1 MEDIUM-TERM PLAN OF POTENTIAL PPP PROJECTS

17 2018 PIPELINE OF PPP PROJECTS

MEDIUM-TERM PLAN OF POTENTIAL PPP PROJECTS FOR THE PERIOD 2018-2020

Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

Introducing new interventional cardiology services and increasing the Mr Almir Rosic, Public Institution quality of health care. This would 2. Appropriate Crkvice 67, Zenica, Zenica Canton Hospital, Interventional prevent referring patients to medical Zenica- Canton Health Sector 1 conceptual project Yes Basic PPP model 4,000,000.00 BAM +387 (0)61 25 73 81, Crkvice 67, 72000 cardiology facilities outside the Canton, which is Development Strategy 2016 - 2025 design [email protected] Zenica imperative for this type of service m involving urgent treatment of patients with life-threatening conditions.

Providing healthcare services in the premises that meet all applicable standards and have state-of-the-art Ms Elmana Public Institution equipment which, coupled with the Zenica-Doboj Canton Health Sector Rekanovic, Crkvice Zenica Canton Hospital, 4. Appropriate feasibility 2 Surgery wing latest techniques, ensures high surgery Development Strategy 2016 - 2025, No Basic PPP model 45,000,000.00 BAM 67, Zenica, +387 Crkvice 67, 72000 study success rates. Modern equipment Architectural Plan, Study (0)61 44 70 60, Zenica makes it possible to perform complex [email protected] surgeries with positive outcomes, thus ensuring high-quality healthcare.

17 18 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

Constructing a new building to ensure faster and better quality care for more patients by means of new examination and hospital treatment methods coupled with hiring and training doctors and other medical staff. The new building would also help protect Public Institution Ms Nejra Latic patients, staff and the environment 2. Appropriate Zenica Canton Hospital, Nuclear medicine Zenica-Doboj Canton Health Sector Kermo, +387 (0)61 47 3 against ionising radiation. High-quality conceptual project Yes Basic PPP model 10,000,000.00 BAM Crkvice 67, 72000 building Development Strategy 2016 - 2025 54 75, dr- equipment and improved healthcare design Zenica conditions in the new building would [email protected] result in faster diagnosing, treatment and healing of patients.

Gamma Knife is a device that precisly delivers a single, finely focused dose of radiation to select parts of the brain aiding the treatment of tumours and other abnormalities. The Gamma knife provides a new tertiary level service, and procuring a Gamma Knife would enable the use of new, modern method of brain radiotherapy unique in the territory of our Mr Armin Durakovic, Public Institution Provision of country. Patients who need this therapy Crkvice 67, Zenica, Zenica Canton Hospital, Zenica-Doboj Canton Health Sector 1. Appropriate public 4 service for should not have to go to other countries. Yes Basic PPP model 9,000,000.00 BAM +387 (0)61 98 89 50, Crkvice 67, 72000 Development Strategy 2016 - 2025 service analysis Gamma Knife The Federation Health Insurance Funds medicinska.fizika@kb Zenica spends around 4,000,000.00 BAM ze.ba annually for such treatments of its beneficiaries abroad. These project would help keep those funds within the country and ensure high-quality threatment and healthcare service to patients.

1719 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

Adding on an inpatient care section Adding on an would make it possible to provide inpatient care healthcare in the premises that meet Ms Elmana Public Institution section to the all applicable standards, have less beds 2. Appropriate Rekanovic, Crkvice Zenica Canton Hospital, Zenica-Doboj Canton Health Sector 5 Zenica Canton per room, adequate sanitary facilities, conceptual project Yes Basic PPP model 7,000,000.00 BAM 67, Zenica, +387 Crkvice 67, 72000 Development Strategy 2016 - 2025 Hospital main and modern equipment. In this way, design (0)61 44 70 60, Zenica building blocks the hospitalised patients would get [email protected] IV, VI and VII quality healthcare and the individual departments adequate premises.

Reconstruction and modernization of existing spaces and dialysis equipment in Cantonal Hospital Zenica and three Health Care in which service are provided will carry out this service to Public Institution the highest attainable standard of Zenica-Doboj Canton Health Sector Crkvice 67, Zenica, Zenica Canton Hospital, 6 Hemodialysis quality of service. Improved quality of Development Strategy 2016 - 2025, 0. Project idea only Yes Basic PPP model 3,000,000.00 BAM 061-416-717 Crkvice 67, 72000 services will directly affect the quality Architectural Plan, Study [email protected] Zenica of life for over 180 patients ZDC who a are currently depend on these services.

Mr Asim Basalic, Tesanj Municipality Development Strategy District heating Manager of Having a modern, sustainable and 2018 / Operational objective: Ensuring for Tesanj "Toplana" d.d. flexible district heating system which support to infrastructure development based municipality /public utilities would ensure quality, reliability and on PPP model / Measures: Assessing energy 3. Appropriate based on company/ , Tesanj 7 Municipality of Tesanj affordability to its users, reduce and efficiency, exploring the potential uses of preliminary project Yes Basic PPP model 30,000,000.00 BAM renewable/enviro Toplana d.d.-Bukva, prevent further risks to human health, renewable energy sources and network design nmentally Tesanj, +387 (0)32 65 and be environmentally friendly and expansion, and examining geothermal friendly energy 05 08, economically justified. energy capacities in the Tesanj municipality sources direktor@toplana- area. tesanj.com.ba

17 20 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

Building new capacities for cultural and similar activities at the location of former "Dom kulture" /cultural centre/ Tesanj Municipality Development Strategy Combined Mr Hajrudin Subasic, in Jelah with aim to enrich the social 2018 / Operational objective: Developing and culture and 2. Appropriate Tesanj Municipality, life of the population gravitating strengthening sports by increasing its overall 8 Municipality of Tesanj sports centre in conceptual project Yes Basic PPP model 3,500,000.00 BAM +387 (0)61 70 36 72, towards Jelah and provide offices for popularity and having more people engage Jelah and a sports design hajrudin.subasic@op the municipal and local community in athletic activities / Measures: Building hall in Jelah cina-tesanj.ba administration, as well as sports halls sports facilities. next to the "1. mart" elementary school.

Developing capacities such as the Tesanj Municipality Development Strategy public bathing area and swimming Mr Hajrudin Subasic, 2018 / Operational objective: Developing and Building an pool based on the "Jugozapad-Tesanj" Tesanj Municipality, strengthening sports by increasing its overall 9 Municipality of Tesanj indoor swimming Zoning Plan which, inter alia, provides 0. Project idea only Yes Basic PPP model 2,000,000.00 BAM +387 (0)61 70 36 72, popularity and having more people engage pool for sports facilities at the location hajrudin.subasic@op in athletic activities / Measures: Building between the "Tosk" football stadium cina-tesanj.ba sports facilities. and the Sports and Recreation Centre.

Building public garages at the location Tesanj Municipality Development Strategy Mr Hajrudin Subasic, Building closed of "INA" filling station, nearby 2018 / Operational objective: Ensuring 3. Appropriate Tesanj Municipality, 10 Municipality of Tesanj garages and car "Simetrale" residential area, based on support to infrastructure development based preliminary project Yes Basic PPP model 270,000.00 BAM +387 (0)61 70 36 72, park - "Simetrale" the preliminary project design part of on PPP model / Measures: Transport planning design hajrudin.subasic@op Tesanj Spatial Plan. in the city of Tesanj. cina-tesanj.ba

Tesanj Municipality Development Strategy Ms Selvedina Using the full range of ESCO model Street lighting 2018 / Operational objective: Ensuring Sejmenovic, Tesanj services to develop a project of reconstruction support to infrastructure development based Municipality, +387 11 Municipality of Tesanj funding LED lights installation based 0. Project idea only Yes Basic PPP model 800,000.00 BAM with installation on PPP model / Measures: Increasing the (0)62 24 41 90, on energy saving in line with the of LED lights electricity capacity for economy and local selvedina.sejmenovic Energy Efficiency Law. community. @opcina-tesanj.ba

17 21 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

Building more car parks, which would Ms Selvedina Tesanj Municipality Development Strategy create conditions for better use of Sejmenovic, Tesanj Building car parks 2018 / Operational objective: Ensuring Enabled stationary traffic resources, tackle the Expected PPP Estimated total value of Municipality, +387 12 Municipality of Tesanj - other Project purpose and specific support toReference infrastructure strategy development paper based 0. Level Project of idea project only application Yes Basic PPP model 150,000.00 BAM PROPONENT chronic lack of parking space, and model the project (0)62 24 41 90, areas/locations objective on (Name PPP model one or / more Measures: strategy Transport papers planning serving development of Art. 18 # (Name and seat of Project title improve overall traffic safety in the (Select an option (Costs of investment + selvedina.sejmenovicContact person (Indicate the expected public service as grounds forin the proposedcity of Tesanj. PPP project and (Select an option from of the PPP public partner) Tesanj municipality area. from the drop- maintenance + risk @opcina-tesanj.ba improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

Using the location known as "Rastoke" to develop sports and recreation facilities as provided for by the Jelah Centre Zoning Plan. Furthermore, Tesanj Municipality Development Strategy Ms Selvedina Building the implementation of this project would 2018 / Operational objective: Developing and Sejmenovic, Tesanj "Rastoke" sports contribute to the construction and strengthening sports by increasing its overall Municipality, +387 13 Municipality of Tesanj 0. Project idea only Yes Basic PPP model 2,500,000.00 BAM and recreation improvement of sports infrastructure popularity and having more people engage (0)62 24 41 90, centre in Jelah planned under the Tesanj Municipality in athletic activities / Measures: Building selvedina.sejmenovic Development Strategy, which list sports facilities. @opcina-tesanj.ba projects such as building sports courts, a pool for water sports and similar contents.

Protecting the lives and property of Mr Dzavid Alicic, Canton Civil Protection Flood protection citizens and businesses in the Zenica- Zenica-Doboj Canton Programme of Zmaja od Bosne bb, Service, in the Zenica- Doboj Canton against flooding by 14 Advancing Rescue and Protection against 0. Project idea only Yes Basic PPP model 20,000,000.00 BAM 72000 Zenica, + 387 Zmaja od Bosne bb, Doboj Canton regulating the brook, creek and river Natural and Other Disasters 2017 - 2022 (0)32 46 08 70, Zenica area channels in the area and applying [email protected] other relevant technical solutions.

Rehabilitation of the municipal Implementing the project which would solid waste help bring the services of municipal landfill and solid waste collection and disposal to The project and the activities are planned "VODOKOM" d.o.o. construction of Mr Sead Imamovic, the next level and permanently resolve under the Law on Waste Management of the /a utilities ltd./, the supporting Special PPP Alije Izetbegovica 51, 15 the matter of waste management in Federation of and 0. Project idea only Yes 8,000,000.00 BAM Alije Izetbegovica 51/I, facilities in line model Kakanj, +387 (0)61 16 the Kakanj municipality area. the Federal Waste Management Plan 2012 - Kakanj with the concept 21 46 Furthermore, the project would create 2017. of regional the conditions for better treatment municipal solid and reuse of waste. waste management

17 22

17 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

Strategy of Development of Spa and Recreation Tourism in the Olovo Municipality. Combining the rich Olovo municipality The Feasibility Study on the Establishment of Ms Merisa Kaljanac, natural and tourist resources with the a Public-Private Partnership to Build a Spa Branilaca Olova bb, Building a spa 3. Appropriate specified location to attract more and Recreation Resort in the Olovo 71340 Olovo, +387 16 Municipality of Olovo and recreation preliminary project Yes Basic PPP model 15,000,000.00 BAM tourists to Olovo, in particular the Municipality Area, and the project Detailed (0)32 82 95 67, resort in Olovo design tourists interested in medicinal bath Hydrogeological Survey of the Soil and Rocks [email protected]. treatment and recreation. at the Location "Banja" in Olovo Municipality ba in Search of Thermal Waters and Exploring the Possibility of Its Use are under way.

2. The Plan for Adjusting the Waste Management at the Municipal Solid Waste Landfill at the Location "Gradina," Olovo Municipality, Managed by the Construction of Public Utilities Company "Biostica" from Olovo (at that time undergoing bankruptcy proceedings) was the facilities approved by the Decision of the Federation Ministry needed for of Environment and Tourism number UP-I 05/2-23- rehabilitation of 11-28/13 of March 26, 2013. the municipal 4. The investment, technical and environmental Rehabilitating and regulating the solid waste documentation for rehabilitation of the municipal Ms Merisa Kaljanac, municipal solid waste landfill and landfill and of the solid waste landfill "Gradina" and the construction of Branilaca Olova bb, building the facilities needed for its supporting capacities in line with the concept of 3. Appropriate supporting 71340 Olovo, +387 17 Municipality of Olovo proper and safe functioning, including regional solid waste management is prepared. By preliminary project No Basic PPP model 2,600,000.00 BAM capacities in line (0)32 82 95 67, the sorting and reloading stations, with its Decision number UP-I 05/2-23-11-12-6/15 FM of design with the concept [email protected]. aim to gradually create preconditions September 30, 2015, the Federation Ministry of of regional solid Environment and Tourism approved the Olovo ba to close the landfill. waste Municipality Environmental Impact Assessment of management at the Project of Rehabilitation of the Municipal Solid Waste Landfill "Gradina," Olovo Municipality, and the the location Construction of Supporting Capacities in Line with "Gradina," Olovo the Concept of Regional Solid Waste Management. Municipality The process of obtaining the relevant spatial- planning permit is under way.

Economic Viability Assessment with the Construction of a Building a small hydropower plant to related conceptual project design for a small Ms Merisa Kaljanac, small cover some of the needs of the hydropower plant "Grabovica" connecting to Branilaca Olova bb, hydropower 3. Appropriate wastewater treatment capacities and the Olovo city water supply system and the 71340 Olovo, +387 18 Municipality of Olovo plant "Grabovica" preliminary project Yes Basic PPP model 600,000.00 BAM using the already existing resources, expansion of Olovo city drinking water (0)32 82 95 67, connecting to the design such as the present location and supply system designed by "GEOTEYCO- [email protected]. Olovo water pipeline. MADESA" I.A.E. from Barcelona, Spain. The ba supply system development of the Study is under way.

17 23 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

Mr Anto Bonic, Sivsa bb, 74230 Usora, Installing LED lights based on energy Street lights in Decision on the Adoption and +387 (0)32 89 52 10, saving models and in line with the FBiH 19 Municipality of Usora the Usora Implementation of the Usora Municipality 0. Project idea only Yes Basic PPP model 1,500,000.00 BAM +387 (0)63 71 91 66, Energy Efficiency Law ("FBiH Official municipality area Zoning Plan 2014 - 2034 [email protected] Gazette," No. 22/17) et.ba, [email protected]

Heating system Mr Anto Bonic, Sivsa Having a modern, sustainable and for the bb, 74230 Usora, flexible district heating system which Healthcare +387 (0)32 89 52 10, would reduce and prevent risks to Decision on the Adoption and Centre and +387 (0)63 71 91 66, 20 Municipality of Usora human health, provide a comfortable Implementation of the Usora Municipality 0. Project idea only Yes Basic PPP model 100,000.00 BAM Municipality of [email protected] work environment, and be Zoning Plan 2014 - 2034 Usora et.ba, environmentally friendly and administrative [email protected] economically justified. premises m

Mr Anto Bonic, Sivsa Building a sports Building a sports hall for physical bb, 74230 Usora, hall in the education of students of the vocational +387 (0)32 89 52 10, Decision on the Adoption and vocational secondary school "Stjepan Radic" in +387 (0)63 71 91 66, 21 Municipality of Usora Implementation of the Usora Municipality 0. Project idea only Yes Basic PPP model 3,000,000.00 BAM secondary school Zabljak and the local elementary [email protected] Zoning Plan 2014 - 2034 "Stjepan Radic" in schools, as well as for general public et.ba, Zabljak (citizen associations, NGOs) [email protected] m

Having a modern, sustainable and flexible district heating system which would reduce and prevent risks to Mr Anto Bonic, Sivsa Pousorje district human health, provide a comfortable Decision on the Adoption and bb, 74230 Usora, heating: District work environment, and be Implementation of the Usora Municipality +387 (0)32 89 52 10, heating for Usora environmentally friendly and Zoning Plan 2014 - 2034; Study of 3. Appropriate +387 (0)63 71 91 66, 22 Municipality of Usora municipality economically justified. Discovering the Usora Municipality District Heating preliminary project Yes Basic PPP model 5,000,000.00 BAM [email protected] based on thermal water, as a renewable energy System; Preliminary project design of the design et.ba, renewable source, of such quality and quantity Pousorje area district heating based on [email protected] energy sources that make it possible to use an optimal renewable energy sources m technical economically sound model to catch and distribute it into the district heating system.

17 24 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

Mr Anto Bonic, Sivsa Decision on the Adoption and bb, 74230 Usora, Building a Building a wastewater disposal system Implementation of the Usora Municipality +387 (0)32 89 52 10, wastewater in the Usora municipality area, Zoning Plan 2014 - 2034; Usora 1. Appropriate public +387 (0)63 71 91 66, 23 Municipality of Usora disposal system reducing potential risk of Yes Basic PPP model 20,000,000.00 BAM Municipality District Heating System Study; service analysis [email protected] in the Usora contamination of groundwater, and Study of the Usora Municipality Wastewater et.ba, municipality area protecting the environment. Collection and Treatment System. [email protected] m

Building and organising a farmers' market at the "Sebilj" Ms Suada Koljenovic, bazaar location, Spatial planning, increasing the 2. Appropriate Visoko Municipality, and building and standard of public services provided by Visoko Municipality Development Strategy 24 Municipality of Visoko conceptual project Yes Basic PPP model 60,000.00 BAM +387 (0)32 73 25 46, organising a the Municipality, and improving 2015 - 2021 design e-sa souvenir and tourism product. [email protected] textiles market in Tabhanska street, Visoko municipality

Building a multi- Ms Nadina Removing the existing temporary storey car park in 3. Appropriate Cerimagic, Visoko constructions (garages), regulating Visoko Municipality Development Strategy 25 Municipality of Visoko the residential preliminary project Yes Basic PPP model 3,500,000.00 BAM Municipality, +387 stationary traffic in Luke, and providing 2015 - 2021 area Luke, Visoko design (0)32 73 25 97, parking space for its residents. municipality [email protected]

Building a sports Mr Suad Efendira, and recreation Spatial planning, improving tourism 3. Appropriate Visoko Municipality, centre in the Visoko Municipality Development Strategy 26 Municipality of Visoko product, and increasing the standard preliminary project Yes Basic PPP model 15,000,000.00 BAM +387 (0)51 57 55 87, residential area 2015 - 2021 of public service. design urbanizam.visoko@g Luke, Visoko mail.com municipality

Building and equipping an animal Mr Mugdim Cosovic, 3. Appropriate shelter with full range of services Visoko Municipality Development Strategy Visoko Municipality, 27 Municipality of Visoko Animal shelter preliminary project Yes Basic PPP model 2,000,000.00 BAM including accommodation, food and 2015 - 2021 + 387 (0)32 73 25 60, design veterinary care. [email protected]

17 25 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

The Plan of Adjusting Waste Management for Sustainable the Zavidovici Municipal Solid Waste Landfill, Ms Dzeraldina municipal solid Reducing the quantities of waste sent Decision by the Federation Ministry of Milicevic and Mr Municipality of waste to regional landfill and closing illegal Environment and Tourism number UP-I-05/2- Almir Mustafic, Safet 28 0. Project idea only Yes Basic PPP model 10,000,000.00 BAM Zavidovici management in landfills in the Zavidovici municipality 23-11-60/12 of June 12, 2012; Environmental Bega Basagica bb, the Zavidovici area. Impact Assessment; Master Plan for Landfill 72200 Zavidovici, municipality area Closure; Zavidovici Municipality Integrated +387 (0)32 87 83 18 Development Strategy 2017 - 2026

Improving water supply services by Replacing entrusting the replacement of transite transite pipes pipes part of the regional water supply Ms Dzeraldina part of the system to a partner with aim to remove Milicevic and Mr regional water Zavidovici Municipality Integrated Municipality of the materials that are harmful to Almir Mustafic, Safet 29 supply system Development Strategy 2017 - 2026; 0. Project idea only No Basic PPP model 6,000,000.00 BAM Zavidovici human health and eliminate the waste Bega Basagica bb, and setting up a architectural plans of water presently amounting to 70 72200 Zavidovici, small percent. The newly built pipeline +387 (0)32 87 83 18 hydropower would be connected to a small run-of- plant river hydropower plant.

Ms Dzeraldina District heating of Expanding the district heating system Milicevic and Mr Municipality of the Zavidovici to broader urban area of the Zavidovici Municipality Integrated Almir Mustafic, Safet 30 0. Project idea only Yes Basic PPP model 10,000,000.00 BAM Zavidovici municipality municipality and improving the Development Strategy 2017 - 2026 Bega Basagica bb, urban area heating services. 72200 Zavidovici, +387 (0)32 87 83 18

Replacing the present street lights with Ms Dzeraldina a more energy-efficient alternative, Milicevic and Mr entrusting the services of maintaining Municipality of Zavidovici Municipality Integrated Almir Mustafic, Safet 31 Street lights the lighting system to a private sector 0. Project idea only Yes Basic PPP model 3,500,000.00 BAM Zavidovici Development Strategy 2017 - 2026 Bega Basagica bb, partner, and expanding the street 72200 Zavidovici, lighting network in the Zavidovici +387 (0)32 87 83 18 municipality area.

Ms Dzeraldina Improving road Making as many roads as possible Milicevic and Mr Municipality of traffic in the usable throughout the year and in line Zavidovici Municipality Integrated Almir Mustafic, Safet 32 0. Project idea only Yes Basic PPP model 7,000,000.00 BAM Zavidovici Zavidovici with the predetermined maintenance Development Strategy 2017 - 2026 Bega Basagica bb, municipality area standards. 72200 Zavidovici, +387 (0)32 87 83 18 17 26 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

Ms Dzeraldina Recreation and Utilize of existing natural and tourist Milicevic and Mr Municipality of spa resort in resources of Zavidovici in order to Zavidovici Municipality Integrated Almir Mustafic, Safet 33 0. Project idea only Yes Basic PPP model 4,000,000.00 BAM Zavidovici Zavidovicikreativ diversify the tourism offer and increase Development Strategy 2017 - 2026 Bega Basagica bb, no the number of tourists 72200 Zavidovici, +387 (0)32 87 83 18

Building and improving the network of local and regional roads with aim to Mr Fuad Construction of make the remote parts of the Maglaj Municipality Development Strategy Hajrulahovic, +387 1. Appropriate public Special PPP 34 Municipality of Maglaj the Novi Seher municipality more accessible and in 2012 - 2020, P3.2.3.9. Construction of the Yes 4,800,000.00 BAM (0)32 60 95 70, service analysis model bypass particular to create preconditions for Novi Seher bypass fuad.hajrulahovic@m economic development and the aglaj.ba opening of "Brezove Dane" coal mines.

Given the lack of a district heating system in the city of Maglaj, the project Mr Fuad is aiming to identify potential District heating Maglaj Municipality Development Strategy 2. Appropriate Hajrulahovic, +387 investors/partners who would build Special PPP 35 Municipality of Maglaj system for the 2012 - 2020, P3.2.1.1. District heating conceptual project Yes 15,500,000.00 BAM (0)32 60 95 70, the necessary infrastructure and model city of Maglaj system for the city of Maglaj design fuad.hajrulahovic@m provide communal heating on aglaj.ba commercial basis, charging a fee from end users for the services.

Aiming to finalise the project and build Reconstruction of the "Kosova" stadium in line with the Mr Fuad the "Kosova" latest standards, Maglaj Municipality Maglaj Municipality Development Strategy 2. Appropriate Hajrulahovic, +387 football stadium and the football club "VIS" from Kosova 2012 - 2020, P2.1.3.7. Reconstruction of Special PPP 36 Municipality of Maglaj conceptual project Yes 350,000.00 BAM (0)32 60 95 70, with the will identify a potential investor the "Kosova" football stadium with the model design fuad.hajrulahovic@m supporting interested to act as a partner helping supporting capacities aglaj.ba capacities build the remaining infrastructure and furnish the stadium.

17 27 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

Given the lack of tennis courts and the Construction of a plans to develop a sports and multifunction recreation centre as part of the Maglaj sports facility - Maglaj Municipality Development Strategy Mr Fuad elementary school, the Municipality is sports fields, 2012 - 2020, P2.1.3.5. Construction of a 2. Appropriate Hajrulahovic, +387 offering a possibility to prospective Special PPP 37 Municipality of Maglaj tennis courts and multifunction sports facility - sports fields, conceptual project Yes 350,000.00 BAM (0)32 60 95 70, investors to build the multifunction model an open stage - tennis courts and an open stage - for the design fuad.hajrulahovic@m sports facility, including sports fields, for the elementary school in Maglaj aglaj.ba tennis courts and an open stage, elementary manage the capacities and charge fees school in Maglaj for their usage.

Maglaj municipality can offer respectable cultural and historic heritage and abundance of natural beauty but at the moment their Establishing and potential is inadequately managed and Mr Fuad managing the underutilised. In that light, the 2. Appropriate Hajrulahovic, +387 Maglaj Municipality Development Strategy Special PPP 38 Municipality of Maglaj integral tourism Municipality of Maglaj is offering a conceptual project Yes 250,000.00 BAM (0)32 60 95 70, 2012 - 2020 model product of Maglaj possibility to prospective investors to design fuad.hajrulahovic@m municipality create and organise a proper system aglaj.ba for managing, maintaining and using the capacities for tourism and other activities, and charge fees for those services.

Installing LED lights based on energy Street lights in 3. Appropriate saving models and in line with the FBiH 061 703 566 39 Municipality of Breza the Breza Municipal Breza Plan 2018-2022 preliminary project Yes Basic PPP model 260,000.00 BAM Energy Efficiency Law ("FBiH Official mail:nermin.cosic@h municipality area design Gazette," No. 22/17) otmail.com

17

28 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

District heating for Breza minicipality based on Having a modern, sustainable and renewable energy flexible district heating system which sources from would reduce and prevent risks to artesian source human health, provide a comfortable Sedra, combining work environment, and be the rich Breza environmentally friendly and municipality 1. Appropriate public 061 703 566 40 Municipality of Breza economically justified. Discovering Municipal Breza Plan 2018-2022 Yes Basic PPP model 5,000,000.00 BAM natural and tourist service analysis mail:nermin.cosic@h thermal water, as a renewable energy resorces with the otmail.com specified location source, of such quality and quantity to attract more that make it possible to use an optimal tourist to Breza, in technical economically sound model to particular the catch and distribute it into the district tourist interested heating system. in medicinal bath and recreation.

Flood protection Protecting the lives and property of in the area of citizens and businesses in the Breza Zenica-Doboj canton Programme of municipality Breza against flooding by 061 703 566 41 Municipality of Breza municipality Advancing Rescue and Protection against 0. Project idea only Yes Basic PPP model 2,000,000.00 BAM regulating the river channels Stavnja mail:nermin.cosic@h within the water Natural and Other Disasters 2017 - 2022 in the area and applying other relevant otmail.com course Stavnja technical solutions. river

Sustainable municipal solid Reducing the amount of waste that is waste 061 703 566 42 Municipality of Breza sent to the regional landfill and its use Municipal Breza Plan 2018-2022 0. Project idea only Yes Basic PPP model 3,000,000.00 BAM management in mail:nermin.cosic@h for as propellant fuel for other purpose. the Breza otmail.com municipality area

17

29 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

Construction of a boiler room on Bio waste,with power of 4.4 MW, would serve as central heating of the city. In 3. Appropriate Boil room on BIO 43 this way Zepce municipality would 2011-2018. Strategic Aim No.3, Priority no. preliminary project Yes Basic PPP model 3,200,000.00 BAM 888-630, waste provide heat energy source for a long 3.1, Measure No.3.1.6. design namik.malicbegovic period of time, which is economically @tel.net.ba viable and environmentally acceptable

Construction of a waste sorting building with capacity of 5t per hourh of compost and supporting facilities. This would significantly reduce the 3. Appropriate A waste sorting costs of waste disposal, create the 44 2011-2018. Strategic Aim No.3, Priority no. preliminary project Yes Basic PPP model 2,200,000.00 BAM 888-630, building conditions for the complete closure of 3.1, Measure No.3.1.3. design namik.malicbegovic the municipal waste landfill @tel.net.ba types of waste and more efficient municipal waste management.

Closure of the The closure of the city landfill waste 3. Appropriate Waste landfills 45 2011-2018. Strategic Aim No.3, Priority no. preliminary project Yes Basic PPP model 1,500,000.00 BAM 888-630, disposal of existing waste. 3.1, Measure No.3.1.3. design namik.malicbegovic @tel.net.ba

Street lighting Replacement of existing lighting with reconstruction with installation rural areas that gravitate towards the 1. Appropriate public 46 of city. The amount of energy consumed 2011-2018. Strategic Aim No.3, Sector goal Yes Basic PPP model 500,000.00 BAM 888-630, service analysis environmentally per one lighting body will be at least no. 3.3, Programme 3.3.1.2. namik.malicbegovic acceptable 1200 25% lower until 2020 compared to @tel.net.ba LED lights 2016 year.

17 30 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

The purpose of the project is to establish the presence of thermal waters in deeper and deep zones of District heating the rock massif and their exploitation for Doboj Jug and use. The aim of the project will be Municipality od Doboj municipality to create the assumption for the Doboj Jug Municipality Development 47 0. Project idea only Yes Basic PPP model 1,100,000.00 BAM Jug based on improvement of public services such as Strategy umihana@dobojjug. renewable drinking water, warming / heating and ba energy sources reducing of the level of air pollution caused by the current heating mode in the Doboj Jug municipality (small heating system in solid fuel).

The purpose of the project is to establish public lighting in the whole Dobojska br.36, area of the Doboj Jug municipality and Municipality of Doboj Doboj Jug Municipality Development 1. Appropriate public 48 Street lights bring it into a energy saving mode. The Yes Basic PPP model 390,000.00 BAM opcinaurb@hotmail. Jug Strategy service analysis project's goal is to save energy in the com 032-692- public lighting system and reduce CO2 546, mob: 061-162- emissions into the air 542

The purpose of the project is to provide an adequate premises to hold Building a a MC sessions which will be available Municipality of Doboj modern sale MC to people with disabilities, as well as an Doboj Jug Municipality Development 49 0. Project idea only Yes Basic PPP model 300,000.00 BAM umihana@dobojjug. Jug and Public adequate premises to hold public Strategy ba 032-691- Libraries meetings (up to 50 persons) and 250 above that area provide for accommodation for Libraries.

17 31 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

The plant for The purpose of the project is to Dobojska br.36, wastewater establish waste water treatment, 2. Appropriate Municipality of Doboj Doboj Jug Municipality Development 50 treatment because water from the currently conceptual project Yes Basic PPP model 2,000,000.00 BAM opcinaurb@hotmail. Jug Strategy municipalities of sewage system flows direcctly into the design com 032-692- Doboj Jug Usore watercourse. 546, mob: 061-162- 542

Improving relevant infrastructure (lights, doors and windows, exterior Ms Samka Lokmic, building walls, heating, air- Zenica-Doboj Improving energy conditioning, etc.) in the elementary Canton Ministry of Zenica-Doboj Canton Development Strategy Zenica-Doboj Canton efficiency in the schools "Mula Mustafa Baseskija," Education, Science, 2016 - 2025; Report on the Comprehensive Ministry of Education, Zenica-Doboj Kakanj (local school in Trsce), "Musa 1. Appropriate public Culture and Sports, 51 Energy Survey of the Vocational Secondary No Basic PPP model 3,000,000.00 BAM Science, Culture and Canton Cazim Catic," Zenica (local school in service analysis Zmaja od Bosne bb, School " Mehmedalija Mak Dizdar" and the Sports elementary Blatusa), "Mak Dizdar", Zenica; "Enver Zenica, +387 (0)32 46 Grammar School "Muhsin Rizvic" in Breza schools - Group 1 Colakovic," Breza, and "Vladimir Nazor," 08 46, Zenica, with aim to improve teaching [email protected] conditions and reduce the costs of a electricity and heating.

Improving relevant infrastructure (lights, doors and windows, exterior building walls, heating, air-conditioning, etc.) in the

Improving energy Ministarstvo za Zenica-Doboj Canton efficiency in the obrazovanje, nauku, Zenica-Doboj Canton Development Strategy Ministry of Education, Zenica-Doboj kulturu i sport ZDK, 52 2016 - 2025; Report on the Comprehensive 0. Project idea only Yes Basic PPP model 13,000,000.00 BAM Science, Culture and Canton Zmaja od Bosne bb, Energy Survey Sports elementary Zenica, schools - Group 2 [email protected] a, 032/460-846

to improve teaching conditions and reduce the costs of electricity and heating.

17 32 Enabled Expected PPP Estimated total value of Project purpose and specific Reference strategy paper Level of project application PROPONENT model the project objective (Name one or more strategy papers serving development of Art. 18 # (Name and seat of Project title (Select an option (Costs of investment + Contact person (Indicate the expected public service as grounds for the proposed PPP project and (Select an option from of the PPP public partner) from the drop- maintenance + risk improvement) the related objectives/measures/activities) the drop-down menu*) Law down menu**) transfer) (Yes/No)

Improving relevant infrastructure (lights, doors and windows, exterior building walls, heating, air- conditioning, etc.) in the following Improving energy Ministarstvo za buildings: "Home od Pupils" Zenica; Zenica-Doboj Canton efficiency in the obrazovanje, nauku, Zenica-Doboj Canton Development Strategy Ministry of Education, Zenica-Doboj kulturu i sport ZDK, 53 2016 - 2025; Report on the Comprehensive 0. Project idea only Yes Basic PPP model 7,000,000.00 BAM Science, Culture and Canton Zmaja od Bosne bb, Energy Survey Sports secondary Zenica, schools - Group 1 [email protected] a, 032/460-846 improve teaching conditions and reduce the cost of electricity and heating.

Improving relevant infrastructure (lights, carpentry, façade, heating and cooling and construction of the Faculty of Medicine building) in the buildings of the University of Zenica (consisting of the buildings of the Institute Kema Improving energy efficiency in Ministarstvo za Faculty of Economics and Law, the Zenica-Doboj Canton University of obrazovanje, nauku, Rectorate building, the pedestrian halls Ministry of Education, Zenica and Zenica-Doboj Canton Development Strategy kulturu i sport ZDK, 54 and the building of the Faculty of 0. Project idea only Yes Basic PPP model 29,000,000.00 BAM Science, Culture and construction of 2016 - 2025 Zmaja od Bosne bb, Mechanical Engineering, which has a Sports the building of Zenica, total surface of about 30,000 m2. the Medical [email protected] Outside the campus there are facilities faculty a, 032/460-846 of the Faculty of Philosophy and the Student Center with a total area of about 7,000 m2.) in order to improve the teaching conditions and reduce the costs of electrical and thermal energy.

348,780,000.00 BAM TOTAL

17 33 ANNUAL PLAN OF POTENTIAL PPP PROJECTS

34 2018 PIPELINE OF PPP PROJECTS ANNUAL PLAN OF POTENTIAL PPP PROJECTS

Reference strategy paper(Name one Enabled Estimated total value Project purpose and specific Level of project Expected PPP model Budget for PROPONENT or more strategy papers serving as application of the project objective development (Select an option from preparation of PPP # (Name and seat of Project title grounds for the proposed PPP project of Art. 18 of (Costs of investment + Contact person (Indicate the expected public (Select an option from the drop-down project proposals public partner) and the related the PPP Law maintenance + risk service improvement) the drop-down menu*) menu**) (in BAM) objectives/measures/activities) (Yes/No) transfer)

Introducing new interventional cardiology services and increasing the quality of health care. This Mr Almir Rosic, Public Institution would prevent referring patients 2. Appropriate Crkvice 67, Zenica, Zenica Canton Zenica-Doboj Canton Health Sector 1 Interventional cardiology to medical facilities outside the conceptual project Yes Basic PPP model 4,000,000.00 BAM 30,000.00 BAM +387 (0)61 25 73 81, Hospital, Crkvice 67, Development Strategy 2016 - 2025 Canton, which is imperative for design [email protected] 72000 Zenica this type of service involving m urgent treatment of patients with life-threatening conditions.

Gamma Knife is a device that precisly delivers a single, finely focused dose of radiation to select parts of the brain aiding the treatment of tumours and other abnormalities. The Gamma knife provides a new tertiary level service, and procuring a Gamma Knife would enable the use of new, modern method of brain Public Institution radiotherapy unique in the Crkvice 67, Zenica, Zenica Canton Provision of service for territory of our country. Patients Zenica-Doboj Canton Health Sector 2 0. Project idea only Yes Basic PPP model 9,000,000.00 BAM 25,500.00 BAM 061/988-950, Hospital, Crkvice 67, Gamma Knife who need this therapy should not Development Strategy 2016 - 2025 medicinska.fizika@k 72000 Zenica have to go to other countries. The Federation Health Insurance Funds bze.ba spends around 4,000,000.00 BAM annually for such treatments of its beneficiaries abroad. These project would help keep those funds within the country and ensure high-quality threatment and healthcare service to patients.

35 Tesanj Municipality Development Mr Asim Basalic, Having a modern, sustainable and Strategy 2018 / Operational objective: Manager of flexible district heating system Ensuring support to infrastructure "Toplana" d.d. District heating for Tesanj which would ensure quality, development based on PPP model / /public utilities 3. Appropriate Municipality of municipality based on reliability and affordability to its Measures: Assessing energy efficiency, company/ , Tesanj 3 preliminary project Yes Basic PPP model 30,000,000.00 BAM 20,000.00 BAM Tesanj renewable/environmentally users, reduce and prevent further exploring the potential uses of Toplana d.d.-Bukva, design friendly energy sources risks to human health, and be renewable energy sources and network Tesanj, +387 (0)32 environmentally friendly and expansion, and examining geothermal 65 05 08, economically justified. energy capacities in the Tesanj direktor@toplana- municipality area. tesanj.com.ba

Building new capacities for cultural and similar activities at the location of former "Dom Tesanj Municipality Development kulture" /cultural centre/ in Jelah Strategy 2018 / Operational objective: Mr Hajrudin Subasic, Combined culture and with aim to enrich the social life of Developing and strengthening sports 2. Appropriate Tesanj Municipality, Municipality of 4 sports centre in Jelah and a the population gravitating by increasing its overall popularity and conceptual project Yes Basic PPP model 3,500,000.00 BAM 10,000.00 BAM +387 (0)61 70 36 72, Tesanj sports hall in Jelah towards Jelah and provide offices having more people engage in athletic design hajrudin.subasic@o for the municipal and local activities / Measures: Building sports pcina-tesanj.ba community administration, as facilities. well as sports halls next to the "1. mart" elementary school.

Strategy of Development of Spa and Recreation Tourism in the Olovo Municipality. Combining the rich Olovo The Feasibility Study on the Ms Merisa Kaljanac, municipality natural and tourist Establishment of a Public-Private Branilaca Olova bb, resources with the specified Partnership to Build a Spa and 3. Appropriate Municipality of Building a spa and 71340 Olovo, +387 5 location to attract more tourists Recreation Resort in the Olovo preliminary project Yes Basic PPP model 15,000,000.00 BAM 11,000.00 BAM Olovo recreation resort in Olovo (0)32 82 95 67, to Olovo, in particular the tourists Municipality Area, and the project design [email protected]. interested in medicinal bath Detailed Hydrogeological Survey of the ba treatment and recreation. Soil and Rocks at the Location "Banja" in Olovo Municipality in Search of Thermal Waters and Exploring the Possibility of Its Use are under way.

36 2. The Plan for Adjusting the Waste Management at the Municipal Solid Waste Landfill at the Location "Gradina," Olovo Municipality, Managed by the Public Utilities Company "Biostica" from Olovo (at that time undergoing bankruptcy proceedings) was approved by the Decision of the Federation Ministry of Environment and Tourism number UP-I 05/2-23-11-28/13 of March 26, 2013. Construction of the facilities 4. The investment, technical and environmental Rehabilitating and regulating the needed for rehabilitation of documentation for rehabilitation of the municipal solid waste landfill and Ms Merisa Kaljanac, the municipal solid waste municipal solid waste landfill "Gradina" and the building the facilities needed for construction of supporting capacities in line with Branilaca Olova bb, landfill and of the 3. Appropriate Municipality of its proper and safe functioning, the concept of regional solid waste management 71340 Olovo, +387 6 supporting capacities in line preliminary project No Basic PPP model 2,600,000.00 BAM 30,000.00 BAM Olovo including the sorting and is prepared. By its Decision number UP-I 05/2- (0)32 82 95 67, with the concept of regional 23-11-12-6/15 FM of September 30, 2015, the design reloading stations, with aim to [email protected]. solid waste management at Federation Ministry of Environment and Tourism gradually create preconditions to ba the location "Gradina," approved the Olovo Municipality Environmental close the landfill. Impact Assessment of the Project of Olovo Municipality Rehabilitation of the Municipal Solid Waste Landfill "Gradina," Olovo Municipality, and the Construction of Supporting Capacities in Line with the Concept of Regional Solid Waste Management. The process of obtaining the relevant spatial-planning permit is under way.

Economic Viability Assessment with the related conceptual project design for a Building a small hydropower Ms Merisa Kaljanac, Construction of a small small hydropower plant "Grabovica" plant to cover some of the needs Branilaca Olova bb, hydropower plant connecting to the Olovo city water 3. Appropriate Municipality of of the wastewater treatment 71340 Olovo, +387 7 "Grabovica" connecting to supply system and the expansion of preliminary project Yes Basic PPP model 600,000.00 BAM 10,000.00 BAM Olovo capacities and using the already (0)32 82 95 67, the Olovo water supply Olovo city drinking water supply system design existing resources, such as the [email protected]. system designed by "GEOTEYCO-MADESA" present location and pipeline. ba I.A.E. from Barcelona, Spain. The development of the Study is under way.

Mr Anto Bonic, Sivsa Installing LED lights based on bb, 74230 Usora, energy saving models and in line Decision on the Adoption and Municipality of Street lights in the Usora +387 (0)32 89 52 10, 8 with the FBiH Energy Efficiency Implementation of the Usora 0. Project idea only Yes Basic PPP model 1,500,000.00 BAM 15,000.00 BAM Usora municipality area +387 (0)63 71 91 66, Law ("FBiH Official Gazette," No. Municipality Zoning Plan 2014 - 2034 [email protected] 22/17) et.ba, Mr Anto Bonic, Sivsa Having a modern, sustainable and bb, 74230 Usora, flexible district heating system Heating system for the +387 (0)32 89 52 10, which would reduce and prevent Decision on the Adoption and Municipality of Healthcare Centre and +387 (0)63 71 91 66, 9 risks to human health, provide a Implementation of the Usora 0. Project idea only Yes Basic PPP model 100,000.00 BAM 15,000.00 BAM Usora Municipality of Usora [email protected] comfortable work environment, Municipality Zoning Plan 2014 - 2034 administrative premises et.ba, and be environmentally friendly [email protected] and economically justified. om

37 Mr Anto Bonic, Sivsa Building a sports hall for physical bb, 74230 Usora, education of students of the +387 (0)32 89 52 10, Building a sports hall in the vocational secondary school Decision on the Adoption and Municipality of +387 (0)63 71 91 66, 10 vocational secondary school "Stjepan Radic" in Zabljak and the Implementation of the Usora 0. Project idea only Yes Basic PPP model 3,000,000.00 BAM 30,000.00 BAM Usora [email protected] "Stjepan Radic" in Zabljak local elementary schools, as well Municipality Zoning Plan 2014 - 2034 et.ba, as for general public (citizen [email protected] associations, NGOs) om

Building and organising a farmers' market at the Ms Suada Spatial planning, increasing the "Sebilj" bazaar location, and 2. Appropriate Koljenovic, Visoko Municipality of standard of public services Visoko Municipality Development 11 building and organising a conceptual project Yes Basic PPP model 60,000.00 BAM 30,000.00 BAM Municipality, +387 Visoko provided by the Municipality, and Strategy 2015 - 2021 souvenir and textiles market design (0)32 73 25 46, e-sa improving tourism product. in Tabhanska street, Visoko [email protected] municipality

The Plan of Adjusting Waste Management for the Zavidovici Municipal Solid Waste Landfill, Decision Ms Dzeraldina Reducing the quantities of waste by the Federation Ministry of Milicevic and Mr Sustainable municipal solid Municipality of sent to regional landfill and Environment and Tourism number UP-I- Almir Mustafic, Safet 12 waste management in the 0. Project idea only Yes Basic PPP model 10,000,000.00 BAM 50,000.00 BAM Zavidovici closing illegal landfills in the 05/2-23-11-60/12 of June 12, 2012; Bega Basagica bb, Zavidovici municipality area Zavidovici municipality area. Environmental Impact Assessment; 72200 Zavidovici, Master Plan for Landfill Closure; +387 (0)32 87 83 18 Zavidovici Municipality Integrated Development Strategy 2017 - 2026

Ms Dzeraldina Expanding the district heating Milicevic and Mr District heating of the Municipality of system to broader urban area of Zavidovici Municipality Integrated Almir Mustafic, Safet 13 Zavidovici municipality 0. Project idea only Yes Basic PPP model 10,000,000.00 BAM 50,000.00 BAM Zavidovici the municipality and improving Development Strategy 2017 - 2026 Bega Basagica bb, urban area the heating services. 72200 Zavidovici, +387 (0)32 87 83 19

Ms Dzeraldina Utilize of existing natural and Milicevic and Mr tourist resources of Zavidovici in Municipality of Recreation and spa resort in Zavidovici Municipality Integrated Almir Mustafic, Safet 14 order to diversify the tourism offer 0. Project idea only Yes Basic PPP model 4,000,000.00 BAM 50,000.00 BAM Zavidovici Zavidovicikreativno Development Strategy 2017 - 2026 Bega Basagica bb, and increase the number of 72200 Zavidovici, tourists +387 (0)32 87 83 20

38 Building and improving the network of local and regional roads with aim to make the Mr Fuad remote parts of the municipality Maglaj Municipality Development Hajrulahovic, +387 Municipality of Construction of the Novi 1. Appropriate public 15 more accessible and in particular Strategy 2012 - 2020, P3.2.3.9. Yes Special PPP model 4,800,000.00 BAM 10,000.00 BAM (0)32 60 95 70, Maglaj Seher bypass service analysis to create preconditions for Construction of the Novi Seher bypass fuad.hajrulahovic@ economic development and the maglaj.ba opening of "Brezove Dane" coal mines.

Aiming to finalise the project and build the "Kosova" stadium in line with the latest standards, Maglaj Mr Fuad Reconstruction of the Maglaj Municipality Development Municipality and the football club 2. Appropriate Hajrulahovic, +387 Municipality of "Kosova" football stadium Strategy 2012 - 2020, P2.1.3.7. 16 "VIS" from Kosova will identify a conceptual project Yes Special PPP model 350,000.00 5,000.00 BAM (0)32 60 95 70, Maglaj with the supporting Reconstruction of the "Kosova" football potential investor interested to design fuad.hajrulahovic@ capacities stadium with the supporting capacities act as a partner helping build the maglaj.ba remaining infrastructure and furnish the stadium.

The purpose of the project is to establish public lighting in the Dobojska br.36, whole area of the Doboj Jug Municipality of municipality and bring it into a Doboj Jug Municipality Development 1. Appropriate public 17 Street lights Yes Osnovni model JPP 390,000.00 BAM 30,000.00 BAM opcinaurb@hotmail. Doboj Jug energy saving mode. The project's Strategy Energy Audit service analysis com 032-692- goal is to save energy in the 546, mob: 061-162- public lighting system and reduce 542 CO2 emissions into the air

The purpose of the project is to provide an adequate premises to hold a MC sessions which will Building a modern sale be available to people with Municipality of Doboj Jug Municipality Development 18 Municipal Council and Public disabilities, as well as an adequate 0. Project idea only Yes Basic PPP model 300,000.00 BAM 20,000.00 BAM umihana@dobojjug. Doboj Jug Strategy Libraries premises to hold public meetings ba 032-691- (up to 50 persons) and above 250 that area provide for accommodation for Libraries.

Installing LED lights based on Decision of adoption and energy saving models and in line 3. Appropriate Municipality of Street lights in the Breza implementation of the Spatial Plan of 061 703 566 19 with the FBiH Energy Efficiency preliminary project Yes Basic PPP model 260,000.00 BAM 50,000.00 BAM Breza municipality area the Municipality of Breza for the period mail:nermin.cosic@h Law ("FBiH Official Gazette," No. design 2014.-2034. otmail.com 22/17)

39 Improving relevant infrastructure (lights, doors and windows, exterior building walls, heating, Ms Samka Lokmic, air-conditioning, etc.) in the Zenica-Doboj Zenica-Doboj Canton Development elementary schools "Mula Mustafa Canton Ministry of Strategy 2016 - 2025; Report on the Zenica-Doboj Improving energy efficiency Baseskija," Kakanj (local school in Education, Science, Comprehensive Energy Survey of the Canton Ministry of in the Zenica-Doboj Canton Trsce), "Musa Cazim Catic," Zenica 1. Appropriate public Culture and Sports, 20 Vocational Secondary School " No Basic PPP model 3,000,000.00 BAM 100,000.00 BAM Education, Science, elementary schools - Group (local school in Blatusa), "Mak service analysis Zmaja od Bosne bb, Mehmedalija Mak Dizdar" and the Culture and Sports 1 Dizdar", Zenica; "Enver Zenica, +387 (0)32 Grammar School "Muhsin Rizvic" in Colakovic," Breza, and "Vladimir 46 08 46, Breza Nazor," Zenica, with aim to [email protected] improve teaching conditions and a reduce the costs of electricity and heating.

TOTAL 102,460,000.00 BAM 591,500.00 BAM

40 42