Myo Thein Deputy Head (Director) of Department Engineering Department (Water & Sanitation) Yangon City Development Committee Content

 Introduction to Yangon City and YCDC  Future population and Water Demand  Challenges and Current Issues  Water Supply Improvement Plan  Development Activities  Sanitation facilities  Sewerage zoning plan  Proposed Wastewater Treatment Plant  Conclusion Introduction to Yangon City and YCDC

OUTLINES OF YANGON CITY

Myanmar:

135 – Races 7 – Divisions 7 – States And 6 – Self-ruled regions Introduction to Yangon City and YCDC

 YCDC (Yangon City Development Committee) has 20 departments and responsibilities for the recreation of the city dwellers, construction and maintenance of roads, bridges, building, playgrounds and parks, water supply works and disposal of solid waste, proper management of sanitation and so on.

 Water which is being used every day in Yangon is supplied and managed by water and sanitation department under YCDC. Future population and Water Demand Population (million) 9.77 10 8.63 7.63 8 6.75 5.67 5.96 6 5.14 4 2

Population (million) Population 0 2010 2015 2020 2025 2030 2035 2040 Year Water Demand (MGD) 600 525 500 422 400 334 300 258 182 199 200 156 100 0 Million Gallon per Day per Million Gallon 2010 2015 2020 2025 2030 2035 2040 (Source: JICA‐YCDC Master Plan 2014) Year Challenges and Current Issues

Frequent Pipe Break in Transmission pipeline Aged Transmission and Distribution Pipe Spaghetti Pipe Damaged Water Meter High Water Demand High NRW Rate (~ 60%)

This image cannot currently be displayed.

6 Water Supply Improvement Plan

This image cannot currently be displayed. Name of Township & Township Zoning System Plan for Yangon City Zone Zone Group’s

1 Central area Central Business District (CBD) Inner Urban Ring (IUR)

2 Tarmwe, Tarmwe, Thingangyun, Thaketa Thaketa

3 Hlaing Mayangone, Yankin, Hlaing

4 Mayangone (South) Mingalardon, North Okkalapa, (South) Insein

5 Mingalardon, (Center) Mingalardon, Shwepyithar (North) Insein, Shwepyithar

6 North side (North) Mingalardon

7 East side 1 East Dagon, North Dagon

8 East side 2 South Dagon, Dagon Seikkan

9 West side Hlaingtharyar 7 10 South side Dala, Seikkyi-Khanaungto, (Source: JICA‐YCDC Master Plan) (W t) Kidi Water Supply Improvement Plan Proposed Yangon City Water Supply System in 2040

River Source: 1. Kokkowa River 2. Toe River

WTP: 1. Gyobyu 2. Ngamoeyeik Phase 1 & 2 3. Lagunpyin 4. Kokkowa 5. Toe

Ground water: 0 in 2025 Water Supply Improvement Plan To meet Sustainable Development Goal SDG 6.1 By 2030, achieve universal and equitable access to safe and affordable drinking water for all 2025 2040

Water Supply System for 2025 Water Supply System for 2040 (Source: JICA‐YCDC Master Plan) DevelopmentThis image cannot currently be displayed. Activities

P P Kokkowa WTP P

1st Phase 60 MGD P P Supply area Zone 9 Zone 1 Zone 10 P 11

Abbreviations WTP: Water Treatment Plant SR: Service Reservoir TP: Transmission pipe DMP: Distribution Main Pipe DP: Distribution Pipe 11 DMA: District Metered Area Development Activities

This image cannot currently be displayed. Project Layout Plan Development Activities This image cannot currently be displayed. •Development Project ‐Greater Yangon Water Supply Improvement Project Phase 1 ‐ 30 MGD to Yangon ‐10 MGD to Thilawa SEZ

This image cannot currently be displayed.

13 Development Activities

Insein Township

14 Development Activities Mayangone (Japanese Nyaunghnapin Grant) WTP-1 (JICA Grant Aid) Insein & South Okkalapa (Manila Water - Yankin Mitsubishi) (JICA Expert)

Thingangyun & Tarmwe Yankin (AFD & EGIS, (JICA Grant France) Aid)

15 Development Activities • Periodically Monitoring Rain Water Reservoirs , Tube Wells , Lagunpyin Creek, Kokkowa River. • Quarterly Monitoring Tap Water( Fecal coli form, Total coli form, lead) • Daily Water Quality Monitoring Surface Water Sources ,WTP, Pumping Station (by Laboratories)

On Site Water Quality Monitoring

Tap water sampling Residual Chlorine Monitoring Development Activities Development Activities Future Service Level Targets in Yangon City Water Supply System

18 Urban Sanitation Facilities

Estimated population with sewer(conventional sewer system) is 300,000 people . Main content of system are 1) Air Compressor Station(2) Pneumatic Ejectors(3) Air Pipeline 4) Gravity sewer pipeline(5) Wastewater Treatment Plant

Wastewater treatment plant Air compressor station Total length of sewer pipe line -(10.75) km(12"CI to 36"CI Pipe) Sewage ejectors -(35) Nos Manholes - 2114 Nos Urban Sanitation Facilities

 Year of Establishment - 12th April 2003  Year of Completion - 17th January 2005  Volume of Daily Treatable sewage - 3.25MGD  Developer - Engineers of Yangon City Development Committee  Cost of Project - USD0.96 Millions + (Myanmar Kyat -2065.7 Millions)  Areas of Plant – 5.56 Acres Urban Sanitation Facilities Office Building Wastewater Treatment Plant Pump Sump Primary Sedimentation Tank Wastewater Wastewater Influent Aeration Tank

Secondary Sedimentation Tank Sludge Thickener Sludge DigesterBeltpress

Final Effluent Chlorination Tank Design Criteria: Area of Plant ‐ 5.56 acres  Design population ‐ 300,000  Daily wastewater discharge‐‐14775 m3/day  BOD influent ‐ 600mg / l  BOD effluent ‐ 60 mg / l  Suspended solid influent ‐ 700 mg / l  Suspended solid effluent ‐ 40 mg / l 0 Sewerage Zoning Plan

SEWERAGE ZONES AREA Zone Township

C1 Botahtaung,Puzundaung,Kyauktada,Pebedam, W1 Lanmadaw,Latha,Alone,a part of Kyeemyintdaing,Dagon,a part of Bahan,a part of Kamaryut,Sanchaung C2+E1 a part of Bahan,Mingalartaungnyunt,Yankin,Thingangyun,Tamwe, S-Okkalapa,a part of Mayangone,N-Okkalapa,N-Dagon W2 a part of Kamaryut,Hlaing,a part of Mayangone E3 Taketa,Dawbon,S-Dagon N1 Insein E4 Dagon Seikkan E2 East Dagon N2 Mingalardon N3 Shwepyithar S1 Dala W3 a part of Kyeemyintdaing,Seikgyi khanaungto,Seikkan W4 Hlaing Tharyar This image cannot currently be displayed. Location Plan of Proposed Wastewater Proposed Treatment Plants Treatment South District Plant(4) Proposed (1) Operate (2006) W.W.T.P (Thanhlatsoon) West District Proposed (2) W.W.T.P Thitaw Street, Alone Township. North District Proposed (3) W.W.T.P Padakaung, . East District Proposed (4) W.W.T.P Thitponeseik, North DagonTownship. Proposed Treatment Plant(3)

Proposed Treatment Proposed Plant(2) Treatment Plant(1) Conclusion

To meet the increasing demand of Yangon population in 2025, Lagunpyin and Kokkowa river water supply project are necessary to implement in which 100 MGD can be supplied to Yangon. At present, these two projects are being implement to meet the target.

Non Revenue Water Reduction projects should be extended throughout the entire distribution system.

Water treatment facilities need to install in all resources.

Real time monitoring and disinfection facilities is necessary to improve water quality.

Upgrading the existing sanitation facilities and the sewerage system extension project should be timely implemented Thank you very much!