JITPUR COAL BLOCK SUMMARY

PART A

Sr. Features Details No. 1. Location Coal Block Jitpur Coal Block Latitude 24 0 46’ 20”N to 24 0 47’ 35”N Longitude 87 0 24’ 15”E to 87 0 25’ 30”E Topo Sheet No. 72 P/5 on RF 1:50000 Coalfield North -western part of t he Chuperbhita Basin of Coalfield Villages Jitpur, Dahubera, Dumberpalem, Pakeri, Telbhitta, Kairajori, Jiajore(As per EC letter) Tehsil/ Taluka District State Jharkhand 2. Connectivity with Block Nearest Rail Head Ne arest Rly Stn: (on Kiul -Bardhaman loop line of E Rly) at a distance of about 70km Road Godda -Sahibganj metalled road passes through Sunder Pahari Block Headquarter. c is about 10km from the block in south-west direction. The block is connected to Sunder Pahari by a seasonal kachha road which passes through Rampur village. Airport 3. Area Geological Block Area 537.93 Ha Mining Lease Area 300 Ha (As per Mining Plan) Project Area 300.31 Ha (Area to be excavated as per mining plan) Forest Ar ea 141. 18 Ha Non -Forest Area 158.82 Ha 4. Climate and Topography Average Annual 1340mm Rainfall Temperature (Min. – 40C – 42 0C Max.) Local Surface Kewari Nala flows from north to south through the central part of the block Drainage Channels and finally joins Gumani River. There are small seasonal nallas which drain into Kewari Nala. Rivers Gumani River flows in E -W direction further south of the block. 5. Exploration Status Completely explored Exploration Agency Mineral Exploration Corporati on Ltd (MEC) Total Number of No of BHs – 29 Boreholes with Meterage – 3144.85m meterage Borehole Density 5.39 BHs/sq km General Dip of Seams 5 to 15 deg towards ESE and NE General Strike NNE -SSW in the northern half with a swing in the ce ntral part to NW -SE in the Direction entire southern half 6. Workable coal Seam details (As per the Mining Plan) Coal Seams / Parting Thickness Depth Geological Extractable Grade Mining Method Range(m) Range Reserve(Mtes) Reserve(Mtes) (UG/OC/Mixed) VII 0.47 -1.3 5 0.251 0.215 E OC Parting 19.60 - 21.61 VI 0.31 -4.60 2.724 1.924 D-E OC Parting 10.69 - 14.14 V 3.04 -5.64 2.064 1.778 F-G OC Parting 18.90 - 29.47 IV BOTTOM 0.10 -2.08 0.812 0.545 E-F OC Parting 20.00 - 20.00 III TOP 0.18 -1. 45 0.15 0.15 G OC Parting 2.00 -7.44 III BOTTOM 0.34 -1.61 0.443 0.418 E-G OC Parting 14.68 - 14.99 L3 0.11 -1.33 0.192 0.192 F OC Parting 3.12 -7.81 II TOP (UP. SPLIT) 1.25 -11.3 11.803 8.856 F-G OC Parting 1.01 -5.13 II T OP (LW. SPLIT) 0.13 -3.12 1.465 5.358 F OC Parting from L3 9.07 -9.07 II TOP 8.36 - 4.230 F OC 10.46 Parting from II Top & 3.14 -6.49 II Top Lw Split II BOTTOM 0.14 -1.87 0.886 8.407 F-G OC Parting from L3 --- II COMBINED 13.03 - 9.569 F-G OC 13.91 Parting from II Comb 2.15 - & II Bot 13.59 L2 1.29 -3.74 6.145 4.483 F-G OC Parting 1.28 -8.94 L1 0.20 -4.18 7.474 5.919 G OC Parting from II Comb 4.42 -4.42 & II Bot L1+L2 7.14 0.393 0.393 G OC Parting from L1+L 2 & 6.77 - L1 13.95 I TOP 3.84 -9.25 16.261 13.700 E-G OC Parting from L2 & L1 7.31 -9.48 & L1 I TOP+MIDDLE 4.59 -9.80 1.847 1.428 E-G OC Parting from I Top 0.84 -3.13 Coal Seams/ Parting Thickness Depth Geological Extractable Grade Mining Method Range(m) Range Reserve(Mtes) Reserve(Mtes) (UG/OC/Mixed) I MIDDLE 0.12 -5.77 8.642 11.769 F-G OC Parting from I Top 1.58 -2.69 I BOTTOM+MIDDLE 2.33 -6.92 0.485 F-G OC Parting from I Mid or 0.37 -6.03 Top+Mid I BOTTOM 0.05 -2.1 3 2.277 E OC Parting from L2 & L1 6.97 -6.97 or L1 I COMBINED 12.58 - 2.982 E-G OC 14.46 Total Coal(Mtes) 81.095 65.535 Total OB(Mm3) 247.50 SR(m3/te) 3.76

PART B

Sr. No. Features Details 1. Previous Allocation Name and Address of Allocatee M/s Jindal Steel & Power Ltd Jindal Centre 12, Bhikaji Cama Place New Delhi-110066 2. Target Capacity as per Mining 2.50 Plan 3. Status of Clearances/Approvals Mining Plan / Mine Closure Plan Approval obtained as per letter no. 1301 6/20/2008 - CA-1 dt. 12.08.2008 from Ministry of Coal annexed in the Mining Plan Forest Clearance Approval obtained for Stage -I as per letter no. 8 - 24/2010-FC dt. 23.11.2012 from MoEF (FC division) Environmental Clearance EC granted as per letter no. J -11015/148/2008 - IA.II(M) dt. 18.05.2019 from MoEF Mining Lease Not obtained Land Acquisition Govt. Land - 35.94 Ha Tenancy Land- 211.27 Ha Forest Land- 141.18 Ha Total- 388.39 Ha No. of PAF s as per Mining Plan/ 218 as per EC Mine Closure Plan 4. Surfa ce Infrastructure already Mine Site office built, if any.

Note: The above data is compiled from Geological Report, Mining Plan, Mine Closure Plan, Environmental Clearance and Forest Clearance and the data furnished by the prior allottee in Annexure-I/II