Liverpool Bay Sanitary Survey Review
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Reliques of the Anglo-Saxon Churches of St. Bridget and St. Hildeburga, West Kirby, Cheshire
RELIQUES OF THE ANGLO-SAXON CHURCHES OF ST. BRIDGET AND ST. HILDEBURGA, WEST KIRKBY, CHESHIRE. By Henry Ecroyd Smith. (BEAD IST DEOBMBEB, 1870.) THE Parish of West Kirkby (now West Kirby), lying 18 miles N.W. of Chester city, is one of the most important in the hundred of Wirral, and occupies the whole of its north western angle. Dr. Ormerod describes its first quarter as comprising the townships of West Kirkby and Newton-cum- Larton, with that of Grange, Great Caldey or Caldey Grange ; second, the townships of Frankby and Greasby ; third, those of Great and Little Meols, with Hoose ; fourth, the township of Little Caldey.* Originally Kirklye, or, settlement at the Church, it became " West Kirkby," to distinguish it from "Kirkby-in-Walley," at the opposite corner of the peninsula of Wirral, now com monly known as Wallasey. Each of these extensive parishes possessed two Churches, those of Wallasey lying the one in Kirkby-in-Walley, the other on the Leasowes and near the sea, which ultimately destroyed it and engulphed the site together with that of its burial-ground. For further informa tion on this head, Bishop Gastrell's " Notitia," Dr. Ormerod's " History of the County,"\ and Lyson's " Cheshire,"% may be consulted. Gastrell's Notitia. The last now simply bears the name of Caldy. t II, 360. Heading of Moretou. { Page 807. 14 The Churches of West Kirkby were situate, the parish Church at the town proper, the other, a Chapel of Ease, upon Saint Hildeburgh's Eye, i.e., the island of St. Hildeburga, which had become insulated through the same potent influence which had wrecked the Chapel, as Bishop Gastrell calls it, upon the Leasowe shore. -
Wirral Landscape Character Assessment 2019 A
Wirral Metropolitan Borough Council Wirral Landscape Character Assessment Final report Prepared by LUC October 2019 Wirral Metropolitan Borough Council Wirral Landscape Character Assessment Version Status Prepared Checked Approved Date 1. Draft Final Report A Knight K Davies K Davies 07.10.2019 K Davies 2. Final Report A Knight K Davies K Davies 30.10.2019 Bristol Land Use Consultants Ltd Landscape Design Edinburgh Registered in England Strategic Planning & Assessment Glasgow Registered number 2549296 Development Planning Lancaster Registered office: Urban Design & Masterplanning London 250 Waterloo Road Environmental Impact Assessment Manchester London SE1 8RD Landscape Planning & Assessment Landscape Management landuse.co.uk 100% recycled paper Ecology Historic Environment GIS & Visualisation Contents Wirral Landscape Character Assessment October 2019 Contents 1c: Eastham Estuarine Edge 60 Chapter 1 Introduction and Landscape Context 4 Chapter 7 Structure of this report 4 LCT 2: River Floodplains 67 Background and purpose of the Landscape Character Assessment 4 2a: The Birket River Floodplain 68 The role of Landscape Character Assessment 5 Wirral in context 5 2b: The Fender River Floodplain 75 Policy context 6 Relationship to published landscape studies 9 Chapter 8 LCT 3: Sandstone Hills 82 Chapter 2 Methodology for the Landscape 3a: Bidston Sandstone Hills 83 Character Assessment 13 3b: Thurstaston and Greasby Sandstone Hills 90 3c: Irby and Pensby Sandstone Hills 98 Approach 13 3d: Heswall Dales Sandstone Hills 105 Process of assessment -
St.Helens Local Plan Core Strategy Adopted by St.Helens Council on 31St October 2012
LDF43E LocalSt.Helens Development Local Plan Framework CCoreore StrategyStrategy PublicationOctober 2012 Version – May 2009 St.Helens Local Plan Core Strategy Adopted by St.Helens Council on 31st October 2012. St.Helens Local Plan Core Strategy Foreword Foreword from St.Helens Local Strategic Partnership and the Cabinet Member for iii Urban Regeneration, Housing and Culture How to Use this Document v Introduction 1 Introduction 2 St.Helens Now 2 Context 14 3 Issues, Problems and Challenges 22 St.Helens in 2027 4 St.Helens in 2027 28 Regenerating St.Helens 5 The Key Diagram 36 6 Overall Spatial Strategy 38 7 St.Helens Core Area 48 8 St.Helens Central Spatial Area 54 9 Newton-le-Willows and Earlestown 62 10 Haydock and Blackbrook 78 11 Rural St.Helens 84 Achieving the Vision 12 Ensuring Quality Development in St.Helens 90 13 Creating an Accessible St.Helens 96 14 Providing Quality Housing in St.Helens 104 15 Ensuring a Strong and Sustainable St.Helens Economy 118 16 Safeguarding and Enhancing Quality of Life in St.Helens 126 17 Minerals and Waste 140 Appendices 1 Appendix 1: Delivery and Monitoring Strategy 146 2 Appendix 2: Bibliography 170 3 Appendix 3: Glossary of Terms 178 4 Appendix 4: Saved UDP policies to be replaced by the Core Strategy 192 St.Helens Local Development Framework St.Helens Local Plan Core Strategy Policies Policy CSS 1 Overall Spatial Strategy 38 Policy CIN 1 Meeting St.Helens' Infrastructure Needs 43 Policy CSD 1 National Planning Policy Framework - Presumption in Favour 44 of Sustainable Development Policy CAS 1 -
Handbook Committee Membership
Cheshire Rugby Football Union MEMBERSHIP CARD SEASON IW2/93 / Namc ...................... Cluh .............................. PAST PRESIDENTS: H. M. BLYTHE(I880/83) J. W. H. THORPE (1883/1904) J. BAXTER(1904/42) R. R. RICHARDS (1942/47) T. WALTON (1947/49) R. D. NESBIT(I949/51) W. H. PEMBERTON (1951) N. McCAIG (1951/53) C. H. OFFLAND (1953) A. S. CAIN (1954/56) J. MONTADOUR (1956/58) P. H. DAVIES(1958/60) W. M. SHENNAN (1960/61) D. R. WYN-WILLIAMS (1961/62) W. G. HOWARD (1962/63) H. V. MIDDLETON (1963/65) W. J. THOMPSON (1965/67) G. C. NODEN (1967/69) N. A. STEEL (1969/71) J. E. STARK (l971m) E. J. LOADER (1973/75) H. M. CURPHEY (1975m) A. F. KOENEN (1977/79) P. G. TURNER (1979/81) A. H. RUSHTON (1981/83) W. S. PLATT(1983/84) G. C. CQX (1984/86) A.l. HART (1986/88) M. COHEN (1988/89) W. GOTT (1989/91) OFFICERS FOR YEAR 1992,93 President: J.M.YOUNG 2 Vanderbyl Avenue. Spital. Wirral. Merse~side L622AP. 051-3345834(Home) Senior Vice-President: F. R.POVALL 4 Mere Park Road. Greasby. Wirral. Merseyside L49 3GN 051-677 9674 (Home) Vice-Presidents: C. J. COVENTRY cio J. F. Parker Ltd Davenport Road. Broadheath. AItrincham. Cheshire WAI45EL. 061-928 0027 (Bus.) N. H. MIDDLEBROOK 27 Clarendon Road. Sale M33 2DU. 061-9622957 (Home) J. N. LENTON 27 Fox Cover Road. Heswall Hills. Wirral. Merseyside L60 IYB. 051-342 3923 (Home) D.P. WRIGHT Tynron Cottage. West Road. Noctorum. Birkenhead. Merseyside L43 9UH. 051-652 0402 (Home) 0244 325123 (Bus.) Past Presidents: H. -
Hoylake Beach Site Management Agreement
Hoylake Beach Site Management Agreement Josef Hanik Senior Ranger Wirral’s Coast Parks and Countryside Technical Services Department 0151 678 5488 September 2010 1.0 EXECUTIVE SUMMARY 2.0 SITE DESCRIPTION 3.0 WIRRAL’S SHORELINE MANAGEMENT PLAN 4.0 MERSEY WATERFRONT QUALITY ASSURANCE SCHEME 5.0 OPERATIONS REQUIRING CONSENT FROM NATURAL ENGLAND 6.0 APPROPRIATE ASSESSMENT 7.0 FUTURE LONG TERM IMPLICATIONS 8.0 HOYLAKE BEACH USERS GROUP 9.0 APPENDIX 9.1 Natural England Site Assessment and Map 9.2 Hoylake Beach Management Operations Test of Significance 9.3 Environment Agency Herbicide Licences at Hoylake Beach 9.4 Natural England Consent for Activities at Hoylake Beach 1.0 Executive Summary 1.1 This Site Management Agreement has been written to provide details of management proposals for the next 5 years (2010 – 2015) at Hoylake Beach which is owned and managed by Wirral Council. 1.2 These proposals are submitted by Wirral Council as an agreed level of management required for the site and as identified by Wirral Council as part of the Mersey Waterfront Quality Assurance Scheme and as part of the Wirral Council Corporate Objectives which are: To create more jobs, achieve a prosperous economy and regenerate Wirral To create a clean, pleasant, safe and sustainable environment To improve health and well being for all, ensuring people who require support are full participants in mainstream society To raise the aspirations of young people To create an excellent Council 1.3 A Site Management Agreement has been requested by Natural England in order for them to provide consent for operations within the designated protected site. -
Hoylake and West Kirby 1 Settlement Area Policy 2
Contents Settlement Area 6 - Hoylake and West Kirby 1 Settlement Area Policy 2 2 Vision Statement 3 3 Reasoned Justification 3 Publisher Software Limehouse with Created Kirby est W & Hoylake for Policy Area Settlement Draft - Strategy Core Core Strategy - Draft Settlement Area 2 Policy for Hoylake & West Kirby 1 Settlement Area Policy Policy CSx.x - Priorities for Hoylake and West Kirby Created The overall strategy for Settlement Area 6 will be to: with 1. Maintain attractive residential areas with good access to Birkenhead, Limehouse Liverpool and Chester 2. Safeguard and enhance the role of West Kirby as the main convenience and comparison retail, office and service centre for the Area Software 3. Safeguard and enhance the role of Hoylake as the focus for district-level shops, offices, services and community facilities 4. Maintain Carr Lane Industrial Estate for small and medium scale industrial Publisher and commercial activities to provide additional local employment 5. Maintain the Victorian and Edwardian heritage of the coastal resorts, while maintaining and improving the facilities for visitors including provision for Core leisure, tourism, coastal recreation and water sports, golf and the facilities and open spaces associated with the coastal promenades and North Wirral Strategy Coastal Park 6. Focus local improvements on the area of need at Greenbank Road, West - Kirby Draft 7. Maintain and enhance the national and international nature conservation Settlement value of the intertidal foreshores and the Hilbre Islands 8. Preserve and enhance the character and appearance of the Conservation Areas at Hoylake, Caldy and West Kirby and the setting of other designated Area heritage assets; the woodland setting of Caldy and Newton; the visual importance of the natural open coastline; and open (hilltop) views across Policy the Dee Estuary to North Wales 9. -
Wirral Landscape Sensitivity Assessment 2019 B
Chapter 3 Project findings Wirral Site Specific Landscape Sensitivity Assessment November 2019 Appendix A: Landscape Sensitivity Assessments LUC I 15 Appendix A Area reference: SP001 Wirral Site Specific Landscape Sensitivity Assessment November 2019 Area reference: SP001 Figure A.1: Map of the area with designations / constraints LUC I A-2 Appendix A Area reference: SP001 Wirral Site Specific Landscape Sensitivity Assessment November 2019 Figure A.2: Aerial photograph of the area LUC I A-3 Appendix A Area reference: SP001 Wirral Site Specific Landscape Sensitivity Assessment November 2019 Figure A.3: Representative photos Woodland copse and informal open space in the east set against the settlement Gently undulating landform with fragmented hedgerows edge of Greasby Location and landscape character context The area is situated in the north-west of the borough and lies to the north-west of Greasby. The B5192 Saughall Massie Road and Pump Lane form the northern and western boundaries respectively. The village of Saughall Massie is situated adjacent to the north-eastern corner of the area. The area lies within the The Birket LCA, forming part of the River Floodplain LCT. It comprises low-lying gently undulating ground with Arrowe Brook and Greasby Brook meandering through the landscape and small-medium scale pastoral fields. The area accommodates Saughall Massie Community fire station in the north-east and areas used for equestrian activities, including stables in the north-west and Greasby Equestrian Centre south-east. Landscape value This area is not subject to any landscape designations (national or local). However, Arrowe Brook and Greasby Brook are key features distinctive for their meandering nature which have influenced the irregular field pattern of the area. -
FARNDON 'Tilstone Fearnall' 1970 'Tiverton' 1971
Earlier titles in this series of histories of Cheshire villages are:— 'Alpraham' 1969 FARNDON 'Tilstone Fearnall' 1970 'Tiverton' 1971 By Frank A. Latham. 'Tarporley' 1973 'Cuddington & Sandiway' 1975 'Tattenhall' 1977 'Christleton' 1979 The History of a Cheshire Village By Local History Groups. Edited by Frank A. Latham. CONTENTS Page FARNDON Foreword 6 Editor's Preface 7 PART I 9 An Introduction to Farndon 11 Research Organiser and Editor In the Beginning 12 Prehistory 13 FRANK A. LATHAM The Coming of the Romans 16 The Dark Ages 18 The Local History Group Conquest 23 MARIE ALCOCK Plantagenet and Tudor 27 LIZ CAPLIN Civil War 33 A. J. CAPLIN The Age of Enlightenment 40 RUPERT CAPPER The Victorians 50 HAROLD T. CORNES Modern Times JENNIFER COX BARBARA DAVIES PART II JENNY HINCKLEY Church and Chapel 59 ARTHUR H. KING Strawberries and Cream 66 HAZEL MORGAN Commerce 71 THOMAS W. SIMON Education 75 CONSTANCE UNSWORTH Village Inns 79 HELEN VYSE MARGARET WILLIS Sports and Pastimes 83 The Bridge 89 Illustrations, Photographs and Maps by A. J. CAPLIN Barnston of Crewe Hill 93 Houses 100 Natural History 106 'On Farndon's Bridge' 112 Published by the Local History Group 1981 and printed by Herald Printers (Whitchurch) Ltd., Whitchurch, Shropshire. APPENDICES Second Edition reprinted in 1985 113 ISBN 0 901993 04 2 Hearth Tax Returns 1664 Houses and their Occupants — The Last Hundred Years 115 The Incumbents 118 The War Memorial 119 AH rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, The Parish Council 120 electronic or mechanical, including photocopy, recording, or any information storage and retrieval system, without permission in writing from the editor, F. -
The Dee Estuary European Marine Site
The Dee Estuary European Marine Site comprising: Dee Estuary / Aber Dyfrdwy Special Area of Conservation The Dee Estuary Special Protection Area The Dee Estuary Ramsar Site Natural England & the Countryside Council for Wales’ advice given under Regulation 33(2) of the Conservation (Natural Habitats &c.) Regulations 1994 January 2010 This document supersedes the May 2004 advice. A Welsh version of all or part of this document can be made available on request This is Volume 1 of 2 Natural England and the Countryside Council of Wales’ advice for the Dee Estuary European marine site given under Regulation 33(2) of the Conservation (Natural Habitats &c.) Regulations 1994 Preface This document contains the joint advice of Natural England1 and the Countryside Council for Wales (CCW) to the other relevant authorities for the Dee Estuary European marine site, as to: (a) the conservation objectives for the site, and (b) any operations which may cause deterioration of natural habitats or the habitats of species, or disturbance of species, for which the site has been designated. This advice is provided in fulfilment of our obligations under Regulation 33(2) of the Habitats Regulations.2 An earlier version of this document was published in 2004 by English Nature and CCW. This document replaces that earlier version. The Dee Estuary European marine site comprises the marine areas of The Dee Estuary Special Protection Area (SPA) and Dee Estuary / Aber Dyfrdwy Special Area of Conservation (SAC). The extent of the Dee Estuary European marine site is defined in Section 1. European marine sites are defined in the Habitats Regulations as any part of a European site covered (continuously or intermittently) by tidal waters or any part of the sea in or adjacent to Great Britain up to the seaward limit of territorial waters. -
Student Guide to Living in Liverpool
A STUDENT GUIDE TO LIVING IN LIVERPOOL www.hope.ac.uk 1 LIVERPOOL HOPE UNIVERSITY A STUDENT GUIDE TO LIVING IN LIVERPOOL CONTENTS THIS IS LIVERPOOL ........................................................ 4 LOCATION ....................................................................... 6 IN THE CITY .................................................................... 9 LIVERPOOL IN NUMBERS .............................................. 10 DID YOU KNOW? ............................................................. 11 OUR STUDENTS ............................................................. 12 HOW TO LIVE IN LIVERPOOL ......................................... 14 CULTURE ....................................................................... 17 FREE STUFF TO DO ........................................................ 20 FUN STUFF TO DO ......................................................... 23 NIGHTLIFE ..................................................................... 26 INDEPENDENT LIVERPOOL ......................................... 29 PLACES TO EAT .............................................................. 35 MUSIC IN LIVERPOOL .................................................... 40 PLACES TO SHOP ........................................................... 45 SPORT IN LIVERPOOL .................................................... 50 “LIFE GOES ON SPORT AT HOPE ............................................................. 52 DAY AFTER DAY...” LIVING ON CAMPUS ....................................................... 55 CONTACT -
Mersey Estuary Catchment Flood Management Plan Summary Report December 2009 Managing Flood Risk We Are the Environment Agency
Mersey Estuary Catchment Flood Management Plan Summary Report December 2009 managing flood risk We are the Environment Agency. It’s our job to look after your environment and make it a better place – for you, and for future generations. Your environment is the air you breathe, the water you drink and the ground you walk on. Working with business, Government and society as a whole, we are making your environment cleaner and healthier. The Environment Agency. Out there, making your environment a better place. Published by: Environment Agency Richard Fairclough House Knutsford Road Warrington WA4 1HT Tel: 0870 8506506 Email: [email protected] www.environment-agency.gov.uk © Environment Agency All rights reserved. This document may be reproduced with prior permission of the Environment Agency. December 2009 Introduction I am pleased to introduce our summary of the Mersey Estuary Catchment Flood Management Plan (CFMP). This CFMP gives an overview of the flood risk in the Mersey Estuary catchment and sets out our preferred plan for sustainable flood risk management over the next 50 to 100 years. The Mersey Estuary CFMP is one of 77 CFMPs for have a 1% chance of flooding in any one year from rivers England and Wales. Through the CFMPs, we have (i.e. a 1% annual probability). We estimate that by 2100 assessed inland flood risk across all of England and approximately 25,000 properties will be at risk of river Wales for the first time. The CFMP considers all types of flooding. This is a 30% increase compared to the current inland flooding, from rivers, groundwater, surface water number at risk across the catchment. -
Lower Mersey Leap Annual Review September 2001
LOWER MERSEY LEAP ANNUAL REVIEW SEPTEMBER 2001 E n v ir o n m e n t Ag e n c y NATIONAL LIBRARY & INFORMATION SERVICE HEAD OFFICE Rio House. Waterside Drive, Aztec West, Almondsbury, Bristol BS32 4UD ENVIRONMENT AGENCY 076559 80 Local Authority Boundaries ^REWE, Jl NANTWICH BCj KEY Area Boundary a - \ , ^ Watercourse N Culverted Watercourse A Canal 50 Council Boundary 10km __ I 40 50 60 Lower Mersey Local Environment Agency Plan E n v i r o n m e n t A g e n c y Area Boundary Watercourse Culverted Watercourse N Canal A Built up Area Motorway 50 A Road 10km Rail Network ___I 40 50 60 Lower Mersey LEAP Second Annual Review EXECUTIVE SUMMARY The Second Annual Review of the Lower Mersey LEAP reports on the progress made from 1999 against LEAP actions. The actions published in the LEAP are supplemental to our everyday work on monitoring, surveying and regulating to protect the environment. Some of the key achievements for the Agency and its partners include: • Cleanaway’s incinerator at Ellesmere Port, destroys waste refrigerant gases (CFC’s and HCFC’s) greatly reducing their global warming and ozone depletion potentials. • New sulphur removal plant at Shell’s Stanlow Refinery has resulted in a reduction of the acid gas sulphur dioxide released into the atmosphere. • The closure of Bridgewater Paper’s coal-fired power station in summer 2000 and its replacement by a gas-fired combined heat and power (CHP) plant has resulted in a reduction in particulate and sulphur dioxide emissions. The new CHP was authorised in November 1999 and commissioned through 2000.