eagles Surface +80 W PIONEERAVE W MEEKER W MAIN AVE 100 Pedestrian Bridge 420

5TH ST SW

3RD ST SW

W STEWART AVE STEWART W 4TH AVE SW AVE 4TH Pedestrian Bridge

S MERIDIAN N MERIDIAN ¼ M IL 2ND ST SE E R A 2ND ST NE D IU 3RD ST SE S

½ M IL E R A E PIONEERAVE D E MAIN AVE IU S

5TH ST NE Parking Option Puyallup Preferred 82814