Abbreviation Meaning Abbreviation Meaning Abbreviation Meaning

°C Celsius (degree) Bd. or Bnd. Bond or Bonded Col. Column µ Micro Bdr. Border Com. Commercial or Common 2-L Two-Lane BE Buried Electric COMM Committee or By Committee 2L1W Two-Lane One-Way Beg. Begin Comp. Composite 2L2W Two-Lane Two-Way Bit. Bituminous Con. Connect or Connection ------A ------Bk. Back Conc. Concrete A Area or Amperes BL or ? Base Line Const. Construct or Construction AAA American Automobile Association BLC Base Line Control Cont. Continuation AADT Annual Average Daily Traffic Bldg. Building Contr. Contractor AASHO American Association Of State Highway Officials Blkhd. Bulkhead Contrl. Controller AASHTO American Association Of State Highway And BLON Begin Length Of Need Coord. Coordinate Transportation Officials Blvd. Boulevard Cor. Corner ABC Asphalt Base Course BM Bench Mark Corr. Corrugated Abd. Abandoned Bndry. Boundary Cov. Cover ABS Acrylonitrite-Butadiene-Styrene Pipe BO Basin Outlet CP Concrete Pipe AC or Asph. Conc. Asphaltic Concrete BOS Beginning Of Survey CPE Corrugated Polyethylene Pipe AC, Ac. Acre Bot. Bottom CPT Cone Penetration Test Accel. Acceleration BP Borrow Pit CR Control Radius or County Road ACI American Concrete Institute Bq. Becquerel CRA Clear Recovery Area Act. Actuated Br. Bridge Crs. or Cse. Course ADA Americans With Disabilities Act, The Brg. Bearing CS Curve To Spiral Adh. Adhesive Brkwy. Breakaway CSIP Cost Savings Initiative Proposal Adj. Adjust BT Buried Telephone Cable or Duct CSL Cross-hole Sonic Logging ADT Average Daily Traffic Btfly. Butterfly CSP Corrugated Steel Pipe AFAD Automated Flagger Assistance Device Btwn., B/W Between CT Clear Trunk Agg. Aggregate BW Barbed Wire, Bottom Width or Both Ways Ctlvr. Cantilever Ah. Ahead ------C ------CTPB Cement Treated Permeable Base AISC American Institute Of Steel Construction C Cantilever Length, Cut, Colorless, Coulomb Ctr., Ctrs. Center AISI American Iron and Steel Institute or Cycle Length CU or Cu Copper Alt. Alternate C & G Curb And Gutter Cu. Yd., CY, or C.Y. Cubic Yard Alum., Al. Aluminum C.C. Crash Cushion Culv. Culvert AM 12:00 Midnight Until 11:59 Noon C.I.P., C-I-P Cast In Place Cwt. Hundredweight ANSI American National Standards Institute CA Coarse Aggregate Cyl. Cylindrical AOS Apparent Opening Size CAP Corrugated Aluminum Pipe ------D ------APL Approved Products List Cap. Capacity D Degree Of Curvature, Depth, Appl. Applied, Application Caps. Capital Letters Density, Distance, Diameter Apprh. Approach CASP Corrugated Aluminized Steel Pipe or Directional Distribution Approx. Approximate CATV Cable Television D, Dia. or Ø Diameter ARTBA American Road & Transportation Builders CB Catch Basin DA Drainage Area or Deflection Angle Association CBC Concrete Box Culvert DBH Diameter At Breast Height Artf. Artificial CBS Concrete Box Structure DBI Ditch Bottom Inlet Asph. Asphalt CC, C/C or C to C Center to Center Dbl. Double Assem. Assembly CCEW Center to Center Each Way DCS Degree Of Curvature (Spiral) Assn. Association CCTV Closed-Circuit Television DD Dry Density Assoc. Associate, Association cd Candela DDHV Directional Design Hour Traffic ASTM American Society For Testing And Materials CD Cross Drain, Cross Direction (Geotextiles) Decel. Deceleration ATPB Asphalt Treated Permeable Base Cem. Cement or Cemetery Deg. Degree Attn. Attention Cem'd. Cemented Delin. Delineators Attnuatr. Attenuator CF, C.F. Cubic Foot Demobl. Demobilization Aux. or Auxil. Auxiliary CFR Code of Federal Regulations Dept. Department Ave. Avenue CFS Cubic Feet Per Second Det. Detour, Detection, Detectable AWG American Wire Gauge Ch. Channel DFE Design Flood Elevation AWS American Welding Society Chchg. Channel Change DGN or Dgn. Design Az Azimuth Chg. Changeable DHV Design Hourly Volume ------B ------CI Cast Iron DHW Design High Water B to B Back to Back CIP Cast Iron Pipe DHWE Design High Water Elevation B/C, B.C. Back Of Curb circ. Circumference DI Drop Inlet Basc. Bascule CJP Complete Joint Penetration weld Dim. Dimension BC Bottle Cap or Bolt Circle Ckt. Circuit Disp. Disposal BCCMP Bituminous Coated Corrugated Metal Pipe CL, C/L or ¡ Center Line Culvert Dist. Distance M

P Cl. or Clear Clearance BCPA Bituminous Coated Pipe Arch Culvert DLS District Location Surveyor 56

: CM Concrete Monument BCPCMP Bituminous Coated And Paved Corrugated Metal DMM Domestic Mail Manual 46 : Pipe Culvert CMB Concrete Median Barrier DOT Department Of Transportation 12 BCPPA CMP Corrugated Metal Pipe DPI or D.P.I. Ditch Point Intersection Bituminous Coated And Paved Pipe Arch Culvert CMPA Corrugated Metal Pipe Arch DR Design Review BCT Breakaway Cable Terminal CO Clean Out Dr. Drain, Drive

2015 BCWE Base Clearance Water Elevation Co. County or Company / Driv. Driven 30 / 6

LAST DESCRIPTION: INDEX SHEET ON

I 2016 REVISION NO. NO. S

I STANDARD ABBREVIATIONS 07/01/15 V DESIGN STANDARDS E 001 1of 4 R Abbreviation Meaning Abbreviation Meaning Abbreviation Meaning

Drwy. Driveway FOC Fiber Optics Cable Incl. or Inc. Included DS Design Speed FPID Financial Project Identification Number Ind. Industry or Industrial DSL Design Service Life FPM or fpm Feet Per Minute Install. Installed DT Ditch FPS or fps Feet Per Second Int. Interior DTOE District Traffic Operations Engineer FR or Fr. Frame Intchg. or Ichg. Interchange Dwg. Drawing Frang. Frangible Inter. Intermediate ------E ------Freq. Frequency Inv. Invert E East or External Distance FS Far Side IP Iron Pipe e Superelevation rate Ft. Foot or Feet IR Iron Rod E to E End to End FTB Floating Turbidity Barrier Isect. Intersection E.P. or EOP Edge Of Pavement FTBA Florida Transportation Builder Association Isl. Island EA or Ea. Each FTP Florida Traffic Plans ITE Institute Of Transportation Engineers EB Eastbound Furn. Furnish ITS Intelligent Transportation Systems ED Each Day ------G ------J ------EIA Electronic Industries Alliance G Giga, Gauss or Shear Modulus J Joule El. or Elev. Elevation g Gram or Gravity JB Junction Box Elast. Elastomeric Ga. Gauge or Gage Jct. Junction Elec. Electric Ga. or Gal. Gallon Jt. Joint Ellip. Elliptical Galv. Galvanized ------K ------Embed. Embedment Gar. Garage K Design Hour Factor Embk. Embankment GD Gutter Drain K Kelvin Emul. Emulsified GFI Ground Fault Interrupter k Kilo (prefix) Encl. Enclosure GIP Galvanized Iron Pipe kg Kilogram Engr. Engineer GM Gas Main kg/m Kilogram Per Meter EOS End Of Survey or Equivalent Opening Size GP Grade Point kg/m? Kilogram Per Cubic Meter EPDM Ethylene Propylene Diene Monomer Gr. Grade, Guardrail or Grate kg/m? Kilogram Per Square Meter Eq. Equation or Equal Gr. or Gro. Gross Kilo One Thousand Equip. Equipment Gr. Wt. or gr. wt. Gross Weight Kip 1000 Pounds Esmt. Easement GRC Galvanized Rigid Steel Conduit km Kilometer Est. Establish or Established Grd. Ground km/h Kilometer Per Hour Est. or Estm. Estimate GRI Geosynthetic Research Institute kN Kilonewton Etc. or etc. Et Cetera (And So Forth) gross km Gross Kilometer kn Knot ETP Electronic Tough Pitch Gttr. Gutter kPa Kilopascal EW Endwall ------H ------ksi Kips Per Square Ex. Except, Example h Hecto kV Kilovolt Exc. or Excav. Excavation H Henry kVA Kilovolt Ampere Exist. Existing H.S., HS High Strength kWh Kilowatt-hour Exp. Expansion ha Hectare ------L ------Ext. Extension HAR Highway Advisory Radio L Length, Length Of Curve, Liter, Left Exwy. Expressway HB Hay Bales or Taper Length, Buffer Length ------F ------HC Horizontal Clearance or Taper Length plus Buffer Space F Fill, Farad HD High Density or Heavy Duty L/W Lightweight F & I Furnish & Install Hd. Head LA or L/A Limited Access F or Final Final Quantity HDPE High Density Polyethylene Lat. Lateral or Latitude F to F Face to Face Hdwl. Headwall lb Pound(s) F.L., FL or ¥ Flow Line HH Heavy Hex lb/sy Pounds Per Square Yard F.S. Florida Statutes Hndrl. Handrail lbf Pound force FA Federal Aid or Fine Aggregate HOA Hand/Off/Automatic LBR Lime rock Bearing Ratio FAC Florida Administrative Code Horiz. or Hor. Horizontal LC Long Chord FAP Federal Aid Project HOT High Occupancy Tolls LCD Longitudinal Channelizing Device FBT Florida Bulb Tee HOV High Occupancy Vehicle LEO Law Enforcement With Flashing FC Friction Course HP High Pressure or Horsepower Lights And FD French Drain Hr. Hour LF Linear Foot (Feet) Fdn. Foundation Hse. House LFD Load Factor Design FDOT Florida Department Of Transportation HSHV High Strength Horizontal Vertical Lgth. Length FE Floor Elevation Ht. Height Lin. Linear Fed. Federal HW or H.W. High Water or Hot Water LM Lane Fert. Fertilizer Hwy. Highway lm Lumen FES Flared End Section Hyd. Hydraulic Lmrk. Lime rock FETS Flared End Terminal Section Hz Hertz Loc. Location M

P FH Fire Hydrant ------I ------Long. Longitude

56 : FHWA Federal Highway Administration I External Angle (Delta), Interstate LOS Limit Of Clear Sight 46 : FIB Florida I Beam ID, I.D. Inside Diameter or Identification LRFD Load Resistance Factor Design 12 Fig. Figure IES Illuminating Engineering Society LRS Low-Relaxation Fin. Finish IMC Intermediate Metal Conduit LS Length Of Spiral FL, Fl. or Fla. Florida in. Inch(es) LS Lump Sum

2015 Inc. Incorporated or Including

/ Flex. Flexible LT Left Turn 30

/ FNQ Fuse (Type Slow Burn) 6

LAST DESCRIPTION: INDEX SHEET ON

I 2016 REVISION NO. NO. S

I STANDARD ABBREVIATIONS 07/01/15 V DESIGN STANDARDS E 001 2 of 4 R Abbreviation Meaning Abbreviation Meaning Abbreviation Meaning Lt. Left POST Point On Semi-Tangent Ltd. Lighted or Limited NCHRP National Cooperative Highway Research POT Point On Tangent Program LU, Lum. Luminaire PP Power Pole NDCBU Neighborhood Delivery And Collection Box lx Lux PPB Pier Protection Barrier Unit ------M ------PPP Polypropylene pipe NE Northeast M Mass, Middle Ordinate Length or Mega Pr. Pair NEMA National Electrical Manufacturers m Meter or Milli Association PRC Point Of Reverse Curvature m? Meter Square net km Net Kilometer Prcst. Precast m/s Meters Per Second NGS National Geodetic Survey Prest. Prestressed m3 Meter Cubed or Cubic Meter NGVD National Geodetic Vertical Datum of 1929 PRM Permanent Reference Monument m3/m Meter Cubed Per Meter NHS National Highway System Prob. Probability Mach. Machine NHW Normal High Water Prod. Product, Production, Producer or Produced Maint. Maintenance NIC Not In Contract Prog. Program or Progression MAS Motorist Awareness System NJ New Jersey Proj. Project or Projection MASH Manual for Assessing Safety NM Net Mile Prop. Proposed Hardware (AASHTO) Nm Newton Meter Prov. Provisions Matl. Material No. Number PRS Portable Regulatory Sign Max. Maximum Nom. Nominal PS & E Plans, Specifications And Estimates MB Median Barrier Norm. Normal PSF or psf Pounds Per Square Foot MBM Thousand (Feet) Board Measure NPS Nominal Pipe Size PSI or psi Pounds Per Square Inch MD Machine Direction (Geotextiles) NPT National Pipe Thread PSU Prestressed Slab Unit Med. Median NRCP Non-Reinforced Concrete Pipe PT Point Of Tangency or Pressure Treated Mega One Million NRTL Nationally Recognized Testing Laboratory PTFE Polytetrafluoroethylene Memb. Member NS Non Stress, Not Suitable or Near Side PVC Polyvinyl Chloride MES Mitered End Section NT, N&T Non Traffic, Nail & Tin PW Pressure Water Mess. Message NTS Not To Scale ------Q ------Mfg. Manufactured or Manufacturer Q Peak Discharge or Flow Volume NW Northwest ------R ------MG 1000 Gallons ------O ------R or Rad. Radius MH, M.H. Manhole or Mounting Height O to O, o to o or O.O. Out to Out R or Rng. Range MHW Mean High Water O.B.G. Optional Base Group R, Rt. Right Mi. Mile OA Overall r/s Revolution Per Second Micro One-Millionth OC or O.C. On Center R/W, ROW Right Of Way Mid. Middle OD or O.D. Outside Diameter rad Radian Mil One-Thousandth Of An Inch OE Overhead Electric rad/s Radian Per Second Mil. Military OH, OHD or Ohd. Overhead RBAC Rock Base Asphaltic Concrete Milli One-Thousandth Opass Overpass RBST Rock Base Surface Treatment Min. Minimum or Minute Opt. Option, Optional or Optically RC Reverse Crown Misc. Miscellaneous OT Overhead Telephone RCP Reinforced Concrete Pipe mL Milliliter Oz. Ounce MLW Mean Low Water ------P ------RCPA Reinforced Concrete Pipe Arch mm Millimeter P Passenger Car & Light Delivery Truck Rd. Road or Round Mobl. Mobilization P or Plan Plan Quantity Rdsd. Roadside Mod. Modify or Modified Pa Pascal Rdwy. Roadway Mol Mole Pa·s Pascal Second Rec. Recovery Mon. Monument Par. Parallel Rect. Reticuline or Rectangular MOT Maintenance Of Traffic Part. Participation or Partition Ref. Reference MOTC Maintenance Of Traffic Committee Pavt. Pavement Refl. Reflective MP Mile Post PC Point Of Curvature Reg. Region, Regular, Registered or Regulation MPa Megapascal PCBC Precast Concrete Box Culvert Reinf. Reinforced or Reinforcing MPH or mph Per Hour PCC Point Of Curvature or Plain Rejuv. Rejuvenation MSL Mean Sea Level Cement Concrete Reloc. Relocated Mtd. Mounted PCE Permanent Construction Easement Rem. Removal MUTCD Manual On Uniform Traffic Control Devices PCF, pcf Pounds per Cubic Foot Repl. Replace MUTS Manual On Uniform Traffic Studies PCMS Portable Changeable Message Sign Req. or Reqd. Required ------N ------P.E. or PE Professional Engineer Res. Residence or Residential N North or Newton Ped Pedestrian or Pedestal RGS Rigid Galvanized Steel N & C Nail & Cap Pen. Penetration RHW Insulation (Moisture & Heat Resistant Rubber) N & D Nail & Disk PG Profile Grade RM Reference Monument N.P. Non Plastic PGL Profile Grade Line RP Reference Point N/m Newtons Per Meter pH Measure Of Acidity or Alkalinity RPM Raised Reflective Pavement Markers M

P N/m? Newtons Per Cubic Meter Ph. Phase rpm or r/min Revolution Per Minute

57 : N/m? Newtons Per Square Meter PI Point Of Intersection RR Railroad 46 : N/mm? Newtons Per Square Millimeter Pkg. Parking RSDU Radar Speed Display Unit 12 NA or N/A Not Available or Not Applicable Pkwy. Parkway Rsf. Resurface NAVD National American Vertical Datum PL or ¢ Property Line or Plate RU Rack Unit NB Northbound PM 12:00 Noon Until 11:59 Midnight RX Receive

2015 POC Point On Curve

/ NC National Coarse or Normal Crown 30 / 6

LAST DESCRIPTION: INDEX SHEET ON

I 2016 REVISION NO. NO. S

I STANDARD ABBREVIATIONS 07/01/15 V DESIGN STANDARDS E 001 3 of 4 R Abbreviation Meaning Abbreviation Meaning Abbreviation Meaning ------S ------T ------W ------S or s Speed, South, Siemens, Or Second t Metric Ton W Width, Wide, West or Watt SAHM Sand-Asphalt Hot Mix T Tangent, Length Of Curve, Percent Trucks, Tesla W.P.I. Work Program Item San. Sanitary T, TWP or Twp. Township W/C Water-Cement Ratio tan. Tangent SB Southbound WB Westbound TBM Temporary Bench Mark SBAC Shell Base Asphaltic Concrete Wb. Weber TC Tangent To Curve SBRM Sand Bituminous Road Mix WB40 Semi Trailer, Intermediate TCB Temporary Concrete Barrier SBST Shell Base Surface Treatment TCE Temporary Construction Easement WB50 Semi Trailer, Large SC Seal Coat TCP Terra Cotta Pipe WB62 Semi Trailer, Interstate SC Spiral To Curve TCP Traffic Control Plan(s) WB67D Semi Trailer, Tandem Sch. Schedule TCZ Traffic Control Zone WM Water Main SCST Sand-Clay Surface Treatment TDLC Transportation Design For Livable Communities WT Water Table Or Weight SD Side Drain, Storm Drain Tel. Telephone WWF Welded Wire Fabric SD Storm Drain Temp. Temperature or Temporary WWR Welded Wire Reinforcing SE Southeast Theo. Theoretical ------X ------Sec. Second THRMPLSTC Thermoplastic X Coordinate Value (East-West Direction) or Sect. Section THW or THWN Insulation (Flame Retardant, Moisture And Heat Extra Sed. Sediment Resistant Thermoplastic) X Rd. Cross Road Sep. Separator Tk Truck Xing. Crossing Seq. Sequential Tk or Thick. Thickness Xsec. Cross Section Serv. Service ------TMA Truck/Trailer Mounted Attenuator Y SF Adjustment Factor In Percent, Silt Fence Y Coordinate Value (North-South Direction) Tn. Ton SG Specific Gravity Yd. Yard Traf. Traffic SG, Subgr. Subgrade Yr. Year Trans. Transition, Transverse, Translate or Transportation Sh. or Sht. Sheet Ω Ohm Treat. Treatment Shldr. Shoulder TS Tangent To Spiral SHW Seasonal High Water TSC Length Of Tangent (Spiral Curve) SIP Stay In Place TTC Temporary Traffic Control SLEO Speed and Law Enforcement Officer TVSS Transient Voltage Surge Suppression SP Superpave TX Transmit Spa., Spcg. or Sp. Space(ing)(s) Typ. Typical Spec. Specification ------U ------SPT Standard Penetration Test UG Underground sq Square UL Underwriters Laboratories Sq. Ft., SF, or S.F. Square Foot Ult. Ultimate sq. in. Square Inch Ultd. Unlimited Sq. Yd., SY or S.Y. Square Yard Unddr. Underdrain(s) SR or S.R. State Road Undrdwy. Under roadway SRAP Spiral Rib Aluminum Pipe unld. Unloaded SRASP Spiral Rib Aluminized Steel Pipe Untr. Untreated SRCP Steel Reinforced Concrete Pipe Upass. Underpass SRD State Road Department UPS Uninterruptible Power Supply SRSP Spiral Rib Steel Pipe USC & GS US Coast and Geodetic Survey (now National Geodetic Survey) SS Sanitary Sewer, Stainless Steel USGS US Geological Survey SSMD Solid State Modular Design USPS United States Postal Service ST Surface Treatment or Spiral To Tangent Util. Utilities St. or ST. Street UV Ultraviolet Sta. Station ------V ------Stab. Stability or Stabilization V Volt, Velocity, Volume or Hourly Volume STB Staked Turbidity Barrier Var. Varies, Variable or Variance Std. Standard VC Vertical Curve Stg. Strong VCP Vitrified Clay Pipe Stge. Storage Veh. Vehicle Stl. Steel Vert. Vertical Str. Structure VF Vertical Foot Sty. Story Vh Verified Horizontal Location SU Single Unit Trucks Vol. Volume Sub. or Subs. Subsoil VP Vertical Panel Sub. or Subst. Substitute VPD or Vpd. Vehicles Per Day Suppts. Supports

M VPH or Vph. Vehicles Per Hour P Sur. Survey VPHPL or Vphpl. Vehicles Per Hour Per Lane 57 : Surf. Surface

46 VRMS Volts Root Mean Square :

12 Sv Sievert Vv Verified Vertical Elevation SW Southwest Vvh Verified Vertical Elevation And Horizontal Location SW or Swk. Sidewalk VW Variable Width Sym. Symmetrical 2015 / Sys. or Syst. System 30 / 6

LAST DESCRIPTION: INDEX SHEET ON

I 2016 REVISION NO. NO. S

I STANDARD ABBREVIATIONS 07/01/15 V DESIGN STANDARDS E 001 4 of 4 R 6 / 17 / 2015 7 : 33 : 09 A M 07/01/05

REVISION LAST FAP NFR FAS SFR FAU SPR FAI 00 00 00 00

R E V I S I ON P DESCRIPTION: Runways Landing AreaOrStrip Commercial OrMunicipalAirport Military Field Railroad Below Railroad Above Grade Crossing Railroad Station Abandoned Railroad Double TrackRailroad Railroad County Road State Highway US NumberedHighway Interstate Highway State ParkRoad State ForestRoad National ForestRoad Federal AidSecondaryHighway Federal AidPrimaryHighway Federal AidUrbanHighway Federal AidInterstateHighway Extension OfLocalRoadsWithinCities Streets InInsetOrDelimitedAreas Private Road Primitive Road Unimproved Road Graded AndDrainedRoad Soil, GravelOrShellSurfacedRoad Hard SurfacedRoad Divided Highway Proposed ControlledAccessHighway Highway Interchange Highway WithFrontageRoads Highway WithFullControlofAccess TF FF M 3 DESIGN STANDARDS Marsh OrSwamp Meandered Lake Intermittent Pond Lake, ReservoirOrPond Flood ControlStructure Dam WithRoad Dam OrSpillwayWithLock Dam Wide Stream Narrow Stream Intracoastal Waterway Canal OrDrainageDitch Toll Ferry Free Ferry Wildlife RefugeBoundary Reservation, ForestOrParkBoundary Delimited Area,PopulationEst. Corporate Limits College OrUniversityBoundary Military ReservationBoundary Location OfInsetBoundaryWithinMap Survey ByOthers State SurveySectionLine Land SectionLine Land GrantLine Extended TownshipLine Civil TownshipBoundary County BoundaryLine State BoundaryLine Tunnel Highway GradeSeparation Drawbridge Small BridgesCloselySpaced Highway Bridge Levee OrDikeWithRoad Levee OrDike Mangroves STANDARD SYMBOLSFORKEYMAP 2016 STANDARD SYMBOLS WP WP B

Governmental ResearchStation Mine OrStrip Fair Grounds,RaceCourseOrRodeoArena Toll House,PortOfEntryOrWeightStation Hospital, HealthCenterOrRestHome Church AndCemetery Cemetery Church School Post Office Scenic Site Recreational AreaOrHistoricSite Museum Boat Ramp Park WithBoatRamp Wayside ParkOrSmall Welcome Station Seminole IndianVillage Other CityOrVillage County Seat State Capital Lighthouse Residential AreaUnderDevelopment 1. symbols areused,legendsornotationsmayberequiredfor clarity. traffic controlsymbolsrefertoIndex600.Whenadditional orsimilar And Marking,Signalization,andLightingprojects.Forwork zone Symbols onthisIndexareintendedforuseallRoadway, Signing GENERAL NOTE WOOD DOT FM FS F J S I A Triangulation Station Locked GateOrFence Communications Facility Power Substation Power Plant Incinerator Sewage DisposalPlant Sanitary Fill Junkyard Armory Coast GuardStation Department ofTransportationFacility Correctional InstitutionOrRoadCamp Patrol OrPoliceStation Fire Station Lookout Tower Fire ControlHeadquarters Bird Sanctuary Game CheckingStation Game Preserve Farmers Market Agricultural InspectionStation 002

INDEX NO.

1 SHEET of NO. 4 6 / 17 / 2015 7 : 33 : 10 A M

07/01/13 REVISION See GeneralNotes, Sheet1 LAST TYP. B.M. NO.112 ALACHUA 18" SD 18" SD C. ± Ø ℅ ¬ � � � � T Y P E P AV ' T

R E V I S I ON WALK DESCRIPTION: Flow Line Round OrDiameter Approximate Delta Angle Property Line Rate OfSuperelevation Centerline Base Line Concrete Monument Piling PierColumn Crash Cushion Guardrail And Sidewalk Edges OfExistingPavement North Arrow Point OfIntersection Bench Mark Triangulation Station Survey ReferencePoint Without Dowels Transverse ContractionJoint Doweled TransverseContractionJoint Doweled TransverseExpansionJoint Keyed LongitudinalJoint Tied LongitudinalJoint Manhole Inlet Storm Drain(Existing) Storm Drain(Proposed) Pipe Culvert-OtherEndTreatments Pipe Culvert-MedianDrain Pipe Culvert-U-TypeEndwall Pipe Culvert-StraightEndwall Pipe Culvert-MiteredEndSection Bridge Box Culvert Fence (LimitedAccess) Railroad (DetailPlans) Railroad (DrainageMaps) Grant Line National OrStateParkForest Fence Line Limited AccessLine Easement Line Right-Of-Way Base OrSurveyLine City Line Section Line Township Line County Line State Line GENERAL SYMBOLS Rt. Lt. B P RES B S 12' MP 327 Skew Rt. Skew Lt. C L Wood Concrete And BarrelsOfConreteBoxCulverts Definition OfSkewForCrossDrains Grove OrOrchard Shrubbery Edge OfWoodedArea Trees Hedge Wetland Boundary(Existing) Wetland Boundary(Proposed) Marsh Shore Line Stream Staked TurbidityBarrier Floating TurbidityBarrier Sediment Barrier School Barn Residence Store Church Borrow Pit Mine OrQuarry Storage Tank(Underground) Storage Tank(Surface) Pump Island Gate Railroad Switch Railroad SignalWithGate Railroad MilePost Levee Water Well,Spring Curb AndGutter Curb STANDARD SYMBOLSFORPLANSHEETS DESIGN STANDARDS 2016 WATER WATER WATER C A ELEC B SAN D SAN COMM SAN WATER GAS GAS TEL ELEC GAS GAS SD EOI TH VALVE COVERUNKNOWN VALVE BOXSANITARYSEWER VALVE BOXWATER VALVE BOXGAS VALVE BOXUNKNOWN VALVE WATER VALVE SANITARYSEWER VALVE UNKNOWN VALVE GAS METER WATER METER GAS METER ELECTRIC METER UNKNOWN FIRE HYDRANT MANHOLE COVERWATER MANHOLE COVERTELEPHONE MANHOLE COVERSANITARYSEWER MANHOLE COVERGAS MANHOLE COVERELECTRIC MANHOLE COVERSTORMWATER MANHOLE COVERCABLETV MANHOLE COVERUNKNOWN QUALITY LEVELDELINEATIONCHANGE TEST HOLEQUALITYLEVELA END OFELECTRONICINFORMATION QUALITY LEVELD(VISUALONLYWILLNOTPLOT) QUALITY LEVELC(VISUALONLYWILLNOTPLOT) QUALITY LEVELB(VISUALONLYWILLNOTPLOT) QUALITY LEVELA(VISUALONLYWILLNOTPLOT) STANDARD SYMBOLS

UTILITY ADJUSTMENTSYMBOLS EXISTING BACK FLOW WATER S SAN GAS SAN GAS NPW GAUGES (DESCRIBED) WELL SPRINKLER WATER FAUCET PUMP STATIONSANITARYSEWER PUMP PETROLEUM/FUEL PUMP NONPETROLEUM SANITARY CLEANOUT SANITARY DUMPSTATION ELECTRICAL OUTLET TRANSFORMER POWER TELEPHONE BOOTH GAS REGULATOR SERVICE CABINETTELEPHONE SERVICE CABINETCABLETV GUY POLE GUY ANCHOR TELEPHONE POLE SHARED POLEWITHTRANSFORMER SHARED POLE POWER POLEWITHTRANSFORMER POWER POLE VENT SANITARYSEWER VENT GAS VENT UNKNOWN VALVE BACKFLOWPREVENTER VALVE COVERWATER VALVE COVERWATERNONPOTABLE VALVE COVERGAS VALVE COVERSANITARYSEWER PROPOSED 002 Transformer Light Pole Tower Guy PoleDeadman Guy WireAndAnchorPin Combination Pole Telephone Pole Power Pole Cable TVServiceBox Cleanout Sewage PumpStation Pump Station Vent (Type) Valve Cover(Type) Valve Box(Type) Valve (Type) Meter (Type) Fire Hydrant Manhole

INDEX NO. 2

SHEET of NO. 4 STANDARD SYMBOLS FOR PLAN SHEETS See General Notes, Sheet 1

UTILITY ADJUSTMENT SYMBOLS

EXISTING EXISTING PROPOSED

PETROLEUM (QLB) 2" OVERHEAD TELEPHONE 6" WATER MAIN

BURIED TELEPHONE (QLB) PETROLEUM (QLC) 6" NON POTABLE WATER BURIED TELEPHONE (QLC) PETROLEUM (QLD)

BURIED TELEPHONE (QLD) PIPE ENCASEMENT (QLB) 8" SANITARY SEWER

BURIED TELEPHONE DUCT (QLB) PIPE ENCASEMENT (QLC)

BURIED TELEPHONE DUCT (QLC) PIPE ENCASEMENT (QLD) 6" GAS

BURIED TELEPHONE DUCT (QLD) SANITARY SEWER (QLB) 4" ROOF DRAIN BURIED TELEPHONE TOLL (QLB) SANITARY SEWER (QLC)

BURIED TELEPHONE TOLL (QLC) SANITARY SEWER (QLD) 8" PETROLEUM

BURIED TELEPHONE TOLL (QLD) STEAM LINE (QLB) 12" STEAM 2" OVERHEAD CABLE TELEVISION STEAM LINE (QLC)

BURIED CABLE TELEVISION (QLB) STEAM LINE (QLD) 12" CASING BURIED CABLE TELEVISION (QLC) WATER LINE (QLB)

BURIED CABLE TELEVISION (QLD) WATER LINE (QLC) 4"x4" DUCT

CABLE TV CONDUIT SYSTEM (QLB) WATER LINE (QLD) (7.5 kV) BURIED ELECTRIC CABLE TV CONDUIT SYSTEM (QLC) 1" OVERHEAD FIBER OPTIC

BURIED FIBER OPTIC CABLE (QLB) CABLE TV CONDUIT SYSTEM (QLD) (7.5 kV) OVERHEAD ELECTRIC

BURIED CONDUIT (QLB) BURIED FIBER OPTIC CABLE (QLC)

BURIED CABLE TELEVISION BURIED CONDUIT (QLC) BURIED FIBER OPTIC CABLE (QLD) 3"

BURIED CONDUIT (QLD) NON-POTABLE WATER LINE (QLB) 2" OVERHEAD CABLE TELEVISION BURIED FIBER OPTIC POWER (QLB) NON-POTABLE WATER LINE (QLC)

BURIED FIBER OPTIC POWER (QLC) NON-POTABLE WATER LINE (QLD) 2" BURIED TELEPHONE

BURIED FIBER OPTIC POWER (QLD) (7.5 kV) OVERHEAD ELECTRIC 2" OVERHEAD TELEPHONE BURIED FIBER OPTIC TELEPHONE (QLB) BURIED POWER (QLB)

BURIED FIBER OPTIC TELEPHONE (QLC) BURIED POWER (QLC) 2" BURIED FIBER OPTIC BURIED FIBER OPTIC TELEPHONE (QLD) BURIED POWER (QLA)

GAS (QLB) SANITARY FORCE MAIN (QLB) 1" OVERHEAD FIBER OPTIC

GAS (QLC) SANITARY FORCE MAIN (QLC)

GAS (QLD) SANITARY FORCE MAIN (QLD) M P

49 : 02 : 5 2015 / 25 / 6

LAST DESCRIPTION: INDEX SHEET ON

I 2016 REVISION NO. NO. S

I STANDARD SYMBOLS 07/01/15 V DESIGN STANDARDS E 002 3 of 4 R 6 / 17 / 2015 7 : 33 : 12 A M

07/01/13 REVISION LAST EXISTING

R E V I S I ON DESCRIPTION: W -D FDW P 5 3 3 PROPOSED TRAFFIC SIGNALSSYMBOLS Signal Phase Pole TabulationCrossReference(JointUsePole) Pole TabulationCrossReference Messenger Wire Programmed SignalHead Signal Lens Signal FaceNumber Flashing DontWalk Walk -Dont Controller Cabinet(PoleMounted) Controller Cabinet(BaseMounted) Pedestrian SignalHead(PoleOrPedestalMounted) Pedestrian Detector Vehicle Detector(Points) Conduit Signal Cable(OnMessengerWire) Vehicle Detector(Loop) Traffic SignalPole(Concrete,Wood,Metal) Traffic SignalHead(MastArmMounted) Traffic SignalHead(PedestalMounted) Traffic SignalHead(SpanWireMounted) DESIGN STANDARDS STANDARD SYMBOLSFORPLANSHEETS EXISTING 2016 PROPOSED LIGHTING SYMBOLS Pendant HungUnderdeckLuminaire Pier CapUnderdeckLuminaire Joint UsePole Light DistributionPoint Lighting Pull-Box Rigid GalvanizedLightingConduitAndConductors PVC (PolyvinylChloride)LightingConduitAndConductors City OrUtilityOwnedLuminaire&Pole High MastLightingTower Final PositionOfRelocatedOrAdjustedPole&Luminaire Existing Pole&LuminaireToBeRemoved Pole &Luminaire STANDARD SYMBOLS

See GeneralNotes,Sheet1 SIGNING ANDPAVEMENTMARKINGSYMBOLS 700-83 13 Traffic FlowArrow Sign ItemNumber Sign Number Traffic Sign(Overhead) Traffic Sign(PostMounted) Stop Bar Skip Line Double SolidLine Single SolidLine Pavement Arrow 002

INDEX NO. 4

SHEET of NO. 4