Samjin Industrial Co., LTD.
SAMJIN INDUSTRIAL Co., LTD. SAMJIN STEEL STRUCTURE Co., LTD.
http://www.samjinst.com Contact : [email protected] Seoul Office : RM., A-507, Ansung Building, 410-13, Shindolim-Dong, Guro-Gu, Seoul, Korea Doha Office : IBA Building No.230,1st floor, C-Ring Rd., Doha, Qatar. P.O.Box: 3973 CEO's Message
"Quality is everything"
Since the foundation of the company in 1967, Samjin has been delivering better reliable standards to fulfill our philosophy “Quality is everything”.
Samjin has strengthened its reliability & credibility as the pre- eminent expert company with optimized technology and accumulated management know-how based on the experience performed over 300 clients around the world.
Now we are stretching our muscles to Gulf area to deliver better products and services with updated technologies and efficient management system.
Hwang, Sunbok / CEO Samjin Industrial Co., LTD.
CONTENTS
ABOUT THE COMPANY ∙ CEO's message∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙3 ∙ Brief history∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙4 ∙ Certificates & Awards∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙6 ∙ Business fields∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙9 ∙ Fabrication plant in Hwasung, Korea∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 11
CIVIL WORK ∙ Road∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 18 ∙ Railway∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 20 ∙ Bridge∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 22 ∙ Floodgate construction∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 36
ARCHITECTURAL WORK ∙ Residential∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 42 ∙ Commercial∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 47 ∙ Office building∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 54 ∙ Public building∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 57 ∙ Station∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 58 ∙ Sports facility∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 62
PLANT ∙ Thermal power plant∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 76 ∙ Petroleum storage tank∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 91 ∙ LNG storage tank∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 92 ∙ Iron mill∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 94 ∙ Nuclear power plant∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 102
2 3 Brief history
Samjin Industries Co., LTD.(together with Samjin Steel Structure Co. LTD.) was founded as a steel structure specialized construction company in Korea 1967. It has embarked on construction field with the sprits of veracity and trust. Since then, Samjin has thrived with local and overseas costomers providing best quality performance.
Jan 2001 Mokdong Hyundai Hyperion apartment Nuclear Energy Projects Oct 2001 Daejon world cup stadium Jun 1996 Installed Uljin nuclear energy #5, 6 main water supply and circulation pump Jul 2002 Achived Level 1 factory certificate Jun 1997 Installed Young Kwang nuclear energy #5, 6 liner plate and nuclear steam Dec 2002 Get Gol Reservoir floodgate construction supply facilities Jan 2004 Chung Gye Chun City park restoration Nov 1999 Installed Uljin nuclear energy #5, 6 CLP&SLP Apr 2004 Hwang Hakdong business center redevelopment Jun 2002 KEDO nuclear energy CLP&SLP installation Oct 2005 Busan Lotteworld department store & plaza steel structure work Feb 2007 Sin Gori nuclear energy #1, 2 nuclear reactor equipment installation Jan 2008 Marafiq IWPP power plant project (steel structure) in Saudi Arabia Nov 2009 Uljin-Nuclear power plant #1, 2 M/C installation Jun 2008 Cirebon 695MW 1uint / Buckstay fabrication work in Indonesia Sep 2008 Al Khalij PJT Buckstay fabrication work in Libya Overseas branches Sep 2008 Gheco-one PJT Buckstay fabrication work in Thailand Dec 2007 Established branch in Kingdom of Saudi Arabia May 2009 Al Dur IWPP power plant project building work (steel structure & New millennium 2000 ~ Business expasion stage Business expasion Nov 2008 Established branch of Samjin Industrial Co., LTD. in Thailand cladding work) in Bahrain Sep 2009 Established branch of Samjin Steel Structure in Kingdom of Bahrain Jun 2009 Haeundae I’ Park apartment steel structure work Dec 2011 Established Samjin Qatar Trading & Contracting in State of Qatar Jul 2009 Yeosu thermal power plant Feb 2012 We are establishing Company in Abu Dhabi, UAE
Major awards Aug 1996 Awarded citation from Ministry of Finance and Economy Dec 2011 Awarded from the Prime Minister of Korea for contribution to the development of nuclear power plant industry
Jul 1994 Established fabrication line in Sihwa city Jul 1996 Hyundai I-Tower building Nov 1996 Busan World Cup stadium May 1997 Kyun Buk KTX 4-1 block (Chunan Station) Jun 1997 Achieved ISO 9001:2000 CHSB-RS Apr 1999 Ulsan world cup stadium 1990's - 2000 Growth stage Growth
Aug 1967 Samjin Workshop was founded in Korea Apr 1973 Renamed as Samjin Industrial Co., LTD. May 1984 Samjin Steel Structure Co., LTD.was founded 1967 - 1980's Development stage Development
4 5 Certificates & Awards
Business registration certificates of overseas branches & corporation Business registration certificates of overseas branches & corporation
State of Qatar : Samjin Industrial Co., LTD. (overseas corporation) Thailand : Samjin Industrial(Thailand) Co., LTD. (overseas corporation)
United Arab Emirates : Samjin Industrial Co., LTD. (overseas branch)
Certificates
Kingdom of Bahrain : Samjin Steel Structure Co., LTD. (overseas branch)
ISO 9001 Cerificate of ISO 9001 Cerificate of ISO 14001 Cerificate of OHSAS 18001 Cerificate of Factory Certificate Samjin Industrial Co., LTD. Samjin Steel Structure Co., LTD. Samjin Industrial Co., LTD. Samjin Industrial Co., LTD. • Certified by :Ministry of • Certified by : HSB-RS • Certified by : HSB-RS • Certified by : HSB-RS • Certified by : HSB-RS Construction and Transportation
Awards
Kingdom of Saudi Arabia : Samjin Steel Structure Co., LTD. (overseas corporation)
Award from the Prime Minister Award from Korea Electric Power Award from Korea Electric Power contribution to the development Corporation for assistance of Corporation for assistance of of nuclear power plant industry thermal power plant construction nuclear power plant construction in 1997 in 1999
6 7 Business fields
Samjin implements projects based on optimized project management system to deliver the best quality products and services.
Investment in business development and proposal
From the planning stage, Samjin provides professional development investment and consulting services for client regarding environmental impact assessment, project feasibility, basic survey and project financing review.
Designing and engineering
Samjin's experiences based on sophisticated designing & cutting-edge engineering technologies are the major know-how of the successes of variety of large scale projects.
Construction
Samjin implements projects based on a customized project management system to deliver the best quality products
Steel structure project
Samjin's own steel fabrication plant in Hwasung with annual production capacity of 57,000 metric-tons is supplying high quality standardized products through the automated production system. This factory achieved ISO 9001:2000 certificate in 1997.
CM (Construction management)
Samjin provides the optimized business management solutions, offering technological and management related alternatives for the entire process of construction contractual work from planing to operation and management to the clients.
8 9 "Quality is everything" Samjin Fabrication lines
Hwasung plant complex is sitting on the area of 52,463m2 in the city of Hwasung, Korea. Our high-end fabrication lines produce products precisely for any steel frame constructions, plant equipment, scaffolds and nuclear energy facility.
10 11 Hwasung plant "Quality is everything" Samjin
Plant introduction Plant organization chart
Team 1 Product / Quality tests Location 221-5 Gwang Pyungri, Susin Myun, Hwa Sung City, Kyung Gido TEL: 031) 357-6271(3) / FAX: 031) 357-6274
E-Mail [email protected] Department of Team 2 Product / Quality tests History 1994. 7. 21. Establishment of Sihwa Factory (area 9,099.7m2) production 1999. 11. Transfer to Sushin Myun, Hwa Sung Goon (area 52,463m2) 2000. 2. 15. Factory Registration Shipping control, Production Process control, Products Production of Floodgate, Infrastructure, Pipes, Construction control Attachments, Metal Factory Items and More. Materials control
Average Maximum 2,000ton, Iron Frame : 3,500ton Production Per Month Public Public affairs, Plant affairs Budget and purchase Department of public affairs Facility Gauging and management maintaining facilities
Department of Quality Guarantee test and quality control control examination
Department of General affairs general affairs Human resources and labor Plant policy
Place Worker Person(s)
Officials 3
General manager 1
Safety first Quality Administrative 19 Hwasung plant Office worker 7 Policy Technical worker (Welder) 85(45) Total 115 Fair process Mutual trust Field worker(across country) approximate 400 Total approximate 515
12 13 Hwasung plant "Quality is everything" Samjin
Production Capacity Machines and facilities
Group Daily Monthly Annual NC Drilling M/C B/H Manufacturer Daito (Japan) B/H 48 ton 1,250 ton 15,000 ton 26.3% Feature H=1,000mm, 3 Axis 33.5φ Process/Assembling 135 ton 3,500 ton 42,000 ton Process/ Assembling Usage H-beamtube drilling, Marking Total 183 ton 4,750 ton 57,000 ton 73.7%
Bans saw (2 Qty) Manufacturer Daito (Japan) Feature Flange width 700mm (max) Usage H-beam pipe and cutting other section steel Plant area and lay-out Scallop M/C (2 Qty) Manufacturer Hataly (Japan) Field area : 52,463m2 Building : 29,645m2 Feature Flange width 700 mm (max) Usage H-beam improvement and Scallop process
Plame planer, CNC drilling BH assembling, machine Splice drilling M/C Straitening machine 80t Gantry Manufacturer Showa Seiko (Japan)
Automated Welding zone Feature 50 φ (Max) Usage Splice drilling welding line Scallop M/C Band saw 5 ton Roof crane 5 ton Plame planer Cutting work 50t Gantry Fit-up zone Manufacturer Tanaka (japan) Splice drilling Feature 15 Torch 4m x 24m machine 20ton 20ton Usage Gas cutting
25t Gantry 20 ton BK assembling and Strengthening M/C 20 ton Manufacturer Tanaka (Japan) Feature H=2,500mm, B=600 Manufacture Usage BH assembling and Strengthening work 10 ton ton 5 20t Gantry Submerged Welding M/C Manufacturer Hyundai Welding (Korea) 50 ton 10 ton Feature Tandem Usage BH automated welding
14 15 "Quality is everything" Samjin Civil Work Samjin is exploring its business opportunities in civil work. We are actively participating in the large scale projects.
• Road • Railway • Bridge • Tunnel • Port • Airport • Subway • Floodgate Construction
16 17 Civil Road "Quality is everything" Samjin
Youngdong Highway
Youngdong Highway 10 Block (Jin Boo Bridge) Project Owner Korea Expressway Corporation Year of Construction 1997.07-1999.09 Remarks 26km
18 19 Civil Railway "Quality is everything" Samjin
Kyungeui Line Rail Bridge
Project Owner Seoul Regional Construction Kyungeui Line Rail Bridge Repair / Installation Management Office Year of Construction 2005.01-2005.12 Remarks 83m
20 21 Civil Railway "Quality is everything" Samjin
Dangsan Railway Bridge
Project Owner Seoul Metro Year of Construction 1997.11-1999.10 Remarks 1,360m
22 23 Civil Bridge "Quality is everything" Samjin
Busan Kwangan Bridge
Project Owner Busan City Construction Department Year of Construction 2008 Remarks 7,420m, Container Transport Road
24 25 Civil Bridge "Quality is everything" Samjin
Sungsoo Bridge
Project Owner Seoul City Construction Safety Sungsoo Bridge Restoration / Expansion Management Department Year of Construction 1995.06-2005.10 Remarks 1,161m
26 27 Civil Bridge "Quality is everything" Samjin
Mapo Bridge
Project Owner Seoul City Construction Safety Management Department Year of Construction 1997.12-2005.06 Remarks 1,600m
28 29 Civil Bridge "Quality is everything" Samjin
Hannam Bridge
Project Owner Seoul City Construction Safety Management Department Year of Construction 1998.08-2005.06 Remarks 915m
30 31 Civil Bridge "Quality is everything" Samjin
Geogeum-Large Bridge
Project Owner Iksan Regional Construction and Geogeum-Large Bridge Installation Work Management Administration Year of Construction 2008.12-2010.12 Remarks 2,028m
32 33 Civil Bridge "Quality is everything" Samjin
Geoje-Large Bridge Youngsan Bridge
Project Owner Geoje Regional Construction and Management Administration Project Owner Youngsan Regional Construction and Management Administration Year of Construction 2004.12-2010.12 Year of Construction 2004.12-2010.12 Remarks 740m Remarks 384.4m
34 35 Civil Floodgate construction "Quality is everything" Samjin
Sukmoon District Floodgate
Sukmoon District Floodgate Repair Project Owner Korea Rural Community & Agricultural Corporation Year of Construction 2001.03-2003.09 Remarks ROLLER GATE-10 Repaired Winch and Hoist Exchanged
36 37 Civil Floodgate construction "Quality is everything" Samjin
Semangeum Drainage Lock Gate
Saemangeum Drainage Lock Gate Oil Pressure Cylinder Change Work Project Owner Korea Rural Corporation Year of Construction 2009.03-2010.02 Remarks Cylinder 3EA Change Work
38 39 "Quality is everything" Samjin Architectural Work Samjin is exploring its business opportunities in architectural work. We are actively participating in the large scale projects.
• Residential • Commercial • Education • Hospital • Public Building • Station • Sports Facility
40 41 ARCHITECTURE Residential building "Quality is everything" Samjin
Haeundae I'Park
Haeundae I'Park Steel Structure Work Project Owner Hyundai Development Co., LTD. Year of Construction 2009.06-2010.12 Remarks 72 Floors
42 43 ARCHITECTURE Commercial residential complex building "Quality is everything" Samjin
Hyperion
Mokdong Hyundai Hyperion Project Owner Hyundai Department Store Year of Construction 2001.01-2003.02 Remarks 69 Floors
44 45 ARCHITECTURE Residential building ARCHITECTURE Commercial building "Quality is everything" Samjin
Hyundai Supervill AK Department Store
Project Owner Hyundai Development Co., LTD. Project Owner AK Plaza Year of Construction 2003 Year of Construction 1993
46 47 ARCHITECTURE Commercial building "Quality is everything" Samjin
Lotte World
Busan 2nd Lotte World Project Owner Lotte World Company Year of Construction 2005.10-2008.09 Remarks 107 Floors
48 49 ARCHITECTURE Commercial building "Quality is everything" Samjin
Techno Mart
Gu-uidong Techno Mart Project Owner Techno Mart Year of Construction 1996.01-1997.04 Remarks 39 Floors
50 51 ARCHITECTURE Commercial building "Quality is everything" Samjin
Boochun Hyundai
Department Store Project Owner Hyundai Department Store Year of Construction 2002.07-2003.08
52 53 ARCHITECTURE Office building "Quality is everything" Samjin
POSCO Center
POSCO Center Project Owner POSCO Center Year of Construction 1995 Remarks 31 Floors
54 55 ARCHITECTURE Office building ARCHITECTURE Public building "Quality is everything" Samjin
Halla Sigma Tower Yongin Culture Welfare Administration Town
Project Owner Halla E&C Corp. Project Owner Yongin City Construction Department Year of Construction 2004 Year of Construction 2008
56 57 ARCHITECTURE Station "Quality is everything" Samjin
Yongsan
Station & Department Store Project Owner Station Department Store Year of Construction 2001.04-2005.04
58 59 ARCHITECTURE Station "Quality is everything" Samjin
Anyang
Station & Department Store Project Owner Station Department Store Year of Construction 2002.02-2001.10
60 61 ARCHITECTURE Sports facility "Quality is everything" Samjin
Busan World Cup Stadium
Project Owner Busan City General Construction Department Year of Construction 1996.11-1999.11
62 63 ARCHITECTURE Sports facility "Quality is everything" Samjin
Busan Kyungnam
Race Track Project Owner Korea Racing Authority Year of Construction 2002.01-2004.06
64 65 ARCHITECTURE Sports facility "Quality is everything" Samjin
Daejeon World Cup Stadium
Project Owner Daejon City Construction Management Department Year of Construction 2001.10-2006.10
66 67 ARCHITECTURE Sports facility "Quality is everything" Samjin
Ulsan World Cup Stadium
Project Owner Ulsan City General Construction Department Year of Construction 1999.04-2001.11
68 69 ARCHITECTURE Sports facility "Quality is everything" Samjin
Jinju Sports Complex Jinju Sports Complex Steel and Pipe Truss Installation Project Owner Jinju Facilities Management Office Year of Construction 2009.04-2009.12
70 71 ARCHITECTURE Sports facility "Quality is everything" Samjin
Euijongbu General
Sports Stadium Project Owner Seoul City Construction Management Department Year of Construction 1998.05-1999.12
72 73 "Quality is everything" Samjin Plant
Samjin is exploring its business opportunities in plant industrial. We are actively participating in the large scale projects.
• Thermal Power Plant • Cemical Power Plant • Petroleum Storage Tank • LNG Storage Tank • Iron Mill • Nuclear Power Plant
74 75 Plant Thermal power plant (Kingdom of Saudi Arabia) "Quality is everything" Samjin
Marafiq IWPP Project Steel Structure Project Owner Jubail Water and Power Co., LTD. Year of Construction 2008.01-2009.06
76 77 Plant Thermal power plant (Kingdom of Bahrain) "Quality is everything" Samjin
Al Dur IWPP Project Building Work (Steel Structure & Cladding Works) Project Owner Al Dur Power and Water Company BSC(C) Year of Construction 2009.05-2011.02
78 79 Plant Thermal power plant (State of Kuwait) "Quality is everything" Samjin
Sabiya CCGT Project Building Work (Steel Structure Works) Project Owner Sabuya CCGT Year of Construction 2009.11-2011.03
80 81 Plant Thermal power plant "Quality is everything" Samjin
Youngheung Thermal Project Owner Korea South-East Power Co., LTD. Work Section #3,4 Boiler/Turbine Iron Frame (2004.11-2006.03) #1,2 Chimney Iron Frame (2002.06-2003.09) #3,4 Duct@Ggh Installation (2006.08.-2007.12) #3,4 Boiler Body/Exterior Installation (2005.04-2009.03) Power Plant #3,4 Boiler Fsh, Frh Tube Change Work (2008.08-2009.09) #1,2 Boiler Final Superheater Tube Change Work (2010.02-2010.05)
82 83 Plant Thermal power plant "Quality is everything" Samjin
Dangjin Thermal Project Owner Korea East West Power Co., LTD. Work Section #1,2 Boiler Iron Frame Installation (1996.02-1999.08) #3,4 Turbine and Main Controller Iron Frame Installation (1997.05-1999.12) Power Plant #5,6 Boiler Iron Frame Installation (2003.01-2004.12) #7,8 Boiler Iron Frame Installation (2007.08-2008.08)
84 85 Plant Thermal power plant "Quality is everything" Samjin
Gunjang Energy Gunjang Energy Boiler Installation Work Project Owner E-TEC E&C Year of Construction 2008.12-2010.05
86 87 Plant Thermal power plant "Quality is everything" Samjin
Yeosu thermal power plant Project Owner Korea South-East Power Co., LTD. Year of Construction 2009.07-2009.12
88 89 Plant Thermal power plant Plant Petroleum storage tank "Quality is everything" Samjin
Taean thermal power plant Hyundai Oilbank Hyundai Oilbank #2 Process & Offsite Tank Manufacture and Installation
Project Owner Korea South-East Power Co., LTD. Project Owner Hyundai Oilbank Co., LTD. Year of Construction 2009.07-2009.12 Year of Construction 2009.12-2011.02
90 91 Plant LNG storage tank "Quality is everything" Samjin
Pyeongtaek LNG tank
Pyeongtaek LNG Tank #21 M/C Piping Installation Work Project Owner Korea Gas Corporation Year of Construction 2008.05-2011.08 Remarks 200,000KL-1
92 93 Plant Iron mill "Quality is everything" Samjin
Project Owner POSCO Work Section #4 Machine Installation (1979.06-1981.10) POSCO #4 1st Repair(1994.01-1994.07) #2 2nd Repair(1997.02-1997.08) #2 Rationalization(2004.02-2005.08) #3 2nd – 5th Machine Installation (2005.12-2006.08) #3 No4 M/C Construction(2006.02-2006.07) #Finex #1 Body Machine(2005.01-2006.12) #4 Sintering Rationalization M/C Installation Work (2009.08-2010.10)
94 95 Plant Iron mill "Quality is everything" Samjin
Project Owner POSCO Work Section #3 Machine Installation (1989.05-1990.10) Kwangyang Steel #5 Machine Equipments (1997.08-1999.03) #1 Repair (2002.03-2002.08) #2 Repair (2002.12-2005.07) #2 Repair (2004.12-2005.08) #3 Repair (2007.10-2007.12) #4 Blast Furnace Repair (2008.03-2009.09) # Thick Plate Strengthen Steel Frame Work (2009.06-2010.10)
96 97 Plant Iron mill "Quality is everything" Samjin
Dangjin Hyundai Steel Dangjin Hyundai Steel Round Bar Factory Steel Manufacture Project Owner HYUNDAI STEEL COMPANY and Installation Work Year of Construction 2008.02-2009.12
98 99 Plant Iron mill "Quality is everything" Samjin
Hyundai Steel Pipe Hyundai Steel Pipe Yoolchon Cold Rolled Mill Factory Project Owner Hyundai Steel Pipe Co., LTD. Year of Construction 1997.05-1998.08
100 101 Plant Nuclear power plant "Quality is everything" Samjin
Uljin nuclear energy
Project Owner Korea East West Power Co., LTD. Work Section Gori Nuclear Energy #1 Steam Generator Exchange (1998.11-2000.10) Nuclear power plant Uljin Nuclear Energy #5,6 Clp&Slp Installation (1999.06-2004.05) Uljin Nuclear Energy #5,6 Main Water Supply and Circulation Pump Installation (1996.06-2004.05) Uljin Nuclear Power Plant #1,2 M/C Installation Work (2009.11-2012.04) Young Kwang Nuclear Energy #5,6 Liner Plate Installation (1997.06-2001.08) Young Kwang Nuclear Energy #5,6 Nuclear Steam Supply Facilities Installation (1997.06-2001.08) Sin Gori Nuclear Energy # 1,2 Liner Plate Installation (2006.03-2011.02) Sin Gori Nuclear Energy #1,2 Nuclear Reactor Equipments Installation (2007.02-2011.07) Sin Gori Nuclear Energy #1,2 Emergency Generator and Alternating Current Diesel Generator Installation (2008.02-2011.05) Kedo Nuclear Energy Clp&Slp Installation (2002.06-2008.12) about 2,593ton Sin Gori Nuclear Energy #3,4 Clp&Slp Installation (2008.09-2013.09) Sin Gori Nuclear Power Plant #3,4 Nuclear Reactor Equipment Main M/C And Assistance M/C Installation (2009.05-2013.07)
102 103 Plant Nuclear power plant "Quality is everything" Samjin
104 105 Appendix "Quality is everything" Samjin
Other construction works in Korea Other Construction
Southern & Northern Jeju thermal power plant Hyundai I-TOWER building Construction of Heat Contractile Machine in Ilsan and Suseo Area Overseas Works Project owner Korea Midland Power Co., LTD. / Korea Southern Project owner Hyundai Department Store (1991.7-1992.6), 26,000H3-4 Client Daelim Industrial Co., LTD. /Hyundai Heavy Industries Co., LTD. Client Hyundai Development Company Work Section #North Jeju Turbine Powerhouse Iron Frame (2004.07-2005.06) Quantity 7,100ton Construction of Heat Contractile Machine in Chungju District Heating. #Northern Jeju Desulfurization and Dust Collector Installation (2004.11-2005.06) Power source Power #Southern Jeju #3, 4 Heavy Oil Pipe Laying Construction(2004.07-2007.05) Construction Period 1996.07-2001.04 (1998.8-1999.6), 26,000H3-2 Power Source #Southern Jeju Various Tanks and Boiler Body Installation (2004.07-2007.05) Marafiq-Iwpp-Project (Steel Structure) Construction of Heat Contractile Machine in Songdo Steam Supply Power Plant. Hwang Hakdong Redevelopment business Equipment Heating Project owner Jubail Water and Power Co. (Kingdom of Saudi Arabia) (2007.12-20008.11), 30,000H3-1 Samchunpo thermal power plant Project owner General Redevelopment Client Hyundai Heavy Industries Co., LTD.
Project owner Korea Electronic Power Corporation Sales and Business facility Client Hyundai Engineering and Construction Co., LTD. Quantity 8,498ton Client Hyundai Heavy Industries Co., LTD. Quantity 7,300ton Construction Period 2008.01-2009.06 Work Section #3,4 Chimney Iron Frame Construction (1991.04-1993.05) Construction Period 2004.04-2006.05
Paju Co-generation plant M/C piping installation work Busan Neospo Project owner Korea District Heating Corp. Project owner Busan City Construction Management Department Tong Young LNG Power Source Client Daewoo E&C Co., LTD. Client Hyundai Heavy Industries Co., LTD. Tong Young Lng Expansion (#13Tank Production/Installation) Al Khalij PJT Buckstay Fabrication Work Scope #HRSGs & Auxiliaries/Feedwater System/Turbine Bypass System Quantity 9,800ton Tong Young Lng Expansion (#17Tank Production/Installation) Client Doosan Heavy Industries Co., LTD. Construction Period 2009.04-2010.11 Construction Term 1996.10-1999.03 Project owner Korea Gas Corporation Quantity 656.896ton Construction Period 2008.09-2010.09 Boochun Hyundai department store Client Hyundai Engineering and Construction Co., LTD. Project owner Hyundai Department Store Quantity 200,000KL-1/140,000KL-1 Client Hyundai Development Company Equipment LNG TANK Incheon steel medium size factory Quantity 11,000ton Construction Period 2007.02-2010.08/ 2009.10-2012.07 Project owner Incheon Steel Co., LTD. Construction Period 2002.07-2003.08 Power Source Client Hyundai Development Company Iron mill Gheco-one PJT Buckstay Fabrication Quantity 18,000ton Busan Lotteworld department store & plaza steel structure work Client Doosan Heavy Industries Co., LTD. Construction Period 1986.10-1989.11 Project owner Lotte Shopping Co., LTD. Quantity 548.859ton Client Lotte E&C Co., LTD. Construction Period 2008.09-2009.12 Hyundai Heavy Industries Yonghyun factory OVERHEAD/GANTRY CRANE Engineering, Supply & Erection Quantity 14,000ton Project owner Hyundai Heavy Industries Co., LTD. Project owner Korea Highway Corporation Construction Period 2005.10-2010.07 Client Hyundai Engineering and Construction Co., LTD. Client Samsung C&T Corporation Quantity 7,900ton Construction Period 2005.05-2006.01 Construction Period 2005.11-2006.03 Quantity OVERHEAD CRANE 1,400 TON X 54M - 1SET Power Source GANTRY CRANE 150 TON X 32M - 1SET GANTRY CRANE 130 TON X 23M - 2SET Cirebon 695MW 1uint/Buckstay Fabrication Kyun Buk KTX 4-1 Block (Chunan Station) GANTRY CRANE 50 TON X 32M - 2SET Client Doosan Heavy Industries Co., LTD. Project owner Korea KTX Construction Corporation equipment Shipment GANTRY CRANE 10 TON X 32M - 1SET GANTRY CRANE 10 TON X 23M - 1SET Quantity 669.7ton Client Halla Engineering and Construction Corp. Construction Period 2008.06-2009.02 Ulsan general sports stadium Quantity 8,450ton Project owner Ulsan City General Construction Department Construction Period 1997.05-2000.12
Client Hyundai Engineering and Construction Co., LTD. Railroad Facility Quantity 2,493ton Incheon International Airport Railroad (Gyulhyun public works)
Sports facility Construction Period 2003.12-2005.08 Project owner Incheon International Airport Railroad Power Source Client KCC Engineering and Construction Co., LTD. Al Dur IWPP-Project Building Work(Steel Structure & Cladding Works) Daejon world cup stadium Quantity 1,350ton (Pipe Infrastructure) Project owner Al Dur Power and Water Company Bsc(C) Project owner Daejon City Construction Management Department Construction Period 2004.11-2005.06 Client Hyundai Heavy Industries Co., LTD. Client Hyundai Development Company Quantity 8,131.43ton Quantity 3,882ton Kyuneui line Dora mountain public works Construction Period 2009.05-2011.02 Construction Period 2001.10-2006.10 Project owner Seoul Regional Construction Management Department Client Hyundai Engineering and Construction Co., LTD. Euijongbu general sports stadium Quantity 1,895ton Project owner Seoul City Construction Management Department Construction Period 2005.01-2005.12 Floodgate Construction Client Hyundai Development Company Spillway & RWO Radial Gate Quantity 3,295ton Project owner Malaysia Construction Period 1998.05-1999.12 Client Posmec Daeheung district repair facility (Yedang resorvoir) Shape Radial Gate Project owner Korea Rural Community & Agricultural Corporation Dimensions 14,900×21,240mm Client KT Construction Company Weight 470 ton/1set Singuje bridge Quantity RADIAL GATE : 26 Exchanged Girder and Canopy Exchanged Quantity 4SET Project owner Korea Expressway Corporation Construction Period 2004.03-2005.12 Client Hyundai Engineering and Construction Co., LTD. Quantity 7,153ton Getgol reservoir floodgate construction Construction Period 1998.02-1998.11 Project owner Incheon City General Construction Department Floodgate Construction Floodgate LNG TANK Equipment Client Youngdong Constructions Company LNG Tank Mechanical Work for Jetty Development and LNG Receiving – Terminal Project Quantity RADIAL GATE - 10 Established Winch and Hoist Built Bridge Construction Chunggyechun restoration Project owner PTT LNG Company Limited Project owner Seoul City Construction Safety Management Department Construction Period 2002.12-2004.10 Client GS Engineering & Construction Corp. Client Hyundai Engineering and Construction Co., LTD. Adress 68/32 Sintavee Garden Sukhumvit Rd., Banchang, Rayong 21130 Thailand Quantity 1,850ton Yeongwol gas and steam power plant tank manufacture and Quantity 160,000 KL – 2 Construction Period 2004.01-2004.07 installation /Hrsg stack manufacture Construction Period 2008.09-2011.05 Doo Mool Bridge / Bi Woo Bridge / Moo Hak Bridge Project owner Korea South Power Co., LTD. Client Keang Nam Enterprises Co., LTD./ Seentec Co., LTD. Seocho-dong aqua bridge Quantity Water Tank(15,000m³- 2unit)/ Pure Water Tank(2,000m³- 2unit) Model Structure (Pedestrian Bridge) Construction Period 2009.04-2009.10/ 2009.08-2009.11 106 107