Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong Project Profile

Project Profile for Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong

Drainage Services Department The Government of the Special Administrative Region

Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong Project Profile

Table of Content

1. BASIC INFORMATION ...... 1 1.1 Project Title ...... 1 1.2 Purpose and Nature of the Project ...... 1 1.3 Name of the Project Proponent...... 1 1.4 Location and Scale of the Project and History of Site...... 1 1.5 Number and Type of Designated Project...... 2 1.6 Name and Telephone Number of Contact Persons...... 2 2. OUTLINE OF PLANNING AND IMPLEMENTATION PROGRAMME ...... 3 2.1 Project Planning and Implementation...... 3 2.2 Project Programme ...... 3 2.3 Interactions with Other Projects ...... 3 3. POSSIBLE IMPACT ON THE ENVIRONMENT...... 4 3.1 Outline Process Involved...... 4 3.2 Construction Phase ...... 4 3.3 Operation Phase...... 6 4. MAJOR ELEMENTS OF THE SURROUNDING ENVIRONMENT ...... 7 4.1 Existing and Planned Sensitive Receivers Affected by the Project...... 7 4.2 Major Elements of the Surrounding Environment Affecting the Project...... 7 5. ENVIRONMENTAL PROTECTION MEASURES TO BE INCORPORATED INTO THE DESIGN AND ANY FURTHER ENVIRONMENTAL IMPLICATIONS...... 8 5.1 Construction Phase ...... 8 5.2 Operation Phase...... 10 5.3 Possible Severity, Distribution and Duration of Environmental Effects...... 10 5.4 Further Implications...... 10 6. USE OF PREVIOUSLY APPROVED EIA REPORTS ...... 12

LIST OF DRAWINGS DCM/2013/012 Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong – Key Plan DCM/2013/013 Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong – Layout Plan (Sheet 1 of 2) DCM/2013/014 Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong – Layout Plan (Sheet 2 of 2)

Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong Project Profile

1. BASIC INFORMATION

1.1 Project Title

The project title is “Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong” (hereinafter referred to as the Project).

1.2 Purpose and Nature of the Project

The Project originates from the findings of the Study “Review of West Kowloon and Sewerage Master Plans” completed by Environmental Protection Department (EPD) in February 2010. The findings of the Study reveal that the sewage from unsewered villages is being discharged to septic tank system or directly to the storm water drainage system and causes water pollution in the downstream drainage system. The purpose of the Project is to provide public sewerage for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong and address water pollution in downstream drainage system.

1.3 Name of the Project Proponent

Consultants Management Division, Drainage Services Department (DSD) of the Government of the Hong Kong Special Administrative Region

1.4 Location and Scale of the Project and History of Site

1.4.1 The Project site covers the areas of Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong which are situated at the Northwest of Tsuen Wan and are the rural areas in Tsuen Wan. The areas are surrounded by Tai Lam and Country Parks at West and North respectively and are occupied by some old villages with scattering village houses. Two historical buildings are found near the Project site with a Tsang Ancestral Hall at Chuen Lung with history dated back to 17th century. Most of the areas are unsewered and sewage from these areas is being discharged to septic tank system or directly to the storm water drainage system and causes water pollution. The Project aims at collecting the sewage generated from the areas and conveying the collected sewage to the existing downstream sewerage system.

1.4.2 The location of the proposed sewers for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong is shown in Drawing nos. DCM/2013/012, 013 & 014. The total length of the public sewers under the Project is about 13 kilometres (km). Sewers in gravity type will

1 Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong Project Profile

be adopted for the conveyance of sewage to the existing downstream sewerage system. Sewage pumping station should not be required, but this will be confirmed during the EIA study. Sewage treatment works and sewage outfall will not be included in the Project.

1.5 Number and Type of Designated Project

The Project is a Designated Project under Item Q.1, Part I of Schedule 2 of the Environmental Impact Assessment Ordinance (EIAO) as some of the proposed sewers for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong fall within the Tai Lam and Tai Mo Shan Country Parks.

1.6 Name and Telephone Number of Contact Persons

Name : Mr. SEIT Kin-fun, Raymond Post : Senior Engineer, Consultants Management Division, DSD Tel : 2594 7292 Fax : 2827 8526

Name : Mr. LEI Kuok-kun Post : Engineer, Consultants Management Division, DSD Tel : 2594 7594 Fax : 2827 8526

2 Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong Project Profile

2. OUTLINE OF PLANNING AND IMPLEMENTATION PROGRAMME

2.1 Project Planning and Implementation

Consultants will be engaged by the project proponent to undertake investigation, impact assessments, design and construction supervision of the Project. DSD will operate and maintain the completed works. It is planned to appoint the consultants in December 2013 with a view to commencing the construction works in 2018.

2.2 Project Programme

Investigation and impact assessments for the Project are targeted to commence in December 2013 and the design is targeted to complete in 2017. Construction works is to be commenced in 2018 for completion before end 2023.

2.3 Interactions with Other Projects

The Project may have interfaces with other projects which are currently under planning or construction. Close liaisons will be maintained with relevant project teams to address the interfacing issues. The interfaces between the Project and other projects will be reviewed during the EIA study.

3 Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong Project Profile

3. POSSIBLE IMPACT ON THE ENVIRONMENT

3.1 Outline Process Involved

The Project comprises the construction of public sewers and associated sewer facilities. Its potential environmental impacts are associated with construction and operation. The process flow diagram for the typical sewerage construction works is illustrated as follows:

Pavement Breaking and Removal

Excavation

Laying Sewerage Pipe Manhole Construction

Backfilling of Materials

Surface Reinstatement

3.2 Construction Phase

3.2.1 Air Quality

Dust emissions would be resulted from wind erosion of works areas and construction activities such as pavement breaking and removal, excavation, stockpiling of excavated material, backfilling of material and surface reinstatement.

3.2.2 Noise

Noise would be generated from construction activities such as pavement breaking, trench excavation, pipe laying, backfilling and reinstatement through the use of conventional construction plant and equipment, like air compressors and excavators.

3.2.3 Water Quality

Runoff from the site during construction may contain sediments and silts arising from

4 Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong Project Profile

excavation, backfilling of materials, and oil/lubricants from construction vehicles and plant. Muddy water may also be generated from construction activities such as dust suppression sprays, dewatering during excavation and washing of construction equipment.

3.2.4 Waste Generation

Waste generated during the construction phase may include:-

 Waste spoil from site clearance, site preparation and earthworks;

 Waste material such as wood, metal scraps and concrete generated from the construction process and also from demolition of existing structures;

 General waste from workers; and

 Chemical waste from maintenance of construction plant and equipment such as lubrication oil.

3.2.5 Ecology

Some of the proposed sewers for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong fall within the Tai Lam and Tai Mo Shan Country Parks. The Project site has a wide variety of natural habitats including agricultural land, woodland, and streamcourses. Some of these natural habitats may serve as habitats for species with conservation interests which include but not limited to fish, amphibian, reptile as well as butterfly species. Construction activities such as pavement breaking, trench excavation and backfilling may have impacts on the natural habitats within the Project site.

3.2.6 Landscape and Visual

The proposed sewerage works fall within the area classified with “high landscape value” in the consultancy study “Landscape Value Mapping of Hong Kong” commissioned by Planning Department. Temporary or permanent landscape and visual impacts during the construction phase may arise as a result of disturbance to the existing landscape of the Project site by the presence of construction plant and temporary works.

3.2.7 Cultural Heritage

The Project is not close to sites of archaeological interest and declared monuments. There are two historic buildings namely Main Building of Kai Yuen (Nil Grade) in Ha Fa Shan and Tsang Ancestral Hall (Grade 3) in Chuen Lung. The concerned buildings are about 30-50 m away from the nearest proposed sewers and their respective locations are

5 Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong Project Profile

shown in drawing nos. DCM/2013/013 & 014. There may be boulder trackways located within the Project area. Construction activities such as pavement breaking and trench excavation may have impacts on the historic buildings and boulder trackways.

3.3 Operation Phase

It is not expected that the Project will generate any significant environmental impacts in the operation phase.

6 Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong Project Profile

4. MAJOR ELEMENTS OF THE SURROUNDING ENVIRONMENT

4.1 Existing and Planned Sensitive Receivers Affected by the Project

The Study “Review of West Kowloon and Tsuen Wan Sewerage Master Plans” completed by EPD in February 2010 had included a preliminary environmental assessment for the unsewered areas in West Kowloon and Tsuen Wan. The Study identified that the noise sensitive receiver (NSR) is Sai Chuk Lam Temple and the air sensitive receivers (ASRs) are Sai Chuk Lam Temple and Ha Fa Shan Children’s Playground and they are village-type residential and community premises. Other than those identified in the Study, the villagers of Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong also are the NSRs and ASRs.

4.1.1 Within the Project, the Study identified that the natural streams in Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong are the water sensitive receivers (WSRs). Locations of the NSRs, ASRs and WSRs are shown in drawing nos. DCM/2013/013 & 014. The NSRs, ASRs and WSRs are not exhaustive and will be reviewed during the EIA study.

4.1.2 The Project site has a wide variety of natural habitats including agricultural land, woodland and streamcourses. Some of these natural habitats may serve as habitats for species with conservation interests which include but not limited to fish, amphibian, reptile as well as butterfly species. Ecological disturbance may arise as a result of construction activities. The ecological value of the habitats involved will be evaluated and the impacts on ecology will be assessed in details with necessary means such as surveys and aerial photos during the EIA Study.

4.2 Major Elements of the Surrounding Environment Affecting the Project

The proposed sewerage works will be carried out mainly on footpath and access roads of the unsewered villages and therefore the effects on the Project from the surrounding environment and land use will be insignificant.

7 Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong Project Profile

5. ENVIRONMENTAL PROTECTION MEASURES TO BE INCORPORATED INTO THE DESIGN AND ANY FURTHER ENVIRONMENTAL IMPLICATIONS

5.1 Construction Phase

5.1.1 Air Quality

The extent of dust generation from the construction works is expected to be insignificant with the implementation of dust suppression measures as stipulated in the Air Pollution Control (Construction Dust) Regulation of Air Pollution Control Ordinance (APCO). These measures will be incorporated into the specifications of the works contracts.

5.1.2 Noise

The majority of the sewer alignments will be small size pipes and located within village areas. Such small-scale construction will have minimal potential construction noise impact to the nearby NSRs. Furthermore, the contractor for the works will have to comply with the provisions of the Noise Control Ordinance. The contractor will be required to follow good site practices, such as use of silenced plant near sensitive receivers, careful scheduling of activities and use of temporary acoustic barriers and acoustic machinery enclosures to reduce noise impact.

5.1.3 Water Quality

The construction activities in the Project would include pavement breaking and removal, excavation, and backfilling materials. Necessary silt removal facilities will be provided to remove any silt before the discharge of site runoff into the nearby stormwater drains. The design of temporary on-site drainage and silt removal facilities will comply with the guidelines stipulated in EPD’s Practice Note for Professional Persons, Construction Site Drainage (ProPECC PN 1/94). Construction activities which fall within water gathering grounds shall comply with “Conditions of Working within Water Gathering Ground” and “Conditions of Working in the Vicinity of Waterworks Installations” issued by WSD, and shall also comply with the Waterworks Ordinance. Separate approval from WSD shall be obtained for works falling within 120m of WSD tunnel reserve. Relevant precautionary measures will be reviewed during the EIA Study and mitigation measures will be incorporated into the specifications of the works contracts.

8 Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong Project Profile

5.1.4 Waste Management

Consideration will be taken during the design phase to minimize the generation of construction and demolition (C&D) materials by maximizing its re-use on site. The inert C&D materials such as concrete arising from the construction of the Project will be sorted on-site. The Contractor will be required to sort all C&D materials and waste into different categories for re-use on site and disposal at public filling, landfills, or recycling facilities as appropriate. General refuse will be stored in enclosed bins and separated from C&D material.

5.1.5 Ecology

Construction works areas will be planned with measures to control construction runoff and drainage to minimize impacts on the water quality of the surrounding area, and thereby minimizing the potential for resulting ecological impacts. Pollution control measures will also be undertaken to alleviate the ecological impacts arising from dust and noise generated by the construction activities. Construction activities such as pavement breaking, trench excavation and backfilling will be confined mainly on footpath and access roads of the unsewered villages to minimise impacts to the habitats of the country parks. Mitigation measures to address potential ecological impacts including those focusing on minimizing impacts to the habitats and species concerned such as by avoiding vegetated areas and disturbance to trees and other vegetations, and replanting, will be developed during the EIA Study and incorporated into the specifications of the works contracts. Seasonality of species occurrence will be taken into consideration for the preparation of construction and implementation programme at ecologically sensitive areas. Consents from Country and Marine Parks Authority will be sought before implementation of the proposed sewerage works within Country Parks.

Trenchless installation method for laying the proposed sewer passing through Tai Mo Shan Country Park from Wang Lung to Route Twist will be considered to minimise impacts to the well-wooded natural slope. The installation methods will be reviewed during the EIA study for incorporation into the specifications of the works contracts as necessary.

5.1.6 Landscape and Visual

Visual impacts from construction activities will be of very short durations. Proper

9 Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong Project Profile

control over site cleanliness and the stockpiling of materials will be exercised to alleviate visual intrusion. Landscape and visual impacts during construction will be minimised by regulation of working hours and minimisation of the duration of works. Trees and shrubs to be retained within or adjacent to the works areas will be carefully protected to avoid damage by machinery as well as to prevent dumping of materials or compaction of soil around the tree roots. The potential adverse impacts on temporary/permanent landscape and visual aspects will further be reviewed in details during EIA study and the respective mitigation measures will be formulated in the study and incorporated into the specifications of the works contracts.

5.1.7 Cultural Heritage

The potential impact on the historic buildings and boulder trackways will further be reviewed in details during EIA study. Mitigation measures will be applied as necessary such that no disturbance or physical damage would be made to the historic buildings and boulder trackways in the vicinity of works sites during the construction phase.

5.2 Operation Phase

Mitigation measures are not required during operation phase of the Project as adverse environmental impacts are not anticipated.

5.3 Possible Severity, Distribution and Duration of Environmental Effects

The Project will improve the environment by providing sewers to the unsewered areas and addressing water pollution in the existing downstream drainage system. It is anticipated that most potential environmental impacts identified will be last for the duration of the construction period, and be temporary and localised. With the implementation of appropriate mitigation measures, there will have no adverse environmental impacts induced from the project.

5.4 Further Implications

5.4.1 Public Consultation

Consultation with the Tsuen Wan Rural Committee (TWRC) on the proposed sewerage works recommended under the Study “Review of West Kowloon and Tsuen Wan Sewerage Master Plans” was carried out on 17 September 2009. No adverse comments

10 Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong Project Profile

were received during that consultation. Further public consultations will be carried out in subsequent stages of the Project.

5.4.2 History of Similar Projects

The Project is similar to other public sewerage projects completed or currently under construction in the villages in .

11 Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong Project Profile

6. USE OF PREVIOUSLY APPROVED EIA REPORTS

There is no EIA report already approved under the EIA Ordinance for this Project. Also, no similar EIA reports were approved in the vicinity of the Project.

- END OF TEXT -

12 10 20 30 j¤U´s¤¥

729 TAI MO SHAN COUNTRY PARK

784

TSING TAM UPPER IRRIGATION RESERVOIR Ϲ LEGEND :

A` Lookout 3 «ˆ PROPOSED SEWERS A` Lookout 702 j¤VÆ¥­ 503 j¤U A` Lookout TAI MO SHAN

957 830 000 N j¤U´s¤¥ TAI MO SHAN COUNTRY PARK

654

flł O A` Lookout TSUEN KAM TSUENAU KAM HO PUI IRRIGATION RESERVOIR A` AU Lookout s¤õ¤A Fire Lookout

s¤õ¤A Fire Lookout 767

579

s¤õ¤A Fire Lookout

432 X¼ Cemetery

A` Lookout

391 ¬½á

359

377

451

fih 303 A` C _ij Lookout

314 8 JUL 408 W. Y. HUI 2013 474 ¥s 11 JUL SHEK LUNG KUNG K. K. LEI 2013

315 flW˘ ø–⁄ 15 JUL Lei Muk Shue aª H¶s Estate K. F. SEIT 2013 Sw P Estate SHEUNG KWAI CHUNG r´º´ Discovery Park ¥‡ 259 U⁄Æ“s⁄B¡Ył§B¡s˛ ROAD Shek Wai Kok CHAI WAN Estate KOK 94 - ` o´ SEWERAGE WORKS FOR HA FA SHAN, KIU TAU ” ñº¨· Water Treatment Fuk Loi Luk Yeung aª Works VILLAGE, WANG LUNG AND MA TONG Estate Sun Chuen Sw P aª Sw P - KEY PLAN „p 5 Ning Fung 9 Court ¥fi o´ R˜« Shek Yam Water Belvedere j¤| HAM TIN Treatment Garden Town Hall ½ Estate Works è¬w¼L Clague Garden U¸º 1 : 25 000 Wƺ´ fl Estate DCM/2013/012 Bayview Garden TSUENTSUEN WAN WAN ª¸F pƒ⁄ j⁄” ª¸F ª¸ª¸ BEACH `² Kwai Chung Bridge Tower A` Tai Wo Hau KWAIKWAI CHUNG CHUNG Lookout Estate Estate SHAM ·‰ ¥X §¿ Ferry Pier ª¸³ Ocean CASAM BEACH Kwai TSENGPointe Hing Estate 3 ª¸±² 825 000 N Kwai Shing East Shek Lei Estate A` Bridge Tower 128 Lookout Estate C«õ Ching Tai Court øªo ª¸p Cheung Fat fi GEMINI BEACHES ¯øº Kwai Luen Estate Estate

Cheung On 5 ª¸±² Kwai Shing West Estate øªw NGA YING CHAU Estate Bridge Tower “‚ ‹A» aª Kwai Fong Sw P X¼ Estate A` Cemetery Lookout HA KWAI CHUNG Tierra Col_pdf_cswp_v8.plt PLOTPEN.TBL c:\temp\dsd_pw\dms12774\dcm_2013_012.dgn 10 20 30

1. »¥ˇ„«ˆƒ⁄ APPROXIMATE LENGTH OF PROPOSED SEWER IN THIS DRAWING IS 2500

188.7 205.6 METRES. 198.7

313.0

359.1 Ϲ LEGEND :

Z «ˆ 315.1 PROPOSED SEWERS

182.4 j¤VÆ¥­ TAI LAM COUNTRY PARK

286.3 320.8 W¤á Sheung Fa Shan j¤U´s¤¥ Z TAI MO SHAN COUNTRY PARK 322.7 Ruin 316.0

182.9 ⁄M NATURAL STREAM 177.4

Z œv¥ Ruin HISTORICAL BUILDING 324.3 Z Ruin ¯“fi– 309.8 ASR

209.3 AIR SENSITIVE RECEIVER

827 500 N 224.7 (ASR) 184.7

NSR ‚›– 149.3 NOISE SENSITIVE RECEIVER

153.6 (NSR) U⁄Æ“s⁄¤„ HA FA SHAN CHILDREN'S WSR ⁄–P ¥© WATER SENSITIVE RECEIVER PLAYGROUND 176.8 (WSR)

178.2 è¦Ë¦L ASR 152.8 SAI CHUK LAM 143.3 TEMPLE

WSR U⁄Æ“s⁄ 153.7 ASR NATURAL STREAM IN NSR HA FA SHAN

U¤áªs¤é Z 81.5

196.0 Ruin MAIN BUILDING OF KAI YUEN 173.6 ¥© Rocky Area IN HA FA SHAN 136.0 x ASR 148.7 Water 113.5 182.7 Tank NSR

415.0 200.9 U¤áªs211.4 213.8 8 JUL VILLAGERS OF ¥© W. Y. HUI 2013 224.3 HA FA SHAN 11 JUL „ s‡–ƒfl K. K. LEI 2013 Z Graves 827 000 N Ruin ˆƒ⁄‹ƒ 134.9 15 JUL CONNECT TO EXISTING K. F. SEIT 2013 SEWERAGE164.7 SYSTEM AT TSUEN KING CIRCUIT „ U⁄Æ“s⁄B¡Ył§B¡s˛ Graves ¥© ¥© - ›¥–›‹¥m‚ˇ„ „ 230.5 Graves SEWERAGE WORKS FOR HA FA SHAN, KIU TAU VILLAGE, WANG LUNG AND MA TONG - LAYOUT PLAN (SHEET 1 OF 2)

212.5 256.0

247.7 Z DCM/2013/013 1 : 5000 Ruin

234.7

192.1 315.6 Z 266.5 Ruin

133.8 65.2 U¤á U¤á 269.5 Ha Fa Shan 261.5 HA FA SHAN 280.3 fl´«

252.9

Col_pdf_cswp_v8.plt PLOTPEN.TBL c:\temp\dsd_pw\dms12774\dcm_2013_013.dgn 10 20 30

382.0 377.6 1. »¥ˇ„«ˆƒ⁄ 379.2 x APPROXIMATE LENGTH OF PROPOSED t⁄sø Water 368.9 SEWER IN THIS DRAWING IS 10500 829 000 N Tank Chuen Lung Cha Tau Wo METRES.

304.9

381.8 377.1 Z 303.4 Ϲ LEGEND : Ruin 365.4 t⁄sK «ˆ Chuen Lung 343.7 j⁄– PROPOSED SEWERS s·} TAI TSO Tit Lo Shing Sun Hoi Tin STREAM j¤VÆ¥­{²³¦Ã 355.6 314.3 TAIEXISTING LAM COUNTRY SEWERS PARK

j¤VÆ¥­j¤U´s¤¥ TAI LAMMO SHAN COUNTRY COUNTRY PARK PARK

345.7 ⁄Mj¤U´s¤¥ t⁄s NATURALTAI MO SHAN STREAM COUNTRY PARK 345.2 Chuen Lung 365.4 Chun Ha 426.1 342.6 ⁄Mœv¥

340.7¤¶ NATURALHISTORICAL STREAM BUILDING

VILLAGERS OF286.6 ASR œv¥¯“fi– 415.2 MA TONG HISTORICALAIR SENSITIVE BUILDING RECEIVER ASR s (ASR) VILLAGERS OF ¯“fi– NSR 315.3 ASR 330.2 WANG LUNG NSR AIR‚›– SENSITIVE RECEIVER Z 283.0 ASR (ASR)NOISE SENSITIVE RECEIVER 294.8 (NSR) NSR ‚›– NSR WSR NOISE⁄–P SENSITIVE RECEIVER 313.9 WANG LUNG 153.6 (NSR)WATER SENSITIVE RECEIVER

¤ 317.0 (WSR) WSR ⁄–P

280.8 MA TONG 311.5 WATER SENSITIVE RECEIVER •fi¸ 828 500 N 333.3 (WSR) Pigging Station

299.7 281.8

296.1 300.7 307.8 307.6 ­¥§¶

317.5 313.1 281.9 313.1

291.5 Z t¤ Ruin Chuen Lung 304.0

387.2 329.8

t⁄s¿· 310.4 254.7 285.7 Z 285.3 Ruin TSANG ANCESTRAL HALL

IN CHUEN LUNG 316.2 312.2 8 JUL 322.2 W. Y. HUI 2013

11 JUL Ył K. K. LEI 2013 VILLAGERS OF KIU 227.4 327.0 TAU VILLAGE 15 JUL K. F. SEIT 2013 ASR WSR Ył§B¡ 337.8 ƒM 339.5 NSR218.5 Z U⁄Æ“s⁄B¡Ył§B¡s˛ »›· NATURAL STREAM IN KIU - ›¥–›‹¥m‚ˇ„ TAU VILLAGE, WANG LUNG Hong Kong 352.4 SEWERAGE WORKS FOR HA FA SHAN, KIU TAU Gun Club 231.6 AND MA TONG VILLAGE, WANG LUNG AND MA TONG ] „ - LAYOUT PLAN (SHEET 2 OF 2) 208.2 Graves 828 000 N 238.6 Y 201.5 KIU TAU ' DCM/2013/014 1 : 5000 310.1 SÅ f³ VILLAGE 302.5

321.5

333.4 '

295.6

188.7 205.6 321.1 198.7

343.7

Z

182.4

202.2

Col_pdf_cswp_v8.plt PLOTPEN.TBL c:\temp\dsd_pw\dms12774\dcm_2013_014.dgn