WE CAN WE CREATE WE ARE REAL 21

Future-proof warehouse solutions in and The

Heylen Warehouses creates and invests in state-of-the-art logistic real estate. We develop, rent and manage future-proof warehouses, used by leading companies and brands. Our buildings reflect the success of our clients and provide a great place-to-work for their thousands of hardworking employees every day. By applying high quality standards and a long-term vision, we develop a promising future for the logistics industry in the Benelux.

www.heylenwarehouses.com AVAILABLE LOCATION: WEERT, THE NETHERLANDS LOGISTIC OPPORTUNITY

Logistic Mill 21 Campus Weert The Netherlands

www.heylenwarehouses.com Logistic Mill 21 Campus - Weert

Logistic Mill 21 Campus, Weert, is a unique logistic development Project located right off the highway A2-E25 in between and . Next to the Belgian border, Heylen Warehouses is building description a state of the art distribution campus. Logistic mill has a green court yart in between

Tenure: Freehold Site surface: 184.735 sqm. Total LFA: 121.785 sqm. Construction: to be determined Floor load: 50 kn/sqm. Floor flatness: DIN 18202 tabel 3, Zeile 4 Clear Height: 12,20 m Loading docks: 1 per 1000 sqm.

Location Weert Logistic Mill 21 Campus is centrally located right off exit 39 of the main highway A2/E35 providing easy access to each notable destination in the Netherlands and abroad.

Close to the borders, 4 barge terminals at 10 to 35 km and 2 rail terminals at 35 km give this location lots of possibilities.

Address: Ringbaan-Noord, Weert

- barge and rail terminals with a local terminal at 6km with frequent connections to the ports of Rotterdam and Antwerp. - several depots of larger parcel and freight carriers close by - 4 major integrator air freight hubs within 2 hours by road Rotterdam

Eindhoven imegen Logistic Mill 21 Campus National Park Weert De Biesbosch N275 s-Hertogenbosch nland port of Moerdi Kampershoek 2.0 1 km A2

Maastricht A15 reda A2 Ringbaan-Noord ilburg A50 6 min N311 A58 Ringbaan-Oost

N640 A73 indhoven A67 A12 enlo Centraal 50 min A2 N266 N275 A21 Weert A73 Antwerp N280 A523 N76 oermond

N73 N78

E313 Cologne/Bonn

en

Liege Logistic Mill 21 Campus - Weert

Layout plan

Belgium border (11 km)

Luchthaven Eindhoven (36 km) A2/E35 Weert CS (4 km) Bus (450 m) Logistic Mill Container terminal 21 Campus (5 km)

Ringbaan Noord

Total size: 184.735 sqm Warehouse: 115.021 sqm Mezzanine: 19.295 sqm Office: 6.764 sqm 10

7 9

6 8

3 5

2 4 1 Logistic Mill 21 Campus - Weert

Technical Warehouse - Clear height: 12,2 m - Span & column grid suitable for both small and wide aisles specifications - dock equipped with dockleveller (60kN dynamic load), shelter and bumper bars - 1 ground level access door (4m x 4,2m) per unit - Floor load: 50kN/m2 - Maximum point load pallet racking: 80kN/foot - Flatness tolerance: according DIN18202, Table 3,Zeile 4 (5mm/2m) - Insulated concrete plinth with a height of 2,5m - Certified automatic sprinkler installation (ESFR roof sprinklers) - Fire hose and hydrants conform to local regulations and building code - Fire alarm and evacuation system conform the rules and code - Heating (12°) and ventilation system - Lighting: energy efficient LED - Average light intensity: 250 lux @ 1,5m

Mezzanine - Mezzanine with a depth of 24 m above expedition area - Floor load of 10kN/m2 - Window for natural light

Offices - Offices on ground floor and mezzanine level with an open floor plan - High-end VRF-system for cooling and heating - Lighting: energy efficient T5 fixtures, 500 Lux at worktable level - Pantry with integrated fridge, stainless steel sink and dishwasher - High-end finishing

Site - Perimeter fencing (2m) with automated entrance gate - Loading area 35m deep, designed for heavy loads (LHV) - Exterior lighting for loading area, circulation roads and park yards - Parking yard for cars

Contact: [email protected] +31 (0)6 31 97 43 36 Diamantstraat 8/214 2200 Herentals heylenwarehouses.com

Disclaimer | All shown images belong to Wil-Ma and Wastiau & Co Architects