/ ,v -I) f I- -/>#fL Document of The WorldBank

FOR OFFICIAL USE ONLY Public Disclosure Authorized

MICROFICHE COPY ReportNo. 10264-BAR

Report No. 10264-BAR Type: (SAR) MATES, A / X38648 / I5132/ LA3IE

STAFF APPRAISAL REPORT Public Disclosure Authorized

BARBADOS

SECOND ROAD MAINTENANCE AND REHABILITATION PROJECT

MAY 29, 1992 Public Disclosure Authorized Public Disclosure Authorized

Department III Infrastructure Operations Division Latin America and the Caribbean Region

This documenthas a restricteddistributior and may be used by recipientsonly in the performanceof their officialduties. Its contentsmay not otherwisebe disclosedwithout World dank authorization. CURRENCY EQUIVALENTS

Currency Unit - Dollar $B1.00 - US$0.50 US$1.00 - $B2.00

WEIGHTS AND MEASURES

1U$ gallon - '3.875liters 1 mile - 1.613 km 1 pound - 0.453 kg

ABBREVIATIONS

BPA Barbados Port Authority GOB EMS Equipment Management System GOB Government of Barbados HMMS Highway MaintenanceManagement System IFAS Integrated Financial Accounting System MCW Ministry of Works, Communicationsand Transportation MMU MaintenanceManagement Unit PU Planning Unit TC Technical Committee TCD Technical Department TEU Twenty-Foot Equivalent Unit TLF Transport Levy Fund TRB Transport Board

FISCAL YEAR

April 1 - March 31 FOR OMCIuL USE ONLY

SECONDROAD MAINTENANCEAND REHABILITATIONPROJECT

STAPFAPPRAISAL REPORT TABLEOF COKTENTS

PateNo.

I LOAN AND PROJECTSUIa ARY ...... 1 II* THESECTOR o oo#&e*3 A. General ...... a. .9 ...... #. 3. B. InstitutionalSetup ...... 4 C. Ports ...... 4 D. Airport...... 5 E. Road Transport ...... 5 (a) The Network ...... 5 (b) RoadAdministration ...... 5 (c) Road Maintenance ...... 6 (d) Road ConstructionIndustry . 8 (e) VehicleFleet ...... 9 (f) Axle Load Regulation * 9 9 (g) TruckingIndustry a ...... 9 (h) PassengerTransport and the Role of the TransportBoard 9 (i) HighwayPlanning . o ...... o * * * . . 11 (j) Fuel Pricesand Other User Charges ...... 12 (k) HighwayFinancing ...... o ... 13 III. PAST BAIKEXPERIENCEIN TE SECTOR ...... 13

IV* THEPROJECT ...... o* ...... 14 A. Justification. . . o...... *...... 14 B. ProjectObjectives . 15 C. ProjectDescription .o...... 16 (a) General ...... , ...... 16 (b) Road Rehabilitation 16 (c) Road Safety ...... 16 (d) OverlayProgram .e. a * v....v.. . 17 (e) Bridgeand CulvertRehabilitation ...... 17 (f) Pilot Programs RoutineMaintenance by Contract . . * s18 (g) 13quipment .18 ...... I (h) InstitutionalImprovement ...... 19

This reportis based on the findingsof an appraisalmission which visited Barbadosin February1992. The missionconsisted of Messrs.Amnon Mates,Task Manager and Economist,Jos6 Luis Irigoyen,Engineer, and Richard Scurfield, Transportation Expert. Peer review was provided by Messrs. John Flora and Ernesto Henriod. The report was prepared under the supervision of Mr. Graham Smith, Division Chief, and Mr. Yoshiaki Abe, Director;Ms. Silvia Delgado assistedin its production.

This document has a restricted distribution and may be used by recipients only in the performance of their officialduties. Its contentsmay not otherwisebe disclosedwithout World Bank authorization. (it)

TABLE OP CONTENTS (cont's) Page No.

Ml General ... 19 (ii) Technical Asoistance ...... 19 gil) Studies . o 20 (iv) Training . v...... 21

F. Project Costs and Financing ...... 22 G. Economic Evaluation ...... 24 (a) Road Rehabilitation ...... 24 (b) OverlayProgram ...... 9 925 (c) Safety Program ...... 26

V* PROJECT INPLMEkNTATION...... 26 A. Project Execution ...... 26 (a) General ...... , ...... 26 (b) Project Coordination .' ...... 26 (c) RoadcMaintenance ...... 9 9 ... 27 B. Procuremont ...... 27 C- Diabursementa ...... 9 9 28 E. Auditlto ...... 29 E. Monitorongm Impa ...... 30 Fo EnvironmentalImpact . 000000031 G. Project Riak .o. . . - ...... o . a 31

VI. AGREEMENTS REACHED AND RECOMMENDATION ...... 32

Recomnendation ...... 34 BARBADOS

SECOND ROAD MAINTENANCE AND REHABILITATIONPROJECT

I. LOAN AND PROJECT SUMIARY

Borrowert Government of Barbados (GOB).

Executing Agency: Ministry of Public Works, Communications and Transportation (MCW).

Amount: US$21.2 million aquivalent.

Terms: 15 years, with 5 years of grace, at the standard variable interest rate. Project Objectives: The objectives of the proposed project are to: (a) install and implement sound maintenance policies and procedures on the road network; (b) preserve the capital base of road infrastructure within the constraintson capital and current expenditures; (c) reduce investmentcosts by transferringall capital works to the private sector and explore the relative merits of private sector participation in carrying out road maintenance activities; (d) improve road safety; and (e) help the Government in its efforts to privatize passenger transport services. Project Description: The project finances a share of MCW's Five-Year (1992/93-1996/97) Investment Plan which was appraised jointly by the Bank and the CDB and is financed in parallel by both organizations. The Bank project will finance: (a) rehabilitation of two sectione of Highway 6; (b) a safety program consistingof improvementto five road intersections; (c) an overlay program involving about 160 km of high-priority roads; (d) rehabilitation of culverts and bridges; (e) a pilot program of routine road maintenance by contract; (f) equipment acquisition and rehabilitation in line with the requirementsof the Four-YearRoad Maintenance Plan; and (g) an institutionalimprovement program consistingof: technical assistancefor road maintenanceand workshop operations;training and retraining programs; and studies to rationalize the road network and privatize public bus transport services. Project Benefitss The projectwill result in substantialupgrading of about 30S of the primary and secondary road networks and a significant reduction in transport cost, traffic congestion and accidents. The project will assist in the transfer of capital works and periodic road maintenance to private contractors, increase efficiency of road maintenance operations and improve equipment availability. The project will allow the Government to carry out vital capital and periodic maintenance works under drastically lower budgetary allocations agreed upon as part of the IMF 1992 stand-byagreement. In addition, the project will lead to an action plan to privatize passenger transport services and reduce to a minimum Government subsidies to the publicly-owned bus company (Transport Board). -2-

Project Risks: The project carries little risk from the technical point of view. However, the agreed road maintenance and investment programs represent the minimum levels needed to preserve the road network; any further budget reductionswill endanger the level of service of the road iafrastructure. We expect that the agreementwith the IMF will make further budgetary cuts unnecessary. Aloo, political factors could deter the Governmentfrom proceedingwith privatizationof passenger transportservices which are currently provided by the publicly-owned bus company. The project is designed so that overlay works FY94/95 and beyond will not proceed until there is satisfactory progress on this privatizationprogram.

Local Foreign Total Prolect Cost: ------(US$ million)------

(a) Civil Works: Rehabilitation 1.1 1.3 2.4 Safety 0.9 1.2 2.1 overlay 5.3 9.9 15.2 Bridges & Culverts 0.2 0.2 0.4 Land Acquisition 1.5 - 1.5 Maint. by contract 0.3 0.4 0.7 Subtotal 9.3 13.0 22.3

(b) Equipment 0.1 2.5 2.6

(c) Technical Assistance, 0.3 1.7 2.0 Studies and Training

(d) Contingencies 2.3 4.0 6.3 Total 12.0 21.2 33.2

Financina Plan:

IBRD Proiect CDB Proiect Total Proaram

Government 12.0 4.0 16.0 IBRD/CDB 21.2 _9.6 30.8 Total 33.2 13.6 46.8

Estimated Disbursements: ------Bank Fiscal Year------

1993 1994 1995 1996 1997

------(US$ million)------Annual 2.7 6.5 6.9 3.5 1.6 Cumulative 2.7 9.2 16.1 19.6 21.2

Estimated Economic Return: 35Z-average for all project components. II. TAE SECTOR

A. General

2.1 Barbados is a relatively stiallisland with a population of 244,000 and a total area of 430 square kilometers. It enjoy., however, an extensive paved road network of 1,550 km (Table 1). The paved road density, at 3.6 km per square kilometers, is high in comparison with other islands of a similar size (Grenada- 1.5; St. Vincent - 1.5; St. Lucia - 1.1). The relatively flat terrain (except for the northeastern part of the island) and the higher standard of living (GDP per capita in Barbados is more than three times higher than the other islands mentioned above) contribute to the incrffasedroad network size. Nevertheless,maintenance of some low-traffictertiary roads could be minimized without affecting the efficiency of the system.

2.2 Barbados has spent substantialresources on developing its elaborate road network. The level of road investmentspeaked in FY86/87 at about $B43 million (Table 2); it has declined in subsequentyears reflecting the completion of major projects (the northern access road and the airport road). Total road investment as a percentage of public sector investment reached a high of 26% in FY86/87, but declined to a more reaeonable 16-18S in recent years (Table 3). In terms of current expenditures, the road sector accounted for 6-9S of public sector expendituressince 1984 (Table 3).

2.3 In addition to roadst the transport system in Barbados consists of one deep water port, several fishing ports and one major internationalairport. There are no railways in Barbados. The main road cargo traffic consists of sugar cane being transported from the producing areas to the ret;neries, rum and molasses which are exported, internal transport of construction materials, especially cement, and general cargo of imports of foodstuff and industrial products.

2.4 In September 1991 the Governmentembarked on a stabilizationprogram that led to a Stand-by arrangement with the IMP in February 1992. The Government reduced the overall public sector deficit from 7.31 of GDP in FY90/91 to 1S in FY91/92 and plans to eliminate it in subsequent years. To achieve this, the Government reduced drastically its capital and current expenditures. Consequently, the investment 2rogram of the Ministry of Public Works, Communicationsand Transportation (MCW) for PY91/92 was reduced by about $B10 million to a level of $B30 million (of which investmentsin roads amount to about $B26 million). The Government also reduced MCW's payroll from 2,500 to about 1,300. The reduced level of investmentand staff will coincide with elimination of all force-accountcapital works and a transfer of most periodic maintenance works to private contractors.

2.5 The Government's strategy for the sector now calls for a minimum investmentin new constructionand reconstructionworks which will be limited to a few high-priorityprojecta, a shift in focus to efficient management of the existingnetwork, especiallyadequate road maintenancepolicies, and an increased role for the private sector in carrying out this strategy. The Government intends to mobilize substantialexternal resources to enable implementationof the required investments and periodic maintenance works and improve the efficiency of public transport sector entities. -4-

B. InstitutionalSetu,

2.6 The Ministry of PublicWorks, Communicationsand Transportation(MCW) is responsible for planning, construction and maintanance of the public road network. MCW customarily prepares engineering studies for small projects and supervises all but the largest capital works carried out by contractors. In addition,MCW has been carrying out some civil works through force-Sccount. MCW is also responsible,through its Licensing Authority, for vehicle registration and ivsapection,issuance of drivers' licenses, compliance with vehicle weight regulation,and regulationof passenger transport. The InternationalTransport and CommunicationsDivision of MCW is responsiblefor air services and oversees the operation of the internationalairport. The organizationalstructure of MCW is given in chart I. The Government-owned Transport Board (TRB) operates passenger transport services. The operations of the Port is the responsibilityof the Barbados Port Authority (BPA).

C. Ports

2.7 Almost all importsand exportsare handled in .he deep water port (30 ft. draught) at Bridgetown. The port commenced operations in 1961 and is well served by marine liners,which provide connectionswith most trading partners. The port facilities, which include six deep-water berths, cargo handling facilities,four transit sheds and administrativefacilities, were expanded and improved in the late 1970's with assistancefrom the IDB. The port's container facility was expanded in recent years and a large crane handling 24 containers per hour was purchased with EEC's assistance. In addition, there are private unloading facilitiesfor aviation fuel and crude oil (ownedby the oil companies) sad coal (owned by Barbados Light Company). The cement plant at Arawak also has its own export facilities. Finally, there are numerous small fishing ports located around the island.

2.8 The Barbados Port Authority (BPA) administers the deep water port, except for stevedoring,which is in private hands. Total traffic in the port in both 1989 and 1990 amounted to about 600,000 tons, substantially above the figures for the three preceding years, but about the same as the traffic level in the early 80's, before the port lost significanttrans-shipment traffic to St. Lucia (Table 4). Container traffic showed consistent growth over the period, from 294,000 tons in 1986 to 435,000 in 1990, and now accounts for over 702 of total traffic. Most cargo traffic at the Bridgetown port is inbound (over 86X of the total) reflecting the trade imbalance. The port also provides a cruise ship stop-over point with duty-free facilities. In 1990, total passenger arrivalswere about 378,000, up substantiallyfrom the 303,000 in 1988. The port management hac introduced several improvements in recent years to reduce operating cost. BPA has shown an operating profit every year up to 1990 (e.g. $B1.3 million in 1988 and $B1.6 million in 1989). The loss in 1990 was a minimal $BO.2 million, after a $BO.5 million provision for foreign exchange losses and one-time expenses related to dismissal of some staff.

2.9 The port facilities are sufficient to handle the traffic in the foreseeablefuture. Containercapacity, at 75,000 TEU annually, is substantially above the present traffic level of 39,000 TEU, while other breakbulk and bulk cargo traffic are not showing significantgrowth. BPA is developing plans for additional facilities to recapture the trans-shipmentmarket, but financing for this purpose from private sources does not seem likely at the moment. -5- D. Airort

2.10 The GrentlyAdams International Airport is Barbados'only airport. A new terminalbuilding and other facilities,coating about $B28 milllon,were completedin 1980with Assistancefrom CIDA ($Can10 million). The facilityis designedto cater to aaarly3 millionpassengers, substantially above the 1990 figureof 1.6 million(Tablo 5). The runwaywas rehabilitatedin 1986with CDB financingand is in good shape. However,freight handling ia inefficientand suffersfrom lack of an adequateall-weather storage facility to accouodate freightcargo, which is growingrapidly (16Z in 1989 and 18S in 1990). CDB is financinga feasibilitystudy for improvementsin this area. 2.11 The airport,with a total lengthof 11,200feet and width of 130 feet, is capableof handlingall commercialaircraft including jumbo jets. It is well servedby NorthAmerican and Europeanairlines. Total air movementsin 1990 amountLito 37,700,up from 35,000in 1989. 2.12 Administrationof the airport is the responsibilityof the InternationalTransport Division within MCW. Airportoperations are generally well run and the staff of about250 is adequate. The airportgenerates various revenues,none of which is earmarked. For FY89/90(last available data) total airportrevenues amounted to about $B33 million,of which the departuretax raised$B19.1 million, landing fees $15.5million, concession fees $B4.0million and otherairline charges $B4.3 million. These revenues were substantiallyabove airportexpenditures, which amountedto $B16.4million, including $B2.2 million in capitaloutlays. E. Road Transport (a) The Network

2.13 The surfacetransport system of 1,550km of publicroads consists of sevenradial highways fsaning out from Bridgetown(Map IBRD 23663). The radial highwaysare linkedto each other by secondaryand tertiary(feeder) roads. In addition,there are some 300 km of privateroads. All of the roads in the public systemare paved but are usuallynarrow (5.5 to 7 meters)and lack sidewalks. The road network(Table 1) is classifiedinto primaryroads (381km or 25Z of the total),secondary roads (215 km or 142), local roads which feed the secondary road network(646 km or 411) and developmentroads, mainly in rural areas (308 km or 201). The roads are generallyin good condition(541). Only 11Z of the roadsare classifiedin poor condition,most of them localroads. Of the primary and seconda-ryrotad, about 60 km are classifiedin bad condition;they will be improved under the project. Trafficvolumes in and around Bridgetownare generally high, and range between5,000 and 22,000vehicles per day within the city and 3,000-20,000on main roads leadinginto the city. Trafficvolumes are drasticallyleos in rural areags,where some roads carry less than 100 vehicles a day. Traffic on some of these low-volumeroads could be satisfiedby alternative routes and this issue will be investigated by the Road Network RationalizationStudy, under the proposedproject (paras. 4.18).

(b) Road Administration

2.14 The Technical Department (TCD) of MCW, headedby the ChiefTechnical Officer (CTO)p is in charge of the design, executionand supervisionof public - 6 - works includedin KCW's capitalinvestment and recurrentprograms through four divisions:Projects, Design Services, Operations, and Mechanical(see Chart 1). The Projects Divisionis responsiblefor the implementationof road projects fundedby externalagencies. The DesignServices Division in in chargeof in- house preparationof designs for public building projects and small road projects,and biddingdocuments for procurementof civilworks. The Operations Divisionis responsiblefor constructionworks done by force-accountand road maintenanceoperatione. Finally, the MechanicalDivision operates and maintains MCW's equipmentfleet as well as the Government'sgeneral purpose vehicle fleet throughthe workshoplocated at MCW's headquarters. 2.15 Engineeringstudies for large projectsare generallyperformed by consultants,as MCW's in-housecapability is limitedto a few key professional staff. Road design standardsand technicalspecifications applied to new constructionand rehabilitationof primaryroads are appropriateand the quality of the studiesis satisfactory.However, there are no separateguidelines and standardsto dealwith the rehabilitationof secondaryand tertiaryroado, which often result in inconsistentstandards being applied for the same level of traffic. To assistMCW in correctingthis problem,the proposedRoad Network RationalizationStudy will defineappropriate standards and strategiesfor road improvementand maintenanceas a functionof trafficlevel and composition. 2.16 All major civilworks are carriedout by privatecontractors. HCW has carried out minor works using its own constructionlabor force. For instance,about 402 of all civilworks under the Bank'srecently completed Road Maintenanceand RehabilitationProject (Loan 2432-BAR)was done by force- account. Those force-accountworks suffered unnecessarydelays and cost increases.Under the retrenchmentprogram announced in September1991, MCW staff assignedto road and buildingconstruction projects has been cut from about 900 to 450 casuallaborers. The proposedproject will supportthe shift away from force-accountworks by ensuringthat all road capitalworks are carriedout by privatecontractors. Furthermore,MCW operatedin the past an asphaltplant located at Seawell; the plant was closed in 1989 and sold to a private contractor.MCW now purchasesmost of the materialsneeded for maintenanceworks from privatesuppliers. 2.17 Supervisionof major civil works contractshas been performedby consultantsunder the overallguidance and monitoringof the ProjectsDivision with the TCD. Usually,the consultantsinvolved in the preparationof the engineeringdesigns were also responsiblefor supervisingconstruction to ensure sccountability.However, quality control of engineeringmaterials has not been rigorouslyenforced and suppliersof materialshave not been requiredto conform to standardspecifications due to the limitedtesting facilities available on the island. In responseto this deficiency,MCW has equippedand strengthenedite Soils and MaterialsLaboratory through a technicalassistance and acquisition programfinanced by the first Bank project. The laboratoryis now capableof establishingstandards and certifyingthe quality of materials uced for maintenance,construction and rehabilitation.The laboratoryalso provides outsideservices for the local constructionindustry.

(c) Road Maintenance 2.18 MCW is responsiblefor road maintenance,including both rural and urban roads,through the OperationsDivision within TCD. The overallbudget for - 7 - maintenancehas been generallyin linewith requirements.However, operational efficiencyhas remainedlow becauseof over-staffingand improperpreparation of maintenancebudgets and allocationof rescurces.Past maintenancebudgets have reflectedthis significantresource imbalance:an average of 732 has been allocatedto labor,202 to materialsand 7Z to equipment,while best practice elsewhereindicates that labor shouldaccount for less than 502 of the total. Until mid-1991MCW had employedon averagesome 1,4OO employeesunder the casual labor regime,who were assignedto maintenanceoperations. In reality,only about 60% were necessaryto carry out this programand the rest were partially used to ca. out capitalworks. This situationhas beer correctedrecently under the retrenchmentprogram, by which maintenanceoperatl - casuallabor has been reducedto about 780 laborers. Savingsexpected t1 ,h such reduction amountto aboutUS$4 millionequivalent on an annualbasis. To avoidrepetition of past overstaffing,agreement was reachedduring negotiations that total staff assignedto road maintenancewill not exceed800 employees. 2.19 Duringproject preparation, MCW, with the assistanceof consultants and IBRD staff, has developeda Four-YearMaintenance Plan for the period FY92/93-FY95/96(Annex 1). The plan is based on an inventoryof the road network,which includedthe specificcondition of every featureof each road link. Taking into accountsuch conditions,and using agreedperformance and productivitystandards, a performancebudget was prepared. This budget is divided into routine a~ndperiodic maintenance activities, showing for each activitythe amountof work that is plannedand expectedto be performedand the resultingcost divided among materials,labor and equipment. The plan also yields the total staffingrequirements in each labor category,the numberof units of each equipmenttype and the requiredquantities of all materials.

2.20 The maintenanceplan for the entirenetwork for FY92/93is givenin Tables6-8. The plan providesfor an adequatelevel of fundingaccording to the existingneeds, a well balanced distributionbetween routine and periodic maintenance,and an increasedparticipation by privatecontractors. The total budgetfor FY92/93,which takes intoaccount the recentstaff reductionsin MCW, amountsto US$10.4million equivalent, compared with about US$15.2equivalent originallybudgeted for FY91/92. For FY93/94the budget increasesto US$13.1 million,reflecting the start of overlayworks under the project. Of the total amount,about 332 will be carriedout by contract,mostly for periodicoverlay worksbut also for a pilot programof routinemaintenance by contract.The total staff necessaryto carry out the plan is about 750, in linewith the available manpower. MCW has alreadypF-pared a satisfactoryassignment schedule for all road maintenancestaff. Agr mAentwas reachedduring negotiations that MCW will implementthe Four-Year(1992/93-1995/96) Road MaintenancePlan as agreedwith the Bank. 2.21 Of the total maintenancebudget of US$13.1million for FY93/94, US$4.2million equivalent are for overlayworks whichwill be coveredunder the proposedproject; hence, the minimum requiredfor the maintenancebudget is US$8.9million equivalent, of which US$3.0million represent materials, US$4.0 millionrepresent labor and US$1.9is the cost of the equipmentoperation. The provisionby the Governmentto MCW of an annualallocation of US$3.0 million equivalentfor materialsconstitutes a conditionof the proposed project. Agreementwas also reachedthat, by December31 of each year,MCW will submitan updateof the Four-YearRoad Maintenance Plan, Includingthe amountallocated for the currentyear and that plannedfor the followingthree years, and thatby June 30 of each year MCW will informthe Bank of the amount actuallyspent in the preceding year and that allocated for the current fiscal year.

2.22 To carny out the Four-Year Road Maintenance Plan, MCW needs to implementappropriate field work schedulingand feedbackreporting procedures, and improve resource usage and crew productivity. The road maintenance managementsystem initiated under the on-goingBank projecthas not yet been installedin the field. czoently,a "PilotDepot" was selectedfor the purpose of implementingsuch proceduresand testing them by the field crews. The proposedproject will assistMCW in implementingthe roadmaintenance management system throughoutall districtsand denotsby providingfollow-up technical assistancein road maintenanceoperations and a trainingprogram to instruct maintenancestaff in the new procedures. 2.23 Organizationally,the responsibilityfor road maintenance operations is divided between three units: the districts,who are in charge of road maintenanceworks, the MaintenanceManagement Unit (MMU),which is responsible for maintenanceplanning and monitoring, and the EquipmentManagement Unit, which is responsiblefor equipmentoperation. The first two units are under the OperationsDivision, whereas the third operatesunder the MechanicalDivision (Workshop).While the organizationalstructure of all units is adequate,one weaknesshas been the lack of coordinationin the assignmentof equipmentunits to maintenanceoperations. The OperationsDivision has littleinput into how the equipmentfleet is assignedto the districtsand how the preventivemaintenance is carriedout. Currently,equipment and vehicles are removedfrom operationfor maintenanceservicing by the MechanicalDivision, are not replaced with substituteunits, and then held out of servicefor extensiveperiods of time, often for repairs that have to wait for spare parts. Two factors have contributedlargely to this problem: the absence of an annual equipment servicingprogram, and the lack of an adequatestock of spare parts. The proposedproject will assistMCW in overcomingthese problems by financingthe purchaseof a stockof spareparts, updating road maintenance plans and providing a second-phasetechnical assistance program geared at the workshoplevel. To facilitatethe implementationof the equipmentmanagement system, the appointment of an equipmentmanager and a workshopaccountant are conditionsof effectiveness of the proposedloan. Furthermore,coordination among organizational units will beoimproved through a Technical Committee (TC); th's committeewas created recently to periodicallyreview the road maintenanceprogram and the equipment needsoriginating from this program,and ensurecoordination with the workshop. (d) Road ConstructionIndustrv

2.24 There are three major companiesin Barbadoswith a construction capacityover US$5 million,which own and operateall asphaltplants on the island. Three othersmaller enterprises provide some pavingservices, although they dependon the large companiesfor the provisionof asphaltmixes. Small jobs are often carriedout by sub-contractors;there is a largenumber of small firms specializedin concreteworks. In addition,there is a well developed marketfor equipmentrentals. The road constructionsector is adequatefor the needs of the countryand operateswithout interference from the Government. 2.25 Road constructioncosts are relativelyhigh. Highwages, dependance on importedgoods, and the small size of the market explainthese high costs. Foreign firms,predominantly regional, have shown some interest,but only in -9 -

mediumand largeroad construction jobs. Legislationfor contractadministration end other legal aspects,such as taxation,employment and importationregimes, is appropriate. In particular,to encourageparticipation of foreignfirms, heavy construction equipmentused in road constructionprojects financed by multilateral agencies can be imported duty-free on a temporary basis, provided it is eithertaken out of the countryat the end of the contract,or officially importedthen by payinga reducedtax. (e) VehicleFleet 2.26 The island'spoeulation is highly motorized with approximately49,000 motor vehiclesregiatered in 1990, or about 190 vehiclesper 1,000 population (Table 9). This comparesvith about 100 vehiclesper 1,000 populationin neighboringSt. Lucia. The vehiclefleet has been growingat a 4-SZ annual rate in recentyears. Most of the fleet is light vehicles,and trucksnumber only about 2,000 or about 4Z of the total fleet. The low percentageof trucks resultsin generallylow deteriorationof road pavements.Among trucks,most are small;there are only a few (76) articulatedtrucks. (f) Axle Load Reaulation 2.27 Axle loads are regulatedby the Road TrafficAct of 1985. This Act sets the maximumgross weight of trucksat 7.7 tons for 2-axletrucks with 2 tires,13.2 tons for 2-axletrucks with dual tiresat the rear axle and 26.5 tons for other trucks. These limitsare satisfactory. All trucksars requiredto post theirnet and grossweight limit alongside. The LicensingAuthority within MCW is responsiblefor enforcementof regulationthrough its specialinspectors. Weighingof vehiclesis done eitherat the LicensingAuthority headquarters in Bridgetownor through an existing arrangementwith four sugar factories throughoutthe island. Penaltiesfor overloadingare steep (up to B$5,000in fines or twe::e-h imprisonment).In general,however, overloading is not commonin Barbados. In exceptionalcases the LicensingAuthority is empowered to issuespecial permits for trucksto haul loadsIn excessof regulatorylimits on specifictrips along a specificroute. The LicensingAuthority also has the right to refuserenewal of a road licenseor specialpermit if the vehicle is judgedlikely to causedamage to the road. To ensurecompliance with regulation, the Ministry of Trade, Industry and Commerce is required to refer all applicationsfor importationof vehiclesexceeding 7.7 tons to the Licensing Authorityto ensurethat they complywith the provisionsof the Road TraffficAct (g) TruckintIndustry

2.28 The total trnckingfleet in Barbadosis about 2,000,mostly light trucks The industryis fragmentedand consistsmainly of individual operators and companiesowning their own trucks. The largestroad haulagecompany owns about sixty trucks and the secondlargest, about fifteen. The industryIs very competitive and freight rates are determined by the truckers without any Governmentinterference. (h) PassengerTransnort Ind the Role of the TransoortBoard

2.29 The transportof passengersis sharedby the privateand the public sectors. The privatesector operates minibuses (carrying 33 passengers)and maxi-taxis(carrying 10 passengers)in additionto regulartaxis. There are 195 - 10 -

registeredminibuses (of which 137 are non-owner driven) and 174 maxi-taxis, in addition to about 1,200 taxis. The issuance of permits for operation of minibuses and maxi-taxis has been suspendedsince 1984, and those for taxis since 1989, because of complaints by existing owners of the rapid proliferation of licenses. MCW assigns routes to minibuses, generally along dense traffic corridors in and out of Bridgetown. The maxi-taxis, which are supposed to operate as a one-party transportvehicles, have in fact been operating as mini- buses by collectingpassengers along city routes. About 330 five-passengervans, which are registeredas regular taxis, have also been collectingpassengers along the routes, in contraventionof their permits. Both maxi-taxis and small vans have been operatingwherever they chose. The Government passed recently a law aimed at regularizing the services of both types of vehicles along assigned routes, while increasing substantiallytheir permit fees.

2.30 The public sector operates its own passenger transport entity, the TransportBoard (TRB), in competitionwith minibusesand maxi-taxis. TRBI'sfleet consists of 180 buses, of which only 80Z are in service. TRB employs about 1,200 people, of which about 800 are drivers or conductors (about equally divided). It operares according to a published route and time schedule,and, by Government instruction, has to service also routes to rural areas which are clearly unprofitable. The passenger fare is determinedby the Government and does not vary with distance. Discounts are mandated for students and senior citizens. The fare was raised by 50% in September 1991 to $B1.50 (US$0.75)per trip. The minibuses charge the same fares as TRB, but are not required to provide the discountedfares.

2.31 Ridershipon TRB's buses has declined sharply in the early 1980's (by about one third between 1980 and 1984), reflecting the introductionof minibus service and the higher level of motorization. Since 1984, the decline has been more orderly, about 2-3% p.a. Total ridership in 1989 amounted to 26 million; of the total, about 70% were full-fare passengers,20% studentswho enjoy a 50% discount, and the rest free-ridingpassengers. Total revenues generated in FY90 were about $B25.8 million, down from $B27.3million in 1989, and in line with the decline in ridership.

2.32 TRB has suffered losses in its operations since 1976 and has relied on Government support to conduct its operations. The subsidy peaked in FY87/88 at a level of $B22 million. Government subsidiesfor operations in both FY90/91 and FY91/92 were about $B10 million. In addition, the Government financed capital expenditures (mainly for purchase of buses) totalling $B6.7 million in 1990-91 and $B2.3 million in FY91/92. As the above figures demonstrate, the financialburden on the Government is substantial,both in absolute terms and as a percentage of total expenditures(over 1% of total public sector expenditures). The actual cash deficit for TRB was about $B5 million higher than the subsidy level and was financed mainly by deferring payments to the National Insurance Board.

2.33 There are several reasons for the poor performance of the Transport Board, most importantof which are internal inefficiencies. For instance, each bus is carrying a driver and a conductor (fare-collector). The salary for all conductorsalone amounts to stme $B6.5 million. On most routes, the installation of a fare collection box could substitute the need for a conductor, and the proposed project includesfinancing for purchase of the fare-boxes. However, the potential release of all conductorshas been a source of continuous labor union - 11 -

conflicts,although 230 positionswere eliminated as of April 1992 in agreement with the union. Other factors contributing to TRB's losses are inefficient maintenance facilities,deficient bus schedules, a requirement to serve remote areas at a frequencywhich makes the service a money-losingproposition, and a uniform fare which makes it impossibleto recover the cost of longer bus routes.

2.34 The Transport Board was the subject of a consultant study in 1984 as well as numerous Government committees. Unfortunately,the focus of these examinationswas on marginal improvementsin operations and schedulingwithout facing the major issue of whether, and to what extent, the public sector should be involved in passenger transport. The Government has now drafted, with Bank assistance, terms of reference for a study to be financed by the European DevelopmentFund, which will develop an action plan to reduce the public sector role in the transport of passengers (Annex 2). The main options to be examined by the study are: (a) a substantialreduction in TRB services limiting them to serving non-economic routes under a specific Government subsidy; and (b)- eliminationof the TRB altogetherwith the money-losingroutes to be transferred to the private sector under a specific subsidy arrangement. The contract for the TRB study is expected to be awarded by September 1992 with final recommendations by June 1993. Pending completion of the study, the Government submitted during negotiations a detailed plan involving a reduction of total staff from the present level of over 1200 to 740 by September 1992, thus completing the conversion to a one-person bus operation. As a result, the cash deficit for FY92/93 will be reduced to about $B4 million. Agreement was reached during negotiationsthat the Governmentwill carry out this plan. Furthermore,by July 31, 1993, the Governmentwill submit to the Bank an acceptabletime-phased action plan based on the results of the Transport Board Study, aiming at reducing to a minimum the public sector involvementin passenger transport. Progress on this action plan will constituteone of the main issues to be reviewed during the Mid- Term Project Review in the first quarter of 1994 (para. 5.20). Disbursements against overlay works in FY94/95 and beyond will not be approved by the Bank unless the mid-term review determines that there is a satisfactoryprogress on the agreed action plan (para. 4.20).

Mi) Hiahway Planning

2.35 As part of the conditionalityof the (first) Road Maintenance and RehabilitationProject, MCW created a Planning Unit (PU) and staffed it with two qualified officers. These officers have attended overseas courses in transport planning and received additional training in the context of the technical assistancein project preparationprovided under the loan. However, most project investmentdecisions have been taken by TCD without sufficientconsultations with the PU. At the same time, a MaintenanceManagement Unit (MMU) was created within the TCD to prepare a road inventory and plah maintenance activities. As the focus of MCW's capital budget is changing from new investment projects to appropriate maintenance policies, the importance of the MHU in the planning process will become more and more pronounced. Given this change in focus, and to improve coordination between the two units, agreement was reached during negotiationsthat the PlanningUnit be incorporatedinto the TechnicalDepartment by December 31, 1992. The upcoming technical assistance will include training for both the PU and the MMU staff in investment and maintenance planning, especially in the use of the Highway Design and MaintenanceModel, developedby the Bank and now commonly used for design of road maintenance strategies. - 12 -

(j) Fuel Priceoand Other User Charao. 2.36 Fuel prices in Barbadosare highs gasolineis pricedat $B1.38per liter (equivalentto US$2.62per US gallon)and diesel at $B1.22 per liter (US$2.32 per gallon). The CIF cost of the productsper gallonwere (as of end- 1991) US$0.74and US$0.65,respectively. The structureof gasolineand diesel pricesis given in Table 10. With the consumptiontax at US$1.36per gallonfor gasolineand US$1.23for diesel,the revenuescollected are substantialt$B61 million in 1990 and an estimated$B77 million in 1991 (Table11). The 1991 figure is itselfmore than the total budgetaryallocation in FY91/92for road maintenance($B22 million)and capitalexpenditures ($B26 million). As the numbersabove indicate,there is also no distortionin the relativepricing of diesel and gasoline. 2.37 The cost of registrationfees and operatingpermits are also high. Privatecars and vans pay an annualfee of $B265-350depending on weight;light trucks $B800; medium trucks $B2,500;and heavy trucks $B5,000. Passenger transport vehicles also pay large fees: minibuses pay an initial permit of $B7,500, and annual fees of $B2,500-3,000; tour operators' vehicles pay an initialfee of $B15,000and annualfee of $B6,000;taxis pay $B1,250for a permit and $B250-400in annualfees; maxi-taxis $B12,500 and $B600;hire cars $B2,500 and $B800; and transportbuses $B800-1,600.As a result,registration fees generatesubstantial revenues: $B16 million in FY90/91and an estimated$B17 millionin FY91/92,a very largeamount in relation to the cost of rehabilitation and maintenanceof the road system. Other chargeson road users includevehicle inspectionfees, drivingtests and licenses,special permits, etc. These fees generated an additional $B6 million in revenues in both FY90/91 and FY91/92. 2.38 Importduties, stamp duty and consumptiontax generatesubstantial additionalrevenues from roadusers. Cars,pick-ups and vans have a duty of 45Z, a consumptiontax of 63-83Z(depending on the value of the vehicle),a stampduty of 201 and a recently imposed luxury surcharge of 2021 Buses and trucks have essentiallythe same set of charges,except that import duty is only 101. Revenuesgenerated by these taxes yieldedover $B36 million in 1988 and an estimated$B37.5 million for 1989, the last year for which actual data are available. The additionalluxury tax of 201 may or may not generateadditional net revenues,since the Governmenthopes that it would have the effect of dampeningdemand and reducingtotal importsof vehicles. 2.39 User chargesand costs are presentedin Table Q2 for the period 1986/87-1990/91and an estimateis providedfor 1991/92. As can be seen from the table,user chargeshave substantiallyexceeded the sum of both roadmaintenance and investmentcosts for each year. For FY91/92,total revenuesare over twice the total road costs. User charges are also adequate in terms of their distributionamong vehicle types. A calculationwas made (Table13) for revenues generatedby buses and trucks on a 1,000 vehicle-per-dayroad based on the averagevehicle distribution within the country. The table showsthat busesand trucksalon generatemore than sufficientrevenues to coverthe maintenance cost of the roads. Therefore,no furtheraction is requiredwith regard to user chargespolicy in Barbadosin terms of its overalllevel or the distributional effectamong vehicletypes. - 13 -

(k) Hishway Financing

2.40 Funds for highwayconstruction and maintenanceare providedby the Governmentfrom generalbudget revenuesafter approvalby the Cabinetand the Parliament. None of the regularuser charges is earmarkedfor highway financing. However,in 1982 a TransportLevy Fund (TLF)was createdto defraythe cost of improvementof publictransport and the constructionand maintenanceof public roads. It is fundedby a chargeagainst earnings of every employedperson (1.75Z of salary chargedto employeesand 0.25Z to employerson all salariesup to $B2,600per month). Total revenuesgenerated by the TLF in PY89/90were about $B27 millionand a similaramount is expectedto be generatedin FY91/92. Most of the funds generatedby the TLF have, until recently,been used for subsidizing the public transport system, with the rest assigned for construction and improvementof developmentalroads. The TLF is a purely fiscal instrument--not a user charge-- because it is levied on earnings and is not related to the use of road infrastructure. Its significance in terms of the budget is that its resources can not be used for other purposes. Given the expected eliminationof Government subsidies to the TRB beyond FY92/93 and the substantialreduction in coming years in road investmentsto be financed wholly by the Government (only about $B7 million in FY94/95), the Transport Levy Act should be amended so as to permit its use for general Government revenues or phased out totally. The Government plans to phase out this tax as part of its overall tax reform which is being developed in cooperationwith the IMF. Agreement was reached during negotiations that the Governmentwill submit to Parliament an amendment to the Transport Levy Act, or abolish it, no later than March 31, 1994.

III. PAST BANK EXPERIENCEIN THE SECTOR

3.1 The Bank has had only one operation in the road sector: the Road Rehabilitation and Maintenance Project, Loan 2432-BAR (US$11.0 million equivalent). It was signed in June 1984 and became effective in November of the same year. The project financed reconstruction of about 31 km of roads, improvement of some road intersections and a technical assistance and institutional building program in the areas of road traffic, workshops, laboratory research, road maintenance and overall planning. The loan closed on December 31, 1991. 3.2 The experience with project implementation has been reasonably good. All road civil works were substantiallycompleted by end-1989, about one year beyond the original closing date. The works have been completed to the desired standard. The only major setbackwas the misprocurementdeclared on the contract for rehabilitationof a section of Highway 2A (from Mile & a Quarter to Highway IA) when MCW reversed a prior decision and awarded the contract, unjustifiably in the Bank's opinion, to a bidder who did not submit the lowest evaluated bid. The Bank subsequently canceled the amount of the loan allocated to Highway 2A (US$2.5 million) and the loan was reduced to US$8.5 million.

3.3 During appraisalof the first projact, the Bank agreed that up to 502 of all road civil works, mostly smaller works, could be carried out by force- account. This was done in recognitionof the available manpower within MCW and taking into account the high mobilization cost by private contractors. The experience with force-accountwork has been satisfactory in terms of quality. - 14 -

However, these works tended to coot more and to take longer than expected. In fact, only force-accountworks remained incompleteby the original closing date of the loan. There is presently no further justificationfor MCW to carry out any force-account capital works, especially given the recent cuts in MCW personnel, which have left just enough staff to carry out the required maintenance work. This change is reflected in the content and design of the proposed project.

3.4 In terms of institutionbuilding, the first projectbrought about the establishment of the Traffic Divisior headed by a qualified overseas-trained officer. MCW also formed the Planning Unit (para 2.35), created the position of an Internal Auditor and established the Integrated Financial Accounting System (IhAS), responsible for monitoring and processing project expenditures. Furthermore, with technical assistance provided by the US Department of Transportation, and financing under the loan, MCW established and equipped a Soils and Materials Laboratory,which is now playing an importantrole in setting engineeringspecifications, reviewing project design and supervisingthe quality of materials used in all civil works.

3.5 The one drawback in achieving the full objectives of the technical assistanceprogram was its late start. Only in 1988 did MCW sign a contract with the US Departmentof Transportationto provide technicalassistance in the areas of equipment, road zaintenance,soils laboratory and traffic management. Both soils laboratory and traffic management experts have fully completed their assignments,having achieved all their objectives. The Traffic Division,which is responsiblefor improvingvehicle and pedestriantraffic flows and increasing road safety, is functioningsmoothly and traffic counts are available throughout the road network. The soils laboratory is responding to all MCW needs as well as providing services to outside parties. However, in the areas of road maintenance, equipment and workshops, the objectives were only partially met. A new equipment maintenance system was designed by the consultants, but the protracted review of the system by the committeeestablished for that purpose by MCW, did not leave sufficient time for the computerization and implementation stage. In terms of road maintenance, a road inventory was prepared, quantity standardsdeveloped, individual maintenance activities costed, and a computerized maintenanceprogram prepared. Again, the system did not enter the implementation and monitoring stage. The implementationof both systemswill be financed by the proposed project. Finally, while the project accounting system has been computerized,the task of computerizingthe accounting system of the MCW as a whole did not take place because of the delays in implementing the road maintenance and the equipment management systems. This task will also be included under the proposed project.

IV. THE PROJECT

A. Justification

4.1 The expansion of the road network to provide all parts of Barbados with reasonable access has now been completed, with only a few links still needing rehabilitationand reconstructionwork to bring them to an acceptable standard. The Governmentstrategy now focuses on providing an adequate level of service, which requires efficient road maintenance and equipment management - 15 _ policies. Some progress in both areas was achieved under the first Road Maintenanceand RehabilitationProject (Loan 2432-BAR)and the completion of this task and the implementation of a road maintenance and equipment management systems constitute a major objective of the new project. The implementationof the two systems will be assisted by outside consultants,and will benefit from the Bank's presence and monitoring.

4.2 Severe shortageof foreignexchange and rapid loss of competitiveness by Barbados' tourism, industriesand agricultureled to the February 1992 stand- by agreement with the IMP. The agreed program calls for drastic cuts in the level of investmentsand current expenditures,which have severely affectedMCW: its personnel has been cut from 2,500 to about 1,300 and maintenance staff from 1,400 to under 800. The level of investmentof MCW for FY91/92 has been reduced from about $B40 million to about $B30 million (of which about $B26 million is for the road sector) and this reduced level will have to be maintained for the following fiscal year. All these measures bring to the fore the need to increase the efficiency of available resources and define properly the level of service and size of the road network. The proposed project allows the GOB to carry out the required periodic maintenance and rehabilitationworks while adapting to reduced levels of investment and staff. The emphasis on periodic maintenance will maximize savings in vehicle operating costs, most of which are in foreign exchange.

4.3 The Bank's involvement will bring about a solution to two other inefficiencies: road maintenance strategies that do not vary in accordancewith traffic level and Transport Board operations which continue to incur heavy financial losses. The proposed project includes a study of the size of the network and agreement on optimal maintenance policies for the remaining roads based on their condition and traffic levels. Second, the Bank's participation in the projectwill allow monitoring of an action plan to reduce to a minimum the Government's subsidy for passenger transport and transfer most or all of the functionsof the publicly-ownedTransport Board to the private sector. Finally, the project will result in better planning procedures through the introduction of a new computerizedaccounting system, and regular updating of the Five-Year Investment Plan and the Four-Year Road Maintenance Plan.

B. Proiect Obiectives

4.4 The objectives of the proposed project are to:

(a) preserve the capital base of road infrastructure within the constraints on capital and current expenditures;

(b) improve road maintenance planning and practices;

*(c) reduce investment costs through the transfer of all capitalworks to the private sector and explore the feasibility of private sector participation in routine maintenance;

(d) improve road safety; and

(e) help the Government in its efforts to privatize passenger transport services. - 16 -

C. ProiectDescrintion (a) General 4.5 MCW has preparedan acceptableFive-Year 1992/93-1996/97 Investment Plan (Table14) designedto derivemaximum benefits from the limitedresources availablefor capitalexpendituress the planwill be updatedannually by December 31. The Bank, in parallelwith CDB, will financemost road investmentsin the period1992-96 which are includedin MCW's live-YearRoad InvestmentPlan except for the TrafficManagement Project, developed by the IDB, which is expectedto start in PY94/95. Projectappraisal has been conductedjointly with CDB and project conditionalityis similar. Given that the Bank's project is being negotiatedlater than CDB's,some additionalconditionality is incorporatedinto the Bank'sloan in the areas of roadmaintenance, road networkrationalization, privatizationof passenger transport servicas and environmentalcontrol. CDB's loan is partlyfinanced (US$7 million out of US$10 million)from the resources of the CDB V Project(Loan 3200-CRG). Disbursements of funds from the CDB loan have been made conditionalon the Bank loan becomingeffective. (b) Road Rehabilitation 4.6 The Bank will financethe rehabilitationand improvementof Highway 6 in two sections: Searlesto Six Roads (6.1km) and CollymoreRock-Villa Road (0.7km). A brief descriptionof these two sub-projectsis given in Table 15. The proposed CDB project would finance the remaining unimproved section of Highway 2A (7.7 km) and two roads which feed traffic into Highway 2A (Clermont Rd. and Canewood Rd., approximately 1.4 km and 1.3 km long, respectively). Together,these sub-projects involve about 18 km and representall rehabilitation needs of the road networkfor the foreseeablefuture, except for urban traffic managementwhich will be the targetof an IDB operation.

4.7 The rehabilitationworks financedby the Bank includerepavement, wideningof the carriagewayto 7 m, improvementof drainageand constructionof road shoulders. The sectionof CollymoreRock also includesremoval of rock which presentssafety hazards and improvingthe visibilityat two intersections which carry trafficof 21,000vehicles per day. The totalbase cost of the road rehabilitationcivil works includedin the Bank'sloan is about US$2.4million, of which the Bank will financethe estimatedforeign exchange cost of about US$1.3million (55Z of total cost). MCW has completedall engineeringstudies and the final designsfor theseworks. (c) Road Safetv

4.8 The road safety component consists of improving five road intersectionswith substantialtraffic and poor accidentrecords. The list of selectedintersections and detailson theirfeatures and proposedworks are given in Table 16. The existing designs of these intersectionsare severely restrictivein terms of capacitybecause of an inadequatenumber of lanes,snort curve radius,and poor sight distances,aggravated in some cases by obstacles that impairvisibility, such as voluminousrocks and stonewvall. Furthermore, thesenarrow roads are restrictedby heavy pedestriantraffic, which sharesthe carriagewaywith vehicletraffic due to the lack of sidewalksand shoulders.The proposedworks includeconstruction of separateturning lanes, sidewalks, some drainagework, removalof existingobstacles which affect sight distanceand - 17 - installationof trafficlights in two cases. The sub-projectsincluded under the oafetyprogram have been identifiedby MCW basedon existingtraffic and accident data, and preliminarydesigns were preparedto evaluatethe effectivenessof alternativesolutions. MCW alreadycompleted the finalengineering designs for the five sub-projects.The totalbase cost of the road safetycomponent is about US$2.1 million,of which the Bank will financeUS$1.1 million (551 of total cost). (d) OverlayProgram 4.9 One of the main objectives of the proposed project is the preservationof adequatestandards on the existingprimary and secondaryroad networks. Hence,the projectincludes a comprehensiveoverlay program to raise standardsand preventthe deteriorationof the existingnetwork. About 250 km of primaryand secondaryroads (approximately42% of the main network)are now in fair condition,and almost60 km (about10) in poor condition;a substantial portionof thisnetwork carries sufficient traffic to warrantah overlay.Timely interventionis particularlyimportant in the case of roads in fair condition, since the repairsneeded once the pavementstarts to break up are severaltimes more costly. The overlayprogram has been designedto reduce the backlog in periodicmaintenance to a level consistentwith MCW's abilityto carry out the requiredworks usingits own resources.To achievethis objectivewithin a four- year period,the overlayprogram to be financedby the Bank coversapproximately 160 km of high-priorityroads. The list of the selectedroad links includedin the proposedproject is given in Table 17. Theseworks were dividedinto four groups,each representingan annualoverlay program of 35-40km to be carriedout by contractors.To completethe program,MCW will performoverlays of about 25 km each year using its own resources;MCW's technicaland operationalcapacities are adequatefor the job.

4.10 MCW identifiedthe road links to be overlaidbased on pavement conditionsurveys, which includedmeasuring surface roughness, traffic data and economicevaluation. The distributionamong yearswas determinedon the basis of the relativeeconomic benefits of the projects. The total base cost of the overlay component is US$15.2 million, of which the Bank will finance the estimatedforeign exchange cost of about US$9.9million (651 of total cost). Agreementwas reachedduring negotiations that MCW will carry out the overlay works accordingto the list agreedwith the Bank. Furthermore,MCW will submit to the Bank the final engineeringfor the overlayworks for each fiscalyear, startingwith PY93/94,by October31 of the precedingPY. In addition,MCW will carry out overlaysof at least 25 km of roads using its own resources;by December31 of each year, startingin 1992, MCW will furnishto the Bank for approvalthe listof road linksselected for overlaythrough force-account during the followingfiscal year based on an economicstudy. At the completionof the project,virtually all primaryand secondaryroads now classifiedin fairor poor conditionwould thus have undergonerehabilitation or overlay.

(e) Bridasand CulvertRehabilitation 4.11 The proposed project includes rehabilitationof bridges and replacementof culvertswhich are in poor conditionand in risk of collapse. Theseworks are based on a surveyof the conditionof all bridgesand culverts throughoutthe primary and secondaryroad network. Three bridges have been selectedfor reconstructionbecause their structuralintegrity has worsened - 18 -

considerably. In addition, four culverts will be replaced under the proposed project due to their state of deteriorationand insufficienthydraulic capacity. Thesa works will include removal of existing structures, construction of new structuresaccording to appropriatedesign standards,repaving of short stretches and in some cases flatteningout of the road's vertical alignment. The total base cost of the bridge and culvert rehabilitationprogram has been estimatedat US$0.4 million, of which the Bank will finance US$0.2 million (55% of total cost). The list of eligible structuresto ba rehabilitatedwas agreed upon.

(f) Pilot Program: Routine Maintenance by Contract

4.12 MCW has traditionally carried out all routine maintenance work through force-account. The cost of routinemaintenance per km is about US$5,000, which, though high, is reasonablegiven the high labor costs in Barbados. The quality of force-accountmaintenance has been acceptable. However, there has never been an attempt to measure the cost and quality of force-accountroutine maintenance against similarwork carried out by the private sector. To provide a base for comparison, the project includes a two-year pilot program involving 65 km of roads whose maintenance will be carried out by a private contractor. The total cost is estimateA at US$0.6 million. Given the high cost of works carried out by the private sector in Barbados (due to the small size of the market and the limited number of local contractors), a larger commitment to privatizationof routine maintenance is not warranted at the moment. The mid- term project review will include an analysis and comparison of the relative merits of private and public sector execution of routinemaintenance. Agreement was reached during negotiation that ACW will submit by December 31, 1994 a proposed strategy for private sctor participationin routine maintenanceworks based on the pilot program for routine maintenance by contract.

(g) Equipment

4.13 MCW's road maintenancefleet is composed of 291 units, of which about 29% are more than 15 years old (Annex 1, Table 7). Of the present fleet, 72 units need minor repairs, 53 need rehabilitationor reconstruction,and 64 should be discarded. Equipment availability,currently about 60Z, has been limited in the past by the lack of timely provisionof spare parts and by the fleet's aging. MCW's workable fleet needs to be expanded and improved to enable MCW to conduct its maintenance activities in accordancewith the agreed road maintenance plan. The proposed project provides for replacement of old and costly-to-operate equipment units and rehabilitation of existing equipment where such rehabilitationis justified on economic grounds. A portion of this component is earmarked for purchase of spare parts.

4.14 A total of 112 new units, 31 major units and 81 minor units, will be acquired through the proposed project at a cost of about US$1.6 million. The list of equipment to be purchased, including some tools for MCW's workshop is given in Table 18. In addition to replacing old units, the list also includes some new equipmentwhich will be purchasedto improve the operationalefficiency of maintenance activities; among such items are weed control equipment, small dump trucks, and asphalt sprayer distributors. About 21 units less than ten years old, and 9 units between ten aradfifteen years old, will be rehabilitated in accordancewith a program prepared by MCW's workshop (Table 19). Most of the program will be carried out in MCW's workshop, which is properly equipped and staffed for this purpose. The project will finance US$0.7 million for purchase - 19 -

of spare parts needed to carry out this portion of the equipment rehabilitation program and provide for a stock of essential parts to reduce downtime during equipment servicing. Additional equipment rehabilitation will be done by contract at a total cost of about US$0.1 million. The equipment whose rehabilitationis considered too expensivewill be disposed of as a part of the program. Finally, about 150 fare-boxes,costing about US$0.2 million, will be purchasedto enable the TransportBoard to convert to a one-personbus operation.

(h) InstitutionalImDrovement

(i) General

4.15 The project includes financing of a technicalassistance program to improveworkshop operationsand implementthe road maintenancemanagement system started under the first Bank project. Also, additional assistance will be provided in devising short-term measures to reduce operational costs of the Transport Board. Furthermore,studies will be undertakento design a medium-term strategy to privatize passenger transport services, optimize maintenance policies, and mechanize the accountingsystem of MCW. A training program for MCW staff in operating areas and in investment evaluation techniques is also included, as is a retrainiug program for laid-off staff. Draft terms of reference for the technical assistance tasks and for all studies were agreed during negotiations. The institutionalimprovement program has a total estimated cost of US$2.0 million.

(ii) Technical Assistance

a. Road Maintenance and Equipment Management System

4.16 Efforts undertakento improvemaintenance management under the f Irst Bank project included 12 man-months over the period 1988-91. To date, a revised maintenance manual for field operations has been completed, a road condition inventory implemented,and a computer program establishedfor the developmentof annual road maintenance requirements. In addition, an equipment management system manual was completed late in 1988 and an inventory of MCW's equipment fleet was developed. Furthermore,MCW created the MaintenanceManagement Unit and strengthenedworkshop management. The technical assistance program to be financed by the proposed project will build on such improvementsand focus on field implementation. In particular, the consultants will assist MCW in: implementing the road maintenance work programming and reporting systems throughoutthe districtsand depots;improvirg crew productivityand work quality throughapplication of performancestandards and upgradedwork practices; setting up an accounting system capable of monitoring MCW's expendituresaccording to specific tasks, reporting actual equipment cost performance,and providing the necessary interfacebetween the existingbudgetary system and the maintenanceand equipmentmanagement systems;and introducingpolicies and proceduresto increase equipment availabilityand utilization,reduce equipment downtime, and improve spare parts management through a computerized inventory sub-system. Terms of reference for the study are given in Annex 3. The technical assistancewould be carried out over a period of two years by a road maintenance specialist (18 months), an equipment management specialist (12 months), and a cost accounting specialist (9 months). Agreement was reached during negotiations that these consultantswill be selected by December 31, 1992, and that a road maintenance system, based on their vork and acceptableto the Bank, will be in place by March - 20 - 31, 1994. In addition,a localconsultant experienced in maintenancemanagement and computersystems will be recruitedto assistthe MHU. His terms of reference are given in Annex 4. b. TransportBoard Operations

4.17 While a medium-termstrategy to privatizethe operationsof the TransportBoard is being studied,thare is a need for expert services in designingand implementingshort-term cost reductionmeasures to enablethe TRB to minimizeits losses,thus reducingthe fiscalburden on the Government.Three monthsof consultingservices will be providedto MCW and TRB under the project for this purpose. (iii)Studies

a. Road NetworkRationalization Study 4.18 As statedin para.2.1, the pavedroad networkis Barbadosis large in comparisonwith other similar countries. A substantialnumber of roads (primarilytertiary and local roads, but also a few secondaryroads) are maintainedto a paved standard,although the traffic level, as low as 100 vehiclesper day, does not seem to justifysuch a standard. Also, some roads with such low levelof trafficcan be leftunmaintained while trafficis diverted to parallelroads. An analysioshould be conductedto findout which roadscould be thus downgradedwithout high socialand economiccost. Furthermore,all paved roadshave in the past been subjectto the same routineand periodicmaintenance policy. Maintenanceactivities on each road need to be re-examinednot only in light of the physicalcondition but also in terms of traffic level and the frequencyand type of economicallyjustified maintenance policies. The proposed Road NetworkRationalization Study (Annex5) will examinewhich roads need to be leftwithout any maintenance,which onesneed to be maintainedto less thanpaved standardand what maintenanceactivitiest and in what frequency,are justified for each road in the remainingroad network. Sincethe resultsof the studywill have an impacton the Four-YearRoad MaintenancePlan, it shouldbe implemented as quickly as possible. Agreementwas reached during negotiationsthat consultantsfor the studybe selectedby December31, 1992,and that agreement on a plan of actionbased on the studyshould be reachedno laterthan December 31, 1993. b. Com2uterizsationStudies

4.19 Most of MCW's accountingand administrativesystems are manually operated. This placesa severeburden on the productionof timelyand accurate managerialreports. MCW intendsto introducea comprehensivecomputerized system whichwill integrateall departmentsinto one informationnetwork, thus ensuring consistencyand promptnessof data, and has already prepared an elaborate documentspecifying the requirementsfor each sub-systemand their integration. However,for this exerciseto be most effective,it shouldstart about six months after the beginningof the technicalassistance for the implementationof the road maintenanceand equipmentmanagement system in orderfor the consultantsto have a lead time to preparethe data base systemin thesetwo areas. Therefore, agreement was reached during negotiations that consultants for the computerizationstudy should be selected by June 30, 1993 and that the mechanizationof MCW accountsbe completedby December31, 1994. Also, MCW has - 21 - recentlysigned a contractfor a more limitedstudy of mechanizingthe accounting systemof the unit which handlesinternationally financed projects. This study will also be financedunder the proposedproject.

c. TransaortBoard Study 4.20 As described in para. 2.34, the European DevelopmentFund has authorizedfinancing for a study of the rttionalizationmeasures and the privatizationoptions for the passengertransport services currently provided by the publicly-ownedTransport Board. The terms of referencefor the study have been reviewedby the Bank and are acceptable(Annex 2). While the Bank is not financingthe study, it will be involvedthrough the implementationof its recommendations.Agreement was reachedduring negotiations that the Government will submit,by July 31, 1993, an actionplan to substantiallyprivatize the operationsof the TransportBoard, based on the recoimmendationsof the Transport Board Study, and implementsuch action plan. Also, the project'smid-term review,to be conductedin the firstquarter of 1994,will focuson the carrying out of the agreedaction plan, and disbursementsagainst overlay works in FY94/95 and beyondwill not be approvedby the Bank unless there is a satisfactory progressin this area and the Bank has confirmedit to the Governmentin writing. (iv) Training 4.21 The proposedproject provides funds for on-sitetraining of MCW staff in various technicalareas. The programwas preparedby MCW based on the recommendationsof consultantsengaged under the first Bank-financedproject. First, short coursesand on-the-jobtraining will be providedby consultants engagedthrough the proposedtechnical assistance program and by trainingexperts hired for this purpose. Second,a local consultant,with broad experiencein MCW's maintenanceoperations, will providethe follow-uptraining needed to acquaintstaff with data sourcesand informationfeedback. Third, the Equipment ManagementDivision (workshop)will be responsiblefor managing a training programfor all driversand operators. This programwill cover such items as properequipment operation, daily inspection and servicerequirements, and safety procedures. Finally,equipment manufacturers will be requestedto provide trainingin conjunctionwith purchasesof new equipment.

4.22 The trainingprogram will also be carried out off-site through participationof MCW's key personnelin local coursesprovided by training institutionsand colleges,international seminars and conferences,overseas courses and medium-termstudy programs,etc. To supportMCW's expansionof computerization,its personnelwill be trainedin electronicdata processing. The consultantsfor the road NetworkRationalization Study will train staff of the MaintenanceManagement unit and the PlanningUnit in the use of the Highway Design and MaintenanceModel and relatedproject evaluation techniques. In addition,the projectwill financea retrainingprogram, when requirnkd,for staff laid off at MCW and the TransportBoard. The total cost of the training component,to be financedunder the project,is US$0.8million. - 22 - F. ProlectCosts and Financing

4.23 As alreadystated, the projectfinances a componentof MCW'a1992/93- 1996/97Investment Plan. The CDB project,which financesanother component (reconstructionof Highway 2A and two related roads), was appraised in coordinationwith the Bank,and includessimilar conditionality. The investment plan is detailedin Tables14 and 20 and summarizedbelow (in US$ million):

IBRDLoan 2432-BAR 0.1 _ _ _ _ 0.1 Tertlary Roads-Venezuela 0.9 _ _ _ _ 0.9 ProposedProject - IBRD 2.4 11.3 8.0 6.6 4.8 33.1

ProposedProject - CDB 2.1 4.2 3.0 3.3 - 12.6

rafficManagement - IDB - 2.0 3.5 5.0 7.5 18.0 ROadsProject. 3.9 2.5 2.5 2.5 5.0 16.4 CW Other Project. 1.9 1.1 1.1 1.1 1.1 6.3

ranaportBoard 1.2 - - - - 1.2

4.24 The sub-programto be financd by the Bank and CDB accounts for about 52Z of all investments in the period 1992-96. The IDB'a Traffic Management Projeet, due to start in 1994, will account for another 20X. The level of MCW's investment in FY92193, at US$12.5 million, is substantially below the actual level of FY91/92(US$15 million). It increases,however, to an average of about uS$19 million in the period 1993-969,still below the original budget for PY90/91 of about USS20 million. Furthermore, the annual Govertment of Barbados (GOB) contribution to the program is to decline over the period from US$13.2 million in FY91/92 to an average of US$9.3 million in 1992-96. The share of GOB in the total investment throughout the 1992-96 period is 522.

4.25 The financing plan for the IBRD/CDB sub-program is as follows:

IBRD ProJect 24.0 42.3 66.3 12.0 21.2 33.2l CDB ProJect 8.0 17.2 25.2 4.0 8.6a 12.6a

a/ Excludes US$1.0 million in interest during construction. - 23 -

BARBADOS

SECOND ROAD MAINTENANCEAND REHABILITATIONPROJECT

FINANCINGOF PROJECT COSTS

P r o j e c t C o s t s P r o j e c t C o s ts B a n k PROJECT COMPONENT CBDS million) CUSS million) L o a n LOCAL FOREIGN TOTAL LOCAL FOREIGN TOTAL CUSS mill) C%)

1. CIVIL WORKS

A. REHABILITATIONPROGRAM

- Highway 6: SearLs - Six Roads 1.8 2.3 4.1 0.9 1.1 2.1 1.1 55 - Highway 6: CotlymoreRock 0.3 0.4 0.8 0.2 0.2 0.4 0.2 55

Subtotal RehabilitationProgram: 2.2 2.7 4.9 1.1 1.3 2.4 1.3 55

B. SAFETY PROGRAM

- Rendezvous - H'way 7 0.7 0.8 1.5 0.3 0.4 0.8 0.4 55 - Codrington - Cave HiLl 0.5 0.6 1.0 0.2 0.3 0.5 0.3 55 - Pine EW - Pine NS 0.2 0.3 0.5 0.1 0.1 0.3 0.1 55 - Thornbury - H'way 7 0.3 0.4 0.7 0.2 0.2 0.3 0.2 55 - Rendezvous - Golf CLub Rd. 0.2 0.2 0.4 0.1 0.1 0.2 0.1 55

Subtotal Safety Program: 1.9 2.3 4.2 0.9 1.1 2.1 1.1 55

C. OVERLAY PROGRAM

- Package "Al 1.9 7.7 9.6 1.0 3.9 4.8 3.9 80 - Package "B" 1.7 5.1 6.8 0.8 2.5 3.4 2.5 75 - Package "C" 3.6 3.6 7.2 1.8 1.8 3.6 1.8 50 - Package ID' 3.5 3.5 6.9 1.7 1.7 3.5 1.7 50

Subtotal Ovorlay Program: 10.7 19.8 30.4 5.3 9.9 15.2 9.9 65

D. BRIDGES AND CULVERTS 0.4 0.5 0.8 0.2 0.2 0.4 0.2 55

E. RMBC PILOT PROGRAM 0.6 0.7 1.3 0.3 0.4 0.6 0.4 55

SUBTOTAL CIVIL WORKS 15.7 25.9 41.6 7.8 13.0 20.8 13.0 62

ll. LAND ACQUISITION 2.9 0.0 2.9 1.5 0.0 1.5 0.0 0

111. EQUIPMENT

New Equipment 0.0 3.3 3.3 0.0 1.7 1.7 1.7 100 Spare Parts for Rehab. and Maintenance 0.0 1.4 1.4 0.0 0.7 0.7 0.7 100 Rehabilitationby Contract 0.1 0.2 0.3 0.1 0.1 0.1 0.1 60 Bus Fareboxes 0.0 0.3 0.3 0.0 0.2 0.2 0.2 100

SUBTOTAL EQUIPMENT 0.1 5.1 5.2 0.1 2.6 2.6 2.6 98

IV. INSTITUTIONALSTRENGTHENING

Technical Assistance 0.0 1.1 1.1 0.0 0.6 0.6 0.6 100 Studies (Rationalizationof Road Network) 0.0 0.4 0.4 0.0 0.2 0.2 0.2 100 Studies (Computerization) 0.0 0.8 0.8 0.0 0.4 0.4 0.4 100 Training - Transport Board 0.5 0.5 1.0 0.3 0.3 0.5 0.3 50 Training - local MCW 0.1 0.1 0.2 0.1 0.1 0.1 0.1 50 Training - foreign MCW 0.0 0.4 0.4 0.0 0.2 0.2 0.2 100

SUBTOTAL INSTITUTIONALSTRENGTHENING 0.6 3.3 3.9 0.3 1.7 2.0 1.7 85

V. PHYSICAL CONTINGENCIES 1.6 2.6 4.2 0.8 1.3 2.1 1.3 62

S U 8 T 0 T A L 20.9 36.9 57.8 10.4 18.5 28.9 18.5 64

VI. PRICE CONTINGENCIES 3.1 5.4 8.5 1.5 2.7 4.2 2.7 63

VII. TOTAL COST 24.0 42.3 66.3 12.0 21.2 33.1 21.2 64

Note: Figures in USS may not add up to the total because of rounding. - 24 -

4.26 The Bank will finance the foreign exchange component of the project (about 64Z)l the remainderwill be financed by GOB. The loan will finance the foreign exchange componentof the rehabilitationand oafety works (55Z), overlay program (651), and rehabilitationof equipmentby contract (60Z). The project will also finance OOZ of the imported cost of all equipment, 1OOZ of technical assistanceand overseas training and 502 of local training. The project cost by year is shown in Table 20. The costs reflect end-1991 prices. The preceding table shows total IBRD project costs by com)onent. Project cost estimates are based on: (i) up-to-date cost estimates by local consultants for all rehabilitation and safety works; (ii) preliminary engineering estimates for overlayworks; (iii) suppliers'current publishedprices for equipmentand spare parts; and (iv) prevailing fe6s for individualtechnical assistance consultants (US$12,000 per month for expatriate consultants and US$4,000 for local). Physical contingenciesare calculatedat 102 of the contract price for all civil works. These contingenciesare estimatedat US$2.1 million. Price contingencies are estimated at 52 p.a. (in US$ equivalent) for the period 1992-96 with an estimated total cost of US$4.2 million. Agreement should be reached during negotiations that MCW and the Government will earmark the counterpart funds needed for the project as follows: FY92/93 - US$0.5 m4llion; FY93/94 - US$3.2 million; FY94/95- US$2.4 million; FY95/96 - US$3.4 million; and FY96/97 - US$2.4 million.

G. Economic Evaluation

(a) Road Rehabilitation

4.27 For purposes of the economicevaluation, the road network in Barbadoe has been divided into over 130 links. Each link has been assigned a ranking from i to 5 for all major physical features (1 being the best) and then assigned an overall physical condition ranking computed as a weighted average of all features. A ranking of 1-5 was also assigned to the traffic level (1 being the lowest) and the traffic and physical condition ranking were combined into one overall ranking. This made it possible to screen relatively fast all road links and identify those in bad conditionwith a high level of traffic. Such roads were most likely to yield the highest rate of return on rehabilitationworks.

4.28 Preliminary engineeringstudies were prepared for the fifteen roads which showed the highest priority in the preselectionprocess. These roads were analyzed using the Highway Design and MaintenanceModel developedby the Bank to find out whether rehabilitationwas justified. All but one section showed acceptable rates of return (182 to over 1002). However, most of the roads proposed for rehabilitation showed a similar level of benefits for a substantially lesser investment consisting mainly of an overlay, which allows cost savings on realignment,drainage works and sidewalk constructionwhere such works are not considered essential. After further screening incorporatingthis option, only five road sections totalling about 18 km were finally selected for full rehabilitation: Highway 2A and two roads leading to it (CanewoodRoad and Clermont Road) totalling 10.4 km, to be financed by CDB, and two sections of Highway 6, totalling 6.8 km, to be financed by the Bank.

4.29 Highway 2A from Warrans to Lancaster, to be financed by the CDB, connects the airport road (known as the ABC highway) with the northern parishes of Barbados. It serves agricultural(sugar), commercial and tourism purposes. This work will complete the rehabilitationof Highway 2A, of which 6.2 km, from - 25 - Laneasterto Mile and a Quarter,were rehabilitated with Government funds between July 1988 and September 1991. The proposed rehabilitationwill reduce vehicle operatingcosts (averagedaily trafficis 2,000-8,000 vehicle per day) and allow diversion and time savingsfor vehiclespresently using the congested,parallel, two-lane Highway 1, where volumes exceed 20,000 vehicles per day in its approachesto the Bridgetown area. The economic return on the rehabilitation of Highway2A and its two accessroads, estimated to cost US$10.5million excluding contingencies (US$1.0 million per km), is about 17Z. 4.30 The Bank will finance the rehabilitation of two sections of Highway 6 leading from Bridgetownto the sooth-easternpart of Barbados. The rehabilitationcost is B$4.9million (US$360,000 per km). Trafficon the road varies from over 20,000vehicles per day in the CollymoreRock sectionnear Bridgetownto a range of 1000-2000in the Searles-SixRoads section. The proposedrehabilitation works will improveroad roughness,horizontal curvature, visibility,drainage and pedestriansafety. In tha economicanalysis, the HDM model simulatedthe road conditionand vehicleoperation costs in the "with" scenario(rehabilitation work carriedout) and the "without"case consistingonly of routinemaintenance and road patching. The rate of economicreturn is over 901 on the high-trafficsection close to Bridgetowrand 201 in the Searles-Six Roads section;the weightedrate of returnis about281. If rehabilitationcost increasesby 15Z, the return on the two road sectionswill be 80S and 181, respectively.The first-yearreturn on the road sectionwhich has the lowest returnis still 15.51,well above the opportunitycost of capital. It shouldbe notedthat the abovereturns exclude benefits related to the safetyfactor, thus underestimatingthe full economicimpact of the rehabilitationwork. (b) OverlayProgram

4.31 The primaryand secondaryroad networkswere subjectto an economic analysis which determined the priority of an overlay program for all roads in thesenetworks which are now classifiedin poor or fair condition.The analysis, usingthe 0DM model,compared the benefitsto be derivedfrom an overlay(costing about US$90,000per km) with those of only routine maintenance(priced at US$5,200per km) and patching (US$25.50per sq.m.). The cut-offpoint for inclusionof roadsin the programwas an economicreturn of 201. About 160 km of high-priorityroads qualified utder this criterion,with returnsranging from 201 to well over 1001 (see detailsin Table 17). The weightedreturn on all roads in this programis 581. The projectswere arrangedin descendingorder accordingto their returnon investmentand dividedinto four annual overlay packageswith projectswith the highestreturn in the firstyear, and thosewith the lowestreturn in the last year. It shouldbe noted that since the projects carriedout in the last year will show furtherdeterioration beyond today's conditionby the time an overlayis carriedout, the actualreturn on the overlay programwill be higher than the above-mentionedreturns. 4.32 The cost of overlayworks can be eatimatedwith a high degree of accuracy because engineeringdesigns are simple, and underestimationof quantitiesis not likely. Nevertheless,a sensitivityanalysis was conductedfor the economicreturns on the overlayprojects assuming that investmentcosts increaseby 151. Under this condition,and takingonly today'sroad condition into account,no sub-projectshows a returnof less than 151. - 26 -

(c) Safety Proaram

4.33 The loan will financethe improvementof five road intersectionswith poor accident records. The proposed works will improve visibility, add turning lanes and construct sidewalks. The economic benefits from the program will include savings in human lives, injuries and damage to property, as well as time savings because of tne reduced road congestion. The economic benefits from reduction in injuries and deaths were based on data supplied by insurance companies and hospitals. As such, they underestimatereal benefits because they do not take fully into account the lost productivity. Time savingswhich entered into the calculationrelated only to work-relatedtrips. The resulting returns, which also exclude environmentalbenefits from the reduced congestion, varied from 142 to 19Z with a weighted average of 171.

V. PROJECT IMPLEMENTATION

A. Proiect Execution

(a) General

5.1 The proposed loan would be made to the Ministry of Public Works, Communicationsand Transportation(MCW), which will carry out the project through its Technical Department. Highway and bridge rehabilitation,overlay works and the safety program will be carried out by private contractors under the supervision of the Projects Division within the Technical Department. The Workshop Manager will be responsiblefor carrying out the equipmentpurchase and rehabilitationprogram and the technical assistance will be supervised by the Chief Technical Officer, Workshop Manager and Chief Financial Officer in the areas of road maintenance,workshop, and accounting oystem, respectively. The studies on Transport Board Operation and Road Network Rationalizationwill be monitored by the Chief Planning Officer under the overall supervision of the Permanent Secretary. The purchase of fare-boxes and employment of a short-term consultant on cost reductionmeasures for the Transport Board will be done under the supervisionof the Permanent Secretary. The Project Coordinator (para. 5.3) will be responsible for putting together all training proposals to be financed by the project.

5.2 Final engineering studies have been completed for the road rehabilitation works, bridges and safety works. By negotiations, final engineering should be available for the first-year overlay works. The engineeringstudies were carried out through a combined effort of consultantsand the Project Design Division within the TechnicalDepartment. This mechanism for projectpreparation operated under the first project and has resulted in reliable designs and cost estimates. Agreement should be reached during negotiationsthat final designs for overlayworks in each fiscal year (startingwith FY93/94) will be sent to the Bank by October 31 of the preceding fiscal year.

(b) Proiect Coordination

5.3 One area which has been relktivelyweak during execution of the on- going operationhas been day-to-daymonitoring of the progress of the project and - 27 -

coordinationamong the various organizationalunits which shared responsibility for its implementation. Therefore, before negotiations, MCW will nominate a qualified candidateacceptable to the Bank to serve as Project Coordinator. The Project Coordinator will be responsible for preparing the quarterly progress reports, advising management of any issue which may affect project implementation,organizing monthly meetings of all units concernedwith project execution, resolving issues with contractorsand suppliers,overviewing project accounting,monitoring submissions of disbursementapplications, and processing and reviewing training proposals.

(c) Road Maintenance

5.4 While the project does not finance routine road maintenance, implementation of a medium-term viable maintenance plan is one of the cornerstones of the project. Also, the project's equipment component was designed in accordancewith the annual maintenancerequirements. The Four-Year Road Maintenance Plan for 1992/93-1995/96has already been prepared by the Maintenance ManagementUnit (MMU)with assistanceof consultantsand Bank staff and was agreed during negotiations. The plan is based on the private sector assuming about 60% of all periodic maintenanceworks and carrying out the pilot program of routine maintenance by contract. The MMU will continue to be responsiblefor updating the Four-YearRoad MaintenancePlan and will be assisted in this task by consultants under the technical assistance program. The execution of the plan will be the responsibilityof the Chief Technical Officer.

B. Procurement

5.5 All civil works contracts exceeding US$1.5 million will be subject to internationalcompetitive bidding (ICB) in accordancewith Bank guidelines. The threshold for ICB was determined based on the experience with the recent Bank loan. The proposed project includes five main contractswhich fall under ICB: (a) rehabilitationof Highway 6 from Searles to Six Roads; and (b) four overlay contracts each covering an annual overlay program. The estimated base cost of the contracts varies between US$2.1 million and US$4.8 million. Contracts for civil works costing below US$1.5 million will be subject to local competitive bidding (LCB) in accordancewith local procedureswhich are acceptable to the Bank. This will include rehabilitationof the CollymoreRock section of Highway 6, rehabilitationof all bridges and culverts, the road safety program and the pilot program for routine maintenance by contract. The civil works for the safety programwill be divided into five contraetseach covering one intersection (base cost varying from US$0.2 million to US$0.8 million). Bridge and culvert works (totallingUS$0.4 million)will be contractedin three packages. The total cost of LCB works is US$4.3 million. The appraisal mission reviewed LCB procedures and found them acceptable. In particular, the procedures allow bidding by foreign contractors.

5.6 The estimated cost of individual contractsis shown in Table 20. In line with para. 4 of Appendix 1 of the Bank's procurement guidelines,MCW will inform the Bank and obtain its approval before agreeing to any change in any contract which will raise its cost by more than 202 over the original contract price. Agreement on the 20% threshold should be reached during negotiations. In addition, disbursements against the contracts for the overlay program in FY94/95and beyond will be subjectto satisfactoryprogress on the implementation of the action plan for the Transport Board (para. 2.34 and 4.20). - 28 - 5.7 Equipmentwill be procuredunder ICB, except for items not exceeding US$25,000and totallingno moro than US$400,000,which will be procuredusing shoppingon the basis of comparisonof price quotationsfrom at least three suppliers. Purchase of fare-boxes (US$200,000)and the contract for rehabilitationof equipment(US$100,000) will alsobe doneby shoppingamong the limited suppliers(due to equipmentspecificity) and establishedworkshops, respectively.Under ICB, suppliersfrom CARICOMcountries, including Barbados, will be givena marginof preference,in accordancewith Bank guidelines.

5.8 All contractsfor civilworks exceeding US$500,000, all contractsfor procurementof equipmentunder ICB and the contractfor equipmentrehabilitation will be subjectto priorreview by the Bank. Thus,prior review will involve90Z of civilworks and about852 of all equipment.Since the rest of the equipment is mostly spareparts, this percentageis satisfactory.Prior reviewwill not cause any delays becauseMCW alreadyuses the Bank's sampledocuments as its standardbidding documents for procurementof goodsand works. The use of these documentswill be confirmedduring negotiations.

5.9 Consultant services for technical assistance and studies will be contractedin accordancewith Bank guidelinesand termsof referenceagreed with the Bank. All contractsfor consultantswhich exceed US$50,000(902 of the total)will be subjectto prior review. Contractsbelow this limitwill be subjectto post-reviewon a selectedbasis. A standardletter of invitationfor consultantsand a standardform of a consultant'scontract, acceptable to the Bank, are alreadyin use by MCW and will be confirmedduring negotiations.

5 10 The following table shows the distribution of the type of procurement appropriate for the acquisitionof works, goods and services under the project.

Clvll Works 22.2 4.3 _ 1.5b/ 28.0 (14.1) (2.4) () -) (16.5) Equipment 2.2 0.7cl 2.9 (2.2) (-) (0.7) (-) (2.9) TechnicalAssistance, _ _ 1.3d/ 0.9./ 2.2 Studies and Training (-) (-) (1.3) (0.5) (1.8)

/ 201ti11s1 f1 llohi .

C. Disbursements

5.11 Disbursementswill be made against the followingcategories of eligibleexpenditures: (a) 55Z of totalexpenditures for road rehabilitation, - 29 -

safety work. and bridge and culvert rehabilitation; (b) 65Z of the total expenditureson road overlays (80Z until disbursementsreach US$7.4 million and 501 thereafter);(c) 602 of the cost of equipmentrehabilitation by contract; (d) 1001 of the CIF cost of imported goods and 901 of expenditureson goods purchased locally; (e) 1001 of total expenditures on technical assistance, studies and overseas training and 50Z of the total cost of local training. The allocation of loan proceeds among the various loan categoriesis shown in Table 21. While the overall financing of overlay works during the project period corresponds to the foreign exchange component (651), the percentage in the first two years has been increased to 801 to ease the burden on the Government given the present acute shortage of foreignexchange. (The financingfor overlayworks in the last two years is only 501).

5.12 Retroactivefinancing, up to a total of US$0.2 million for equipment (fare-boxes for buses) and US$150,000 for consultants (bus operations, road maintenance and project accounting) is recommended for expendituresmade after March 1, 1992, but before loan signature. These payments ensure continuity of the technicalassistance program startedunder the first Bank project and provide urgent short-term assistance to the Transport Board.

5.13 A special account will be established in the Central Bank with an initial deposit of US$1.7 million, which representsapproximately four months of Bank-financed expenditures. MCW would be entitled to make payments from the Special Account for the Bank-financedportion of all expenditures.Applications for replenishmentof the Special Account would be submittedusing statementsof Expenditures(SOE'a) for expendituresunder contractsfor: (a) civil works whose value is the equivalentof US$500,000 or less; (b) expendituresunder contracts for equipment purchasewhose value is US$25,000 or less; and (c) expenditureson consultantswhose contractvalue is the equivalentof US$50,000 or less. Back-up documentationwould be reviewed by supervisionmissions in the field on a sample basis. All other withdrawal applicationswould be fully documented.

5.14 The estimateddisbursement schedule for the proposed loan, based on the assumptionthat the loan would become effectivein the third quarter of 1992, is shown in Table 22. The estimatedprofile extends disbursementsthrough March 1997, or approximately4.5 years. This is about one year less than it took to disburse the funds allocated for civil works under the first loan. The smaller share of rehabilitationunder the present project and the lack of force-account capital works will help expedite project execution.

D. Audits

5.15 Records related to project expenditureswill be kept by the Internal Financial Account System (IPAS),a unit within the Accounting Departmentof MCW which was established under the first project. The Project coordinator will ensure that all bills are promptly sent to IFAS for processing. The Internal Auditor will provide an additionalcontrol point, verifyingthat all payments are made against eligible expenditures.

5.16 All accounts under the first loan were audited by private external auditors. There were some delays in submissionof reports but their quality has been acceptable. Agreement was reached during negotiations that the project accounts, the Special Account and SOE's will be audited by private external auditors, acceptable to the Bank, in accordance with appropriate accounting - 30 -

principles,and that auditstatements will be submittedno laterthan fivemonths after the end of each fiscalyear. E. Monitoring

5.17 The projectwill be monitoredagainst the followingaction program:

October 31, 1992 Complete final engineering for overlayworke for FY93194. December31, 1992 Transfer Planning Unit to Technical Department. Submit list of roads to be overlaid during 1993/94 by force-account. Select conoultants for road maintenance and workshop improvement. Select consultants for Road Network Rationalization Study. Update Five-Year Investment Plan and Four-Year Malntenance Plan. March 31, 1993 Complete 25 lm of overlay. in FY92/93 using force-account. June 30, 1993 Select coneultants for the computerization study. Submit to parliament the amendment to the Quarries Act. July 31, 1993 Agreeon actionplan for privatizationof publicbue transportation. October31, 1993 Completefinal engineering for overlay-work.for FY94195. December31, 1993 Submitlit of roadsto be overlaidduring 1994/95 by force-account. Agree on actionplan basedon the Road NetworkRationalization Study. UpdateFive-Year Inveatment Pln and Four-YearMaintenance Plan. March 31, 1994 Complete25 km of overlay.in FY93/94using force-account. Put in placenew roadmaintenance management system. Submitamendment to, or phaseout, the TraneportLevy Act. October31, 1994 Completefinal engineering for overlaywork. for FY95/96 December31, 1994 Submitstrategy for privatesector participation in roadmaintenance. Completecomputerization of MCW9s accounts. submit list of roads to be overlaid during 1995/96 by force account.

5.18 As part of the monitoringprogram, MCW will achievethe following productivitystandards by December31, 1993s

Pothole Paching Tou of asphalt 5.0 9.0 1.0 Concrete placed Manual Drain Cleaning Km Cleaned 0.1 8.0 1.0 Guard Rall Rpazr MaterReplaced 15.0 10.0 2.0 Manual Weeding Km Roadside 1.0 12.0 1.0 Culvert Maintenance Culvert Repaired 1.0 6.2 0.2 Concrete Slipper Repair MaterReplaced 20.0 7.2 1.2 Resurfacing Ton of Asphalt 300.0 19.0 10.0 Concrete Placed _ surface Tr=atment Sq. m. resealed 1000.0 13.0 4.0

5.19 ZCW will submitto the Bank quarterlyreports, to be preparedby the Project coordinator, showing: (a) progress on each contract under implementation;(b) up-to-date project cost estimateby component;(c) statusof - 31 - loan disbursementsagainst forecast; end (d) actualamount spent in counterpart funds for each project componentagainst the amount budgeted. The Project Coordinatorwill be responsiblefor preparationof *ll reports.

5.20 In the firstquarter of 1994,the Bankwill conducta mid-termreview with the participationof MCW and the Ministryof Financeand EconomicAffairs. The reviewwill covers physicalprogress of the project;execution of the institutionalstrengthening program; implementation of the Five-YearInvestment Plan and Four-YearMaintenance Plan and theircorresponding financing; the status of computerizationof MCW'saccounts; and progresson the actionplans resulting from the TransportBoard Study and the Road NetworkRationalization Study. At the Bank'srequest, the Governmentwill adopt the requiredremedial actions. F. EnvironmentalImnact

5.21 The projectitsolf will not have any adverseenvironmental impact as most civil works involve only overlaysover existingroads. The two road sectionsto be rehabilitateddo not involvea major change in alignmentor relocation.On the otherhand, the projectwill reducetraffic congestion, air pollution,and road accidents. The CDB-financedrehabilitation of a secticnof Highway2A involvesrelocation and changesin alignment;disbursements of that loan are conditionalon agreementon adequatemitigatory measures. 5.22 All civil works contractssigned by MCW include provisionsfor cleaningup of constructionsites and removalof debris. However,MCW does not have any staffassigned on a permanentbasis for monitoring compliance with these provisions.Agreement should be reachedduring negotiations that, as a condition for loan effectiveness,MCW will appointan environmentalofficer within the TechnicalDepartment under termsof referenceacceptable to the Bank. A suitable candidateis currentlyundergoing overseas training in the environmentalcontrol area.

5.23 Environmentalmonitoring for transportprojects at the Government level is vested in the EnvironmentalUnit of the Ministryof Labor,Consumer Affairs and the Environment. The unit has four technicalofficers, all with training in relevant areas. The unit is preparing environmental impact statements on an ad-hoc basis such as the recent study for the Traffic Management Projectbeing preparedby the IDB. 5.24 The operationof quarriesis governedby the QuarriesAct of 1967. The act providesfor substantialsafeguards to ensure their safe operation. However,the Act does not providefor similarsafeguards against soil erosion, contaminationof undergroundwater or any otherenvironmental hazard. Agreement should be reached during negotiationsthat the Governmentwill prepare an amendmentto the QuarriesAct to includeenvironmental considerations and submit it to Parliamentno laterthan June 30, 1993. G. ProisctRisk 5.25 The projectposes little risk from the technicalpoint of view, becauseit involvesmainly overlaysover existingroads. As statedin paras. 3.1-3.5,execution of the firstBank projecthas been satisfactory,and did not raiseany major implementationissues. Cooperationwith all consultantsunder the technical assistanceprogram has been good and MCW has shown strong - 32 - commitmentto implementthe institutionalImprovement program. Some delays experiencedwith civilworks under the ongoingloan are unlikelyto recurbecause the proposedproject does not includeany more force-accountcapital works, which were the main reasonfor the delays. 5.26 The deterioratingmacro-economic framework could leadto shortageof counterpartfunds. The projecthas tried to minimizethis risk by agreeingon an overall investmentplan which maintains a viable road conservationand rehabilitationstrategy, while keepingwithin the substantiallylower limits for capitalexpenditures. Furthermore, the project is designedso that its size could be adjusteddownward, if necessary,by reducingthe overlayprogram which is carriedout in four annualpackages. In addition,budget difficulties _ould impactMCW's resourcesavailable for road maintenance.The projectincludes a redesignedmaintenance plan based on the reducednumber of staff availableand allocatesmost periodicmaintenance work to private contractors. However, additional cuts beyond those already introduced could jeopardize this equilibrium.Given the recentstand-by agreement with the IMF, the risk of the GOB havingto resortto additionalbudgetary cuts, is low. 5.27 The Governmentcould encounter political difficulties in implementing the privatizationof the TransportBoard operationsbecause of the short-term employmenteffect (the TRB employsover 12 of the country'swork force). We believe, however,that the Governmentis stronglycommitted to the privatization strategy. To encouragethe Governmentto followthrough on this comitment, disbursementsagainst overlay works in FY94/95and beyondwill depend on the progroasin implementingthe privatizationscheme.

VI3 AGREEMENTSREACHED AND RECOMMENDATION

6.1 As conditions of loan effectiveness, MCWwill: (a) appoint the equipment manager; (b) appoint a workshop accountant; (c) appoint an environmentalofficer within the TechnicalDepartment under terms of reference acceptableto the Bank (paras.2.23 and 5.22); 6.2 Agreementwas reachedduring negotiations that: (a) Total MCW staff assignedto road maintenancewill not exceed800 employees(para. 2.18).

(b) MCW will carry out the 1992/93- 1995/96Four-Year Road Maintenance Plan (para.2.20); (c) The Governmentwill provideMCW with US$3.0million equivalentin each budgetyear for road maintonancematerials (para. 2.21);

(d) The Governmentwill implementthe plan for reducingthe Transport Board annualcash deficitto US$2 millionor less (e) The Governmentwill submit,by July 31, 1993,a time-phasedaction plan, acceptableto the Bank, based on the result of the Transport Board Study,to substantiallyprivatize passenger transport services and implementsuch actionplan (para.2.34 and 4.20); - 33 - (f) The Government,MCW and the Bank will conducta Mid-TermProject Review in the first quarter of 1994 which will cover physical progress of the project, execution of the institutional strengtheningprogram, implementation of the live-YearInvestment Plan and Four-Year MaintenancePlan and their corresponding financing,status of computerizationof MCW's accounts,and the progresson the action plans resultingfrom the TransportBoard Study and the Road NetworkRationalization Study. At the Bank's request,the Governmentwill adopt,as necessary,remedial actions (paras.2.34 and 5.20)t (g) the Bank will not disburseagainst contracts for overlayworks in FY94/95and beyond,unless it is satisfiedwith the progresson the action plan resultingfrom the Transport Board Study and has confirmedit to the Governmentin writing (paras.2.34 and 4.20);

(h) the Government will submit to Parliament an amendment to the Transport Levy Act to permit its revenues to be used for general Governmentpurposes, or abolishit, by March 31, 1994 (para 2.40); (i) MCW will carry out overlayworks on at least25 km of roads in each fiscalyear using its own resources(para. 4.9);

(j) the Governmentwill carry out the overlayprogram financed by the project according to the list agreed with the Bank (para. 4.10);

(k) the Government will earmark the counterpart funds needed for the project as follows: FY92/93,US$0.5 million; FY93/94, US$3.2 million; FY94/95,US$2.4 million; FY95/96, US$3.4 million; and FY96/97,US$2.4 million (para. 4.26);

(1) MCWwill inform the Bank, and obtain its approval, before agreeing to any change in a contract which will raise its cost by more than 2OZ over the original contract price (para. 5.6); and

(i) the Government will submit to Parliament an amended Quarries Act incorporating environmental considerations by June 30, 1993 (para. 5.24). 6.3 An action program will be agreed with MOnT to improve its institutionalcapability, project planning and preparation.It will includethe followingactions by MCWs

(a) Updating the Five-Year Investment Plan and the Four-Year Road Maintenance Plan by December 31 of each year and submitting them to the Bank (paras.2.21 and 4.5);

(b) Informingthe Bank by June 30 of each year of the actual amount spent on road maintenancein the prior fiscalyear and the amount allocatedin the presentfiscal year (para.2.21);

(c) incorporatingthe PlanningUnit into the TechnicalDepartment by December31, 1992 (para.2.35); - 34 - (d) submittingto the Bank by December31 of each year the list of roads to be overlaidduring the followingfiscal year using NCW's own resources,together with the economicanalysis justifying such works (para.4.10); (e) submittingby December 31, 1994 a strategy for private sector participationin routinemaintenance works, based on the resultsof the pilot programfor routinemaintenance by contract(para. 4.12); (f) selecting the consultantsfor road maintenance and workshop improvementby December31, 1992, and having a road maintenance plan, based on their work and acceptableto the Bank, in place by March 31, 1994 (para.4.16); (g) selectingthe consultantsfor the Road NetworkRationalization Study by December31, 1992,and agreeingwith the Bank on a plan of action based on the study by December31, 1993 (para.4.18); (h) selectingthe consultantsfor the computerizationstudy by June 30, 1993, and having the mechanizedaccounting system in place by December31, 1994 (para.4.19); (i) completingfinal engineering for overlayworks to be financedby the Bank in each fiscalyear, startingwith FY93/94,by October31 of the precedingyear (para.5.2); and (j) complyingwith the followingproductivity indicators by December31, 1993 (para.5.18):

Pothole Paching Ton of asphalt 5.0 9.0 1.0 Concrete placed _ l ManualDrain Cleaning Km Cleaned 0.1 8.0 1.0 Guard Rail Repair Meter Replaced 15.0 10.0 2.0 Manual Weeding Km Roadside 1.0 12.0 1.0 CulvertMaintenance CulvertRepaired 1.0 6.2 0.2 ConcreteSlipper Repair Meter Replaced 20.0 7.2 1.2 Resurfacing Ton of Asphalt 300.0 19.0 10.0 .___ Concrete Placed Surface Treatrent Sq. m. resealed 1000.0 13.0 4.0

Recommendation

6.4 The proposedproject constitutes a suitablebasis for a Bank loan of US$21.2million equivalent on the terms and conditionsset out in chaptersI-VI of this report. BABADOS

SEC;ONDROAD MAINTENANCE AND REHIABILITATIONPROJECT

ROAD NETWORKSTATISTICS BY ROADCATEGORY AND DISTRICT(*

DISTRICT j PRIMARYROADS POO SECONDARYROADS j LOCALROADS j DEVELOPM4ENTROIADS TOTALDISTRICT KNAE TOTAL GOOD FAIR OR TOTAL GOOD FAIR POOR TOTAL GOOD FAIR POOR I TOTAL GOOD FAIR POORI TOTAL GOUM FAIR POOR

North East (kmn) 81.7 22.6 52.3 6.8 29.4 0.9 19.1 9.4 95.3 23.0 45.7 26.6 1 13.6 9.0 3.8 0.9 219.9 55.5 120.9 43.6 CX) 100.0 27.7 64.0 8.3 100.0 3.1 65.0 32.0 100.0 24.1 48.0 27.9 1100.0 66.1 27.7 6.3 100.0 25.2 55.0 19.8 North West (kmn) 1 66.3 29.9 22.913.5 162.3 11.6 38.1 12.6 1103.946.3 30.627.1 159.0 47.1 9.022.9 29 1.41 134.8 100.5 56.1 (X) 1100.045.1 34.6 20.4 100.0 18.6 61.1 20.2 100.0 44.5 29.4 ?6.0 100.0 79.8 15.3 4.9 1100.0 46.3 34.5 19.2 ------.------.- 4-.-I".------9.------SouAthCentral (kmn)1 61.2 20.2 35.3 5.7 1 35.1 6.0 20.8 8.3 1 97.9 35.9 45.9 16.1 1 14.0 9.4 3.0 1.6 208.1 71.5 104.9 31.7 (X) 100.0 33.0 57.7 9.3 1 100.0 17.1 59.2 23.7 100.0 36.7 46.9 16.4 100.0 67.4 21.1 11.5 j100.0 34.4 50.4 --.--- -. +- -- ..-.------.+ ..-- 15.2 -.--.-- -. .4------. - --4..4---..------St. Philip (kmn)1 35.3 22.2 13.1 0.j 21.7 13.8 7.9 0.0 69.9 34.9 26.5 8.6 j 57.2 45.4 8.3 3.5 1 184.1 116.3 '55.8 12.1 (X I 100.0 62.9 37.1 D0.0 I 100.0 63.6 36. 00 100.0 49.9 37.8 12.2 100.0 79.4 14.5 6.1 100.0 63.2 30.3 6.5 ------4------I.- -I… ------Christ Church (kin) 1 67.1 47.6 18.5 1.1 1 24.9 15.5 9.4 0.00 1 74.9 39.2 27.2 8.5 1 122.2 70.0 45.5 6.8 289.0 172.2 100.5 16.3 CX) I100.0 70.9 27.5 1.6 100.0 62.4 37.6 0.0 100.0 52.4 36.3 11.3 100.0 57.2 37.2 5.5 1100.0 59.6 34.8 5.6 ------.--- - 9------4.------St. Michael Worth (kin) 50.4 40.7 9.7 0.0 28.2 22.9 4.3 1. 125.0 90.1 26.7 8.2 1 25.5 18.8 5.7 1.1 1 229.0 172.5 46.3 10.3 C)I100.0 80.8 19.2 00 1.0 83 151 3.6 100.0 72.1 21.4 6.6 j100.0 73.5 22.2 4.3 100.0 75.3 20.2 4.5 ------+*------.- - - St. MichaeLSouth (kmn) 18.7 18.3 0.4 0.0 1 14.0 13.1 1.0 0.001 79.4 71.8 5.9 1.8 16.1 13.6 2.6 0.0 128.2 116.7 9.7 1.8 c, MX 100.0 98.1 1.9 0.0 100.0 93.2 6.8 0.0 100.0 90.4 7.4 2.2 100.0 84.2 15.8 0.0 I100.0 91.1 7.6 1.4 J … ……… .-- … … … … … … … … … … … … … … … … … … ------.- ~~~~------ITOTALNETWOR (kin) 380.6 201.4 152.1 27.1 215.4 83.8 100.4 31.3 646.1 341.2 208.4 96.6 307.5 213.1 77.7 16.7 11,54.9.6 839.4 538.5 171.7 C) 100.0 52.9 40. 71 100.0 38.9 46.6 14.5 100.0 52.8 32.2 15.0 100.0 69.3 25.3 5.4 I100.054.2 34.7 11.1 NOTES: ()Paved roadsonty; unipaved roads are negligible(13.15 kmn). Funkctionatclassification: -Primaryroads :roads whichradiate from Bridgetown to variousparishes. -Secondaryroads : roadsjoining two primaryroads. -Locatroads : roadswhich initiate and end withina parish. -Developnientroads: roads providing acces to housingdevelopments.

0- 0' - 36 -

Wale- 2

BARBADOS

Second Road Naintenance and RehabilitationProiect

Road Capital Expenditures 1985/86 - 1990/91 a/

($B million)

Estimate 1985/86 1986/87 1987/88 1988/89 1989/90 1990/91

Northern Access Road 0.2 8.6 12.9 0.6 2.0 0.5

Airport Road 6.6 21.1 17.2 19.6 3.5 1.0

Highway Rehabilitation 4.5 5.0 6.4 13.3 8.8 13.1

Tenantry & Subsidiary Roads 4.9 1.7 0.4 1.3 8.7 7.6

Bridges & Drainage 0.8 1.6 0.8 1.0 3.1 1.6

Traffic Management 0.9 1.4 0.3 0.2 1.2 1.0

Vehicles and Equipment 1.0 0.8 2.0 1.1 2.1 0.2

Project Administration 1.4 1.5 1.5 1.3 1.3 1.3

Bridgetown Development 0.9 1.6 0.5 0.2 0.6 0.8

Scotland District - - - - - 4.0

Other 0.8 0.3 0.4 - 0.2 0.1

Total 22.0 43.6 42.4 38.6 31.5 31.2

_/ Fiscal Year ending March 31.

Source: Barbados Budget Estimates, various years. BARBADOS

Second Road Maintenance and RehabilitationProiect

CaDital and Current ExDendituresin the Road Sector

($B million)

Capital Expenditures Current Expenditures of 2- of 2 Total Public Road Total Public Road Year McW TRBa/ Road Sector in total MCW TRB Road Sector in total

1984-85 12.2 0.6 12.8 147.6 8.7 43.1 10.8 53.9 595.4 9.1

1985-86 22.0 0.5 22.5 146.1 15.4 48.5 14.0 62.5 663.1 9.4

1986-87 43.6 - 43.6 165.1 26.4 48.0 12.4 60.4 685.2 8.8

1987-88 42.4 0.1 42.5 191.3 22.2 55.0 22.0 77.0 817.8 9.4

1988-89 38.6 0.2 38.8 222.5 17.4 54.2 12.2 66.4 857.9 7.7

1989-90 31.5 5.8 37.3 202.6 18.4 53.4 10.0 63.4 1000.0 6.3

1990-91 31.2 6.7 37.9 231.0 16.4 55.4 12.0 67.4 1050.5 6.4

1991/92b/ 35.0 4.8 39.8 218.4 18.2 57.3 10.0 67.3 1129.2 6.0 a/ Transport Board b/ Estimate

Source: Barbados Budget Estimates,various years. BARBADOS

Second Road Maintenance and Rehabilitation Prolect

Port Carto Movements

Inward Cargo Outward Central Cargo Cold Storase Carto Year General Carao Crand Breakbulk Containers Dreakbulk Containers Other Total Breakbulk Containers Total Total

1986 138,627 256,211 4,379 20,250 15,429 434,896 3,822 37,353 41,175 476,071 1987 118,277 289,168 5,744 22,660 11,850 447,699 3,754 41,435 45,189 492,888 1988 114,593 316,505 6,282 21,786 12,436 471,602 5,838 52,953 58,791 530,393 1989 128,475 363,521 4,870 26,133 :,223 530,222 4,285 67,273 71,558 601,780 1990 115,014 360,082 6,402 21,984 10,890 514,372 3,492 75,327 78,819 593,191

Shive Visiting Deep Water Port

Year Tankers Carao Cruise molasses Sugar Others Total 1986 106 751 292 n.a. n.a. 298 1,447 1987 89 725 414 n.a. n.a. 218 1,446 1988 81 684 455 n.a. n.a. 93 1,313 1989 60 709 497 n.a. n.a. 64 1,330 1990 45 702 520 16 5 133 1,421

Source: Barbados Port Authority. - 39 -

Table 5

BARBADOS

Second Road Maintenance and RehabilitationProiect

AirDort Traffic Statistics

1988 1989 2 change 1990 2 change in 1989 in 1990

Passenger Traffic

Scheduled Passengers-Departing 542,098 536,492 -1.0 550,660 2.6 Scheduled Passengers-Arriving 536,832 532,340 -0.8 568,030 6.7 Scheduled Passengers-Transit 377,934 328,057 -13.2 275,149 -16.1 Total Scheduled Passengers 1,456,864 1,3969889 -4.1 1,393,839 -0.2 Non-ScheduledPassengers 194,895 263,438 35.2 211,289 -19.8

Total Passengers 1,651,759 1,660,327 0.5 1,605,128 -3.3

Cargo Traffic (tons)

Scheduled Freight-Loaded n.a 3,254 n.a 3,874 19.0 Scheduled Freight-Unloaded n.a 4,845 n.a 5,648 16.6

Total Scheduled Freight 6,966 8,099 16.3 9.522 17.6 Non-ScheduledFreight 7,356 6,439 8.8 5,478 -14.9

Total Freight 14,322 14,538 1.5 15,000 3.2

Aircraft Movements

Scheduled 24,447 24,470 0.1 23,861 -2.5 Non-scheduled 7,561 7,908 4.6 9,194 16.3 Other 2,576 2,761 7.2 2,660 -3.7

Total p4,584 35,139 1.6 35,715 1.6

Source: Statistics Unit, Division of InternationalTransport, MCW. "s RtOADMAIWUI "A ftfo F11902160 trrem CW nrtTotl g I tlr twork * 1.Ss.4 t Reed. wader Routine 8(itoooPerMCO I 3349.6 km loads under, Psriodi UsI... Wret... £0.0 in I'l £epbalt ce t s a 197.3 in (a) Oerlay "rmegre * 33.3 km tb) Aphalt cs treat_or nt pamte. 332.3 tn ek) Raal Program F 34.7 In

rxu nrt91>norf -n mtisr MfUlcms er-rIT.T AccrOro ...... mu------.-. ACTiVIT miLl &ccMpIM anYm . qUmnTiT I Qm cam !PN. I E . TOTAL IMM-L AW VI r TrTA I =1. MT cm! 1AL. cmS i -- --- routs 00.Om--oy- WIT qunt MS 5) (50o$) (5(W0is) I 10$)- (50 (31$) (50$4) IQ1SMMIT (5$) ---- 0C) I (5$)

8010 VOt sale I6ethic 3.0 tern 3.019 p.la.in *1,030 813,342 .260 81.7 91.3 $6.0 M0.2 1.720.128 1.035.133 633.152 3.303,413 475 344.5 164.603 3,330.015 1020 Rtgradiag Unpaved Shoulder 1.0 km i a3ud.el.n 42 Is 13 54.0 471.6 40e.0 930.6 n.002 .4 0 31357 81.3358 29 1.093.2 31.703 44.062 8010 Patching Paved Shoulders 1.0 IIN so p.abl.ka 39 39 39 433.2 437.6 363.0 1304.48 37.733 11.048 010.00 46.3008 - - 4.9 £040 JoInt & Crack Sealn 400.0 Itt 3a099 16.i. 165 443 151.356 403 0.6 0.6 1.0 2 6 121.017 129.005 161356 411.435* 4.081 2.5 11.525 *4203 1010 Cold lIa Prod4c£tio 6.0 0 3099 v.l".k 6.380 6.360 8,603 So.7 n5.0 39.0 133.7 374.3*3 37640 240 020 808.75 _ _ O Z75 1110 Drain Cleaning an1al 0.1 IN 962 dlitch m 313 91 910 0.0 4163.4 2600.0 6716.4 0 37h.869 2264800 615.4S0 23 7,777. 171.184 706358 1120 Drain Clsains llacbaical 2.0 m 805 ditce In 707 641 321 0.0 U08 1 320.0 504.1 0 120.559 205.120 325.647 66 S84.0 36.544 364.223 1330 Culvert Claslag 2.0 each 1.162 tuber 578 833 411 0.0 104.0 245.3 429.2 0 153 2t4 204 293 3575357 45 493.6 223214 373.71* 1240wall Cleanltn 3. 2 376 aumber I 09 480 160 0.0 83.3 136.3 221.5 0 41 O3 635,43 06.474 Ii 213.1 2.606 800.36o £310 Traffic Big. Ealagaence 4.08.*3 each 9.336. mace 8.196 1.0 29 66 3).1. 831 3,336 130,787 0 103.073 26 704.1 3.308 196.30 1220 tradfiC $Sig oVAetLaIeue 12.0 eah 0.336 mvher 10196 3.170 98 132.8 26.6 I2.0200.7 177.934 31134 25.7401 240 250.5 6.312 24131 1230 Guard Sali Repair. 15.0 1.. 05 srin a 0.863 8.722 388 6.7 36.2 24.0 66.06 5 176 31.1431 202 328 382, 18 141 76.7 10.818 591.726 1240 FaIntin4 Center i 4.0 l.a 143 pin 6£ 61 is 750.0 101.3 70.0 921.3 4.57S0 6.176 4.270 35.106 - - - 56.196 1330 S tcialo at lIarig 6.0 each I200" _mber GIS 792 112 62. 79.1 43.0 IU4.6 49.500 62.616 34.056 146.172 21 240.4 5.52C 15 .100 1310 'dedg 1ua 1.0 in S96 raide. I 4.484 4.441 4,441 0.0 603.5 204.5 605.0 0 2.680.144 00 18.8 3.306.325 43 829.2 30.956 3. 20. 2" 4- a32 "deeigMcaia 6.0 In 3.986 relde.ka 2.331 23.13 307 0.0 33.0 48.5 68.6 0 78.687 *16.871 194.830 860 94.0 13.790 2110.631 I Tr. trI n I R 1.0 no. 13 d4potled 84 04 64 0.0 390.3 32.3 126.6 0 33.331 21.861 61,215 - - - 63.216 SG40 . iteac 0.2 each 00 mher 65 6s 325 134.3 864.32 32.0 8860.3 0.70 508,624 .360 120.034 120.934 1420 Culert lainteeance 1.0 each 1.62 maber 1,592 1.353 1 5133 33 334.8 32.0 443.1 46.300 I1.,.10 70.76 69 s. 0.06 709,0 1430Repair of CenrateSlipor 20.0 oerb a 1.421 elIp.ih 21,60l 20,396 1.020 10.3 £96 .0 38.0 213.130 399.354 163,13 773,660 ,203 43 2 33.00 827.665 8*0 E_r ancy ActIvities ada, 18.0 83 depoletd 3.340 3820 24 0. 3 46.1 08. 0o43.601 163.437 107.35 220 1 13. 24.e W 3332.1n I1U0 m tacatlg o 3.0tt, depedt 460 4*9 280 J64 383.35 0.0 168.0 24,433 4o.78o1.1 0 30S 200.7 0,034 68s.230 1620 AdminiatratvaActlvitta. Wa. 1dp3 6.0""oud 16,892 2.782 0.0 33.3I 0.0 33.3I "000,* 0 800.14I"- 68.864 ------…------… -- -- ...... …------…------…------.--. ,------TOTAL R eO tVI Mn * SAINTZUAUCI 2.929.64197.552.731 3.460.570 83.090.950 | 3.537 | M4A6N.481

Reurfacng 380.0 te I 3 l.rd.o to0,2S5 89,3895 64 I8. 3.3 7.0 163.42 29,20.584 67.003 134,003 13,1.453 I) I-) 2.000.000 3,833,63 t7n08720 Sucface ToeateAen t 19 .0411 69 la.rd.in8 *60.26 16938 18 1 .4 0.7 0.2.7I 23.386 824,9335 1.4 38.78 - 316,678 810 wall Dlating 03 I 13 depoed 10I6 0 a 179.6 31.3 40.0 256. I - - 96 203.3 25,330 28,330 820 Czrata Drain & Culvertn J.0 0 8 depotled 480 234 73 802.8 201.5 19.3 423.5 22.902 43,210 26.730 94,922 3s6 463.3 124.734 219.676 1630 Wrerch Drama 4.0 a 1"3.o 5 444 3 JIS42.0 69.3 63.4 2.6 0 3 as3 97.105 1840 CaLl. Srueteres 4.0 basit 13 e po tid 213 273 46 280.0 07.4 90. 397.6 3 73 26.381 24,*6 £05,33 - 106.334

t e T A L r I 9 I e D I C NAZUW UANCj 3.301.309 304.6O4 345,739 3,031.690 2.133.804 j .104,802

T e T A L ROAD n* IlA sT 6e3* C 1 r6e23010417Ls A 7,3572 3.54.2" 17,123,64m.7 2911.641130.110,89

() JPolrtia of the ilrat contract for overly orsi remaider to icudd la It l993J94. 1

a( 0~ sm mib forianm atn amzu cn3334 ummrzum amvnmcs RIAL~~~~~wSmmQomamz LaUra n,ii,

ACTIVM A Tack sit. Crus ~~SandPort.-Painta.-Stgu Guard ISuperSect. Sm. Art. 3.1. L.B. Oral. Dii Mo ITruck SMi Back fot" lAp sbTg an VAUTA A-p.SmIgr C Trei?oe vellvorLead. Art. O.Os. vpa "ar (qSteer boLoad. CamI"spi pav. Mgm.Back. ~~. WifII It) (1)1.3) (.3(3) "0eg')(610)(6104) a H(AS) (df)day;0 (d;4dald7)d y)I ) (dy I (day)07)(day)(dy(a)(e)dy(day) day)(day)Ida,

3010 Vmt b3aPatclolf S.O tme 2.268 11342 36 228 - -224 -2258 13610 2258-6- -(aSa 100 eaadsnpndsbul 3.Ohkm 13 - I - - -13 -s 13 i 3Is 13 1030 latchiaginPw gbwaflders. lOhe. 38 II; 0- 38 - - 38 - 3 234 3 I040O,i.t* SCzck Samel;, 400.0 Ur* 403 - -161 -1210 403 -403 1614 403So - -403 - - 1030Cold tax ?radmactiam 6.0 US 1.063 - 423 S38 - -- -163 30 - 212 16 IIlObralalaanSngUmal 0.3a 810 … …… …… … 910- - - -. .910 34 I;91 1120Dri laigMchncl 2 e 31------321- - -"4 32 1 962 321 321 321 130CleiCann 2.0ec 4371……… 47- - -417 417 144 417 - 417 1340 .0..3WalCenn 160------160 160 480 160 160 120 eii iaanem 4.0 eac 293… …… … 293 - 29 -73 - - 585 12220rfiSinKaeaia 12.0ec 984 39 98to 1170 -w go8…… 98 30 9 lZ30 301.:rIi3eez 58I……… 20 581 - -163 - 871 581 2901 3981-58 1240 asigneLie 4.01. Is …… …… 44 15 Si is1 1s 33 is… …… 1 1230Pay Speial i Machige 6.0 ac 13 … ………24 32 - 28 - - - 13 264 13 I310 SeedIngUsui 3.0 h 441 ---- 44 ……2221 2221 44410 22212223 32Uedn*gM eania 6.0 h. 387------56 - 19 194 18 399 --- 97 133 be rmn lmsn . o. 4 ---- 8 168 1431 1232 42 to 8i1:aitmne0. c 35 - - 65 33 33 98 -2- -33 23 - 63 1300 65 142 Sevr aneac . ah1333 1333 767 767 307 - - - - 1333 15333 - - - 301 6132 307 - - - l4303epairadCmcreteSlig 2e20Okrl220-20032401020 1020 -& -lli24 67 0 1020 1310~~raeacyActivitiea284-284 l1.0.dey - - - 284 - - ~~~~~2842269 284 242 - - - - It toprcI,:: 2..3" 20 419 3134419……418 163 £dinetatyeAciu"i 6.0 aday 2.782 ………… 5564…13128: : : _ …------,----. … .…… .4…- -- : .. . ..----…~~~~~~~~~~~------lesasree -3q.knnt orR -lsarko 111439 37 587 10495,3343 5393 697 S0M 11702907 14012 1631 2878 6773 1347308 50S 8718 101191 $677 2913 737 1347 2003 0 0 0 397 13 .a. ... . … ---.- ~~~~~~-… ~ ~ … .. …~------

3733eerfen n00ot64 649853393 6386 534 3Su - - 138 4 4 lllrea eatuant 100.I 30 - - 7 1134……… … 8 - - 79 189 189 1314 3In 189 - - - log13 - 3830DiIngSell 3~~.0. 0 'An" creeDaiei lera.. 3.0. 73no 160 7331120 73 224 73 75 373 73 73 3840Cables Stcucturaa 6.0 Leak 46-4" " 4364 46 ------~….-- - 4 . ~ .------nesmmReuiemetsfo Peioic o 119283 71 473 1283 7331120 0 0 0 01338130 0 224 3133$79 403 770 32141770189 15 0 73 318 854 0 0

rneureqUawaviza te for Total Praran I30"107 1060 117803416 6533 697 Soso 1170 2907 1A4350396 2878 6997 16603443 347 9548104403 9441NO102 12 1347 2079 318 234 38n? 1 (Noeer of poopleAmita needed per yew)______0 0alpmaim geeurcee are listed. a)sooln ""ram (amau1). B-ROS SECONDROAD MAINTENANCEAND REBAAILITATICOPROJECT ICWJSROAD NH&1JM2UI PMM YWI P13992193 REsoue REUIDWS FOL FORCE ACC T W S Sumary for all usintensoc districts

(1) LABOR N U RsS (2) KlTERUlLS REUIREMTS

* e~~na.-5~~~~ a.... .n...... a...... L A B 0 B (a) g POG3 HEEDS CW ROWDEAIBTE3ANCE STSaF AD BUDGET KHUIPN£O BAlANCE(c) 1 A T £ I I A L S PRN NEEDS Job Unit Cost iTotal Days Number COST I Total Days Nusber OPERATIOSS WO11RS5P I Balane Cost -aterial Unit Un1t Cos- Quantit- Cost- positie n (eSBDIday3 Rquired StaffCb) t(BD$) Available Staffib) (BD$) (80$) I days) (80) Descriptlon (BDSjun3 tIUalts) (80$) SuperiLsor (Oper ations) 63.00 34.151 69 904,130 14.980 70 943.740 629 39,610 AspbaltConcrete ton Section Leajer (Operatiuon) 71.02 3,96 2la 139.270 Nix 350.00 30.744 4.611.600 Senior krzta 5.350 25 379.957 3.389 240,68 Tack Asphalt litr 0.52 1^'397 55.t46 66.98 2.87B 16 192,801 2.782 13 ia6.33D (96) (6,463) Aspalt Emulson litr 0.52 1,0,.937 artIsan 551.164 63.00 6.997 35 440,842 18.832 88 13186.416 33835 745,574 Cruhed Aggregate 3 24.00 13.780 Laborer 282.120 48.50 104,4s0 488 5,063,666 97.156 454 4.712,066 (7,249) (351,600) Sand .3 Havy Equipmnt Operator 73.02 3,660 30.00 3.417 102.510 8 117.929 1.712 8 121.586 52 3.658 Cersnt bag 10.60 6,515 69.059 Operator 56.67 5,457 26 309,276 5,992 28 339.567 535 30,291 SelectedSoil - earth *3 34.00 78 1,092 Igbt Equipment Operator 49.31 3.463 16 170,785 3.210 I5 358.285 4253) (12.500) Timber aqft Driver 2.95 37.906 I33,23 54.32 9.548 45 518,674 9.630 45 523,102 82 4.428 Sign Post .150.00 1170 l17S,!O - *--4~~~~~~~~~~~~~~~~~~~------.------Guard Rail and poet a 20.00 2,904 58.320 TOTAL | 150,724 714 7.857.372 I 359,644 746 7,40S.517 1,142,540 1 8.920 693.685 Paint galon …. _ _ _._ ... 60.00 697 41.820 … . . . … - … -...... __-... __--_ .__ , , Traffic Paint litre 18.75 5,080 95,250 (a) Only personnel directly lnvolved In road maintenance operetions Is iacluded (operation crew). Depots managers (7 tecbahlcans I and 25 tecbnlciae 11). and supervisors, Boulders .2 36.00 1.820 65,520 technician. and worksbop-& a_cbanics la 3(edquaters not included. Gonteatil *2 8.00 3,335 8.924 (bI Number of persoas required or available, calculated a*sumlag 214 (c) N r balance calcultaded eubstractIng workLng days per year (rounded oa district basts) _ ...... tae total day. required by the progrm froe the total days availableIn eacb position TOTAL COST 6.230,947 witlin NliC anpowrg poeltive figures nd11cate surplu, whble negative fia brackets) deficit. --___ _ _._ _-

t'3 (3) EQUIRUIET REQUIRDENTSI

...... l_...... _._. ... . _. E q U I P M E b T t(a) I PGRAM NEEDS INtCW1161NTENANCE FLEET IMCW ADDITIONAL UNITS I UNITS TO BE RENTED I BUDGETREQUIRUE3IS BY ITENS (d) I TOTAL ------*------t------'------...... ------t PRODCL Equipment W Cost I Total Days No Unlts ITotal Daya So.Units ITotal Days No.UnitsITotal Days Unlt Cost lInsurante Description Fuel-Lub. Parts Repairs Rentals I BUDGET CBDSlday) Required (b) Available lcbeduled (c) IicheduledSb) (BD$lday) (BD$) (8D$) (BD$) (9D$) (BDS) I (9DS) Duep or lisatTruck 260.00 9,447 52 9.360 52 3 20.00 472,350 709,5251.1,05.299 370,046 - 2,456,220 Skid St*er 400.00 3,302 17 3 060 172 400.00 Alr _ 4',535 242,034 170,66S 34.133 2 462.347 Compressor ibmer 96 00 2 078 32 1,080 6 _ _ 998 100.00 3,240 145,460 17,280 Back-Bo 9,120 99,800 275.500 230.50 82 S 540 3 _ _ - 600.00 6,090 1013500 66,584 12.9929 387 166 Truck Hydraulic 177.00 84 1 380 FroantEnd Loader 25. 1 .347 1 3260 I _ _ - 480.00 3,008 9,240 4,200 420 _ 14 868 7 - - 600.00 3483 16,7 0.6 352 - 3250 Roller 200.00 3318 2 2340 13 _ _ - 200 00 338 28,620 9,540 3,590 - 40 068 Asphalt Bprayer 350 5 30 1-- 4.0 72 2.28 5,302 2.540 - ,890 Aspbalt Paver 189.00 Tractor vllosdsr ettactmenge 281.00 64 1 380 I _ - 13,200.00 13600 5.504 4,160 852 - 49 1 1,080 6 _ _ - 600.00 882 7.350 4.606 93 _ 13.76912,096 TMeVer - cpactor 22.00 2.381 13 2,520 14 _ Oree Tr3ck - 75,00 0 35,715 9,524 7,143 _ 52,392 111.50 14 1 180 I _ _ _ 300.00 231 630 650 10 Sp cal Paint Marker 21.00 17 - 1,561 FlailrNever 1 360 2 _ _ - 240.00 34 221 85 17 - 357 88.00 397 2 36is 237 302.00I 720 36,277 6.660 3,080 22,1354 4873 PuMp 15.00 284 2 360 2 -…4000 21 13,3 1 704 31136 284 - 4.260 - ~~--- - - ...... '~~~- .- - - - . .------TOTAL | 20.648 3381 22,860 127 I - - 1 1,215 1538,703 1.473.441 13511.431 '---- 263.350 121.934 1 3.888,859 S .-.--- -- S~~~~~~~~~..-.-...... --...--...- ..-. B.....-.-... a) Only quipment units directly involved in field operatlons and required for the m* ateaance plan a*r lsted. Oeebr unice needed to support adeiniatrative op=rtions are not Included. functions and upervie maintenance tb) Nuxer of units computed assuming 180 working days per year. 0' Cc) Additional units that are lcorporated to WM's maintenance fleet as a result of quipmat purchase or rehabilitation. C-A (d) Budget requirements shown are Ilaited to those units directly involved in field operations, seaded to carry out the maintenance pl The incidence ervision as pick ups-., of other eqipmet unite for maintenance (D dtrmin NCI-a-- suhe total workshop budget.as well as of other workshop's -- includin maintenance of other ministries'ge purposefleets--, should be taken into account in ordar to COtsigvnette - 43 -

Table 9 BARBADOS

Second Road Maintenance and RehabilitationProlect

Vehicle Fleet by Year

Taxis Private and Vans Motor Hired Buses and and Year Cars Vehicles Minibuses Pickups Lorries Otherl/ Total

1970 15,787 1,789 213 1,961 1,574 560 21,884

1975 22,129 1,770 257 1,949 1,560 538 28,203

1980 24,177 2,027 329 3,157 1,373 585 31,648

1985 30,908 1,871 416 2,591 1,732 1,173 38,691

1986 32,869 1,981 440 2,503 1,739 1,426 40,958

1987 34,740 2,266 470 2,755 1,841 1,529 43,601

1988 34,859 2,600 473 2,722 1,817 1,466 43,937

1989 38,711 3,070 446 3,090 2,001 1,441 48,759

1990 38,832 3,089 447 3,077 2,015 1,261 48,721

1/ Includes tractors, trailers, ambulances,jeeps, landrovers,road constructionequipment, etc.

Source: Licensing Authority,MCW. - 44 -

TUbl* 10

BARBADOS Se-ondRoead-aintenance and RehabilitationProject

Price Structure of Petroleum Product. (as of Septomber 1991)

Gasolina Diesel $B/llter $USgallons $B/liter $US/Gallons Coat of Product 0.39 0.74 0.34 0.65 RefinerySurcharge 0.04 0.08 0.04 0.08 RefineryPrice 0.43 0.82 0.38 0.73 ConsumptionTax 0.72 1.37 0.65 '.23

Ex-refineryPrice 1.15 2.19 1.03 1.96 Marketer.'Margin 0.10 0.19 0.10 0.19

WholesalePrice 1.25 2.38 1.13 2.15 Dealers'Margin 0.13 0.24 0.09 0.17 RetailPrice 1.38 2.62 1.22 2.32

Source: EnergyDivision, Ministry of Financeand EconomicAffairs, October1991. - 45 -

Table I11

B A R A A D 0 S

Second Rosd Maintenance and RehabilitationProioct

Fuel Consumgtion Tax (1986-1991)

Amount Sold in Barrels Revenue Collected

p ax Gasoline Diesel Gasoline Diesel 12101

1986 396,356 205,054 $27,616,383 $12,093,177 39,709,560

1987 427,289 206,046 $29,431,322 $11,988,105 41,419,427

1988 466,029 221,503 $33,335,054 $13,474,028 46,809,082

1989 477,747 239,530 $37,845,524 $16,411,798 54,257,322

1990 493,186 308,902 $39,657,086 $21,533,558 61,190,644

1991j/ 501,758 317,561 $49,253,245 $27,761,098 77,014,343

jl Estimate

Sources Energy Division, Ministry of Finance and Econimic Affairs, October 1991. BARBADOS

Second Boad Maintenance and Rehabilitation Prolect Road User Charges and Cost ($8'0O0)

User Charses est. 1986 1947 1988 1989 1990 1991

ConsumptlonTax-Gasollne 27,616 29,431 33,335 37,845 Consumption 39,657 49,253 Tax-Dlesel 12.093 11.988 13.474 16.412 21.534 Subtotal Fuel Tax 27.761 39,709 41,419 46,809 54,257 61,191 77,014 import duties-vehiclesand parts 22,712 23,991 27,123 29,163 17,379 n.a. Conasumption-Tax/Sta.pduty 8,796 5,781 9,002 19,351 Tunry surcharge 12,895 n.a. - -_.&. Subtotalother taxes 31,508 29,772 36,125 48,514 30,274 30,000al Registrationfees 13,084 14,363 14,453 Inspection 15,835 16,000 17,000 fee, drivers licenses,etc. 4.366 6.715 6.179 5.675 Total Charge 6.245 6.265 U667 92.269 103.566 124.281 113.710 130.279 good Costs Naintenance 23,430 26,810 27,374 27,488 29,664 30,414 Capital outlays 31.183 30.937 38.462 34,291 Total costs 29.823 27.872 54. 61.779 59.487 56.286

TransportBoard Subsidy 12,350 11,442 21,138 15,767 18,706 14,811 TransportLevy Pund 13,658 21,900 23,700 27,150 26,000 27,500

al Estimate

Sources: HIMnstry of Finance and Planning. Ministry of IndustryTrade and Commerce, Energy Divlison. Budget Estimate, various years.

0 - 47 -

Table 13

BARBADOS

Second Road Maintenance and Rehabilitation Pro1ect

Fuel Tao Revenues Generated by Trucks and Buses

(based on an average 1,000 vehicles/day, one-km, road)

Cars Utility Buses Trucks

Z of vehicles in fleet 86.0 6.3 1.0 6.7

Km per vehicle per year 15,000 25,000 73,000 30,000

S of vehicles on road 74.9 9.2 4.2 11.7

Vehicles per day by type 749 92 42 117

Liters per vehicle/km 0.115 0.168 0.248 0.255

Fuel consumptionper dayL' 86.1 15.5 10.4 29.8

Fuel consumptionper year!' 31,439 5,641 3,802 10,890

Tax per liter1 ' 0.72 0.72 0.72 0.72

Tax proceeds by vehicle type1 / 22,636 4,062 2,737 7,840

Fuel Tax Trucks/Buses 1 / 10,577

Road Maintenance Cost/km.1' 10,400

1/ in liters. 2/ in Barbados Dollar. sDD -- D Iamvau AND lmLaIXU PRO=?

WRU IVISTIOIN PLO 1992193- 191941?(in 3D$O0)

ITI 1603M n99l2931D 11199311 Fl1994195 111995196 111996197 TOTL Fn-U ERinnm C65U Subprogram TOTAL. G0O EZITAAL TOTAL GOB IITmuBII TOTAL SOS fl1M. tOAL 600 WERNI. TOTAL GO SUMAL TOTAL Co VrRA#

1.02 Trc.alcal K _neot Se l sr 1,000 1,000 0 1.000 1.000 * 1.000 1,000 0 1,000 1,000 0 1,000 1,000 0 5.000 5.000 0

2.01 fv Ctractia 6 Kaintm Serv. (a)0e,enre t-f1oanc.d1~Oct* 0 0 0 0 0 0 0 0 0 0 0 0 5,000 3,000 0 5.000 5,000 0 b) ISD (first Red rojeet) 200 200 200 0 0 0 a 0 0 0 0 0 0 0 0 200 200 2SW (C) Coo (E1gbey 11 4,200 1.100 3,100 6.400 SSo 7.650 6.000 650 5.200 6.600 s.600 1.000 0 0 0 25.200 7.900 17300 (4) IN1D (Second good ojct) 4,750 950 3,800 22,600 6,500 16,100 15,950 4,750 11.200 13.200 6,050 6,350 9,700 4*,b6 4.50 66.200 23.900 42.300 (a) a1n CUsm Ads) 0 0 0 0 0 0o 1,00 2,100 4.900 10,000 5.000 7.000 15.000 4.500 10.500 32.000 9.600 2.400

2.02 SubsIdsryoad Cmstr. & alnt. Sev. 1.600 1,600 0 0 0 0 0 0 0 0 0 0 0 0 0o .60 1.600 0

2.03 Aseid. load CoDstr.& Kslut.Sexy. 400 60 0 600 600 0 "a 600 0 600 600 0 600 6o0 0 5.000 i,0mo 0

2.0 bridge Caatn.ctic. 2s0 250 0 0 0 0 0 0 0 0 0 0 0 a 0 250 250 a

3.02 Sp.cIu Draagodw 650 0 0 6s50 65 0 85o 650 0 650 o5 a 650 Io 0 4,250 4.250 0

4.01 DistrIut Specal VGAs 3,500 3.soo 0 2.000 2,000 0 2,000 2,000 0 2,000 2,000 0 2,000 2.000 0o 1.50 I,500 0

5.02 major Vrsu & 3,N.uatlm 3,500 3.500 0 2,000 2.000 0 2,000 2,000 0 2,000 2,000 0 2.000 2.000 0 I1,50 11500 0

6.02O chre of Onl. PR""l ILpmnt 2 200 0 100 100 0 1oo 1oo 0 10O 100 0 100 100 0 6S0 goo 0

7.02 purcase of Air.Ccaidt

6.04? FerU sstm, 25A 250 0 0 0 0 0 0 0 0 o 0 0 0 0 250 250 a

9.02 ?nspetloard 2.306 2,300 0 0 0 0 0 a 0 0 0 0 0 0 0 2.300 2.500 0

10.0lS_nss Coectios 5 so So5 0 0 0 0 0 0 0 0 0 0 a 0 0 soo s50 0

To 24,600 17,90 7,100 i0,250 14,300 23,95 56,200 14,750 21,450 n7.050 22.700 14.25S0 .6,950 21,600 I5,550 , 17.250 91.230 82,200 0

0' BARBADOS

SECOSDROAD NAINTENANCE AND REHABILITATION PROJECT

ROADREHABILITATION PROGRAM

P k O P O S E D U O R K TOTAL ROADVANE LENGTHWIDTH SURFACE AADT IRR PAVEMENT COST LANDACUIIS. INPLBIENTATION (SECTION) ROaD SAFETY CBDS'OOO) (ODS000) (km) (m) TYPE (v/day) (X) REHABILITATION IMPROVEMENT PROJECTSTARTIN*G IMPROVEMENT (USS'OOO) (US'OCOO) DURAtIOU YEAR Highway 6 6.10 5.50 AC 1,814 17.9 -Surface scarification, Seartes-Six -Carriageway widening -Construction of 2m- 4,105.2 1,161.5 Roads structure widening and 1 year 1993 from 5.5m to 7m, and width sidewalks in 2,052.6 580.8 repavementw/ asphalt construction of 2- residential areas (15X concrete (75m= thick.) width paved shoulders. of project's length. -drainage Improvement -aLignaent feprovement -removal of obstacles; (new culverts). (vertical-horizontal)-relocation of utility in criticalsections. polesand retaining wallsand structures. Highway 6 0.71 6.00 AC 21,099 92.6 -Surface scarification, Collty3re Rock-Villa -Carriagemay widening -Construction of Zr- 173.4 579.2 1 year Rd. structure widening and 1994 and construction of width sidewalks all 386.7 289.6 repevesent w/ asphalt turning lanes to along project's length concrete (75=m thick.) ioprove road capacity. (both sides). -removal of hazardous rocks and obstacles; -improving visibility at two intersections.

TOTALPROGRAM 6.81 3,825 29.7 (BDSOO0) 4,878.5 1,740.7 (USSOOOO) 2,439.3 870.4

_==__~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~* BARBADWS SECONDROAD MAINTENANCE AND REHABILITATION PROJECT ROADSAFETY PROGRAIM

ACCIDENTS ADT WORKCOST LANDACO. IMPLEMENTATION INTERSECTION TOTALRATE Cc) INTERSECTION EXISTING IMPROVED PROPOSEDWORK CDS'OOO)tBDS'l00) DURATIONSTARTING (a) (b) v/day FEATURES (USS'OOO)(USS'OOO) (years) (year)

RendezvousRoad - Highway 7 58 12.37 12,842 Type (d): T T -Traffic lights; 1,517 380 1 year mid 1992 Flow control (e): S TS (lights) -two tuming lanes to 759 190 Turning lanes : None Both sides improve intersection's Visibility : Good Good capacity; Sidewalks : Partial Complete -sidewalks on both sides; Pedest. traffic: Very high -drainage (major works)

Codrington - Cave Hill 24 6.36 10,333 Type (d): ST ST -Traffic lights; 1,012 579 1 year 1993 (Green Hilt - H'way 2) Flow control (e): S IS (tlights) -two turning Lanes to 506 Turning lanes : None Both sides improve capacity; Visibility : Poor, mall Improved -reinstate wall; Sidewalks : Incomplete Complete -sidewalks on both sides Pedest. traffic: Very high -drainage (mejor works) Pine Eli - Pirke IS 18 5.36 9,204 Type td): X X -Road realigisent to 527 17 1 year 1994 Flow control Ce): S S improve verticat profile; 263 8 Turning lanes : None Yes -turning lanes on one Visibility : Poor, vert. Improved road (improve capacity); aligraent. -sidewalks on both sides Sidewalks : None Complete (two schools nearby); Pedest. traffic : Very high -major drainage morks to avoid flooding.

Thornbury - Highway 7 32 11.57 7,578 Type (d): T T -Removalof walls to 688 18 1 year 1994 (Thorebury Hill) Flow control (e): S S improve vIsibility; 344 9 Turning lanes : None Yes -road realigment to Visibility : Poor, rock Improved eltiminate dangerous wall & slope curve; Sidewalks : None Complete -sidewalks on both sides Pedest. traffic: Very high (shopping center nearby);

RendezvousRd.-Golf Club Rd. 32 6.83 12,842 Type ld): T (2 juict) T -Visibility improvement 408 210 1 year 1995 Oayrells Rd.-Golf Cltu Rd. Flow control (e): S S through shifting road 204 105 Turning lanes : Nne Yes aligruent and removing Visibility : Poor, wall Impr,ved a building and walls; & building -sidewalks all along Sideualks : None Complete road section between Pedest. traffic : Very high intersections.

TOTALPROGRAM (DS'O00) 4,152 1,203 (USSOOO5) 2,076 312 tD

(a) Numberof accidents: Based on MKl Traffic Unit's records (January 1,1989-June 30,1989). (b) Accident rate: numberof accidents per vehicle million (c) Traffic : Average daily traffic counted on main road. {d) Junction Type : IS1l Staggered 7 junction; IT] I junction; EX] Four cross. (e) Junction Control : COS]Overhead signals; (RI Roundabout; ESI Stop/no control device; [TS) Traffic signals (ltights). SDCC6D3OAD MAINTENAC MM8 RUDSILITIOI PROJIB

OVEBAL PROGRAM(1992193 - 1996197)

LOCATIO g0m am5 SEXIPlCi9 LST IIDIII 2 3.08013. SIT TOTAL COST 1.R.A. I P8S1S SAn CLSS FM TO Esa) (a) TME MQI) (vlday) (BDS000) (US$S000) (2)

FIRST TM PROGRAM(1992193-1993194)

71 I 8TS VITLAIUE3AD S St. L CwrsncCap - Bremay Dway H4ibv w7 Junctloa 0.32 6.00 ST 133 14.976 93 47 100.0 I SIx HiGHWAYI P Spring GardsllBtt lRock Church St. Junction (U'wy 13) 13.96 7.00 AC 109 9.254 4.723 2.362 100.0 (vie Payne Bays. IiD1tomw Gibbs. and SpsiShtstown- Main Straet) 72 x HIGHWAYT P Hgbwsy 7 (COitis) AK5 NCgs1s (Newton) 2.40 6.00 AC ISO 4.955 710 355 100.0 74 I SIGxmY a P lglaay 7 Junction lairy Vallay Junction 4.52 5.50 AC-st III 3.938 1.065 133 100.0 IS Gl. UIwID 4 P Stwartcni Jiacti Carmichasl load 9.25 7.00 AC 130 3.180 1.861 931 100.0 (via Messah Street and Voodlrnd T.-rapiks) 43 a BlGows I P Cottage Plantation lbway 3B (Groevs iL1 JunCt.) 1.28 6.00 AC 86 3.000 319 160 100.0 73 E M L mu11 1 5 Grams Ranl 31ghay T (Oistits Dill Juact.) 2.90 5.00 AC 148 1.526 853 427 97.8

SUBIOTAL (1992193-1"3194)t 34.63 9.625 4.813 99.8

SECO5DTM P* (18,4193)

19 P B151 43 P balton Thicketta 6.00 6.00 AC 109 1.653 1.080 540 84.1 19 0 BIGBY05 45 P Ulghy 4 (Tgupiks Junction) St. Philip border (Balton) 4.50 6.00 AC 109 1.653 810 405 84.5 38 X IIICEY4 Q P BIUgbesR Hglasay P ano Q Jt'ntlo 0.80 3.00 AC-ST 67 3.000 144 72 81.3 26 n *GWsi e P Eotbarsal Turing - 1e11o B'way ElClneood e4. Junction 2.10 6.00 AC 67 2.733 378 169 77.2 42 a 111Gb4V P Highway 4 Valkers near St.Gorge Church 1.30 5.00 AC-ST 95 2.000 234 117 73.9 35 P IIISB1 5 P Rockasll Pole DSS 322 4i1e.s) 5.00 9.00 AC 57 3.067 900 450 71.8 52 a LOCIST KUL1 S Charls two Bridge BNitcy 3 (Ltcust Ball Junction) 2.60 6.00 AC-ST 58 2.807 468 234 64.8 17 J 3IG01i3 38 P St.esorge border anlsbbury Pit. Junction by St.Johm aixed sebool 4.60 6.00 Ac-sT 65 2.384 828 414 36.6 36 P I3G01A X P Pole MD 322 (te.) Nigla.y 5 3.90 7.00 AC 56 2.644 1.062 331 56.0 2 Z 3G131 A P lose EIll JuDct. Mile * Qunrter Charles 8 O'Ueal Bighesy 1.40 6.00 AC 72 2.169 232 126 55.3 65 a IMOUT UBE1T0 S JunCt. Eigbhay I and 25 Orange BIll (lZbway 3S-3) 3.30 6.00 AC 105 1.326 594 297 54.6

SUB5TWA. (199419S1) 37.50 6.750 3,375 69.0

Perish codes (A3 St. Sndrsw;131 St. Peters 101 St. GeorSes IJI St. JohnI in] St. uMebhal 1(0 St. Josephs [PI St. Philip: (SI St. Jaws; (TI St. Tbca; JRI Christ Churec load clases IP] Primry road; (S6 Secodery roadt IL) Local road. Surface types (ACl Asapal coarete ai; (ST? Surfsc trestuts or other *spbalt pentration roads.

o -4j -DOAD HUTC AD BMLUIlTs DPRm?

0VU! PROGRM (1992193 . 1990197)

Locanm 3MB am*0O L3*TU VIDIB 5031CR10001. LT TOTALCOSmIL 9 9*353 am CLAS n13 To (m (a) sM cqu (wIde,) (BWhOO) (nSo eX )000)

132 TM u"A" (1995196)

30 J menG a P St. Job. mxed Sebool St. Philip Bordor lmoitte 3.90 5.00 AC-ST 76 ImS 702 #51 52.6 60 T PS-3 S Jumatio with St. 9bhlp Chreh Six Cross Roads Juctio 2.72 5.00 ST 194 70e 090 245 06.9 12 A 3IGMW a P Cbspuan Village (by shop) Bruce Vale 5.00 6.00 ST 122 840 900 050 03.9 31 P EIlGt 8 P Monrite higbay 45 Junctio 1.40 6.00 ST S1 1,498 252 126 41.1 41 0 EtUMT W11 P Uay S (Lhr BiUeye) Bighuy 4 - Contant 2.00 5.00 AC 64 2,000 M6 to0 40.4 40 J Urn,, P*B ZIglmay (Tour Cree toeds) St. George Border (WoodLed) 1.90 5.00 ST So 1.31 302 III 39.6 tO 3 Amme ROA S RIBInsay 33 (Pour Creo Roads) Mount Tabor Cb. CJS-6 Junctio) 1.28 6.00 ST ds 1.200 230 1L5 30.7 00 Z uIoaaiV P Brt111 a (St. DavId. JimctiLo) B11ay 6 (mmn-tiyn) 2.20 6.00 AC 50 2.1S3 403 202 $3.6 0 F BIA! 13 P BIaUe I (IUteobtold) Collatesu 2.t0 AC 65 1,643 46 243 32.0 34 P 31 * n P OGgbhterlend Development Ieujlbillhuay 5 Jumcti 0.00 5.00 ST 91 979 720 360 30.6 48 J GU0M 1AD S Bl_uap 4 St. Phlip Border ear Rena 2.20 5.00 ST 99 80o 396 198 29.0 25 t 11101 P P Sprin IIUll by Wni-mart 2.50 6.50 AC 107 686 0)0 223 29.1 5S 0 Wm rISCoC.6co S upper pars Bstae Nosee 2.0J 5.00 ST 186 00 370 1U7 28.6 55 P Cn EUL S Sill View Junction (Ketdal) BNbguy 40 (Cbureb Villagel 1.20 s.00 ST 146 *00 216 l08 27.2 10 0 3113W 51 P blvn mllU St. Sylvns Village 2.8o 5.00 ST 19 400 S0 252 25.4 14 DM a 3 (IB'uay SC) S St. Sylvens Brce Vale 1.80 3.50 ST 139 400 324 162 25.4 >

$03T AL (195186). 39.72 7.150 3,575 36.3

N10m t 1 VUA (10497)

3 I 3m a P Vildly I - Buty 6 * Lowland1s ABCBlghusy 9.40 5.00 AC U6 1.770 1.692 B46 26.3 S8 0 sum ML 5 SugaRll La BUI S 1.40 6.00 AC 135 400 252 126 24.6 11 A IGT 2 P Druc Vale (Coggis Bi J.met.) Greenand grids arley Bill 4.70 6.00 AC-ST d1 1.450 846 423 21.7 49 S 1AUIADS S B 1)aay1S (Utreat) Mls-and-o..qnrter 2.50 5.50 AC-ST 95 70e 050 22S 23.5 " a Remy a S St. dieoolas Abbey Diamd Corne 1.80 5.00 ST 98 650 324 162 25.0 51 a 1llCWU11T ROAD S B4itusy 05 (Bthibto Corset) Rigilty 4 fMout Coiner) 1.51 5.00 AC-ST 110 500 272 136 22.4 29 J Cmir a P St. JclmMlslhol Rath BUl 2.70 5.00 ST 8 752 066 243 21.7 45 0 EIAT I * Bigibwy 3 (Ste Slizaeitb) BSibcny 3 (Bathehabal 2.90 6.00 ST 147 300 522 261 21.2 S S SAmi LA P7 B4by I (Boitson) Seaview (St.Tbomas Border) 2.90 5.00 AC 63 1.261 522 261 20.7 5 t 120111T IA P ldg_avy (Seview) St. tbomes Chureb (DighBy 2U) 0.80 3.00 AC 63 1.261 144 72 20.7 67 5 55.5 S flUglsy 21 Indin around - Prospect 3.10 3.00 Sr 109 050 335 279 39.0 9 J 33C011 C P B4bgray 21 (Lonaster) Zndesrour 1.60 5.00 AC £61 562 2e8 144 19.0 16 0 UCBET 3B P Groves Plantation St. Jobn Border 3.10 5.00 AC-ST 61 1.166 558 279 17.0 I'd ______. ______. 00 SWUAL R1996197)3 39.01 6.914 5 457 22.6 ID .1.

TOTAL.PR20RA (1992195 - IN96/97) 150.26 30.438 15.219 60.5 F

ParIeb codes 11 St. Andr_u I3I St. Peters (0) St. GCore (JI St. Johln pIl St. Mbhal; 101 St. Josephi (P) St. Pbhilip, Sl St. Jsal (T) St. Thobeas III Cbrist Cburch Road cLeasa (P) Primry roads IS] Secondary roads [L) Local road. Sortac tips (ACE Aspbalt comrste mix 1ST) Surface treatnt or otber eapbalt pantraiim roa4d. _ 53 - Table 18

BARBADOS SECONDROAD NAITENANCE AND REHABILITATIONPROJECT ROAD MAINETENANCEEQUIPMENT TO BE PURCHASED(1992/93-1995/96)

1992/93 1M3/94 1994/95 199M/96 T 0 T A L EQUIPMENT UNIT COST UNITS COST UNITS COST UNITS COST UNITS COST UNITS COST DESCRIPTION CUSS) (No) (USS) (No) CUSS) (No) (USS) (No) (USS) (No) CUSS)

MAJOR EQUIPMENT: Small Duffp Trucks 30,000 0 7 210,000 - 0 - 0 7 210,000 Small FlatBed Truckw/lift 27,000 0 * 0 1 27,000 0 1 27,000 TractorTrailer Unit 120,000 - 0 1 120,000 0 0 1 120,000 TreeTrfmrers w/5O ft. extensfon 100,000 0 - 0 1 100,000 0 1 100.000 UtilityVehicles 20,000 6 120,000 - 0 - 0 0 6 120,000 FrontEnd Loaders 60,000 - 0 0 2 120,000 - 0 2 120,000 Backhoes 35.000 - 0 2 70,000 - 0 - 0 2 70,000 PedestrianRotlers 27.000 0 0 3 81.000 3 81,000 6 162,000 Road Sweepers 70,000 0 0 - 0 1 70,000 1 70,000 Afr coWpressorsw/Jack hammers 20,000 - 0 4 80,000 0 - . 0 4 80,000 ...... SubtotalMajor EquIpment: 6 120,000 14 480,000 7 328.000 4 151,000 31 1,079,000

MINOR EQUIPMENT MechanicalSprayer 12,000 - 0 6 72,000 - 0 0 6 72,000 Hand Sprayer 7,000 - 0 7 49,000 - 0 7 49,000 14 98,000 Compactors RRaers 2,500 - 0 7 17,500 0 0 7 17,500 Flair Mowerswith Tractors 30,000 0 - 0 1 30,000 1 30,000 2 60,000 Brush Cutters 500 - 0 10 5,000 10 5,000 - 0 20 10,000 PUmPs 4,000 0 - 0 4 16,000 4 16,000 8 32,000 Chain Saw and Accesorfes 500 0 - 0 12 6,000 - 0 12 6,000 AsphaltCutting Saws 1,000 0 3 3,000 0 0 3 3,000 ConcreteCutting Saws 2,000 - 0 0 3 6,000 0 3 6,000 Small Trailers 6,000 0 6 36,000 - 0 0 6 36,000 ...... SubtotalMinor Equipment - 0 39 182,500 30 63,000 12 95,000 81 340,500 ......

TOTAL EQUIPMENT - 6 120,000 53 662,500 37 391,000 16 246,000 112 1,419,500

Spare Parts for new equipment - 12,000 - 66,250 - 39,100 - 24,600 - 141,950

Tooltsfor MCW'sworkshop - 90,000 - 0 0 - 0 - 90,000

TOTALROAD MAINTENANCEEQUIPMENT AND WORKSHOPTOOLS 222,000 - 728,750 - 430,100 - 270,600 - 1,651,450 uuuuuuuuu...... u_ ...... u_ ...... u EMMS RD AM ETuRARcEAND 2 ILITATIGPO PRWC

UIPIHW RO8EPR ADMMREEILITATIOS PROGRA (1992-1995) (Costs In us$)

EQUIPHENT (a) o R C OS PE UN b) 1 9 9 2 1993 1 9 9 4 1995 T L rEPLA~3iDW TIRE PAUTS AROR COWIRACTREIIIUL PARTS CiTCi PARTS CTRACT PATS COTRACT IT PARUS CONTACT PARTS COamRACT CATEMR COST oP COST COST OUTr COST D TlTSCOST IT iN COSST DourCOSTcoST1TS Ouror MTI CmST 1US$) tu1 (Ust) (DSS) S$) RtO (NOo) US$) (uS i S) 1US$) (No) 1US$)DS $) I (No) 1US$) 1SS$) Ib(N) CUSS) 1SOM)

MaIO EQWlP

Trucks 30.000 R so00o0r 2 soo s 25.000 12.500 10 50.000 25.000 - _ _ 0 0 15 7.000 37 SOO =..1 7,500 2,500 2.500 0.42 - - - - - 10 75.000 25,000 1o 75.000 25,000 20 150e000 50,000

Truck Tractors 120.000 Rehabb. 10,000 5.000 0.13 - - I 10.000 0 - - - I 10.000 0

Skid Steers 30.000 epair I.500 - 2 3.000 a 2 3.000 0 o o 4 6,000 0 Iab. 2 000 1.000 - 0.10 2.000 ------1 2.000 0

IBboe0_ - tractors 30000 pair 3000 2,500 _O 1 3,000 2, Rbab. 3.500 1,750 22500 0.26 - 10,500 7,500 2 7.000 5.000 S 17500 12,500

End Loadrs 60,000 Rpair 9 000 2 Soo 3 27,000 7,500 3 27 000 7 soo =lish. 10,000 5.000 2.500 0.29 - - - 1 10.00 2.500 10.000 2,500 2 20.000 5.000

Rollers 27.500 =eair 3,500 _ 2 7.000 a 1 3I 500 0 5 10.500 0 b. 4 000 2,000 0.22 - - 4.000 - - - 1 4t0 0

Ar Co.preeeore 15,000 Reir 3,750 2,500 2 3,500 5.000 ______2 *.500 S,000 ehab. 2100022,500 1.000 0.37 1 2,000 2.5O - - 2 4.0000 5.00 5 6,000 7,500 Motorgradr 100,000 Repair 35000 _- _- 1I.000 ,000 0 0 …------…------I Subtotal major pupsmte 8 ii32,000 17,500 23 111,000 45.000 19 106.000 37,500 12 6.So5 27.500 62 337,500 127.500s

Pick-upe 15,0006 pir 1.750 2 3.,00 0 5 8.750 0 _ . 7 12 250 0 2,000 l.000 0.20 - - - - - 00 0 6,00 7 14000 0

Mehacll sprayer, 15.000 Re,ar 2 0ON 1 2.000 4,000 0 A 2,000 0 4 .000 0 2.500 1.000 0.23 - 0 00 10.000 0 _- _- - 4 10IO0 0O

Smau z"ipMOMta) - Rpsir 2,600 20 52,000 0 35 91,000 0 35 91,000 0 25 65,000 0 115 299.000 0

Subtotal Minor Equipments 2I 57,500 0 44 109,750 0 41 103,000 0 29 73,.00 o 117 543,250 o

TOTALPROGRM (Parts ad work contracted out) 31 89,500 17.500 67 220,750 45,000 60 209,00037,500 41 161.500 27,500 199I 660,750 127.500

Notes, (a) Equipment categoris aNd replacemnt costs. Tn uite to be repaired or rebiUttated were aLected by Uorkehop' a anageaent taking iuto account uipment conditlon. age, estimated rehabilitation coat and remaining life after rebabiltation. Otbhr eld and coetly-to-operate units of MC fleet, whose rebabiltation wae not justified on ecowooc ground and -- tbhr fore-- not included In Lhe prg,rm, wil be dispoed. Dletributicn of work by year reflects priorit, in equipment nede end io consistent witb Veorkshop capacity to perform the work. (b) Proposed work Is classified Into mjor repatrs and full rehbilitation, Basd an the needs of the unite selected for each equipment category ad type of work, average unit coats ar estimated for$ 11) parts needed for repair and rehabilitation work performd by ISCIs Vorkahop. (ii) work to be contracted out to private Sarage. In Wdditio, labor costs are estiated for all rehabilitation work in order to calculate total rebablitation coat ad rehabiltatioulreplaceaeut coat ratio. (c) Smll qulpmst iclude hand sprayer, peps., genrators, dumpers, cain savw, tamrs, brush cutters, etc. 001*01 e inXls an aoutwTrc PROEC PROJECTOSTLATs B? 1161 £1992191 - 19961911 (la M-3000)

135 am3 151 an TOTA 33 AL 0 L 835alCTaTALI 1A33IU1D CU tAL I= 0 AL 005CB la 133 Go TOMA 1. Cl%L 5o

A. lIn AL5T108 F!t9

-Ugb4i1 4a Searls - Us Rog" 55 43 1,29 924 20 SS _ 1.129 924 2,033 - 11b. *GCo1oyuor. 9.k 4$S _ _ _ _ 21; 14 391 _ _ _ 213 174 351 "total Um tst FUatimProgru 5S 43U 0 0 1,129 924 2.053 21a 114 3So 0 0 0 0 0 0 1,42 I.6 2.43a *. 5131 1109 .t.nde02... 1 aI1 Ss 45 163 1S3 30 252 106 4 - - - - - 41 341 137 Codr4rLs.. CoveUMU 3 4SS 27t 229 S3 I PUMIM a -as3S 213 228 3S0 43 - 43 *I9 263 - 43 3it 263 .TkobDOqv- 3,m1 I 3 45 - log-3 813 144 a djodsv --- in6 I3l 344 Dayr.L1a-Clot Club 34. SS 45 - - - - 1 92 204 - - 12 92 204 Subto.ta Softy Progess U 16S 165 8U3 n00 30 434 9S 334 *13 400 112 92 204 0 0 0 1.*42 934 2.0n6 C. 0356.A1 PROGRAM

. Package 3 ('9 60 to 600 200 2.000 3.030 63 3.813 - - - _ - * *ackae .3e (8 _ _ *30_ 6 4.61$ s60 20 - , _ _ _2.31 38 347,snn * - t32?1 -0ng 2.n 64 3.313 akg M 3so s0 a 0 0 1.146 5.166 3.313 .18 173 .1 AS - .3tack.g. ('3 $0 ~~30so - - * - 0 0 a 5.q .7295.2 3.431 .1392" 8.129 3.431qg 6.48.2 Cv-rl'y UoF ol 4n is 600 2n00 5000 3.030 763 3.613 23.251 34 3,313 I.13 5.119 3.3131 1.29 1.1M 3.43 s7.693 S1.32? .no220 D.811CS*amCW.1UT 35 43 3 2 6S 194 IS9 353 ------230 to 416 S. OCM r PIWdAN 33 43 55 43 t00 III 145 322 122 22 - - - - - 334 259 641 SUTT CvL 08K1 1.056 409 1,465 5.00 2.425 1.S34 3.13 1.393 4.5 1.900 8.519 3.119 1.29 1.739 3.4S7 12.960 I.Wn 29.196 t1.UAapui iM 0200o - - - o0 Sl Sol 0 "I "1 - - 0 1.*n 1.4n 111. l01llT m a tpm *00 0 222 0 222 129 C 1 430 0 430 211 0 all - - - I.631 0 3.51 aor anta for tlob" 6,lat. 100 0 00 0 90 221 0 221 209 0 209 162 0 162 - ababllt.tlm b Contract 68"I- 0 69 60 40 It A Is 27 58 43 23 is s 317 11 23 - - - 17 S 328 Vr.obca. I10 - - _ r Is0 0 - - _ _ _ - _ _ _ IS0 0 IS0 sUIOTALr4W 412 7 419 9n7 56 99s 662 IS 611 449 11 40 0 0 0 2.333 *1 2.610 IT. ITSTITIAL S615KB1U

T*Cbal" l A.Iataac 100 0 IS0 0 IS0 220 0 220 IS0 a IS0 ------ss0 0 330 od Network satml s It, 5 0 2 - 0 - - - - .. Mo. 8rlaattow,s wAy - - - 20 0 200 80 0 400- - 400 0 0 s - Traart ad soo 3s.o 1: 230 30 - Tr& :So 230n o 2 300 *a- lcal2 3030 so - 83 is 30 *3 53 AZ 20 S0 00 - rta1la tora*n 500 3so so 500 0oa so0 0 o0 40 0 6 60 C 60 s0 0 s0 o20 0 2C0 Sf1UhALUST1TUP 6LS2gnh mf l8o0o 0 log 143 26s 1,010 a 3s IS 610 70 20 90 0 0 0 1.630 300 5.30 W. NhSC6L CU ENlS 106 42 341 300 142 1o 3U0 840 4a9 5 o" 3in 13 1,7 34 5.296 12 080 S 0 3 S 0 S* 1 5,54 431 8.51* 7.350 2.,n 10.238 4.631 2.546 6.91? 2.608 2.9ae n.399 1.901 8,001 3.403 15.464 IO.4S 29.901 cr VI. M1CCC 1-4 usTIUOC e1 22 114 149 302 .051 7162 24? 1.008 S62 42 .014 U.03S" 323 I.349 3.69 I.238 na

WI%. IOTAL cm I'1 400 2,253 .0S9 3.251 11.310 S,S3 2,332 7.93 3.170 3.442 6.*2 2.427 2,421 4,33 21.153 11.392 33.8i O (* 9:oaetage of Bank flnaac*a foc t41. category varies an 8.1lw.s S0X for 41.9.ra.mats 'AP to a total of 0381.41 .111cii Sal30tbaroafto., .0111 dlaka.aaaaat. xact. U0813. .111100. - 56 - Table 21

BARBADOS

SECOND ROAD MAINTENANCEAND REHABILITATIONPROJECT

Estimated Schedule of Disbursementsby Bank FY

Disbursed in Cumulative Quarter FY Disbursements % 1993

September 30, 1992 1.7 1/ 1.7 8.0 December 31, 1992 0.1 1.8 8.5 March 31, 1993 0.2 2.0 9.4 June 30, 1993 0.7 2.7 2.7 12.9

1994

September 30, 1993 1.1 3.9 18.3 December 31, 1993 1.6 l 5.4 25.7 March 31, 1594 1.8 7.2 34.3 June 30, 1994 2.0 6.5 9.2 43.5

1995

September 30, 1994 2.0 11.2 53.2 December 31, 1994 1.9 13.1 62.1 March 31, 1995 1.6 14.7 69.7 June 30, 1995 1.4 6.9 16.1 76.2

1996

September 30, 1995 1.2 17.3 82.0 December 31, 1995 0.8 18.2 86.0 March 31, 1996 0.7 18.9 89.6 June 30, 1996 0.7 3.5 19.6 92.7

1997

September 30, 1996 0.6 20.2 95.6 December 31, 1996 0.5 20.7 98.1 March 31, 1997 0.4 1.5 21.2 100.0

Assumptions

Loan Signing Date: July 1992 Loan Effectiveness: August 1992 Project Completion: September 30, 1996 Loan Closing Date: March 31, 1997

1/ Including initial deposit into Special Account.

Source: Mission Estimates. - 57 -

Table 22

BMADOS

Second Road Maintenance und RehabilitationProiect

Allocation of Loan Proceed.

Ci) Civil Works

(a) Overlays 9,900,000 80S until disbursements reach US$7.4 million; 502 thereafter.

(b) rehabilitationof roads, bridges, 3,100,000 55Z of total. culverts, road safety works, and routine maintenance by contract.

(ii) Hauipment and Sgare Parts

(a) Purchase 2,500,000 1OOZ of foreign. 902 of local.

(b) Rehabilitation 100,000 602 of total.

(iii) InstitutionalStrenathenina

(a) Technical Assietance and studies 1,100,000 1OOS (b) Training 500,000 lOO of foreign. 5O0 of local.

(iv) Unallocated 4,000,000

Total 4.200.000 SECONDROAD hIDMM1UTNISCE REHABILITATION PROJECT MM Organization Chart

Minister of PubUe Wor,ks C icAtioa and Tranuportation

TRART PUBLIC WORKS § BOaRD l l DIVISIOll IllxI0UhL TRASORT aD | | COIIS DIVlSlDII

Board of Direct*or ] Per uge Secretars Permanent Secretar|Y

| General Statistiee Ai Offiee. Stf

BARBADOSPM1| GRAMMEYAAMr AUTHDRIT! INTEATIOH&L AIRPORT

Board of Directors

_ I_ternal_ Aditor] |General ger Airport Mger|

Deputy Permanent Secrtare -O - - - -EPARTT- - -EC-ICL ICE DEPAIT | Integ. Finantcial LICDNSINGAUTHORITY |ELECRICAL ESGTn D1A T N T C I DEA TMN | IPMO DEPAR Accounting System Chief Finance Officer ______A___ Chief Tecbnical Officerl _Chief ______D__ _ L------J Licensing Off. Chief Electrical EHg. Chief _ IAC I Persocnnl Off. ADINISTRAIVE OFF1CEI PISISG OFFICE Chief Admini0t.OfficorI [fficer a

DESIGN SERLVICB PROJECTS OPERATIC0NS Deputy Chief T. 0. Deputy l ORL>RP Chief T. 0. Deputy Chief T. 0. Senior aechan. Eng. ARCHITSECTAL| qProj. Engineer MATERIALSMI. | Workhop Manager|

LAWD SRVEYING Architect CIVILcProj. ENGINEER. Equipment iMnag.|

ENGINEEBIN6R | BBlLDlN6S C -Yd Struct. U BORATORY|

-FQNlAITY StlRV W

DISTRICTS S Mlichael Worth S Sicbkael South _ North Irest

C -hr ia eC r - 59 -

ANNEX1 Page 1 of 9

BARBADOS

SECOND ROAD MAINTENANCEAND REHABILITATIONPROJECT

ROAD MAINTENANCE

Maintenance Management

1. Organizationally,the responsibilityfor road maintenance operations is divided between three organizationalunits: i) the Maintenance Management Section (MMS), which is in charge of maintenance planning and budgeting, and evaluating the implementationof such maintenance plans; ii) the seven Road Districts, which are in charge f delivering maintenance services through 13 individualdepots or maintenancefacilities, conveniently distributed throughout the island; and iii) the Equipment Management Section, which is responsiblefor equipment operation. The first two units are under the Operations Division, whereas the third operates under the Mechanical Division (Workshop). To enhance coordination between these units and periodically review progress on the development of improved procedures for road maintenance management, MCW designated in 1991 a Technical Committee,which consists of key personnel from the Operations Division. In addition, two other units also provide support to maintenance operations: the Materials Management Section within the Operations Division, which administerscontracts for procurementof materials and supplies needed for all road work carried out by force account, as quarries and asphalt mix plants are currently owned and operated by the private sector; and the Workshop Section, within the Mechanical Division,which is in charge of keeping operational MCW's road maintenance equipment fleet as well as the Government's general purpose vehicle fleet. The chart of this annex describes the existing maintenance operations organization down to the maintenance crew level. In general, the organizationalstructure of all these units is adequate. However, one weakness has been the lack of coordinationin the assignment of equipment units to maintenance operations,which is discussed in detail in para. 14.

2. The overall budget for maintenancehas been generally in line with the requirements. However, operationalefficiency has remained low because of over- staffing and improper preparation of maintenance budgets and allocations of resourcesamong uses. Maintenancebudgets have reflectedin the past significant resource imbalance; an average of 73% have been allocated to labor-related expenditures, leaving little for materials (20%) and equipment (7Z). The majority of workers are employed in the districts. Until mid-1991 MCW had employed on average some 1400 personnel assigned to maintenance operations. In reality, only about 60% were necessary to deliver maintenance services and the rest were partially used to carry out capital works. This situation has been corrected recently under the recent retrenchmentprogram by which maintenance operations labor force has been reduced to about 776 staff (30 technicians and 746 supervisorsand workers). Consequently,with the retrenchmentprogram, MCW has now completed a tentative reassignmentof road maintenance staff among all categories s-ndis in the process of putting it into effect. - 60 -

ANNEX1 Page 2 of 9

Road Maintenance Personnel

Ex Weedina Patching Drainaxe Other Total 1986/87 500 230 210 260 1,200 1987/88 300 375 150 175 1,000 1988/89 200 380 145 275 1,000 1989/90 315 375 105 315 1,110 1990/91 430 370 198 396 1,384 1991/92 430 370 198 396 1,384 1992/93 186 220 110 270 776

3. Maintenance management is still an area with a clear scope for improvement. The Highway MaintenanceManagement System (HMMS) establishedunder the first Bank project enabled MMS to prepare the Four-Year Maintenance Plan, which is discussedbelow. However, this system has not yet been installedin the field, and hence, not tested by maintenance crews. To carry out the Four-Year Maintenance Plan, MCW needs to implement appropriate field work scheduling and feedback reporting procedures, and to improve resource usage and crew productivity. The proposed project will assist MCW in implementing the HMNMS throughoutall districtsand depots by providinga follow-uptechnical assistance in road maintenance and a training program to instructmaintenance staff in the new procedures, under the terms of reference outlined in Annex 3. In addition, the projectwill furtherthe technicalassistance to MMS under terms of reference provided in Annex 4.

Four-Year Maintenance Proaram

4. During project preparation, MCW with assistance of consultants and IBRD staff, developeda performancemaintenance program for fiscal years 1992/93 to 1995/96. This process started with the completion of the road feature inventoryof the entire highway system,which includes the quantity and specific condition of each component that needs to be maintained in each link. Then, 29 maintenanceactivities (23 activities for routine maintenanceand 6 for periodic maintenance)-- which provide for the most frequent and relevant tasks needed to maintain all road features-- were selected. For each activity, a work measurement unit (e.g. tons of patching)was assigned and performance standards were developed. These performance standards define the activity, the daily resource requirementsin terms of crew and equipment, the daily accomplishment expected when using such resources (productivity)and the approved work method. In addition,MCW establishedthe levels of service to be maintained on each road component when providing a "full level" of maintenance services. This "full level" was defined by a set of quantity standards (e.g. tons of patching per year) --variable according to road class and component condition--, with a separate standard for each activity. They were fixed by the Technical Committee based on the existing experience. The annualwork quantitieswere determined for each maintenance activity by multiplying the quantity standards by the appropriateinventory quantity. The amount and types of resources requiredwere determined by using each maintenance activity's performance standard. Annual costs for each activity were computed by multiplying the resource quantities by unit costs for labor, equipment and materials as determined by the Maintenance Management Section (MMS). The sum of all annual activity costs is the maintenance budget. - 61 -

ANNEX 1 Page 3 of 9

5. The maintenance program for fiscal year 1992/93 is given in Table 6 of this report. The maintenance program and budget were prepared for each maintenance district. The total program for the entire road network was determined as a sum of all district programs. The total maintenance budget, as calculated,is US$10.4million, of which US$7.3 million (70.22)is for activities considered as routine maintenance and US$3.1 million (29.8Z) for periodic maintenance. Out of the total maintenanceprogram, about US$1.4 million (13.5Z) will be carried out by contract. The plan includes,under periodic maintenance activities,extensive overlayand reseal programs (see para. 9 and 10); a portion of the first contract for overlayworks is included in this fiscal year while the remainder is included in fiscal year 1993/94. Another special feature of this plan is the inclusion of a Routine-Maintenance-By-ContractPilot Program, described in para. 18 of this annex. This maintenance plan provides for an adequate level of funding according to the existing network needs, a well balanced distributionbetween routine and periodicmaintenance, and an increased participation by private contractors. The plan also gives the total staffing requirements in each labor category, the number of units of each equipment and required quantities of all materials. Tables 7 and 8 show the results in terms of key resource requirements (materials, labor and equipment) by maintenance activity and budgets required for force account works, respectively. These requirementsare consistent with the current levels of personnel and equipment available within MCW.

6. The programs for the period 1993/94 - 1995/96 were prepared on the same basis that of the 1992/93. They are also based on the assumption that the condition of the network will be improved through the implementation of the rehabilitationand periodic maintenance programs. Tables 1 to 3 in this annex show the results (in BD$) determined for each fiscal year. For the sake of brevity, the tables showing the resource requirementshave been omitted. The total budget for fiscal year 1993/94 is slightly higher than the others; this is because the first year overlay program is more costly due to the higher cost of the roads involved (Highway 1). Maintenanceby contract is on the average about 302, which is adequate. MCW will update annually the Four-Year Maintenance Program based on an update of the road feature inventory and overlay and reseal programs, and feedback from maintenanceprogram under execution. The cost of the Four-Year Maintenance Plan is as follows:

Maintenance Programs 1992/93-1995/96

Summary of Costs(&)

Fiscal Total S of which Routine Maintenance Periodic Maintenance Year Budget by contract Total % of total Total X of total O&RprogramCb) ------. ,------_------_--_----__----_-----__-----_------1992/93 10.4 13.51 7.3 70.2S 3.1 29.82 60.0 km 1993/94 13.1 32.21 7.2 55.0X 5.9 45.0S 96.8 km 1994/95 12.3 28.51 6.9 56.01 5.4 44.01 101.2 km 1995/96 12.2 30.31 6.6 54.01 5.6 46.01 99.2 km ------_-_------__------__------_------Total 48.0 26.71 28.0 58.32 20.0 41.71 357.2 km ---- _------__---___------___------__------__----____--_------(*JCost in US$ million. (b) Overlayand resealprogram, to be carriedout by contractand forceaccount. The fourthcontract for overlay works (38.4 km) is not included, as it will be executed in fiscal year 1996/97. - 62 -

ANNEX I Page 4 of 9

7. The plans provide the necessary inputs to prepare an appropriate maintenance budget and establish the key resources needed for force account works. To ensure that they can be implemented,the provision by the Government to MCW of an annual allocationfor materials consistentwith the requirementsof the plans constitutesa conditionof the proposed project. The current breakdown among resources is summarized below:

Maintenance Programs 1992/93-1995/96 Breakdown of Force Account Costs by Resources(O Fiscal TotalProgram Materials Labor Equipment Year (ForceAccount) Total X of total TotalS of total Total X of total ___9______6.9______3_.1.____34.7______3.______44.0______1.9______21.3______1992/93 8.9 3.1 34.7 3.9 44.0 1.9 21.3 1993/94 8.8 3.0 34.1 3.9 44.3 1.9 21.6 1994195 8.8 3.0 34.1 3.9 44.3 1.9 21.6 1995/96 8.5 2.8 33.2 3.9 45.8 1.8 21.0 -- ___------_------_----_------_------__------__------_--- Total 35.0 11.9 34.1 15.6 44.5 7.5 21.4 Cos50tin US$ mllilon.

Overlay and Reseal Programs

8. The periodic maintenanceprogram consistsmainly of overlay and reseal works. The overlay and reseal programs have been designed to curb the current trend by which the length of the road network in fair to poor condition -- requiringperiodic maintenance--is increasingannually. Timely interventionis particularlyimportant in the case of roads in fair condition,since the repairs needed once the pavement starts to break up are several times more costly. (Generally,costs of reconstructionare four times higher than the cost of an opportune overlay or reseal work).

9. About 250 km of primary and secondary roads (approximately42Z of the main network) are now in fair condition, and almost 60 km (about 102) in poor condition; a substantialportion of this network carries sufficient traffic to warrant an overlay. The overlay program aims at raising the standards and preventing further deteriorationof this part of the network. About 250 km of primary and secondary roads will be overlaid during project implementation; overlay works for about 150 km (about 60% of the total) of high priority roads will be contracted out, while the remainingportion will be carried out by force account. The proposed projectwill finance the overlayprogram to be carried out by contract,which totals US$15.2million. This will help MCW reduce the backlog in periodic maintenance during the four-yearperiod to a level consistentwith its ability to perform the required work using its own resources. The list of the selected road links included in the proposed project is given in Table 17 of the report. These road sections were selected based on pavement condition surveys, which included measuring pavement distress and surface roughness, traffic data and economic evaluation. The works were divided into four groups, each representingan annual overlay program of approximately40 km to be carried out by private contractors. The distributionamong years was determined on the basis of the relative economic benefits of the projects. To complete the overlay program, MCW will perform overlays on about 25 km each year, using its own - 63 -

ANNEX1 Page 5 of 9 resources; MCW's technical and operational capacity are adequate for the job. The list of road sections to be overlaid by force account is given in Table 4 of this annex. This list will be updated annually based on an economic evaluation and prioritizationof overlay needs.

10. The reseal program will provide preventive maintenance to about 140 km of local and some secondary roads. The work will be carried out entirely by force account. MCW has the expertise, personnel and equipment to do the job. The list of road sections selected for the reseal program is given in Table 5 in this annex. The distribution among years, approximately 35 km per year, was determined taking into account road condition and traffic. Again, the list will be updated annually based on an update of the road and traffic inventories.

Eaui2ment Fleet

11. MCW's road maintenance fleet is composed of 291 unit, of which 90 (331) are less than seven years old, 102 (38%) between 7 and 15 years old, and 78 (291) more than 15 years old. At present, 174 units (60%) are in service -- although about 72 units (25%) have some problems that will require repair during the next four-year period--, 53 units (18%) need rehabilitationand 64 (22X) should be discarded. Table 6 of this annex shows the various equipment groups and the current condition of each group. This workable fleet is not adequate to carry out the work by force account defined in the Four-YearMaintenance Program. New units will be needed to complete or replace old units, and many of the existing units will need major repairs, rehabilitationor reconstructionduring the four-year period. Finally, very old units, whose rehabilitation is not justified on economic grounds will be sold at auction or discarded.

Eauipment Management

12. The efficiency of the workshop operations has remain low in the past. Equipment availability, currently about 60%, has been limited by the lack of timely provision of spare DArts and by the fleet's aging. Some equipment is so old that spare parts are not commercially available and in order to keep it operating the workshop has to adapt alternate parts. In addition, improper planning of preventive maintenance has caused long down-time. The proposed project provides for replacementof old and costly-to-operatedequipment units, which will lessen the workload on the workshop, as well as increase the number of units in operation. This will enable the workshop to concentrate on preventive or planned repairs and perform more rehabilitationtype work. Also, a portion of this component is earmarked for purchase of spare parts to support MCW's execution of the equipment rehabilitationand repair program.

13. The existing organizationalstructure for equipmentadministration is adequate and only minor changesare needed. However, accountabilityof equipment management and incentivesfor efficientutilization need to be strengthened. The implementationunder the proposed of project of the Equipment Management System (EMS) will provide relevant data to monitor workshop performance and equipment operation. Concurrently,in the future, each equipmentunit will prefer&bly be - 64 -

ANNEX 1 Page 6 of 9 assigned to a specific operator who will be responsible for its operation and day-to-day maintenance. These operators will be trained under a program developed by MCW's workshop and to be financed by the proposed project.

14. Better coordinationis needed between the Operations Division and the Equipment Management Section within the workshop to improve the assignment of equipment units to maintenance operations. Currently, the Operations Division has little input into how the equipment fleet is assigned to the districts and how the preventive maintenanceis performed. Frequently,equipment and vehicles are removed from operation for maintenance servicing by the workshop, are not replaced with substitute units, and then held out of service for extensive periods of time, often for repairs that have to wait for spare parts. The lack of an annual equipment servicingprogram, of an adequate stock of spare parts, and of a maintenance work program capable of determining districts' equipment needs, has contributedlargely to this problem. The proposed projectwill assist MCW in overcoming these problems by financing the purchase of parts, updating road maintenance plans and providinga second-phasetechnical assistance program geared at improving the efficiency of the workshop. Coordination between Operations and the workshop will be enhanced by having the Head of the Equipment Management Section and representatives of the workshop participate in the TechnicalCommittee. This committeewill meet monthly to review road maintenance program and the equipment needs originating from such program, and ensure coordinationwith the workshop.

Eauipment Acquisition.Rehabilitation and Disposal

15. Based on the resources needed to carry out the Four-Year Maintenance Program and the existing condition of the fleet, MCW prepared the equipment acquisition program given in Table 18 of the report. This program is satisfactory. It comprises a total of 112 units, consisting of 31 major equipment units and 81 minor equipment pieces,which will be purchased under the proposed project at a cost of about US$1.65 million. The units selected provide for a high efficiency in maintenance operations and are consistent with MCW's maintenance practices. MCW, assisted by a consultant, will develop final specificationssuitable for procurementpurposes. These specificationswill also cover on-site training for servicing,minor repair and adjustments procedures, and operator's training needs.

16. In parallel with the equipment acquisitionprogram, MCW also defined the equipment rehabilitationprogram shown in Table 19 of the report. This program includes the needs for rehabilitation and major repairs of all the existing units which will not be discarded (i.e. those whose cost of rehabilitationis less than 40Z of their replacementcost) during the four-year period. The program will be carried out in MCW's workshop, which has proper facilities and competent personnel for this task. The proposed project will finance US$0.7 million in spare parts needed to repair and rehabilitate the equipment listed in Table 19 of the report. Rehabilitationof diesel engines (fuel pumps and injectors)will be contracted out, as MCW's workshop lacks the equipment to do this job, at an estimatedcost of US$0.13 million. The proposed -65-

ANNEX1 Page 7 of 9 project will finance 60X of the total cost of equipment rehabilitation by contract.

17. Finally, obsolete equipment will be disposed during the four-year period. MCW has already "deadlined" 33 major units for disposal. MCW will prepare a policy guidelineand update the program for disposal of equipmentunits which are under one of the following conditibns: i) equipment wrecked beyond economical repair; ii) cost to repair is greater than 401 of the cost of a replacement unit; and, iii) equipment no longer needed because of its low reliabilityor because of changes in work procedures. Through the implementation of these three programs MCW will increase the equipment availabilityratio from the present 60% tc an appropriate 85% by 1994, which will enable an efficient utilization of the equipment fleet.

Routine-Maintenance-By-ContractPilot Proarsm

18. Program Obiectives. The main objective of this pilot program is to obtain experience on costs, quality of work, supervision needs, benefits and disadvantagesof contractmaintenance as comparedwith force accountmaintenance. Lessons learned from this pilot scheme and the comparison with force account operations will enable MCW to establish a clear policy for delivery of road maintenance,while identifyingpossibilities for increasingproductivity of force account work, assessing the capability of the existing local construction industry and potential interest in routine maintenance, and exploring which alternativemodes to carry out maintenanceactivities are more cost-effectiveand what implementationproblems need to be resolved in order to adopt them.

19. ScoDe of the Pilot Program. The program consist of 66.7 km of linked roads located in a geographical area which comprises part of the parishes of Christ Church, St. George and St. Philip. A complete list of the road sections included in the program is shown in Table 7 of this annex. These road sections constitute a representativesample of typical conditions observed islandwide, which will enable testing the performance of contracted mainten-ice under different environments: a variety of traffic conditions, ranging from high traffic (over 6,000 vehicles per day) to some low traffic local roads; an aple sample of road componenets to be maintained, from urban roads with curbs and stormdrains to rural roads with earth ditches and roadside vegetation; and different surface type (asphalt concrete and penetration treatment) showing different levels of distress (f-om good to poor). The sections have been distributedamong three parishes with extensive road networks to avoid the risk of staff redundancy within MCW districts.

20. The pilot program involves all routinemaintenance activities included in MCW's annual maintenance plan. The work program has been developed taking into account the same maintenance activities and quantity standards uEed by MCW in force account operations. Table 8 of this annex summarizes the maintenance plan for a two-year period, with the list of maintenance activities, the correspondingmeasurement units and an estimate of quantities for each activity or work program. However, some activitieswill have to be divided into separate items to facilitate their tendering,measurement and payment. MCW will review - 66 -

ANNEX 1 Page 8 of 9

this list during preparationof the final documents for bidding. The total cost of the RMBC Pilot Program has been estimated at US$0.64 million, based on historical data using force account because data on unit cost for maintenance work performed by contract is not yet available.

21. Contract type and provisions. The contract will be of the "unit price" type. However, in order to provide for inclusionof additionalwork items not initiallyincluded in the contract,the tendererswill be requested to quote hourly rates for basic equipmentand personnel, and some allowance for up to 10% of the contract'svalue to be done on a cost-plus-fixed-profitfee basis will be included for activitieswhose unit costs cannot be reasonablepredicted. Payment will be based on actual quantities and quoted or established prices. Although the work program defines quantitiesof work, the contract will allow variations in defect or excess over those originally estimated. MCW will assess the capacity of the local constructionindustry and the most convenient-- and likely- - size to be targeted by the program. Based on this analysis, MCW will define the duration of the contract (one contract two-year period or two contracts one- year period), as well ae allowancefor advances for mobilization --usually about 20%-- and the value of performanceguarantees to be requested, if any. MCW will complete preparation of the bid package, which will include contract forms, minimum qualifications to be met by bidders, technical specifications,bond requirements, plans including location of the selected road links, and informationto bidders on the bid process, award criteria,project implementation and supervisoryarrangements.

22. Tendering of Contracts. To obtain responsive competitive bids, MCW will advertise locally the invitation to bid and will schedule a pre-bid conference. Through this meeting, MCW will answer questions that potential bidders may have about the project requirementsand to ensure that all bidders fully understandwhat is required,the methods to be used, the expected schedule, special equipment or personnelrequirements and any other informationthat could add to their understandingof the project before preparing their proposals. The contract will be awarded to the bidder whose bid has been determined to be substantiallyresponsive to the bidding documents and who has offered the lowest evaluated bid price, provided further that the bidder has the capability and resources to carry out the contract as effectivelyestablished in the bidding documents.

23. Contract Management and SuDervisory Arranzements. The Operations Division within the TechnicalDepartment will be in charge of the implementation of the pilot project. MCW will designatea Program Coordinatorto administerthe contracZ and provide the 'Liaisonbetween MCW and the contractor in order to ensure that the program is implementedin a timely fashion. Supervisionwill be carried o't by designated supervisorsfrom the Operations Division, using spots reviews to monitor quality of works and bi-weeklymeasurement of executed works to prepare payment statements. The ProgramCoordinator will retain close control over the works to be performed, identifyingpriorities and developing monthly work schedules;however, the contractorwill assume the responsibilityfor daily scheduling as well as execution of works. The supervisionwill keep records of the work accomplished in terms of pay quantities and compliance with specifications. - 67 -

ANNEX1 Page 9 of 9

24. Program Evaluation and Recommendations. The consultants hired under the terms of reference given in Annex 3 will assess the comparative costs, benefits and quality of maintenance work carried out by contract and force account. The comparison of contract maintenance with similar work by force account will be based on performance and cost data (including direct cost, overhead and supervision costs) obtained from the RMBC pilot program and the evaluation of force account operationthrough the HMMS and EMS. The consultants will make recommendationsregarding: i) possibilitiesfor increasingproductivity of force account operations in view of the results of the RMBC pilot program; and ii) planning, financing, supervision, and administrative requirements for effective preparation and execution of maintenancework by contract (including recommendationson best activitiesto contract). Based on these recommendations, MCW will review the current maintenance policies in order to increase productivityof operationsby force account and introducemaintenance by contract on a larger scale if proved effective.

25. Schedule. MCW, assisted by a consultant,will complete preparation of the bid package and designate a program coordinator within its Operations Division. Contracting of a private contractor to carry out the pilot program should be completedby December 31, 1992. During the implementationof the pilot project, the Operations Division through the Program Coordinator,will collect data on cost and quality of maintenance activities carried out under the pilot program and similar work by force account. The preliminary assessment of the efficiency of road maintenance operations carr-id by both force account and contract should be available by December 31, 1993. MCW will discuss with the Bank the preliminary results during the Mid-Term Project Review in the first quarter of 1994. MCW will formulate such strategy and submit it to the Bank by December 31, 1994. BARBADOS SECONDROAD MAINTENANCE AND REHABILITATIONPROJECT MCWMAINTENANCE OPERATIONS ORCANIZATION STRUCTURE Headquaters

OPERATIONSDIVISION DEPUTY CHIEF TECHNICAL OFFICER|

MAINTENANCE L Senior Technieal Officer

Coordination with TECHNICALCOMMITTEE…_ Workshop Divlsion

QUANTITYSURVEYOR DISTRICTS OPERATIONS MAINTENANCEMANAGEMENT SECTION Materials Manager Techlcal Officer Technlcal Officer

Technician - Road lnventory UnLt - Plannin, Control, and Eval"ztlon UnLt - Wells Inspector - Utilities Supervisor 00

Senior Technician Senior TechnLcian Senlor Technician Districts (7)

St. Michaei N. St. Hichael S. Christ Church St. Philip South Central North East North West Technlclan I Techniclan I Techniclan I Techniclan I Technician I TechnicLan I Technician I

- Denots-Subdenots (13) Deacons Farm Richmond South Point Six Roads Golden Ridge Belleplaine Prospect Prince Road Joes Rlver SpeLghatown Country Road Bagatelle Chance Hall - Personnel in Districts Total Techniclan I I I 1 1 1 1 1 7 Technician II 3 5 3 2 3 3 4 23 Supervlsor 12 9 7 7 8 16 11 70 Section Leader 1 8 3 2 2 3 6 25 Artisan 13 26 9 10 6 9 28 101 Labourer 63 82 45 40 69 91 64 454 Equip. Operators 9 16 8 13 11 17 22 96 P > Total: 102 147 76 75 100 140 136 776 If BABAOS SDECODROAD lINtIANCZ AMD RaOILITTIWH PROJECT

IeN 6 ROA WWVAN nu Mg F1993194 drosraw Prspgoas merAdailiatan4 for rogs i MProgra0.0.0 k K RoadsTotal excluedroad egth from InN entice , I prosram netwok aI 1,549.60.0 km RmdoWWOC I",Rcutuw km ~~~~~~~~~~~~~~~~~~~~~~~~Roadsun6er Periodic Nrlintenance Prottgsa 96.8 in Calcumrete Aephalt pavements a 99I7.3 (aC) Overlay Proarma 91h Cbl Aspbhat er . treatm_t pma 552.1 h Ib) t Al Program a 7. hk

lltl-CE IV-ITIES------R06D IENV--- FO C CCOUNTW. Ul TI COStST "M CC ACCOUNT cO !POSAP1cRW COST - ,wrAcrI TOT. AC..T .. . ._ ._...... ,,...... ------. ------w------...... ctm nAIL! ACGIi oaM lN.lTt IqoanmE IM. CREW lagATUAl LAMMR EQuiP. TOTAL I NATrIAL LABO 1 I T TOTAL I 8 t031 COSt TOrAL I cosT CmU ------PODWUC.M?T Ofl UNITS9 IT| QUT. DAYS C|DS$). D$) IdD8$) CDS) (|D$)D ItDS) (D$) (BDS) 1Q0* ItDSICR053 |I SDSI ROUIINEMA..h. E .. .. e030 Pot Sole Patching 5.0 tone 3,099 P.18.1a. 10,896l0,918 2.08e 15e.7 91.1 56.4 299.6 1,519,99K 952.56 587,575 3.121.129 1 7 5e93 2 45 .285.814 9020 Ragirad4nUnpave6 Shwulder 9.0 km IS n.SAh.M 42 Is Is 8K.0 457.6 909.0 950.6 3,092 5,949 5,517 12,558 2910953.2 31.703 944062 9030 ratcbing Pawed Shoulder. 1.0 hk 8s p.abl. D99 39 453.2 451.6 262.0 9 94 37175 17.8K 10.998 46.59 _ _- 46 .59$ 9090 Joint 3.acPdkuCrldM Sea 00 ein r 3 099 g.l .h 47.17 143.486 319 0. 12. .el 4.789 2292'7 253.549 4.087 2.8 11.525 365.066 1050 COLd Nim Pr-uct n I I9s.03 3,99 p.ka 5,952 5,932 989 58.7 28.0 39.7 325.5 34 1664.09629030 22959174351 1 7 - 142.el4 131.0DrainC92 dth k l8 8 60 0.0 4163.4 2600.0 676.4 0 358.062 22.600 $1,652 22 794 12 3320 DbrainECIsanlog Nsbenlcl 2.0 k 2 805 ditch ho 625 09 305 0.0 388.3 549.8 507.8 0 164,541 194.7128 309.268 66 59.0 8594 21065 1430 CulvertCl renn 1.0 e*abch 162 tmaer 818 853 431 0.0 184.0 2K5.3 429.5 0 153.272 204.293 1.2,365 45 493.6 22.234 379.779 1140well ClIng9 5.s0 3 2.r315376 npmbr 493 480 160 0.0 85.5 156.35 221. 0 41,040 65,428 309.478 19 255.1 2864 909,285 1310 TrafficSign 4.0 each 9.336 ubaree I9 ,1062 266 26.8 136.5 0.0 169.3 28.482 144.974 0 713.435 26 204.9 5.308 81,0743 1220TraffIc Sign Inetalatione 12.0 each 9,556 number 9.088 9,062 89 152.3 26.6 23.7 200.4 163.309 28,240 23.014 212,782 26 250.5 6.512 219.294 9210 Guard Rail Repaits 99.0 La 9s d.r.o 8.269 8.128 542 6.7 26.2 23.9 66.7 54.214 293.980 194,09506.7 542.219 143 90.6i 5S_.036 9240 PaintiSgCenter Lines 4.0 in 143O p.bo 81 63 Is 750.0 101.5 70.3 929.5 45,730 6,176 4,285 56,2. 2 | - 6 56.39. 3250 SpeCIalPavema,nt Markings 6.0 sacb 23,999eambr 730 707 318 625 7. 25 949 4.6 585 5.2 3,9 2 704 558 16.246 3590NeedIng Sraat_D 9et.0ho 29 re1de.o1 4,484 4,441 41431 0.0 6035. 204.5 808.0 0 2680,44 909,185 5582 43 929.2 9 S62 4 3320 NeedIng cenlcal 6.0 o 2,986 r1ldekm 2,351 2,83 297 0.0 53.0 48.8 28 0 8 _ 3 36 294 5.30 2 86 3320 Tree* Tr ^lg A Remoi 9.0 no. 13 depoted 86 96 96 0.0 159.5 329.03S 729.8 0 38.348 531613 69,961 _ - 9.961 110 Scrlge MaLnteneee 0.2 each 69 damtber 48 4 240 424.3 374 .2 39860.5 6.446 80,365 2.496 419.305 _ _ 9203 3420Culveirt Nulntenance 3. ah 1,62:mer 2.I 2.390 2210 156 3 22.8 32.0. 45.3. 330.053 773.480 120,120 1.023.655 59 509.6 30.067 9,5.0 34I ocrt lpe 2.0Iaso herb ,21 slip.ka 21601 20261020 1. 19.6 7.3 27.5 233.138 399,354 152.970 765.462 1.205 43.2 52.008 67410 3190Eusmrgcy ActIvIties 90mdy 9 depotled 3,340 3,920 284, 0. 52. 463 9.,:6,47 1283 27.5 2 9. 2.1 2.7 3830Precastig 2,0 aS 13 dpot:4 468 43 290 5. 9. .0 19. 4,5 46,739 0 79,371 so 200.7 10.034 Al20 3630MG1 Wodlog&AfuinlatratVe elgua cill 0. . dye 191 depo4fe^r.s [email protected] 16,692b91 2.1826 62510. 9 1513. 00731 162.3530 2 4417 7 80.965679 117 672 130717009 101 t*1 7 25000 O 729.8 00Os019.- …-…_ … … ….__._. __ ...---. - --- _ _.._____...... …. .__...…___…………__ __...- 1$20 CerWe5.0 Dr d ID* 4 Culsort13 d pt/ dl 512 256 S 102 6 201 $ 119 $ 42J166a n 26 266 518 30 5416 1011 e4.856 4894.0 124 754 21J 236 OT L .0 DI I N S N A INT A CE 2,762.696 7,605,.76 5.377,781 3.7K5.655 643.510 14.589.I"9

* … ~~~~~~~~------……---- . …------...... …------…-- -. .

1790 IesurfacTIngt300.9 tone, 129 lard.h 38,9918 5,911 63 359.9 3.3 7.5 162.:7 2,672,770 166,567 327,612 3,077.0 ') C)162.0 0.702,009 3720 Surface TraInt 90. m2 73 184341845sordh 8 .4a07 .6 2. 21,374 124.360 10.611 53.34i - 536.164 389hll DiggIng .0::.2 13 depotled 96 0 0 379.6 37,3 400.0 26. goB 29. 825 8 5 3820 ConcreteDran. 6 Gaalvarta 3. .2 I 1 epts 236 85 302.66 209.6 199.3 4263.8 26.266 51,668 S 30,48 908,483 25 487.5 124.754 23,2:236

T O AA L OADA n BAINTESANC P LAN b 600 129 7.923.918 3,736.480 17,662,528 6 421644 26.104169

C1) Reminder portionof tb* flset contractfor averimywork.,

a-> a- SECONDROAD MtL4111tCE AND REAARILITATIOIPRWECT

tiCWS ROADMAIf2ABCE PLfA FOR n13994193 rorean pr pered for a ENRE 15MTA Total road laogth In *ntire network * 13549.60km Itod under Rehabilitation Program a e.o km Road* ecluded from 3 S progr'm a 0.0 km load, under Routine Maintenance Progrom a 1549.6 km Road. under Periodic Maigataance Programs 101.2 km (a) Aspbalt concrete pavements a 997.3 km (a) Overlty Program a 63.3 km (bh Aspbhlt surface treatmant pavemetes S52.3 km (b) Reseal Progra. A 31.9 km

MAI3TUCE ACTIVITIES I ROADIWIENTORI I FORCEACCOUNT I UNIT COST by FORCEACCOUNT I PS5CRAICOST - FORCEACCOUNT PROGRAMCOST - CONTRACT I TOTAL -ACTIVITy - 06DLY &CPII NPE I3V3. AIITITrl3 WORI. CREW IMATERlALIABOR EQUIP. OTAL I MATERALS LABOR EQUI3PMT TaTAL WORK UNIT COST TOTAL COST CODE NAME PRODUC.UNIT IOP UNITS UIWT I IQU3MT DAYS 8D0I) (8DS) (BDS) (8D$) (80DS) (D0$) (SD$) (8DS) QUAfTITr (BD$) (SD$) (8DS) ROUTINEMAINIE33ABCE 3 I030 Pot Mole Ptchinag 3.0 tone 3.099 p. .. m 9.976 9.976 1 993 3SI.7 9. 36.4 29s.6 3.512.960 913.:03 562.646 2.988.710 - _ _ 2.988.710 3020 Regredlag UnpavedShulder 1.0k IS u.lm 42 42 42 84 0 4S7.6 409.0 950.6 3.52B 19.220 37.178 39.926 - _ _ 39.926 1030 Patebig Pawd Sbouldere 1.0 km 80 p.shl.km 39 39 39 453.2 457.6 282.0 1194.8 17.753 17.868 30.998 46.598 - _ _ 46.S9B 3040 Joelt * Crack SealIng 400.0 Itre 3 099 p.la.Ic 127.599 927.388319 0.8 0.e 0.9 2.5 95.699 102.07S9 34.839 312.618 _ 1050 Cold His Prodactito _ _ 312 6I8 6.0 13 3,099 p.lka- 5.414 5.414 902 S8.7 28.0 38.7 323.3 317.639 351.392 209.359 678.93 _ _ - 678.S91 Dral laual 1110 Cleaniag 0.8 km 962 diteb km 97 97 970 0.0 4163.4 2600.0 6763.4 0 403,80 252.200 656.050 - _ _ 656.00 1120 Drala Cleaning eIchanical 2.0 km 903 ditch km 664 664 332 0.0 388.1 339.8 507.8 0 124.885 212.314 337.199 _ _ _ 337.199 1130 Cleaning Culvert 2.0 eacb 1.162 mumber 878 818 439 0.0 184.0 24S.3 429.3 0 1618552 215.330 376,682 - _ _ 376.882 1140 Uell Cleaning 3.0 wv.3 2,376 nuber 480 0 0 0.0 85.5 136.3 221.8 0 0 0 0 480 255.1 122.448 122.448 1210 Traffic Slga Maintmenance 4.0 each 9.336 umber 1088 81088 272 26.6 136.5 0.0 163.3 29.158 146,523 0 177,681 - - - 177.68I Traffic Sign Inetelatione 1220 12.0 *acb 9.336 number 13088 I 088 91 362.1 26.6 21.7 200.4 165,463 28.952 23.511 217,992 - _ _ 211.992 1230 Guard 811 Repair. 13. 1.0 95 g.r.km 8.269 8.269 551 6.7 36.2 23.9 66.7 55.154 299,090 197.381 353,625 - _ _ 551.623 1240 Painting Canter Lime 4.0 1.e 143 p.km 61 61 3S 7SO.0 101.3 70.3 921.5 45.750 6.176 4.285 36.212 _ - _ S6.212 3230 Sp ecial Pavement Harking 6.0 eacb 3.099 numbt 637 637 106 62.5 79.1 43.3 184.9 39.813 50.361 27.601 117.775 - _ _ 117 1310 1 edline Maual 1.0 km 2.986 relde.km 4,484 4.484 4.484 0.0 603.5 204.5 808.0 0 2.706.094 916,978 3.623.072 _ _ _ 3,623,072 1320 Weeding Mechutical 6.0 km 2.986 reid.km 2,551 2,353 42S 0.0 33.0 48.8 81.8 0 84.234 124,361 208,595 _ _ _ 208.395 1330 Tree Trimtn & Reumming 1.0 to. 13 deponted 96 96 96 0.0 399.5 329.3 726.8 0 38.340 31.613 69,961 - _ _ 69.961 * 1410 Bridge MaIntenance 0.2 each 89 number 48 48 240 134.3 1674.2 52.0 1860.5 6,446 90,363 2.496 89.305 _ _ _ 89.305 0 142 Culvert Mlatenance 1.0 each 1,162 tnmber 2.369 2,369 2.369 56.3 334.6 52.0 443.1 133,375 793.236 123,188 1,049.799 _ _ _ 1,049.799 1430 Repair of Concret Sllpper 20.0 kehrb a 14212 lip.km 21,601 21,601 1.080 10.5 19.6 7.5 37.5 225,730 422,s48 162.00, 810.686 _ _108.46866 3310 Emergency Actbivtlee 83.0 mdey 33 depot/ad 3,320 3,120 284 0.0 52.4 46.1 98.S 0 363.457 143.801 307,23S _ _ _ 307.258 8630 Preceding 2.0 m3 33 depotled 4I9 419 230 38.4 III.3 0.0 169.9 24,433 46,719 0 713 71 _ _ 71,171 3630 AdenlaItratlve Actgvltls 6.0 day 13 depotled 16,692 16.692 2,782 0.0 53.3 0.0 33.3 0 S90.3I4 0 690.184 _ _ _ 890U,

T o T A L RODTIN1E N A I N T EN A t C E 2,672,922 7.652.813 3,332,153 13.677.888 122,4401 13.09336 …~ ~~ … .4. … a … a….4.…----.4.-.-. … - … .4 ------…~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-- PEltlODIC 11411t6CE

1710 Ieturtacng 300.0 tone 13 l I39,931 18.911 63 II.9 3.3 7.3 162.7 2,872 770 66.567 137.672 3,077,009 (6) () 6.750,000 9.827 000 1720 Surface Tretam 3000.0 *2 16 la.rd.km 388,434 398,434 388 3.4 0.7 0.6 2.7 273 ,74 324,380 320,631 516,364 - 6 364 I830 11 DI 5.mSggIng 13 depotlad 96 0 0 179.6 37.3 40.0 256.8 . 96 29S.3 28,350 28,350 8200Concrete Drain s culvert. 3.0 m' 13 depotiad 512 236 83 102.6 201.8 119.3 423.8 26.266 S.l668 30,548 108.483 256 481.3 124.754 233,236 1U30 rreach Drdare 6.0 a 13 depotlad 312 312 85 42.0 89.3 83.4 216.8 21,504 45.7U4 43,73S 110,981 _ _ ge981 3840 Cabion Stretures 6.0 bahket 13 depotiad 312 312 52 210.0 97.4 90.2 397.6 63,520 30,3e6 28,133 124.039 _124.039

T O t A L P E 2 I 0 D I C n A I NTIT N & N C * 3.257.433 318,74S 360.699 3,936,873 6,903,104 10,8539.79

T 01 A L 10 A D I A 1 TS A3*b C E P L A N 3,930,356 7.971,356 3,712,652 17,614,764 7.023,332 24,640.315 0) Second contractfor overlayworks. crn tD X N .. S W 161 VAIWruMCi AN3 501A81LTATtCu PRJECt iaa'S8.61 MAINTENANCEPMM 10 v1995196 Pr TM jsepared for En&Il 3h1AU Total road leogth to entire network a 1,349.6 km n erhoabtlltatiomR.. Progrem I 0.0 km Roads excluded firesN A atpoga 0.0 h Zoad. uniec outine Naintenance Program 1.3,49.6 km &o&d. under Periodic Maintenance Pragrema 99.2 km (a) Asphalt concrete pavements a 991.3 km (a) Overlay Program 39h (b) Aephalt eurf&Ce treatment0 pavemenS,O 312.3ha (hI Beseal Program a 31.4 ha1

M&ilKTUABCEAC)!VITES I ROD IMVUIORY fPE co?IwT MoT By FORCEACCOUNIT PROGRAMCOST - FORCEACCOUNT P8.O6163COST - CONTRACT TOA - LYIYtY---- PAIL) Y-~081Y I MORE-EB*D11- CUMV KWM&T AL 4ASD3 iquiP- -tALz 4t IAMTIALA., LAEI8.-.- LQPIPIENi! IDAlr4 _. van6 UIT COST tOTAL ICOST CODE NaME PRODuc. UNIT iO'WITS IRittI I ZOiNt. DAYS I (80) 6806) (905) (BP5) I (D05) (B0$) (BS (P) 40*#TV MM0S 18061--- 1506)7

1010 Pot mole PatchIng 3. oe 3,09 p.ah .191 8.18) 1.11 3020 311 9.1 1. 299.6 1.302,001 18s.T63 484, 94 2,171,960 - - 2.111,900 Resradiag UnpavedSboulder 1.0ha- II2 ueh.h 42 4 2 8. 3. 0.0 906 339 1.2 1118 39.926 --- 3.2 £030 Patching Paved Sboulder. 1.0 ha 80 p.ohl.km 39 39 39 451.2 4351.6 282. 1194.8 11,13 11,684 la g9o 46,598 - - - 1040 Crack ILr 46.39 Joint 6 Sealing 400.0 .9 .aha 36741613 0.9 6 . . .3 80066 83.403 96,019 261.341 - - 26,1 3030 Cold Miz Production 6.0m 3,9 p.la.ka 4,10 4.303 III 19.01 28.0 38.7 13.3 264.19)1 3330 126,084 174.13£ S64.406--- 440 Drain Cleaning Manuel 0.1 ha 962 diltchha 097 97 910 0.0 41683. 2600.0 6163. 0 403.830 252.200 656,050 - - 656,030 1320 Drain Cleanina Mechanical 2.0 ha 803 ditchkm 664 664 332 0.0 £88.1 339.8 301.8 0 124.885 212,314 331.199 --- 331,199 1130 CulvertCleanIns 2.0 each 3162 number 816 818 419 0.0 184.0 243.3 429.3 0 £61,552 213,330 316.8B2 - - 36,82 1140 Weil Clesaning I.v2316 auamber 480 0a . 33 13. 2. 0 0 480 233.3 122,448 112,449 £210 TrafficSign aience 4.0 each 9.336 number 2.088 3 098 212 26.a 136.3 0.0 163.3 29,338 148.323 0 377,693 1220 TraficiSign Imestalationa - - 11.fi8 12.0 sea 9,336 nusber 3,088 1.069 91 112.1 26.6 21.1 200.4 165.463 28.932 23,311 217,992 --- 231.992 £230 Guard Rail Repair. is. l.a 95 g.r.loo 6,269 9,269 331 6.1 36.2 23.9 66.1 3.3154 299,090 191.381 333.623 £240 PaintingCaoter Linac - -33.623 4.00l.a £43 P.AS 61 61 is 130.0 101.3 10.3 923.3 43,110 6,316 4.283 16,212 - 6,232 £2 10pecia1 Pavement Itarkange 6.0 each 3,009 nmbser 330 530 B8 62.1 19.3 43.3 £84.9 33,123 1330IlamnaciheedIng 41.902 22,963 91 992 - -- 1.992 3~~~~~.0ha 2,986reids.ke 4.494 4.48484 84 00 933 243 8800 2,706.0914 936,918 3,23.012 - -- 3,201 £12 :NedingItechantcel 6.0 ha 2,986 weideka, I,331 2,333 42 0.0 330 488 9. 424 £24,361 treTrimlug Removing 208,1935 0.9 £33 I 3. o 3depotled 96 96 96 0.0 399.5 329.3 128.8 0 38,348 31,613 69.961 - . 69,963 .. 340BridgeMalugenaces 0.aeach 8mabc 8 48 240 334.3 1614.2 12.0 £960.1 6.446 80.363 £40CulivrrMaintenance A. eah 1,162numger 2496 69.301 89.303 - 2,369 2,3U9 2.369 36.3 334.8 32.0 443.1 133.315 793.235 2,8 ,4.9 ,4.9 £430of Repair Conrete Slipper 2.3.0her a 1,421 slip.k 21.601 21,60l1.3090 30.1 19.6 1.3 31. 22,30 42948 3A2,08 80.6 8 10,686 £33 Ecrec Atvcee £. day Is d.potlad 3,320 3.120 294 0.0 52,4 46.1 98.5 Act0iPreceeing203 0 363,451 143,801 301,238 301-uo.z5e 13I d:p"tlad 439 419 230 38.4 1ii.5 0.0 169.9 24,433 46 1319 0 11.11£ . -- 1.1 1830 Adminierative Activitiese 6.0 aday 13 dpaptled 16.692 316,6922,192 0.0 33.3 0.0 33.3 0 890.164 0 990,164- - 90,4 …-… ------.---- , ----. … ..------.. $. … .4,…r.…- I-- 4------…--.------4-.------… TOT A L Rou9T Ing MAINTENA HCE 1,2386,193 1.414,831 3,215,071 133016,121 122.44813.398.569

1110 Resurfacing 300.0 ton., 128 la.rd.ka 3,3 1893 61 131.9 3.1 . 6. 2,812,110 66.367 1327672 3.017.00 c11 (a3 7,310.000 10.227,009 310Surface Treatment 3000.0 102 I tIla.rd. S 1:9,43413864341 388 3.4 0.1 06 21 211,314 124.390 120,611 316,6 - 16,364 £83 Nell DiggIng 1.0 SS I 3 depotlad 96 0 0 119.6 31.3 40.0 236.9 - - - - 96 293.) 29.330; 29.330 38210Concrete Oraine & Culverte 3.0 :3 I 3) depotiod 332 236 as 302.6 201.6 119.3 423.8 26.266 1.,665 10,348 13048.4 236 481.3 324,134 213.236 £830 Preach Drain$ 6.0 a 3 4epoted 132 332 83 42.0 99.3 03.4 236. 21,304 43,142 43.1131 31,0.9911 £3.9I'IO 3640 Gablon Structures 6.0 beeket 33 depocled 332 312 32 230.0 91.4 90. 2 3921. 63.520 30,386 28,333 Ia32..0)9312,3 -* …------. ------,…… ------…--.------… --.. TO0 T£ L P ER I5 0 2 C M A I NT I UAUC E 3.237,433 338,143 360,699 3,9365,813 7,302,104 £1,239,919

T 0 T A L 10 0 D ImT1AisaA gu CZg P L A U 1.643,621 1.793,594 3,373.173 17,012,996 1,423,532 24,439,341

40) Third contractfor oveclepwocha. 72 - ANNEX1 Table 4 BARBADOS

SECOND ROAD MAINTENANCE AND REHABILITATIONPROJECT

OVERLAY PROGRAM TO BE CARRIED OUT BY MCW OWN FORCES

ROAD PARISH ROAD LENGTH WIDTH NAME CODE CLAS9 FROM TO (kkm) (m)

FIRST YEAR PROGRAM (1992/93) 1

Highway B A P IGreenland Cherry Tree Hill 3.5 6.0 Highway D T P Cane Garden Porey Spring 5.0 6.5 Farm Rd. E S H'way 1 H'way 2A 2.6 6.5 Whim Rd. E S H'way 1 H'way 2A 1.6 5.0 Cartton Rd. S S XHway 1 (Lower Cartton) H'way 2A (Upper CarLton) 4.8 6.0 MoLyneux (Norwoods) S S H'way 1 Bennets (St. Thomas Bder.) 2.3 4.0 Porters Rd. S S H'way 1 (Porters) HNway 2A (Westmoreland) 3.6 5.0 Prior Park Rd. S S Husbands Road (SS-2) St. Thomas Border 1.5 6.0 Prior Park Rd. T S St. James Border H'way 2A 0.1 5.0 Bennets Rd. T S New Road (Left side) H way 2A Junction 0.4 5.5 Subtotal(1992/93): 25.3 5.8

SECOND YEAR PROGRAM (1993/94) E

Highway 1B L P Crab Hill Ent. North Point Resort 4.9 5.2 Highway C A P j Turners Hatl Yard Pole w/H'way C sign 5.0 6.0 Highway E T P Exchange Mount Wilton (Lammings Junc.) 4.8 6.0 Highway E 0 P Mount Wilton Melvin HilL 1.3 5.5 Highway K J P Massiah Street (via Stewart Hill) St. Phillip Border 0.9 5.0 Highway K P P Stewart Hill H'way F Junction 0.8 5.0 Prospect Rd. E S Indian Ground/Prospect Charles D. O'Neal H'way 0.9 5.0 LS-6 L S HMway IC (Mt. PLeasant) Grave Yard-Date Tree Hill 5.9 6.0

Subtotal (1993/94): 24.5 5.7

THIRD YEAR PROGRAM (1994/95)

Highway 1C L P O'Neal H'way (St. Lucy Church) H'way lB (River Bay) 4.7 6.0 Highway C A P Apes HiLL (Plantation) White HiLL Junction 2.9 6.2 Highway J J P Society and H'way H H'way F 1.4 5.0 Newbury-St. Judes Rd. G S Higway X (Newbury Junct.) St. John Border (Todds Cr.) 3.7 5.0 Churchview Rd. J S Parris HiLL and JS-6 HMway F (Mary Lane) 1.9 6.0 Clifton HaLL Rd. J S H'way 3B (GaLL Hill) St. Joseph Border (Malvern) 3.5 5.0 JS-8 J S ViLla Nova Junction St. Joseph Border 1.5 6.0 Mount Gay Rd. L S H way IB (St. Lucy Church) Road to CoLLin 4.8 5.0 Coffee Gully Rd. 0 S H'way 3 (GrantLeyAdams School) Easy HaLl (OS-2 1.4 4.5

Subtotal (1994/95): 25.8 5.4

FOURTH YEAR PROGRAM (1995/96)

St. Lucy Dist. Hosp. L P North Point Surf Resort H'way IC (River Bay) 0.6 5.2 AS-1 A S Gregg Farm/TurnersHall Junct. H'way 2 3.7 5.5 AS-4 A S Morgan Lewis Seaview 1.6 5.5 Collins Rd. E S St. Peter Border MiLl Wall (The Gave Yard) 1.2 5.0 ES-8 E S O'NeaL H'way (via Portland) Collins and ES-11 4.6 5.0 ALexandra Rd. L Sj H'way IC (Half Acre) LS-4 2.3 5.0 LS-10 L S I HMway 1C (Spring Hall) H'way 1C (Brighthall) 1.2 5.0 LS-7 L S Chance HaLL (MTW Depot) LS-6 2.4 6.0 Easy Hall Rd. 0 Si St. John Border (Easy HaLL) H'way 3 (Cotton Tower) 1.6 4.5 Easy Hall Rd. 0 SI Easy Hall Junction Horton 0.6 5.0 St. Silas Rd. S SI H'way ZA (St. Silas) Endeavour 2.9 5.0 Plum Tree Rd. T SI HNway 2A (Blowers Junct.) H'way D (Farmers) 2.7 5.0

Subtotal (1995/96): 1 25.4 5.2

TOTAL PROGRAM 101.0 5.5

Parish Code: (Al St. Andrews; (El St. Peter; (GI St. George; til St. John; (Ml St. Michael; (01 St. Joseph UP1 St. Philip; IS1 St. James; mT3 St. Thomas; EX] Christ Church. Road Class: (PI Primary road;j (SI Secondary road; (LI Local road. - 73 - ANNEX1 Table 5 (a) BARBADOS 'SECONDROAD MAINTENANCE AND REHABILITATION PROJECT RESEALPIOGRAM TO BE C4RRIEDOUT BY MCW OWN FORCESC1992/93-1995/96)

ROAD PARISH ROAD! SECTION LENGTH WIDTH NAME CODE CLASSg FRON TO (km) (m) FIRSTYEAR PROGRAM (1992/93)

Highway3 G P GrovesCorner St. JosephBorder 0.5 5.0 Baxters/WhiteHitl A S I H'way2 BrokenRoad 0.1 5.0 CogginsHilt A S I Haggatts ChaleyMount 1.7 5.S Luke Hill E S IO'NealH'way LukeHill (firstculvert) 0.6 5.0 Lowe"Greys-Buttals R G S H'way5 (LoweGreys) H'way4b (Buttals-Brighton) 1.2 6.0 SweetVale G S H way 3 (GrovesCorner) St. JohnBorder (Redland) 3.1 5.0 Todds-WoodlandRd. G S H'way4 (Woodland) St. JohnBorder (Todds) 0.5 5.0 EtlesmereRd. J S ToddsJunction St. GeorgeBorder (Ellosmere) 0.5 5.0 JS*5 J S St. GeorgeBorder (Redland Plant.) Clifton Hall Yard Junction 4.6 6.0 Hannays-Friendship L S O'NealH'way (Bourbon) H'way1B (St. SwithinsCh.) 3.9 5.0 BecklesRd. M S Bay Street BrittonRd-Britton New Rd. 1.4 5.0 BissexHill 0 S BlssexHouse St. AndrewBorder (Choliey Mount) 0.9 5.5 SpringfieldRd. 0 S BissexHouse Cattlewash 2.9 5.0 PS-7 P S BushyPark Junctionwith PP4B 1.6 5.0 MountHillaby A L HillabyRoad End of road (Cul de Sac) 0.7 5.0 Rock Hall A L TurnersHall Main Road 1.9 4.5 Corbin2d. E L GreavesRd. Cul de Sac 0.8 4.5 FirstAve. G L Greens SecondAve. (Greens) 0.8 5.0 BridgeCot Rd. a L H'wayX H'way3 1.2 5.0 BydeMill G L H'way4B (BydeMill) Drax Hall (TenantryRd.#2) 1.5 5.0 ByreRd. G L Greens H'way4 0.8 5.0 SweetVale LinkRd. G L H'way3 St. JosephBorder 0.3 3.5 Cheshire J L East Mont Cul de Sac 2.0 4.0 Luke Hilt (Oxford) L L Luke Hill (firstculvert) Mt. Gay (LS-4) 1.1 5.0 BelairAve. M L FifthAve. (AlkinsLand) Hoad Land 0.1 4.0 Subtotal(1992/93): 34.7 5.1 SECONDYEAR PROGRAM(1993/94)

Boscobelle E S ES-8 Firstwall house on hill 0.4 5.0 Boscobelle E 5 ES-9 The Risk 1.3 6.0 Shermans E S. H'wayIB (Clinketts) FishBay (AssemblyChurch) 0.3 5.5 AshfordRd. J S HNway4 (GuineaRd.) ColletonCorner 2.0 5.0 Cllnketts-CheckerHal L S. ShermansAssembly Hall CementPlant Entrance 1.9 5.5 HusbandsRd. L S H'wayIB HarrsionBase (BOF) 1.0 5.0 JoseyHill Rd. L S MountGay (LS-4) Cul de Sac 2.1 5.0 TrentsRd. L S. H*way1C (St. LucyChurch) H'way1B (PoliceStation) 2.9 5.2 Trents Rd. L S LS-8 LS-9 1.1 4.0 Belle Rd. N S BelleJunction-ABC HNway DayrellsJunction 2.1 6.0 Upton Rd. M S H'way 6 Cable nd wireless 0.4 5.0 SeallyHil.-Bayffeld P S NearEast PointSupply Shop HNway4B 4.4 5.0 Wanstead S S Wanstead(St. Michael Border) HaynesvilLe 2.1 6.0 Bloomsburry T S H'way 2 Junction Bloomsburry 0.5 5.0 ount Misery T S HNwayD Junction Carrfngton - H'way ZA 3.2 6.0 Rock Hall T S Near St. ThomasChurch PoreySpring 1.8 6.0 Church Hill X S Near Christ Chureh-H'wayT H'way 7 Junc.-off ChanceryLane 0.9 5.0 EAterprise X S XPU (KeizerHill) XPU (SayersCourt) 4.1 6.0 KindallHilL X S Off ABC H'way H'way6 Junction 0.6 5.0 Pot House J L HOway38 Welch TownRoad 1.4 5.0 Welch Town#1 J L H'way F H'way 0 1.2 4.5 Maycocks L L H'way 1 Cul de Sac 0.9 4.0 College Savannah P L Blade Main Road St. John Border 1.1 5.0 Subtotal(1993/94): 37.7 5.4 - 74 - ANNEX1 Table 5 (b) BARBADOS SECONDROAD MAINTENANCE AND REHABILITATION PROJECT

RESEALPROGRAM TO BE CARRIEDOUT BY MCWOWN FORCES(1992/93-1995/96)

ROAD PARISH ROAD SECTION LENGTHWiDTH NAME CODECLASS FROM TO (km) (m) THIRDYEAR PROGRAM (1994/95) Bawden A L SawdenRoad End of Road 1.2 5.0 Franklyn Doughlfn Ten A L Belteplaine Rd Junction End of Penetrated Road 0.6 5.0 Jordan's Road A L Belleptaine Rd Junction End of Penetrated Road 0.5 5.0 King Street A L St. Simons Church End of Road (Cul De Sac) 0.6 4.5 Less BehoLden A L Chalky Mount Junction End of Penetrated Road 0.5 5.0 Sledge Pond A L Indian Ground End of Penetrated Road 0.7 4.5 Church HiLL Road E L Highway 1 (St. Joseph Hospital) Behind CP School 0.5 4.5 Ctarkes Road E L Highway 1 (Ashton Hall) Highway 2A 1.0 4.5 DennyRoad E L Whim Whim 0.6 3.5 Goodridge Road E L Whim Cul De Sac 0.3 4.0 LonesomeHilt E L Four Hilt Road-OrangeHill CuL De Sac 0.6 3.5 Muttins E L Highway 1 Highway 2A 2.6 0.0 Niles Road E L Farm Road Cul De Sac 0.4 2.5 RichmondHill E L Highway2A Cut De Sac 0.8 5.0 Sweet HomeRoad E L Highway 1 Cut De Sac 0.5 4.5 Warleigh E L Highway2A Farm/Naymans 1.3 4.5 Briggs Hilt Ave. G L HighwayX Cut De Sac 0.4 3.0 First Step S G L First Step A Cul De Sac 0.1 3.5 First Step RoadA G L Highway4 Highway4 0.1 3.j Free Hill #2 G L WorkmansRoad #2 WorkmansRoad #1 0.5 4.0 Giles Road G L Highway 5 (Watts Village) Cul De Sac 0.2 5.0 HarmonyCottage G L Farm Road CuL De Sac 0.4 4.0 Jericho Road G L WorkmansRoad #3 Jordan Road 0.3 3.5 Johnson Road G L WorkmansRoad Cul De Sac 0.2 3.5 Mayfield Road G L Flat Rock Road Francia Road Junction 0.6 4.5 Mayffeld Ten. Rd #1 G L Mayfield Road CuL De Sac 0.2 4.0 Middleton #2 G L Middletown #1 Middletown #3 0.4 4.0 Middleton #3 G L Middletown #1 Cut De Sac 0.4 4.0 Niles Road G L Etlenton Road Ellenton Road 0.3 3.0 Ruth King Road G L Sareant Road Walker Road 0.3 4.0 Todds Lands #2 G L Todds Land-Macaroni Village Highway Y 0.4 4.0 Waverley Cot Rd. #2 G L Wavertey Cot Road#1 Cut De Sac 0.4 3.5 Workmans#3 G L Workmans#2 Cul De Sac 0.5 3.5 Mount Tabor Church Rd J L Sherbourn (JS-5) JS-7 0.4 3.5 Venture Road #1 J L Venture Road (JS-7) Cut De Sac 0.4 3.5 Welch Town#2 J L Welch Town#1 Welch Town#1 0.2 4.0 Animal Flower Cave Rd L L Highway 15 Animal Flower Cave Entrance 0.7 5.0 Benthams L L Highway 1C (By Post Office) End of Penetrated Road 0.3 3.5 Clinketts Garden L L Clinketts Road Cut De Sac 0.3 4.0 .Ctlnketts Garden IA L L Ctinketts Garden Cul De Sac 0.1 3.0 Spring Villa L L Highway 1B Cut De Sac 0.3 4.0 2nd Ave. Chelston N L TamarindAve, Dalkeith Village Chelston Ave. 0.2 4.5 3rd Ave. Chelston M L Chelston Ave. TamarindAve, Dalkeith Village 0.1 4.5 Ash DeaneVillage M L DeaconsFarm Road Highway 1 (tBlack Rock) 0.1 4.0 Chelston Ave. M L Cutloden Road TamarindAve, Dalkeith Village 0.3 4.5 Chelston Ave. #1 M L Chelston Ave. TamarindAve, Dalkeith Village 0.1 4.5 Chelston Ave. #2A M L Chelston Ave. Chelston Ave. #2 0.1 4.5 Straker Road M L Highway (St. Stephens) Strakers Road Junction 0.4 4.5 Cambridge 0 L Bissex Road End of Penetrated Road 1.3 5.0 GuTte; Road 0 L Andrew's Factory Junction St. GeorgeBoarder Junction 0.7 5.0 Spa Hill 0 L Mellowes Hill Cane Garden (St. Andrew boarder) 2.0 5.0 VaughnRoad 0 L VaughnRoad #1 End of Penetrated Road 0.1 5.0 VaughnRoad #1 0 L Horse Hill VaughnRoad #2 Junction 0.5 5.0 VaughnRoad #2 0 L Horse Hill End of Penetrated Road 0.4 5.0 Barnes Road P L Highway4B Pole #PQK923 0.6 4.5 Bayley's P L Highway 4B Cul De Sac 0.7 4.5 Bentley Tenantry P L PP5 Near Pole #SNK77 PP5 Junction 0.3 4.5 Brere on #1 P L PP5Opposite Pole #SNK77 Highway 5 0.7 5.0 Cave Land P L Stroude Land (Kirtons) End of Penetrated Road 0.6 4.5 Cotes Road P L Long Bay-Sealy Hill End of Section 0.7 4.5 Drake's Land P L Highway5 Cut De Sac 0.3 4.5 Evelyn Road P L PS-1 (Hamblin Road) End of Penetrated Road 0.5 4.5 - 75 - ANNEX1 Table 5 (c) BARBADOS

SECONDROAD MAINTENANCE AND REHABILITATION PROJECT

RESEALPROGRAM TO BE CARRIEDOUT BY MCWOWN FORCES(1992/93-1995/96)

ROAD PARISH ROAD SEC;ION LENGTH WIDTH NAME CODE CLASS FROM TO (km) tm) Featherbed Lane P L Highway4B St. Phillip Boundary Mark 0.7 4.5 HamdenRoad P L PS-1 End of Penetrated Road 0.5 4.5 Lashley Road P L Highway N Cul De Sac 0.9 4.V, Merricks Road P L Long Bay-SeaLy Hill CuL De Sac 0.4 4.5 Mill Road P L Long Bay-SeaLy Hill Cut De Sac 0.3 4.5 PL-128 P L Near Carrington Factory Halton Highway 48 1.7 4.5 River Road P L Long Bay-Sealy HiLL Cut De Sac 0.9 5.0 Robinson Road P L Highway 5 Cut De Sac 0.3 5.0 Waterhall Road S L St. Silas Road Cul De Sac 0.4 3.5

Subtotal (1994/95): 37.9 4.1

FOURTHYEAR PROGRAM (1995/96)

Chalky MouLit A L Coggins Junction Coral Island Pottery 1.2 5.0 Farell's Road A L East Coast Junction Lakes 0.7 5.0 St. Simons A L Haggatts Yard (Bus) St. Simons 2.2 4.5 Battley #2 E L Highway 1 Farm Road 0.8 4.5 Four Hill E L Rock Hall Orange Hill Junction 3.4 4.0 Indian Ground E L Four Hill Orange Hill Junction 1.8 4.5 Millionaire Road E L Highway 1 (Ashton Hall) Cut De Sac 0.6 4.5 Rock Dundo Via Gibbs E L Highway 1 St. James Border 1.3 5.5 Faim Road G L Ellerton Junction Harmony Cottage 1.8 4.5 Walker Road G L Toronto-Blemans Road Junction Crawford Road Junction 0.5 4.0 Workmans G L Free Hill Highway X (Gun Hill) 1.7 5.0 Conset Bay Road J L Highway H (College Bottom) Cul De Sac 1.4 4.5 Yearwood Road M L Highway 1 Fairfield Road 0.4 4.5 Mellows Hill 0 L Junction Off Parks Cattlewash Junction 3.6 5.0 Surinam 0 L Horse Hill End of Penetrated Road 0.6 5.0 Cottage Vale P L PS-2 End of Road 0.7 5.0 Eastbourne P L Eastbourne #1 Cut De Sac 0.4 4.5 Gaskin Via Bushy Park P L Highway M Cul De Sac 0.7 4.5 Hampton P L Highway 5 Highway 6 Junction 1.2 4.5 River Road P L Long Bay-Sealy Hill Cul De Sac 0.9 5.0 CarLton 1st Ave. S L Highway 1 Link Road 0.3 5.0 CarLton 2nd Ave. S L Highway 1 Link Road 0.3 5.0 Cemetary Lane S L Highway 1 Molyneux (Junction) 0.7 6.0 Crick Hill S L Highway 1 Jun with St. Albans Junction with Porters Road 1.3 5.0 Norwoods Road S L Holders Hill Sandy Lane/Bennets Road Junction 1.7 4.0 Rock Dundo Road S L Gibbes Rock Dundo 2.1 5.0 Bagatelle Gardens T L RedmanaVillage Road Highway 2A 0.4 0.0 Highland T L Post Office Lion Castle Plantation Entrance 0.6 4.4 Walkers Spring T L Walkes Spring Jack in the Box 1.1 0.0 Bannatyne-Small Ridge X L Highway U (Near Pole UKT 450) Cart Road Junction 0.4 4.0 Charnocks Road #3 X L Charnocks Road #1 Cul De Sac (Signal Station) 0.4 4.5 Boby Village #4 X L Highway R (Edey Village) Cut De Sac 0.3 4.5

Subtotal (1995/96): 35.4 4.5

TOTAL PROGRAM 145.7 4.8

Parish Code: CA] St. Andrews; CEl St. Peter; EGl St. George; tJ] St. John; CM3St. Michael; CO] St. Joseph [Pl St. Philip; CS] St. James; CT] St. Thomas; EX] Christ Church. Road Class: [Pl Primary road; ES] Secondary road; EL] Local road. BARBADOS SECONDROAD NAINTENANCE AND REHABILITATIONPROJECT MCUROAD MAINTENANCE EOUIPHENT BY AGEAND CONDITION

TOTAL No. OF UNITSPER AGE GROUP lX OF TOTAL) No. OF UNITS BY CONDITION(X OF TOTAL)Ca) CAT. EOUIPHENT Nu4BER ...... CODE CATEGORY OF UNITS 0-3 YEARS 3-7 YEARS 7-11 YEARS 11-15 YEARS)15 YEARS ACTIVE NEEDREPAIR NEEDREHAB. DISPOSAL IN FLEET No. (X) No. lX) No. lX) No. (X) No. (X) No. (X) No. (X) No. (X) No. CX) MAJOREQUIPMENT TIO Trucks, dap or tipper 42 6 141 13 311 13 311 5 12X 5 121 23 55X 5 12X 15 36X 4 10X T2O Trucks, ftat bed 20 OX 16 aox - 01 1 5x 3 151 17 851 7 35S 2 101 1 5X T30 Trucks, special purposeCb) 13 . OX 2 151 2 151 5 38X 4 31X 6 46X 3 23X 4 31X 3 23X 114 End loader, skid steer type 18 5 28X 12 67X 1 6X OX OX 17 94X 4 221 1 61 - O 145 Tractor loader, backhoe 7 3 43X 0- - OX 3 431 1 141 3 431 OX 3 43X 1 141 (c) Tractors, varius types a OX 2 251 1 131 3 381 2 251 6 75X 1 13X 2 25 - ox 112 Front endtoader, altsizes 12 1 8 I 8X 3 251 2 171 5 42X 7 sBx 3 251 2 171 3 251 154 Roller, pedestrian 4 4 1001 0X - 0 - 01 - 01 4 1001 - 0O - 01 - 01 ld) Roller. others (all types) 30 oX 1 3X 1 3X 6 201 22 731 9 301 3 101 1 3X 20 67X 311 Air caW essor, w/hmmers 9 - oX - 0X 5 56X 4 44X OX 6 671 2 221 3 33X - O 121lotorgrader 2 - OX 1 501 - OX - OX 1 501 1 501 1 501 - OX 1 501 ...... ----- ...... Stbtotat aJor equipment: 165 19 121 48 291 26 16X 29 181 43 26X 99 601 29 181 33 201 33 20 NINOREWIPIN£T 62 Asphalt sprayer, maal 13 1 8S 5 38X 3 231 2 151 2 151 9 693 4 311 4 311 - 521 Asphalt paver, self prop. 3 - oX 0X - oX 3 1001 0 1 331 OX OX 2 671t l6l Tamper - smell cmpactor 14 OX - 0X - 0X - 01 14 1001 7 501 7 501 0- 7 501 141 Tractor w/fLaIr ower att. I - 0 - 0 1100 - 0 - 0X 1 1001 1 1001 - 0X OX ?21 Bush cutter,. mmal 12 (e) 01 (e) 01 (e) 0X (0)01 Ce) 0X 12 1001 6 501 OX 0- 211 Special paint mrker 3 - 01 2 671 - OX 1 331 0 2 671 2 67 - 0 1 331 T01 Pick-up 22 2 91 3 141 3 141 10 451 4 185 15 681 7 321 7 32X OX C07 Car 2 1 50X OX OX OX 1 50X 1 50 - OX - OX 1 501 181 Crane, self propetled 1 - 0X - X - 0X 1 1001 - 0X 11001 11001 - OX 0X 412 Traiter - small putt type 1 0X 0- OX 1 100 - 0 0 OZ - 0 1 1001 - 0X 411 Trallers lo boy type I - 0X - 0 0% 1 100X - 0X 0 0X 0X 0X 1 1001 512 Mixer. asphalt 2 - 0X 2 1001 0X - OX 0 0 01 - 0X - 0X 2 100 511 Mixer,concrete 6 2 331 - 0X - 01 0 4 67 2 33 2 331 - 01 4 671 711 Vibratorconcrete 5 Ce) 0X (e) 0X Ce) 0X (e) 0X (e) 0X 5 1001 5 1001 - 0X - OX 821 Uelder 4 (e) 01 (e) 0X (e) 0X (e) 0O Ce) 01 4 1001 2 501 0X 01 171 Thwaites&per 28 - 0X 01 01 18 641 10 361 10 361 6 211 8 2 10 361 811 Plup-uater,all sizes 5 2 401 - 0l 01 3 60 - 0 2 40 - 01 - 01 3 60X 831 Generatorw/light plant 3 - oX 3 00 - 0X - 0X - oX 3 1001 OX 01 - 0X ...... SubtotalmInor equipaent 126 8 8X 15 141 7 7X 40 38X 35 331 75 601 43 341 20 161 31 251

TOTALS 291 |27 101 63 231 3' 12X 69 261 78 29X1 174 601 n 25X 53 18X 64 22X

Notes:Ca)Four groups:1) active,units currently in operation;ii) need repair,units in operationthat will needmajor rqpairduring the next fouryears; iii)need rehabilitation,units to be rehabilitatedin sameperiod; iv) disposal,deadlined units to be disposed(rehabilitation not justified). i- l" tb) Includes: tankers, water truck, asphalt truck,grab truck,tree trimer, and tractor truck. 0 (c) Includes: 3 tractor-bulldozers,1 excavator, and 4 loader-crawlers. C1% (d) Includes: 2 rubber-tyre, 6 steel-2-wheel, 21 steel-3-wheel, and 1 towed type. Ce) Age data not available; subtotals by age groupexclude these equipment units. - 77 -

ANNEX 1 Table 7

BARBADOS SECONDROAD MAINTENANCE AND RENABILITATZOH PROJECT ROADSSELECTED FOR TIE ROUTINE-ANTN CE-BY-CONTRACTPILOT PROGRiAM

a^s,"Zw wZ"w"Zw---s-MZI-...... c...... ROAD PARISg SECT7ON LESGTH wIDTH SURFACE(b) TrFFIC NAE (a) FRCM TO (km) (m) TYPE CCND (v/day) ...... !!...... 2,...... - -.--.-.-...... -.-..... -.-...... ----.-...... -- Primary Roads Highway 5 M Pole VM 575 (Map Hill) Lover itrmey 0.9 6.0 AC 0 6,671 Highway 5 a Lover Birney Boarded all Juncttou 3.2 6.0 AC G 7,834 High ay 5 I Boarded Hall Junction Brigbton Junction 1.9 6.0 AC G 2.736 Highway 5 0 Brighton Juncttio Campaign Castle 1.4 6.0 AC G 6.042 Highway 5 S Campaign Cacotl EdgecumbeJunction 0.9 6 0 AC G 5.671 Highway S 0 Edgocwube Junction Robinson* (Long Bay Junct.) 8.9 6.0 AC-RP r 4,079 Highway B 0 Six Roads Junctton g vay N CRirtonso 2.2 5.0 RP V 3.130 Highway 7 X Greame Hall Junction Rock Ball 10.7 6.0 AC G 5.400 Htghv y N P Rock fall Sam Lord& Ccatlo 9.0 7.0 AC G 2,691 Highway P X Hway 5 St. Patrick Junction 4.5 3.0 AC 0 1.455 Highway Q X B way 6 SkemneeBHll-Yorkshire 2.9 3.0 RP F 1.909 Subtotal Primary Roadsc 46.5 6.0 40i4 Local Roads MangroveRd. P Four Roads (HvwaySB) Rock Hail (H'vay N) 3.6 S.0 AC-RP C-F N.A. Berlin Rd. (*) P HBway 6 St. Patrick 1.1 5.0 AC-Rp C-F N.A. Cave Land Rd. P Stroude Land (Riraons) End of road 0.6 4.5 RP P N.A. Diamond Valley P Hway N Junction Crane Junction 2.0 5.0 RP F N.A. Drakes Land P BRvay S Cul do sac 1.7 5.0 Rp P N.A. Foursquare Rd. P Four Roads Hvway 6 (Woodborne) 1.7 5.0 RP 0 N.. Garret Rd. P PS-6 End of road 0.7 4.5 RP P N.A. Hamden Rd. P PS-I End of road 0.5 4.5 RP P N.A. Nampton Rd. P lIvay 3 H'vay 6 1.2 4.5 AC P N.A. Harlington (4) P Haway N Junction Cul de sac 1.1 3.0 AC 0-F N.A. HarmonyLodge P ETay N Foul Bsay 1.0 4.3 AC G N.A. Noddings (* P Hway N (Rirtona) HNdding Junction 3.1 5.0 RP F N.A. Highland P H vay 6 H'vay 6 0.6 5.0 AC G N.A. Jesnay Lane P R way 5 Cul. de sac 0.4 5.0 RP F N.A. Nursery Rd. P Hwvy SB Cul do sac 0.9 4.5 RP P N.A. Subtotal Local Roades 20.2 4;9 N Ai TOTALROUTINE-NAINTEHANCE-BY-CONTRACT PILOT PROGRAM 66 7 (a) Parish Codes l St. Michaell (GI St. George, CP3 St. PhiILp; and (XI Christ Church (b) Surface Type: AlJ Asphalt Concrete ni and tRU) Penstrationroads Surface Condition: CG Good; (P1 fair; and [P3 Poor vI Includes roads 1 an #2

Table 8

BARBADOS SECONDROAD tLUNTENANCE AM REABILIT ATION PROJECT 3OUTZHE. NAhTEACE-BYCONTRACT PILT PROGM 1992/93.1993/94 Program prepared fore Road links under BM1CPilot Program Road Network Lengtht 66.7 km

...... f.. -- - -- ...... MNANTENCEACVITIES (a) | ROADFEATURE INVEITORY | PROGRAMCOST CTWO.YEARPROGRAM) ...... __.__. z _ _ _ ACTIVITY ACCOMLISaGRRT INVENTORTZND)' VIORE UNIT COST TOTALCOST CODE VANE UNIT Or UNITS UN7T QUNATITT (90s) (BD$)

1010 Pot Bole Patching tous of AC six placed 123 lae I= of paved rds. 956 344.5 329.371 1020 Re radin Un aved Shoulders km of *houlder regraded 8 Cm of unpaved should. 58 1,093.2 63.407 1040 Jolnt & Crack Sealing lure of emulsion placed 123 lana Cm of psved rdt. 8,174 2.8 23.01S 1110 Drain CleaoingManal kn of drain cleaned 71 Cm of pav/unp.ditee 44 7,777.9 342.22S 1120 Drain CleaningMechanical km of drain cleaned 66 km of unpaved diteb s 132 384.0 77,08S 1130 CulvertCleant No. of culvert cleaned 59 No. of culverts 90 493.6 44.428 .140 W.ll Cleaning a3 of wells cleaned 49 No. of wells 22 255.1 5.612 1210 Traffic SigonMaintenance No. of signs repaired 359 Ho. of signs 32 204.1 10,61U 1220 Traffic Sign Instalations Ho. of signs installed 359 go. of signs 52 250.3 '13.023 1230 Guard Rail Rapair* ltn. a of fences rqplacod 2 C, of urdr./fances 282 76.7 1 5 1230 Special Pavement Markinge No. of ep. rks panted 123 lane lC ofd ved rds. 46 240.4 11.J57 1310 Weeding Manual 1m of roaddided weeded 124 km of road* de 66 929.2 79,911 1320 Weeding Mechanbcal km of roadasded weeded 124 km of roadside 336 94.0 31,97 1330 Tree Trimaing6 Removing No. of trees trimmd global estimate 0 1410 Bridge Maintenance go. of bridges repaired . mber 0 134 1420 Culvert Ma tenance No of culvorts repaired 39 ber 18 309.6 640,16 1430 Repair of Concrete Slipper lin. v of kerba replaced 31 ailpl bm 410 45.1 tO .0I 1310 Emergency Activities man days used a lobal estimate 440 113.3 49.834 1610 Prcacs ting^ aS of concreteused - global eatimate 100 200.7 20.068 __ _ ,~~... ,,.. ,.. ,,...._____._...... _._._...... ___...... ___... -----

TOTALROUTINE-MAXNTEWCE.BY.CONTRACT PILOT PROGRAM(Two-year Program) 1,287,075

. a...... *fl . a.. .. aa. . SaS.. . S**~~~~~~~...... (a) The list of activities and work quantities wil be revLewed during preparation oC bid package Sone of these activities be divided into different itms to facilitate their tndering, measurement and paymnt. _78 -

ANNEPX 2 Page 1 of 8

BARBADOS

SECOND ROAD MAINTENANCE AND REHABILITATION PROJECT

Terms of Reference for a Study of the Rationalization of the Public Tranasort Svstem ir B&rbadoe

obilctis e

1. The Study's objectives are to:

(a) identify the most appropriate mix of publicly and privately owned bus transport to meet public passenger transport demand for Barbados; and

(b) determine the optimal organizational, operational and regulatory structure that will meet the requirements of this system at the least overall cost to the consumer and Government.

Background

2. Passenger transport in Barbados is shared by the publicly-owned bus company, the Transport Board, with a fleet of about 180 buses, and private operators of minibuses (carrying 31 passenger) and maxi-taxis (carrying 10 passengers) in addition to regular taxis. There are 195 minibuses, 174 maxi- taxis and 1200 regular taxis in operation. The Ministry of Public Works, Communications and Transportation (MCW) assigns routes to minibuses, generally along corridors leading in and out of Bridgetown.

3. The Transport Board carries about 26 million passengers a year and employs about 1,500 people, of which about 1,000 are either drivers or conductors. It operates according to a published route and time schedule and services all areas in Barbados. Passenger fare, determined by the Government, is currently BDS $1.50 throughout the country with discounts for students and senior citizens.

4. The Transport Board has suffered operating losses since 1976 and has relied on Government support to conduct its operations. The main _easons for the loses were operating inefficiencies (a ratio of about 7 employees per bus), deficient maintenance of the bus fleet, and increasing competition from minibuses along the most lucrative passenger routes. The Government subsidy peaked in 1987/88 at a level of BDS $22 million; in recent years it has been between BDS $10 and $15 million. In addition, the Government hAs customarily financed the Transport Board's capital expenditures, mainly for bus purchases (e.g., BDS $6.7 million in 1990/91 and BDS $2.3 million in 1991/92). - 79 -

ANNEX 2 Page 2 of 8

Scooe of Work

5. The Study is to be divided into four components:

(a) Review of Existina Situation. This component will analyze the existing public transport system.

(b) Definiticn and Analysis of Future ODtions. This component will define and compare the options for providing public transport on the island, with a view to (i.)determining the most appropriate public transport system both economically and socially; and (ii) reducing or eliminating Government subsidies to public bus transport.

(c) Policy and Institutional Framework. This component will define the policy, planning, organizational and regulatory requirements for the adequate management of the preferred public bus transport option. It will include (i) the definition of the role of a Public Transport Authority/Commission which would have overall responsibility for the regulation of public transport; and (ii) the definition of the future roles of the Transport Board (if still in existence) and privately-owned public transit systems.

(d) Imolementation Reauirements. This component will formulate re,.ommendations with regard to the implementation of the new public transport sys:em, if appropriate, and define the need, if any, for further technical assistance.

Review of Existinc Situation

6. This component will cover, but not necessarily be limited to, the following activities, investigations and outputs:

(a) Review of previous studies on bus transport in Barbados (see Appendix A) and definition of the existing bus network and services.

(b) Using existing data sources, collecting the relevant existing ard projected socio-economic and demographic data on population and its distribution, education demand (transport of school children), industrial, tourism and other development, income distribution, vehicle ownership, road users, costs, public transport patronage by route and by service usage, et cetera. (Some data are available from the last census and regular quarterly sample household surveys c&rried out by tovernment).

(c) Identify data gaps and fill them using limited surveys (in particu- lar, it is envisaged that some roadside counts may be required to determine the relative importance of the publicly and orivately owned bus systems). - 80 -

ANNEX2 Page 3 of 8

(d) Using existing data sources, and only limited new data collection, study existing bus, mini-bus, route-taxi and normal taxi operations using cost data obtained from interviews with transport owners and analysis of available financial data. The investigations shall separate general passengers from subsidized passengers such as school children, old age pensioners and police, and distinguish by trip type, length, et cetera. The Consultants will prepare sJionle operating cost models for the different types of service.

(e) Review the present institutional framework for public transport in Barbados and identify possible impediments to the implementation of any proposed changes to this framework. This shall include an analysis of functions, responsibilities and level of authority of the different entities participating in the provision of public transport a,. they actually exist.

(f) Review and evaluate the existing legislation as it relates to Public Transport ii. Barbados including that which relates to public transport management, including environmental considerations, and the institutional and enforcement provisions.

(g) Examine and assess the impact of the legislation on public transport management policies.

Definition and Analvsis of Future options

7. This component will define and analyze the options for the organization of public transport in Barbados.

(a) Define future optiono for study, including -

(1) Maintaining the present relative role of the Transport Board and private operators and deveioping an action plan involving reorganization of the Transport Board, staff reductions, improvements of the route and frequen- cy schedule, modification to maintenance facilities - sub option (a) with subsidies; sub option (b) without subsidies.

(ii) The Transport Board becoming an independent, government corporation operating a fleet of, say 50 to 100 buses providing an agreed range of services - sub option (a) with subsidies; sub option (b) without subsidies.

(iii) The complete privatization of the public transport system through the sale of Transport Board assets to the public - sub option (a) with subsidies; sub option (b) without subsidies. - 81 -

ANNEX 2 Page 4 of 8

($v) The privatization of the public transport system with the Transport Board becoming an employee-owned operation - sub option (a) with subsidies; sub option (b) without subsidies.

(When developing the options, the consultantsshould consider how subsidies, if any, can be effectivelytargeted, if franchLe tendering could be useful and how socially desirable but uneconomic routes should be served).

(b) Analysis and comparisonof options includingthe following informa- tion:

(i) Brief descriptionof the option.

(ii) Organizationand regulatory framework for the option.

(iLi) Estimates of ridership by mode.

(iv) Impact of alternativefares structures.'

(v) Aggregate costs, economic costs and cost recovery for each type of bus service.

(vi) Level of subeidy required.

(vii) Provide a comparative evaluation of policy options, including related environmental ones and prepare an evaluation matrix showing the advantages and disadvaa- tages of each solution.

(c) Make recommendationto Government on the most appropriate option.

Policy and InstitutionalFramework

8. This componentwill define in detail the action required to implement the chosen option.

(a) Refine the policy changesrequired to implementthe selected option. These actions should include the areas of administration,regula- tion and financing.

(b) Define the appropriate inetitutionalframework for the implementa- tlon of the selected option including a plan for the changes required within existing institutions and the creation of any new entitles such as a new transport authority.

The fare structure utilized shall be so varied as to cover (a) flat fares, (b) stage fares, (c) zonal fares, and (d) special fares. - 82 -

ANNEX 2 Page 5 of 8

(C) Outline the functions of the transport authority and design the organizational structure that will enable this entity to develop long-term planning and effective public transport management strategies.

(d) Recommend amendments that will update and/or consolidate the existing legislationas it relates to Public Transport.

(e) Prepare drafting instructionsfor the implementationof the chosen option.

(f) Review the present regulations concerned with the presentation of operating and financial information to the Government or transport authority and make appropriate recommendationsfor revisions.

(g) Develop the framework for a transport planning data base system, including the relevant environmental data, and establish a system for managing it in the future using the data collected for this study as the initial inputs.

(h) Identify and prepare the transportplanning processes to be used for the management and monitoring of the accepted transport option. This shall include an identificationof transport analysis require- ments, the organizationof the transport planning process, and an identificationof the appropriate software.

(i) Examine the existing regulations and procedures governing the use and mainte.ianceof vehicles in the public transport system and make appropriate recommendationsfor change.

(j) Examine the existing regulations governing the operation of bus depots, terminals, and bus stops.

ImplementationReauirements

9. Under this componentthe Consultantwill provide a detailedprogramme for the implementationof the chosen option:

The Consultantswill be required to:

(a) produce a detailed implementationplan for the various restructuring measures connected with the implementationof the accepted public bus transport system;

(b) identify costs and potential sources of financing; - 83 -

ANNEX 2 Page 6 of 8

(C) specifically propose programmes to achieve economical performance and cost effective use of vehicles which are used for the purposes of public transport. This shall include the formulation of a comprehensive human resource development programme for all catego ries of persons within the public transport system.

(d) make recommendations as regards the need for short-term technical assistance to help the Government in introducing and implementing the new structure for public transport, including in particular the establishment of an on-going transport planning systems, the creation of a Transport Authority, and the reorganization of the Transport Board operations; and

(e) provide Terms of Reference, task descriptions and expertise profiles for the technical assistance requirements defined under the foregoing paragraph.

Timeframe and ReDortina

10. The Study is required to be completed within thirty six (36) weeks from commencement and will be executed in two (2) stages.

Staae I

11. This stage will cover the activities described under paragraph 3.2. Review of the Existino Situation, and 3.3. Definition and Analysis of Options and should be completed within the following time frame:

Cumulative Weeks Contract signature 0 weeks -

Start of work 4 4

Submission of Inception Report 2 6

Submission of Stage 1 Report and recommendations in draft 14 20

Government/EDF comments and instructions to proceed to Stage 2 on the basis of identified accepted system option 4 24 - 84 -

ANNEX 2 Page 7 of 8

Staae II

12. This stage will cover the activities described under paragraph 3.4 Policy and Institutional Framework and 3.5 Imolementation Reauirements and should be completed within the following time frame: Cumulative Weeks Instructions by Government to proceed with Stage 2 0 weeks 24

Submission draft Stage 2 Report 6 " 26

Government/EDF comments 4 " 30

Submission of Final Report Stage 1 and 2 2 " 36

13. The Reports are to be submitted.

Inception Report 12 copies Draft Report: to the Government 12 copies to EDF 3 copies

Final Report to the Government 20 copies to the EDF 5 copies

The Executina Aaencv

14. The Ministry of Public Works, Communications and Transportation is the agency of the Government of Barbados with executive responsibility for the subject of public transport. The Ministry of Public Works, Communications and Transportation shall therefore have executive responsibility on behalf of the Government of Barbados for the conduct of the Study.

15. The Permanent Secretary is the principal administrative officer of the Ministry of Public Works, Communications and Transportation. The study team shall therefore work in close liaison with the Permanent Secretary, Ministry of Public Works, Communications and Transportation and all reports shall be submitted to that official. -85 -

* ~~~~~~~~~~~~~~~~ANNEXa Page 8 of a

Reartg Relevantntto Transpr_t Board

1. The Transport Board Barbados - A Survey United Transport Overseas - February 1973

2. Report on Monthly Management Accounts of the Transport Board F.J. Fennell - December 1974

3. Report on the Transport Board Dr. C.N. Blackman and others - June 1980

4. Barbados Surface Transportation Study Wilbur Smith and Associates - October 1980

S. Report on the Transport Board William E. Griswold, Headway Associates - February 1984

6. Further Observation on the Operation of the Barbados Transport Board William S. Griswold, Headway Associates - April 1984

7. Evaluation Report of Transport Board Operation Department January 1987

8. Report on Transport Board (Prepared for Cabinet) - January 1987

9. Public Transport in Barbadoss Some Measures for Improvement, Thesis for Diploma in Transport and Development Desmond Sabir - 1987

10. Barbados Bus Survey O.C. Verlo - October 1987

11. Special Report on Fleet Replacement Programme (1988 - 1993) February 1988

12. Review of Taxi Operations - BDB 1988 - 86 -

ANNEX 3 Page 1 of 7

BARBADOS

SECOND ROAD MAINTENANCEAND REHABILITATIONPROJECT

Outline of Terms of Reference for Technical Assistance for MCW in Road Maintenance and Zauliment Manaoement

Background

1. Barbados has a well-developedroad network consisting of about 1,550 km. With the expansion of the road network substantially completed, providing adequatemaintenance is being assigned the highest priority. Efforts undertaken to improve maintenance management under the IBRD-financed (first) Road Maintenance and Rehabilitation Project included creation in 1984 of the Maintenance Management Section (MMS) within MCW's Operations Division and technical assistance provided by consultantsin equipment and road maintenance management. The technical assistance in equipment management started early in 1988 and totalled four man-months. To date, an EquipmentManagement System (EMS) has been designed and adopted by the Workshop, and an inventoryof all but small equipment has been completed. In addition, to strengthen workshop management, MCW has recently appointed a Senior Mechanical Engineer and currently is in the procesn of reassigning some functions among its staff, according to an organizationalchart discussed with the consultants. With the EMS having been designed, further assistance is needed to ensure its full implementation, particularlythe cost accounting and equipment management policies that depend on feedback from the steady applicationof the system.

2. The technicalassistance in road maintenance,amounting to six man-months, started in September, 1989, with financing under the IBRD (first) Road Maintenance and RehabilitationProject. Its overall objective was establishing a Highway MaintenanceManagement System (HMMS). During this period, MCW set up the MKS to support the developmentof the HMMS, appointed additional staff, and purchased computers and a roughness meter, and designated in 1991 a Technical Committee (TC), which conisistsof key personnel from MCW's operations and Workshop division, to periodi.cally review the manuals, performancestandards and reporting systems of the HMMS and facilitate its implementation. On the technical side, the first roadway feature inventory of the whole network was completed in 1991 and several components of the HMMS were defined, including maintenar.ceperformance standards and a field operations manual. In addition, development of computer programs to facilitatemaintenance planning started in 1991 with IBRD assistance.However, the HMMS has not yet been installed in the field and its procedures not tested. Hence, additionaltechnical assistance is needed to ensure its full implementation, introduce improved maintenance practices through its application, and provide the necessary training of supervisors and maintenance crews to support it. - 87 -

ANNEX 3 Page 2 of 7

Obiectives

2. The technical assistance aims at strengthening MCW's capacity to plan and carry out more efficient road maintenance operations through supporting full implementation of the HMMS and EMS in MCW's headquarters and maintenance districts. Specifics objectives are to:

(a) improve the quality of road maintenance by upgrading work methods, providing levels of service consistent with road functional classes, and deliverJng opportune and responsive maintenance services; (b) increase productivity of maintenance operations by imprcving work scheduling practices, establishing uniform performance standards and monitor performance of maintenance crews; (c) assist in preparation of a priority-based maintenance performance plan and allocation of resources, supported by dependable information feedback from the field; (d) improve utilization of MCW's maintenance equipment through adequate management of MCW's Workshop operations and enhanced coordination between workshop and field forces; (e) monitor maintenance operational costs and other maintenance related expenditures, providing the necessary interface with the government's budgetary system; and (f) assess cost-effectiveness and relative quality of the Routine- Maintenance-by-Contract Pilot Program and the Periodic Maintenance Program performed by private contractors against force account work.

Scope of the Assistance

3. The technical assistance will focus on field implementation. All of the aspects of the HMMS and EMS will be tested and upgraded according to the experience gained during their implementation. The consultants will assist MCW's Operations and Workshop divisions in strengthening road maintenance management and in achieving an adequate level of efficiency, as expressed by MCW's action plan for road maintenance improvement, included under the (IBRD-financed) Second Road Maintenance and Rehabilitation Project. In particular, the consultants hired under this technical assistance will perform the following main tasks:

(a) reviewing current maintenance procedures, policies and organizational capabilities within MCW and the districts; (b) assisting MCW in the implementation of all aspects of HMM4S in a pilot district; (c) upgrading work methods; (d) reviewing performance standards; (e) setting up an accounting system capable of monitoring MCW's expenditures according to specific tasks, reporting actual equipment cost performance, and providing the necessary interface between the existing budgetary system and both HMMS and EMS; (f) implementing the recommendations of the Road Network Rationalization Study (RNRS), defining maintenance activities, levels-of-service and - 88 -

ANNIX 3 Page 3 of 7

quantity standards as needed for preparation and implementationof maintenance plans according to the maintenance strategies recommended by the study; (g) expanding the HMHS to all maintenance districts; (h) assisting MCW in developing the Routine-Maintenance-by-Contract (RMBC) Pilot Program; (i) assessing the efficiency of road maintenanceoperations carried out by both force account and contract; (j) assisting the workshop management in the implementation of all aspects of EMS and the establishmentof policies geared at reducing fleet operation costs and improving equipment availability and methods of equipment assignment to the districts; and (k) training MCW's maintenancepersonnel.

4. Reviewina current maintenance procedures. policies and organizational capabilities within MCW and the districts. The consultants will review the current maintenance policies used by MCW and organization set-up, particularly in the districts, in order to assess their efficiency and scope in relation to the implementation of the HMMS island-wide. The consultants will point out deficiencies ii both technical and organizationalmatters that could hinder implementationof the HMMS, as well as mechanisms to overcame such deficiencies and sequence in which these mechanisms should be implementedaccording to their relevance for the implementation of the HMNS. After agreement with the Technical Committee, these findings will he turned into an action plan, which in addition to guiding the consultant efforts, will also facilitate assignment of MCW's counterpart staff.

S. Assistina MCW in the implementationof all asoects of the HMMS in a pilot district. The viabilityof all aspects of HMMS, especially field work scheduling and reporting procedures,will be tested first on a pilot district to generate basic field data and allow for fine tuning at an early stage. In this phase, the technical assistance will give special attention to the adequate use of the reporting procedures by field crews to ensure they supply timely, useful and accurate information as required while ascertaining that the design of the informationsheets provides for easy use in the field. In addition, this close monitoring of field practices will enable the consultants to validate the definitionof maintenanceactivities, maintenance performance standards, quantity standards and unit costs used by MKS to prepare maintenance performance plans. The consultantswill ensure that these elements of the HMMS, as implemented,are capable of providing a common baeis for measuring program compliance,unit costs, resource usage, productivity and other management and technical indicators. Finally, the implementationof the pilot program will enable the consultant to identify areas in which additionaltraining is required.

5. Upgradinawork methods. The consultantswill assesswork methods currently used by maintenance forces, analyzingsuch aspects as technology applied, use of equipment, composition and skills of crews, and quality control practices. Consequently, they will introduce improved work practices tailored to local conditions,and create checklistsand other simple guidelinesto help supervision and quality control of work in the field. - 89 -

ANNX 3 Page 4 of 7

6. settina up a cost accountina svstem. The consultants will set up a computerizedcost accounting system to support the cost estimation and analysis systems recommended under the HMMS and EMS for road maintenance, equipment and spare parts management purposes. This system will enable MCW tot l) monitor its payments and expenditures on road maintenance according to work progreso; ii) determine actual direct and overhead costs of maintenanceactivities carried out by force account, and of supervisorycoats of activities performed by contract; iii) develop and charge equipment rental rates and report actual equipment cost performanceagainst the planned budgets; and iv) provide the necessary interface between the existing budgetary system and the maintenance and equipment management systems to enable the reconciliationof costs and resource usage.

7. Izmplementina the recommendations of the Road Network ationaliztsin Studv LRNRS). The results of the Road Network Rationalization Study will have a significant impact on both MCW'e maintenance policies and the Four-Year Maintenance Plan, as it will examine which roads need to be left without any maintenance,which ones need to be maintained to less than paved standard, and what activities, and in what frequency, are justified for each road in the remaining network. The consultants will assist MCW in implementing the recommendationsof the study, developing guidelines to interpret and carry out the policy recommendations through the maintenance management process and incorporatingin HMMS all adjustments needed in this respect, such as defining appropriate levels-of-service and quantity standards for each maintenance activity and road category,and new malntenance activities. The consultants will also assist MCW in formulating updated maintenance programs and reorganizing MCW's maintenance forces.

8. Exoandina the HMMSto all maintenance districts. As soon as the viability of the HMMSin the pilot district is demonstrated,the implementationof the system will be expanded to all the remaining districts. The consultants will strengthen the district's ability to develop and monitor weekly or bi-weekly programs tailored to reflect work priorities, the availabilityof maintenance resources (personnel,equipment and materials) and special conditions (urgentor emergency situations). During this phase, the consultantswill assist the TC in monitoring progress in the installationof HNNS at both the central and district level and adherence to its procedures and standards. Fo.rthis purpose, the consultants will prepare management evaluation reports, such as monthly maintenance activities reports, district monthly work progress and cost summary reports to be discuseed with all district techniciansduring the TC's meetings. In addition, the consultants will guide XCW in the preparation of annual maintenance reports, evaluating results accomplished by MCW in terms of compliance with the annual work plan and budget, adherence to maintenance performance standards and other indicator of efficiency, and evolutlon of the network condition during the period.

9. An6is 'w0 MCW in develo_ina the Routine-Maintenance-by-Contract(RMECE pilot Program. The consultantswill assist NCW in the supervisionand evaluation of the RMBC Pilot Program. The main objectiveof this pilot program is to obtain experience on costs, quality of work, supervision needs, and benefits and disadvantages of contract maintenance as compared with force account maintenance. - 90 -

ANNEX 3 Page 5 of 7

In this respect, the consultants will: i) advise MCW's program coordinator on best procedures to perform supervisory tasks while ensuring that performance and cost data are being adequately collected; ii) establish procedures to colle !t performance and cost data needed to evaluate the results of the program; iii) recommend improved procedures with respect to planning, budgeting, tendering, supervising, and administering maintenance by contract; and iv) introduce the necessary adjustments to contract documents and procedures, standards and specifications to be used in the subsequent phase of the program.

10. Assessina the efficiency of road maintenance operations carried out by both force account and contract. The technical assistance will assess the comparative costs, benefits, and quality of maintenance work --routine and periodic-- carried out by contract and force account. The comparison of contract maintenance with force account maintenance will be based on performance and cost data (including direct, overhead and supervision costs) obtained from the RMBC pilot program, the evaluation of force account operations through the HMMS and EMS, and the execution of periodic maintenance contracts (overlay program). This analysis will look at differences in aspects such as: quality of meterials and workmanship; selection of appropriate equipment, including use of specialized equipment; compliance with work specifications and safety standards; success in handling road traffic through work zones; level of supervision required; flexibility and time required to respond to emergencies and other unscheduled work; and response to increased or peak workloads. The consultants will also identify those activities which showed greater cost-efficiency when carried out by force account, and vice versa, in order to facilitate future decisions on contracting. Based on these findings, the consultants will make recommendations regarding: i) possibilities for increasing productivity of force account operations in view of the results of the RMBC pilot program; and ii) planning, financing, supervision, and administrative requirements for effective preparation and execution of maintenance work by contract (including selection of work iteme to be contracted and measurement units; type, scope and duration of contracts; procurement procedures for contracting, payment provisions and procedures, and bidding documents; frequency of inspection, the form of reporting, and recommended practices for supervision of contracted maintenance).

11. Assistina Workshop's manacement in the implementation of all aspects of EMS. The consultants will assist MCW's Workshop in analyzing the data on the availability and use of MCW's equipment fleet according to the EMS, and i.msplementingthe programs and policies on equipment management derived from these analyses. This task will require: i) development of productivity performance standards for most frequent tasks carried out in the Workshop; ii) preparation of specifications and technical documents for procurement of new equipment (including requirements for critical spare parts items and on-site training for servicing, minor repair and adjustment procedures); iii) guidance during the execution of the equipment rehabilitation program; iv) preparation of a program for disposal of obsolete and costly-to-operate equipment; and iv) developing an engine oil analysis program to enhance EMS' equipment preventive maintenance program, to be contracted out; vi) establishing a computerized spare parts inventory capable of maintaining a file of all parts stocked in the workshop together with balances on hand, in order to analyze parts usage, generate stock - 91 -

ANNEX 3 Page 6 of 7

management information and process accounting transactions for parts issued, receipts, and adjustments.

12. Trainina MCW's maintenance personnel. To achieve the objectives of this technical assistance, training for improved productivity is essential. The consultants will provide on-the-job training to the counterpart personnel assigned by MCW, making them effectively participate in all technical assistance activities to ensure full knowledge of procedures and systems developed by the consultants. Based on the findings of the pilot district, the consultants will prepare and assist MCW in delivering a comprehensive training program to support a complete implementation of the HMMS and EMS. This program will be conveniently targeted at technicians, supervisors and other workers, and its content will vary according to the specific needs of these groups. The consultants will also set up a system for the evaluation and control of the training programs, and provide technical training to instructors selected among MCWIs staff, in order to ensure the continuity of the maintenance training program once the consultant's services are completed.

Staffina

13 The technical assistance will be carried out over a period of 24 months by the following specialists:

i) a road maintenance engineer with background in maintenance management systems, maintenance operations by force account, routine and periodic maintenance by contract, computer systems, and training personnel, who will be the program leader (18 months); ii) an equipment and workshop specialist, with experience in equipment management systems (9 months); iii) a specialist in maintenance cost accounting, with experience in computerized systems (9 months);

Executing Agencv and Counterpart Staff

14. MCW Technical Department, through its Operations and Workshop Divisions, will be the executing agency. Currently, Operatiors is in charge of managing road maintenance operations through seven districts, which are responsible for field operations. The Maintenance Management Sec_ion (MMS), within the Operations Division, is in charge of maintenance planning and evaluation. The utilization and control of all maintenance equipment come under the responsibility of the Workshop division. To strengthen its capacity to effectively coordinate maintenance activities, MCW has appointed a Technical Committee, which meets twice a month. MCW will designate among its permanent staff at the central office and the districts the counterpart personnel to be assigned to the consutltants. - 92 -

ANNEX 3 Page 7 of 7

Schedule and Reoorts

15. The technical assistance will start early in 1993. A tentative schedule of tasks is outlined below:

Months 1 2 Tasks 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 (a) (b) ********.**** (c) (d) (e) ***************** *****oo (f) (g) ****** ************ (h) (i) Ci) *.*******.********** (k) ****t*****************.**************'***********************

16. Both HNMS and EMS should be made operational in all districts by December 31, 1993. The consultants will submit the following reports:

SCODe Date initialAnalysis and plan of action By end of month 1 Implementationof HMMS in Pilotdistrict At completionof task (b) Implementationof recomuendationsof RNRS At completionof task (f) Evaluationof RMBC PilotProgram At completionof task (i) Work progressreports Quarterly Draft final report By end of month 23 Final Report 30 days after receipt of MVW'scomments - 93 -

AMNX -4 Fage 1 of 3

BARBADOS

SECOND ROAD MAINTENANCEAND REHABILITATIONPROJECT

outline of Terms of Reference for Technical Assistance to strengthen MCW's Maintenance Manaaement Section

Backaround

1. In, 1984 MCW created, within its Operations Division, the Maintenance Management Section (MMS)I to monitor the quality and efficiency of maintenance activities performed by MCW's forces. Further, in November, 1987, MCW entered into an agreementwith the U.S. Federal Highway Administration(FHWA) to provide technical assistance in several areas. The technical assistance in road maintenance --totallingeight man-months--was launchedin September,1989, with the overall objective of establishinga Highway Maintenance Management System (HMMS). During this period, MMS was set up to support the development of the HMMS: additional staff was appointed and computers were purchased in mid-1990. The first roadway feature inventory of the island's 1570 km of highways was completed by January, 1991 and several components of the HMMS were defined, incluling maintenanceperformance standards and a field operations manual. In addition,MCW appointed a TechnicalCommittee (TC) --consistingof key personnel from MCW's Operations and Workshop divisions-- to periodically review the manuals, standards and reporting systems of the HMMS and facilitate its implementation. Also, in 1991 MMS began operating a Mays Ride Meter to measure pavement roughness and developing computer programs to facilitate maintenance planning. However, such progress has been adversely affected by the recent layoffs of some of MMS staff under the retrenchmentprogram and the retirement of its Head. Although MMS has been partially restaffed by reassignment of personnel from other units within the Operations Divisions, there is an urgent need to strengthen the MMS, train its new staff, and assist the Technical Committee to enable full developmentand implementationof the HMMS.

Obiectives

2. The overall objectiveof the technicalassistance is to improvemaintenance planning and monitoring by strengtheningMMS' capacityto: i) prepare needs-based annual maintenance plans and work calendars! Li) update the roadway feature inventory and other information systems on a periodic basis; iii) assist the districts in scheduling and reporting work programs; iv) report monthly on work accomplishments,work cost and productivity,and evaluate the results achieved during the implementationof the work programs; and v) update from time to time performance standards, cost estimates, and quality and quantity standards, according to recommendationsof the TC.

l/Initially this section was named Method and Analysis, and staffed with a Senior Technician and a supervisor. - 94 -

ANNEX 4 Page 2 of 3

Scope of the Assistance

3. The consultant hired under this technical assistance will perform the following main taskss

(a) assisting the Head of MMS in the implementationof HMMS and training MMS staff; (b) reviewing road inventory sections and preparing districts maps, appropriate for use in maintenanceoperations; (c) upgrading the roadway feature inventory and data collection procedures; (d) developing computer programs to support the application of HMHS in maintenance planning and evaluation; (e) assisting tha Tecnnical Committee in reviewing HMMS's components; (f) updating MCW's Four-YearMaintenance Plan; (g) preparing the Periodic Maintenance Program to be carried out by MCW's Operations Division and the Routine-Maintenance-By-Contract (RMBC) Pilot Program;

4. Assisting the Head of MMS in the imoiementationof HMMS and trainina MMS staff. The consultant will help the new Head of MMS --to be designated-- in getting acquainted with all aspects of the development of HMMS and in reorganizingMMS's teams. In order to develop the specializedskills required, MMS' staff will be grouped into two units: i) Roadway Feature Inventory Unit, which will be in charge of updating road inventories and condition surveys -- includingmeasurement of pavement roughnesswith the Mays Ride Meter (MRM)--;and ii) Planning, Evaluation and Control Unit, which will be responsible for preparation of maintenance plans and evaluation of work. The consultant will prepare job descriptions and skill requirements for each position within this units ard will train the designated staff accordingly. While overseeing the tasks performed by MMS staff, the consultantwill provide on-the-jobtraining in all aspects related to the implementationof the HMMS. Special attention will be devoted to training of staff assigned to the operation of MRM; this comprehensive training program will cover theory and practice regarding: i) calibrationwith test sections;ii) ) equipmentoperation and use of softwarefor data collection; iii) use of control sections; and iv) data analysis and applications. The consultant will also provide technical assistance to the TC through field testing of all aspects of the HMMS, helping the committee in reviewing the HMMS' components and the procedures to be followed under the system. In this regard, he will prepare short guidelines and follow-upreports to be distributed to techniciansand discussed at TC's meetings.

5. Reviewing road inventory sections and preDarino districts ma2s. The consultant will review the current road sections defined in the inventory to ensure that they are homogeneous in terms of traffic, pavement type, organizational limits (districts and parishes) and easily identified in the field. Then, he will prepare appropriatemaps of all roads within a district with all road sections clearly identified,in order to enable their utilization by maintenance crews for work scheduling and reportingpurposes. A code will be assigned to each road segment to facilitate its identificationin the system. - 95 _

ANNEX 4 Page 3 of 3

6. Upgrading the roadway feature inventory and data collection Rrocedures. The technical assistance will review the scope and consistency of the information available through the Roadway Feature Inventory as well as the efficiency and reliability of the data collection procedures. Based on this, he will: i) establish procedures to incorporate roughness and traffic data into the inventory, and perform more objective pavement condition surveys; ii) assist MMS in the implementation of the Bridges, Culverts and Wells Inventory; iii) organize and oversee updating of the road inventory; and iv) assist the Traffic Unit in implementing the Road Signs Inventory and a computerized Road Traffic Inventory, compatible with the MMS' information systems.

7. Developina computer Programs to sunoort the aoilication of HMMS in maintenance vlannino and evaluation. The consultant will continue the development of computer programs to enhance the capabilities of the Maintenance Planning and Budgeting software. These new programs will support preparation of annual work calendars, evaluation and control of maintenance works, and preparation of management reports. In addition, the consultant will assist the Senior Mechanical Engineer in developing computerized information systems compatible with those used by the MMS.

8. Updatina MCW's Four-Year Maintenance Plan. The consultant will guide MMS staff through a complete application of all HMMS components as well as the computer software developed to support some of its phases. Particularly, updating MCW's performance maintenance plans for the years 1993/94-1995/96 will become necessary once the road inventory is updated and results from the 1992/92 maintenance plan are known. In addition, the consultant will assist the Operations Division in the preparation of the documents needed to implement the RMBC Pilot Program.

9. PreDaring the Periodic Maintenance Program to be carried out by MCW's OtperationsDivision and the Routine-Maintenance-By-Contract (RMBCl Pilot Program. This task will require the selection of road sections to be included in MCW's Resealing and Overlay Programs as well as the RMBC pilot program, preparation of work programs, and, in the case of the RMBC pilot program, preparation of appropriate tendering documents.

Staff ina

10. The technical ae-istance will be provided by a specialist in road maintenance management and computerized systems. It is envisaged that 18 man- months will be needed to complete the tasks described above.

Schedule and Revorts

11. The technical assistance will start early in 1992. The consultant will submit quarterly reports. - 96 -

ANNEX5 Page 1 of 3

BARBADOS

SECOND ROAD MAINTENANCE AND REHABILITATIONPROJECT

Road Network RationalizationStudy Terms of Reference

Background

1. Barbados has a total area of only 430 square kilometers but enjoys a relatively extensive paved road network of 1,550 km (381 km primary; 215 km secondary; and 954 km of local and developmentroads). The paved road density, at 3.6 per square kilometers, is high in comparison with other islands of a similar nature. The relativelyflat terrain (exceptfor the north-easternpart of the island) and the relatively high GNP per capita, contribute to the increased size of the road network. Nevertheless,maintenance of some low- traffic tertiary roads could probably be minimized without affecting the efficiency of the system.

2. The existing maintenance plan for the road network is based on quantity standards per km of roads. The plan takes into account the overlay works included in MCW's investmentplan which are based on economic returnswhich, in turn, are determined by traffic levels. However, the traffic level does not directly affect the quantity standardsper km, as specified in the plan, thus the recommended level of routine maintenance is insensitive to traffic levels.

Obiective

3. To define a set of maintenance policies and a system by which each route is assigned a policy based on its physical condition and traffic level.

Methodology

4. The consultantswill elaborate a matrix which will show the maintenance policy which is economically feasible based on two variables: traffic level(measured as number of standard axles) and road condition (measured according to an acceptable roughness index). This will be done as follows:

(a) a set of maintenancealternatives will be defined by the consultant including (i) no maintenance; (ii) minimum routine meintenance (cuttinggrass, cleaning culverts,maintaining drains, etc.); (iii) minimum routine maintenance plus, patching (e.g. patching each year 50% of all pothole, 75%; and 100%); (iv) routine maintenance plus patching at 100% plus resealir.g(according to a benchmark to be establishedby the cor.sultants);and (iv) the preceding option plus periodic overlay; - 97 -

ANNEX 5 Page 2 of 3

(b) using the Highway Design and Maintenance Model, or any other acceptable model, the consultants will recommend a maintenance strategy matrix for a model road section based on the traffic level and roughness condition. The consultants should develop several model matrixes based on criteria determined by different minimum economic rates of return (i.e. discount rates);

(c) the total road network in Barbados should be divided into sections according to the features listed in the existing road inventorywith each section identified by traffic ar.droughness data;

(d) using the above data, the consultants will assign each route a maintenance strategy and calculate annual maintenance cost for the total network for each model matrix (i.e. for each cutoff discount rate);

(e) the consultants will then select the final matrix of maintenance strategies (and the implicit economic discount rate) by subjecting total maintenance cost to the existing budgetary constraints;and

(f) finally, the consultantswill prepare a list of all road sections the and the recommendedmaintenance strategy highlightingon those where no maintenance is justified and those where only minimum maintenance is recommended.

Schedule

5. The study should be carried out in about eight months as follows: (a) review of roughness and traffic data: 2 months (b) collection of HDM data: 2 months (c) model simulation and matrix preparation for draft report: 2 months (d) comments by MCW s month

(e) final report with recommended strategy by route: 1 month 8 months

Staff

6. It is estimated that about 3 months of a civil engineer's time and 10 months of transport economists' time will be required. Of the transport economists' input, about seven months will be provided by the chief economist/studydirector and three by an assistant economist/statistician. - 98 -

ANNEXS Page 3 of 3

Facilities

7. The Ministry of Public Works, Communications and Transportation will provide the consultantswith offize space, office equipment (includingpersonal computers) and transportation. All other costs will be financed by the Second Road Maintenance and RehabilitationProject.

Reports

8. A draft report will be prepared after four months and copies sent for comments to the Ministry of Public Works, Communicationsand Transportation(ten copies),Ministry of Finance and EconomicAffairs (five copies), CDB (two copies) and IBRD (two copies). The final report,includingthe comments received by the Government,will be completedwith 30 days of receipt of comments and sent, with the same number of copies, to the above-mentionedorganizations.

Other

9. The Ministry of PublicWorks, Communicationsand Transportationwill assign a staff to work as counterpart with the consultants. In addition, the consultantswill give during their stay a two-week course explaining and training the maintenance management unit staff in use and application of the HDM model. IBRD23663

S -' 5935 59 301 BARBADOS 132 xonineliTown SECOND ROAD MAINTENANCE

, \\ X AND REHABILITATIONPROJECT / {r ,SprlngHall h Hall Harrison,-O /TLaC- i 2I /, \ #Hcif Acre >xs ) - PROJECTOVERLAY PROGRAM

- -<,1 _ PROJECTREHABILITATION PROGRAM O PROJECTSAFETY PROGRAM Fryer'sW I ...... -- CDB*FINANCEDROADS

Colleton MC Lewi PRIMARYROADS &eguaN m a 5 ------SECONDARYROADS A ROADMAINTENANCE DEPOTS -131' Speightatown _ ona Hill PARISHBOUNDARIES 1313

l

7 4Rock. Dundo\ ,.ol I <

Holeton JAtMES '>re ($o 5v rn - m Stmorel OMf j t fA < r j-ndc Wln.J\nd

P>rospecAtt c e 0TkOl o G > K -1beas

Hol~ e StaurwosAi,o

59*40'~~~~~~~~~~~~~~~~~~~o 31' Deocon. oM E*tp~ '~ .vxrssRas '

ProspectO& EOG -13.>-_ ,s 13.05'RLHLwn

CUt _ _DOMI2NICA0N tal Llon0_ __/

JAMAICA co l a A ,A h IIUA0 2 r

VrOMI~IcA 0 2 6 KILOMETERS

b S.~ ie LUCI A ST. VlNC IRTR % BASBAr,OS Thi mophas been p,epored by TheWorld B0nkP slafexdsluelw fo, *GReNbn's a StpnA cas nlne ,,f, od and b for ID lnbenaluse of Th World ____ _ J_ ,,vX--X_VE_N_E__ZUEL_A _,,23,-~~"TEI'ADAD __Rich BOpankGrasmp.530 Ie eaolnlintused an,dlA. bak dorie scha annIhi; 9*25

APRIL1992