Eggington Road, Etwall Development Framework Document April 2017 Barton Willmore

Regent House Prince’s Gate 4 Homer Road Solihull B91 3QQ

T: 0121 711 5151 F: 0121 711 5152

Desk Top Publishing and Graphic Design by Barton Willmore

This artwork was printed on paper using fibre sourced from sustainable plantation wood from suppliers who practice sustainable management of forests in line with strict international standards. Pulp used in its manufacture is also Elemental Chlorine Free (ECF).

Copyright

The contents of this document must not be copied or reproduced in whole of in part without the written consent of Barton Willmore LLP. All plans are reproduced from the Ordnance Survey Map with the permission of the Controller of HMSO. Crown copyright Reserved. Licence No. AR152684.

J:\16000 - 16999\16900 - 16999\16967 - Land at Milverton Road, Warwick\A5\ Graphic Design\Documents\Development Framework Document

Document Status: Final Revision: - Author: Various Authorised by: Kathryn Ventham Issue Date: April 2017 Job No: 22274 Contents

1.0 Introduction Purpose of this Document ...... 4 The Site ...... 5

2.0 Planning Policies National Planning Policy Framework (NPPF) ...... 6 Emerging South Local Plan ...... 8

3.0 Etwall Village Profile and Facilities ...... 10

4.0 Site Assessment Topography ...... 12 Site Access ...... 12 Archaeology and Cultural Heritage ...... 12 Sustainable Transport ...... 14 Landscape and Visual ...... 16 Ecology ...... 16 Flood Risk and Drainage ...... 17 Noise ...... 17 Odour and Severn Trent Treatment Works ...... 17 Agricultural Land Quality ...... 18 Utilities ...... 18 Summary of Assessment ...... 18

5.0 Development Framework Context Land Use and Amount ...... 20 Access ...... 22 Sustainable Development Principles ...... 22

6.0 Landscape, Ecology & Drainage Landscape and Ecology Strategy ...... 24 Drainage Strategy ...... 24

7.0 Summary Conclusions ...... 26 4 1.0 Introduction This section describes the purpose of the Development Framework Document and the Site location.

Purpose of this Document 1.3 Section 2 of this document explains the policy context behind the masterplan. Section 3 sets 1.1 This Development Framework Document (DFD) out the context of the settlement. Section 4 has been prepared by Barton Willmore on behalf includes the technical analysis work that has been of Taylor Wimpey UK Ltd who have land interests completed to date which have helped to define key to the west of Road, Etwall. The land Site features and those development opportunities interest which is the focus of this DFD is illustrated which have influenced the proposed pattern of in Figure 1.1 and 1.2 and is referred hereafter as future development. ‘the Site’. 1.4 An assessment of the development framework 1.2 Taylor Wimpey have been working on site context in terms of master planning is presented appraisal work and the promotion of the site in in Section 5. In Section 6 the main considerations conjunction with the submission of an outline in terms of landscape, drainage and ecology are planning application for the development of up to considered in preparing the wider master plan, 120 dwellings. This has enabled the production before a summary is provided at Section 7. of a comprehensive masterplan (Figure X.X) which is intended to guide the future development of the Site and support the achievement of a co-ordinated and comprehensive development.

Figure 1.1> Wider Location Plans 5

The Site 1.7 The Site is not currently proposed for allocation in the emerging Local Plan Part 2, but is capable 1.5 Taylor Wimpey control the site located to of delivering up to 120 dwellings. Importantly, it the south-west of Etwall, with a total site area can do so whilst respecting the key characteristics measuring 7.9 hectares. of the Site. The Site remains outside the proposed settlement boundary for Etwall although 1.6 The Site is bounded by Eggington Road to the representations are made which demonstrate east, residential development along Chestnut Grove that the Site could be easily assimilated into the and The Bancroft to the north, Severn Trent Sewage settlement of Etwall with the inclusion of logical Works to the west and agricultural development and defensible boundaries to the Site and the wider and the A50 further to the south. Importantly settlement. all sides of the site have logical and permanent boundaries, which sensibly add to the built form of Etwall.

Severn Trent Sewage Treatment Works

STW access track

Sustrans route

Access track

Figure 1.2> Site Location Plan 6 2.0 Planning Policies The planning policy context for the Site is highlighted in this Section, with particular regard given to those aspects of adopted and emerging policy which have influenced our initial land use proposals and framework masterplan.

National Planning Policy Framework (NPPF) • Identify the size, type, tenure and range of housing that is required in particular 2.1 At the heart of the NPPF is a presumption in locations, reflecting local demand; and favour of sustainable development. For plan- making this means that local planning authorities • Where they have identified that affordable should positively seek opportunities to meet the housing is needed, set policies for meeting development needs of their area. Local Plans this need on site, unless off-site provision or should meet objectively assessed needs, with a financial contribution of broadly equivalent sufficient flexibility to adapt to rapid change, unless value can be robustly justified (for example any adverse impacts of doing so would significantly to improve or make more effective use of and demonstrably outweigh the benefits, when the existing housing stock) and the agreed assessed against the policies in the NPPF taken as approach contributes to the objective of a whole; or specific policies in the NPPF indicate creating mixed and balanced communities. development should be restricted. Such policies should be sufficiently flexible to take account of changing market 2.2 NPPF paragraph 47 states that in order to conditions over time. boost significantly the supply of housing Local Planning Authorities should use their evidence base to ensure that their Local Plan meets the full objectively assessed needs for market and affordable housing in the housing market area, as far as is consistent with the policies set out in this Framework, including identifying key sites which are critical to the delivery of the housing strategy over the plan period.

2.3 NPPF paragraph 50 states that to deliver a wide choice of high quality homes, widen opportunities for home ownership and create sustainable, inclusive and mixed communities, local planning authorities should:

• Plan for a mix of housing based on current and future demographic trends, market trends and the needs of different groups in the community (such as, but not limited to, families with children, older people, people with disabilities, service families and people wishing to build their own homes);

Figure 2.1> National Planning Policy Framework 7

2.4 Paragraph 55 states that to promote sustainable 2.5 Local Plans are the key to delivering sustainable development in rural areas, housing should be development that reflects the vision and aspirations located where it will enhance or maintain the vitality of local communities. Local Plans must be of rural communities. For example, where there are prepared with the objective of contributing to the groups of smaller settlements, development in one achievement of sustainable development. Local village may support services in a village nearby. planning authorities should seek opportunities to achieve each of the economic, social and environmental dimensions of sustainable development, and net gains across three. Local Plans should be aspirational but realistic. They should address the spatial implications of economic, social and environmental change.

Figure 2.1> National Planning Policy Framework Figure 2.2> Etwall Proposed Settlement Boundary Map 8

South Derbyshire Local Plan Part 1 Emerging Local Plan Part 2 2.6 The Local Plan Part 1 was adopted by the Council on 13th June 2016. It sets out the long- 2.9 The emerging Local Plan Part 2 was submitted term vision, objectives and strategy for the spatial to the Secretary of State for Examination on 24th development of South Derbyshire to 2028 and January 2017. Once adopted, it will replace the provides a framework for promoting and controlling 1998 Local Plan in full. development. 2.10 Emerging Policy SDT1 states that settlement 2.7 Policy S1 sets out that over the plan period, boundaries define the built limits of a settlement at least 12,618 dwellings will be built in South and distinguish between the built form of a Derbyshire. Policy S2 states that the Council settlement and the countryside. Outside of will take a positive approach when considering settlement boundaries land will be considered development proposals that reflects the as countryside. Within settlement boundaries as presumption in favour of sustainable development defined on the policies map, development will be as set out in the NPPF. Policy S4 sets out that permitted where it accords with the development Part 2 of the Local Plan will allocate 600 dwellings plan. across non-strategic sites (i.e. less than 100 dwellings). 2.11 Emerging Policy BNE5 as set out in the main modifications states that outside of settlement 2.8 Policy H1 sets out that the level of development boundaries, land will be considered as countryside. for each settlement will be of a scale appropriate Planning permission will be granted in the to the size and role of that settlement. Etwall countryside where the development is: is defined as a ‘Key Service Village’. Here, development of all sizes within the settlement i) Essential to a rural based activity; or boundary will be considered appropriate and sites adjacent to the settlement boundary as an ii) Unavoidable in the countryside; or exceptions or cross subsidy site, as long as not greater than 25 dwellings. iii) Considered to be infill that is in keeping with the character of the locality and represents the infilling of a small gap for not normally more than two dwellings, within small groups of housing.

2.12 Development granted should not unduly impact on: landscape character and quality, biodiversity, best and most versatile land, and heritage assets.

Figure 2.3> Emerging South Derbyshire Local Plan Part 2 9 10 3.0 Etwall A review of existing local facilities and movement patterns has been undertaken to assess how the Site relates in terms of distance and accessibility. Profile of Village and Facilities Employment

3.1 Etwall lies approximately 12km to the south-west 3.6 There are a number of employment opportunities of city centre. It is defined as a ‘Key Service within a 6km radius of the Site. The largest of Village’ and therefore has a range of services and these are Toyota’s Burnaston Plant (approximately facilities available capable of accommodating 5.5km east of the Site) and Hilton Business Park a level of growth within the village to meet the (approximately 4km south-west of the Site). objectively assessed needs of the District. 3.7 In addition to these large scale employment 3.2 The local area and wider context offers an areas there is local employment within Etwall’s excellent range of accessible retail and leisure existing businesses and the schools, which is facilities to meet local needs. The development of further enhanced by opportunities within Burton- the Site offers potential benefits to these facilities upon-Trent town centre and Derby city centre. by securing additional expenditure within the local area. The following services and facilities are Retail and Leisure available within or close to Etwall: 3.8 It is considered that there is a good level of Education retail provision for a settlement of Etwall’s size. Within the centre of the village there is a Londis 3.3 The nearest schools to the Site are: supermarket on Main Street, the Spread Eagle pub and a Post Office, which incorporates a Tea Room • Etwall Primary School (approximately 550m and sandwich bar located on Willington Road. from the Site) Both of these are within approximately 1km of the Site. • John Port Secondary School (approximately 750m from the Site) 3.9 In addition to this central village area, on Springfield Road there is a convenience store 3.4 Both of these schools are located within and takeaway (approximately 300m from the walking distance of the Site (within 800m). It is Site) and on Chestnut Grove there is a pharmacy, anticipated that appropriate contributions will be hairdressers and local supermarket (approximately made to ensure that the high standard of education 500m from the Site). provision in Etwall is maintained. 3.10 Etwall Leisure Centre is located within the Healthcare grounds of John Port School and is available for community use. The centre is a modern facility 3.5 The most accessible primary health care and includes a swimming pool, floodlit all weather facilities are at Hilton (Wellbrook Medical Centre) pitches, a sports hall and a fitness suite. or Willington (Willington Surgery). These two facilities are approximately 3.5km and 5km from 3.11 Further afield retail provision is available in the Site respectively. It is understood that both Hilton and on a larger scale in Burton-upon- surgeries are currently accepting new patients, with Trent and Derby centres. A full range of retail Willington having just moved into a new surgery in facilities that would be expected from centres of order to increase the level of healthcare provision this size are available. There is also provision in locally. district centre in Derby City, including a supermarket which is located approximately 5km to the north-east of the Site. 11

Figure 3.1> Facilities Plan 12 4.0 Site Assessment To ensure the delivery of this Site, which sensitively and positively integrates with the existing urban area, a range of technical assessments of the Site have been undertaken on behalf of Taylor Wimpey. This assessment work is described below, with key physical features and development opportunities and constraints identified for the Site. This work has shaped and informed the design response to the Site which is presented as a framework masterplan in Section 5.

Topography 4.5 Opportunities to provide a pedestrian and cycle connection from Eggington Road through the Site 4.1 The Site is gently sloping with gradual falls and connecting with the existing pedestrian route towards the Etwall Brook and north towards from Old Station Close and the SUSTRANS Route dwellings on The Bancroft. Localised areas of more 549 will be promoted. rapid topographical change are evident within the Site, particularly in the north-eastern corner. Re- Archaeology and Cultural Heritage grading may be required at a detailed application stage to re-profile this zone. 4.6 There are no Scheduled Monuments or Listed Buildings within or adjoining the Site. The nearest 4.2 The general topographical conditions do not Listed Building is located approximately 520m to constrain the delivery of development on the Site the north of the Site. Analysis of the Listed Building but will aid the creation of a positive surface water confirms that the Site will have no impact on the drainage strategy. heritage asset due to the intervening modern housing developments. Site Access 4.7 The Site is not located within a Conservation 4.3 The Site is currently served from Eggington Road Area or within a Registered Park and Garden. The by an agricultural access. To form an acceptable Etwall Conservation Area is some 440m to the vehicle access to serve a residential development a north-east of the Site. new access position just to the north of the existing agricultural field access will be formed and the field 4.8 The Site does display areas of ridge and access will be closed. Access onto the existing furrow associated with historic agricultural track running parallel to Eggington Road will be farming methods. A geophysical survey has provided from the new access junction. been undertaken which indicates that there is no evidence to indicate the presence of archaeological 4.4 An existing access track serving the Severn Trent remains of high importance that would warrant Sewage Treatment Works (STW) also connects preservation in-situ and therefore preclude to Eggington Road. Access to the STW must development. be maintained from Egginton Road however, an alternative routing within the Site may be possible. The access track could potentially provide an alternative pedestrian/cycle connection on to Eggington Road. 13

Figure 4.1> Constraints Plan 14

Sustainable Transport

4.9 Two regular bus services operate within Etwall close to the Site. Service numbers V1 and V2 operate along Eggington Road and Hilton Road to the north of the Site and provide an hourly weekday link between Burton and Derby. The nearest bus stops to the Site are located to the east of the Site on Eggington Road opposite The Bancroft and can be accessed from the Site via existing footways along Eggington Road. This stop is currently served by the V1 service and is unmarked.

4.10 Willington Rail Station is the nearest station to the Site and is situated approximately 5km to the south-east of the Site. Willington Station can be accessed via bus services V1 and V2 and provides services to a number of significant locations including Derby, Nottingham and Birmingham.

Figure 4.2> The Villager Bus Map (Source: Trent Barton) 15

Figure 4.2> Local Movement Analysis 16

Landscape and Visual 4.15 Mitigation will be provided by, where possible, incorporating existing hedgerow and hedgerow 4.11 The Site is not covered by any statutory or non- trees within the proposed development layout. statutory designations for landscape character or The introduction of new hedgerow and hedgerow quality. trees along key boundaries will help to reduce the localised landscape and visual impact and enhance 4.12 The sensitivity of the landscape character within biodiversity gain. The level of planting across the Study Area has been shown to be of ‘low- the Site will be substantially increased through medium’ sensitivity to this type of development and the development, helping to preserve the rural the magnitude of landscape effect is considered to character of the wider local area. be ‘low-medium’. Therefore, it is anticipated that there will be slight-moderate adverse effects on the Ecology landscape generated by the scheme. These effects are adverse due to the loss of agricultural land 4.16 The Site comprises an arable field with improved and the introduction of development on previously and semi-improved grassland, scattered/dense undeveloped land, however, these impacts are scrub, hedgerow, tall ruderal and a watercourse. localised and do not affect the wider landscape character. 4.17 There are no statutory designations covering any part of the Site and no internationally important 4.13 Views into the Site from the north are limited as designations present within 10km of the Site. There a result of the existing development to the northern is one nationally significant site the Hilton Gravel and eastern boundaries. Pit Site of Scientific Interest (SSSI) within 2km of the Site. Several other locally important sites are 4.14 Views into the Site can be gained from the A50. located within 2km of the site boundaries. The southern hedgerow is somewhat sparse and as a result some residential development is currently 4.18 Habitats on site are likely to support foraging visible from this viewpoint. The development could bats, foraging badgers, amphibians including Great deliver significant buffer planting along the southern Crested Newts (GCN), hedgehog, polecat and boundary, in order to improve upon the current breeding birds. No badger setts are located on site situation and minimise any future landscape impact or within 30m from the site boundaries. No invasive from this aspect. species are located within the site. 17

4.19 Overall, there are no overriding constraints to the site within the proposed landscaping areas. development of the Site assuming appropriate The locations have been guided by the analysis of avoidance and mitigation measures are the site topography and designed to contain run off implemented to ensure ecological constraints before it enters the Etwall Brook. to the development are anticipated. Indeed, it is anticipated that a net biodiversity gain can be Noise delivered. 4.23 Acoustic analysis of the Site confirms that the Flood Risk and Drainage dominant noise source is from the A50 to the south of the Site. Noise surveys have confirmed that 4.20 The Site falls within Flood Zones 1, 2 and 3. some parts of the Site measure 55dB and over. Residential development will be confined to areas In order to achieve acceptable noise standards within Flood Zone 1, therefore being sequentially a mitigation strategy will be required, particularly preferable for development. Flood Zones 2 and 3 along the southern edge of the Site. are adjacent to the Etwall Brook to the northern part of the Site and the southern spur. No residential Odour and Severn Trent Treatment Works development will be proposed in these areas and (STW) they will be given over to provide the detailed landscaping strategies to support the development 4.24 1Given the proximity of the existing sewage of the Site. treatment works (STW) to the west of the site, an odour assessment has been undertaken. The 4.21 A series of existing field drains, located adjacent assessment utilised field odour surveys undertaken to field boundary hedgerows cross the two Sites on over a five day period during weather conditions both an east to west and north to south alignment conducive to odour migration. Odour was detected and ultimately flow into the Etwall Brook. These at three locations directly adjacent the STW and at features will be retained and a 5m buffer provided 20m from the boundary, within the suggested 35m to either side to enable maintenance. standoff from the proposed residential area. Odour was not detected at any other location during the 4.22 To facilitate the residential development, survey. locations for new surface water attenuation ponds and swales (up to 6.5m wide) are identified within 18

4.25 Based on the implementation of a significant 4.28 A LV/HV cable currently runs alongside the landscape area between the treatment works and existing access track to the Sewage Treatment residential development, odour is not considered Works. Potential to retain or reposition this cable to be a constraint to development during normal will be explored at any detailed application stage. operation. 4.29 Due to the Sites topography, an approximate Agricultural Land Quality location for a foul pumping station is identified as part of the constraints information. 4.26 No land at the Site has been identified as being of Best and Most Versatile Land (BMVL), rather Summary of Assessment it is classified as moderate quality subgrade 3b 4.30 The assessment has revealed a series of agricultural land. features and development opportunities which can be positively integrated into the proposed Utilities development. As such no overriding constraints to development have been identified, supporting 4.27 There are no significant utility constraints within the Site. A service corridor runs along Eggington the case for development coming forward in this Road, away from any potential development. location. Other services such as overhead plant, surface water sewers and foul sewers cross the northern parts of the Site. These will be retained in-situ and opportunities to access them for maintenance retained. 19 20 5.0 Development Framework Context Taking all of the assessment and analysis work as well as interpreting the Local Plan policy requirements, a framework masterplan has emerged for the Site. The following sections explain the main components and strategies underpinning the framework, namely those focused on the distribution of land uses; access and movement; landscape, ecology and drainage; and the indicative phasing and delivery of development.

Land Use and Amount 5.3 Up to 30% of the dwellings (36 dwellings in total) can be offered as affordable dwellings. Of 5.1 Table 5.1 and Figure 5.1 provide an indication the overall 30% provision, the following mix is of the proposed distribution of land uses and how indicatively suggested: they are broken down. The predominant land use will be residential, with the site capable of delivering • 1 and 2 bedroom dwellings (68%) up to 120 dwellings on a net developable area of approximately 3.78 hectares on the 7.9 hectare site. • 3 bedroom dwellings (32%)

5.4 Within the Site, a total of 2.62 hectares is 5.2 An indicative mix of dwellings has been used to inform the illustrative layout plan which comprises identified as informal/natural green space or of the following and demonstrates just one option informal/natural public amenity space. This of how the site could be developed: equates to almost one third of the combined site area. The majority of the informal/natural green • 1 and 2 bedroom dwellings (25%) space will provide an extension to the existing natural green space south of the Old Station • 3 bedroom dwellings (45%) Road development, or accommodate sustainable drainage elements to the south of the Site. • 4 bedroom dwellings (30%) 5.5 Further green elements include landscape Land Use Hectares Acres buffers (equating to 1.18 hectares) and formal Residential Application Boundary open space (equating to 0.23 hectares) will also Residential Development Area (includes roads) 3.66 9.04 be provided. Formal open spaces will include the Informal/ Natural Greenspace 0.83 2.05 potential to provide for children’s play equipment Formal Open Space 0.35 0.86 Existing and Proposed Highway Junction 0.10 0.25 where spaces will benefit from passive surveillance. Amenity Buffer to Existing Dwellings & Highway Verge 0.15 0.38 5.6 Low Level Amenity Buffer to Existing Dwellings 0.04 0.10 An area of 0.026 hectares has been retained to Severn Trent Access/ Pedestrian Link 0.03 0.07 allow access to the Severn Trent Sewage Treatment TOTAL 5.17 12.78 Works (STW), should it be required. An element of the existing highway (approximately 0.1 hectares) Landscape Application Boundary Informal/ Natural Greenspace 1.00 2.47 has also been included as part of the overall land Amenity Buffer to Existing Dwellings 0.14 0.34 budget to facilitate for the creation of the new Informal/ Natural Public Amenity Space 0.78 1.94 access junction. STW Woodland Buffer 0.85 2.10 STW access track 0.01 0.03 TOTAL 2.78 6.88

Combined Total 7.95 19.65 Table 5.1> Land Use Schedule 21

Figure 5.1> Framework Master Plan 22

Access Sustainable Development Principles

5.7 Access will be served directly from Egginton 5.9 In defining sustainable development, the NPPF Road to service the entire development. The new requires development proposals to be sustainable access has been designed to tie into the existing in terms of its economic, social and environmental function of Eggington Road as well as connect into roles. As such, Table 5.2 outlines how the the existing pedestrian footpath. The position has proposals accord with the definition of ‘sustainable been safety audited to confirm that it will function development’ as set out within paragraph 7 of the without impact to the existing junctions to the east NPPF. of the Site.

5.8 The existing southern access track for agricultural purposes will be retained as will the existing access route to the STW. It will not be possible for private care users to utilise these access points, which is consistent with the current operation of these access points.

The construction of the proposed development would support construction jobs directly related to the development. The provision of 120 dwellings will generate additional convenience, comparison and leisure services expenditure in the local area. An economic role/ economic benefits The Council will gain a direct contribution through the New Homes Bonus, provided by the Department for Communities and Local Government. The proposed development will generate additional Council Tax payments to the Council. The provision of 120 new homes will support the creation of strong, vibrant and healthy communities. The provision of 30% affordable housing will increase the District’s supply of affordable homes and help to reduce inequalities, amounting to 26 dwellings of the proposed 120 dwellings to be delivered as affordable housing. The development of the Site for residential uses would contribute towards a shortfall in the five-year supply of deliverable housing land, in a sustainable location. A social role/social benefits The proposed development incorporates formal and informal open spaces which are within easy walking distances of the new homes and will encourage the development of healthy communities as well as ensuring positive linkages with the existing community in Etwall. The Site is in an accessible location with connections to pedestrian routes (including the SUSTRANS Route 549), which link to the key services and facilities located within Etwall.

The proposed development includes retention of key existing ecological assets and the enhancement of biodiversity including the areas of planting and trees across the Site and the provision of new green infrastructure in accordance with the landscape strategy. The Site adjoins the existing built-up boundary of Etwall, which has been identified as a Key Service Village as part of the Local Plan (Part 1). As such a number of shops An environmental role/ environmental and services are located either within walking distance or via existing bus routes thus benefits reducing the need for the private car. The Site is well contained by existing built-form or permanent boundaries ensuring that the impact on the surrounding landscape is minimised. Provision of Sustainable Urban Drainage Systems (SUDS) including onsite attenuation ponds and no adverse impact on flood risk. A commitment to sustainable waste management and construction during development and occupation. Table 5.2> Sustainable Development Principles Table 23 24 6.0 Landscape, Ecology & Drainage A strong landscape framework will form an important part of the proposals. The development of the Site provides the opportunity to enrich and strengthen the existing landscape structure, whilst improving ecological and recreational functions.

Landscape and Ecology Strategy Drainage Strategy

6.1 The design intention is to create multi-functional 6.5 The 1:50,000 online British Geological Survey landscape features within which a range of Map (Ref 8) documents several superficial units functional formal and informal open spaces and within the site boundary. Superficial deposits of ecological typologies can be delivered. These ‘Head – Clay, Silt Sand and Gravel’ are recorded to spaces will also positively integrate surface water the north and south with ‘Alluvium – Clay, Silt Sand drainage functions which will be designed to and Gravel’ recorded to the west on the Etwall contribute towards the overall character, quality and Brook floodplain. To the far south of the site, close amenity of the public realm. to the A50, deposits of ‘Eggington Common Sand and Gravel’ are recorded. Central and northern 6.2 The proposed landscape strategy sets out that extents display no superficial deposits. Bedrock the majority of existing landscape features on the deposits are documented by the British Geological Site, including the boundary trees and hedgerows Survey Map as belonging to the ‘Gunthorpe will be retained in the development proposals. Member – Mudstone – Sedimentary Bedrock Enhancement planting to the Site boundaries, formed approximately 229 to 246 million years ago particularly a new woodland belt to the southern in the Triassic Period’. and western boundaries, will help to create a landscape framework within which the development 6.6 The site area proposed for residential can sit, ensuring the wider countryside and its development falls wholly within Flood Zone 1. It character are respected as well as providing a is only the land which forms part of the informal strong, defined boundary to the south-west of open space, landscape buffer and balancing Etwall. The existing landscape features and ponds which is partly located within land at risk of topography of the site, alongside future surface flooding. Hydraulic modelling of the Etwall Brook water drainage requirements have strongly has been undertaken to accurately assess the influenced the creation of a connected landscaped extent of Flood Zones 2 and 3 adjacent to the Site. buffer running along key site boundaries. 6.7 Soakage testing undertaken has confirmed that 6.3 The proposed built form will be set back from the ground is unsuitable for infiltration drainage. It Eggington Road to the south-east corner of the is therefore proposed to discharge surface water Site creating a sensitive approach into Etwall on the flows to two drainage ponds positioned to the north approach from the south. Development of the Site and south of the Site. The basins will then make is well related to the surrounding existing settlement limited discharges to the Etwall Brook which flows pattern. It will not extend the built form any further to the west of the Site. Attenuation will be provided south or west than the existing settlement and within the site for storms up to the 1 in 100 year would create a rounded, well landscaped edge to (+40% allowance for climate change) return period the south-west of Etwall. event.

6.4 The landscape buffer zones, enhanced 6.8 Flows will be released at the Qbar greenfield woodland planting and proposed SUDs will discharge rate which will be applied for all rainfall provide an opportunity for ecological biodiversity events up to the 1 in 100 year (+40% climate by encouraging the use of surrounding landscape. change) critical rain storm so that up to 70% Within the SUDs area it is recommended to provide betterment will be provided compared with the run- some wet-meadow vegetation including a species off from the undeveloped site. mix akin to the floodplain meadow to enhance biodiversity and flora species within the Site. 25

6.9 Due to the site topography, the southern part the new foul water system within the north eastern of the development will drain to a new foul water part of the development (Option 1) or to the existing pumping station. It is proposed that foul water 150mm combined STW sewer network located in flows will be pumped via a rising main either to Eggington Road (Option 2).

Figure 6.1> Drainage Strategy Plan 26 7.0 Summary The Site has excellent links to the local area and is in an inherently sustainable location with access to local services and facilities.

Conclusions 7.4 The landscape buffers, particularly to the northern and southern boundaries, will also assist 7.1 This Development Framework Document (DFD) in softening the development edge of the proposals demonstrates that the development of land west of thereby respecting the landscape setting of this Eggington Road, Etwall can assist South Derbyshire Site and making use of existing permanent features in sustainably meeting the housing needs of to provide logical and defensible boundaries which existing and future residents as the area continues could assist in meeting the challenges required by to grow. an alteration to the settlement boundary of Etwall.

7.2 The Site has excellent links to the local area 7.5 In summary, the Site represents a highly and is in an inherently sustainable location with sustainable and deliverable opportunity for a access to employment, retail, education and residential development which is both available and public transport within 2.5km of the Site. The deliverable now. Site also has the potential to enhance pedestrian connectivity along the SUSTRANS Route 549 and existing footpaths within Etwall into the village core.

7.3 The Site would provide areas of public open space for leisure and recreational purposes within its boundaries. This would be provided via two formal areas of open space completed by significant landscape buffers along key site boundaries. The landscape buffers and SUDS provision will also provide zones to enhance ecological biodiversity on the Site. 27 Kathryn Ventham Planning Partner Email: [email protected] Telephone: 0121 711 515