Govt. of Bihar Rural Works Department Notice Inviting Tender (No.-RWD/PMGSY/HQ/ET/18-13) Engineer-in-Chief, Rural Works Department, Bihar invites Percentage rate Tender on behalf of Governor of Bihar (through e-procurement system) from bona fide, approved and eligible Contractors registered with RWD/RCD/CPWD/MES/ Railways/Other State/Central Govt. departments for the following PMGSY works including maintenance for five years after construction of roads and Bridges. Packagewise Earnes Length Amount t Amount SL Package New Technology/ District Block Name of Road / Bridge (in Money Payable to No No. Bridge (Rs. in Lakhs) Kms) (Rs. in Works Division Const. Maint. Lakhs) 1 2 3 4 5 6 7 8 9 10 11 L034-THATHA NIRPUR BR-17R- EE, RWD,Works 1 Khagaria Mansi -- ROAD TO SAHARKUNDI 1.80 76.15 7.82 1.690 145 Divisio, Khagaria (VR) Panelled Cement BR-38R- Concrete
L034-Bichla Gaon, L059 To EE, RWD,Works 2 Arwal Arwal 0.51 22.04 1.93 0.481 342 Cold Mix Saidpur (TRACK20) Division, Arwal Technology BR-38R- Panelled Cement L067-Arwal jehananabad To EE, RWD,Works 3 Arwal Arwal 0.511 17.86 0 0.358 343 Concrete khangah (TRACK36) Division, Arwal BR-38R- L068-Rampur chauram to EE, RWD,Works 4 Arwal Arwal -- 1.792 84.32 8.27 1.856 344 bakaeya (TRACK37) Division, Arwal Banshi BR-38R- Panelled Cement L022-Karapi Shahar Telpa RD EE, RWD,Works 5 Arwal 0.8 44.76 0.18 0.901 Surajpur 345 Concrete to Karwan Balram (TRACK20) Division, Arwal Panelled Cement Banshi BR-38R- Concrete
L021-Makhmilpur Daudpur EE, RWD,Works 6 Arwal 1.924 82.77 8.38 1.828 Surajpur 346 Cold Mix (TRACK7) Division, Arwal Technology Panelled Cement Banshi BR-38R- Concrete
L076-karpi telpa road to EE, RWD,Works 7 Arwal 2.003 97.14 9.15 2.131 Surajpur 347 Cold Mix abdhpur (TRACK28) Division, Arwal Technology Banshi BR-38R- T02-Chand Bigha to sherpur EE, RWD,Works 8 Arwal -- 5.125 244.93 24.4 5.400 Surajpur 348 (VR1) Division, Arwal Banshi BR-38R- L041-Chand Bigha Kutupur EE, RWD,Works 9 Arwal -- 1.5 92.98 6.6 1.997 Surajpur 349 (TRACK8) Division, Arwal Panelled Cement BR-38R- Concrete
L028-Walidad T02 To EE, RWD,Works 10 Arwal Kaler 0.611 22.85 2.22 0.503 350 Cold Mix Sikandarpur Dhawai (VR5) Division, Arwal Technology Panelled Cement BR-38R- Concrete
T02-NH98 To Prabhu Tola Via EE, RWD,Works 11 Arwal Kaler 1.249 46.63 5.39 1.043 351 Cold Mix Shivpur (TRACK35) Division, Arwal Technology Panelled Cement BR-38R- Concrete
L024-Kamata L025 To EE, RWD,Works 12 Arwal Kaler 0.952 33.96 2.68 0.735 352 Cold Mix Khusdihara (TRACK23) Division, Arwal Technology Panelled Cement BR-38R- Concrete
L068-Sakri To Guli Bigha EE, RWD,Works 13 Arwal Kaler 0.594 24.24 2.17 0.530 353 Cold Mix (TRACK37) Division, Arwal Technology Panelled Cement BR-38R- Concrete
L031-Imamganj Nahar T02 To EE, RWD,Works 14 Arwal Kaler 0.875 34.03 1.74 0.717 354 Cold Mix Rupaich (TRACK5) Division, Arwal Technology Panelled Cement BR-38R- Concrete
L024-Karpi Barahmile Road, EE, RWD,Works 15 Arwal Karpi 1.303 46.75 5.05 1.039 355 Cold Mix T03 To Salarpur (TRACK8) Division, Arwal Technology Panelled Cement BR-38R- Concrete
L027-Sikariya T02 to Tali EE, RWD,Works 16 Arwal Kurtha 0.814 26.78 3.06 0.598 356 Cold Mix (TRACK10) Division, Arwal Technology Panelled Cement BR-38R- Concrete
L052-Pinjrawan to Manepaker EE, RWD,Works 17 Arwal Kurtha 1.238 51.71 5.64 1.150 357 Cold Mix (TRACK40) Division, Arwal Technology BR-38R- L042-Mirzapur Dakra L043, EE, RWD,Works 18 Arwal Kurtha -- 3.25 179.16 11.72 3.827 358 To Dhamaul (TRACK26) Division, Arwal BR-04R- L039-T01 To Dargahpur EE, RWD,Works 19 Begusarai Bacchwara -- 1.23 49.62 2.93 1.054 239 (VR39) Division, Teghara EE, RWD,Works BR-12R- 20 Gaya Banke Bazar Waste Plastics L053-L046 to Sondha (VR53) 3.172 149.14 12.38 3.238 Division, 978 Imamganj EE, RWD,Works BR-17R- Panelled Cement L054-MAJHWARIYA TO 21 Khagaria Alauli 2.41 140.05 7.5 2.958 Division, 153 Concrete KULWARI (TRACK41) Khagaria EE, RWD,Works Muzaffarp BR-23R- L044-L067 Kalyanpur to Division, 22 Aurai -- 1.9 96.72 13.41 2.208 ur 444 AdampurNisf (VR21) Muzaffarpur East- 2 EE, RWD,Works Muzaffarp BR-23R- Division, 23 Aurai Fly Ash Subgrade L052-T06 To Rasulpur (VR29) 1.5 69.04 11.6 1.617 ur 445 Muzaffarpur East- 2 EE, RWD,Works Muzaffarp BR-23R- Division, 24 Aurai -- L043-L067 to Narhar (VR20) 1.8 79.22 11.51 1.819 ur 446 Muzaffarpur East- 2 EE, RWD,Works Muzaffarp BR-23R- L078-PMSGY Road Nunu Division, 25 Aurai -- 1.158 56.78 8.93 1.317 ur 447 House To Jonky Khurd (VR44) Muzaffarpur East- 2 EE, RWD,Works Muzaffarp BR-23R- Division, 26 Aurai -- L045-T06 to Atraha (VR22) 1.312 79.16 5.7 1.701 ur 448 Muzaffarpur East- 2 EE, RWD,Works Muzaffarp BR-23R- L084-PMGSY To Berauna Division, 27 Aurai -- 1.2 62.31 7.38 1.397 ur 449 Musahri Tola (VR65) Muzaffarpur East- 2 EE, RWD,Works Muzaffarp BR-23R- L082-Block Chowk To Division, 28 Aurai -- 0.818 45.55 6.58 1.045 ur 450 Halimpur (VR58) Muzaffarpur East- 2 EE, RWD,Works Muzaffarp BR-23R- L047-L046 to Tarajiwar Division, 29 Aurai -- 1.1 56.96 6 1.262 ur 451 (VR24) Muzaffarpur East- 2 EE, RWD,Works Muzaffarp BR-23R- T03-Pindauli PWD Rd to Division, 30 Katra -- 3.85 223.78 24.8 4.984 ur 452 Budhkara (ODR4) Muzaffarpur East- 2 EE, RWD,Works Muzaffarp BR-23R- L025-T02 to Azrakwe Division, 31 Katra -- 3.42 170.49 23.24 3.884 ur 453 Lakhanpur (VR10) Muzaffarpur East- 2 EE, RWD,Works Muzaffarp BR-23R- T01-Bagani To Lakhanpur Division, 32 Katra -- 2.124 130.02 17.13 2.950 ur 454 Road (ODR1) Muzaffarpur East- 2 EE, RWD,Works L021-Ghosaut Bajar To Muzaffarp BR-23R- Division, 33 Minapur -- Ghosaut Brahman Tola east 0.6 33.04 3.51 0.733 ur 455 Muzaffarpur East- (VR69) 2 EE, RWD,Works Muzaffarp BR-23R- L084-T08 To Hazratpur Division, 34 Minapur -- 2.413 142.42 14.62 3.149 ur 456 (VR63) Muzaffarpur East- 2 EE, RWD,Works L091-T02 PWD NH77 To Muzaffarp BR-23R- Division, 35 Minapur -- Raghai Primary Health Centre 0.509 26.5 3.95 0.611 ur 457 Muzaffarpur East- (VR16) 2 EE, RWD,Works Muzaffarp BR-23R- L045-T02 Khanejadpur To Division, 36 Minapur -- 1.926 108.74 12.32 2.427 ur 458 Dheria (VR24) Muzaffarpur East- 2 EE, RWD,Works L026-T01Banghara PWD Road Muzaffarp BR-23R- Division, 37 Minapur -- To Mantoli Harkamansahi 2.08 91.48 15.88 2.153 ur 459 Muzaffarpur East- (VR7) 2 L106-L025 Dharampur EE, RWD,Works Muzaffarp BR-23R- Banghara PWD Road To Division, 38 Minapur -- 0.745 43.01 5.74 0.977 ur 460 Brahman Tola Harka Khutauna Muzaffarpur East- (VR6) 2 EE, RWD,Works Muzaffarp BR-23R- L034-T02 Belsand PWD Road Division, 39 Minapur -- 1.65 90.3 11.22 2.035 ur 461 To Sulemanpur (ODR4) Muzaffarpur East- 2 EE, RWD,Works Muzaffarp BR-23R- L068-Lo41 to Baugra Nizat 40 Sahebganj -- 2.991 148.17 23.83 3.449 Division, ur 464 (VR43) Muzaffarpur West L104-PMGSY Road Babu BR-33R- EE, RWD,Works 41 Sitamarhi Bajpatti -- Narha House of Kishori Mallik 3.4 138.15 1.37 2.797 631 Division, Pupari to Garhiya (VR76) Panelled Cement EE, RWD,Works BR-35R- Concrete
42 Supaul Chhatapur L051-T03 To Karhara (VR18) 2.15 93.06 13.03 2.127 Division, 155 Cold Mix Triveniganj Technology Panelled Cement EE, RWD,Works BR-35R- Concrete
L022-Ghiwha P.W.D Road To 43 Supaul Chhatapur 7.875 369.42 45.21 8.313 Division, 157 Cold Mix Brahman Tola (VR11) Triveniganj Technology Panelled Cement EE, RWD,Works BR-35R- Concrete
L047-Jadia Mehta To Mandal 44 Supaul Triveniganj 3.94 174.18 23.94 3.972 Division, 177 Cold Mix Tola (ODR22) Triveniganj Technology Panelled Cement EE, RWD,Works BR-35R- Concrete
L054-Babhangawan Middile 45 Supaul Triveniganj 3.73 160.19 22.01 3.653 Division, 178 Cold Mix Scholl To Bela (ODR29) Triveniganj Technology Panelled Cement EE, RWD,Works BR-35R- Concrete
L050-T04 To Yadav Tola 46 Supaul Triveniganj 1.225 52.66 6.02 1.177 Division, 180 Cold Mix (ODR25) Triveniganj Technology Panelled Cement EE, RWD,Works BR-35R- Concrete
L053-T01 To Koriapatti Yadav 47 Supaul Triveniganj 2.79 121.49 14.56 2.728 Division, 181 Cold Mix Tola (ODR28) Triveniganj Technology L061-PWD ROAD T05 BR-10R- POKHRAM TO BHAINI EE, RWD,Works 48 Darbhanga Biraul Bridge 91.36 278.54 5.78 5.701 372 BHAYA BELGAU SARDI Division, Biraul (VR18)HIGH LEVEL L048-T05 BALHA TO BR-10R- EE, RWD,Works 49 Darbhanga Biraul Bridge NAVDEGA (VR16)HIGH 33.68 147.53 3.83 3.035 373 Division, Biraul LEVEL BR-10R- L047-T01 TO KHAISA EE, RWD,Works 50 Darbhanga Kiratpur Bridge 33.68 129.78 3.42 2.671 374 (VR31)HIGH LEVEL Division, Biraul BR-10R- L025-T01 TO KIRATHPUR EE, RWD,Works 51 Darbhanga Kiratpur Bridge 45.68 204.12 4.84 4.190 375 (VR6)HIGH LEVEL Division, Biraul BR-10R- L035-T01 TO BHUBHAUL EE, RWD,Works 52 Darbhanga Kiratpur Bridge 68.52 238.08 4.78 4.869 376 (VR16)HIGH LEVEL Division, Biraul BR-10R- L040-TETARI TO KUBAUL EE, RWD,Works 53 Darbhanga Kiratpur Bridge 68.52 245.04 5.12 5.016 377 (VR24)HIGH LEVEL Division, Biraul BR-10R- L029-L028 TO PAKARIA EE, RWD,Works 54 Darbhanga Kiratpur Bridge 68.52 240.63 5.05 4.926 378 (VR10)HIGH LEVEL Division, Biraul Kusheshwar BR-10R- L030-T03 TO SISAUNA EE, RWD,Works 55 Darbhanga Bridge 33.68 122.63 3.7 2.533 Sthan East 379 (VR12)HIFH LEVEL Division, Biraul L044-L048 to Lutua EE, RWD,Works BR-12R- 56 Gaya Banke Bazar Bridge (VR44)RCC T Girder Bridge 65.14 228.24 2.75 4.631 Division, 979 over Nalla Imamganj EE, RWD,Works BR-12R- Maigra to ChonhaRCC Voided 57 Gaya Dumaria Bridge 70.88 327.82 2.36 6.620 Division, 983 Slab Bridge over Morha River Imamganj L051-L024 Dhauri Village to EE, RWD,Works BR-22R- Shambhuganj Dhauri Division, 58 Munger Tetia Bamber Bridge 19.07 151.46 13.96 3.317 164 (TRACK51)Bridge on Dadha Kharagpur- River Tarapur T01-Rakar more to Lohan.. EE, RWD,Works BR-31R- 59 Shekhpura Chewara Bridge part-4.. from kewali (VR2)LSB 17.95 59.51 0.5 1.203 Division, 092 near Lutaut village Shekhpura T01-Rakar more to Lohan.. part-4.. from kewali EE, RWD,Works BR-31R- 60 Shekhpura Chewara Bridge (VR2)Bridge on Kewali to 22.2 67.07 0.61 1.357 Division, 094 Lohan Road on Nati River near Shekhpura Chhtiyara Village EE, RWD,Works BR-31R- L024-T01 To Maheshpur 61 Shekhpura Chewara Bridge 17.95 58.55 0.97 1.193 Division, 095 (VR24)Bridge over nati River Shekhpura T01-T 01 Bhadaus more sirari EE, RWD,Works Ghat BR-31R- 62 Shekhpura Bridge Mehsar koyla baoghat Road 27.6 79.57 1.55 1.626 Division, Kusumbha 096 (TRACK16)Kanuhari soti Shekhpura

T01-T 01 Bhadaus more sirari EE, RWD,Works Ghat BR-31R- 63 Shekhpura Bridge Mehsar koyla baoghat Road 16.8 60.13 0.82 1.222 Division, Kusumbha 097 (TRACK16)at khanda-02 Shekhpura

T01-T 01 Bhadaus more sirari EE, RWD,Works Ghat BR-31R- 64 Shekhpura Bridge Mehsar koyla baoghat Road 33 107.83 1.13 2.185 Division, Kusumbha 098 (TRACK16)At Khanda -03 Shekhpura

BR-04R- L023 - NH-28 To Temahuan EE, RWD,Works 65 Begusarai Bacchwara Bridge 96.8 530.82 13 10.904 240 (VR23)Chiwanr Division,Teghara Ramdiri Ramnagar REO Rd to EE, RWD,Works BR-04R- 66 Begusarai Matihani Bridge Mahaji BhawanandpurMahaji 106.16 771.95 6.68 15.612 Division,Begusara 244 Pul i Meskur - NarauliHL Bridge BR-25R- Over Tilaiya river at EE, RWD,Works 67 Nawada Meskaur Bridge 251.68 906.43 13 18.435 661 Rankajalalpur to Narauli road Division,Rajauli under Sirdala Block SIHIN - SAIDPUR BR-25R- PAKARIAHL Bridge over 1054.4 EE, RWD,Works 68 Nawada Nardiganj Bridge 185.78 6.9 21.280 663 Tilaiya River at Sihin To 6 Division,Nawada saidpur Pakariya Road Nadirganj - IchuakarmaHL BR-25R- Bridge at Nardiganj to EE, RWD,Works 69 Nawada Nardiganj Bridge 132.7 786.15 5.61 15.875 664 Ichuakarma road at Nardiganj Division,Nawada Block Berauta - HazidhawHL Bridge BR-25R- over Dhanarjay River at EE, RWD,Works 70 Nawada Narhat Bridge 79.62 533.17 4.36 10.777 666 Berauta to Dulambigha Road at Division,Rajauli Narhat block Berrie - FatehpurHL Bridge BR-25R- over Dhanarjay river at Berrie - EE, RWD,Works 71 Nawada Sirdala Bridge 159.24 930.65 7.8 18.816 674 Fatehpur to Taran Road at Division,Rajauli Sirdala block L055-Sahangawn To Tiyarpur (VR55)RCC Bride over BR-27R- Perman River L055- EE, RWD,Works 72 Purnea Amaur Bridge 98.04 670.74 8.33 13.615 484 Sahangawn To Tiyarpur Division,Baisi (VR55) at Gangeli Ghat near Km 1.00 L046-L045 to Salha chandan Samastipu BR-33R- 1046.1 EE, RWD,Works 73 Bithan Bridge (TRACK46)Rcc Bridge At 159.24 8.04 21.137 r 661 7 Division,Rosera Phuhiya ghat EE, RWD,Works Aurangaba BR-02R- Panelled Cement 74 Aurangabad L104-T04 To Tenduadan 0.75 42.32 0.14 0.851 Division,Auranga d 696 Concrete bad Mechinical EE, RWD,Works Aurangaba BR-02R- Stabilization 75 Deo L107-L107-L076 To Manjhouli 0.8 40.57 1.35 0.840 Division,Auranga d 698
Panelled bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 76 Deo L109-L109-T09 To Kurahabar 1.9 80.3 7.23 1.755 Division,Auranga d 699
Panelled bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 77 Deo L111-L111-L043 To Anjaniya 0.75 43.95 1.72 0.916 Division,Auranga d 700
Panelled bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 78 Deo L113-T05 To Amarbigha 1.2 57.31 3.83 1.226 Division,Auranga d 701
Panelled bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 79 Deo L115-L035 To Ledhabigha 3.1 136.66 9.5 2.931 Division,Auranga d 702
Panelled bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 80 Deo L105-L097 To Padmanbigha 1.6 79.55 6.12 1.718 Division,Auranga d 703
Panelled bad Cement Concrete Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization L100-L100- L052 To 81 Deo 1.85 94.68 7.62 2.051 Division,Auranga d 704
Panelled Mahurama bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 82 Deo L095-T02 To Choukna 1.5 76.12 4.37 1.614 Division,Auranga d 705
Panelled bad Cement Concrete

Mechnical L111-L111-T03 T0 Baliya EE, RWD,Works Aurangaba BR-02R- stabilization 83 Kutumba PMGSY ROAD TO 3.7 230.88 13.3 4.896 Division,Auranga d 706
Panelled SONBARSHA bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization L112-AMBA NABINAGAR 84 Kutumba 0.9 47.9 2.87 1.018 Division,Auranga d 707
Panelled ROAD TO RAMPUR bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 85 Madanpur L161-L161-T03 to Eraki Kala 1.5 77.59 5.68 1.670 Division,Auranga d 708
Panelled bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 86 Madanpur L159-L159-L112 to Loharsi 1.8 92.98 6.04 1.985 Division,Auranga d 709
Panelled bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 87 Madanpur L158-L158-L048 To Wajidpur 1.1 61.53 3.16 1.297 Division,Auranga d 710
Panelled bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 88 Madanpur L157-L157-L021 to Sugri 1.5 84.93 5.66 1.816 Division,Auranga d 711
Panelled bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 89 Madanpur L156-L156-L043 to Belwa 1.85 85.32 7.7 1.865 Division,Auranga d 712
Panelled bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 90 Madanpur L154-L154-T04 to Baju Bigha 1.4 75.48 4.07 1.595 Division,Auranga d 713
Panelled bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 91 Madanpur L152-L152-L052 to Gongra 1.3 66.7 1.93 1.376 Division,Auranga d 714
Panelled bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 92 Madanpur L147-L147-T04 to Chauthaiya 0.7 32.55 1.47 0.682 Division,Auranga d 715
Panelled bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 93 Madanpur L145-L145-T06 to Juthi Bigha 0.75 41.36 1.42 0.858 Division,Auranga d 716
Panelled bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization L144-L144-T04 to Bhuiya 94 Madanpur 3 148.62 10.46 3.190 Division,Auranga d 717
Panelled Bigha bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization L140-L140-L106 Chotki 95 Madanpur 0.9 49.98 2.71 1.056 Division,Auranga d 718
Panelled Chechani toGurmidih bad Cement Concrete Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization L139-L139-L041 to Chiraiya 96 Madanpur 2.6 143.13 9.22 3.055 Division,Auranga d 719
Panelled (Murgadha) bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization L147-L147-L061 Maigra At 97 Nabinagar 2 109.74 7.68 2.354 Division,Auranga d 720
Panelled Bara road to Amadih via Simari bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization L197-L197-L081 Ghuja Pipra 98 Nabinagar 1.45 79.66 4.51 1.688 Division,Auranga d 721
Panelled road to Anjania bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization 99 Nabinagar L157-L157-L101 to Barai khap 1.5 91.83 6.73 1.976 Division,Auranga d 722
Panelled bad Cement Concrete

Mechnical L193-L193-T04 Barun EE, RWD,Works Aurangaba BR-02R- stabilization 100 Nabinagar Nabinagar road to Darua via 3 175.78 8.82 3.701 Division,Auranga d 723
Panelled Gamhariay bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization L188-L188-T03 Nabinagar 101 Nabinagar 1.5 83.09 6.23 1.791 Division,Auranga d 724
Panelled Tandwa road Ghura Sagar bad Cement Concrete

Mechnical L150-L150-T04 Barun EE, RWD,Works Aurangaba BR-02R- stabilization 102 Nabinagar Nabinagar road Near Harkhu 4.5 251.83 17 5.390 Division,Auranga d 725
Panelled Bigha to Rampur bad Cement Concrete

Mechnical EE, RWD,Works Aurangaba BR-02R- stabilization L155-L155-L021 Jaipur 103 Nabinagar 2.65 145.7 10.28 3.127 Division,Auranga d 726
Panelled PMGSY road to Saharsha bad Cement Concrete

Mechnical L170-L170-L034 Itwa Salaiya EE, RWD,Works Aurangaba BR-02R- stabilization 104 Nabinagar road to Saya (Bariyawan 1.3 71.29 2.92 1.488 Division,Auranga d 727
Panelled Panchayat) bad Cement Concrete EE, RWD,Works BR-07R- Panelled Cement L041-L 048 to Utarbadi 105 Bhojpur Jagdishpur 1.1 59.63 4.21 1.280 Division,Jagdishp 315 Concrete (VR41) ur BR-08R- L049-Chakki Bagen Path to EE, RWD,Works 106 Buxar Chakki Waste Plastics 1.6 77.48 10.68 1.768 244 Jawahi Panchayat (VR49) Division,Dumraon L082-DEHRI PATH TO BR-08R- EE, RWD,Works 107 Buxar Chausa Waste Plastics DEHRI HARIJAN TOLA 1.5 70.79 8.1 1.582 245 Division,Buxar (VR82) BR-08R- L042-Koran Sarai Narayanpur EE, RWD,Works 108 Buxar Dumraon Waste Plastics 1.85 93.55 6.59 2.008 246 to Bairia (LO42) Division,Dumraon L035-SARENJA NARAYANPUR BASAON BR-08R- EE, RWD,Works 109 Buxar Itarhi Waste Plastics KALA ROAD TO BARKA 0.9 45.21 4.82 1.003 247 Division,Buxar GAON YADAV TOLA (VR35) L054-BUXAR DHANSOI BR-08R- EE, RWD,Works 110 Buxar Itarhi Waste Plastics ROAD TO KARANJUWA 1.5 70.82 8.13 1.583 248 Division,Buxar (L54) BR-08R- L071-Selempur To Mukundpur EE, RWD,Works 111 Buxar Nawanagar Waste Plastics 1.65 88.26 7 1.910 249 (VR71) Division,Dumraon Chapra(Sa BR-09R- L025-Kesarpur to Kuraia Road EE, RWD,Works 112 Dighwara -- 4.205 207.98 10.21 4.375 ran) 458 (VR7) Division,Sonpur

Panelled Cement EE, RWD,Works BR-12R- L032-JAYAGIR ROAD 113 Gaya Barachatti Concrete
2.125 106.51 9.99 2.336 Division,Sherghat 990 TOTERBAARA (VR59) Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- L034-T01 TO 114 Gaya Barachatti Concrete
1.775 93.94 8.34 2.051 Division,Sherghat 992 TILAYAKALAN (VR17) Waste Plastics i Panelled Cement EE, RWD,Works BR-12R- L056-Bighi to Manphar 115 Gaya Barachatti Concrete
2.107 110.66 8.4 2.387 Division,Sherghat 993 (VR15) Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- L021-L022 TO BARWADIH 116 Gaya Barachatti Concrete
2.375 141.58 10.15 3.042 Division,Sherghat 994 (VR3) Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- 117 Gaya Dobhi Concrete
L074-LO29 TO WARI (VR49) 1.009 57.31 3.22 1.214 Division,Sherghat 995 Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- L049-L027 TO TETARIA 118 Gaya Dobhi Concrete
1.238 57.51 5.93 1.272 Division,Sherghat 996 KALAN (VR25) Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- 119 Gaya Dumaria Concrete
L045-T02 to Rabdi (VR45) 6.935 434.07 31.45 9.334 Division,Imamgan 997 Waste Plastics j

Panelled Cement EE, RWD,Works BR-12R- L025-L068 TO LIKIKHAP 120 Gaya Gurua Concrete
2.38 129.2 10.26 2.796 Division,Sherghat 998 (VR5) Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- L116-L037 TO 121 Gaya Gurua Concrete
0.86 45.15 4.01 0.986 Division,Sherghat 999 BALJORIBIGHA (VR85) Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- L118-L036 TO 122 Gaya Gurua Concrete
0.854 44.18 3.6 0.958 Division,Sherghat 1000 SHUKULKHAP (VR87) Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- 123 Gaya Gurua Concrete
L122-L057 TO SITACHUAN 1.022 62.95 4.52 1.353 Division,Sherghat 1001 Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- L124-L068 TO SHIVPUR 124 Gaya Gurua Concrete
1.861 98.34 7.92 2.131 Division,Sherghat 1002 KUTIYA Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- 125 Gaya Gurua Concrete
L128-NH TO RAHMAN DIH 1.149 62.87 3.02 1.321 Division,Sherghat 1003 Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- L129-L100 TO CHATAK 126 Gaya Gurua Concrete
0.896 49.37 3.92 1.068 Division,Sherghat 1004 BIGHA Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- L131-L046 TO GANERI 127 Gaya Gurua Concrete
1.611 87.94 6.82 1.900 Division,Sherghat 1005 BIGHA VIA TULABIGHA Waste Plastics i

Panelled Cement BR-12R- EE, RWD,Works 128 Gaya Konch Concrete
L119- T04 to Dhannu Bigha 1.72 90.47 6.83 1.951 1006 Division,Tikari Waste Plastics

Panelled Cement EE, RWD,Works BR-12R- L027-L035 HAMZAPUR TO 129 Gaya Mohanpur Concrete
3.382 200.97 16.44 4.359 Division,Sherghat 1007 NAWADIH (VR6) Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- L065-T02 TO KHARGPUR 130 Gaya Mohanpur Concrete
0.85 44.06 4.18 0.967 Division,Sherghat 1008 (VR41) Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- L070-L055 TO DOMAN 131 Gaya Mohanpur Concrete
1.261 64.62 5.15 1.399 Division,Sherghat 1009 BIGHA (VR51) Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- L074-L035 TO DHAMANA 132 Gaya Mohanpur Concrete
0.812 40.6 3.2 0.878 Division,Sherghat 1010 (VR55) Waste Plastics i EE, RWD,Works BR-12R- L076-T02 TO 133 Gaya Mohanpur Waste Plastics 0.797 59.06 4.15 1.267 Division,Sherghat 1011 KHALARACHAK (VR57) i Panelled Cement EE, RWD,Works BR-12R- L080-Lakhaipur to Jai Nagar 134 Gaya Mohanpur Concrete
2.024 89.84 9.11 1.984 Division,Sherghat 1012 (VR61) Waste Plastics i

Panelled Cement EE, RWD,Works BR-12R- 135 Gaya Mohanpur Concrete
L104-L084 TO BELA 1.651 76.1 6.84 1.663 Division,Sherghat 1013 Waste Plastics i Panelled Cement EE, RWD,Works BR-12R- L066-L026 TO HEMADIH 136 Gaya Mohanpur Concrete
3.212 189.6 14.37 4.090 Division,Sherghat 1014 (VR47) Waste Plastics i Panelled Cement EE, RWD,Works BR-12R- L044-T01 TO 137 Gaya Mohanpur Concrete
2.519 123.61 11.54 2.710 Division,Sherghat 1015 SUDHAGORAIL (VR23) Waste Plastics i Panelled Cement EE, RWD,Works BR-12R- L075-L026 TO GAJUKURHA 138 Gaya Mohanpur Concrete
2.519 117.18 11.17 2.573 Division,Sherghat 1016 (VR56) Waste Plastics i Panelled Cement EE, RWD,Works BR-12R- L072-TO3 TO TETARIYA 139 Gaya Mohanpur Concrete
3.974 172.74 16.84 3.801 Division,Sherghat 1017 (VR53) Waste Plastics i Panelled Cement EE, RWD,Works BR-12R- L064-L028 AMARAHA 140 Gaya Mohanpur Concrete
2 100.07 9.05 2.188 Division,Sherghat 1018 (VR40) Waste Plastics i

Mechnical L088-PWD KACHANA BR-25R- stabilization EE, RWD,Works 141 Nawada Kauakol KAWAKOL ROAD TO 3.1 170.33 9.04 3.596 675
Panelled Division,Nawada WARA (TRACK61) Cement Concrete L094-SIRDALA HISUA BR-25R- Panelled Cement EE, RWD,Works 142 Nawada Sirdala PATH TO CHONUBIGHA 0.527 23.18 1.4 0.493 676 Concrete Division,Rajauli (ODR94) BR-34R- L065-T02 to Papaur EE, RWD,Works 143 Siwan Panchrukhi -- 2.4 120.75 6.17 2.545 423 (TRACK14) Division,Siwan-1 BR-34R- L072-Harnathpur To Harijan EE, RWD,Works 144 Siwan Raghunathpur -- 1.8 78.23 2.68 1.622 424 Tola harnathpur (TRACK29) Division,Siwan-1 West EE, RWD,Works BR-37R- Panelled Cement L029-Khairatola to santpatti 145 Champara Bhitaha 2.183 143.07 8.4 3.037 Division,- 642 Concrete (VR13) n 2 West BR-37R- Panelled Cement L141-Thawaiya To Shikoiya EE, RWD,Works 146 Champara Manjhaulia 4.312 253.39 15.95 5.400 643 Concrete (TRACK141) Division, n West L072-Machargawn Pitch Road BR-37R- Panelled Cement EE, RWD,Works 147 Champara Nautan to Parsauni Village 2.053 113.54 6.76 2.412 644 Concrete Division,Bettiah n (TRACK72) West BR-37R- L055-Sansaria to Baroria Tola EE, RWD,Works 148 Champara Nautan -- 2.491 138.57 8.37 2.946 645 (TRACK55) Division,Bettiah n West EE, RWD,Works BR-37R- L051-PMGSY santpur harijan 149 Champara Ramnagar -- 1.827 119.45 6.74 2.530 Division,Bagaha- 646 tola to Tarkulwa (VR96) n 1 L033-BIZULIYA TO EE, RWD,Works BR-10R- BANDUHALI, SIMRA TOLA 150 Darbhanga Baheri Bridge 18.84 125.6 2.36 2.566 Division,Darbhan 388 (VR33) BIZULIYA to ga-1 BANDUHALI, SIMRA TOLA L032-T04 TO KHOTAHI BR-10R- EE, RWD,Works 151 Darbhanga Biraul Bridge (VR32) T04 TO TO 33.68 221.83 5.12 4.550 389 Division,Biraul KHOTAHI AT CH -5100 M L032-T04 TO KHOTAHI BR-10R- EE, RWD,Works 152 Darbhanga Biraul Bridge (VR32) T04 TO KHOTAHI 18.84 130.27 2.99 2.672 390 Division,Biraul AT Ch. 3600 M T02-DHOBOLIYA TO Kusheshwar BR-10R- TILAKPUR (ODR2) T01 PWD EE, RWD,Works 153 Darbhanga Bridge 18.84 139.24 3.4 2.860 Sthan East 391 BHADHAR TO NADIYAMI Division,Biraul ROAD At CH-1+225 Kusheshwar BR-10R- L031-T03 TO ADALPUR EE, RWD,Works 154 Darbhanga Bridge 33.68 186.06 5.04 3.832 Sthan East 392 (VR13) T03 TO ADALPUR Division,Biraul L028-Jatwa Link Road No 23 East BR-11R- to Janerwa (VR4) Jatwa se EE, RWD,Works 155 Champara Banjaria Bridge 51.12 270.48 3.11 5.485 705 Janerwa Path me CH- 7400 per Division,Motihari n Ledihar ke Paas Pul Ka Nirman Jatwa Link Route No. 23 - Janerwa (59) RCC BRIDGE East BR-11R- OVER KOHINIMA RIVER EE, RWD,Works 156 Champara Banjaria Bridge 51.12 242.85 2.75 4.924 706 AT CH 3200 M IN JATWA Division,Motihari n LINK ROAD NO 23 TO JANERWA Jatwa Link Route No. 23 - East Janerwa (59) Jatwa se Janerwa BR-11R- EE, RWD,Works 157 Champara Banjaria Bridge Path me 3500 CH per 35.12 210.52 2.82 4.277 707 Division,Motihari n Chakardahwa Nahar me Pul ka Nirman L028-Jatwa Link Road No 23 East to Janerwa (VR4) Construction BR-11R- EE, RWD,Works 158 Champara Banjaria Bridge of rcc Box Culvert (3 x 6 x 3.5) 20 89.54 1.76 1.831 708 Division,Motihari n in Jatwa Link Road no 23 To janerwa at Ch 0.5 km L022-Motihari Chaurodano Pirauli road to Jhitkahiya East BR-11R- (VR8) RCC Bridge over EE, RWD,Works 159 Champara Motihari Bridge 70.2 414.1 4.13 8.386 709 Tilawe River in Motihari Division,Motihari n Chhauradano pirauli road - Jhitkahian (021) L057-Dhekha Bela Watjung To East Hathiyahee (VR13) BR-11R- EE, RWD,Works 160 Champara Pipra Kothi Bridge Construction of RCC Bridge 70.2 413.79 4.13 8.379 710 Division,Motihari n Over Dhanouti River near Bela Refuge Colony L040-Belwatiya To Shayampur East BR-11R- 6 to 13 K.M (VR10) Belwatiya EE, RWD,Works 161 Champara Sugauli Bridge 43.6 174.52 2.37 3.547 711 Shyampur Path me Petrol Division,Motihari n Pump ke pas Pul Nirman L038-Balbatia Shayampur East Belwatiya To Karamwa 0 to 6 BR-11R- EE, RWD,Works 162 Champara Sugauli Bridge (VR9) Belwatiya Shyampur 27.6 119.94 1.96 2.444 712 Division,Motihari n Path me Purab Pakdi Tree ke Pass Pul Nirman L035-Ledihar to Unwabrit East (VR28) CONSTRUCTION OF BR-11R- EE, RWD,Works 163 Champara Sugauli Bridge BRIDGE IN LEDIHAR TO 58.66 323.12 3.31 6.545 714 Division,Motihari n UNWA BRIT ROAD AT CHAINAGE 0.100 KM L040-Belwatiya To Shayampur 6 to 13 K.M (VR10) East BR-11R- BELWATIYA SHYAMPUR EE, RWD,Works 164 Champara Sugauli Bridge 27.6 115.77 1.64 2.354 715 PATH ME NAKARDEI Division,Motihari n CHOCK KE PAS PUL NIRMAN L070-Belwatiya to Shayampur 13 to 20 (VR40) BELWATIYA East BR-11R- SHYAMPUR PATH ME EE, RWD,Works 165 Champara Sugauli Bridge 35.12 221.06 3.41 4.501 716 SHAMPUR BARWA Division,Motihari n MUSHAR TOLI KE PAS PUL NIRMAN BR-16R- T05-UCHLA TO PIPRA EE, RWD,Works 166 Katihar Barari Bridge 57.27 277.59 4.67 5.659 370 (VR127) Bero Dhar Division,Katihar BR-16R- L083-L081 to Dhenua (VR83) EE, RWD,Works 167 Katihar Barari Bridge 34.18 213.76 2.44 4.335 371 Distributary of Kosi Division,Katihar L038-HASANGANJ TO BR-16R- EE, RWD,Works 168 Katihar Hasanganj Bridge DUSAI PATH PART 1 (VR38) 45.68 217.97 4.36 4.458 372 Division,Katihar Branch of Kamla L051-LALIYAHI CHOWK BR-16R- EE, RWD,Works 169 Katihar Korha Bridge TO PEKHA (TRACK51) 114.2 428.41 7.47 8.739 373 Division,Katihar Distributary of Kari Kosi L050-NH 31 TO AZAMABAD BR-16R- PATH UPTO BHAGALPUR EE, RWD,Works 170 Katihar Kursela Bridge 42.18 242.78 3.39 4.936 374 BOARDER (VR50) Kalwalia Division,Katihar Dhar L044-BANKATA TO Madhuban BR-21R- EE, RWD,Works 171 Benipatti Bridge KARHARA (VR44) Betauna 56.52 220.01 4.7 4.505 i 680 Division,Benipatti Bridge L074-PARJUAR TO Madhuban BR-21R- EE, RWD,Works 172 Benipatti Bridge MAHRAJPUR (TRACK74) 19.6 77.95 2.84 1.620 i 681 Division,Benipatti MAHARAJPUR BRIDGE L038-BISFI TO SINGHIYA Madhuban BR-21R- EE, RWD,Works 173 Bisfi Bridge (TRACK38) BISFI TO 62.52 249.37 5.03 5.101 i 682 Division,Benipatti SINGHIYA AT CH. 1.075 KM

L038-BISFI TO SINGHIYA Madhuban BR-21R- EE, RWD,Works 174 Bisfi Bridge (TRACK38) BISFI TO 45.68 201.75 3.27 4.111 i 684 Division,Benipatti SINGHIYA AT CH. 5.000 KM

L038-BISFI TO SINGHIYA Madhuban BR-21R- EE, RWD,Works 175 Bisfi Bridge (TRACK38) BISFI TO 83.36 321.3 4.31 6.528 i 685 Division,Benipatti SINGHIYA AT CH. 1.050 KM L050-T02 TO BHAGWATI Madhuban BR-21R- (TRACK50) T02 TO EE, RWD,Works 176 Bisfi Bridge 19.6 74.81 1.98 1.540 i 686 BHAGWATI (BHAGAUTI Division,Benipatti BRIDGE) L050-T02 TO BHAGWATI Madhuban BR-21R- (TRACK50) T02 TO EE, RWD,Works 177 Bisfi Bridge 19.6 76.05 2.17 1.568 i 687 BHAGWATI (NOORCHAK Division,Benipatti BRIDGE) Madhuban BR-21R- L029-L030 TO SUKHWASI EE, RWD,Works 178 Harlakhi Bridge 33.68 223.4 4.47 4.569 i 688 (TRACK29) Lalapipal Bridge Division,Benipatti Madhuban BR-21R- L035-AWARI TO ANDOULI EE, RWD,Works 179 Madhwapur Bridge 74.84 344.02 2.24 6.943 i 689 (VR35) Andauli Bridge Division,Benipatti Madhuban BR-21R- L034-L033 TO SUJATPUR EE, RWD,Works 180 Madhwapur Bridge 56.14 295.02 2.81 5.971 i 690 (VR34) Sujatpur Rato Bridge Division,Benipatti Madhuban BR-21R- L034-L033 TO SUJATPUR EE, RWD,Works 181 Madhwapur Bridge 19.6 80.5 2.57 1.666 i 691 (VR34) AT PARRI Division,Benipatti L055-Ratwara To Jajuwar EE, RWD,Works Muzaffarp BR-23R- (VR48) Construction of 182 Aurai Bridge 34.22 175.18 4.82 3.609 Division,Muzaffar ur 466 2x17.11 mt RCC Bridge at pur East-2 L025 T03 to Ratwara Road L071-Raiber To Prasadpur BR-27R- (VR71) RCC Bridge Over EE, RWD,Works 183 Purnea Baisa Bridge 51.12 266.58 3.88 5.423 491 Fuleswari Dhar in 1st km of Division,Baisi Raiber To Prasadpur (VR71) N.H.-31 Chariya to Marwa Road RCC BOX Culvert Over BR-27R- EE, RWD,Works 184 Purnea Baisi Bridge Perman River near Marwa at 27.6 126.79 2.49 2.592 492 Division,Baisi 1st km in NH31 Chiraiya to Marhwa (VR3) L093-N H 30 TO DHARKANDHA (ODR66) EE, RWD,Works BR-28R- 185 Rohtas Dinara Bridge Construction of RCC Brigde 45.68 221.57 7.05 4.584 Division,Bikramg 583 over Kachan River at ch. 3100 anj mtrs L028-PWD Road Pipra T01 to West EE, RWD,Works BR-37R- Raybari (VR8) Pipra 186 Champara Bgaha Bridge 50 255.6 1.67 5.158 Division,Bagaha- 648 T01 to raybari mahuawa (over n 1 khaiti river) at ch West L029-Khairatola to santpatti EE, RWD,Works BR-37R- 187 Champara Bhitaha Bridge (VR13) Bridge in River Nala in 52.28 247.55 1.59 4.995 Division,Bagaha- 649 n khaira tola Santpatti Road 2 West L141-Thawaiya To Shikoiya BR-37R- EE, RWD,Works 188 Champara Manjhaulia Bridge (TRACK141) Thawaiya to 58.7 237.81 1.6 4.800 650 Division,Bettiah n shikoiiya West L037-T05 Chamua to Madraul EE, RWD,Works BR-37R- 189 Champara Bridge (VR37) Camuna - Madraul on 136.86 478.93 3.99 9.683 Division,Narkatia 651 n River Balour ganj L055-PWD Road Sosha West EE, RWD,Works BR-37R- (VR36) Mathia se harpur ke 190 Champara Ramnagar Bridge 50.18 258.16 2.11 5.218 Division,Bagaha- 652 bich dhonghi nadi per HL n 1 bridge West L024-Kataha T04 to Jamira EE, RWD,Works BR-37R- 191 Champara Sidhaw Bridge (VR4) Kanta to jamira at ch 60 260.75 2.16 5.271 Division,Bagaha- 653 n 7872 m 1 West L024-Kataha T04 to Jamira EE, RWD,Works BR-37R- 192 Champara Sidhaw Bridge (VR4) Kanta to jamira at ch 45 246.42 1.53 4.971 Division,Bagaha- 654 n 1400 m 1 West L041-Harnatand to Bairiya kala EE, RWD,Works BR-37R- 193 Champara Sidhaw Bridge (VR21) Harnatar to Bairiya 25 186.84 1.48 3.776 Division,Bagaha- 656 n kala at ch 1650 m 1 West L036-Sidhaw T02 to Amwa EE, RWD,Works BR-37R- 194 Champara Sidhaw Bridge (VR16) Sidhaw to Amwa at ch 54 284.34 1.98 5.741 Division,Bagaha- 657 n 4400 m 1 L044-Rampurwa Balmikinagar West EE, RWD,Works BR-37R- Road T01 to Parsauni (VR24) 195 Champara Sidhaw Bridge 74.84 308.75 2.26 6.236 Division,Bagaha- 658 Parsauni to rampur n 1 valmikinagar road at ch 2300 m West L039-Naurangiya to Songarwa EE, RWD,Works BR-37R- 196 Champara Sidhaw Bridge (VR19) Songadhwa to 50 267.93 2.66 5.425 Division,Bagaha- 659 n Naurangiya at ch 4500 m 1 West L026-Chutaha T04 to Kadmaha EE, RWD,Works BR-37R- 197 Champara Sidhaw Bridge (VR6) Chutaha to Kadmaha at 45 260.76 2.04 5.269 Division,Bagaha- 660 n ch 4700 m 1 West L037-Laukariya T02 to EE, RWD,Works BR-37R- 198 Champara Sidhaw Bridge Khajuriya (VR17) Laukariya to 40 233.27 1.52 4.708 Division,Bagaha- 661 n Khajuriya at ch 2400 m 1 West L024-Kataha T04 to Jamira EE, RWD,Works BR-37R- 199 Champara Sidhaw Bridge (VR4) Kanta to Jamira Ch 3500 50.14 267.06 2.04 5.395 Division,Bagaha- 662 n m 1 L030-Harpur Tola to Puraina West EE, RWD,Works BR-37R- (VR10) High Level RCC 200 Champara Thakrahan Bridge 37.44 206.28 1.53 4.167 Division,Bagaha- 663 Bridge in Harpur tola to n 2 puraina Road at ch 0.65 L030-Harpur Tola to Puraina West EE, RWD,Works BR-37R- (VR10) High Level RCC 201 Champara Thakrahan Bridge 33.44 197.43 1.46 3.988 Division,Bagaha- 664 Bridge in Harpur tola to n 2 puraina Road at ch 2.46 KM L030-Harpur Tola to Puraina West EE, RWD,Works BR-37R- (VR10) High Level RCC 202 Champara Thakrahan Bridge 33.44 193.38 1.42 3.906 Division,Bagaha- 665 Bridge in Harpur tola to n 2 puraina Road at ch 4.5 KM L030-Harpur Tola to Puraina West EE, RWD,Works BR-37R- (VR10) High Level RCC 203 Champara Thakrahan Bridge 56.14 255.98 2.22 5.177 Division,Bagaha- 666 Bridge in Harpur tola to n 2 puraina Road at ch 8700 West L030-Bettiah Nawalpur Road BR-37R- EE, RWD,Works 204 Champara Yogapatti Bridge to Kewlapur (TRACK30) 33.48 191.02 1.46 3.859 667 Division,Bettiah n Bettiah Nawalpur to kawalapur L027-Nawgawa to Madarpur West BR-37R- (TRACK27) 2700 M EE, RWD,Works 205 Champara Yogapatti Bridge 24.78 179.52 1.33 3.626 668 inYogapatti Block Office to Division,Bettiah n Madarpur Path L027-Nawgawa to Madarpur West BR-37R- (TRACK27) 3200 M EE, RWD,Works 206 Champara Yogapatti Bridge 37.48 194.73 1.55 3.935 669 inYogapatti Block Office to Division,Bettiah n Madarpur Path L027-Nawgawa to Madarpur West BR-37R- (TRACK27) Gandak Dhar of EE, RWD,Works 207 Champara Yogapatti Bridge 24.78 170.06 1.33 3.436 670 3400M in Yogapatti Block Division,Bettiah n Office to Madarpur Path L027-Nawgawa to Madarpur West BR-37R- (TRACK27) Gandak Dhar of EE, RWD,Works 208 Champara Yogapatti Bridge 37.48 194.08 1.55 3.922 671 4200 M in Yogapatti Block Division,Bettiah n Office to Madarpur Path EE, RWD,Works Kishangan BR-18R- L064-L061 to Pakamolna 209 Pothia -- 1.275 96.03 6.384 2.06 Divisio, j 207 (TRACK64) Kishanganj-2

Date and Time for Downloading of Bidding Documents : From 04.06.2018 (09:00) to 12.06.2018 (12:00) Last date and Time of Online Bid Submission including Scanned copy of Bid Security, cost of Bid Document (Rs.10,000.00 for Bids costing more than Rs. 50 lakh and Rs. 5000 for Rs. 50 lakh to Rs. 15 lakh ) from a Scheduled Commercial Bank and scanned copy of Affidavits. : 12.06.2018 up to 15:00 Hours Last date and Time for Submission of document in hard copy (original documents such as Bid Security, Cost of Bid document and Affidavits) : 15.06.2018 up to 15:00 Hours Online Bid Opening Date and Time : 15.06.2018 at 15:30 Hours Place, date and time of Pre-Bid Meeting:- Office of Respective Works Circle , RWD : 01.06.2018 from 11:00AM hours All documents submitted by the bidder with affidavit shall be considered in technical bid evaluation but after award all the documents shall be duly verified. Details of tender related information can be viewed/ downloaded from the website http://pmgsytendersbih.gov.in. Interested Bidders will have to register with their DSC (Digital Signature Certificate) in the web site http://pmgsytendersbih.gov.in .

Engineer-in-Chief, Rural Works Department, Bihar, Patna

SECTION 1

1 The Bidder may submit bids for any number of the work Packages. Bidders are advised to note the minimum qualification criteria specified in Clause 4 of the Instructions to bidders to qualify for the award of the contract and also inspect the site before bidding. 2 Time allowed for completion of each package is 12 months, including rainy season. 3 If the size of the package is greater than 10 Crore then Construction / Time of completion shall be enhanced from 12 Months to 18 Months. 4 The bids shall remain valid for acceptance for a period of 90(ninety) days from the last date of submission of bids. Bids once submitted cannot be withdrawn. If any bidder/tenderer withdraws his bid/ tender before the said period or makes any modifications in the terms and conditions of the bid, the said earnest money shall stand forfeited. 5 A set of bidding documents will be available online on website http://pmgsytendersbih.gov.in. Cost of bid document as per the amount specified in the Appendix to ITB non-refundable will be deposited in the form of demand draft of any schedule bank in favour of the Executive Engineer mentioned in column 11 of the table corresponding to the respective package. 6 Bids must be submitted on-line on website http://pmgsytendersbih.gov.in 7 Bids submitted on-line must be accompanied with scanned copy of Demand Draft of bid cost per package as part of Contractor’s documents. 8 Instrument of Bid Security (as specified in the bidding document) of the amount specified for the work in the table shall be valid for 45 days beyond the validity of the bid. Scanned copy of the instrument of this affidavit shall be submitted on-line as part of Contractor’s documents. 9 Each bidder is required to furnish an affidavit giving information on prescribed Performa Section-3 Qualification Information of the Bidders required for evaluation of the bidding capacity of the bidder. Scanned cop of this affidavit shall be submitted on-line as part of Contractor’s document. 10 Affidavit (as detailed in point 9 above) along with Original Demand Draft of Cost of Bid Document in the form of DD and Bid Security shall be placed in an envelope and must be submitted at the office of Secretary, Bihar Rural Roads Development Agency (BRRDA), Patna or to respective Executive Engineer office as mentioned in NIT either by registered post or by hand before the opening date of the Bid strictly observing the following conditions:- a) Contractor’s WILL NOT WRITE THEIR NAMES OR THEIR FIRM’S NAME on this envelope. b) When the contractor submits his bid on-line, he will get an acknowledgement of submitted bid. The number mentioned on this acknowledgement only will be mentioned on the envelope containing original affidavit, DD for Bid cost and earnest money. This is essential to maintain the confidentiality of bidder. c) A copy of acknowledgement slip will be put inside this envelope to ensure proper identification of the bidder. 11 The date and time of opening of the financial bid shall be notified on website http://pmgsytendersbih.gov.in. This is conveyed to the bidder automatically through an e-mail message. The Financial bids shall be opened accordingly on-line on the same website http://pmgsytendersbih.gov.in at the office of Secretary, Bihar Rural Roads Development Agency (BRRDA), Patna by the designated officers. All communication with the bidder will be done through e-mail message. 12 A bidder not be permitted to bid for works in the Circle responsible for awarded an execution of contracts in which his or his spouse’s near relatives (defined as first blood relations, and their spouses) is posted as Divisional Accountant or as an officer in any capacity between the grades of Superintending Engineer and Junior Engineer(both inclusive) 13 No Engineer of Gazetted rank or other gazetted officer employed in Engineering or Administrative duties in an Engineering Department of the State/Central Government is allowed to work as a Contractor for a period of two years after his retirement from Government service, without Government permission. This contract is liable to be cancelled if either the Contractor or any of his employees is found to be such a person who had not obtained the permission of the Government as aforesaid before submission of the tender or engagement in the Contractor’s service. 14 Bid documents and other details consisting of qualification information and eligibility criterion of bidders, plans, specifications, drawings, the schedule of quantities of the various classes of work to be done and the set of terms & conditions of contract to be compiled with by the contractor can be seen in the office of the Executive Engineer mentioned in column 9 of the table corresponding to the respective package. All these documents can be downloaded from the website http://pmgsytendersbih.gov.in directly. 15 In evaluation of bidder’s experience, the work done as Sub-contractor shall also be considered. 16 Other details can be seen in the bidding documents. 17 Qualified bidders have to be registered with RWD (if not already registered) before signing of agreement. 18 The undersigned has right to extend or cancel the tender without assigning any reason. nonsivee circular (letter no. 2046 ( 19 All Documents Submitted by the Bidders with affidavit shall be considered in technical bid evaluation but after award all the documents shall be duly verified.

Engineer-in-Chief Rural Works Department Bihar, Patna