Federal Register / Vol. 86, No. 127 / Wednesday, July 7, 2021 / Notices 35819

Number of Frequency of Responses Burden hour Annual burden Hourly cost Information collection respondents response per annum per response hours per response Annual cost

CoC Applications

CoC HIC (includes Subpopulation Ex- trapolation Tool, Stratified Extrapo- lation Tool, Housing Inventory Chart, and a General Extrapo- lation Tool) ...... 405 1 405 8 3,240 $41.37 $134,038.80 CoC PIT Process ...... 405 1 405 8 3,240 41.37 134,038.80 CoC Application ...... 405 1 405 50 20,250 41.37 837,742.50 CoC Priority Listing and Reallocation Forms .. 405 1 405 15 6,075 41.37 251,322.75 HUD–2991 ...... 405 1 405 3 1,215 41.37 50,264.55

Subtotal CoC Ap- plication ...... 405 1 405 84 34,020 41.37 1,407,407.40

Project Applications

Renewal Project ...... 7,300 1 7,300 0.50 3,650 41.37 151,000.50 New Project ...... 803 1 803 1.50 1,204.50 41.37 49,830.17 Renewal YHPD Project 200 1 200 1.50 300 41.37 12,411.00 Replacement YHDP Project ...... 80 1 80 2 160 41.37 6,619.20 CoC Planning ...... 405 1 405 1.50 607.50 41.37 25,132.28 UFA Costs ...... 12 1 12 1 12 41.37 496.44 SF–424 ...... 8,800 1 8,800 0.05 440 41.37 18,202.80 HUD–2880 ...... 8,800 1 8,800 0.05 440 41.37 18,202.80 HUD–50070 ...... 8,800 1 8,800 0.05 440 41.37 18,202.80 SF LLL ...... 8,800 1 8,800 0.05 440 41.37 18,202.80 Certification of Lob- bying ...... 8,800 1 8,800 0.05 440 41.37 18,202.80 HUD–40090–4 ...... 8,800 1 8,800 0.05 440 41.37 18,202.80

Subtotal Project Applications Submissions ...... 8,800 1 8,800 8.3 8,574 41.37 354,706.38

CoC and Project Applications Overall Total

Total for CoC and Project Applications .. 9,205 1 9,205 92.3 42,594 41.37 1,762,113.78

B. Solicitation of Public Comment information technology, e.g., permitting DEPARTMENT OF THE INTERIOR This notice is soliciting comments electronic submission of responses. Fish and Wildlife Service from members of the public and affected HUD encourages interested parties to parties concerning the collection of submit comment in response to these information described in Section A on questions. [FWS–R6–ES–2019–N156; the following: FXES11140600000] (1) Whether the proposed collection C. Authority of information is necessary for the Endangered and Threatened Wildlife Section 3507 of the Paperwork proper performance of the functions of and ; Draft Recovery Plan for the agency, including whether the Reduction Act of 1995, 44 U.S.C. Mustard information will have practical utility; Chapter 35. AGENCY: Fish and Wildlife Service, (2) If the information will be Anna P. Guido, Interior. processed and used in a timely manner; Department Reports Management Officer, (3) The accuracy of the agency’s ACTION: Notice of document availability Office of the Chief Information Officer. estimate of the burden of the proposed for review and comment. collection of information; [FR Doc. 2021–14378 Filed 7–6–21; 8:45 am] (4) Ways to enhance the quality, BILLING CODE 4210–67–P SUMMARY: We, the U.S. Fish and utility, and clarity of the information to Wildlife Service, announce the be collected; and availability of a draft recovery plan for (5) Ways to minimize the burden of Mosquito Range mustard, a the collection of information on those species listed as threatened under the who are to respond; including through Endangered Species Act. We are the use of appropriate automated requesting review and comment from collection techniques or other forms of the public on this draft plan.

VerDate Sep<11>2014 19:04 Jul 06, 2021 Jkt 253001 PO 00000 Frm 00091 Fmt 4703 Sfmt 4703 E:\FR\FM\07JYN1.SGM 07JYN1 khammond on DSKJM1Z7X2PROD with NOTICES 35820 Federal Register / Vol. 86, No. 127 / Wednesday, July 7, 2021 / Notices

DATES: We must receive any comments alpine areas where Mosquito Range protection of the Act is no longer on the draft recovery plan on or before mustard lives range in elevations from necessary. Pursuant to section 4(f) of the September 7, 2021. 3,600 to 4,050 meters (11,800 to 13,280 Act, a recovery plan must, to the ADDRESSES: feet) and are generally moist, fed by maximum extent possible, include: Document availability: Copies of the melting snowbanks, and contain a (1) A description of site-specific draft recovery plan are available at diverse and abundant community. management actions as may be Mosquito Range mustard is found http://www.fws.gov/endangered/ necessary to achieve the plan’s goal for primarily on public lands managed by species/recovery-plans.html. the conservation and survival of the the U.S. Forest Service (approximately Alternatively, you may request a copy species; by U.S. mail from the Western Colorado 51 percent) and the Bureau of Land Ecological Services Field Office; 445 W Management (17 percent). (2) Objective, measurable criteria Gunnison Ave. #240; Grand Junction, Approximately 31 percent of the overall which, when met, would support a CO 81501; or by telephone at 970–243– range is privately owned, with the determination under section 4(a)(1) of 2778. Persons who use a remaining 1 percent owned by the State the Act that the species should be telecommunications device for the deaf of Colorado. There is no overlap of removed from the List of Endangered may call the Federal Relay Service at occupied habitat with Tribal lands. and Threatened Species; and 800–877–8339. Currently, there are 26 known (3) Estimates of time and costs populations of the mosquito range Submitting comments: If you wish to required to carry out those measures mustard, distributed across comment on the draft recovery plan, needed to achieve the plan’s goal and to approximately 100 hectares (246 acres) you may submit your comments in achieve intermediate steps toward that of habitat. Only 11 out of the 26 total writing by email to Ann Timberman, at goal. [email protected], or by U.S. known populations are characterized as We used our new recovery planning mail to Ann Timberman, Western Slope relatively large, with high or moderate Field Supervisor, at the above U.S. mail resiliency, each with 200 or more and implementation (RPI) process to address. individuals. These 11 populations develop the draft recovery plan for account for over 95 percent of the Mosquito Range mustard. The RPI FOR FURTHER INFORMATION CONTACT: Ann known number of individuals across the process helps reduce the time needed to Timberman, Western Slope Field species’ range and are considered to be develop and implement recovery plans, Supervisor, at the above U.S. mail the most resilient populations. The increases the relevancy of the recovery address or by telephone at 970–243– remaining 15 populations have fewer plan over longer timeframes, and adds 2778. Persons who use a than 200 individuals and are considered flexibility so that the recovery plan can telecommunications device for the deaf to have low resiliency. be more easily adjusted to new may call the Federal Relay Service at The primary threats to Mosquito 800–877–8339. information and circumstances. Under Range mustard, both at the time of our RPI process, a recovery plan will SUPPLEMENTARY INFORMATION: We, the listing and currently, are small and include the three statutorily required U.S. Fish and Wildlife Service (Service), geographically isolated populations, elements for recovery plans—objective announce the availability of a draft climate change, the inadequacy of and measurable criteria, site-specific recovery plan for Mosquito Range regulatory mechanisms, disturbances management actions, and estimates of mustard ( penlandii), a plant related to recreation, such as hiking, time and cost—along with a concise listed as threatened under the biking, camping, and off-highway introduction and our strategy for how Endangered Species Act, as amended vehicle use, disturbances related to we plan to achieve species recovery. (Act; 16 U.S.C. 1531 et seq.). The draft mining, and alteration of hydrology. The RPI recovery plan is supported by recovery plan includes objective, Please refer to our biological report for a separate biological report for Mosquito measurable criteria, and site-specific additional discussion and full analyses Range mustard (Service 2021, entire). management actions as may be of the life history, ecology, and The biological report is an in-depth, but necessary to remove the species from biological status for Mosquito Range not exhaustive, review of the species’ the Federal List of Endangered and mustard (Service 2021, entire). Threatened Plants. We are requesting biology and threats, an evaluation of its review and comment from the public on Recovery Planning Process biological status, and an assessment of this draft recovery plan. Restoring an endangered or the resources and conditions needed to threatened animal or plant to the point maintain long-term viability. The Species Information where it is again a secure, self- biological report provides the scientific On August 12, 1993, we listed sustaining member of its ecosystem is a background and threats assessment for Mosquito Range mustard as a threatened primary goal of the Service’s Mosquito Range mustard, which are key plant (July 28, 1993; 58 FR 40539). We endangered species program. Recovery to the development of the recovery plan. did not designate critical habitat due to means improving the status of a listed A third, separate working document, risk associated with vandalism. species to the point at which listing is called the recovery implementation Mosquito Range mustard is a small, no longer necessary according to the strategy (RIS), steps down the more herbaceous plant in the mustard family criteria specified under section 4(a)(1) of general descriptions of actions in the (), with white flowers and the Act. The Act requires recovery plans recovery plan to detail the specifics stout leaves. The species is found in for listed species unless such a plan needed to implement the recovery plan, high-elevation, alpine habitats of the would not promote the conservation of which improves the flexibility of the Mosquito Mountain Range, in Lake, a particular species. To help guide recovery plan. The RIS will be Park, and Summit Counties in central recovery efforts, we prepare recovery adaptable, with new information on Colorado. The Mosquito Mountain plans to promote the conservation of the actions incorporated, as needed, Range is one of the driest and highest species. without requiring a concurrent revision elevation mountain ranges in Colorado; The purpose of a recovery plan is to to the recovery plan, unless changes to therefore, temperatures are cold, winds provide a recommended framework for the three statutory elements are are strong, and winters are long. The the recovery of a species so that required.

VerDate Sep<11>2014 17:44 Jul 06, 2021 Jkt 253001 PO 00000 Frm 00092 Fmt 4703 Sfmt 4703 E:\FR\FM\07JYN1.SGM 07JYN1 khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 86, No. 127 / Wednesday, July 7, 2021 / Notices 35821

Draft Recovery Plan mountain-prairie/science/ comment, you should be aware that Below, we summarize components peerReview.php. We also submitted our your entire comment—including your from our draft recovery plan. Please biological report to our Federal and personal identifying information—may reference the draft recovery plan for full State partners for their scientific review. be made publicly available at any time. details. The biological report is the scientific You may request at the top of your The draft recovery plan describes the foundation for the draft recovery plan. comment that we withhold this information from public review; recovery goal for the Mosquito Range Request for Public Comments however, we cannot guarantee that we mustard as its long-term viability in the All comments we receive by the date wild. For recovery, the species needs at will be able to do so. specified (see DATES) will be considered least 11 (redundant) persistent prior to approval of the recovery plan. Authority (resilient) populations across the Written comments and materials The authority for this action is section species’ range, where population trends regarding the recovery plan should be 4(f) of the Endangered Species Act, 16 are stable or increasing and ecological sent via one of the means in the U.S.C. 1533(f). and genetic diversity are maintained ADDRESSES section. (representation). This would be We will consider all information we Matthew Hogan, achieved by implementing recovery receive during the public comment Deputy Regional Director, Lakewood, actions, such as protecting, conserving, period, and particularly look for Colorado. and monitoring known populations, comments that provide scientific [FR Doc. 2021–14464 Filed 7–6–21; 8:45 am] surveying for additional populations, rationale or factual background. The BILLING CODE 4333–15–P and coordinating with stakeholders. Service and other Federal agencies and The draft recovery plan includes partners will take these comments into recovery criteria for delisting. The consideration in the course of DEPARTMENT OF THE INTERIOR delisting criteria include: implementing an approved final Fish and Wildlife Service (1) Maintaining population trends for recovery plan. We are specifically the Mosquito Range mustard that are seeking comments and suggestions on [FWS–HQ–ES–2021–N166; stable or increasing, according to the following questions: FXHC11140900000–212–FF09E33000; OMB objective measures that are described in • Understanding that the time and Control Number 1018–0148] the draft recovery plan; and cost presented in the draft recovery plan Agency Information Collection (2) Maintaining existing regulatory will be fine-tuned when localized Activities; Submission to the Office of mechanisms or other conservation plans recovery implementation strategies are Management and Budget for Review that currently provide protections for developed, do you think that the and Approval; Land-Based Wind Mosquito Range mustard and including estimated time and cost to recovery are Energy Guidelines protections in any new or amended land realistic? Is the estimate reflective of the management plans on Federal lands. time and cost of actions that may have AGENCY: Fish and Wildlife Service, Peer Review already been implemented by Federal, Interior. State, county, or other agencies? Please In accordance with our July 1, 1994, ACTION: Notice of information collection; provide suggestions or methods for request for comment. peer review policy (59 FR 34270; July 1, determining a more accurate estimation. 1994); our August 22, 2016, Director’s • Do the draft recovery criteria SUMMARY: In accordance with the Memo on the Peer Review Process; and provide clear direction to partners on Paperwork Reduction Act of 1995, we, the Office of Management and Budget’s what is needed to recover Mosquito the U.S. Fish and Wildlife Service December 16, 2004, Final Information Range mustard? How could they be (Service), are proposing to renew an Quality Bulletin for Peer Review improved for clarity? information collection. (revised June 2012), we will seek the • Are the draft recovery criteria both DATES: Interested persons are invited to expert opinion of at least three objective and measurable given the submit comments on or before August 6, appropriate and independent specialists information available for Mosquito 2021. regarding scientific data and Range mustard now and into the future? interpretations contained in the species ADDRESSES: Written comments and Please provide suggestions. recommendations for the proposed biological report and the draft recovery • Understanding that specific, information collection should be sent plan. We will send copies of both detailed, and area-specific recovery within 30 days of publication of this documents to the peer reviewers actions will be developed in the RIS, do notice to www.reginfo.gov/public/do/ immediately following publication of you think that the draft recovery actions PRAMain. Find this particular this notice in the Federal Register. We presented in the draft recovery plan information collection by selecting will ensure that the opinions of peer generally cover the types of actions ‘‘Currently under Review—Open for reviewers are objective and unbiased by necessary to meet the recovery criteria? Public Comments’’ or by using the following the guidelines set forth in the If not, what general actions are missing? search function. Please provide a copy Director’s Memo, which updates and Are any of the draft recovery actions of your comments to the Service clarifies Service policy on peer review unnecessary for achieving recovery? Information Collection Clearance (U.S. Fish and Wildlife Service 2016). Have we prioritized the actions Officer, U.S. Fish and Wildlife Service, The purpose of such review is to ensure appropriately? that our decisions are based on MS: PRB (JAO/3W), 5275 Leesburg Pike, Public Availability of Comments Falls Church, VA 22041–3803 (mail); or scientifically sound data, assumptions, _ and analysis. Accordingly, our final We will summarize and respond to by email to Info [email protected]. Please species biological report and recovery the issues raised by the public in an reference OMB Control Number 1018– plan may differ from the draft appendix to the approved final recovery 0148 in the subject line of your documents. We will post the results of plan. Before including your address, comments. this structured peer review process on phone number, email address, or other FOR FURTHER INFORMATION CONTACT: our website at https://www.fws.gov/ personal identifying information in your Madonna L. Baucum, Service

VerDate Sep<11>2014 17:44 Jul 06, 2021 Jkt 253001 PO 00000 Frm 00093 Fmt 4703 Sfmt 4703 E:\FR\FM\07JYN1.SGM 07JYN1 khammond on DSKJM1Z7X2PROD with NOTICES