Land Acquisition & Resettlement Plan (LARP) ______

Project Number: 47024-004 Loan Number: 3470-PAK

Document Type: Final May 2019

PAK: Pehur High Level Canal Extension Project

Land Acquisition and Resettlement Plan for Lot-2

Prepared by:

Khyber Pakhtunkhwa Irrigation Department for the Asian Development Bank (ADB).

NOTES

(i) The fiscal year (FY) of the Government of the Islamic Republic of and its agencies ends on 30 June. (ii) In this report “$” refer to US dollars.

The Land Acquisition and Resettlement Plan is the document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff. These documents are made publicly available in accordance with ADB’s Access to Information Policy and as agreed between ADB and the Irrigation Department. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. PROJECT MANAGEMENT OFFICE (PMO) KHYBER PAKHTUNKHWA IRRIGATION DEPARTMENT GOVERNMENT OF KHYBER PAKHTUNKHWA

PEHUR HIGH LEVEL CANAL EXTENSION PROJECT

ADB LOAN NO. 3470 PAK

LAND ACQUISITION & RESETTELMENT PLAN

LOT-II: INDUS AMBAR PRESSURE PIPELINE

APRIL, 2019

PROJECT IMPLEMENTATION CONSULTANTS:

Engineering Consultants (Pvt.) Ltd, Sri Lanka (Lead Firm) Techno Legal Consultants (Pvt.) Ltd, Pakistan (JV Firm) AGES Consultants, Pakistan (JV Firm) Geotechnical Consultancy Services, Pakistan (JV Firm) ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

ADB Loan 3470-PAK: Detail Design of PHLCE Project Lot-II: Indus Ambar Pressure Pipeline Land Acquisition & Resettlement Plan

TABLE OF CONTENTS

TABLE OF CONTENTS ...... i LIST OF TABLES ...... iv LIST OF FIGURES ...... vi LIST OF ANNEXURES ...... vii

PEHUR HIGH LEVEL CANAL EXTENSION PROJECT ...... 1 EXECUTIVE SUMMARY ...... 1 1 INTRODUCTION ...... 1-1 1.1 Background ...... 1-1 1.2 Project Objectives ...... 1-1 1.3 Project Description ...... 1-1 1.4 Design Detail of Lot-II: ...... 1-5 1.5 Objectives of the LARP ...... 1-6 1.6 Alternative Options for Minimizing the Resettlement Impacts ...... 1-6 1.7 Width of Lot-II, Indus Ambar Pressure Pipe ...... 1-7 2 Scope OF LAND ACQUISITION AND RESETTLEMENT ...... 2-1 2.1 General ...... 2-1 2.2 Scope of Land Acquisition...... 2-1 2.3 Methodology and Proceedings: ...... 2-1 2.4 Collection and Review of Secondary Data/Information ...... 2-3 2.5 Pre-Test of Questionnaire ...... 2-3 2.6 Collection of Primary Data ...... 2-3 2.7 Project Impact Assessment ...... 2-4 2.7.1 Impact on Land ...... 2-4 2.7.2 Impact on Private Structures ...... 2-7 2.7.3 Impact on Crops ...... 2-8 2.7.4 Impacts on Trees ...... 2-8 2.7.5 Summary of Affected Assets and DPs ...... 2-9 2.7.6 Asset Valuation ...... 2-14 2.7.7 Valuation of Land ...... 2-15 2.7.8 Valuation of Structures ...... 2-17 2.7.9 Valuation of Crops ...... 2-18

i

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

2.7.10 Valuation of Trees ...... 2-18 2.7.11 Physical Displacement of DPs ...... 2-19

3 SOCIO- ¡¢£¢¤ ¥¡ ¡¦§¨§¡© ¨¥ © ¥¡ ¢ ©¦  ¦¢ ¦¢  ...... 3-1

3.1       ! ...... 3-1 3.2 Education and Literacy Levels of Members of DPs Households...... 3-1 3.3 Income and Expenditure of the Sample Respondents ...... 3-1 3.3.1 Land Holding Status of DPs ...... 3-3 3.3.2 Vulnerable Households ...... 3-4 3.3.3 Ethnicity ...... 3-4 3.3.4 Available Social Amenities in the Project Area ...... 3-5 3.3.5 Housing Conditions ...... 3-5

3.4 Gender Survey ...... 3-6

" #   3.4.1 !  n Socio-economic Activities ...... 3-7 3.5 Conflict Resolution Mechanism in the Project Area ...... 3-7 3.6 Indigenous Peoples (IP) ...... 3-8 3.7 Impact on Historical, Cultural and Religious Structures ...... 3-8 4 LEGAL FRAMEWORK, POLICY SND ENTITLEMENT ...... 4-1

4.1 General ...... 4-1

# #

( $ ! ! & $! )* +    ! $ !    ! 4.2 $%  $!  & $' $ ! ...... 4-1 4.2.1 Constitution of the Islamic Republic of Pakistan (1973) ...... 4-1

4.2.2 Land Acquisition Act (1894) ...... 4-1

#     !  *0 ), 1 $2 ($/  *0 1 $ 4.3 ),  - !. ! $/0 tement 2009 4-3 4.4 Comparison of Key LAA and ADB SPS-2009 and Measures to Address the Gap4-4 4.5 Eligibility and Entitlements ...... 4-6 4.6 Entitlements ...... 4-7 4.7 Compensation for DPs with Legal and Administrative Impediments ...... 4-10 5 COMPENSATION, RELOCATION AND INCOME RESTORATION ...... 5-1 5.1 General ...... 5-1 5.1.1 Additional Assistance for Vulnerable Households ...... 5-1 5.2 Livelihood Support Intervention Measures ...... 5-1 6 INFORMATION DISCLOSURE, CONSULTATION AND PARTICIPATION ...... 6-1 6.1 Project Stakeholders ...... 6-1 6.2 Public Consultations along the Project Alignment ...... 6-1 6.3 Concerns Regarding the Project ...... 6-1 6.4 Consultative Discussions with Women ...... 6-2 6.5 Consultations with DPs ...... 6-2 6.6 Information Disclosure ...... 6-3 7 INSTITUTIONAL ARRANGEMENTS ...... 7-1

ii

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

7.1 Project Steering Committee ...... 7-1 7.2 Khyber Pakhtunkhwa Irrigation Department (KPID) ...... 7-1 7.3 Project Implementation Consultants ...... 7-1 7.4 LAR Coordination Committee ...... 7-2 7.5 External Resettlement Monitor ...... 7-2 8 Grievance Redress Mechanism ...... 8-1 8.1 TOR of Grievances Redressal Committee at Project Level ...... 8-1 8.2 TOR Grievances Redressal Committee at Field Level ...... 8-2 8.3 Organogram ...... 8-4 9 IMPLEMENTATION SCHEDULE OF LARP-II ...... 9-1 10 RESETTLEMENT BUDGET ...... 10-1 11 MONITORING AND EVALUATION ...... 11-1 11.1 Internal Monitoring ...... 11-1 11.2 External Monitoring ...... 11-2 11.3 Purpose and objective ...... 11-2 11.4 Major Tasks of ERM ...... 11-3 11.5 Monitoring Indicators ...... 11-4 11.6 Methodology of External Monitoring ...... 11-4 11.7 Reporting Requirements ...... 11-6

iii

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

LIST OF TABLES

Summary of Affected Assets and DPs ...... 3 Detail of Affected Structures and HH ...... 3 Table 1. 1: Lot-wise Component of PHLCE Project ...... 1-2 Table 1. 2: Salient Features of PHLCEP LOT-II Irrigation Component ...... 1-5 Table 1. 3: Structures on PHLCEP LOT-II Irrigation Component ...... 1-5 Table 2. 1: Land Required for Lot-II by Type and Mouza-Wise ...... 2-2 Table 2.2: Lot-II - Category of Impacted/ Acquired Private Land Mouza-wise ...... 2-5 Table 2.3: Degree of Impact on Agricultural Land in Lot-II ...... 2-7 Table 2.4: Private Structures in ROW of Lot-II...... 2-7 Table 2.5: Area of Cropped Land and Crop Yield in Lot-II ...... 2-8 Table 2.6: Non-Fruit and Fruit Trees under impact in Lot-II ...... 2-9 Table 2.7: Summary of Affected Assets and DPs ...... 2-9 Table 2.7.1: Detail of Affected Structures and HH ...... 2-10 Table 2.8: Summary of Affected Assets ...... 2-10 Table 2.8.1: Detail of Affected Structures and HH ...... 2-11 Table 2.9: Number of HH with Production land affected ...... 2-12 Table 2.10: Summary of Impacts ...... 2-13 Table 2.10.1: Detail of Affected Structures and HH ...... 2-13 Table 2.11: Valuation of Land (Mouza and Category-wise) by District Collector, ..... 2-16 Table 2.12: Valuation of Structures ...... 2-17 Table 2.13: Valuation of Crop Land Mouza-Wise ...... 2-18 Table 2.14: Affected Non-Fruit Trees in Lot-II ...... 2-19 Table 2.15: Affected Fruit Trees in Lot-II ...... 2-19

Table 3.1: Literacy Rate and Education Level of Members of DP ¡ Households ...... 3-1

Table 3. 2: Occupation of DPs and Average Monthly Household Income ...... 3-2

¢£ ¤¥¦ § ¨ §© ¦  ¦     ¦ ¥

¡

...... 3-3

¢£ ¤¥¦ § ¨ © £  ¥    £      ¦¦  ¡ ...... 3-4 Table 3. 5: Categories of Vulnerable Households among the Surveyed DPs ...... 3-4

Table 3. 6: Access to Social Amenities in Lot-II Project Area ...... 3-5

¢£ ¤¥¦ § ¨ ©          ¦¦  ¡

...... 3-5

Table 3. 8: Locations and Number of Participants of Consultations with Women ...... 3-6

¢£ ¤¥¦ § ¨ ©  ¦  ¥¦   

" # ¡ $ %

! -economic Activities ...... 3-7

  && ' (! Table 4.1: Salient Features of Pakista ¡ ...... 4-2

iv

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

¡ ¢£¤ ¥ ¦ §¨ © ¤ ¤ ¤ ¢¤¤¤ ¡  ¡  ¡  © £   ¡  ¤¡  ¤      ¤   ¤ Differences or Gaps ...... 4-5 Table 4. 3: Entitlement Matrix for Compensation ...... 4-9 Table 8. 1: Grievances Redressal Committee at Project Level ...... 8-1 Table 8. 2: Grievances Redressal Committee at Field Level ...... 8-2 Table 8. 3: Community Complaints/Grievance Redress Process/mechanism...... 8-3 Table 9. 1: Implementation Schedule of LARP for Lot-II ...... 9-1 Table 10. 1: Detail Budget of Land Mouza and Category wise for Lot-II ...... 10-2 Table 10. 2: Detailed Budget for LARP of LOT-II, PHLCE Project ...... 10-3

v

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

LIST OF FIGURES

Figure 1.1: Location Map PHLCE Project ...... 1-3 Figure 1. 2: Location Map for Indus Ambar Pressure Pipeline (Lot-II) ...... 1-4 Figure 8. 1: Institutional set-up for the Implementation of LARP ...... 8-5

vi

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

LIST OF ANNEXURES

Annexure-1: Draft Notification of under Section-4 for Lot-II Annexure-2: Questionnaire for Data Collection Annexure-3: Brochure Annexure-4: Demand Bills of the Deputy Commissioner, Swabi Annexure-5: Census of Affected Persons/ DPs Annexure-6: List of Consultation Meetings with Community/ Stakeholders Annexure-7: Summary Sheet of Structures of C&W Department Annexure-8: Notification of District Price Assessment Committee Annexure-9: Notification of Project Steering Committee Annexure-10: LAR Notification

vii

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

ABBREVIATIONS

ADB Asian Development Bank C&W Communication and Works CAP corrective action plan CCA culturable command area CCR community complaints register DFO district forest officer DGSD Director General Small Dams DH displaced household DMS detailed measurement survey DPAC district price assessment committee DPC displaced persons committee DP displaced person EA executing agency ERM external resettlement monitor GPS global positioning system GRC grievance redress committee HPK Halcrow Pakistan (Pvt) Limited IA implementing agency ICS Integrated Consulting Services (Pvt) Limited IDC International Development Consultants IMR internal monitoring report IP indigenous people KP Khyber Pakhtunkhwa KPID Khyber Pakhtunkhwa Irrigation Department KPWRSP Khyber Pakhtunkhwa Water Resources Sector Project LAA Land Acquisition Act 1894 LAC land acquisition collector LAR land acquisition and resettlement LARP land acquisition and resettlement plan MIS management information system NTP notice to proceed OFWM on-farm water management OPL official poverty line PC-1 Planning Commission- 1 PHED Public Health Engineering Department PHLCE Pehur High Level Canal Extension PIU project implementation unit PMO project management office

i

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

POL petroleum, oils, & lubricants PPTA project preparatory technical assistance PRA participatory rapid appraisal PSC project steering committee RoW right of way SIA social impact assessment SPS Safeguard Policy Statement 2009

ii

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

DEFINITION OF TERMS

The following terms and definitions have been used in this land acquisition and resettlement plan (LARP).

Affected Household: All members of a household residing under one roof and operating as a single economic unit and are adversely affected by the Project, or any of its components. It may consist of a single nuclear family or an extended family group.

CoI (Corridor of Impact): CoI is working area falling within RoW or outside the ROW. It is generally used to restrict to carry out any civil/ development activity.

Compensation: Payment in cash or in kind of the replacement cost of the acquired assets.

Cut-off-date: The date that establishes DPs eligibility to receive compensation for affected assets and to receive rehabilitation assistance. Any person who enters in the area after the announced cut of date or any assets established in corridor of impact after cut-off date will not be eligible for compensation

Displaced Person (DP): Displaced persons are those who are physically displaced (relocation, loss of residential land, or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of involuntary acquisition of land for the Project.

Entitlement: Range of measures comprising compensation, income restoration, transfer assistance, income substitution, and relocation, which are due to DPs, depending on the nature of their losses, to restore their economic and social base.

Income Restoration: Includes re-establishing income sources and livelihood of the DPs according to their status.

Involuntary Resettlement: Any physical or economic displacement where the DPs have no right to refuse the land acquisition by the state that result in their displacement. This occurs when land is acquired through (i) expropriation by invoking the eminent domain power of the state, or (ii) land is acquired through negotiated settlement when the pricing is negotiated in a process where expropriation will be the consequence of a failure in the negotiation.

¢ ¡ ¢ ¡ ¢ £ ¤

Indigenous People: Refers to ¡ ethnic minorities , cultural minorities , tribes , natives ,

¢ ¡ ¢ ¡indigenous cultural minorities and aboriginals whose social or cultural beliefs and practices are distinct from the mainstream society and are, therefore, at greater risk of being disadvantaged in the development process.

Land Acquisition: The process whereby a person is compelled by a government agency to acquire all or part of the land a person owns or possesses to the ownership and possession of the government agency for public purpose in return for compensation.

Market Value: The value of an asset determined by market transaction of similar assets and finally arrived at after negotiations with the owners. It includes transaction costs and without the depreciation and deductions for salvaged building material.

Marginally Affected: Land or structure is affected less than 10 percent and the remaining portion is still viable for use.

Participation: A process that allows other stakeholders to influence and share control over

iii

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

development initiatives, decisions and the use of resources that affect them.

Relocation: The physical relocation of a DP from her/his pre-Project place of residence or business.

Replacement Cost: The value determined to be fair compensation for land based on its productive potential, the replacement cost of houses and structures (current fair market price of building materials and labor without depreciation or deductions for salvaged building material), and the market value of residential land, crops, trees, and other commodities.

Resettlement Effect: Loss of physical and non-physical assets; including homes, communities, productive land, income-earning assets & sources, users of resources, cultural sites, social structures, networks/ties, cultural identity and mutual help mechanisms.

Severely Affected: DPs who will experience major impacts, which are defined as (i) being physically displaced from housing, or (ii) losing 10% or more of their productive assets (income generating).

Squatters/ Informal Settlers: People who occupy and use land without having any legal title, or right to use/possess the land/asset.

Stakeholders: Include the DPs and communities, proponents, private and public businesses, the host communities and other concerned departments/agencies that may be affected, benefit, have a role in the implementation or may influence the Project.

Vulnerable Groups: The marginalized or those distinct households or people who might face the risk of marginalization and suffer disproportionately from resettlement affects. These may include households with income below the poverty line, the landless, households headed by an elderly, female headed households, women and children, indigenous peoples, and those without legal title to land.

Barani Land: It is an agricultural and cultivable land, the crops of which have no source of irrigation other than rainfall. This type of land is usually sown with single crop in a year, mostly in Rabi season when temperature decreases. The major crop of Rabi is Wheat.

Local Terms

Jirga: An assembly of local elders convened to resolve community concerns. Kharif: Summer cropping season of the year (15th April - 15th September). Rabi: Winter cropping season of the year (15 September - 15th April). Mouza (Village): A demarcated territory for which separate revenue record (Cadastral map) is maintained by the Revenue Department. Pacca: House or building with concrete construction with burnt bricks. Semi-Pacca: House or building constructed with burnt bricks and mud Kacha: House constructed with un-burnt bricks and mud, or temporary wooden poles. Patwari: Revenue record keeper at the village/ Mouza level. Qanoongo: Officer-in-charge of the patwari. Shamlat: Communal Land Tehsil: A sub-district 1 Marla: 272.25 sq foot 1 Kanal: 20 marlas 1 Acre: 08 kanals

iv

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

PEHUR HIGH LEVEL CANAL EXTENSION PROJECT

EXECUTIVE SUMMARY

1. The Government of Pakistan has received a loan from the Asian Development Bank (ADB) for financing the cost of preparation of detail Engineering Design and Construction of PHLCE Project in District Swabi of Khyber Pakhtunkhwa Province. 2. The Project envisages extension of the PHLC through two main pressure pipes off taking from the Tunnel of and with downstream canal system to irrigate a gross command area (GCA) of about 14,000 hectare (ha) and cultivable command area (CCA) of 12,354 hectare (ha), out of which an area of 7,930 (ha) is to be commanded under this project while an area of 4,424 hectare (ha) will brought under command in future. 3. Prior to induction of Project Implementation Consultant, a draft LARP for the entire project was prepared by PPTA consultant and was approved by ADB. Now after approval of the final design report the project is divided in to three lots for construction purpose each with independent land acquisition and compensation component. Hence three LARPs (one for each lot) is being prepared. LARP-II has been prepared and submitted to ADB. This LARP is for Lot-II. Detailed design and bidding process has been completed for all the three lots. 4. The Khyber Pakhtunkhwa Irrigation Department (KPID) is the executing agency (EA) and implementing agency (IA) for the construction of canal infrastructure. The other IA is the Provincial Agriculture Department (KPAD)/Director General On-Farm Water Management (OFWM) for their respective component of the project. Project management office (PMO) has been established in June 2017 at Irrigation House Gohati Swabi to manage all the preparatory

activities associated with LARP. The PMO is headed by a Project Director responsible for

¡ ¢£¤ ¥¦§ ¨§© ¥ §¤¨ ¤ ¥¦§ ¦  ¨ §© ¨ ¦ ¤ ¦ § £ ¤ ¨ ¨ ¥ ¨ ¥ ¥¤ ¦ £§© ¦  implementation. The Director PMO, with the assistance of social safeguard staff is responsible for the timely updating, implementation and monitoring of LAR activities. 5. Notification under Section-4 (Annexure-1) of Land Acquisition Act for Lot-II was issued by the District Collector (DC) Swabi on 10 April 2018. Katha-wise list of registered names (2900) on the land which is being acquired for Lot-II was provided by the DC Swabi based on the partially updated land records on 20 February 2019. Based on this list, a survey of all the actual and present owners/claimants and other DPs like leaseholders, renters and workers) was conducted and completed on 5th March, 2019 to obtain socio-economic data. Three hundred and Four (312) DPs were identified. Out of which, 301 responded to the questionnaire, while 11 DPs (8 DPs of 8 No. structures and 3 No. of DPs having agriculture land) refused to give any data. Socio-economic information on the 11 DPs were obtained from neighbors and adjacent land owners. 6. This land acquisition and resettlement plan (LARP) has been prepared based on the approved design and alignment of the pressure pipeline and allied structures. The major objective of this LARP is to assess the type and magnitude of land acquisition and resettlement (LAR) impacts, eligibility and entitlement of compensation; institutional arrangements for the implementation of LAR activities as well as redressal of community complaints, implementation schedule and conducting internal and external monitoring.

1

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

7. Lot-II of the Project requires a total of 917.66 kanal (114.71 acre) of land in the 9 mouzas of Topi and Swabil Tehsils of District Swabi that is owned/ claimed by 129 DPs and 16 DPs owned built-up area. Of which, kanal 293.13 (36.64 acre) is rain-fed land that is owned/ claimed by 40 DPs, 494.93 kanal (61.87 acre) is irrigated land that is owned/ claimed by 70 DPs and 129.6 kanal (16.20 acre) is uncultivable/ baran land that is owned/ claimed by 19 DPs. Around 11 kanal (1.38 acre) is government owned land for which a no-objection certificate (NOC) from the respective department will be issued. 8. According to the census of Lot-II, has identified 312 DPs, out of which 129 are the land owners, 16 owned built-up area, 64 are share cropper, and 98 are lease holders while the remaining 5 are the tenants. 49 DPs have been identified as vulnerable DPs, out of which 45 DPs were living below poverty line, 3 DPs were disabled headed household and one female (widow) headed household which are eligible for vulnerable allowance. 9. 16 No of DPs will lose 11 number of structures having a financial layout of PKR 6.237 million. Similarly, 129 DPs will also lose 2323 non-fruit trees and 12 DPs will lose 47 fruit trees. No DPs has been identified to lose hundred percent of land or lift with the quantum of land unviable economically. 10. To determine the cost of land being acquired, a district price assessment committee (DPAC) has been notified by DC Swabi. Mouza-wise price for each type of land were fixed by the above committee on 22 January 2019 and communicated to the PMO on 09 March 2019. To work out its distribution amongst the DPs, the census of DPs have been considered. The DC Swabi office while distributing this amount will prepare its own acquaintance roll based on land record and supporting documents provided by the current/ actual land owners. The validated/ verified acquaintance roll will serve as the final list of DPs and their respective share in the compensation for the affected land and non-land assets. Total budget for Lot-II is Rs. 794.59 million. 11. Grievances redressal committee, one at the project level and two at the field (tehsil) level for Lot-II have been notified with their respective TORs. Each committee has female representation as well. For the information of general public, a brochure in Urdu language describing the salient feature of project and its benefits to the area inhabitant have been displayed at the union council office and DC office. A total of 34 consultation meetings were conducted in the project area during the design period, out of which 14 including four female meetings were conducted in Lot-II area. 12. The LAR activities will be monitored both internally and externally. Internal monitoring will be conducted by the PMO (social safeguard staff), while external monitoring will be carried out by a qualified external resettlement monitor (ERM) who has been hired through Project Implementation Consultants (PIC) PHLCE.

2

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Summary of Affected Assets and DPs

S. No. Affected Asset Unit Quantity No. of DPs 1 Land a. rain-fed (barani) agricultural land Acre 36.64 40 landowners b. irrigated (chahi) agricultural land Acre 61.87 70 landowners c. uncultivatable (ghair mumkin) land Acre 16.20 19 landowners d. government-land Acre 1.375 Irrigation Department e. severely-affected (10% or more of 259 landowners, leaseholders, Acre 98.51 productive land) sharecroppers and tenants 2 Crops a. irrigated land planted with wheat Acre 61.87 70 DPs b. rain-fed land planted with wheat Acre 36.64 207 DPs 3 Trees a. Non-fruit trees No. 2323 129 DPs b. Fruit trees No. 47 12 DPs Structures (Solid block masonry PCC 4 M3 477.33 and RCC) 16 DPs Structures (PCC, Shops, building M2 591.64 room and Hotel room) Detail of Affected Structures and HH

Size of Type of Structure Use of No. of Location/ Ownership S. No. Structure/ Affected Land HH Mouzas Status Unit

Solid Block Masonry wall 20.39 (M3) 1 Residential 1 Bamkhel Private PCC 1:2:4 0.64 (M3) Random rubble masonry 32.49 (M3) 2 Agriculture 1 Bamkhel Private PCC 1:2:4 271 (M3) Random rubble masonry 19.75 (M3) Bamkhel Private 3 Agriculture 1 PCC 1:2:4 1.65 (M2) Bamkhel Private 1 Hotel Room 26.02 (M2) Bamkhel Private Random rubble masonry 4 5.10 (M3) Commercial 1 Bamkhel Private Boundary wall Block Masonry 6.80 (M3) Bamkhel Private Random rubble masonry 14.16 (M3) Bamkhel Private Boundary wall 5 1 MS Sheet door with angle 3.25 (M2) Residential Bamkhel Private iron frame 6 5-Shops 76.67 (M2) Commercial 3 Swabi Private Building Basement 73.93 (M2) Swabi Private (Covered Area) 7 Commercial 2 Building Ground Floor 73.93 (M3) Swabi Private (Covered Area) Building Basement 120.28 (M2) Swabi Private (Covered Area) 8 Commercial 3 Building Ground Floor 120.28 (M2) Swabi Private (Covered Area) Building room (Covered 9 Area) 60.32 (M2) Residential 1 Swabi Private

3

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Size of Type of Structure Use of No. of Location/ Ownership S. No. Structure/ Affected Land HH Mouzas Status Unit Building room (covered 68.77 (M2) 1 Kala Private area) Part-I 10 Building room (covered Residential 40.47 (M2) Kala Private area) Part-II Random Rubble Masonry 28.94 (M3) 1 Kala Private (Retaining Wall)

11 RCC Slab (1:2:4) 4.13 (M3) Swabi Private Agriculture MS reinforcement steel 0.06 (Ton) Swabi Private (Grade 40)

4

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

1 INTRODUCTION

1.1 Background

1. In March 2015, the ADB and Government of KP agreed to proceed with a stand-alone loan for Pehur High Level Canal Extension Project. The investment project is being implementing on the basis of updated feasibility studies; detail engineering design, cost estimates, and Planning Commission Proforma No.1 (PC-1) of the project is being reviewed and updated where necessary. The project will create new irrigation system to enhance agricultural production in 7,930 ha in of Khyber Pakhtunkhwa Province. The project will increase crop intensity by 166%, improve crop yield and increase farm-related income. It will directly benefit over 15,000 rural people, mostly poor. The project will (i) construct about 94 km new irrigation canals, and (ii) build farmers capacity. The project has involuntary resettlement impacts. As per ADB policy, projects involving land acquisition and resettlement impacts are required to prepare and disclose a land acquisition and resettlement plan (LARP).

2. A draft LARP based on the feasibility study was prepared and approved by ADB and disclosed during the processing of the Project. This updated LARP is prepared based on the detail measurement survey and socio-economic baseline survey conducted by the project implementation consultant (PIC) for Lot-II: Indus Ambar Pressure Pipe following the approved detailed design and final alignment and data provided by District Collector (DC) office, Swabi. A final/ implementation-ready LARP approved by ADB reflecting final impacts, DP list and official compensation rates and mobilization of the external resettlement monitor (ERM) are conditions for the award of civil works contract, while full implementation of the compensation program described in the updated/ final LARP including the full delivery of compensation to the DPs and submission of a compliance report by the ERM is a condition for issuing the notice-to-proceed with the civil works.

3. The Khyber Pakhtunkhwa Irrigation Department (KPID) is the executing agency (EA) for the project and IA for Output 1, while Khyber Pakhtunkhwa Agriculture Department is the IA for Output 2.

1.2 Project Objectives

4. The investment project aims to increase farm and non-farm incomes of households engaged in agriculture mainly in Swabi District of Khyber Pakhtunkhwa Province. The indicative outcome of the investment project is increased agriculture productivity and increased farm incomes. Pehur High Level Canal Extension (PHLCE) Project has two major objectives.

Bring rain-fed areas of Janda Boka and Indus Ambar under sustainable regular canal irrigation system; and,

Improve the capacity of beneficiaries to efficiently use water and agriculture

1.3 Project Description

5. The PHLCE Project is an extension to the command area of the Gandaf Tunnel which conveys irrigation water from Tarbela Reservoir. Initially the provision/ water allocation for the areas of Janda Boka, Indus Lift Irrigation Scheme and Ambar Lift Scheme had already been

1-1

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

made in the design of PHLC. The project has been divided into three lots for construction purpose, therefore three (3) separate Lot-specific LARPs for the purpose are being prepared. The LARP for Lot-II has been finalized while the remaining Lot-III LARP are being prepared. The scope of the three lots is shown in Table 1.1. This LARP is for Lot-II.

Table 1. 1: Lot-wise Component of PHLCE Project

S. No. Lot wise Components of PHLCE Project

Lot-I Janda Boka Pressure Pipe and Irrigation System

Lot-II Indus Ambar Pressure Pipe (IA PP)

Lot-III Indus and Ambar Irrigation System

6. The areas originally envisaged to be brought under command through lift irrigation schemes are now possible to be commanded under gravity as the minimum operating level of Tarbela Reservoir source has increased. Water is proposed to be conveyed through two separate pressure pipes to higher elevation of each area from where gravity canal system will bring these areas under irrigation.

7. Pressure Pipe for Indus Ambar area is the largest component of the PHLCE Project. Indus Ambar Pressure Pipe will emanate from Gundaf tunnel with a diameter of 2.37 m up to Mian Dheri and 2.33 m further downstream up to Indus Ambar outlet. The pressure pipe is designed to carry 5.56 m3/Sec (196.5 cusec) of water. The pipe will be buried at a minimum depth of 1.5 m to absorb the ground loading and coated with protective material to safeguard against corrosion. The entire pipe is enclave in RCC cover. The crosses some of main roads like Swabi road and Topi Swabi road beside a number of local roads. The depth of pipe and thickness of concrete covers is increased at the road crossing locations. The pressure pipe also crosses a number of nullah and canals including Kundal and Badrai khwars beside many water course crossings. The depth of pressure pipe at these crossing is increased and surface is protected by rip-rap stone pitching to safeguard against scour potential at RD 1505 km of the pressure pipe an outlet is provided to irrigate 265 ha of rain-fed lands of Mian Dheri. The Indus Ambar pressure pipe will have a service road all along its length from RD 0+000 at Gundaf Tunnel to RD 24+800 km at its outlet near Gaju Khan Shrine.

1-2

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Figure 1.1: Location Map PHLCE Project

1-3

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Figure 1. 2: Location Map for Indus Ambar Pressure Pipeline (Lot-II)

1-4

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

8. Access to the project area is possible by public transport throughout the year. Motorway M-1 passes through the center of Ambar-Indus area at Jahangira from the main GT Road connecting Swabi to the other parts of the country. Another road from Mardan is connecting Swabi on the other side with Mardan, Peshawar, Swat and Buner.

9. Main components of Indus Ambar Pressure Pipe and Irrigation System of PHLCE project include:

Connection with Gandaf tunnel

Pressure pipe and outlet works

An outlet for the rain fed lands of Mian Dheri at RD 1505 km.

1.4 Design Detail of Lot-II:

10. Major salient features of Lot-II: Indus Ambar Pressure Pipe are presented in Table 1.2 and 1.3 as derived from the detailed design report.

Table 1. 2: Salient Features of PHLCEP LOT-II Irrigation Component

Lot-II S. No. Description Unit Indus Ambar Pressure Pipe 1 Lengths of Pressure Pipes m 24,800 Indus Ambar Reach-1 m 15,550 Indus Ambar Reach-2 m 9,250 Mian Dheri Reach-1 m 800 2 Diameters of Pressure Pipes Indus Ambar Reach-1 m 2.37 Indus Ambar Reach-2 m 2.33 Mian Dhreri Reach m 0.35

Table 1. 3: Structures on PHLCEP LOT-II Irrigation Component

Lot-II: Indus Ambar S. No Structure's Type Pressure Pipe System Canal Structures 1 Bifurcations and Pressure pipe outlets 2 2 Drainage Manholes/valve 21 3 Air / Vacuum valves 20 4 Pressure Relief valves 3 5 Butterfly Valves 4 6 Globe Valve 3 7 Sleeve Valve 3 8 Flow meter 1 Total 57

1-5

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

1.5 Objectives of the LARP

11. This LARP covers the land acquisition and resettlement impacts of the Indus Ambar pressure pipe in Lot-II of the PHLCE Project. The main objective of the LARP is to identify overall project impacts in the form of quantity and valuation. The LARP provides a clear picture of the project impacts, consultation with DPs, measurement of impacted structures, and fair valuation for the compensation, procedure of the payment to the DPs and implementation of the LARP. It aims to enhance, or at least restore, the livelihoods of all DPs in real terms relative to pre-project levels; and improve the standards of living of the displaced poor (if any) and other vulnerable groups in accordance with existing laws of Pakistan and ADB SPS-2009.

12. The following aspects are covered in this LARP:

Number and types of affected structures of DPs;

Assessment of the loss of crops and trees (fruits, wood and timber);

Assessment of the number of vulnerable households;

Data on unit prices for land and other affected assets;

Socio-economic information and profile;

Information disclosure, consultation, and participation;

Policy and legal framework;

Consultative meetings with local persons/ general public along the subproject route alignment;

Entitlement for compensation and assistance;

Institutional arrangements and grievance redress mechanisms;

Implementation schedule;

Resettlement budget; and

Monitoring & evaluation.

1.6 Alternative Options for Minimizing the Resettlement Impacts

13. Appropriate efforts and all possible engineering design options have been considered while finalizing the present alignment, the previous alignment proposed by PPTA was detour/ shifted RD wise to avoid its passing through the following settlement.

i. RD 0+300 compound of Grade Station of Pehur Hydro Power Complex. ii. RD 0+700 to 1+400 through the settlement along the Wuch Khwar near Irrigation Colony. iii. RD 1+400 to 3+500 the isolated hoses of Haji Abad. iv. RD 3+500 to 7+200 lots of settlements and infrastructure of congested / populated Sogandi Village. v. RD 7+200 to 8+600 small settlements Hamza Maira, Baja.

1-6

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

vi. RD 8+600 to 11+400 lots of settlement of Mian Banda College road Bamkhel. vii. RD 11+400 to 19+200 settlements of Golu Dheri Swabi. viii. RD 19+200 to 20+600 settlement of Gelawand, Mian Dheri, Kala. ix. RD 20+100 to 24+000 settlement of Dera Mata Wand Shagy Wand. To straighten the alignment and keeping it away from the settlement, identifying the preliminary alignment to avoid and minimize LAR impacts. This alignment has been done through review of satellite imagery and topographic surveys carried out during the project design preparation and thorough field surveys conducted. The implementation of this project can cause resettlement issues like clearance of ROW for execution of civil works, demolishing and setting back of permanent structures and cutting of trees within the ROW.

1.7 Width of Lot-II, Indus Ambar Pressure Pipe

14. A land width of 22m is being acquired for the entire length of Indus Ambar Pressure Pipe.

1-7

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

2 SCOPE OF LAND ACQUISITION AND RESETTLEMENT

2.1 General

15. The assessment of the project impacts based on detailed design has been carried out by adopting a well-defined approach and methodology and in close coordination with the Revenue Department and land acquisition collectors (LACs). According to the census survey conducted, there are 312 persons affected in Lot-II including 11 DPs who were not willing to respond to the interview. Notification of Section-4 of the Land Acquisition Act (LAA) was issued on 27 April 2018. Documentation and request for issuance of notification under Section-5 of the LAA has been prepared and submitted by PD-PMO to the District Collector Swabi. The demand bill at (Annexure-4) has been received by KPID on 09 March 2019. Funds for compensation and allowances that are not covered by the LAA but required as per ADB SPS 2009 are kept by PMO for disbursement to DPs once the LARP-II is approved.

16. Assessment of land, crops, trees and structures have been completed. The census of DPs assets summary at (Annexure-5). The actual claimants and land-users have been identified by the PMO/ PIC for onward assessment and recording of assets. The list of registered names in the land records and affected land provided by the DC will be updated and developed into an acquaintance roll that identifies the specific share and entitlement of each DPs after receipt of supporting documents from DPs and mutations in the land records prior to land award under Section-11 of the LAA.

17. Detailed measurement surveys (DMS) was jointly conducted by the staff of PIC, PMO and respective department i.e., Forest, Agriculture, C & W department in the month of February 2019 and was valuated by the District Price Assessment Committee in a meeting held on January 21, 2019. The census and socio-economic survey of DPs and consultations meetings at (Annexure-

6) has been done by the PIC. All the 312 DPs for the entire Lot-II LARP were contacted.

¡¢ £¤¥ ¦§ ¨£ ¡© £ ¡ § ¡¥ ¤ £¢   £ ¤ ¢  § £  ¨¡§ ¤ ¨    ¤  ¦§ ¤  § ¤ £ their neighbors and owners of adjacent land.

2.2 Scope of Land Acquisition

18. The survey was conducted along the alignment of the Indus Ambar pressure pipe. On the way side discussions with local community and the general public were also carried out while conducting the field survey.

19. The project has been divided into three lots for construction purpose, therefore three (3) separate LARPs for the purpose are being prepare. This LARP for LAot-II has been prepared and finalized while LARP for Lot-III is being prepared.

2.3 Methodology and Proceedings:

20. A team of ex-patwaris and zilladars under the supervision of a well conversant Land Acquisition and Resettlement (LAR) Specialist was constituted by the PIC for preparing the updated LARP. The team was provided with Google Imageries duly marked with alignment of the designed pressure pipes and canals.

2-1

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

21. The team collected khasra numbers of the land upon which the pressure pipes and canal alignments are proposed to pass with the help of shajrah kishtwar (land maps) and khasrah girdawri (periodical books) of the mauza (revenue state) concerned having the details of land number, area, etc. They furnished khasrah (field) numbers and area for acquisition tentatively and framed the draft notifications under Section-4 of the LAA and submitted to Project Management Office PMO for further process. The PMO submitted the same to DC Swabi District which were used for issuance of notifications of Section-4 of the LAA.

22. The notifications of Section-4 of the LAA in 27 April 2018 were published in government gazette for general information of all concerned. After publication of the notifications, the staff of the DC with coordination of PIC staff earmarked the alignments in the musavis (land maps) and prepared field books and as per survey/ level marks of the PIC. The Revenue Specialist of PIC framed notification under Section-5 of Land LAA which has been submitted to DC Swabi.

23. Request for acquisition of 917.66 Kanal (114.7 acres) of privately owned land has been made to the DC Swabi for Lot-II: Indus Ambar Pressure Pipe of the project. which is owned/ claimed by 129 DPs and 16 DPs owned built-up area. Of which, kanal 293.13 (36.64 acre) is rain- fed land that is owned/ claimed by 40 DPs, 494.93 kanal (61.87 acre) is irrigated land that is owned/ claimed by 70 DPs and 129.6 kanal (16.20 acre) is uncultivable/ baran land that is owned/ claimed by 19 DPs. Around 11 kanal (1.38 acre) is government owned land for which a no- objection certificate (NOC) from the respective department will be issued.

24. The area under acquisition also includes built up property at 11 points in the RoW of the designed Canal containing solid block masonry, plain cement concert, random rubber masonry foundation, a hotel room, boundary walls and five number of shops (Summary sheet given in (Annexure-7).

25. Out of the total 814.40 Kanal agriculture land affected 189.07 Kanal (23.21 %) is rain fed giving single crop in a year mostly in Rabi, 369.92 Kanal (45.43%) area is canal irrigated (with 2 cropping per year), 145.94 Kanal (17.92%)of the affected agricultural land is irrigated via tube wells giving 2 crops in year, 104.05 Kanal (12.78%) area is sandy land depends upon rains, giving single crop a year, 162.95 (20%) is uncultivable area while the remaining 5.45 Kanal (0.66%) land is barren for the time being, giving no crops.

Table 2. 1: Land Required for Lot-II by Type and Mouza-Wise

Types of Private Land in Kanal (Acre) Canal Mira Rain- Well Ghair S. Mouzas Irrigated (similar Banjar Uncultivable Total Fed Irrigated Mumkin No. of Lot-II (Shah as Rain- (Baran) Land Area (Barani) (Chahi) Abadi Nehri) Fed) 61.3 115.5 1 54.15(6.77) Sharqi (7.66) (14.44) Maini 14.55 44.85 76.15 2 16.75 (2.1) Gharbi (1.81) (5.60) (9.52) 10.65 28.35 21.12 1.50 65.12 3 Kota 3.50 (0.44) (1.33) (3.54) (2.64) (0.18) (8.14) 153.05 153.1 4 Baja (19.18) (19.14) Bam 38.25 55.31 3.1 102.4 5 5.7 (0.71) Khel (4.78) (6.91) (0.38) (12.80)

2-2

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Types of Private Land in Kanal (Acre) Canal Mira Rain- Well Ghair S. Mouzas Irrigated (similar Banjar Uncultivable Total Fed Irrigated Mumkin No. of Lot-II (Shah as Rain- (Baran) Land Area (Barani) (Chahi) Abadi Nehri) Fed) 15.87 102.72 11.61 2.35 132.6 6 Swabi (1.98) (12.84) (1.45) (0.29) (16.57) 23.35 33.9 126 7 Kala 8.05 (1) 49.6 (6.2) 11.15 (1.39) (2.92) (4.23) (15.75) 19 70.2 125.3 8 Dara 17.6 (2.2) 8.3 (1.03) 10.2 (1.27) (2.37) (8.77) (15.66) Shah 21.4 21.4 9 - Mansoor (2.67) (2.67) 189.07 369.92 145.94 104.05 1.50 5.45 101.45 917.66 Total Land (23.63) (46.24) (18.24) (13) (0.18) (0.68) (12.68) (114.70)

2.4 Collection and Review of Secondary Data/Information

26. All available data/information related to the Project area and Project components were collected by the PIC from KPID, concerned local government offices, Revenue Department and Agriculture Department of District Swabi. The district census report of district Swabi was also reviewed for comparison and updating based on Government of Pakistan (GOP) 6th Population & Housing Census 2017.

2.5 Pre-Test of Questionnaire

27. A detailed socio-economic questionnaire was developed and submitted to the ADB for review. Comments received were incorporated accordingly. Moreover, the teams went to the field area for pretesting of the survey tools and modified the questionnaire where needed. The revised questionnaire was also shared with ADB. The data were collected through the finalized approved questionnaire by ADB team. The sample format of the questionnaire is shown as Appendix-I.

2.6 Collection of Primary Data

28. Before collection of data, a one-day training of data collection was provided to the field teams comprising of enumerators, sociologists and gender specialist by the Social Safeguards Specialist of ADB and PIC team. Main points of the training were as follows:

How to introduce yourself

Project introduction and objectives of the project

Purpose of data collection

Questionnaire filling and responses recoded

29. The detailed survey of DPs was carried out from 06 to 25 February 2019 using a structured questionnaire. 100% of the actual/ present owners or land-users (tenants, renters, share cropper and workers) for the entire Lot-II was targeted but 11 DPs at Swabi mouza refused to provide information/ data. Information on these 11 DPs was gathered through their neighbors and owners of adjacent land. There are 312 DPs (including 11 DPs who refused during data

2-3

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

collection). Sixteen DPs are losing structures including shops. The DPs were identified and interviewed by 5-teams of enumerators comprising of ex-patwari (revenue record keeper) hired by PMO along with PIC team. They did a walk-through of the entire alignment with the help of design drawings and Google maps and attempted to identify the actual affected land owners/ land-users. In parallel, the team contacted local representatives to invite people at a common place to discuss and provide information on the land owners/ land users along the alignment.

2.7 Project Impact Assessment

30. Field survey for the assessment of value of various types of affected land and non-land assets has been finalized and valuation has been calculated and placed at the resettlement budget. Unit rate of compensation for different categories and types Mauza-wise land, structures, crops and trees etc. have been provided by the DC, Swabi, with the collaboration of the concerned line departments. A committee appointed by the Project Director was constituted to verify, assess and evaluate assets/ inventories attached or permanently attached to land, e.g., structure, orchards, trees, crops and type of lands affected by the project based on unit rates prevailing in the market. The committee has completed its tasks for Lot-II, through physical survey and consultation with the local people in the project area.

31. Detailed measurement survey for land acquisition has been conducted by joint teams of PMO, PIC and Revenue Department Swabi under the supervision of LAR/ Revenue Specialist of the Project. Notables in the community also accompanied the land acquisition party wherever available after issuance of notification under Section-4 of LAA. The same team has prepared the documents for Section-5 of the LAA and submitted to DC for further action. Another team comprising of PMO, PIC, District Revenue Department and other concerned line departments completed details of nature of lands, number of type of trees, crops, other structures, etc. for assessing its value by the DC.

2.7.1 Impact on Land

32. Lot-II of the Project requires a total of 917.66 kanal (114.71 acre) of land in the 9 mouzas of Topi and Swabil Tehsils of District Swabi that is owned/ claimed by 129 DPs. Of which, kanal 293.13 (36.64 acre) is rain-fed land that is owned/ claimed by 40 DPs, 494.93 kanal (61.87 acre) is irrigated land that is owned/ claimed by 70 DPs and 129.6 kanal (16.20 acre) is uncultivable/ baran land that is owned/ claimed by 19 DPs. The details on DPs and impacted land of different categories in each mouza of Lot-II are shown in Table 2.2.

2-4

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Table 2.2: Lot-II - Category of Impacted/ Acquired Private Land Mouza-wise

No. of DPs Total Land Total Land under Mouzas Category of Land (Owners) under S. No. Acquisition (in of Lot-II in Lot-II Acquisition (in Kanal) Acre) 1 Barani (Rain Fed) 3 10.65 1.33 Shah Nehri (Canal 2 6 28.35 3.54 Irrigated) Banjr Qadeem 3 3 21.2 2.65 Kotha (Baran) Ghair Mumkin 4 1 1.5 0.19 Abadi (Built-up) Ghair Mumkin 5 1 3.5 0.44 (Uncultivated) 6 Barani (Rain Fed) 2 15.88 1.99

7 Chahi (Irrigated) 2 11.61 1.45 Swabi Ghair Mumkin 8 1 2.35 0.29 (Uncultivated) Shah Nehri (Canal 9 15 102.91 12.86 Irrigated) 10 Barani (Rain Fed) 1 8.05 1.01

11 Chahi (Irrigated) 6 49.6 6.20 Ghair Mumkin 12 2 11.15 1.39 Kala (Uncultivated) Shah Nehri (Canal 13 7 23.35 2.92 Irrigated) Maira (Similar as 14 12 33.85 4.23 Rain Fed) Shah 15 Barani (Rain Fed) 2 21.4 2.68 Mansoor Shah Nehri (Canal 16 Baja 20 153.05 19.13 Irrigated) Nul Chahi (Tube 17 2 9.5 1.19 Well Irrigated) 18 Barani (Rain Fed) 5 38.25 4.78

19 Bamkhel Chahi (Irrigated) 5 45.81 5.73 Ghair Mumkin 20 1 5.7 0.71 (Uncultivated) Banjr Qadeem 21 1 3.1 0.39 (Baran) 22 Barani (Rain Fed) 2 19 2.38 Ghair Mumkin 23 1 10.2 1.28 (Uncultivated) Shah Nehri (Canal 24 2 17.6 2.20 Dara Irrigated) Maira (Same as 25 5 70.2 8.78 Rain Fed) Chahi (Well 26 1 8.3 1.04 Irrigated) 27 Barani (Rain Fed) 6 61.3 7.66

2-5

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

No. of DPs Total Land Total Land under Mouzas Category of Land (Owners) under S. No. Acquisition (in of Lot-II in Lot-II Acquisition (in Kanal) Acre) Maini Ghair Mumkin 28 6 54.15 6.77 Sharqi (Uncultivated) 29 Barani (Rain Fed) 2 14.55 1.82 Maini 30 Abi (Irrigated) 4 44.85 5.61 Gharbi Ghair Mumkin 31 2 16.75 2.09 (Uncultivated) Total 129.00 917.66 114.71 Source: Revenue Department, District Collector Swabi December 2018

33. An additional 11 kanal is required for Lot-II is government land owned by Irrigation Department and currently not in used by any third-party user. The government land will be transferred to KPID through issuance of NOC (no-objection certificate) from the respective departments.

34. The Project area is comprised of different categories of land. Most of the land is fertile and fit for agriculture although most affected agriculture land in Lot-II is irrigated area. Tube wells were also used to irrigate agricultural land during the summer year.

35. Based on the survey, 259 DPs (including 93 land owners, and 98 lease holders, 63 share croppers and 5 tenants) are losing 10% or more of agricultural land (productive) are considered significantly affected. The reason for the large number of significantly affected DPs is because of very small landholding. Many landowners own less than 2 acres of land. The remaining 13 DPs (only land owners) and 1 lease holder are losing less than 10% of agricultural land and are considered marginally affected. The remaining DPs (land owners) are losing their uncultivable (ghair mumkin) land which is non-productive. There is a general trend that by constructing an access road and/ Or by providing perennial irrigation water the land become more valuable. With the construction of Indus Ambar Pressure Pipe an earthen road will be provided for accessibility, connectivity of the small settlements and transportation of agriculture goods etc. Therefore, the land previously having no access path becomes more valuable by the construction of Indus Ambar pressure Pipe. The land owners left over with small chunk of land/ unviable land were offered to acquired their leftover land but they refuse as these leftover small chunk of land/ unviable land became more valuable for farm houses etc. not even a single case has come across expressing willingness to surrender their leftover land for acquisition. None of the DPs has been losing hundred percent of their agriculture land. No DP is left with unviable land parcel so that their entire land is to be acquired. The degree of impact on agricultural land has been calculated and the summary is given below in Table 2.3.

2-6

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Table 2.3: Degree of Impact on Agricultural Land in Lot-II

Number of DPs (Productive Agriculture Land) Percent of Agricultural Land to be Leaseholders, Total Acquired from Total Land Percent Landowners Share croppers, and Tenants 10% and above (significantly affected) a. 10 to 30 % 49 12 61 22 b. 31 to 70 % 33 135 168 62 c. more than 70% 11 19 30 11 Less than 10% of land (marginally 13 1 14 5 affected) Total 106 167 273 100 Source: Socio-economic survey of PIC, February 2019

2.7.2 Impact on Private Structures

36. Eleven (11) privately-owned structures constructed, 3 on agriculture land, 4 on residential land and 4 on commercial land in the mouzas Bamkhel, Swabi and Kala comprising of masonry walls, hotel rooms, boundary wall, shops with basement and retaining walls in Lot-II. Out of the 4 commercial structure there is running business on only one structure containing 5 number of shops at Swabi-Jehangira road crossing. The 1-hotel room mention above is actually a room used for the staff of hotel in Mouza Bamkhel and the hotel room is not used for hotel business. As such in the 4 number of structure constructed in the commercial area only 1 structure (5- shops) will lose their business permanently. Hence provision of compensation equal to 1-year income is made in the LARP budget. Though some of the structures are partially affected yet the prices assessed by the concerned department are for the entire structure. Their prices have been assessed by concerned department and incorporated in the LARP budget. The detail of the structures is given in Table 2.4. Their prices have been assessed by concerned department and incorporated in the LARP budget.

Table 2.4: Private Structures in ROW of Lot-II

Size of Use of No. of S. Type of Structure Location/ Ownership Structure/ Land HH No. Affected Mouzas Status Unit Solid Block Masonry 20.39 (M3) 1 wall Residential 1 Bamkhel private PCC 1:2:4 0.64 (M3) Random rubble 32.49 (M3) 2 masonry Agriculture 1 Bamkhel Private PCC 1:2:4 271 (M3) Random rubble Bamkhel Private 19.75 (M3) 3 masonry Agriculture 1 PCC 1:2:4 1.65 (M2) Bamkhel Private 1 Hotel Room 26.02 (M2) Bamkhel Private Random rubble Bamkhel Private 4 5.10 (M3) Commercial 1 masonry Boundary wall Block Masonry 6.80 (M3) Bamkhel Private

2-7

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Size of Use of No. of S. Type of Structure Location/ Ownership Structure/ Land HH No. Affected Mouzas Status Unit Random rubble Bamkhel Private 14.16 (M3) 1 masonry Boundary wall 5 Residential MS Sheet door with Bamkhel Private 3.25 (M2) angle iron frame 6 5-Shops 76.67 (M2) Commercial 3 Swabi Private Building Basement Swabi Private 73.93 (M2) 2 (Covered Area) 7 Commercial Building Ground Floor Swabi Private 73.93 (M3) (Covered Area) Building Basement Swabi Private 120.28 (M2) 3 (Covered Area) 8 Commercial Building Ground Floor Swabi Private 120.28 (M2) (Covered Area) Building room (Covered Swabi Private 9 Area) 60.32 (M2) Residential 1

Building room (covered Kala Private 68.77 (M2) 1 area) Part-I 10 Residential Building room (covered Kala Private 40.47 (M2) area) Part-II Random Rubble Kala Private Masonry (Retaining 28.94 (M3) 1 Wall) 11 Agriculture RCC Slab (1:2:4) 4.13 (M3) Swabi Private MS reinforcement steel Swabi Private 0.06 (Ton) (Grade 40)

2.7.3 Impact on Crops

37. Of the cultivated land, 293.13 kanals (36.64 acres) are rain fed and 494.93 kanals (61.87 acres) land are irrigated through tube wells. Wheat is the only crop planted on these land. Wheat crop yield is better in irrigated land as compared to rain-fed land. A total of 82 landowners, there are also 10 leaseholders, 40 share croppers and 16 tenants stand to lose income from crops. Keeping in view the impacts on the crops, the crop compensation will be provided according to the affected land of crop as assessed by DPAC/ DC (District Price Assessment Committee/ Deputy Commissioner) Swabi. The crop land and yield are given in below Table 2.5. Table 2.5: Area of Cropped Land and Crop Yield in Lot-II

Average Yield Average Average Income Category of Crop Area Crop In Kilogram/ Price of Crop Derived/ Acre Land in Kanal Kanal (PKR) (PKR) Rain-Fed 293.13 71 24,013 Wheat 1700/ 40kg Irrigated 494.93 116 39,312 Total 788.06 Source: Survey by PIC team, February 2019

2.7.4 Impacts on Trees

38. Privately-owned trees will be uprooted from the ROW of the entire Lot-II. Mature trees will be removed before handing over the ROW to the contractor. One hundred and Twenty-nine

2-8

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

DPs will lose 2323 non-fruit trees, while 12 DPs will lose 47 fruit trees. The fruit trees were mostly used (70%) for domestic use. The fruit trees are peach, guava, orange, plum and apricot. More than 98% of the non-fruit trees are wood and timber trees which have been assessed by the Forest Department. The owners of these trees will be compensated according to the assessment by the Forest Department as shown in Table 2.6 provided by the District Collector, Swabi.

Table 2.6: Non-Fruit and Fruit Trees under impact in Lot-II

Category of Number of S. No. DPs Total Price (Rs) Trees Trees 1 Non-Fruit Trees 129 2323 1,728,937 2 Fruit Trees 12 47 215,195 Total 2370 1,944,132 Source: Assessment of Trees by Forest & Agriculture Department, December 2018

2.7.5 Summary of Affected Assets and DPs

39. In Lot-II, 129 land owners DPs will lose a total of 114.71 acre (917.66 kanal) land in the 9 mouzas of Topi and Swabil Tehsils of District Swabi. Out of which, kanal 293.13 (36.64 acre) is rain-fed land that is owned/ claimed by 40 DPs, 494.93 kanal (61.87 acre) is irrigated land that is owned/ claimed by 70 DPs and 129.6 kanal (16.20 acre) is uncultivable/ barren land that is owned/ claimed by 19 DPs. 16 No of DPs will lose 11 number of structures having a financial layout of PKR 6.237 million. Similarly, 129 DPs will also lose 2323 non-fruit trees and 12 DPs will lose 47 fruit trees. No DPs has been identified to lose hundred percent of land or lift with the quantum of land unviable economically. A summary of the impacts and DPs is shown in Table 2.7.

Table 2.7: Summary of Affected Assets and DPs

No. Affected Asset Unit Quantity No. of DPs 1 Land a. rain-fed (barani) agricultural land Acre 36.64 40 landowners b. irrigated (chahi) agricultural land Acre 61.87 70 landowners c. uncultivatable (ghair mumkin) land Acre 16.20 19 landowners d. government-land Acre 1.375 Irrigation Department 259 landowners, e. severely-affected (10% or more of Acre 98.51 leaseholders, productive land) sharecroppers and tenants 2 Crops a. irrigated land planted with wheat Acre 61.87 70 DPs b. rain-fed land planted with wheat Acre 36.64 207 DPs 3 Trees a. Non-fruit trees No. 2323 129 DPs b. Fruit trees No. 47 12 DPs Structures (Solid block masonry 4 M3 477.33 PCC and RCC) Structures (PCC, Shops, building 16 DPs M2 591.64 room and Hotel room)

2-9

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Table 2.7.1: Detail of Affected Structures and HH

Size of S. Type of Structure Use of No. of Location/ Ownership Structure/ No. Affected Land HH Mouzas Status Unit Solid Block Masonry 20.39 (M3) 1 wall Residential 1 Bamkhel private PCC 1:2:4 0.64 (M3) Random rubble 32.49 (M3) 2 masonry Agriculture 1 Bamkhel Private PCC 1:2:4 271 (M3) Random rubble 19.75 (M3) Bamkhel Private 3 masonry Agriculture 1 PCC 1:2:4 1.65 (M2) Bamkhel Private 1 Hotel Room 26.02 (M2) Bamkhel Private Random rubble 4 5.10 (M3) Commercial 1 Bamkhel Private masonry Boundary wall Block Masonry 6.80 (M3) Bamkhel Private Random rubble 14.16 (M3) Bamkhel Private masonry Boundary wall 5 Residential 1 MS Sheet door with 3.25 (M2) Bamkhel Private angle iron frame 6 5-Shops 76.67 (M2) Commercial 3 Swabi Private Building Basement 73.93 (M2) Swabi Private (Covered Area) 7 Commercial 2 Building Ground Floor 73.93 (M3) Swabi Private (Covered Area) Building Basement 120.28 (M2) Swabi Private (Covered Area) 8 Commercial 3 Building Ground Floor 120.28 (M2) Swabi Private (Covered Area) Building room (Covered 9 Area) 60.32 (M2) Residential 1 Swabi Private

Building room (covered 68.77 (M2) Kala Private area) Part-I 10 Residential 1 Building room (covered 40.47 (M2) Kala Private area) Part-II Random Rubble Masonry (Retaining 28.94 (M3) Kala Private Wall) 11 Agriculture 1 RCC Slab (1:2:4) 4.13 (M3) Swabi Private MS reinforcement steel 0.06 (Ton) Swabi Private (Grade 40) Table 2.8: Summary of Affected Assets

No. of HH S.No. Item Unit Quantity Affected I LAND M3 477.33 1 Residential Land (Urban Area) 16 M2 591.64 2 Residential Land (Rural Area) - M2 -

2-10

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

No. of HH S.No. Item Unit Quantity Affected 3 Agricultural Land i) Rain-fed Land 40 M2 148,276.82 ii) Irrigated Land 70 M2 250,379.00 iii) Uncultivable Land 19 M2 65,559.07 4 Other Land i) Government Land Govt. M2 5,564.43 II Structure Structures (Solid block masonry PCC 1 M3 477.33 and RCC) 16 Structures (PCC, Shops, building room 2 M2 591.64 and Hotel room) 3 Temporary - m3 - 4 Other - m3 - 5 Graves - m3 - III Infrastructure 1 Electricity Line - km - IV Crop, Trees 1 Crop 277 m2 398,655.83 2 Trees i) Fruit-Trees 12 Number 47 ii) Non-Fruit Trees 129 Number 2323 Table 2.8.1: Detail of Affected Structures and HH

Size of S. Type of Structure Use of No. of Location/ Ownership Structure/ No. Affected Land HH Mouzas Status Unit Solid Block Masonry 20.39 (M3) 1 1 wall Residential Bamkhel private PCC 1:2:4 0.64 (M3) Random rubble 32.49 (M3) Agriculture 1 2 masonry Bamkhel Private PCC 1:2:4 271 (M3) Random rubble 19.75 (M3) 1 Bamkhel Private 3 masonry Agriculture PCC 1:2:4 1.65 (M2) Bamkhel Private 1 Hotel Room 26.02 (M2) Bamkhel Private

Random rubble 4 5.10 (M3) 1 Bamkhel Private masonry Boundary wall Commercial Block Masonry 6.80 (M3) Bamkhel Private Random rubble 14.16 (M3) 1 Bamkhel Private masonry Boundary wall 5 MS Sheet door with 3.25 (M2) Residential Bamkhel Private angle iron frame 6 5-Shops 76.67 (M2) Commercial 3 Swabi Private Building Basement 73.93 (M2) 2 Swabi Private (Covered Area) 7 Building Ground Floor 73.93 (M3) Commercial Swabi Private (Covered Area)

2-11

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Size of S. Type of Structure Use of No. of Location/ Ownership Structure/ No. Affected Land HH Mouzas Status Unit Building Basement 120.28 (M2) Swabi Private (Covered Area) 8 3 Building Ground Floor Commercial 120.28 (M2) Swabi Private (Covered Area) Building room (Covered 9 Area) 60.32 (M2) Residential 1 Swabi Private

Building room (covered 68.77 (M2) Kala Private area) Part-I 10 1 Building room (covered Residential 40.47 (M2) Kala Private area) Part-II Random Rubble Masonry (Retaining 28.94 (M3) Kala Private Wall) 11 1 RCC Slab (1:2:4) 4.13 (M3) Agriculture Swabi Private MS reinforcement steel 0.06 (Ton) Swabi Private (Grade 40)

Table 2.9: Number of HH with Production land affected

< 10% of total land 10% - 70% >70% Total Category of

Land Affected

APs APs APs

AHs

AHs AHs AHs

Totalof

% of AHs % of AHs % of AHs % of AHs

TotalAPs

Number of Number of Number of Number of Number of Number of

Rain-fed 6 37 43 27 167 27 7 43 47 40 247 26 (barani) land

Irrigated 7 43 50 57 353 57 6 37 40 70 433 45 (chahi) land

Uncultivable (ghair 1 7 7 16 100 16 2 12 13 19 119 12 mumkin) land

Grand Total 14 87 100 100 620 100 15 92 100 129 799 83

2-12

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Table 2.10: Summary of Impacts

Number of S.No. Item Affected Unit Quantity HHs I Land 1 Agricultural land 277 M2 398,655.83 2 Residental Land - - - 3 Production forest land - - - 4 Other land Govt. M2 5,564 II Structure Structures (Solid block masonry PCC 1 16 M3 477.33 and RCC) Structures (PCC, Shops, building room 2 M2 591.64 and Hotel room) 3 Temporary House 4 Other Structure - - - III Crops and trees 1 Crops 277 M2 398,655.83 2 Forest trees (Non-Fruit) 129 Number 2,323 3 Other Trees (Fruit) 12 Number 47 IV Loss of Business 16 Number various PKR V Number of Vulnerable HH 49 2,205,000 15000/month Number of HH severely Affected PKR VI 259 PKR Various Entitled to Income Rehabilitation 12,380,399 Table 2.10.1: Detail of Affected Structures and HH

Size of S. Type of Structure Use of No. of Location/ Ownership Structure/ No. Affected Land HH Mouzas Status Unit Solid Block Masonry 20.39 (M3) 1 1 wall Residential Bamkhel private PCC 1:2:4 0.64 (M3) Random rubble 32.49 (M3) Agriculture 1 2 masonry Bamkhel Private PCC 1:2:4 271 (M3) Random rubble 19.75 (M3) 1 Bamkhel Private 3 masonry Agriculture PCC 1:2:4 1.65 (M2) Bamkhel Private 1 Hotel Room 26.02 (M2) Bamkhel Private

Random rubble 4 5.10 (M3) 1 Bamkhel Private masonry Boundary wall Commercial Block Masonry 6.80 (M3) Bamkhel Private Random rubble 14.16 (M3) 1 Bamkhel Private masonry Boundary wall 5 MS Sheet door with 3.25 (M2) Residential Bamkhel Private angle iron frame 6 5-Shops 76.67 (M2) Commercial 3 Swabi Private

2-13

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Size of S. Type of Structure Use of No. of Location/ Ownership Structure/ No. Affected Land HH Mouzas Status Unit Building Basement 73.93 (M2) 2 Swabi Private (Covered Area) 7 Building Ground Floor 73.93 (M3) Commercial Swabi Private (Covered Area) Building Basement 120.28 (M2) 3 Swabi Private (Covered Area) 8 Building Ground Floor Commercial 120.28 (M2) Swabi Private (Covered Area) Building room (Covered 9 Area) 60.32 (M2) Residential 1 Swabi Private

Building room (covered 68.77 (M2) 1 Kala Private area) Part-I 10 Building room (covered Residential 40.47 (M2) Kala Private area) Part-II Random Rubble Masonry (Retaining 28.94 (M3) 1 Kala Private Wall) 11 RCC Slab (1:2:4) 4.13 (M3) Agriculture Swabi Private MS reinforcement steel 0.06 (Ton) Swabi Private (Grade 40)

2.7.6 Asset Valuation

40. Most of the areas in Pakistan have been subject to the settlement operation in which the land holdings have been consolidated, demarcated in various units (acres), soil classified and land revenue assessed. In the project area in the districts of Swabi, all areas have been settled which facilitates the sale and transfer of land. Some portions of the state land are also leased for agriculture use based on market rates for a period of not more than 15 years, inclusive of 5-year extension. Special committees at the district level are constituted to determine the market rate against which state land and structures would be leased out.

41. There is an active land market in the project area. Land sales, leases and transfers are recorded and used in the preparation of valuation tables by the revenue departments for taxation purposes. Real estate agents and firms also operate in the project area and Information of properties for sale are sometimes posted in newspapers or posted online in various sites such as www.zameen.com, www.olx.com.pk, etc.

42. Legally, the valuation of land and other affected assets (structures, crops and trees) is within the exclusive powers of the District Collector (DC). In KP, DC is administrative head of the district comprising of relevant departments, and revenue staff who assist in this process. Input from the Agriculture Department were sought in determining value of crop losses that includes income losses for 2 crop harvests (summer and winter season) for one year. Input from the Communication and Works Department were sought in the valuation of affected structures. The Forestry, Environment and Wildlife Department provided input on the value of affected trees. Legally, Deputy Commissioner (who is also the District Collector) can ask all district heads of relevant departments for assistance in valuation.

2-14

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

43. Section 23 of the Land Acquisition Act prescribes the matters to be considered in determining compensation. These include (i) market-value of the land at the date of the publication of the notification under section 4, sub-section taking into account transfer of land similarly situated and in similar use, and potential-value of the land to be acquired subject to certain conditions; (ii) the damage sustained by the person interested to any standing crops or trees which may be on the land; (iii) the damage (if any) sustained by the person interested for severing such land from his other land; (iv) the damage (if any) sustained by the person interested to his other property, movable or immovable, in any other manner, or his earnings; (v) reasonable expenses (if any) incidental to being compelled to change his residence or place of business; and (vi) the damage resulting from diminution of the profits of the land between the time of the publication of the declaration under section 6 and the time of the Collector's taking possession of the land. In addition to the market-value of the land, a 15% premium is added in consideration to the compulsory nature of the acquisition, if the acquisition has been made for a public purpose.

44. As per Section 48 of Standing Order 28 of the LAA, the acquiring officer is the Land Acquisition Collector (LAC) (who is also the DC) gives the detail all the data from which the market value of the land can be estimated, viz: (a) the prices paid for land recently acquired in that or neighboring villages, (b) the prices paid in private transactions as discoverable from the register of mutations, etc. (c) all other information available, especially with regard to the points referred to in section 23 of the LAA.

45. Prior to land award as per Section 11 of the LAA, the DC will make an inquiry from the affected landowners on the measurements and valuation conducted. This provides the DPs the

opportunity to question or raise objections on the true area of the land, valuation and amount of

¡¢£¤ ¥¦§¨©¡ ¥ §¥ §££ ¡ ¨© ¡ ¥ ¢¤¥¨ ¡ ¡¢£¤ ¥¦§¨© ¡ ¥ ¤ ¡ ¤ ¨ ¤ §§ © ¦ © ¥§© ¤  ¦  §© ¢¦ and objections will be evaluated and adjustments to the compensation as deemed justified by the DC can be made.

46. For this LARP preparation, the valuation survey was undertaken by the concerned department for estimating the unit rate for compensation of different types of losses such as land, structures, trees, crops, etc. For assets valuation, District Price Assessment Committee has been notified by the District Collector Swabi. The land compensation is determined on the actual market rate i.e., land sold by private owners within last one year based on local knowledge by the respective patwaris and information from real estate brokers and the price registered with the district collector. In additional 15 % land value is added to the price determine by the DPAC. In case of disagreement with the price, the affectees can approach the district collector under Section-9 of Land Acquisition Act 1894, for re-assessing the land price. Similarly, crop, trees and structures etc., is assessed by the DPAC under the schedule of relevant department usually renewed on yearly basis. Assessment. Notification on the formation of DPAC is at (Annexure- 8).

2.7.7 Valuation of Land

47. As indicated earlier, Lot-II will affect 917.66 kanal (114.71 acre) of private land. The prices per kanal for pressure pipe, main canal and its distribution system were assessed by the DC according to category of land in all four mouzas of Lot-II.

2-15

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

48. The following detailed table shows the current price of different category of land which is provided by the DC through DPAC determined the price of land according to the categories of land and prices/rate as provided in Table 2.11. Table 2.11: Valuation of Land (Mouza and Category-wise) by District Collector, Swabi

Category of Total Land under Unit Rate/ S. No. Mouzas of Lot-II Land in Lot-II Acquisition (Kanal) Kanal in Rs Barani (Rain 1 10.65 471,060 Fed) Shah Nehri 2 28.35 435,640 (Canal Irrigated) Banjr Qadeem 3 Kotha 21.2 176,000 (Baran) Ghair Mumkin 4 1.5 1,650,000 Abadi (Built-up) Ghair Mumkin 5 3.5 99,000 (Uncultivated) Barani (Rain 6 15.88 428,375 Fed) 7 Chahi (Irrigated) 11.61 543,780 Swabi Ghair Mumkin 8 2.35 220,000 (Uncultivated) Shah Nehri 9 102.91 540,213 (Canal Irrigated) Barani (Rain 10 8.05 726,000 Fed) 11 Chahi (Irrigated) 49.6 561,000 Ghair Mumkin 12 11.15 180,400 Kala (Uncultivated) Shah Nehri 13 23.35 440,000 (Canal Irrigated) Maira (Similar 14 33.85 533,618 as Rain Fed) Barani (Rain 15 Shah Mansoor 21.4 680,056 Fed) Shah Nehri 16 Baja 153.05 1,086,770 (Canal Irrigated) Nul Chahi (Tube 17 9.5 900,000 Well Irrigated) Barani (Rain 18 38.25 421,182 Fed) 19 Bamkhel Chahi (Irrigated) 45.81 940,476 Ghair Mumkin 20 5.7 220,000 (Uncultivated) Banjr Qadeem 21 3.1 240,000 (Baran) Barani (Rain 22 19 550,000 Fed) Ghair Mumkin 23 Dara 10.2 660,000 (Uncultivated) Shah Nehri 24 17.6 792,000 (Canal Irrigated)

2-16

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Category of Total Land under Unit Rate/ S. No. Mouzas of Lot-II Land in Lot-II Acquisition (Kanal) Kanal in Rs Maira (Same as 25 70.2 267,000 Rain Fed) Chahi (Well 26 8.3 549,240 Irrigated) Barani (Rain 27 61.3 511,877 Fed) Maini Sharqi Ghair Mumkin 28 54.15 180,400 (Uncultivated) Barani (Rain 29 14.55 511,877 Fed) 30 Maini Gharbi Abi (Irrigated) 44.85 563,261 Ghair Mumkin 31 16.75 180,400 (Uncultivated) Total 917.66

2.7.8 Valuation of Structures

49. The area under acquisition also includes built-up property at 11 points in the RoW of the designed Canal containing solid block masonry, plain cement concert, random rubble masonry foundation, a hotel room, boundary walls and five number shops. The District Building Department/ C&W valuated the structures as shown in Table 2.12.

Table 2.12: Valuation of Structures

Type of Structure Size of Amount in Location/ Ownership S. No. Affected Structure/ Unit PKR Muza Status Solid Block Masonry wall 20.39 (M3) 21057 1 Bamkhel private PCC 1:2:4 0.64 (M3) 684 Random rubble masonry 32.49 (M3) 81962 2 Bamkhel Private PCC 1:2:4 271 (M3) 2907 Random rubble masonry 19.75 (M3) 49820 Bamkhel Private 3 PCC 1:2:4 1.65 (M2) 1767 Bamkhel Private 1-Hotel Room 26.02 (M2) 84000 Bamkhel Private Random rubble masonry 12857 Bamkhel Private 4 5.10 (M3) Boundary wall Block Masonry 6.80 (M3) 7019 Bamkhel Private Random rubble masonry 35713 Bamkhel Private 14.16 (M3) Boundary wall 5 MS Sheet door with 4183 Bamkhel Private 3.25 (M2) angle iron frame 6 7-Shops 76.67 (M2) 701250 Swabi Private Building Basement 636368 Swabi Private 73.93 (M2) (Covered Area) 7 Building Ground Floor 715914 Swabi Private 73.93 (M3) (Covered Area) Building Basement 1035400 Swabi Private 120.28 (M2) (Covered Area) 8 Building Ground Floor 1164825 Swabi Private 120.28 (M2) (Covered Area) Building room (Covered 584100 Swabi Private 9 60.32 (M2) Area)

2-17

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Type of Structure Size of Amount in Location/ Ownership S. No. Affected Structure/ Unit PKR Muza Status Building room (covered 666000 Kala Private 68.77 (M2) area) Part-I 10 Building room (covered 348400 Kala Private 40.47 (M2) area) Part-II Random Rubble 72998 Kala Private 28.94 (M3) Masonry (Retaining Wall) 11 RCC Slab (1:2:4) 4.13 (M3) 9000 Swabi Private MS reinforcement steel 488 Swabi Private 0.06 (Ton) (Grade 40)

2.7.9 Valuation of Crops

50. Standing crops wheat only is being affected in Lot-II which has been surveyed and valuated by the DPAC and concerned department. The valuation thereof has been incorporated in the resettlement budget. As per policy of compensation of crops would be paid as envisaged in the ADB SPS 2009. The affected crop compensation for Lot-II under acquisition per kanal was valuated and assessed in Table 2.13.

Table 2.13: Valuation of Crop Land Mouza-Wise

Quantity Unit Rate S. No. Mouzas Crops Unit Amount (Rs) (Kanal) (Rs) 1 Mouza Kotha Wheat Kanal 39 15,508 604,800

2 Mouza Swabi Wheat Kanal 130.4 11,873 1,548,225

3 Mouza Kala Wheat Kanal 114.85 17,014 1,954,110 Mouza Shah 4 Wheat Kanal 21.4 10,500 224,700 Mansoor 5 Mouza Baja Wheat Kanal 153.05 9,767 1,494,775 Mouza 6 Wheat Kanal 93.56 13,551 1,267,875 Bamkhel 7 Mouza Dara Wheat Kanal 115.1 11,818 1,360,275 Mouza Maini 8 Wheat Kanal 61.3 18,059 1,107,000 Sharqi Mouza Maini 9 Wheat Kanal 59.4 12,283 729,600 Gharbi Total 788.06 10,291,360

2.7.10 Valuation of Trees

51. A committee was constituted by the project director PHLCE Project, vides PMO PHLCE No.642/PMO/PHLCE/2G, dated 4 October 2018 to count and valuate the standing orchards, trees and structures and affected crops. Assessment of the trees were recorded at site. The survey team has enumerated and valuated the affected trees which has been reflected in the resettlement budget of the LARP as received from the office of DC Swabi. Details are given in below Table 2.14 and Table 2.15.

2-18

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Table 2.7: Affected Non-Fruit Trees in Lot-II

Type of S. No. No. of Trees Volume (CFT) Rate/ Unit Total Amount Trees 1 Bery (wild) 205 6304 24 152520 2 Gul Toth 214 3164 50 159216 3 Bamboo 246 450 407 183024 4 Bekyanra 205 1019 150 152520 5 Tooth 150 8674 13 111600 6 Phullai 89 5690 12 66216 7 Sreikh 145 2354 46 107880 8 Ailanthus 187 3084 45 139128 9 Sheshim 260 4433 44 193440 10 Kekar 142 568 186 105648 11 Eucalyptus 164 444 275 122016 12 Popular 223 739 225 165920 13 Wild Injeer 93 439 156 69809 Total 2323 37362 1,728,937 Source: Assessment of Trees by Forest Department, December 2018

Table 2.8: Affected Fruit Trees in Lot-II

S. No. Type of Trees No. of Trees Average Rate in PKR Total Amount 1 Peech 4 11345 45380 2 Apricot 5 7618 38090 3 Orange 26 4415 114785 4 Guava 4 1485 5940 5 Pomegranate 1 500 500 6 Plum 7 1500 10500 Total 47 215,195 Source: Assessment of Trees by Agriculture Department, December 2018

2.7.11 Physical Displacement of DPs

52. The DPs of Five Shops, Five Houses and One hotel room will be physically displaced being located in the RoW of Indus Ambar Pressure Pipe alignment to be acquired in Lot-II. The detail of these structure is tabulated in Table 2.8. These DPs will be compensated for required admissible allowances and included in the RP budget accordingly.

2-19

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

3 SOCIO-ECONOMIC CHARACTERIS ¡¢ £¤ ¥¦ §¨© ¥£ EHOLDS

53. The analysis is based on the findings of the DMS and socio-economic survey of 312 DPs. The study aimed to assess the present condition of the DPs and to appraise the project impacts on their livelihood. This section provides information on the demographic characteristics,

education, health, occupations, sources of income, pattern of household expenditures, etc. of the

                  !  "    !   # their neighbors and owners of adjacent land.

3.1 $%&' ()* &+,) -. /)01) &232) 4

54. Among the surveyed households, there are slightly more males (52%) than females (48%) members. Around 16% were children below 10 years of age. The average household size works out as 7. About 1546 household members (80%) are in the working age population out of the 312 HHs. The remaining 4% are elderly members.

3.2 Education and Literacy Levels of Members of DPs Households  9         : 55. 5 6 78   !              22% have primary level, 18% middle level, 16% matriculate level, 11% intermediate level, 7% graduation level and 5% post-graduation level of education. The illiterate population was 5% and 16% children up to 10 years were recorded. The information in respect to education and literacy

"     !        s is provided in Table 3.1.

Table 3.1: Literacy Rate and Education Level of Members of DP; < Households

S. No. Education Level Number Percent 1 Primary 427 22 2 Middle 350 18 3 Matriculate 311 16 4 Intermediate 214 11 5 Graduate 136 7 6 Post Graduate 97 5 Total Literate 1534 79 7 Illiterate 90 5 8 Children up to 10 years 309 16 G. Total 1,933 100 Source: socio-economic survey by PIC February, 2019

3.3 Income and Expenditure of the Sample Respondents

56. Due to scarcity of water the land is becoming barren and most farmers depend on rains for cultivation. Their cultivation is associated with the intensity of rains. Due to shortage of water and disappointment from yearly low crop yields, many of them have adopted occupations other than farming for their livelihoods. The occupations have been categorized based on primary

3-1

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

source of income. The census survey has revealed that 83% of the DPs are engaged in farming followed by laborers and service providers with 4% and 3%, respectively. According to proportion of DPs 7% involved in business, followed by those working in the government and private sectors (2%). The percentage of DPs (1%) are related to pension holders. The average monthly income comes out Rs.39, 587. Among the surveyed DPs, 12% were found having monthly income below the official poverty line (OPL-official poverty line 15000/ month according to GoP finance bill 2018). Table 3.2 below shows the occupation and the average monthly household income of the surveyed DPs.

Table 3. 2: Occupation of DPs and Average Monthly Household Income

Number Average Monthly S. No. Occupation Percent of DPs Income/ HH (PKR) 1 Agriculture 258 83 30,342 2 Laborers 11 4 14,416 3 Service Providers (artisan) 10 3 56,708 4 Business 23 7 67,500 5 Govt./ Pvt. Employees 6 2 43,345 6 Pension holders 4 1 25,208 Total 312 100 39,587 Source: socio-economic survey by PIC February, 2019

The explanation to various occupation categories is given below:

(i) Agriculturist: (83% of surveyed DPs)

57. In the rural society, land is considered a mark of prestige and mode of power to influence other. As a person has a large piece of land, he possesses influence and power to control other peoples. The DPs under this occupation category will lose their land permanently. Livelihood restoration support to facilitate these DPs in looking for alternative income sources and linking with relevant agencies will be needed. They will be employed in the project activities directly as skilled and skilled labor on priority basis and also linked their services with other external agencies during the time of implementation of project as well as enhancement in crops yield per acre and their productivity.

(ii) Laborers (4% of surveyed DPs)

58. These DPs were found on daily base job opportunity for their livelihood. They are happy with the project as they would be able to get a job for a long time. These DPs will be compensated against losing their land or structures as per ADB SPS 2009.

(iii) Service Providers (3% of surveyed DPs)

59. These DPs also belong to a farming community. But their low income from land never supported fully to their family needs, so they were forced to adopt different occupation by which they can earn more than that of small piece of land. Their source of livelihood will not be affected by the project.

3-2

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

(iv) Business: (7% of surveyed DPs)

60. In Lot-II of the project there are DPs who will loss or disruption of their business as a result of the project. Therefore, compensation of their business will be provided according to the assessment of DPAC/ DC, Swabi in the entire lot-II.

(v) Govt. / Private Employees (2% of surveyed DPs)

61. According to the census survey 2% under this category is spending their lives comfortably as they have permanent source of income by which they can fulfill their domestic expenses easily. They are also least bothered about the acquisition of their lands. However, they will be compensated as per ADB policy.

(vi) Pension Holders (1% of surveyed DPs)

62. The district Swabi is famous due to presentation of its population in various government departments. Due to barren land, most of the people joined Pakistan army and other government organization for their livelihood. They have also small piece of land that is not sufficient to fulfill domestic expenditures like kitchen grocery, clothing, education of the children and other social obligations. They are least bothered about their small piece of land to be acquired for the project, because they rely on their pension to support them. The baseline information relating to the household expenditure pattern in respect of DPs population is shown in Table 3.3.

Table 3. 3 ¡¢£ ¤¥¦ §¨© ¤    © ¤ ¦

Expenses S. No. Description of Expenditures Monthly (PKR) % of Total Expenses

1 Food Expenses 7,548,000 55

2 Non-Food Items 3,573,000 26

3 Utilities 1,681,150 11

4 Health Care 909,686 8 Source: Survey by PIC February 2019

63. Expenditure on food and non-food items comes to about 81% of their total expenses. Expenses on utilities and health care is 11% and 8% of the total household expenditure, respectively. Most of the families spend their savings on social obligations, construction of concrete house on priority followed by education of their children, purchase of motor cycle, purchase of refrigerator, marriage of siblings, purchase of mobile phone, etc.

3.3.1 Land Holding Status of DPs

64. The 44% of the DPs are land owners, 33% are lease holders, 22% are share croppers and 2% are tenants on the affected land. The land holding tenure is low in the project area and on that basis 54% of the landowners hold land less than 2 acres. Only 46% are land owners with land holding of up to 10 acres. There is no formal agreement/ tenure execution system in the area. Verbal agreement from crop to crop system between the landowner and sharecropper,

3-3

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

tenants and leaseholders is invoked in the area since years. Table 3.4 shows the landholding status of the surveyed DPs.

Table 3. 4 ¡¢£ ¤ ¥¦ §¤¨£ © ¢ ¦  ¤ 

S. No. Categories No. of DPs 1 Owners 129 2 Lease Holders 98 3 Share Croppers 64 4 Tenants 5 Total 296

3.3.2 Vulnerable Households

65. The distinct people who might face the risk of marginalization and suffer disproportionately from resettlement affects, including the women, children, destitute persons, squatters; those with historical or cultural rights; and landless groups. For this project in lot-II, households that are below the poverty line, households headed by women or widows are considered vulnerable households.

66. Out of 312 surveyed DPs, 49 DPs are considered vulnerable household based on their socio-economic profile. These include 45 DPs with monthly household income below the official poverty line (OPL), 1 DP from a woman-headed household and 3 DPs from a household headed by disabled. Vulnerable households are entitled to receive vulnerable household assistance. The vulnerable allowance has been incorporated in the budget. The list of category wise vulnerable households at Table 3.5.

Table 3. 5: Categories of Vulnerable Households among the Surveyed DPs

S. No. Categories No. of DPs Percentage 1 Poor (income below the OPL) 45 92 2 Women-headed household 1 2 3 Disabled-headed households 3 6 Total 49 100

3.3.3 Ethnicity

67. Almost all DPs belong to Pashtun tribes of Yousafzai. Majority of them belong to the sub tribes of mohmand, afghan, bajwari, utman khel, gujar, lohar and umarzai which are dominant in the area. All DPs are . These tribes and subtribes are more like kinship groups and castes that are mainstreamed into the general Pakistani culture and society. None of these groups identify themselves as distinct indigenous cultural group with collective attachment to a distinct habitat and customary cultural and social institutions that are separate from the general Pakistani culture. Hence, none of the DPs may be considered as indigenous people as defined under ADB SPS 2009.

3-4

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

3.3.4 Available Social Amenities in the Project Area

68. Electricity is available 100 % in the entire lot-II of project area. Among those with access, only 80% are satisfied with the electricity supply. Educational facilities are available in the area and is accessed by 72%. Out of them, 91% were satisfied with the quality of services, while 28% showed their dissatisfaction. Health care facility in shape of BHUs and RHCs is available to about 64% of the surveyed population. Out of these, 66% are satisfied with the available health facilities. Availability of sewerage/ drainage facility was reported by 76% of the respondents and about 74% are satisfied with the quality of services provided. Other amenities like gas and telephone are partially available in the project corridor. The information in respect of access to social amenities and their quality of services is given in Table 3.6.

Table 3. 6: Access to Social Amenities in Lot-II Project Area

S. No Facility Available (%) Not Available (%) Satisfactory (%) 1 Electricity 100 0 80 2 Gas 30 70 90 3 Water Supply 95 05 80 4 Telephone 10 90 85 5 Sewerage 76 24 74 6 BHU 64 36 66 7 School 72 28 91 Source: Survey by PIC Consultants February 2019

3.3.5 Housing Conditions

69. Housing conditions of the respondents have been analyzed according to the type of houses in which they are residing. These are categorized as pacca, semi-pacca and kacha. A house or building with concrete and/or bricks or blocks falls in pacca category. House or building constructed with burnt bricks and mud comes under semi-pacca category, whereas a house constructed with un-burnt bricks and mud or temporary wooden poles etc. is categorized as kacha.

70. Half of the respondents (53%) live in pacca houses, followed by 17% living in semi-pacca and 30% in kacha houses. The reason of constructing pacca houses is that hilly flood water damages the kacha house rapidly. The peoples are forced to build their structures as pacca which is long lasting.

Table 3. 7 ¡¢£¤ ¥¦§ ¨¢¦© ¥ ¥¢¦ ¢ £ © ¤

S. No Housing Condition No. of Structures Percentage 1 Pacca 164 53 2 Semi Pacca 53 17 3 Kacha 95 30 Total 312 100

3-5

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

3.4 Gender Survey

71. According to the 6th population and housing census of 2017, the female population of Khyber Pakhtunkhwa province and District Swabi are 49.3% and 49.7%, respectively. In the rural society, female plays important role in managing the household from home chores to work in the fields and taking care of the livestock. Rural women are major contributors in four sub-sectors of the rural economy; crop production, livestock rearing, cottage industry and household & family maintenance activities such as fetching water, fuel collection and fodder for livestock, food preparation & preservation and caring for children. Most of their work and labor does not carry weight, unrecognized and unappreciated.

72. This is culturally prevailing in the country and in project area that assets and properties are managed and controlled by the male of the household. Men are usually the title holders of the land, although there are also many cases where women are also title holders. 100% of the respondents indicated that women alone cannot sell or purchase their properties. Mostly, the males carry out such activities. Females are dependent to their male members for land matters. Beside this, the females of the households are the responsibility of their male members.

73. Keeping in view the important role of the female in the household as well as in the society, consultations with women were also conducted in 4 settlements in September 2018 to record their views. During interviews and consultation, data was also collected to ascertain female social status and gender issues. Locations and number of participants for the gender consultations is provided in Table 3.8:

Table 3. 8: Locations and Number of Participants of Consultations with Women

S. No. Location/ Village No. of Women Participants 1 Swabi 17 2 Bamkhel 16 3 Kala 14 4 Baja 12 Total 59 Source: Consultation Meetings by PIC September, 2018

74. Women participate in various activities including household activities, child caring and importantly in income generation activities like management of livestock and fields work in the season of sowing and harvesting of crops. A limited number of females was reported in the government and private sector to help their male members in managing the household expenses who were serving as teacher in private schools and in hospital.

75. Data regarding education of the females revealed that there were no constraints for females in going to schools and colleges except they have to travel a lot to the nearby villages and cities for higher education. In spite of that, the trend of getting education is increasing in the area and parents treated boys and girls equally in getting education. It was also observed that most of the participants were not satisfied with available health facilities. Women have no choice but to rely on traditional practitioners and midwives.

3-6

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

76. It was also derived from the consultations that some NGOs provide social services to the community members especially to the females. The National Rural Support Program (NRSP), Pakistan Poverty Alleviation Fund (PPAF) along with local support organizations were working in the Project area and playing pivotal role in poverty alleviation through soft and hard activities for the females in the communities on education, infrastructure and health sectors.

77. No gender-based violence issue was noted by the PIC during the census survey. The credit goes to vibrant media to create awareness to stop such malpractice. The collected data revealed that the most pressing needs of women were the availability of proper health, education facilities in the area. They were explained their mobility and privacy will not be disturbed as alternate routes were available or will be established easily during working on site.

3.4.1 ¡ ¢£¤¥¦ §¡¨ £ © ¤ ¡ ©¡ -economic Activities

78. The survey data revealed that the participation rate of women in various socio-economic activities in the project corridor is generally high, 100% in case of household activities and child caring. Their participation rate in case of property matters, social obligations, farm activities and livestock rearing stood at 50%, 80%, 50% and 35%, respectively.

79. As far as decision making for different activities is concerned, their involvement in case of child caring matters and household activities was highest;100 percent whereas, in case of farm

activities/ matters was at lowest; about 50 percent. For other matters, the involvement of the

                                 decision making in the routine socio-economic life is presented in Table 3.9.

Table 3. 9 !"#$ %&' (") $ * % + ",* "-economic Activities

S. No. Item Participation (%) Decision Making (%) 1 Household Activities 100 92 2 Child Caring 100 97 3 Farm Activities 50 15 4 Livestock Rearing 40 30 5 Sale & Purchase of Property 40 40 6 Social Obligations 65 55

3.5 Conflict Resolution Mechanism in the Project Area

80. Generally, local disputes are settled through Jirga (Negotiation). The Jirga is an informal structure but well organized conflict resolving mechanism exists in the Project area of lot-II. At present this system has been regularized in the prevailing local bodies system. Yet most of the conflicts and disputes are being settled through Jirga and District Dispute Resolution Committee (DDRC). According to the Jirga mechanism, the influential of the area, a community representative (Chairman/ Counselor), local religious leader, village malik, after hearing the parties, play their role to resolve the reported dispute/ conflict with mutual consensus. If any of the party is not satisfied with the decision of the Jirga, then they are free to lodge complaint to police station or court of law or DDRC. Generally, the people prefer to settle their disputes through the Jirga to avoid from long enmity, wastage of time and resources.

3-7

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

3.6 Indigenous Peoples (IP)

81. No indigenous people or community has been existed in the entire Lot-II of project area

¡¡¢ £¤ ¥¦§ ¨¢ © § £¤ ¢ ¥¡   

3.7 Impact on Historical, Cultural and Religious Structures

82. During assessment and detail measurement surveys none of the historical, cultural or religious places/ structure or its part existed in the entire Lot-II project area.

3-8

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

4 LEGAL FRAMEWORK, POLICY SND ENTITLEMENT

4.1 General

83. This section describes national and local laws and regulations that apply to the project, identifies gaps between local laws and ADB's policy requirements, and discusses how gaps are addressed; describes the methodology for determining valuations and compensation rates at replacement cost for assets, incomes, and livelihoods; and describes the land acquisition process and proposes a schedule for meeting key procedural requirements.

4.2 ¡¢£ ¤¥ ¡¦§ ¤ ¨¡© ¡¦   ¡¥£  ns on Land Acquisition and Resettlement

4.2.1 Constitution of the Islamic Republic of Pakistan (1973)

84. The Constitution of Pakistan (1973) clearly addresses the protection of property !  $ 

         ! "  # $ %  $    &   $'% y deprived of his property save

   $"  (   () " # $ % $% *    &   $'%! $* +!  " $   ,  % $  $ $-

  -$ %!& %!%$ "   & *   ! $* $-  ( (  % $  " -$   $'%    $ )

. / . . therefore and either fixes the amount of compensation or specifies the principles on and the

manner in which compensation is to be determined and given. Further, Article 4 (sub-

 ! 0 $- 1      2 # 3 $  $ "'   $     -  &  * & $ "* %!   $ $  % $% *

/ / / of any person shall be taken except in accordance with law.

4.2.2 Land Acquisition Act (1894)

85. The Land Acquisition Act (LAA) of 1894 is the de-facto legal instrument governing resettlement and compensation to DPs. However, it does not provide for the Project to give due consideration to social, cultural, economic, and environmental conditions associated with resettlement. Although LAA lays down detailed procedures for acquisition of private properties for public purposes and compensation, it does not extend to resettlement and rehabilitation of persons as required by donor agencies including ADB. Further, experience in other projects has established that compensation stipulated in the law may not be adequate to provide for equal or enhanced living status to resettled DPs.

86. Based on the LAA, only legal owners and tenants registered with the land revenue department or with formal lease agreements are eligible for compensation/livelihood support. For those without title rights, there are no laws in Pakistan or KP province. The LAA does not openly mandate for specific rehabilitation/ assistance provisions benefiting the poor, vulnerable groups, nor does it overtly provide for rehabilitation of income/livelihood losses or resettlement costs. This, however, is often done in many projects through ad-hoc arrangements negotiated between a specific EA and the DPs.

87. The law deals with matters related to the acquisition of private land and other immovable assets that may exist on it when the land is acquired for public purpose. The right to acquire land for public purposes is established when Section-4 of the LAA is triggered. The LAA specifies a systematic approach for acquisition and compensation of land and other properties for development projects. It stipulates various sections pertaining to notifications, surveys, acquisition, compensation and apportionment awards along with dispute resolution, penalties and

4-1

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

exemptions. Surveys for land acquisition are to be disclosed to the displaced persons. The Salient features of major sections of the Act are given in Table 4.1

Table 4.1 ¡ ¢£¤ ¥¦§ ¨ ¥¢§© ¥  ¢¤ § ¢¦     

Key Sections of LAA Salient Features of the LAA 1894 Publication of preliminary notification that land in the locality may be needed for public Section 4 purpose and makes it lawful to conduct survey on the land. Section 5 Formal notification of land needed for a public purpose.

Section 5a Hearing of objections to the land acquisition

Section 6 The Government makes a formal declaration of intent to acquire a particular land. The Land Commissioner directs the Land Acquisition Collector (LAC) to take order Section 7 the acquisition of the land. The LAC directs the land acquired to be physically marked out, measured and Section 8 planned. The LAC gives notice to all DPs that the Government intends to take possession Section 9 of the land and if they have any claims for compensation then these claims are to be made to him at an appointed time. The LAC records statements of the DPs in the area of land to be acquired or any Section 10 part thereof as co-proprietor, sub-proprietor, mortgage, and tenant or otherwise.

The LAC makes enquiries into the measurements, value and claim and issues  "   ,  '-  Section 11        !"# $ %    !"  &'" (   " )( *  !+"  ! of compensation. Section 12 LAC gives notice of final award to persons interested in the acquired land. When award is made, LAC takes possession and the land shall thereupon vest Section 16 absolutely in the Government, free from all encumbrances Special power in case of emergency to take possession of any land needed for Section 17 public purposes or for a company. In case of dissatisfaction with the award, allows DPs to request the LAC to refer Section 18 the case onward to the court for a decision. This does not affect the Government taking possession of land. Relates to matters to be considered in determining compensation including i) market value of land, ii) loss of standing crops, trees and structures, iii) any damage sustained at the time of possession, iv) injurious affect to other property

(moveable or immoveable) or earnings, v) expenses incidental to compelled Section 23 relocation of the residence or business and vi diminution of the profits between the time of publication of Section 6 and the time of taking possession plus 15% premium in view of the compulsory nature of the acquisition for public purposes. Relates to the determination of compensation values and interest premium for land Section 28 acquisition. Allows the LAC to grant to persons having limited interest on the acquired land Section 31 other lands in exchange. If within a period of one year from the date of publication of declaration under section 6 in respect of any land, the Collector has not made an award under Section 48 section 11 in respect to such land, the owner of the land shall, unless he has been to a material extent responsible for the delay be entitled to receive compensation for the damage suffered by him in consequence of the delay.

4-2

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

¤ © ¦  ¨© ¡¢£¤      ¨© 4.3 ¡¢£¤ ¥¦ §¨© ¦  Statement 2009

88. The Safeguard Policy Statement (SPS) aims to avoid involuntary resettlement wherever possible; to minimize involuntary resettlement by exploring project and design alternatives; to enhance, or at least restore, the livelihoods of all economically displaced persons in real terms relative to pre-project levels; and to improve standards of living of the displaced poor and other vulnerable groups. The SPS applies to all ADB-financed and/or ADB-administered sovereign and non-sovereign projects, and their components regardless of the source of financing, including investment projects funded by a loan; and/or a grant; and/or other means, such as equity and/or guarantees.

89. The involuntary resettlement safeguards are triggered in case of physical displacement (relocation, loss of residential land, or loss of shelter) and economic displacement (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. It covers them whether such losses and involuntary restrictions are full or partial, permanent or temporary.

90. The following principles are applied to achieve these objectives:

i. Screen the project early on to identify past, present and future involuntary resettlement impacts and risks. Determine the scope of resettlement planning through a survey and/or census of displaced persons, including a gender analysis, specifically related to resettlement impacts and risks;

ii. Carry out meaningful consultations with affected persons, host communities, and concerned non-government organizations. Inform all displaced persons of their entitlements and resettlement options. Ensure their participation in planning, implementation, and monitoring and evaluation of resettlement programs. Pay particular attention to the needs of vulnerable groups, especially those below the poverty line, the landless, the elderly, women and children, and Indigenous Peoples, and those without legal title to land, and ensure their participation in consultations. Establish a grievance redress mechanism to receive and facilitate resolution of the displaced

person s concerns. Support the social and cultural institutions of displaced persons and their host population. Where involuntary resettlement impacts and risks are highly complex and sensitive, compensation and resettlement decisions should be preceded by a social preparation phase.

iii. Improve, or at least restore, the livelihoods of all displaced persons through (i) land-based resettlement strategies when affected livelihoods are land-based where possible, or cash compensation at replacement costs for land when the loss of land does not undermine livelihoods, (ii) prompt replacement of assets with access to assets of equal or higher value, (iii) prompt compensation at full replacement cost for assets that cannot be restored, and (iv) additional revenues and services through benefit sharing schemes where possible.

iv. Provide physically and economically displaced persons with needed assistance, including (i) if there is relocation, secured tenure to relocation land, better housing at resettlement sites with comparable access to employment and production opportunities, integration of resettled persons economically and socially

4-3

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

into their host communities, and extension of project benefits to host communities; (ii) transitional support and development assistance, such as land development, credit facilities, training, or employment opportunities; and (iii) civic infrastructure and community services, as required.

v. Improve the standards of living of the displaced poor and other vulnerable groups, including women, to at least national minimum standards. In r ural areas, provide them with legal and affordable access to land and resources; in urban areas, provide them with appropriate income sources and legal and affordable access to adequate housing.

vi. Develop procedures in a transparent, consistent, and equitable manner if land acquisition is through negotiated settlement to ensure that those people who enter into negotiated settlements will maintain the same or better income and livelihood status.

vii. Ensure that displaced persons without titles to land or any recognizable legal rights to land are eligible for resettlement assistance and compensation for loss of non-land assets.

viii. Prepare a resettlement plan ¡¢ £¤¥¢¦ §¨© ¤ ¨ § ¡¢ ¥ ¤¨  ¨¦ §¦¡  ¨¦  ¦  income and livelihood restoration strategy, institutional arrangements, monitoring and reporting framework, budget, and time-bound implementation schedule.

ix. Disclose a draft resettlement plan or the compensation matrix, eligibility criteria or rates determined for the affected land, structures, trees etc., including documentation of the consultation process in a timely manner, before project appraisal, in an accessible place and a form and language(s) understandable to affected persons and other stakeholders. Disclose t h e final resettlement plan and its updates to affected persons and other stakeholders.

x. Conceive and execute involuntary resettlement as part of a development project

or program. Include the full costs of resettlement in the presentation of project s costs and benefits. For a project with significant involuntary resettlement impacts, consider implementing the involuntary resettlement component of the project as a stand-alone operation.

xi. Pay compensation and provide other resettlement entitlements before physical or economic displacement. Implement the resettlement plan under close supervision throughout project implementation.

xii. Monitor and assess resettlement outcomes, their impacts on the standards of living of displaced persons, and whether the objectives of the resettlement plan have been achieved by taking into account the baseline conditions and the results of resettlement monitoring. Disclose monitoring reports

4.4 Comparison of Key LAA and ADB SPS-2009 and Measures to Address the

Gap ¤ ¦  ¤ £ ¦ § ¤ 

91. ¨ ¥§¨ § ¡  ¢ § ¦¢¨ ¢ ¢ ¨  ¤¡ §  ¢  ¥ ¨ ¤¦ ¤ ¨ ¡ ¦

¤  ¨ ¢¦ §¤¨ ¤ ¥ ¢   ¦ ¢  §¡ §  £¦ ¢ ¡ ¤ ¦  ¤ £  ¦ § ¤  ¥ ¢£ §¡ §¦¢ ¦ §¤¨ ¤  ¥ ¢ § ¦¢¨ law is unclear on how rehabilitation is to be achieved and in practice the provision of rehabilitation

4-4

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

is left to ad hoc arrangements taken by the local governments and specific project ¢ ¤ £¥ £ ¥© ¤ ¡¢ ¡¢ ¢£¤£¥ ¦§ ¨©¤ ¥ ¢¤ ¦ £¢¥ ¡¤ ¡¤ ¡¤ ¡ ¥ ¢ £ ¢     £ cess, structure and consultations undertaken with DPs, valuation and project specific grievance redress mechanism. Other gaps include requirement to compensate and assist DPs without legal rights to land, attention to vulnerable groups, indigenous people and severely affected DPs, importance given to gender issues, monitoring of resettlement implementation, and disclosure of resettlement plans and monitoring reports. In case of emergency acquisition under the LAA, people may be

displaced prior to being compensated and assisted. To clarify these issues and reconcile gaps

¤¥ ¤ ¤ £   ¦¥ £ ¦  £ ¢  ¡¢ ¢¦¤ ¥© ¤ ¦¤  ¤ ¦¡¤ ¦  ¢¡ ¥ ©¤ ¡¢ ¤ ¥ ¤ £¦¡ £

         ! compensation at replacement cost of all items, the rehabilitation of informal settlers and the provision of subsidies or allowances for DPs that may be relocated, suffer business losses or may be severely affected.

92. Difference between Pakistan s Law, ADB Policy and measures to address the

differences or gaps are outlined in Table: 4.2: 0 +6 Table 4. 2" #$% %&'&( )& *& +,&&( -. / $0+.( 10 2. ,3 4#5 -6 7$ )8 . ( 9 :&.0 ; '& Address the Differences or Gaps

Pakistan LAA 1894 ADB SPS 2009 Measures to Address the Gap in the Project Compensation for land and other DPs are to be compensated Land valuation is to be based on current assets is based on average for all their losses at replacement (market) value with an additional values and department unit rates replacement cost, including payment of 15%. The valuation for the that do not ensure replacement transaction cost and other acquired housing land and other assets is the market value of the property related expenses, without full replacement costs, without deducting for acquired. However, LAA deducting for depreciation. depreciation, keeping in view the fair market requires that a 15% compulsory values, transaction costs and other acquisition surcharge applicable payments that may be required. supplement the assessed compensation. No provision for resettlement Requires support for Provision will be made to pay for expenses, income/livelihood rehabilitation of income and resettlement expenses (transportation and rehabilitation measures or livelihood, severe losses, transitional allowances), compensate for loss allowances for displaced poor and for vulnerable groups. of income, and provide support to vulnerable and vulnerable groups. persons and those severely impacted (considered to be those losing 10% or more of their productive assets). Squatters and informal Lack of formal title is not a Squatters, informal tenants/leaseholders are tenants/lease holders are not bar to compensation and entitled to compensation for loss of entitled to compensation for rehabilitation. All DPs, structures and livelihood and for relocation. If loss of structures, crops including non-titled DPs, are they occupied the land or structures in the eligible for compensation of project area prior to the cut-off date for all non-land assets if they eligibility for resettlement assistance. occupied the land or structures in the project area prior to the cutoff date for eligibility for resettlement assistance. Has no specific requirement for Requires the preparation of Draft LARP is prepared prior to ADB the preparation of a LARP a LARP based on social appraisal of the project. Final LARP is impact assessment and prepared based on detailed design and is a consultation with DPs condition for awarding civil works contracts.

4-5

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Pakistan LAA 1894 ADB SPS 2009 Measures to Address the Gap in the Project elaborating on displaced

persons entitlements, the income and livelihood restoration strategy, institutional arrangements, monitoring and reporting framework, budget, and time-bound implementation schedule. No convenient grievance Requires the establishment Will establish easily accessible grievance redress mechanism except of accessible grievance redress mechanism available throughout recourse of appeal to formal redress mechanisms to project implementation that will be widely administrative jurisdiction or the receive and facilitate the publicized within respective project area and

court of law resolution of DPs concerns amongst the DPs. about displacement and other impacts, including compensation There is no requirement for Requires that LARP LARP implementation will be monitored monitoring resettlement implementation is monitored both internally and externally. Both internal implementation and disclosure and LARP and monitoring and external resettlement monitoring of resettlement plans and reports are disclosed in an reports will be disclosed. monitoring reports accessible place and a form and language(s) understandable to DPs and other stakeholders. Has an emergency provision Requires that DPs are Emergency provision of the LAA will not be that allows civil works to compensated and provided used in acquiring land for the project. Civil proceed before compensation is other resettlement works may only proceed after the LARP is paid entitlements before physical implemented and compensation for loss of or economic displacement. assets and other allowances are fully paid.

4.5 Eligibility and Entitlements ¡ ¥©¦  ¤ ¡¦£  ¥ 93. Cut-¡¢ ¢ £¤¥¦ § ¨ ©¦ ¦ ¥ ¢¡  ¡¦¤ ¥ ¡   ¦  ¥¦ £ ¥ - off date for each section that involves LAR impacts. The cut-off date shall be set and announced to prevent influx of outsiders and to avoid false and frivolous claims for compensation, relocation and livelihood rehabilitation entitlements. Any person who enters in the project land after the announced cut of date or any assets established in corridor of impact after cut-off date will not be eligible for compensation however, the affected persons will be served a prior notice to remove their assets and take the salvage free of cost.

94. In case of acquisition of land and land-based assets under LAA provisions, the cut-off date is the date of notification of land acquisition under Section-4 of the LAA in the official gazette. Each DP will be documented and issued identification as to confirm his/her presence on the proposed site/alignment of the project prior to the cut-off date and to avoid false and frivolous claims at the time of LARP implementation. The cut-off date was disclosed to the DPs through consultative meetings, focus group discussions, field surveys and other means of communication including face-to-face communication with communities in close coordination with the heads of the villages.

4-6

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

95. DPs are those who are physically displaced (relocation, loss of residential land, or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. The persons holding or occupying the land/assets at the subproject site on or before the cut-off date and who face physical or economic displacement due to permanent or temporary loss of their assets including land, structures and other assets appended to the land or their livelihood whether full or partial as a consequence of land acquisition or eviction from public land (ROW) will be entitled for compensation and rehabilitation/income restoration provisions under the provisions of this LARP.

96. DPs may include (i) persons or legal entities with formal legal rights to acquired land and/or structures in entirety or in part, (ii) persons who have no formal legal rights to land and/or structures lost wholly or in part but who have claims to such lands that are recognized or recognizable under national law, and (iii) persons who lost the land or structure they occupy in entirety or in part who have neither formal legal rights nor recognized or recognizable claims to such land. The eligible DPs entitled for compensation under this LARP may include but not limited to the categories defined below:

Owners of land and assets i.e. structures (residential/ commercial or of any other use) with formal legal title to land and the recorded occupiers/users of land/assets as provided in the land record registers and cadasters etc.;

DPs whose rights are not formal or legal but whose claims are recognized or recognizable under national laws or customs will be eligible for compensation against their affected land/assets. Such DPs may include people who have customary usufruct right to the land that is held either by the community (collectively) or the state or people who have inherited, occupied, and utilized the land for generations but lack titles simply because the state has not formalized the land records and issued title to them.

DPs without formal legal rights or recognizable claims under national law and customs and may include all squatters, tenants, sharecroppers, and wage laborers. Although such DPs lack legal or recognizable rights to the land/asset but because of lost assets or impacted livelihoods they will be considered DPs eligible to receive compensation for assets other than land and resettlement assistance.

Cultivators or those whose livelihood is dependent on acquired land, business operators of affected commercial structures and their employees whether registered under law or informal and the identified vulnerable groups.

4.6 Entitlements

97. The entitlement matrix is prepared that will be implemented according to compensation ¨ © ¢¨  ¡¤¢¨¦ £ © ¨ ©  ¡¢£ ¤£ ¥£¢£ ¦§ ¨ © ¡ ©¦£¦¢ ¡ ¡©¦ ¨ ¡  £ © ¢ £ ©¡ £¦  ¨ £ ¦ B Safeguard Statement Policy (SPS-2009).

4-7

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

98. Keeping in view the possible project impacts, the following compensation and other assistance/allowances would be permissible to the DPs as provided in (Annexure-5).

Affected structure/ trees/ land compensation.

Vulnerability/ women-headed household allowance;

Crop compensation and additional crop compensation allowance;

Severity allowance.

4-8

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Table 4. 3: Entitlement Matrix for Compensation

Asset Specification Eligible Persons Compensation Entitlements

Cash compensation at replacement cost plus 15% compulsory acquisition surcharge (CAS) free of taxes, registration and transfer costs; or 129 Farmer/

Titleholder Land for land compensation through provision of plots of equal value and productivity as that of lost. (The final rates will be applied/determined by the District Revenue Department/BOR, Govt. of KP)

Cash compensation equivalent to 98 Lessee market value of gross harvest crop of the (registered or affected land for the remaining lease All land falls not) years, up to maximum of three years. under project

64 Sharecropper/ 5 Cash compensation equal to the Impact Tenant market value of gross annual crop yield of (registered or lost land, proportionate to their share for not) two years. Agricultural

Agriculture Cash indemnity corresponding to their Land, Workers salary for the remaining part of the including (registered or agriculture season up to maximum three uncultivable not) months. waste land

No compensation for lost land. (permanent

One rehabilitation allowance equal to impact) Squatters/ market value of the gross annual yield of Informal Setters lost land in addition to standard crop compensation.

98 Farmer/ Severe agricultural land impact Titleholder allowance equal to the market value of the tenant/ gross annual yield of lost land for one Leaseholder year. Additional

64 Sharecropper One severe impact allowance equal to provision for DPs (registered or value of share of harvest lost (Additional losing more than not) to standard crop compensation) 10% their total

Agriculture operational Agriculture workers, whose contracts Workers agricultural will be interrupted, will receive an (registered or holding. indemnity corresponding to three months not) of income.

One rehabilitation allowance equal to Squatters/Inform value of one gross harvest (In addition to al Settlers crop compensation) Land required All eligible Temporary

temporarily persons, as above Crop compensation for last season(s) impact on during civil (with and without and reclamation of land to original use. arable land works title)

Crop compensation based on full All users with or Crops grown All type of market rate for one-year harvest including without title or on land to be affected crops kharif/ rabi agriculture season based on registration acquired Provincial agriculture department.

Fruit trees: compensation for mature fruit- bearing trees will comprise of the market rate of the yearly crop yield All affected Trees 129 Owner multiplied by the number of years required trees to grow such a tree to the same productive level it was cut; and for immature trees that are yet to bear fruit compensation will be

4-9

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Asset Specification Eligible Persons Compensation Entitlements based on the gross expense needed to reproduce the tree to the same age it was cut.

Timber trees will be valued based on the market value of their dry wood volume. The wood of the fallen tree will remain with the owner and its value will not be deducted from the compensation.

16 All relevant DPs For covered area PKR 9682/ (M2) Boundary All affected

(including informal Boundary wall PKR 2522/ (M3) wall, floor etc. persons settlers) Poor and female-headed

Lump sum assistance allowance in Households cash equal to 3 months OPL @ PKR Affected and other 49 Head of the 15000 (each). Vulnerable Vulnerable

household Temporary or permanent employment Households households, during construction or operation, where Including the feasible. elderly, identified through the SIA

The next eligible DP will be his wife to get compensation.

No need to provide court succession letter, only death certificate verified by the affected persons committee will be In case of DP Headed of Any structure provided. Expires household

In case the DP was only person expires and no other family member recorded during the census survey, no other person will be entitled and compensation will be cancelled.

Dealt with as appropriate during project Unidentified Unanticipated All DPs implementation according to the ADB Losses impacts Safeguard Policy. * OPL. (Official Poverty Line) as declared minimum wage by the Government (2018-19)

4.7 Compensation for DPs with Legal and Administrative Impediments

99. A condition for commencing civil is the completion of compensation payments and provision of allowances to DPs. However, there are cases when compensation cannot be disbursed to certain DPs due to a number of legal and administrative impediments. DPs who are unable to receive their compensation include:

i. DPs who did not accept the award due to objection to (a) the measurement of the land or affected asset, (b) the amount of compensation, (c) the person to whom it is payable, or the apportionment of the compensation among the persons interested; ii. Absentee land owners (DPs living overseas or in other parts of the country), and without an authorized representative to collect compensation; iii. DPs with pending inheritance mutations; iv. DPs unenthusiastic to collect meager compensation amount; v. DPs unable to alienate the acquired asset like juveniles with no legally documented guardian or due to other issues.

4-10

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

100. Compensation for both land and non-land assets is deemed to have been paid when the amount in cash or cheque has been provided to DPs or deposited into their bank account, or in the District Treasury ready to be withdrawn at any time the impediment is resolved.

101. Although compensation of these DPs is beyond the control of the PMO and are mainly dependent of the actions of the DPs or ruling/ decision from a third-party i.e. the court or BOR, PMO will exert good-faith efforts to (a) contact and notify DPs through their last known address, village heads or kins; (b) inform DPs who to contact or where to proceed to collect their compensation; and (c) explore possible actions that may help them receive their compensation.

102. The district collector with support from PMO/PIC, will undertake continued community consultations and outreach in order to locate, assist and guide DPs with legal and administrative impediments. Through these efforts with pending compensation payments, organizing village meetings, posting of notices in public places, serving notices at last known address of DPs and publishing the names of unpaid DPs in the print media is needed to demonstrate that due efforts were conducted in addressing cases with impediments.

103. Pending compensation payments, organizing village meetings, posting of notices in public places, serving notices at last known address of DPs and publishing the names of unpaid DPs in the print media is needed to demonstrate that due efforts were conducted in addressing cases with impediments.

4-11

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

5 COMPENSATION, RELOCATION AND INCOME RESTORATION

5.1 General

104. This section deals with the compensations for affected land, structures and assets based on the findings of the census and socio-economic survey, Deputy Commissioner Swabi demand bill under the legal and policy framework of GoP & ADB guidelines. The LARP focuses on providing compensations for the lost assets and prescribes measures to restore their livelihoods to at least the same living standards of the DPs prior to the project. In Lot-II some of the livelihood will be affected wherever land is being acquired is not only compensated with the prevailing market rate but in addition to it the additional crops compensation and vulnerability allowances are also paid as per SPS 2009 of ADB.

105. Affected land and other assets will be compensated at replacement rate in a timely manner to ensure that DPs are able to adopt to the impact and are able to use the compensation for alternative or supplemental source of income for their household. For DPs losing 10% or more of their agricultural land, a severity allowance equivalent to one-year crop income loss will be provided as an additional support for them during the transition as they find alternative source of income.

5.1.1 Additional Assistance for Vulnerable Households

106. Based on the sample survey a total of 49 DPs out of 312 have been identified as vulnerable. Out of these, 1 DP were female headed household, 45 DPs were poor and below the OPL while 3 DPs were identified as disabled headed household. These DPs will be provided a one-time vulnerable allowance equal to 3 months OPL.

5.2 Livelihood Support Intervention Measures

107. 259 DPs (including 93 land owners, and 98 lease holders, 63 share croppers and 5 tenants) are losing 10% or more of agricultural land (productive) are considered significantly and are severely affected (i.e. losing 10% or more of their productive assets) and 36 DPs belonging to vulnerable households may require livelihood support in addition to the compensation and

monetary allowances to help them cope with their displacement. Related to this, members of ¡ §§ ¦ ¨ ¥ ¡ §§ ¦¨ §  ¤ ¡ ¨¥  these D ¡ ¢ £¤¥ ¡¦£¤§ ¨ ¡ © §§ ¦ ¤   ¦ ¨   ¦   ¦ §¤  ¦   ¡ project implementation.

108. Prioritization in project-related jobs- A number of employment opportunities will be created during the construction phase, particularly for the un-skilled labor. The contractor will employ the un-skilled/skilled labor (male and female) from the local communities/DPs.

109. Under the Khyber Pakhtunkhwa Government employment policy, long-term/ permanent employment is provided to the DPs losing land on public developmental schemes. Similarly, after completion of the PHLCE project permanent/ long-term employment for maintenance and operation of the canal system will be provided to some of these DPs preferably losing land.

110. Training and Facilitation Support (water-use skills and farm management capacity improved in project area) under the output-2 of PHLCE project, the project Implementation Office

5-1

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

(PIO/ KPAD) will provide various types of trainings, distribution of agri-inputs, formation of water user associations, construction of water courses, undertaking water user association trainings for efficient operation and maintenance and organization, establishment of 100 demonstration plots and conduct farmer field schools and farmers training in demonstration plots, and training for livestock raring will be consider on need basis. Therefore, through agriculture or livelihood expert and other social mobilization team will be engaged and link such DPs with related livelihood support and training programs in the project area and provide alternative occupations or livelihood sources that they may explore. The livelihood restoration cost of PKR 1 million is also included in LARP-II budget.

5-2

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

6 INFORMATION DISCLOSURE, CONSULTATION AND PARTICIPATION

6.1 Project Stakeholders

111. There are two types of stakeholders, i.e. primary and secondary stakeholders. In accordance with the ADB guidelines, the primary stakeholders are the initial stakeholders, such as displaced persons (DPs), general public and women located within the vicinity of the project area. Public consultation was made with the local community/ general public along the project alignment and positive response by these people/ DPs was noted.

112. Under this project, the secondary stakeholders are the representatives of Government Departments/ agencies involved in the planning, design, implementation and operation of the project, including various government departments such as Irrigation, Revenue, Forest, Agriculture, C&W, Education, Health, WAPDA and local government authorities.

6.2 Public Consultations along the Project Alignment

113. During the socio economic survey, a total of 14 consultative meetings were conducted in which 198 participants were participated.

114. During the field survey people were asked about their views regarding the PHLCE project. In general, people have positive thinking and better hopes about the project. According to them it will be beneficial for their agricultural land and eventually this canal will raise the productivity of their land and overall prosperity in the vicinity.

6.3 Concerns Regarding the Project

i. Land owners demanded compensation against land to be acquired for the canal should be in accordance with the latest market rates. The participants expressed concern that the Government land rates are not acceptable to them. Participants requested that compensation against land acquisition should be given according to the latest market rates. Reply: The matter was take up with the collector of the district and he fixed prices of land as per the average cost of one year back with effect from the date of notification under section-4, as per transaction of sale and purchase of land in the vicinity. Even if the DPs are not satisfying with one-year latest sale rate in the nearby vicinity they can file an objection with the district collector for reconsideration. The district collector is competent to review the already decided rate. Similarly, the crops, fruit and non-fruit trees were assessed and valuated by the concerned department in accordance with the current schedule rate of the affected assets. ii. The participants enquired about the land which falls within the RoW of the propose pressure pipe; will it be considered as government property or existing ownership will remain? They wanted to know whether they will be allowed to cultivate crops after completion of works on the land which falls within the RoW of the proposed pressure pipe.

6-1

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Reply: Yes! Its Government property since it will transfer on the name of government and no one will be allowed for cultivation in the entire ROW. iii. Male household members should be employed in the project related jobs so that they can stay in their own community, rather than seeking employment outside the project area. In this way their social safety could be enhanced. Reply: Agreed the contractor will be asked to engage the local and preferably APs/ DPs in the construction of the project. iv. The alignment should be in such a way that the loss of agricultural land will be minimal. Reply: To minimize the displacement, canal alignment has been designed to award its traversing through the settlements and agriculture land.

6.4 Consultative Discussions with Women

115. During the consultation with the women along the project alignment and in the project area, interaction with them was made through a female social mobilizer. During consultation, the following concerns were pointed out by the local women: -

i. Women routine activities/ jobs should be affected due to the implementation of the project activities? Reply: Women routine activities/ jobs etc. will never be affected during implementation of project activities as the pressure pipe alignment has been designed in open area or even minimum residential structures affected and never affected the mobility of the local population. ii. The present passage/ crossing at different locations should be damaged during implementation of civil works? Reply: During implementation of the project activities where ever present passage/ crossing will damage for some time, there will be arrange alternative routes and none of the routine activities of local population will be affected and soon will be rehabilitated after completion of activities. iii. Organize vocational training center for women for income generating activities in project area. Reply: Vocational trainings will be arrange after construction of pressure pipes and canal by the agriculture department through PIO which is related to agriculture and other income generation activities. 116. The community especially the farming community are very excited after hearing about the actual implementation of the PHLCE project. The detail of consultation meetings/ focus group discussions in community/ stake holders are annexed as (Annexure-06).

6.5 Consultations with DPs

117. Based on the consultations with the affected persons and general public, a number of concerns were highlighted above and accordingly some feedback was also provided. The main

6-2

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

concerns included the compensation especially crops and trees should be provided based on current market rates and disbursement should be made prior to the start of civil works; employment to the local people should be provided in the project construction activities. RoW clearance for undertaking the project activities should be minimized at the best possible extent.

118. Future consultation with the APs/ DPs will be made through Deputy Director social safeguard and its team. Disbursement of compensation will be made through the PMO and verify by the ERM.

6.6 Information Disclosure

119. Detailed information of the project after translating into National Language Urdu has been displayed to the local community at appropriate places i.e., PMO, DC and Nazim of District Office Swabi. The purpose of these information, that community and stakeholders to know about the project activities, i.e. eligibility for entitlement and compensation, price assessment & valuation of losses, severity allowances, vulnerability allowances, payment of compensation, community complaints redress system, project benefits etc.

6-3

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

7 INSTITUTIONAL ARRANGEMENTS

120. Institutional arrangements and their role & responsibilities are mentioned in this section of LARP. The details are as under;

7.1 Project Steering Committee

121. The Project Steering Committee (PSC) mentioned is notified by the KP government, under notification no. C/FA/P&D/ADB/2018, to review the progress and make key decisions for the project. The PSC is chaired by the Additional Chief Secretary from the Planning and Development Department (P&DD) includes Secretaries of KPID, KPAD, Finance, Member Board of Revenue, Deputy Commissioner Swabi, Deputy Commissioner Nowshera, Representative of ADB, Chief Foreign Aid P&D Department, Chief (Water) P&D Department and any co-opted member. The Project Director is being secretary of the PSC. Copy of the notified committee is as (Annexure-09).

7.2 Khyber Pakhtunkhwa Irrigation Department (KPID)

122. KPID is the executing agency (EA) and responsible for overall execution of the PHLCE

¡¢£ ¤¥¦§ ¨ © ¤   ¡¤¥¦¢ ¡¦¤ ¢  -Farm Water Management (OFWM) and Agriculture Extension as implementing agency (IA) for improved agriculture and water use skills. For this purpose, the EA established the project management office (PMO) at project level in Gohati Swabi in June, 2017. The PMO headed by a Project Director to manage all activities associated with the execution and implementation of land acquisition and resettlement and also to ensure the availability of funds for the LARP implementation and other corrective action measures.

7.3 Project Implementation Consultants

123. The PMO is supported by a Project Implementation Consultant (PIC) along with revenue and land acquisition specialist to prepare, implement and monitor the final LARP based on the detailed design of Lot-II of PHLCE Project. The land acquisition team who are responsible for the following activities:

i. Support the BOR in the conduct of DMS and conduct census of all DPs and socio- economic surveys; ii. Thorough coordination with the BOR and relevant departments at the district level to ensure the actual calculation of compensation and assistance according to the provision and policy. iii. Support the PMO at all level and regular consultations with DPs in preparation and implementation of this LARP; iv. Preparation of this LARP for ADB review, including any subsequent update or corrective actions in case of emerging or unforeseen impacts, as required; v. Disclose the final LARP to the DPs after translating the summary of LARP in local language (Urdu/ Pashtu) to make it more understandable.

7-1

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

vi. Update, and maintain the database of the DPs and their assets needed the effective implementation and monitoring of LAR activities; vii. Prepare an action plan to implement the LARP; viii. Formation and orientation of the Grievance Redressal Committee (GRC) for the community complaints resolution; ix. To resolve grievances of DPs, monitor and regularly report on the implementation of the grievance redress mechanism, and maintain a grievances log book; x. Support the PMO in the effective implementation of the LARP, including the livelihood restoration activities; xi. Distribute the notices to the entitled DPs regarding their payment of compensation; xii. Facilitate the DPs in completion of necessary documentation to receive their entitled payments; xiii. Develop a close interaction with the DPs/ community to address their possible concerns;

xiv. Provide proper guidance for the ¡¢£¤ ¤¥ ¦ ¥ § ¨© ¤ £ §¥  ¥£ ¦ ¤¥ ¦ xv. Help the DPs to put their complaints (if any) in front of the GRC, if still issue not resolved consult the Court of law. xvi. Explore the possibility and facilitate land swapping and land consolidation to assist DPs in improving the viability of their remaining plots; xvii. Prepare monthly progress report on the LARP implementation for submission to the PMO, and a semi-annual internal monitoring report for submission to ADB; xviii. Help DPs in other related activities.

7.4 LAR Coordination Committee

124. The functions pertaining to compensation of assets other than land, such as structures/ buildings, trees & crops; and income rehabilitation/ livelihood assistance, the assessment & valuation is being carried out by the District Collector Swabi, through local line departments. The competent authority has notified a committee of concerned departments to ensure smooth and transparent acquisition of land for the construction of PHLCE Project Swabi. The composition and terms of references of the committee mentioned under the notification No. 44- AO/Irr/PHLC/2017-18 dated 17 July, 2018, attached as (Annexure-10).

7.5 External Resettlement Monitor

125. An external resettlement monitor (ERM) is being hired by the PMO through PIC to conduct semi-annual external monitoring reports regarding the implementation of this LARP. As per SPS 2009, all monitoring reports will be disclosed to DPs including the preparation of corrective action plan(s).

7-2

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

8 GRIEVANCE REDRESS MECHANISM

126. This section describes mechanism to receive and facilitate the resolution of displaced

¡¢£¤¥ £¦ §¤¥ §¡¢¥£ ¨ ¥© ¢ ¡ ¨¥§¡£  ¡   ¨ ¥£ ¤ ¡ ¢¤ §¡ ©¢¡ £ ¨ ¢¡ ¨§§¡£ £  ¡ ¤ © £  ¨§¡© persons including women. A grievance mechanism is available to allow a DP to appeal against any disagreeable decision, practice or activity arising from land or other assets compensation. DPs will be fully informed of their rights and of the procedures for addressing complaints whether verbally or in written during consultation, survey, and time of compensation. It is preferred that DPs/ local community should submit their complaints/ concerns and issues formally and accordingly the project staff will enter the complaint on community complaint register (CCR) (ready and available) consisting the minimum information of name and address of complainer, description of complaint, action taken, status of resolution of complaints and other necessary information/ record and reasons in case the issue is not satisfactorily resolved. Proper consideration will be given to avoid the grievances rather than going through a redress process. This can be obtained through the practicable LAR design and implementation, by ensuring full participation and consultation with the DPs, and by establishing extensive communication and coordination between the community, the PMO, the DO (Revenue)/ LAC and other line departments.

127. The following two types of GRCs with their TORs have been notified by the PMO.

Table 8. 1: Grievances Redressal Committee at Project Level

S.No. NAME DESIGNATION 1 Deputy Project Director ( PMO) Chairman 2 Deputy Director Resettlement (PMO) Member 3 Social Safeguard Specialist (PIC) Member 4 Tehsil Nazim (Concerned Tehsil ) Member 5 Revenue Specialist (PIC) Member 6 Representative of (DC Office) Member 7 Deputy Collector (PMO) Member

8.1 TOR of Grievances Redressal Committee at Project Level

i. This GRC will work closely to KPID and GRC at field level. ii. To receive and facilitate the application and grievances of DPs. iii. To explains how the procedures are accessible to DPs. iv. To inform the Affected/ displaced persons of their rights and of the procedures for addressing complaints whether verbally or in writing during consultation, survey, and time of compensation. v. To enter the complaint on community complaint register (CCR) consisting the minimum information of name and address of complainer, description of complaint, action taken,

8-1

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

status of resolution of complaints and other necessary information/ record and reasons in case the issue is not satisfactorily resolved. vi. Proper consideration will be given to avoid the grievances rather than going through a redress process. This can be obtained through the practicable LAR design and implementation, vii. To ensuring full participation and consultation with the DPs and by establishing extensive communication and coordination between the community and PMO. viii. At Project level KPID staff will inform the displaced persons about GRC and mechanism by pasting the information at prominent places. Names and contact numbers of the members of the GRC and PMO staff will be disseminated to DPs through information brochures once these have been notified. ix. The complaints will be registered by maintaining a community complaints register (CCR), where the name & address of complainer, date, description of complaint and action taken will be entered. Table 8. 2: Grievances Redressal Committee at Field Level

S. No. NAME DESIGNATION 1 Deputy Collector (PMO) Chairman 2 Social Safeguard Specialist (PIC) Member 3 Tehsil Nazim (Concerned) Member 4 Lady Tehsil Councilor Member 5 Nazim UC (Concerned) Member 6 Representative of the DPs Member 7 Patwari (Concerned) Member

8.2 TOR Grievances Redressal Committee at Field Level

i. This GRC will work closely to Community and GRC at project level. ii. To receive and facilitate the application and grievances of Affected/ displaced persons. iii. To explains how the procedures are accessible to DPs. iv. To facilitate the Affected/ displaced persons to appeal against any decision, practice or activity arising from land or other assets compensation. v. To inform the displaced persons of their rights and of the procedures for addressing complaints whether verbally or in writing during consultation, survey, and time of compensation. vi. to enter the complaint on community complaint register (CCR) consisting the minimum information of name and address of complainer, description of complaint, action taken,

8-2

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

status of resolution of complaints and other necessary information/ record and reasons in case the issue is not satisfactorily resolved. vii. Proper consideration will be given to avoid the grievances rather than going through a redress process. viii. To ensuring full participation and consultation with the DPs and by establishing extensive communication and coordination between the community and PMO. ix. To inform the displaced persons about GRC and mechanism by pasting the information at prominent places. Names and contact numbers of the members of the GRC members and will be disseminated to DPs through information brochures. x. The complaints will be registered by maintaining a community complaints register (CCR), where the name & address of complainer, date, description of complaint and action taken will be entered xi. the issues/ community concerns relating to the land will be addressed by the revenue department (LAC)/ and or can be referred to GRC, while issues other than land will be directly addressed by the PMO and can be placed with GRC at project level to resolve the community issues. Names and contact numbers of the members of the GRC and PMO staff will be disseminated to DPs through information brochures once these have been designated/ recruited. Table 8. 3: Community Complaints/Grievance Redress Process/mechanism.

Step - 1 The Project will establish a Grievances Redressal Committee (GRC) at

Project and Field Level and also establish a grievance register at PMO level.

¡ ¢ £¤¥ ¦ ¢§¨ © ¢¤ ¥¤   §¢   §¥  ¥ ¨ ¤ ¢ §¢    ¢ ¤¢¢¢  part of internal and external monitoring. Step - 2 The Grievances Redressal Committee (GRC) at Project and field level will be responsible for documenting verbal and written complaints. Complaints will be written onto a complaints register. The complaints Register and records (a) who reports the complaint; (b) the date the complaint was received and recorded; (c) the nature of the complaint; (d) information of proposed corrective action; (e) date of response (verbal and written) provided to the complainant; (f) corrective actions taken by whom and when, and (g) the date the complaint was closed out. Minor complaints will then be directed to the GRC at field level within 2 (two) days period, the Grievances Redressal Committee (GRC) members and/ or Contractor Representatives depending on the particular cases for necessary actions and immediate response. This will be followed by the action plan provision and implementation no longer than 3 (three) working days. Step - 3 All major complaints will be forwarded to the GRC at project level and Management team. Appropriate actions to close out the complaint will be determined and written onto the form. Where necessary the team will investigate complaints from the community and an investigation report will be developed. All the process should be finalized within 1 (0ne) week at most,

8-3

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

depending upon the cases. Step - 4 A written response for every grievance will be prepared within 14 (fourteen) working days at most. The response will be delivered verbally before the written copy is provided to the complainant. The complainant will be asked to sign and date the complaints register. Step - 5 Action Plan implementation. The management will recognizes that eventually timelines for possible actions will be determined by the nature of the grievance as stipulated in the agreed action form. If more time is required to implement appropriate actions, the Grievances (GRC) at field level will inform the complainant however, will assume responsibility for ensuring all actions are implemented to close out the complaint. In most cases the written response and agreed actions may be sufficient to resolve the complaint, otherwise if the complainants unresolved, Step - 6 The complainant will be referred to the Grievances Resolution Committee at project level. The Grievances Redressal Committee at project level aims to resolve complaints within 21 (Twenty-One) working days. Again, depending on the nature of the complaint, a longer timeline may be agreed upon with the complainant. If an agreeable solution is reached, the complainant will be asked to sign on the log book, date, complaints and the agreements to confirm receipt of agreement with the Project written response.

Step 7 If both parties are agreed on the compliances of results, both parties will sign and date the agreement on grievance register. The agreement will become the formal document for evaluation purposes on project level.

Step 8 In case, the grievance redressal system does not satisfy the Affected/ displaced persons, then they can pursue further by submitting their case to the appropriate court of law as per the process set out in Section 18 to 22 of the LAA 1894.

8.3 Organogram

128. An Organogram showing the institutional arrangements for the implementation of LARP is illustrated through a diagram presented in Figure 8-1

8-4

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Figure 8. 1: Institutional set-up for the Implementation of LARP

Abbreviations Explanation C&W Communication & Works DFO District Forest Officer DO (R) District Officer (Revenue) DO District Officer DP Displaced Person GRC Grievance Redress Committee GS Gender Specialist GRS Grievance Redress Specialist KPID Khyber Pakhtunkhwa Irrigation Department LAC Land Acquisition Collector MIS Management Information System PD Project Director PMO Project Management Office RS Resettlement Specialist SSMC Social Safeguard Management Consultant XEN Executive Engineer ERM External Resettlement Monitor

8-5

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

9 IMPLEMENTATION SCHEDULE OF LARP-II

129. The commencement of civil work will be subject to the satisfactory implementation of this LARP-II including payment of compensation of land, structures, crops, trees and allowances/ and redress of community concerns. The implementation should be verified by an independent/ external monitor. ADB considers LARP-II implementation to start after the approval of the final/ implementation-ready LARP.

130. However, an updated schedule for the implementation of LARP (milestones) and its associated activities of Lot-II, are given in Table 9.1.

Table 9. 1: Implementation Schedule of LARP for Lot-II

Action Responsibility Date of Task Completion Census of DPs (with socio-economic data) PIC Consultants Completed Notify grievance redress committee PMO Completed Submit revised updated LARP to ADB with PIC 24 April 2019 approved rates of compensation Consultants Approve updated LARP ADB 30 April 2019

Hire and mobilize ERM PMO/ PIC 1 June 2019 Translate updated LARP information booklet to PIC 15 May 2019 Urdu language for disseminating to DPs and disclose updated LARP. Sign civil works contract for Lot-II PMO 30 June 2019

Pay mobilization advance PMO/ 10 July 2019 Contractor Publish notification of Section-5 of LAA for Lot-II DC/ LAC/ 20 April 2019 in; Commissioner a. Mouza Kotha b. Mouza Swabi c. Mouza Kala d. Mouza Shah Mansoor e. Mouza Baja f. Mouza Bamkhel g. Mouza Dara h. Mouza Maini Sharqi i. Mouza Maini Gharbi Publish Declaration of Land Acquisition under Commissioner/ 30 May 2019 section 6 for Lot-II; Printing Press a. Mouza Kotha b. Mouza Swabi c. Mouza Kala d. Mouza Shah Mansoor e. Mouza Baja f. Mouza Bamkhel

9-1

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Action Responsibility Date of Task Completion g. Mouza Dara h. Mouza Maini Sharqi i. Mouza Maini Gharbi Issue and notify land award under section 11 of DC/LAC 30 July 2019 LAA for Lot-II; a. Mouza Kotha b. Mouza Swabi c. Mouza Kala d. Mouza Shah Mansoor e. Mouza Baja f. Mouza Bamkhel g. Mouza Dara h. Mouza Maini Sharqi i. Mouza Maini Gharbi Distribute notices to DPs for payment of PMO/ LAC and 30 August 2019 compensation for Lot-II; support PIC a. Mouza Kotha b. Mouza Swabi c. Mouza Kala d. Mouza Shah Mansoor e. Mouza Baja f. Mouza Bamkhel g. Mouza Dara h. Mouza Maini Sharqi i. Mouza Maini Gharbi Submit first external monitoring and compliance ERM 30 August 2019 report Approve compliance report and commencement ADB 15 September 2019 of work Demarcate in the field areas to be kept from civil PIC/ Contractor 30 September 2019 work and orient the contractor on the required actions. a. Mouza Kotha b. Mouza Swabi c. Mouza Kala d. Mouza Shah Mansoor e. Mouza Baja f. Mouza Bamkhel g. Mouza Dara h. Mouza Maini Sharqi i. Mouza Maini Gharbi Complete disbursement of compensation for the LAC/DC Swabi 30 September 2019 land and structure; a. Mouza Kotha b. Mouza Swabi c. Mouza Kala d. Mouza Shah Mansoor e. Mouza Baja

9-2

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Action Responsibility Date of Task Completion f. Mouza Bamkhel g. Mouza Dara h. Mouza Maini Sharqi i. Mouza Maini Gharbi Submit compliance report on LARP ERM 15 October 2019 implementation for ADB approval and recommend issuance of no-objection for commencing work in areas where compensation has been disbursed. Issue no-objection for NTP with civil works for Lot- ADB 30 October 2019 II Submit semi-annual external monitoring report on ERM April 2020 and every 6 remaining LARP activities and emerging LAR months thereafter until issues during implementation of civil works completion of the Project

9-3

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

10 RESETTLEMENT BUDGET

131. The resettlement budget has been prepared considering the impacts, which include the

loss of land, crops, trees other assets based on demand bills as received from deputy  ¤  ¦ ¦¦¥ ¤¤¦¤¤¦ ¡¥  ¡¢ ¢£¤ ¤£¡ ¥¦§¨ © £ ¥£ £   ¤ ¤ §¦¤ ¡ ¢¦¥ ¤ £¡ ¥ ¡ he basis of available information. The prices of different land types determined by DPAC and District Collector Swabi. The details of mouza wise demand bills for lot-II in the attached (Annexure-4). The budget presented below is prepared on the basis of demand bill received from the District Collector, Swabi. Provision calculated for 10% or more of affected land holders DPs @ equal to 1-crop/ year. Similarly, provision calculated at minimum wage fixed by the government @ PKR 15,000/ month for a period of three months for vulnerable DPs. The total amount of land acquisition is PKR 644.75 million for land compensation as presented in below Table 10.1 and the overall amount of budget is PKR 794.59 million to compensate all DPs for smooth implementation of LARP as presented in Table 10.2 below. The detail lists of DPs and their land, crops, trees structure and other compensation details in the attached (Annexure-5). The EA as in close contact with the DC Swabi, to ensure with the timely payment of compensation, in order to implement LARP envisaged in the SPS 2009.

10-1

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Table 10. 1: Detail Budget of Land Mouza and Category wise for Lot-II

Lot-II: Valuation of Land Muza and Categary wise by District Collector, Swabi Mouza wise Valuation of Land (PKR) Stamp Duty @ District Council Fee Total Amount of Grand Total S.No. Mouzas of Lot-II Categary of Land in Lot-II Total Land under Amount of Land Total Amount Amount in Rate/ Kanal CAS @ 15 % 2% on Total @ 2% on Total Land Categary Amount Mouza Acquisition (Kanal) under Acquisition (Col: 6+7) Million Amount (Col: 8) Amount (Col: 8) wise Wise of Lot-II 1 2 3 4 5 6 7 8 9 10 11 1 Barani (Rain Fed) 10.65 471,060 5,016,789 752,518 5,769,307 115,386 115,386 6,000,080

2 Shah Nehri (Canal Irrigated) 28.35 435,640 12,350,394 1,852,559 14,202,953 284,059 284,059 14,771,071

3 Kotha Banjr Qadeem (Baran) 21.2 176,000 3,731,200 559,680 4,290,880 85,818 85,818 4,462,515 28,608,180 28.6

4 Ghair Mumkin Abadi (Built-up) 1.5 1,650,000 2,475,000 371,250 2,846,250 56,925 56,925 2,960,100

5 Ghair Mumkin (Uncultivated) 3.5 99,000 346,500 51,975 398,475 7,970 7,970 414,414

6 Barani (Rain Fed) 15.88 428,375 6,804,022 1,020,603 7,824,625 156,493 156,493 8,137,610

7 Chahi (Well Irrigated) 11.61 543,780 6,313,890 947,084 7,260,974 145,219 145,219 7,551,412 Swabi 82,794,091 82.8 8 Ghair Mumkin (Uncultivated) 2.35 220,000 517,000 77,550 594,550 11,891 11,891 618,332

9 Shah Nehri (Canal Irrigated) 102.91 540,213 55,590,917 8,338,638 63,929,555 1,278,591 1,278,591 66,486,737

10 Barani (Rain Fed) 8.05 726,000 5,844,300 876,645 6,720,945 134,419 134,419 6,989,783

11 Chahi (Well Irrigated) 49.6 561,000 27,825,600 4,173,840 31,999,440 639,989 639,989 33,279,418

12 Kala Ghair Mumkin (Uncultivated) 11.15 180,400 2,011,460 301,719 2,313,179 46,264 46,264 2,405,706 76,565,921 76.6

13 Shah Nehri (Canal Irrigated) 23.35 440,000 10,274,000 1,541,100 11,815,100 236,302 236,302 12,287,704

14 Maira (Samilar as Rain Fed) 33.85 533,618 18,062,969 2,709,445 20,772,414 415,448 415,448 21,603,311

15 Shah Mansoor Barani (Rain Fed) 21.4 680,056 14,553,198 2,182,980 16,736,178 334,724 334,724 17,405,625 17,405,625 17.41 16 Baja Shah Nehri (Canal Irrigated) 153.05 1,086,770 166,330,148 24,949,522 191,279,670 3,825,593 3,825,593 198,930,857 198,930,857 198.93

17 Nul Chahi (Tube Well Irrigated) 9.5 900,000 8,550,000 1,282,500 9,832,500 196,650 196,650 10,225,800

18 Barani (Rain Fed) 38.25 421,182 16,110,211 2,416,532 18,526,743 370,535 370,535 19,267,812

19 Bamkhel Chahi (Well Irrigated) 45.81 940,476 43,079,024 6,461,854 49,540,878 990,818 990,818 51,522,513 83,405,733 83.41

20 Ghair Mumkin (Uncultivated) 5.7 220,000 1,254,000 188,100 1,442,100 28,842 28,842 1,499,784

21 Banjr Qadeem (Baran) 3.1 240,000 744,000 111,600 855,600 17,112 17,112 889,824

22 Barani (Rain Fed) 19 550,000 10,450,000 1,567,500 12,017,500 240,350 240,350 12,498,200

23 Ghair Mumkin (Uncultivated) 10.2 660,000 6,732,000 1,009,800 7,741,800 154,836 154,836 8,051,472

24 Dara Shah Nehri (Canal Irrigated) 17.6 792,000 13,939,200 2,090,880 16,030,080 320,602 320,602 16,671,283 65,090,257 65.09

25 Maira (Samilar as Rain Fed) 70.2 267,000 18,743,400 2,811,510 21,554,910 431,098 431,098 22,417,106

26 Chahi (Well Irrigated) 8.3 549,240 4,558,692 683,804 5,242,496 104,850 104,850 5,452,196 27 Barani (Rain Fed) 61.3 511,877 31,378,060 4,706,709 36,084,769 721,695 721,695 37,528,160 Maini Sharqi 49,211,477 49.21 28 Ghair Mumkin (Uncultivated) 54.15 180,400 9,768,660 1,465,299 11,233,959 224,679 224,679 11,683,317

29 Barani (Rain Fed) 14.55 511,877 7,447,810 1,117,172 8,564,982 171,300 171,300 8,907,581

30 Maini Gharbi Abi (Irrigated) 44.85 563,261 25,262,255 3,789,338 29,051,593 581,032 581,032 30,213,657 42,735,191 42.74

31 Ghair Mumkin (Uncultivated) 16.75 180,400 3,021,700 453,255 3,474,955 69,499 69,499 3,613,953

Total 917.66 16,259,625 539,086,399 80,862,960 619,949,359 12,398,987 12,398,987 644,747,334 644,747,334 644.75

10-2

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Table 10. 2: Detailed Budget for LARP of LOT-II, PHLCE Project

Total S. No. of Unit Rate Resettlement Activities Unit Quantity Compensation Remarks No. DPs (Rs.) Amount in Rs. A Land Compensation Mouza & Category Wise 1 Mouza Kotha i) Barani (Rain Fed) 3 Kanal 10.65 471,060 5,016,789 ii) Shah Nehri (Canal Irrigated) 6 Kanal 28.35 435,640 12,350,394 iii) Banjr Qadeem (Baran) 3 Kanal 21.2 176,000 3,731,200 iv) Ghair Mumkin Abadi (Built-up) 1 Kanal 1.5 1,650,000 2,475,000 v) Ghair Mumkin (Uncultivated) 1 Kanal 3.5 99,000 346,500 2 Mouza Swabi i) Barani (Rain Fed) 2 Kanal 15.88 428,375 6,804,022 ii) Chahi (Irrigated) 2 Kanal 11.61 543,780 6,313,890 iii) Ghair Mumkin (Uncultivated) 1 Kanal 2.35 220,000 517,000 iv Shah Nehri (Canal Irrigated) 15 Kanal 102.91 540,213 55,590,917 3 Mouza Kala i) Barani (Rain Fed) 1 Kanal 8.05 726,000 5,844,300 ii) Chahi (Irrigated) 6 Kanal 49.6 561,000 27,825,600 iii) Ghair Mumkin (Uncultivated) 2 Kanal 11.15 180,400 2,011,460 iv) Shah Nehri (Canal Irrigated) 7 Kanal 23.35 440,000 10,274,000 Governm v) Maira (Similar as Rain Fed) 12 Kanal 33.85 533,618 18,062,969 ent land will be 4 Mouza Shah Mansoor acquired i) Barani (Rain Fed) 2 Kanal 21.4 680,056 14,553,198 through 5 Mouza Baja no objection i) Shah Nehri (Canal Irrigated) 20 Kanal 153.05 1,086,770 166,330,148 certificate 6 Mouza Bamkhel (NOC) i) Nul Chahi (Tube Well Irrigated) 2 Kanal 9.5 900,000 8,550,000 from concerne ii) Barani (Rain Fed) 5 Kanal 38.25 421,182 16,110,211 d iii) Chahi (Irrigated) 5 Kanal 45.81 940,476 4,307,9024 departme iv) Ghair Mumkin (Uncultivated) 1 Kanal 5.7 220,000 1,254,000 nt v) Banjr Qadeem (Baran) 1 Kanal 3.1 240,000 744,000 7 Mouza Dara i) Barani (Rain Fed) 2 Kanal 19 550,000 10,450,000 ii) Ghair Mumkin (Uncultivated) 1 Kanal 10.2 660,000 6,732,000 iii) Shah Nehri (Canal Irrigated) 2 Kanal 17.6 792,000 13,939,200 iv) Maira (Same as Rain Fed) 5 Kanal 70.2 267,000 18,743,400 v) Chahi (Well Irrigated) 1 Kanal 8.3 549,240 4,558,692 8 Mouza Maini Sharqi i) Barani (Rain Fed) 6 Kanal 61.3 511,877 31,378,060 ii) Ghair Mumkin (Uncultivated) 6 Kanal 54.15 180,400 9,768,660 9 Mouza Maini Gharbi i) Barani (Rain Fed) 2 Kanal 14.55 511,877 7,447,810 ii) Abi (Irrigated) 4 Kanal 44.85 563,261 25,262,255 iii) Ghair Mumkin (Uncultivated) 2 Kanal 16.75 180,400 3,021,700

10-3

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Total S. No. of Unit Rate Resettlement Activities Unit Quantity Compensation Remarks No. DPs (Rs.) Amount in Rs. Govt. Land Kanal 11 -- -- Compulsory Acquisition 15% 80,862,960 Surcharge 15% Add. 2 % Stamp Duty 2% 12,398,987 Add. 2 % District Council Fee 2% 12,398,987 Sub-Total Land (A) 644,747,333 Crop Compensation Mouza Wise For Rabi Season 1-Mouza Kotha 11 Kanal 39 15,508 604,800 2-Mouza Swabi 51 Kanal 130.4 11,873 1,548,225 3-Mouza Kala 64 Kanal 114.85 17,014 1,954,110 4-Mouza Shah Mansoor 08 Kanal 21.4 10,500 224,700 5-Mouza Baja 43 Kanal 153.05 9,767 1,494,775 B 6-Mouza Bamkhel 56 Kanal 93.56 13,551 1,267,875 7-Mouza Dara 17 Kanal 115.1 11,818 1,360,275 8-Mouza Maini Sharqi 09 Kanal 61.3 18,059 1,107,000 9-Mouza Maini Gharbi 14 Kanal 59.4 12,283 729,600 Additional Crop Compensation 70 Kanal 494.93 Various 6,141,883 for Irrigated Land Sub-Total Crops (B) 16,433,243 Trees Category Wise i) Non-Fruit Trees 129 No. 2,323 Various 1,728,937 C ii) Fruit Trees 12 No. 47 Various 215,195 Sub-Total Trees (C) No. 2370 Various 1,944,132 Private Structure in ROW D Built-up Structures 16 Various Various Various 6,236,867 Sub-Total Private Structure (D) 6,236,867 Other Allowances Based on DPs affected

a) Income disturbance 4 , 00 ,00 0 monthly 16 Months 6 50000 allowance for six months income from business

E Shops Lump and (b) Shifting allowance 16 30000 480,000 sum allied structure 03 OPL @Rs. (c) Livelihood Allowance 15000/- 16 Months 3 15000 720,000 (Relocation) for three month

10-4

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

Total S. No. of Unit Rate Resettlement Activities Unit Quantity Compensation Remarks No. DPs (Rs.) Amount in Rs. d) Vulnerability Allowance (Cash Allowance for 3-months 49 Months 3 15000 2,205,000 @ PKR 15000/ Month Fixed) e) Severity allowance for DPs 1-Crop losing >10% of Agriculture land 259 Rate/ Various Various 12,380,399 @ 1-crop/year Year Sub-Total Allowances (E) 20,585,399 F lump Livelihood restoration cost - 1,000,000 sum lump G Cost of ERM* - 1,983,337 sum Total (Sub-Total A+B+C+D+E+F) (PKR) 690,946,974

Add 15 % Contingency 1 ¡ ¢ £¤ 2,046 Amount in Million PKR 794.59 *The cost of ERM for lot-II is chargeable to PMO and not included in the LARP total budget.

10-5

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

11 MONITORING AND EVALUATION

132. The land acquisition and resettlement activities of PHLCE Project will be monitored both internally and externally. Internal monitoring will be conducted by the EA (PMO) assisted by the consultants while the external monitoring will be carried out by deploying an ERM as the project involves land acquisition and other impact. The external monitor hiring process is finalized and soon will be mobilized after approval of this LARP. The frequency of external monitoring will be identified in each LARP (Lot wise) depending on the scale and sensitivity of impacts.

133. The baseline socio-economic surveys will provide the benchmark for monitoring. Under the ADB SPS (2009), all monitoring reports will be disclosed to displaced persons. These reports will be submitted to the ADB for review and approval prior to possessing the land.

134. Projects risks and impacts will determine the extent and frequency of the monitoring activities. The EA will carry out the safeguard measures and implement relevant plans as provided in the legal agreements. Monitoring reports will be prepared monthly, quarterly and annually. The EA is also required to:

i. Establish and maintain procedures to monitor the progress of the implementation of resettlement plans. ii. Verify their compliance with safeguard measures and their progress toward intended outcomes, iii. Document and disclose monitoring results and identify necessary corrective and preventive actions in the periodic monitoring reports, iv. Follow up on these actions to ensure progress toward the desired outcomes, v. Retain qualified and experienced external monitor to verify monitoring information for projects with significant impacts and risks, vi. Submit periodic monitoring reports (monthly, quarterly and annually) on safeguard measures. 135. The ADB will monitor projects on an ongoing basis until a project completion report is issued. All monitoring reports will be disclosed to displaced persons.

11.1 Internal Monitoring

136. The internal monitoring will be prepared by the PMO and social safeguard management consultant on a quarterly basis. Internal monitoring beyond the provision of evidence of payments of cash compensation will be routinely carried out by the PMO. Submission of internal monitoring reports to ADB will be prepared on quarterly basis depending on the LARP implementation period, and separate from the usual progress reporting so these can be uploaded on the ADB website for disclosure. Although the progress reports may contain some general update on resettlement, these are not disclosed.

137. The internal monitoring indicators will include those directly related to the land acquisition process and levels of household well-being/welfare. These indicators need to relate to the change

11-1

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

in circumstances before project commencement, during construction and post construction. This information will be collected by the social safeguard unit of the PMO and reported monthly in order to assess the progress and results of the LARP implementation. The LARP may require revisions as demonstrated by the results of the monitoring. The monthly reports will be consolidated into quarterly progress reports as per standard format of ADB. The following are the specific times for setting of monitoring/ benchmarks data/ reports.

i. During the initial information campaign and consultation with displaced persons. ii. At the time of assessment of land acquisition entitlements, and also at the time of compensation payment for land, crops and trees. iii. At the time of compensation assessment and payment for affected structures and other non-land, crop and tree assets. iv. Immediately after the relocation of displaced persons. v. At the time of payments for loss of income. vi. During the selection and distribution of replacement land areas. vii. During and after income restoration activities.

138. Based on the above information, the PMO (EA) will monitor the day-to-day resettlement activities related to each lot of the projects using the following techniques.

i. Review of census information for all displaced persons. ii. Consultation and informal interviews with displaced persons. iii. In-depth case studies and establishing baseline data iv. Sample surveys of displaced persons.

v. ¡¢ £¤ ¥¦ §¨ ©¤ £¤ ¡§ £¡  vi. Public community meetings.

11.2 External Monitoring

139. As identified the project have an impact due to the acquisition of private agricultural land of DPs or provision of other allowances, the external monitoring will review the LARP and will be carried out during the implementation of LARP. The terms of reference (ToR) for the external monitor has been prepared and shared with PMO and will be implemented before the LARP commences and get clearance from ADB. Though, external resettlement monitor (ERM) is on the strength of PMO but due to provincial ban on recruitment etc., the PMO was unable to engage an experience ERM. One Mr. Abdul Hameed an experience ERM has been selected through PIC for the purpose.

11.3 Purpose and objective

140. The objective of external resettlement monitoring is to review the LARP implementation, and assess the (i) achievement of resettlement objectives, (ii) restoration of the economic and

11-2

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

social conditions of the displaced persons (DPs), (iii) the effectiveness and impacts of the proposed entitlements, (iv) the need for further mitigation measures if any and (v) institutional arrangements and capacity to implement resettlement plan. External monitoring should confirm if compensation payments have been completed in sections with LAR impacts which can be handed-over for civil works and timely advice KPID to make decisions on corrective measures, if required, to implement the LARP effectively.

141. As per Schedule 5 of the Loan Agreement, KPID is required to ensure that (a) no land shall be acquired for the purposes of the Project under the emergency acquisition provisions of the LAA; and (b) no physical or economic displacement takes place in connection with the Project until; (i) compensation and other entitlements have been provided to displaced persons (DPs) in accordance with the lot wise LARPs; and (ii) a comprehensive income and livelihood restoration program has been established in accordance with the lot wise LARPs.

11.4 Major Tasks of ERM

142. The major tasks for the ERM include the following:

i. Identify, through field verification and review of records, any gaps in the resettlement baseline information, including list of DPs, vulnerable groups, affected assets and livelihood, and suggest steps to update the data; ii. Review and verify the effective implementation of the lot wise LARPs according to requirements of the loan covenants and ADB involuntary resettlement safeguards; iii. Monitor and assess whether resettlement objectives of enhancing, or at least restoring the livelihoods of all DPs in real terms relative to pre-project levels and improving the standards of living of the displaced poor and other vulnerable groups have been met; iv. Review and verify results of internal monitoring reports prepared by PMO through review of records and random field-visits involving DPs and community groups; v. Assess the adequacy of information disclosure and consultation activities in meeting the disclosure and meaningful consultation requirements as per ADB SPS (2009); vi. Assess if the required grievance redress mechanism (GRM) for the project is existing and functional, status and actions taken on grievances received and recommend measures for improvements, if required; vii. Verify completion of compensation payments in sections with LAR issues and confirm which sections can be handed over for civil works; viii. Identify problems/potential problems and emerging LAR issues during project implementation; and recommend to KPID PMO the required corrective actions and measures to mitigate problems; ix. Verify if the livelihoods and the standard of living of DPs, including those of the non-titled DPs, are restored or improved; and,

11-3

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

x. Within six months prior to the project closing, conduct a post-evaluation of the implementation of the lot wise LARPs and learn strategic lessons for future policy formulation and planning.

11.5 Monitoring Indicators

143. The monitoring will assess the extent to which the provisions in the lot wise LARPs are being followed and if objectives are being met. Some key indicators include the following:

i. Payment of compensation, adequacy of budget and timelines of payments; ii. Adequacy of institutional arrangements; iii. Land and other assets inventory, updating of revenue records and record keeping; iv. Consultation and information dissemination; v. Delivery of entitlements, relevance and adequacy; vi. Preparation and adequacy of relocation arrangements; vii. House reconstruction; viii. Provision of employment to DPs, its adequacy, and income levels; ix. Gender impacts; x. Identification and rehabilitation of vulnerable groups; xi. Infrastructure repair, relocation, or replacement; xii. Provision of transition allowances. xiii. Quality, effectiveness, efficiency and sustainability of the resettlement efforts. xiv. Major problems being faced and limitations of implementing the LARPs, emerging LAR issues during project implementation and corrective measures needed to implement resettlement effectively.

11.6 Methodology of External Monitoring

144. The methodology for the assignment includes the following:

i. The ERM will review the data and process of the detailed measurement survey (DMS), census and socio-economic surveys to establish the baseline for monitoring and evaluating project benefits. The review will include a review of records (including database, DMS records, questionnaires), a random sample interview using a structured questionnaire and focused group discussions (FGDs) with some DPs. The sample size for the sample interviews will be proportionate to the number of DPs in each lots. The interviews and FGDs will check the DMS process from identification to agreement on DMS results and evaluate if DMS activities were carried out in a participatory and transparent manner;

11-4

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

ii. The ERM will synchronize its DP and asset database with the PMO database to come up with a common baseline for internal and external monitoring. The database will include validated data on affected assets and categories of DPs, including those who are severely affected, vulnerable, DPs requiring relocation and DPs with legal and administrative impediments i.e. out of the project area, with inheritance mutations, with disputes, DPs with missing documentation, etc. iii. The result of the review will be presented in an inception report which will include the validated list of DPs and affected assets, review of the LARP updating process, a monitoring work plan (including the preparation of audit reports and semi-annual monitoring reports), and recommendations for addressing gaps noted in the review. The inception report will be submitted to the PMO and ADB for review and approval; iv. Lot wise resettlement audit, that the PMO will propose for handing over civil works (supported by a compensation monitoring/progress report), the ERM review the status of compensation award as per Section 11 of the LAA, and carry out a review of records and random interviews of DPs. The review will confirm disbursement of compensation payments and cash assistance (including applicable rehabilitation assistance/allowances: relocation assistance, livelihood restoration allowance, severe impact allowance, income loss compensation, etc.) and adequacy of notification and consultations. The review will also assess cases with legal and administrative impediments to compensation, including adequacy of actions taken by the project to address these impediments. Based on the review, the ERM will submit resettlement audit reports confirming the sections/sites that may be handed over for civil works; v. Six months after mobilization and every six months during the implementation of the project, the ERM will undertake regular external resettlement monitoring to cover (i) the overall progress in compensation payments, (ii) status of livelihood restoration activities including employment of DPs in project-related jobs, (iii) LAR issues and non- compliances arising during project implementation, (iv) grievance redress mechanism and status of complaints, (v) information disclosure, (vi) and consultation activities. These semi-annual reports will be submitted to PMO and ADB for review and will be uploaded on the ADB website for disclosure. An input to these semi-annual external monitoring report is the internal monitoring report to be prepared by the PMO; vi. A post-resettlement survey will be carried within 6 months before the closing of the project. Sampling for the will include 100% of severely affected and vulnerable households, as well as at least 20% of all other DPs. The post-resettlement survey results will be compared with the baseline information collected by the ERM at the start of his/her assignment. FGDs will also be conducted with DPs and relevant agencies to help compare pre and post-LARP condition of the DPs. Results will be presented through a post-resettlement/final report which will also be submitted to PMO and ADB for review and disclosure;

11-5

ADB Loan 3470-PAK: Lot-II: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan

11.7 Reporting Requirements

i. An Inception Report, including baseline survey report, final list of DPs and assets, draft formats (as appropriate for various outputs, such as questionnaires, guides, etc.) and draft outlines for various reports (including resettlement audit reports, semi-annual monitoring report and post-LARP implementation/ final report within 1 month upon signing of the contract; ii. Lot wise resettlement audit reports within 2 weeks after receipt of request for handing over for civil works (supported by a compensation monitoring/progress report) iii. Semi-annual monitoring reports within 6 months from mobilization and every after 6 months iv. Post-LARP implementation/final report within 6 months before closing of the project 145. All reports prepared on ADB format will be submitted to PMO, for onward transmittal to ADB and will be disclosed as and when required for information of DPs.

11-6

Annexures

Annexure-1: Draft Notification of under Section-4 for Lot-II

Annexure-2: Questionnaire for Data Collection A. SOCIO ECONOMIC BASELINE SURVEY FORM

Date: ______ID No: (Lot/Component/Moza#/Khasra#/DP#)

______

1. Identification

1.1 Name of Respondent ______1.2 ¡¢ £¤¥ ¦§ ¨¡©¤

1.3 Status of Respondent Owner ____Tenant____ Share Cropper ____ Lease ____ Squatter ____ Other______

1.4 Respondent CNIC No: ______1.5 Tribe ______

1.6 Address______

Settlement: ______Tehsil: ______

District: ______Tel #: ______

1.7 Demographic Profile of Respondent      Children M ______F ______Total ______

Relationship

with Sr. Family

(See

(Rs./ Household From

codes) codes)

Codes)

Income

Age Age

Annum)

No. Members Name of

(Y/N)

(Yrs.) (Yrs.)

Diseases

Business/ Business/

Year (See

Occupation Occupation

Head (HH) During Last

Education

(See codes) (See Codes) Disability Type Main Secondary Main Secondary 1 2 3 4 5 6 7 8 9 10 *Other: Rent from property, remittances, net sale of items during a year, net income from agriculture etc. Demographic Codes: a) Relationship: 1=Self, 2=Wife, 3=Son, 4=Daughter, 5=Father, 6=Mother, 7=Brother, 8=Sister, 9=Grand Father, 10=Grand Mother, 11=Bhabhi, 12=Nephew, 13=Father-in-Law, 14=Mother- in- Law, 15= Daughter in law, 16= Grandson, 17= Grand Daughter, 18=Others b) Sex: 1=Male, 2=Female c) Education: 1= Primary 2= Middle 3= Matric, 4= Intermediate, 5= BA/BSc, 6= MA/MSc, 7=LLB, 8=Engineer, 9=MBBS, 10=Technical Diploma, 11=Dars-e-Nizami, 12=Can Read Quran, 13= Can Insert Signatures, 14= Illiterate, d) Occupations: 1=Agriculturist, 2=Shopkeeper, 3= Trader, 4= Govt. Servant, 5=Private Servant, 6= Labour, 7=General Labour, 8=Livestock, 9=Fishing, 10= 8=Driver, 11=Health Related, 12=Educator/Teacher, 13=House-Maid, 14= House Wife, 15=Gone Abroad, 16=Gone out City within Pakistan 17 Retired

1 - 9 e) Diseases: 1=Diarrhea, 2=Measles, 3=Hepatitis, 4=Typhoid, 5=HIV/AIDS, 6=Polio, 7=Cholera, 8=Tuberculosis, 9=Heart Disease, 10=No Disease, 2. Average Monthly Expenditure on Food and Non-Food Items

2.1 Monthly Expenditure on Food & Non-Food Items (Rs.)

a) Exp. On Food Items Sr. Item Qty. / Month Expenditure (Rs.) No. 1. Wheat / Atta (Flour) 2. Maize Flour 3. Ghee 4. Sugar 5. Pulses 6. Vegetables 7. Tea Leaves 8. Milk 9. Other Specify 10. Meat Total:

b) Exp. On Non-Food Items: 1. Fire wood 2. Gas Cylinder 3. Kerosene Oil 4. Washing Material 5. Shoes and Clothing 6. Medicines 7. Education 8. Social Obligations 9. Others Total:

2.4 Av. Monthly utility bills for: Electricity (Rs.) ______

Communication (Rs.) ______Water (Rs.) ______

3. Possession of Household Goods

Item No. Value (Rs.) Item No. Value (Rs.) Television Car Washing machine Vehicle Geyser Tractor Electric fan Telephone/Mobile Electric iron Electric Water Pump Sewing machine Computer Motor cycle/ scooter Other Total:

2 - 9

4. Credit

4.1 Have you obtained credit during last year? Yes [ ], No. [ ], if yes, source of credit: Formal [ ], Informal [ ] 4.2 Please write the name of relevant source

Formal source (s) ______

Informal source (s) ______

Percentage of interest ______

4.3 Purpose of Loan (Tick)

Purchase House Rs. ______

Business Rs. ______

Repair of House Rs. ______

Medicare of Family Member Rs. ______

Family/ Social matters Rs. ______

Agriculture inputs Rs. ______

Livestock Rs. ______

Education Rs. ______

Other (specify) Rs. ______

4.4 Mode of repayment (Tick the relevant)

1) One time [ ] 2) Through installments [ ],

i) Quarterly installments [ ] ii) Six monthly [ ],

iii) Annual [ ] iv) Other (specify) ______

4.5 How much repayment has been made so far? a) 100% [ ], b) 75% [ ], c) 50% [ ], d) 25% [ ], Less than 25 % [ ], Not paid yet [ ]

5. Housing Conditions

5.1 Do you have your own house?

1) Yes ____ 2) No. ____

If yes then

Total Area of the house: square ft/Marla.______Present Value______Rs.

Semi Pacca Type of Room No. of Room Katcha (tick) Pacca (tick) (tick) Living rooms Verandah Animal shed Other shed

3 - 9 Bathroom/Latrine 6. Access to Social Amenities (Tick) Social Amenities Available Satisfactory Non-Satisfactory Electricity Sui Gas Water Supply Telephone Sewerage/Drainage Health Facility Education Facility Others

7 Land Use and Status

7.1 Number of shareholders in ownership ______7.2 Land use arrangement Self ______Tenant (tenure of tenancy) ______years/Months Lease (tenure of lease) ______Years/Months Rent (Rs. / acre) ______Share Cropper (Arrangements) ______Other ______

Land Acre Kanal Marla a. Total Area owned b. Total Cultivated Area

Area Under Rabi( winter) Crops

Area Under Kharif (summer) Crops c. Uncultivated Area

Waste land

Area Under Farm Houses

Barren Land

7.3 Cropping Pattern, Yield and Cost

Av. Price/40 Total Cost Sr. Area Sown Major Crops Production kgs Incurred No. Acre Kanal (Kgs) (Rs.) (Rs.) 1 Wheat 2 Maize 3 Tobacco 4 Rice 5 Sugarcane

4 - 9 Av. Price/40 Total Cost Sr. Area Sown Major Crops Production kgs Incurred No. Acre Kanal (Kgs) (Rs.) (Rs.) 6 Orchards 7 Vegetables 8 Other Grand Total:

8. Livestock Inventory Livestock No. Present Value (Rs.) Buffaloes Cows Horse Donkey Beefarm Sheep Goat Poultry Other

9. Trees Inventory Fruit Trees ______Other Trees ______Total ______10. Social Organizations

10.1 Are there any existing village/social organizations in your area? _____ (Y/N)

Category Y/N Religious Educational Skill Development Centre Social Welfare Women Organization Other

10.2. Pattern of Decision Making

Which types of decisions are influential in village matters? Sr.No. Person / Status Decision Pattern % 1 Court 2 Jirga

5 - 9 10.3 Were their decisions considered final and implemented successfully? 1. Yes 2. No

i) Level of acceptability (%) ______ii) Successful implementation (%) ______

10.4 Were you involved in any dispute in the past 01 years? 1. Yes 2. No

10.5 If yes, what was the nature of dispute and how was it resolved

Nature of Dispute Method of Resolution 1. ______2. ______3. ______

 £¦ 11. ¡¢£ ¤¥¦ §¨ © ¨ ¡ ¤ ¨ ¤ £ ¦ ¡ ¤ ¨ ¤ ¤  £ ©£ ¤ 

11.1 Women participation in different household activities:

Activities Participation (y/n) Decision Making (y/n) Household activities Jobs Farm/Crop activities Livestock rearing Sale & Purchase of properties Social obligations (marriage, birthday & other functions) Local representation (councilor/ political gathering)

Education

Others

11.2 Women issues in the project area

______

______

6 - 9 12. Proposed Impact of the Project Increase Decrease

Employment opportunities

Marketing facilities opportunities

Living standard

Unemployment

Income generating activities

Mobility (Access to Resources)

Quality of drinking water

Agriculture water

Other specify______

12.1 General Remarks of the Respondents

13. Resettlement Part

13.1 Ownership of Affected Structures______(Self/rented/landlord property/relative property

13.2 Affected residential structures

Types of Construction Total Area (sft) Affected Area Structures Semi Kacha Pacca Sq. ft. Rft. Pacca Houses Boundary Wall Ladder Other Total

13.2 Impact on Farm House

Structures Type of Construction Total Area Affected Area (Sft) Kacha Pacca Semi Pacca Sq.ft Rft. Rooms Cattle Shed

7 - 9 Structures Type of Construction Total Area Affected Area (Sft) Kacha Pacca Semi Pacca Sq.ft Rft. Boundary Wall Other

13.3 Impact on Commercial Structures

Type of Construction Total Area Affected Area Structures Kacha Pacca Semi Pacca Sq.ft Shop Wooden Cabin DPC Iron Cabin Other

13.4 Impact on Community Structure

Type of Affected Structure Type of Name Size (Sft) (room/open area/wall) Construction

Schools Mosque Graveyard Health Centre Shrine Others Total:

13.5 Impact on Tube wells

Yes ______No ______

If yes then

Types of Tube wells No. Electric Diesel Turbine Other Total:

13.6 Impact on Utility

Yes ______No ______

8 - 9 If yes then

Types Nos. / Area Electric poles Transformer Transmission line Telephone Other Total:

13.7 Miscellaneous Impact of the Project

Types Nos. / Area Hand Pump Watercourse Lawn Other

14. Do you have any alternate residence place?

Yes No

If yes then (tick relevant)

Distance from House Yes/No Location current residence (km) Owned Tenancy Relative Other

15. Vulnerability ______

______

16. People concern about the project?

______

______

17. Views / Comments of Interviewers

______

______

Name & Signature of Interviewer: ______Date: ______

Checked By: ______Signature ______Date: ______

9 - 9 Annexure-3: Urdu Broacher

©¦ ¤ £ ¡¢¤¡¥¢ ¦§ ¨©¢ § ¤    ¨¡¤   ©¡ ¥  ¤ © ¡©    §¡

Annexure-4: Demand Bills of the Deputy Commissioner, Swabi

Annexure-5: List of Affected Persons/DPs Lot-II: Census of DPs Land, Crops, Trees and Structure Prices, Severity and Vulnerability Allowances etc. of Affected Persons under Indus Ambar Pressure Pipeline of PHLCE Project

Livelihood Vulnerability Income Allowance Amount of Crop Amount of Additional Crop Severity Allowance of 10 % Amount of Amount of Allowance (Cash Disturbance Grand Total Amount Father Name/ Husband Status of Land Amount of Shifting (Relocation) for 3- S. No Name of Land Holder Compensation @ 1- Compensation for Irrigated OR More Land Affected Affected Structure Affected Trees Allowance for 3- Allowance for 6- (A+B+C+D+E+F+G+H+I Name Holders Affected Land (A) Allowance (I) Months @ OPL Rs. Crop/ Year (B) Land @ 1-Crop/ Year (C.) Persons @ 1-Crop/ Year (D) (E.) (F) Months Rs.15000/ Months @ Rs. +J) 15000/ Month (J) Month Fixed (G) 50000/ Month (H)

1 Muhammad Fazal Muhibullah Owner 8,311,074 64,951 64,951 64,951 30,530 8,536,455

2 Gohar zaman khan Rajab khan Owner 2,999,485 23,441 23,441 23,441 20,970 3,090,778

3 Shahid Kamal Sher Kamal Owner 3,068,304 85,070 85,070 16,183 3,254,627

4 Bashir Kamal Meer Jamal Owner 2,454,643 68,056 68,056 20,970 2,611,725

5 Shereen Kamal Meer Jamal Owner 1,012,000 34,028 34,028 34,028 22,516 1,136,600

6 Wazir Kamal Meer Jamal Owner 1,265,000 42,535 42,535 42,535 11,426 1,404,031

7 Khaliq Dad Mian Khan Owner 1,534,152 42,535 42,535 15,970 1,635,192

8 Zari Dad Khan Mian Khan Owner 1,518,000 51,042 51,042 51,042 33,124 1,704,250

9 Sabzer Ali Khanzada Owner 1,695,100 56,997 56,997 15,532 1,824,626

10 Tariq Ali Abdul Ali Owner 1,840,982 51,042 51,042 13,315 1,956,381

11 Gul Sher Shehzada Owner 7,741,800 204,168 204,168 204,168 15,755 8,370,059

12 Liaq Ahmad Amroz Khan Owner 1,771,000 59,549 59,549 59,549 16,593 1,966,240

13 Wazir Muhammad Ghulam Ahmad Owner 613,661 17,014 17,014 15,722 663,411

14 Habib Un Nabi Noor Akbar Owner 2,454,643 68,056 68,056 14,426 2,605,181

15 Fazal Wahid Nishad Khan Owner 1,227,321 34,028 34,028 15,532 1,310,909

16 Sami ur Rahman Jan Nisar Owner 1,534,152 42,535 42,535 15,970 1,635,192

17 Sardar Akhtar Fazal Akbar Owner 1,227,321 34,028 16,970 45000 1,323,319

18 Abdur Rahman S Owner 2,774,145 73,160 73,160 73,160 15,201 3,008,827

19 Noor Akbar Abdul Akbar Owner 1,840,982 51,042 51,042 22,970 1,966,036

20 Fazal Rahman Muhammad Rahman Owner 2,024,000 68,056 68,056 68,056 26,613 2,254,781

21 Kareem Sher Khan Sher Owner 7,741,800 204,168 204,168 204,168 16,712 8,371,016

22 Habib Haider Karam Khan Owner 6,720,945 136,963 136,963 17,294 7,012,164

23 Said Johar Karam Khan Owner 2,530,000 85,070 85,070 85,070 24,516 2,809,726

24 Faqir Sher Ilyas Khan Owner 2,774,145 73,160 73,160 73,160 18,602 3,012,228

25 Noorullah Khan Najab Khan Owner 5,161,200 136,112 136,112 136,112 12,170 5,581,706

26 Raham Nawan Umer Khitab Owner 1,135,272 31,476 31,476 13,315 1,211,539

27 Alamgir Samiul Haq Owner 5,806,350 153,126 153,126 153,126 14,426 6,280,154

28 Jawad Khan Ambores Khan owner 1,068,419 - - - 15,557 1,083,976

29 Basit Rahim Rahim Muhammad Owner 1,244,760 - - - 16,754 1,261,514

30 Sultan sher Hakim Khan Owner 1,840,982 51,042 15,970 1,907,994

31 Madar Khan Daud Khan Owner 3,070,500 118,180 118,180 15,490 3,322,350

32 Najeem Khan Owner 7,741,800 - - - 11,970 7,753,770

33 Abdul Wadood Khan Said Umar Owner 4,605,750 177,270 10,970 4,793,990

34 Dayim Khan Najam Khan Owner 6,325,000 118,180 118,180 11,532 6,572,892

35 Sar daraz khan Gujar Owner 1,442,100 - - - 12,205 1,454,305

36 Gul Akbar Haji Akbar Owner 8,446,885 105,833 105,833 105,833 15,226 8,779,611 Lot-II: Census of DPs Land, Crops, Trees and Structure Prices, Severity and Vulnerability Allowances etc. of Affected Persons under Indus Ambar Pressure Pipeline of PHLCE Project

Livelihood Vulnerability Income Allowance Amount of Crop Amount of Additional Crop Severity Allowance of 10 % Amount of Amount of Allowance (Cash Disturbance Grand Total Amount Father Name/ Husband Status of Land Amount of Shifting (Relocation) for 3- S. No Name of Land Holder Compensation @ 1- Compensation for Irrigated OR More Land Affected Affected Structure Affected Trees Allowance for 3- Allowance for 6- (A+B+C+D+E+F+G+H+I Name Holders Affected Land (A) Allowance (I) Months @ OPL Rs. Crop/ Year (B) Land @ 1-Crop/ Year (C.) Persons @ 1-Crop/ Year (D) (E.) (F) Months Rs.15000/ Months @ Rs. +J) 15000/ Month (J) Month Fixed (G) 50000/ Month (H)

37 Syed Qamar Khan Khushab Owner 10,815,474 135,510 135,510 135,510 12,126 11,234,130

38 Gul Amin Khan Gul dad Owner 15,141,664 189,714 189,714 189,714 9,494 15,720,300

39 Miss Rihayat (Widow) Sawar khan Owner 2,421,797 67,755 67,755 8,865 45000 2,611,172

40 Riaz haider Ghulam Haider Owner 8,652,379 108,408 108,408 108,408 19,722 8,997,325

41 Faqir Firdaus Owner 3,874,874 108,408 108,408 16,593 4,108,283

42 Muhammad Haroon Gul Zada Owner 5,812,312 162,612 162,612 5,020 6,142,556

43 Ibrahim Khan Kachkool Khan Owner 6,489,284 81,306 81,306 81,306 6,382 6,739,584

44 Umer Khitab Mirza Muhammad Owner 3,027,246 84,694 84,694 7,095 3,203,728

45 Maskeen Khan Bashir Hayat Owner 5,175,000 67,755 67,755 67,755 9,491 5,387,756

46 Fazal Wadood Shafiq Owner 4,657,500 60,980 60,980 60,980 10,970 4,851,409

47 Fazal Wahab Ghulam Habib Owner 855,600 - - - 9,970 865,570

48 Mustaqeem Zarin Shah Owner 3,390,515 94,857 94,857 8,970 3,589,199

49 Abdul Wali Khan Yaqoob Khan Owner 3,941,050 94,984 94,984 8,534 4,139,552

50 Maqsood Ali Umar Ali Owner 3,881,934 93,559 93,559 17,970 4,087,023

51 Fida Muhammad Owner 5,591,205 106,857 106,857 106,857 13,426 5,925,202

52 Tila Muhammad Owner 6,212,450 118,730 118,730 118,730 20,970 6,589,610

53 Mumtaz Muhammad Owner 6,212,450 118,730 118,730 118,730 18,970 6,587,610

54 Shah Fasand Khan Bilanad Khan Owner 1,807,823 34,550 34,550 34,550 19,970 1,931,444

55 Rohul Amin Muhammad Shaer Owner 4,348,715 83,111 83,111 83,111 5,532 45000 4,648,580

56 Fazal Malik Shah Fasand Khan Owner 3,508,197 66,608 66,608 66,608 9,192 3,717,211

57 Abdur Rashhed Khan Sher Dali Khan Owner 1,242,490 23,746 23,746 23,746 10,516 1,324,244

58 Jan Bahadur Sher Fel Khan Owner 1,863,735 35,619 35,619 35,619 8,865 1,979,457

59 Ali Boray Khan Ghulam Ahmad Owner 594,550 - - - 11,970 606,520

60 Ghulam Muhammad Timber Shah Owner 7,454,939 142,476 142,476 142,476 23,970 7,906,337

61 Taj Rasool Suhbat khan Owner 3,752,082 71,238 71,238 71,238 16,862 3,982,658

62 Irfan Ali Ghulam Rasool Owner 3,727,470 71,238 71,238 71,238 15,970 3,957,154

63 Jamal Khan Sher Zameen Khan Owner 3,727,470 71,238 71,238 71,238 19,926 3,961,110

64 Syed Johar Hashim Khan Owner 6,833,694 130,603 130,603 130,603 25,532 7,251,035

65 Fazal Wahab Hikmat Khan Owner 4,969,960 94,984 94,984 94,984 42,205 5,297,117

66 Mir Aman Khan Mir Kamal Owner 4,348,715 83,111 83,111 83,111 24,359 4,622,407

67 Roz Ameen Khan Syed Kalam Owner 3,106,225 59,365 59,365 59,365 19,532 3,303,852

68 Ayub Khan Ghulam Nabi Owner 2,484,980 47,492 47,492 47,492 18,516 2,645,972

69 Hasham Bahadar M Bahadar Owner 7,820,644 105,000 26,970 7,952,614

70 Anwar Ali Shahbaz Khan Owner 5,692,500 106,362 106,362 17,849 5,923,073

71 Saeed ur Rahman Sawab Khan Owner 4,298,700 165,452 165,452 18,970 4,648,574

72 Sadiq Ullah Rahim Ullah Owner 9,108,000 118,180 118,180 118,180 16,970 9,479,510 Lot-II: Census of DPs Land, Crops, Trees and Structure Prices, Severity and Vulnerability Allowances etc. of Affected Persons under Indus Ambar Pressure Pipeline of PHLCE Project

Livelihood Vulnerability Income Allowance Amount of Crop Amount of Additional Crop Severity Allowance of 10 % Amount of Amount of Allowance (Cash Disturbance Grand Total Amount Father Name/ Husband Status of Land Amount of Shifting (Relocation) for 3- S. No Name of Land Holder Compensation @ 1- Compensation for Irrigated OR More Land Affected Affected Structure Affected Trees Allowance for 3- Allowance for 6- (A+B+C+D+E+F+G+H+I Name Holders Affected Land (A) Allowance (I) Months @ OPL Rs. Crop/ Year (B) Land @ 1-Crop/ Year (C.) Persons @ 1-Crop/ Year (D) (E.) (F) Months Rs.15000/ Months @ Rs. +J) 15000/ Month (J) Month Fixed (G) 50000/ Month (H)

73 Aziz ur Rahman Gul Rahman Owner 6,141,000 236,360 236,360 18,970 6,632,690

74 Mutahir Khan Jan Said Owner 3,438,960 132,362 22,022 3,593,344

75 Badar jan gul Jan Gul Owner 5,242,496 98,089 98,089 98,089 21,970 5,558,734

76 Iqbal Shah Nimat Shah Owner 8,915,534 119,700 26,970 9,062,204

77 Muhammad Zada Zar Noor Owner 12,497,855 97,670 97,670 97,670 24,970 12,815,835

78 Irfanullah Shamroz Owner 17,496,997 136,738 136,738 136,738 22,516 17,929,727

79 Zareen Khan Raz Noor Owner 21,246,354 166,039 166,039 166,039 21,970 21,766,441

80 Sultan Mir Bahadar Owner 8,748,499 68,369 68,369 68,369 23,970 8,977,576

81 Razi Khan Noorzy Owner 14,997,426 117,204 117,204 117,204 42,970 15,392,008

82 Mustaqe Khan Abdul Hakeem Khan Owner 13,747,641 107,437 107,437 107,437 5,970 14,075,922

83 Jahanzab Faiz Muhammad Owner 2,499,571 19,534 19,534 7,428 2,546,067

84 Amraiz Khan Mir Ahmad Owner 2,499,571 19,534 19,534 19,534 17,970 2,576,143

85 Iqrar muhammad miskeen mohammad Owner 13,122,748 102,554 102,554 102,554 20,970 13,451,378

86 Sher jan jan muhammad Owner 11,872,962 92,787 92,787 92,787 18,970 12,170,292

87 Mushtaq Ahmad Abdullah Owner 11,248,070 87,903 87,903 87,903 22,970 11,534,749

88 Ezatullah Lal zareen khan Owner 12,497,855 97,670 97,670 97,670 20,970 12,811,835

89 Israr muhammad Shair Islam khan Owner 9,998,284 78,136 78,136 29,291 10,183,847

90 Naseem Muhammad Qasim Khan Owner 7,498,713 58,602 58,602 58,602 15,548 7,690,067

91 Abdul Basir Mafad khan Owner 3,749,357 29,301 29,301 9,824 3,817,783

92 Fazal Rabi Gul Kareem Owner 11,373,048 88,880 88,880 88,880 10,732 11,650,419

93 Zahir Khan Azmat khan Owner 2,499,571 19,534 19,534 11,754 2,550,393

94 Gul Hussain Gantal Owner 2,374,592 18,557 18,557 18,557 10,970 2,441,234

95 Syed Arab Khan Ashraf Khan Owner 6,922,080 89,817 89,817 89,817 6,548 7,198,078

96 Iktiar Zaman hussain shah Owner 4,007,888 124,064 124,064 124,064 7,470 4,387,550

97 Suleman Shah Hazir Khan Owner 398,475 - - - 6,531 405,006

98 Waheed Shah Mir Khatam Shah Owner 850,080 - - 6,770 856,850

99 Gulab Jan Faraz Owner 3,005,916 93,048 93,048 93,048 10,516 3,295,576

100 Gulraz khan Ali kha Owner 2,504,930 77,540 77,540 77,540 11,755 2,749,305

101 Gafur khan Muhammad Amin Owner 2,708,595 77,540 77,540 10,501 2,874,176

102 Taj muhamad Waheed Gul Owner 2,024,000 - 155,080 10,491 2,189,571

103 Akram Ullah Zameer gull Owner 2,504,930 77,540 77,540 77,540 9,865 2,747,415

104 Bakhtia Mutaba khan Owner 1,502,958 46,524 46,524 11,845 1,607,851

105 Zubair ahmad Hazer Muhammad Owner 1,416,800 - - - 10,795 1,427,595

106 Rahim ullah Mian Sahib Uddin Owner 676,331 20,936 20,936 9,533 727,736

107 Mohammad Gul zameen khan Owner 2,846,250 - - - 6,557 2,852,807

108 Roohul amin Abdul mannan Owner 1,977,274 56,604 56,604 11,835 2,102,318 Lot-II: Census of DPs Land, Crops, Trees and Structure Prices, Severity and Vulnerability Allowances etc. of Affected Persons under Indus Ambar Pressure Pipeline of PHLCE Project

Livelihood Vulnerability Income Allowance Amount of Crop Amount of Additional Crop Severity Allowance of 10 % Amount of Amount of Allowance (Cash Disturbance Grand Total Amount Father Name/ Husband Status of Land Amount of Shifting (Relocation) for 3- S. No Name of Land Holder Compensation @ 1- Compensation for Irrigated OR More Land Affected Affected Structure Affected Trees Allowance for 3- Allowance for 6- (A+B+C+D+E+F+G+H+I Name Holders Affected Land (A) Allowance (I) Months @ OPL Rs. Crop/ Year (B) Land @ 1-Crop/ Year (C.) Persons @ 1-Crop/ Year (D) (E.) (F) Months Rs.15000/ Months @ Rs. +J) 15000/ Month (J) Month Fixed (G) 50000/ Month (H)

109 Umer gul Taza gul Owner 1,083,438 31,016 31,016 10,538 1,156,008

110 Mokhsin Aurangzeb Owner 7,063,903 216,708 216,708 10,517 7,507,836

111 Yamin Gul Amin Owner 4,120,610 85,981 85,981 9,540 4,302,112

112 Sher Zamin mir zamin khan Owner 4,444,372 92,737 92,737 10,493 4,640,338

113 Sardar Ali Fazle Mola Owner 5,732,589 108,705 108,705 108,705 6,615 6,065,317

114 Nasrullah Rahim ullah Owner 6,477,502 122,830 122,830 122,830 7,235 6,853,227

115 Aitabar Ullah noor muhammad Owner 2,282,060 - - - 7,391 2,289,451

116 Abdur Rehman Akbar Din Owner 7,773,002 147,396 147,396 147,396 11,482 8,226,672

117 Sher Zada Islam Khan Owner 5,297,927 162,531 162,531 10,532 5,633,521

118 Abdur rehman ghafoor Owner 1,867,140 - - - 9,734 1,876,874

119 Intazar Khan Sarfaraz khan Owner 2,074,600 - - - 9,470 2,084,070

120 Naveed Khsn Hayat Khan Owner 4,885,866 149,890 149,890 8,526 5,194,171

121 Shams ur rehamn Rehman gul Owner 6,475,244 198,649 198,649 7,395 6,879,937

122 Taj muhamad sher dad Owner 1,867,140 - - - 12,970 1,880,110

123 Amir Zaman haider khan Owner 1,659,680 - - - 11,470 1,671,150

124 Lal Badsha Ahmad shah Owner 1,815,275 - - - 10,493 1,825,768

125 Murad Ali gharib Ali Owner 1,659,680 - - - 9,822 1,669,502

126 Mohabat Khan masal khan Owner 9,068,502 171,962 171,962 171,962 10,498 9,594,886

127 Arif Hayat Gul hayat Owner 4,709,268 144,472 144,472 11,550 5,009,762

128 Gul Shah Mir wali Owner 7,652,561 234,767 234,767 10,531 8,132,626

129 Safarish Khan Firdos khan Owner 1,483,339 - - - 9,382 1,492,721

130 Wadood Khan Mian Khan Share Cropper 170,140 34,793 204,933

131 Rezer Khan Babar Jang Share Cropper 68,056 13,917 45000 126,973

132 Azaz Akbar Haji Akbar Share Cropper 136,112 27,835 163,947

133 Afser Ali Meer Nawaz Share Cropper 170,140 34,793 204,933

134 Fareed Khan Pur Dil Khan Share Cropper 136,112 27,835 163,947

135 Kareem Jamal Meer Jamal Share Cropper 153,126 31,314 184,440

136 Muhammad Zahir Farid Khan Share Cropper 187,154 38,273 225,427

137 Abdullah Ahad Sher Anwar Khan Share Cropper 68,056 13,917 45000 126,973

138 Muhammad Raziq Feroz Khan Share Cropper 51,042 10,438 45000 106,480

139 Noor Abrar Suhbat Khan Share Cropper 85,070 17,397 45000 147,467

140 Akbar Saeed Mian Gul Jan Share Cropper 102,084 20,876 122,960

141 Wareed Khan Raza Khan Share Cropper 153,126 31,314 45000 229,440

142 Majeed Gul Fazal Gul Share Cropper 119,098 24,355 143,453

143 Taj Wali Khan Muhammad Rehman Share Cropper 102,084 20,876 122,960

144 Ghulam Hazrat Muhammad Rehman Share Cropper 68,056 13,917 45000 126,973 Lot-II: Census of DPs Land, Crops, Trees and Structure Prices, Severity and Vulnerability Allowances etc. of Affected Persons under Indus Ambar Pressure Pipeline of PHLCE Project

Livelihood Vulnerability Income Allowance Amount of Crop Amount of Additional Crop Severity Allowance of 10 % Amount of Amount of Allowance (Cash Disturbance Grand Total Amount Father Name/ Husband Status of Land Amount of Shifting (Relocation) for 3- S. No Name of Land Holder Compensation @ 1- Compensation for Irrigated OR More Land Affected Affected Structure Affected Trees Allowance for 3- Allowance for 6- (A+B+C+D+E+F+G+H+I Name Holders Affected Land (A) Allowance (I) Months @ OPL Rs. Crop/ Year (B) Land @ 1-Crop/ Year (C.) Persons @ 1-Crop/ Year (D) (E.) (F) Months Rs.15000/ Months @ Rs. +J) 15000/ Month (J) Month Fixed (G) 50000/ Month (H)

145 Misal Khan Jehanzeb Share Cropper 85,070 17,397 45000 147,467

146 Mir Rahman Mir Waiz Khan Share Cropper 136,112 27,835 163,947

147 Aziz Rahman Gul Rahman Share Cropper 153,126 31,314 184,440

148 Shanwary Khan Meran Shah Share Cropper 136,112 27,835 163,947

149 Raza Khan Mandar Khan Share Cropper 102,084 20,876 122,960

150 Fawad Ali Sabaz Ali Share Cropper 68,056 13,917 45000 126,973

151 Muhammad Riaz Sudbarg Khan Lease 85,070 17,397 45000 147,467

152 Roohul Amin Muhammd Sadiq Lease 153,126 31,314 184,440

153 Amir Jamil Khan Amer Abdullah Lease 170,140 34,793 204,933

154 Fazal Dayan Ali Akbar Lease 68,056 13,917 45000 126,973

155 Said Arif Khan Saha Nawaz Khan Lease 102,084 20,876 122,960

156 Ameer Hassan Shah Said Lease 85,070 17,397 45000 147,467

157 Fida Hussain Meer Said Khan Lease 119,098 24,355 45000 188,453

158 Khaista Khan Muhammad Hanif Lease 153,126 31,314 45000 229,440

159 Khan Said Khan Sher Lease 136,112 27,835 45000 208,947

160 Sammar Khan Samandar Khan Lease 136,112 27,835 45000 208,947

161 Wazir Muhammad Jamal Khan Lease 85,070 17,397 45000 147,467

162 Sher Zamin Khan Meer Ahmad Shah Lease 102,084 20,876 122,960

163 Sher Ayaz Sher Alam Lease 119,098 24,355 143,453

164 Asif Ali Ameer Bahadar Lease 85,070 17,397 102,467

165 Gull zar Wali khan Lease 68,056 13,917 45000 126,973

166 Alam Sher Faqeer sher Lease 119,098 24,355 45000 188,453

167 Abid khan Fazal Maula Tenant 136,112 27,835 45000 208,947

168 Shehzad Mutakalib Shah Share Cropper 82,726 16,917 45000 144,643

169 Akhtar Muneer M Astan Share Cropper 47,272 9,667 45000 101,939

170 Fazal Elahi Mahmood Khan Share Cropper 70,908 14,501 85,409

171 Muhammad Khan Gul Rahman Share Cropper 82,726 16,917 99,643

172 Abdur Rahman Haji Alif Khan Share Cropper 59,090 12,084 71,174

173 Lajbar Khan Haji Munaras Khan Share Cropper 129,998 26,584 156,582

174 Muhammad Arif Muhammad Islam Share Cropper 153,634 31,418 185,052

175 Rashid Gul Taja Gul Share Cropper 67,755 13,856 81,611

176 Muntazir khan Said Wali Share Cropper 81,306 16,627 97,933

177 Sardar Nabi Habib Ur Rahman Share Cropper 67,755 13,856 81,611

178 Noor Zaman Khan Yae Muhammad khan Share Cropper 67,755 13,856 81,611

179 Sher Sultan Harimullah Share Cropper 54,204 11,085 65,289

180 Abdul Haleem Abdul Karim Share Cropper 40,653 8,313 45000 93,966 Lot-II: Census of DPs Land, Crops, Trees and Structure Prices, Severity and Vulnerability Allowances etc. of Affected Persons under Indus Ambar Pressure Pipeline of PHLCE Project

Livelihood Vulnerability Income Allowance Amount of Crop Amount of Additional Crop Severity Allowance of 10 % Amount of Amount of Allowance (Cash Disturbance Grand Total Amount Father Name/ Husband Status of Land Amount of Shifting (Relocation) for 3- S. No Name of Land Holder Compensation @ 1- Compensation for Irrigated OR More Land Affected Affected Structure Affected Trees Allowance for 3- Allowance for 6- (A+B+C+D+E+F+G+H+I Name Holders Affected Land (A) Allowance (I) Months @ OPL Rs. Crop/ Year (B) Land @ 1-Crop/ Year (C.) Persons @ 1-Crop/ Year (D) (E.) (F) Months Rs.15000/ Months @ Rs. +J) 15000/ Month (J) Month Fixed (G) 50000/ Month (H)

181 Gul Roz Khan Shanaz Khan Share Cropper 81,306 16,627 97,933

182 Anwar Iqbal Janas Khan Share Cropper 67,755 13,856 81,611

183 Sheroz Khan Mirawas Khan Share Cropper 94,857 19,398 114,255

184 Murad Ali Nooran Said Share Cropper 108,408 22,169 130,577

185 Aslam Wilayat Share Cropper 54,204 11,085 45000 110,289

186 Habib Ur Rahman Zar Gul Share Cropper 67,755 13,856 81,611

187 Sher Rahman Bakht Jamal Share Cropper 81,306 16,627 97,933

188 Munir Ahmad Mir Ahmad Share Cropper 81,306 16,627 97,933

189 Habiburrahman Noor Zaman Share Cropper 27,102 5,542 45000 77,644

190 Bakhtawar Shah Gul Amin Shah Share Cropper 67,755 13,856 81,611

191 Arshad Ahmad Gul Hayat Share Cropper 13,551 45000 58,551

192 Sher Zaman Mir Zaman Lease 135,510 27,712 163,222

193 Rafiullah Hazrat Ullah Lease 54,204 11,085 65,289

194 Zar Navish khan Sheeren khan Lease 94,857 19,398 114,255

195 Aeen khan Bahadur khan Lease 108,408 22,169 130,577

196 Fazli Rabi Sanober Lease 67,755 13,856 81,611

197 Ali Muhammad Sultan Muhammad Lease 121,959 24,940 146,899

198 Gul Paras khan Ilyas Khan Lease 135,510 27,712 163,222

199 Muhammad Said Muhammad Qadar Lease 67,755 13,856 81,611

200 Fazal Hussain Khaista Gul Lease 94,857 19,398 114,255

201 Manzoor Ali shah Sher nawaz khan Lease 67,755 13,856 81,611

202 Mir Nawaz Sher Aslam Lease 81,306 16,627 97,933

203 Inayat Gul Mirza Muhammad Lease 40,653 8,313 48,966

204 Amir Nawab Khan Sher Aslam Lease 81,306 16,627 97,933

205 Gul Zareed Muhammad Fazeer Lease 67,755 13,856 81,611

206 Zarnoosh Khan Shereen Khan Lease 94,857 19,398 114,255

207 Bakht Zareed Muhammad Fazeer Lease 67,755 13,856 81,611

208 Sher Nawaz Khan Sher Aman Khan Lease 54,204 11,085 65,289

209 Gul Raheem Esa Khan Lease 67,755 13,856 81,611

210 Said Jamal Raheemullah Lease 67,755 13,856 81,611

211 Ziaullah Rafiullah Lease 94,857 19,398 114,255

212 Inayat Ur Rahman Shams Ur Rahman Lease 108,408 22,169 130,577

213 Amir Bacha Qalandar Lease 94,857 19,398 45000 159,255

214 Muhammad Laiq Gul Muhammad Lease 81,306 16,627 97,933

215 Ahmad Jan Haji Said Shaha Lease 67,755 13,856 45000 126,611

216 Zar Gul Muhammad Hakim Lease 54,204 11,085 65,289 Lot-II: Census of DPs Land, Crops, Trees and Structure Prices, Severity and Vulnerability Allowances etc. of Affected Persons under Indus Ambar Pressure Pipeline of PHLCE Project

Livelihood Vulnerability Income Allowance Amount of Crop Amount of Additional Crop Severity Allowance of 10 % Amount of Amount of Allowance (Cash Disturbance Grand Total Amount Father Name/ Husband Status of Land Amount of Shifting (Relocation) for 3- S. No Name of Land Holder Compensation @ 1- Compensation for Irrigated OR More Land Affected Affected Structure Affected Trees Allowance for 3- Allowance for 6- (A+B+C+D+E+F+G+H+I Name Holders Affected Land (A) Allowance (I) Months @ OPL Rs. Crop/ Year (B) Land @ 1-Crop/ Year (C.) Persons @ 1-Crop/ Year (D) (E.) (F) Months Rs.15000/ Months @ Rs. +J) 15000/ Month (J) Month Fixed (G) 50000/ Month (H)

217 Qadar Rahman Sher Ahmad Lease 108,408 22,169 130,577

218 Gulrez Khan Shamas Khan Lease 40,653 40,653

219 Shah Afzal Mira Khan Lease 83,146 17,003 100,149

220 Muhammad Sher Gul Sher Lease 95,024 19,432 45000 159,456

221 Sher Zada Gulab Khan Lease 47,512 9,716 45000 102,228

222 Alam Sher Gul Sher Lease 71,268 14,574 85,842

223 Taj Bar Khan Laj Bar Khan Lease 59,390 12,145 71,535

224 Abdur Raziq Mir Wahid Lease 35,634 7,287 42,921

225 Rozi Khan Said Asghar Lease 59,390 12,145 71,535

226 Nisar Muhmmad Gul Hussain Lease 47,512 9,716 57,228

227 Riaz Muhammad Gul Muhammad Lease 71,268 14,574 85,842

228 Ameen Khan Faqeer Khan Lease 47,512 9,716 57,228

229 Bakhtiar Muhammad Mukhtiar Lease 35,634 7,287 42,921

230 Mir Zaman Khan Mir Kamal Lease 83,146 17,003 100,149

231 Sarzameen Syed Kalam Lease 59,390 12,145 71,535

232 Nazir Kamal Haji Noor Jamal Lease 59,390 12,145 71,535

233 Mushtaq Ali Sher Ali Tenant 83,146 17,003 45000 145,149

234 Hamid Ali Mughaqib Tenant 71,268 14,574 45000 130,842

235 Amir Naawaz Haneef Gul Tenant 59,390 12,145 45000 116,535

236 Said Arab Khan Hameed Khan Tenant 47,512 9,716 45000 102,228

237 M.Pervaiz Said Muhammad Share Cropper 47,512 9,716 57,228

238 Fazal Raziq Khan Raziq Share Cropper 71,268 14,574 85,842

239 Fayaz Ahmad Ali Bor khan Share Cropper 83,146 17,003 100,149

240 Badri Zaman Aslam Sher Share Cropper 71,268 14,574 85,842

241 Muhammad Ibraheem Muhammad Naeem Share Cropper 71,268 14,574 85,842

242 Imtyaz Khan Raziq Share Cropper 59,390 12,145 71,535

243 Faqeer Shah Naseem Shah Share Cropper 47,512 9,716 57,228

244 Sher Aman Khan Suhbat khan Share Cropper 59,390 12,145 71,535

245 Fazal Amin Fazal rehman Share Cropper 35,634 45000 80,634

246 Ibne Amin Noor Ul Abrar Share Cropper 83,146 17,003 100,149

247 Waqar Ahmad Nazeer Muhammad Share Cropper 59,390 12,145 71,535

248 Zameen Khan Syed Amin Jan Share Cropper 71,268 14,574 85,842

249 Abdul Wahab Said Amin Jan Share Cropper 83,146 17,003 100,149

250 Fazal Qadar Akhter Muhammad Share Cropper 71,268 14,574 85,842

251 Mukamil Khan Rehan Khan Share Cropper 84,000 17,178 45000 146,178

252 Fazal Hayat Waris khan Share Cropper 73,500 15,031 88,531 Lot-II: Census of DPs Land, Crops, Trees and Structure Prices, Severity and Vulnerability Allowances etc. of Affected Persons under Indus Ambar Pressure Pipeline of PHLCE Project

Livelihood Vulnerability Income Allowance Amount of Crop Amount of Additional Crop Severity Allowance of 10 % Amount of Amount of Allowance (Cash Disturbance Grand Total Amount Father Name/ Husband Status of Land Amount of Shifting (Relocation) for 3- S. No Name of Land Holder Compensation @ 1- Compensation for Irrigated OR More Land Affected Affected Structure Affected Trees Allowance for 3- Allowance for 6- (A+B+C+D+E+F+G+H+I Name Holders Affected Land (A) Allowance (I) Months @ OPL Rs. Crop/ Year (B) Land @ 1-Crop/ Year (C.) Persons @ 1-Crop/ Year (D) (E.) (F) Months Rs.15000/ Months @ Rs. +J) 15000/ Month (J) Month Fixed (G) 50000/ Month (H)

253 Sabz Ali khan Raza khan Share Cropper 63,000 12,883 75,883

254 Husain ali Anwar Bag Share Cropper 42,000 8,589 45000 95,589

255 Hazrat muhammad Hazrat jameel Share Cropper 31,500 45000 76,500

256 Ali Gohar Jandad Khan Lease 52,500 10,736 63,236

257 Muhammad Raheem Saaz Noor Lease 87,903 17,976 105,879

258 Muhammad Shoaib raghib ullah Lease 58,602 11,984 70,586

259 Shair Zameen Khan Shamas Khan Lease 107,437 21,971 129,408

260 Ghanayat Ullah safiullah Lease 107,437 21,971 129,408

261 Pir Zada m akbar Lease 58,602 11,984 70,586

262 Abdul Samad Muhammad Nabi Lease 78,136 15,979 94,115

263 Ahmad Shah Syed Manan Lease 87,903 17,976 105,879

264 Fazal Bahadur Amir Bahadur Lease 78,136 15,979 94,115

265 Ghulam Akbar Mir Akbar Lease 68,369 13,981 82,350

266 Shareen Muhammad Muhammad Lease 78,136 15,979 94,115

267 Haroon Ur Rasheed Banaras Lease 58,602 11,984 70,586

268 Amjad Ahmad Khanpur Lease 68,369 13,981 82,350

269 Muhammad Waheed Rahid Ullah Lease 78,136 15,979 94,115

270 Sahar Gul Muhammad Gul Lease 78,136 15,979 94,115

271 Naem khan Said awal khan Lease 68,369 13,981 82,350

272 Hamza sher Ali sher Lease 58,602 11,984 70,586

273 Rehman ullah Sahab Khan Lease 78,136 23,805 101,941

274 Akhtar Gul Shahi Bahar Lease 58,602 11,984 70,586

275 Muhammad gul Sahab khan Lease 48,835 9,987 58,822

276 Noor syed Gul Rahmat Lease 39,068 13,983 53,051

277 Wasif Ullah Jumma khan Lease 87,903 17,976 105,879

278 Sher Muhammad khan Sardar Ali Lease 29,301 29,301

279 Taj Bahadar Sameen jan Lease 48,835 15,398 64,233

280 Muhammad Islam Noor Muhammad Lease 155,080 31,714 45000 231,794

281 Abdul Hameed Amir Ali Lease 46,524 9,514 56,038

282 Khaliq dad Qamar Dad Lease 108,354 22,158 130,512

283 Karim khan Umer Dad Lease 72,236 14,772 45000 132,008

284 Fazle-e- amin Mohammad Amin Lease 90,295 24,851 115,146

285 Ahmad Ali Khan Lal Zaman Lease 72,236 14,772 45000 132,008

286 Islam Din Muhammad Din Lease 144,472 29,544 174,016

287 Saeed Khan Mir wali Lease 126,413 25,851 152,264

288 Umar Khitab Akbar din Lease 108,354 22,158 130,512 Lot-II: Census of DPs Land, Crops, Trees and Structure Prices, Severity and Vulnerability Allowances etc. of Affected Persons under Indus Ambar Pressure Pipeline of PHLCE Project

Livelihood Vulnerability Income Allowance Amount of Crop Amount of Additional Crop Severity Allowance of 10 % Amount of Amount of Allowance (Cash Disturbance Grand Total Amount Father Name/ Husband Status of Land Amount of Shifting (Relocation) for 3- S. No Name of Land Holder Compensation @ 1- Compensation for Irrigated OR More Land Affected Affected Structure Affected Trees Allowance for 3- Allowance for 6- (A+B+C+D+E+F+G+H+I Name Holders Affected Land (A) Allowance (I) Months @ OPL Rs. Crop/ Year (B) Land @ 1-Crop/ Year (C.) Persons @ 1-Crop/ Year (D) (E.) (F) Months Rs.15000/ Months @ Rs. +J) 15000/ Month (J) Month Fixed (G) 50000/ Month (H)

289 Toti rehman hassan shah Lease 98,264 20,095 118,359

290 Zakir Khan Mir Zaman Lease 73,698 21,391 45000 140,089

291 Shak Amin Gul Amin Lease 49,132 10,047 45000 104,179

292 Muhammad Rehman Amanat khan Lease 61,415 12,559 45000 118,974

293 Farman ullah Aleem Sad Lease 85,981 17,583 45000 148,564

294 Waseem Hayat Saeed ur Rehman Lease 98,264 19,891 118,155

295 Rahman Said Rahim ullah Lease 36,849 45000 81,849

296 Hassan khan Sohbat khan Lease 49,132 16,451 45000 110,583

297 21,741 300000 30000 45000 396,741

298 85,000 300000 30000 45000 460,000

299 51,600 300000 30000 45000 426,600

300 103,876 300000 30000 45000 478,876

301 40,000 300000 30000 45000 415,000

302 (5-Shops of 5 DPs) 701,250 1800000 180000 270000 2,951,250

303 1,352,300 300000 30000 45000 1,727,300

304 2,200,000 300000 30000 45000 2,575,000

305 584,100 300000 30000 45000 959,100

306 1,014,500 300000 30000 45000 1,389,500

307 82,500 300000 30000 45000 457,500

-

Total Amount in PKR 619,954,598 24,103,300 6,141,843 12,380,399 6,236,867 1,944,132 2,205,000 4,800,000 480,000 720,000 678,966,139

Total Amount in Million 619.95 24.10 6.14 12.38 6.24 1.94 2.21 4.80 0.48 0.72 678.97 Annexure-6: List of Consultation Meetings with Community/ Stakeholders Annexure, 06 1-Consultation Meeting/ Focus Group Discussions in Community/ Stake Holders. Meeting Place, Mouza Swabi Name and Designation Names and Key Issues Discussed. of the Consultants who Designation of the conducted the Meeting Participants Stake holders/ Official/Community Mr. Amutharaj Female Community, The consultants welcomed the International Consultant Female Councilors participants of the meeting and Social and Gender and Male Nazim of explained the project details and Specialist. the Village. the purpose of the meeting Mr. Wazir Ali Consultant especially to women. The Social and Gender components of output 2 such as Specialist. demonstration plots, formation of WUA, training on high efficiency irrigation system, modern & appropriate cultivation practices and provision of agriculture inputs to women were discussed.

The women who participated at the meeting informed that water availability for domestic purposes and cultivation is a challenge for them. The ground water table is very low and the wells are deep. They pointed out that household wells are not available to all the families, so they have to depend on the tube wells installed by the government in public places. The government tube wells are not close to all the houses. The distance varies from 10 to 100 meters to the houses in the village. The women requested the consultants to accommodate few design features in the cannel design to cater the domestic water demand in the village. They highlighted that they demanding bathing places to children and washing places in identified locations of the proposed canal. They also requested to include drinking water access to cattle in the design of the canal because women are taking care of the cattle at home.

The participants informed that a Local NGO provided training on cultivation practice and provided farm inputs to continue cultivation for livelihood support. Ultimately the effort had gone unsuccessful due to lack of irrigation water. The women at the meeting appreciated the proposed training programs on off-season vegetables, kitchen gardening, tunnel farming and advanced agriculture technologies. They said the proposed canal water and the proposed training would be an asset for them for their livelihood. It would help them to cultivate kharif and rabi crops throughout the year. They are anxiously looking forward to see the project in their village to flourish their lives. The consultants explored the possibility of women participation in WUA activities. The women are keen to contribute their role in WUA and proud to become a member of it. They said they would not waste the canal water and not allow others also to misuse the canal water because it is precious to the village peoples. The consultants asked about the women participation in agriculture activities in the village. In response to this situation they said women used to go to the fields with their family members and assist the male members in different agriculture activities Female are very supportive to the male members in the agriculture activities in addition to their routine and traditional household responsibilities. Finally the women at the meeting said they are very supportive of this project. The consultants thanked the participants and their initiatives. With this, the meeting adjourned.

2- Consultation Meeting/ Focus Group Discussions in Community/ Stake Holders. Meeting Place, Mouza Shahmansoor

Name and Designation Names and Key Issues Discussed of the Consultants Designation of the who conducted the Participants Stake Meeting holders/ Official/Community Mr. Wazir Ali Consultant Nazim, elected The participants expressed concern Social and Gender Representatives and that the Government land rates were Specialist Community members not acceptable to them. Mr. Asad Khan of UC Mainai Community requested that Consultant Environment compensation against land Specialist. acquisition should be given according to the latest market rates. According to Nazim the farmers of the village are poor therefore, they were partially willing for the installation of pressure pipe in their agricultural land. They wanted to know whether the land falling within right of way of pressure pipe would be considered as property of Irrigation Department or the existing ownership would remain.

3-Consultation Meeting/ Focus Group Discussions in Community/ Stake Holders.

Meeting Place, Mouza Maini Sharqi

Name and Names and Key Issues Discussed Designation of the Designation of the Consultants who Participants Stake conducted the holders/ Meeting Official/Community Mr. Wazir Ali UC Nazim and Community of village Pabani were Consultant Social Elected Councilors completely supportive of the construction and Gender and community. of proposed canal. Consultant team Specialist informed the participants that settlements are not affected and change in alignment is not required. The participants expressed concern that the Government land rates are not acceptable to them. Participants requested that compensation against land acquisition should be given according to the latest market rates.

4-Consultation Meeting/ Focus Group Discussions in Community/ Stake Holders. Meeting Place, Office of the XEN Swabi 2 Name and Names and Key Issues Discussed Designation of the Designation of the Consultants who Participants Stake conducted the holders/ Meeting Official/Community Mr. Wazir Ali Mr. Sardar Zafar XEN Meetings were conducted with XEN Consultant Social Swabi.2 Swabi 2 office KP Irrigation Department. and Gender Mr. Walayat Khan DPD The representatives of the said Specialist PHLCE. departments were briefed on the proposed project interventions and later Mr. Amutu Raj International they provided information (List of Tube Consultant Social Wells of Irrigation Department) required and Gender by the consultant Team. Specialist

5-Consultation Meeting/ Focus Group Discussions in Community/ Stake Holders. Meeting Place, District Agriculture Office Swabi Name and Names and Key Issues Discussed Designation of the Designation of the Consultants who Participants Stake conducted the holders/ Meeting. Official/Community Mr. Wazir Ali Mr. Muhammed The Consultant briefed officials on PHLCE. Consultant Social Israr khan District The District Officer agriculture show his and Gender Agriculture Officer great interest in the project activities Specialist Swabi especially in the output 2 of the project. He Mr. Hayat Ullah Khan Mr. Amir Khatam also showed his full cooperation with Consultant Irrigation Khan Agronomist project staff and consultants. water use expert. Swabi. Mr. Nimat Gill. Agronomist.

6-Consultation Meeting/ Focus Group Discussions in Community/ Stake Holders. Meeting Place, District Water Management Office Swabi Name and Names and Designation Key Issues Discussed Designation of the of the Participants Stake Consultants who holders/ conducted the Official/Community Meeting Mr. Wazir Ali Mr. Abdul Hafeez Khan Consultants briefed District Officer Consultant Social and District Water Management Water Management on PHLCE Gender Specialist Officer Swabi project. He showed his great Mr. Hayat Ullah Khan Mr. M. Farooq interest in project especially in Consultant Irrigation Water Management Officer Water Management Component. water use expert. Swabi. He also showed his full cooperation Mr. Nimat Gill. with project staff. Agronomist.

7-Consultation Meeting/ Focus Group Discussions in Community/ Stake Holders. Meeting Place, Mouza Bamkhel Name and Names and Key Issues Discussed Designation of Designation of the the Consultants Participants Stake who conducted holders/ the Meeting Official/Community Miss. Alia Female Community Male household members should be Social Mobilizer and local councilors employed in the project related jobs so that village Maini they can stay in their own community, rather than seeking employment outside the project area. In this way their social safety could be enhanced. Community demanded vocational training center for income generating activities for women to increase the overall household income

8-Consultation Meeting/ Focus Group Discussions in Community/ Stake Holders. Meeting Place, District Health Office Swabi Name and Names and Key Issues Discussed Designation of Designation of the the Consultants Participants Stake who conducted holders/ the Meeting Official/Community Mr. Wazir Ali Dr Naiz Muhammed. The Consultant briefed the District Health Consultant District Health Officer (DHO) Officer on PHLCE project. The Social and Officer ( DHO) District Health Officer assured his full support Gender Swabi to consultant and also share the District Data Specialist with Consultant for updating the report.

9-Consultation Meeting/ Focus Group Discussions in Community/ Stake Holders. Meeting Place, Mouza Swabi Name and Names and Key Issues Discussed Designation of the Designation of the Consultants who Participants Stake conducted the holders/ Meeting Official/Community Mr. Wazir Ali Mr. Arif Shah Government departments and NGOs were Consultant Social President Tanzeem organized to discuss project interventions and Gender Naujawanan Topi and their potential impacts. In these Specialist. NGO Swabi. meetings, stakeholders were informed of the salient features of the project, its location and activities. 10-Consultation Meeting/ Focus Group Discussions in Community/ Stake Holders. Meeting Place, Mouza Kotha Name and Names and Key Issues Discussed Designation of the Designation of the Consultants who Participants Stake conducted the holders/ Meeting Official/Community Mr. Wazir Ali Community, UC The Community of Village Pabani were Consultant Social and Nazim and Elected completely supportive of the Gender Specialist Councilors. construction of proposed canal. The study team informed the participants that settlements were not affected and change in alignment was not required.

11-Consultation Meeting/ Focus Group Discussions in Community/ Stake Holders. Meeting Place, Mouza Mainai Gharbi

Name and Names and Key Issues Discussed Designation of the Designation of the Consultants who Participants Stake conducted the holders/ Meeting Official/Community Mr. Wazir Ali Nazim, elected The participants expressed concern that Consultant Social and Representatives and the Government land rates were not Gender Specialist Community members acceptable. Mr. Asad Khan of UC Mainai Community requested that compensation Consultant against land acquisition should be given Environment according to the latest market rates. Specialist.

12-DPs/ Community Concerns and their Redress

Remarks/ Actions to be Concerns Feedback Taken Compensation for the affected Compensation rates Under the supervision of Deputy land, houses, shops and other needs to be assessed Commissioner (DC) a District private assets should be fixed in based on the Price Committee (DPC) has accordance with current market replacement cost. been constitute to assess the rates/replacement cost. market and fix the rate of land, structures, shops other assets and properties according to yaksala (current year market rate). Remarks/ Actions to be Concerns Feedback Taken The rates of land available in Land compensation Under the supervision of Deputy revenue record are very low; should be at current Commissioner (DC) a District therefore, the Affected persons market rates. Price Committee (DPC) has should be compensated as per been constitute to assess the market rates. market and fix the rate of land, structures, shops other assets and properties according to yaksala (current year market rate).

Compensation on the loss of Compensation for the This is a mandatory as per ADB crops and trees should be loss of crops and SPS 2009 to ensure the ensured before to start the trees would be payment of compensation prior project. estimated by the to start civil works. concerned departments considering the current market rates and would be paid before to start of construction work.

The permission should be made The local community The local community would be to local community to collect the would be allowed to allowed to collect the removed wood material from the removed collect the removed trees. trees. trees.

It should be preferred if In case of crop losses, Construction is a continuous construction activities should be crop compensation activity. However, crop losses done after the harvest of the should be provided. would be provided based on the crops affected cropped area. Unskilled/ semi-skilled labour Requisite unskilled Provision of such clause has should be taken from the local labor would be already been made in the population. This opportunity will engaged from local contract agreement of contractor help to increase household population preferably income of local population of the DPs. sub-project area. Religious and educational Generally, relocation There is no such structure in structures like of Mosques, graves, land acquired for RoW of the Mosques, madrassas and commercial and canal system in the area graveyards/shrines should be residential structures saved from demolishing as such has been avoided as possible. except those ones which are unavoidable to relocate. However re- building/ re-settlement of such social, religious structures will be ensured. Remarks/ Actions to be Concerns Feedback

Taken ¡ ¤ ¥¨ § ¡ ¥© ¨  ¦¦ £ ¡¢£ ¤ ¡ ¥ ¦¡ § ¨¦© ¢ ¡ ¦  The timing of work will passage on selected locations at be adjusted in a way instructed not to disturbed canal should not be disturbed to avoid disturbance in mobility of women during during the construction activities. women construction of canal network activities/mobility. Relocation of settlements PHLCE has been The canal network has been should be minimized by designed in a way to designed in a way that impact changing the PHLCE minimize the impact on settlements is minimized design, where possible. on settlements.

Payment of compensation for Allowance should be Compensation would be paid to vulnerable DPs should be paid the concerned prior to taking the ensured. work in hand by the contractor Transport for relocation of assets To take care of the There is no displacement and timely compensation to all land acquisition, involved in this lot the affected persons must be relocation and ensured. compensation matters, Entitlement Matrix has been developed in consultations with the DPs for the compensation of their affected land, structures and their source of livelihood. In addition to compensation the Allowance should be There is no displacement livelihood assistance to the DPs paid involved in this lot should also be provided.

Compensation against all the This can be ensured Compensation would be paid to losses should be provided prior that all payments will the concerned prior to taking the to start of the civil work so that be given to the eligible work in hand by the contractor the impact on the livelihood of and entitled DPs prior the DPs could be minimized. to initiate the civil work.

Annexure-7: Summary Sheet of Structures of C&W Department

Annexure-8: Notification of District Price Assessment Committee

Annexure-9: Notification of Project Steering Committee

Annexure-10: LAR Notification