Your search for projects in State: CO, Total Results : 462
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2008 Unknown Trail and Drainage Project includes two steep re-routes; Unspecified/Unidentifi $11,600 $5,200 $16,800
Improvements installation of stone steps, reinforced able
drainage dips, and a split log bridge;
revegetation; dam checks; hardening of
stream crossings; and delineation of
approaches.
CO 2008 Tools and Equipment Purchase Trail Maintenance Purchase a crew passenger van, 2 closed Unspecified/Unidentifi $9,250 $9,293 $18,543
Equipment utility trailers, and equipment for 1 camping able
crew
CO 2008 Unspecified/Unidentifiable Trail Re-Route and Relocation and reconstruction of a new Unspecified/Unidentifi $93,314 $37,886 $131,200
Construction and Trailhead trailhead, restoration of 4x4 road closure (2.5 able
Improvements miles) to wilderness, and installation of a
parking lot, bridge, gate, and information
kiosks. Trail maintenance will also be
performed.
CO 2008 Unspecified/Unidentifiable Trail and Bridge Construction 14 miles of trail maintenance, 3 miles of new Unspecified/Unidentifi $35,292 $42,027 $77,319
trail construction, and installation of 1 bridge able
CO 2008 Unspecified/Unidentifiable Trail Construction, Project will complete construction of 500 feet Unspecified/Unidentifi $30,000 $48,200 $78,200
Maintenance, and Drainage of new trail across a drainage that will able
Improvements connect 2 existing OHV road systems,
creating a 7.5 mile loop. Work on the two
road systems includes corridor clearing,
construction of 10 drainage dips, cleaning...
CO 2008 Unspecified/Unidentifiable Trail Re-route and Project includes 10 miles of trail Unspecified/Unidentifi $20,000 $65,000 $85,000
Maintenance maintenance, a 2,750 foot trail re-route, as able
well as bridge repair.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2008 Unspecified/Unidentifiable Trail Renovation and Slope Reconstruct 0.25 mile trail. Close and reclaim Unspecified/Unidentifi $21,507 $94,611 $116,118
Stabilization social trail and complete slope stabilization able
and erosion control at 14,000 feet.
CO 2008 Unspecified/Unidentifiable Trail, Boardwalk, and Project includes 5 trail Unspecified/Unidentifi $25,000 $107,000 $132,000
Maintenance Improvements maintenance/reconstruction projects able
including 1,000 foot re-route, boardwalk
replacement, resurfacing scenic lake loop
trail, and general trail maintenance.
CO 2008 Unspecified/Unidentifiable Trail Re-route and Construct a 1.1 mile trail re-route, reconstruct Unspecified/Unidentifi $170,075 $175,706 $345,781
Construction 0.29 mile section of existing social trail, able
restore 1.37 miles of poorly located and badly
eroded social trail, and maintain 2.78 miles of
existing trails
CO 2009 Unspecified/Unidentifiable Trail Maintenance Late summer and fall of 2006, the Western Unspecified/Unidentifi $40,000 $4,928 $44,928
Slope of Colorado experienced record levels able
of moisture and a combination of saturated
soils and high use have created a backlog of
heavy trail maintenance across the entire
district. The district used a...
CO 2009 Unspecified/Unidentifiable Construct Interpretive Trail Construct a 0.5 mile interpretive trail to Unspecified/Unidentifi $21,665 $105,028 $126,693
and Signs complement a new outdoor classroom and able
educate the public about the unique geology
in the area. Installation of interpretive signs
and connection to 12 other miles of trails
CO 2009 Unspecified/Unidentifiable Trail and Bridge Construction Complete a single-track loop by constructing Unspecified/Unidentifi $9,364 $130,736 $140,100
and Signs 7,400 linear feet for hiking/biking and able
backcountry Nordic skiing. Three bridges will
be installed along with signs (historical,
interpretive, directional)
CO 1999 Sand Creek National Trail Construction Construction of a .5 mile trail segment which 1 Denver $25,000 $27,650 $52,650
Recreation Trail lies on the former Stapleton Airport Property
in Denver
CO 2003 Bluff Trail Construct Trails, Signage, Fencing 1 Denver $15,000 $88,000 $103,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2006 Colorado State Parks Trails Crew Leadership Program 1 Denver $27,985 $11,500 $39,485
for Colorado State Parks
CO 2010 N/A Outdoor Stewardship The Outdoor Stewardship Institute is the 1 Denver $10,000 $3,000 $13,000
Institute Training Program training arm of Volunteers for Outdoor
Colorado and will offer trainings to volunteers
and staff of outdoor stewardship
organizations, public land agencies and other
interested parties of non-motorized and...
CO 2011 N/A Outdoor Stewardship The Outdoor Stewardship Institute is the 1 Denver $10,000 $3,000 $13,000
Institute Training Program training arm of Volunteers for Outdoor
Colorado and will offer trainings to volunteers
and staff of outdoor stewardship
organizations, public land agencies and other
interested parties of non-motorized and...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2000 Various Trails Install Signs Signage 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $50,000 $25,000 $75,000
Costilla, Crowley,
Custer, Delta, Denver,
Dolores, Douglas,
Eagle, El Paso, Elbert,
Fremont, Garfield,
Gilpin, Grand,
Gunnison, Hinsdale,
Huerfano, Jackson,
Jefferson, Kiowa, Kit
Carson, La Plata,
Lake, Larimer, Las
Animas, Lincoln,
Logan, Mesa, Mineral,
Moffat, Montezuma,
Montrose, Morgan,
Otero, Ouray, Park,
Phillips, Pitkin,
Prowers, Pueblo, Rio
Blanco, Rio Grande,
Routt, Saguache, San
Juan, San Miguel,
Sedgwick, Summit,
Teller, Washington,
Weld, Yuma
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2001 Colorado Fourteeners Trails Trail Maintenance and Construct Trails, Erosion Control, Kiosks, 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $129,900 $550,400 $680,300
Construction Signage Costilla, Crowley,
Custer, Delta, Denver,
Dolores, Douglas,
Eagle, El Paso, Elbert,
Fremont, Garfield,
Gilpin, Grand,
Gunnison, Hinsdale,
Huerfano, Jackson,
Jefferson, Kiowa, Kit
Carson, La Plata,
Lake, Larimer, Las
Animas, Lincoln,
Logan, Mesa, Mineral,
Moffat, Montezuma,
Montrose, Morgan,
Otero, Ouray, Park,
Phillips, Pitkin,
Prowers, Pueblo, Rio
Blanco, Rio Grande,
Routt, Saguache, San
Juan, San Miguel,
Sedgwick, Summit,
Teller, Washington,
Weld, Yuma
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2001 Winter Trail Improvements Winter Trail Improvements Improvements, Construction, Signage, 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $267,144 $66,786 $333,930
Maintenance, Renovation Costilla, Crowley,
Custer, Delta, Denver,
Dolores, Douglas,
Eagle, El Paso, Elbert,
Fremont, Garfield,
Gilpin, Grand,
Gunnison, Hinsdale,
Huerfano, Jackson,
Jefferson, Kiowa, Kit
Carson, La Plata,
Lake, Larimer, Las
Animas, Lincoln,
Logan, Mesa, Mineral,
Moffat, Montezuma,
Montrose, Morgan,
Otero, Ouray, Park,
Phillips, Pitkin,
Prowers, Pueblo, Rio
Blanco, Rio Grande,
Routt, Saguache, San
Juan, San Miguel,
Sedgwick, Summit,
Teller, Washington,
Weld, Yuma
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2002 State Administration Administration Expenses Administration 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $15,000 $3,750 $18,750
Costilla, Crowley,
Custer, Delta, Denver,
Dolores, Douglas,
Eagle, El Paso, Elbert,
Fremont, Garfield,
Gilpin, Grand,
Gunnison, Hinsdale,
Huerfano, Jackson,
Jefferson, Kiowa, Kit
Carson, La Plata,
Lake, Larimer, Las
Animas, Lincoln,
Logan, Mesa, Mineral,
Moffat, Montezuma,
Montrose, Morgan,
Otero, Ouray, Park,
Phillips, Pitkin,
Prowers, Pueblo, Rio
Blanco, Rio Grande,
Routt, Saguache, San
Juan, San Miguel,
Sedgwick, Summit,
Teller, Washington,
Weld, Yuma
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2004 Safety and Education Trail Access and Safety Southwest Youth Corps respectfully requests 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $27,500 $27,740 $55,240
Initiative a recreation grant from the Colorado State Costilla, Crowley,
Parks Trails Program for a Trail Access and Custer, Delta, Denver,
Safety Initiative which will include clearing Dolores, Douglas,
and maintenance of high-use and neglected Eagle, El Paso, Elbert,
trails in the San Juan National... Fremont, Garfield,
Gilpin, Grand,
Gunnison, Hinsdale,
Huerfano, Jackson,
Jefferson, Kiowa, Kit
Carson, La Plata,
Lake, Larimer, Las
Animas, Lincoln,
Logan, Mesa, Mineral,
Moffat, Montezuma,
Montrose, Morgan,
Otero, Ouray, Park,
Phillips, Pitkin,
Prowers, Pueblo, Rio
Blanco, Rio Grande,
Routt, Saguache, San
Juan, San Miguel,
Sedgwick, Summit,
Teller, Washington,
Weld, Yuma
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2004 Continental Divide National Building Continental divide Trail (CDT) with 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $69,200 $73,100 $142,300
Scenic Trail community collaboration Costilla, Crowley,
Custer, Delta, Denver,
Dolores, Douglas,
Eagle, El Paso, Elbert,
Fremont, Garfield,
Gilpin, Grand,
Gunnison, Hinsdale,
Huerfano, Jackson,
Jefferson, Kiowa, Kit
Carson, La Plata,
Lake, Larimer, Las
Animas, Lincoln,
Logan, Mesa, Mineral,
Moffat, Montezuma,
Montrose, Morgan,
Otero, Ouray, Park,
Phillips, Pitkin,
Prowers, Pueblo, Rio
Blanco, Rio Grande,
Routt, Saguache, San
Juan, San Miguel,
Sedgwick, Summit,
Teller, Washington,
Weld, Yuma
CO 2005 Winter Recreation Trails Snow Capital Grants Trail Grooming Equipment 1, 2, 3, 4, 5, 6, 7 Statewide $10,000 $2,500 $12,500
Grooming Equipment
CO 2005 Winter Recreation Trails Snow Capital Grants Trail Grooming Equipment 1, 2, 3, 4, 5, 6, 7 Statewide $24,369 $6,092 $30,461
Grooming Equipment
CO 2008 Colorado State Parks Trails Trail Improvements Front and backcountry trail maintenance, 1, 2, 3, 4, 5, 6, 7 Statewide $90,000 $13,000 $103,000
rehab, reconstruction, re-routes and new
construction on Colorado State Parks lands
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2008 Winter Recreation Trails Purchase Snow Trail Replace 1996 Piston Bulley 300 with a newer 1, 2, 3, 4, 5, 6, 7 Statewide $45,000 $20,000 $65,000
Equipment model snowcat to groom winter recreation
trails for 30,000 users (including a new user
group, the hybrid motorized
skier/snowboarder) from November through
May
CO 2008 Winter Recreation Trails Purchase Snow Trail 1,840 hours of volunteer grooming and 1, 2, 3, 4, 5, 6, 7 Statewide $37,500 $37,500 $75,000
Equipment maintenance of 110 miles of
snowmobile/multi-use winter sport trails.
Purchase 4WD wrecker truck with rollback
bed to transport snow groomer to 8 wide
spread winter sport trailheads for grooming
CO 2008 Winter Recreation Trails Purchase Snow Trail Replacement groomer for member-owned 1, 2, 3, 4, 5, 6, 7 Statewide $11,037 $53,963 $65,000
Equipment 1988 snowcat with 14,000 hours for multi-use
winter recreation trail system (for
snowmobiles, cross country skiing,
snowshoeing, and dogsledding). Trail system
receives 50-75 weekday users and over 200
weekday...
CO 2008 Winter Recreation Trails Purchase Snow Trail Purchase new snow cat to groom winter trails 1, 2, 3, 4, 5, 6, 7 Statewide $65,000 $90,000 $155,000
Equipment system, which the club has been grooming
for multi-use winter recreation for 20 years.
The Club also builds alpine ski tracks
alongside the snowmobile trail on the Big
Meadows Trail.
CO 2008 Winter Recreation Trails Purchase Snow Trail Purchase 2006 Bombardier BR350 Groomer 1, 2, 3, 4, 5, 6, 7 Statewide $55,000 $104,000 $159,000
Equipment Snowcat to maintain 91, multi-use winter
recreation trails (for snowmobiles,
cross-country skiing, dog sledding,
snowshoeing, etc.)
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2009 Colorado State Parks Trails Trail Construction and Trail improvements and maintenance on 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $87,000 $13,262 $100,262
Renovation recreational and climbing access trails. Costilla, Crowley,
Project also includes re-routes, rehabilitation, Custer, Delta, Denver,
corridor clearing, and construction on Dolores, Douglas,
Colorado State Parks lands Eagle, El Paso, Elbert,
Fremont, Garfield,
Gilpin, Grand,
Gunnison, Hinsdale,
Huerfano, Jackson,
Jefferson, Kiowa, Kit
Carson, La Plata,
Lake, Larimer, Las
Animas, Lincoln,
Logan, Mesa, Mineral,
Moffat, Montezuma,
Montrose, Morgan,
Otero, Ouray, Park,
Phillips, Pitkin,
Prowers, Pueblo, Rio
Blanco, Rio Grande,
Routt, Saguache, San
Juan, San Miguel,
Sedgwick, Summit,
Teller, Washington,
Weld, Yuma
CO 2009 Winter Recreation Trails Purchase Snow Trail Replace 1996 groomer with 10,600 hours 1, 2, 3, 4, 5, 6, 7 Statewide $60,780 $22,720 $83,500
Equipment with 2004 groomer with 2,900 hours. Trail
system has been ranked by "Snowest"
magazine in the top 10 trail systems in the
U.S., with 36,000 snowmobiles on the system
annually.
CO 2009 Winter Recreation Trails Purchase Snow Trail Groomer purchase. Multi-use winter trail 1, 2, 3, 4, 5, 6, 7 Statewide $26,296 $26,593 $52,889
Equipment system for a 6-month winter season.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2009 Winter Recreation Trails Purchase Snow Trail Upgrade 1990 groomer with 11,000 hours 1, 2, 3, 4, 5, 6, 7 Statewide $7,396 $81,919 $89,315
Equipment with newer model. Trails good for novice to
intermediate recreationists.
CO 2009 Colorado State Parks Trails Support for Youth Corps and Support for 14 volunteer projects, a pilot 1, 2, 3, 4, 5, 6, 7 Statewide $53,903 $244,448 $298,351
Volunteer Trail Work 4-week volunteer trail crew, a 6-weeks of
Youth Corps project, and 8.2 miles of new
and reconstructed trail. Work will be done in
two National Forests and one National Park
(NP).
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2012 Statewide Trail Maintenance OHV Travel Management The Travel Management Signage project is a 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $10,782 $69,218 $80,000
Signage state-wide effort that works with all of the Costilla, Crowley,
federal and state land management agencies Custer, Delta, Denver,
and OHV clubs, both at the state and Field Dolores, Douglas,
Office levels. The goal is to get the best Eagle, El Paso, Elbert,
signage possible installed in the... Fremont, Garfield,
Gilpin, Grand,
Gunnison, Hinsdale,
Huerfano, Jackson,
Jefferson, Kiowa, Kit
Carson, La Plata,
Lake, Larimer, Las
Animas, Lincoln,
Logan, Mesa, Mineral,
Moffat, Montezuma,
Montrose, Morgan,
Otero, Ouray, Park,
Phillips, Pitkin,
Prowers, Pueblo, Rio
Blanco, Rio Grande,
Routt, Saguache, San
Juan, San Miguel,
Sedgwick, Summit,
Teller, Washington,
Weld, Yuma
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2013 Colorado OHV Trails OHV Travel Management The grant is being requested to augment the 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $49,035 $85,965 $135,000
Signage 13 limited funds available to the land Costilla, Crowley,
management agencies for installing travel Custer, Delta, Denver,
management signage in the field to Dolores, Douglas,
implement the new Travel Management Eagle, El Paso, Elbert,
Plans being adopted in all of the National Fremont, Garfield,
Forests and on... Gilpin, Grand,
Gunnison, Hinsdale,
Huerfano, Jackson,
Jefferson, Kiowa, Kit
Carson, La Plata,
Lake, Larimer, Las
Animas, Lincoln,
Logan, Mesa, Mineral,
Moffat, Montezuma,
Montrose, Morgan,
Otero, Ouray, Park,
Phillips, Pitkin,
Prowers, Pueblo, Rio
Blanco, Rio Grande,
Routt, Saguache, San
Juan, San Miguel,
Sedgwick, Summit,
Teller, Washington,
Weld, Yuma
CO 2015 Safety and Education Colorado Trail Training VOC seeks support to maintain participation 1, 2, 3, 4, 5, 6, 7 Statewide $44,907 $13,472 $58,379
in its traditional trail training program for
2015-2017 for 300 participants per year and
expand opportunities for Millennials and rural
residents by creating new and innovative
methods for delivering...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2015 Various OHV Trails 2015 Travel Management The project will permit the distribution of 1, 2, 3, 4, 5, 6, 7 Statewide $109,720 $21,944 $131,664
Signage travel management signage for installation in
the field. Funds from the grant will be used to
purchase fiberglass, wood, and steel sign
posts, numbers, letters, and "open to/closed
to" strip stickers. Some...
CO 2015 Winter Recreation Trails 2015 Snow Grooming Snow grooming to the 28 snow clubs in CO 1, 2, 3, 4, 5, 6, 7 Statewide $369,761 $73,952 $443,713
CO 2016 Fourteen Peaks Trails Sustainable Trail CFI will continue studying the conditions of 1, 2, 3, 4, 5, 6, 7 Statewide $45,000 $13,500 $58,500
Maintenance more than 30 Fourteen Peaks trails. Baseline
inventories will occur on 16 routes that were
not inventoried in 2011-13. Updated
inventories will occur on 12 routes initially
assessed in 2011. Compact trail...
CO 2017 Safety and Education VOC Stewardship Training Volunteers for Outdoor Colorado (VOC) will 1, 2, 3, 4, 5, 6, 7 Statewide $44,670 $13,401 $58,071
convert stewardship trainings to online
courses through Colorado State University
(CSU), expand the new Independent Steward
training in 3 Continental Divide Trail gateway
communities, and develop portable...
CO 2018 Safety and Education Responsible Recreation Motorized recreation education and safety 1, 2, 3, 4, 5, 6, 7, 8 Statewide $139,921 $90,079 $230,000
Campaign
CO 2018 Safety and Education Travel management signage Travel management signage 1, 2, 3, 4, 5, 6, 7, 8 Statewide $59,466 $25,534 $85,000
CO 2000 Ralston Creek Trail Construct Trail, Signage 1, 2, 4, 6, 7 Jefferson, Adams $50,000 $50,000 $100,000
CO 2017 Safety and Education Training Tool and Leaders The grantee seeks support to recruit and train 1, 2, 5, 8, 14, 15 Boulder, Larimer, $45,000 $13,500 $58,500
134 volunteer trail leaders, purchase a trailer Denver
to transport tools and materials to project
sites, purchase new trail tools including
crosscut and chain saws, and create online
refresher videos on...
CO 2003 Garden of the Gods Trail Construct Trail, Erosion Control 11 El Paso $40,800 $134,200 $175,000
CO 2002 Southern Pikes Peak Improvements 12 El Paso $33,000 $55,000 $88,000
Greenway
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 1999 Union Pacific Railroad Trail Trail Construction Construction of an 8 foot wide concrete trail, 2 Larimer $20,000 $110,000 $130,000
5 foot wide path, fencing and seeding
CO 1999 South Platte River Trail Bridge Installation Construction of a new bridge to replace the 2 Jefferson $76,000 $113,100 $189,100
railroad in the Buffalo Creek flood,
construction 1/2 mile of new connecting trail,
parking
CO 1999 Continental Divide National Reconstruction and rehabilitation of up to 5 2 Larimer $9,500 $2,375 $11,875
Scenic Trail miles of eroded and braided trail above the
tree line on the Tonahutu
CO 2000 Devil's Backbone Nature Construct Trail, Bridges, Signage, Benches 2 Larimer $60,000 $91,300 $151,300
Trail
CO 2000 Niwot Trail and Cottontail Construct Trail, Signage, Bridge, Fencing 2 Boulder $200,000 $413,000 $613,000
Trail
CO 2002 Boulder Area Trails Mapping and Trail Guides Mapping 2 Boulder $11,800 $18,200 $30,000
CO 2002 Walnut Creek Trail Trail Construction Construct Trail 2 Jefferson $14,700 $24,500 $39,200
CO 2002 Summit County Commons Trail Construction Construct Trail 2 Summit $15,000 $27,293 $42,293
Bikepath
CO 2002 Hayden Green Mountain Trail Construction Construct Trail 2 Jefferson $14,240 $29,200 $43,440
Park Summit Loop Trail
CO 2002 Two Ponds National Wildlife Bridge Installation Bridges 2 Jefferson $15,920 $45,135 $61,055
Refuge
CO 2002 Rimrock Open Space Trail Trail Construction Construct Trail 2 Larimer $51,000 $114,400 $165,400
CO 2002 Bear Creek National Trail Construction Construct Trail 2 Ouray $83,886 $300,000 $383,886
Recreation Trail
CO 2002 Grand Lake Winter Trail Improvements Grooming 2 Eagle $20,332 $5,083 $25,415
CO 2002 Vail Pass National Winter Trail Improvements Grooming 2 Eagle, Summit $8,500 $2,125 $10,625
Recreation Trail
CO 2002 Golden Gate Canyon State Trail Construction Construct Trail 2 Jefferson $9,250 $2,313 $11,563
Park Trails
CO 2002 Lory State Park Trail and Bridge Construction Construct Trail, Bridges, Maintenance 2 Larimer $9,250 $2,313 $11,563
CO 2002 Vail Redstone Road to Winter Trail Improvements Grooming 2 Summit $8,589 $2,147 $10,736
Muddy Pass
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2003 Dillon, Georgetown, Winter Colorado Mountain Club Maintenance, Signage 2 Jefferson $3,000 $1,000 $4,000
Park, CDTA Route Annual Trail Program
CO 2003 Two Ponds National Wildlife Improvements 2 Jefferson $15,000 $7,557 $22,557
Refuge Trail
CO 2003 Mitchell Lake Forest Lakes, Trailhead, Improvements 2 Boulder, Gilpin $6,200 $8,600 $14,800
South Boulder Creek Trail
CO 2004 Buffalo Creek Recreation Trail Improvements Continued trail maintenance and 2 Jefferson $14,300 $10,694 $24,994
Area Trails reconstruction on the Buffalo Creek Area
Trails. Projects include: 1. Colorado Trail
Re-route 1 - 0.3 miles and rehabilitation 2.
Colorado Trail Re-route 2 - 0.1 miles and
rehabilitation 3. Switchback Maintenance
on...
CO 2004 East Eagle Trails Trail Construction Develop a non-motorized trail system on BLM 2 Eagle $11,000 $11,000 $22,000
land adjacent to the Town of Eagle. The
system will consist of 6.6 miles of single track
trails and 7.2 miles of two track trails and
roads. This area is heavily used by hikers,
bikers, runners and...
CO 2004 T1N, R73W, Section 33 Trail and Habitat Restoration Wildlands Restoration Volunteers (WVR) will 2 Boulder $14,400 $30,588 $44,988
T1S, R73W, Section 4 conduct five trail and habitat restoration
projects in 2004 at popular, heavily used, and
heavily impacted sites. These sites are
located in the Indian Peaks and James Peaks
Wilderness areas and other...
CO 2004 Buffalo Mountain Trail Trail Construction The Buffalo Mountain trail construction 2 Summit $18,900 $31,235 $50,135
project is proposed to construct 7,738 of new
trail on the eastern shoulder of Buffalo
Mountain (elevation 12,777 feet).
Approximately 40% of the trail is above tree
line in talus. The existing user-created...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2004 Glenwood Springs Field OHV Trail Crew Hire an OHV Trail Crew for six months and 2 Eagle $34,000 $35,500 $69,500
Office Trails the Rocky Mountain Youth Corps for two
weeks to construct and maintain OHV trail
systems in the Glenwood Springs Field
Office. Ongoing duties will include: maintain
and improve trails, build new trails where...
CO 2004 Yeoman Park Year-Round Trail and Trailhead The trail project is located in Eagle County, 2 Eagle $72,500 $81,300 $153,800
Trail Construction on the White River National Forest. The
project is approximately 15 miles south of the
town of Eagle and adjacent to the Yeoman
Park campground. The project will complete
a 2 mile loop fishing access and...
CO 2004 Swan Mountain Recreational Trail Construction The objective of this overall project is to 2 Summit $100,000 $454,000 $554,000
Pathway complete the recpath loop around Dillon
Reservoir through the construction of a safe,
enjoyable grade separated recpath to
connect the areas of Keystone/Snake River
Basin and Breckenridge/Upper Blue Basin....
CO 2005 White River National Forest Winter Trail Improvements Groom and maintain 28 miles of snowmobile 2 Summit $1,029 $2,271 $3,300
trails from Tiger Road in Breckenridge to the
summit of Georgia Pass
CO 2005 Fraser to Granby Trail Capital Equipment We are requesting $12,000 in order to 2 Grand $12,000 $3,000 $15,000
Acquisition, Purchase Trail acquire a small earthmoving machine and a
Maintenance Equipment trailer for use in both maintenance and new
trail construction on the Fraser-to-Granby
Trail. We have constructed approximately 8.5
miles of the Fraser-to-Granby Trail,...
CO 2005 White River National Forest Winter Trail Improvements Groom and maintain 59 miles of snowmobile 2 Eagle $4,412 $10,588 $15,000
trails in Eagle County in the White River
National Forest
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2005 Ypsilon Lake Trail Conservation Corps Support This project will utilize an SCA crew of 6 2 Larimer $15,000 $32,535 $47,535
and Trail Construction students and two crew leaders working
directly with a NPS trail crew on the Ypsilon
Lake Trail. The objective of this project is to
perform needed maintenance on drainage
structures, brush the 4.5 mile trail...
CO 2005 Arapaho National Forest Winter Trail Improvements Groom and maintain 104 miles of 2 Grand $882 $101,118 $102,000
snowmobile trails in the Arapaho National
Forest
CO 2005 Wildlife Restoration Trail Improvements and Wildlands Restoration Volunteers (WRV) will 2 Boulder $14,900 $185,100 $200,000
Volunteers 2005 Partnership Construction conduct seven trail/stewardship projects in
for Stewardship 2005 at popular, heavily used and impacted
sites. Sites include: Lake Isabelle,
Sourdough, Pawnee Pass, and Forest Lakes
trails in the Indian Peaks and James Peak...
CO 2005 Mule Deer Trail Re-route Trail Re-route Reroute old trail to lessen the erosion of the 2 Jefferson $0 Unknown $0
current trail and make people less likely to cut
the trail
CO 2006 Mount Evans Trails, Pyramid Fourteener's Highline and Grip hoists and highline trams will be used on 2 Jefferson $9,800 $4,580 $14,380
Peak Trails Grip hoist Equipment two of CFIs construction and restoration
projects currently underway, on Mt. Evans
and Pyramid Peak. On both mountains, rock
sources critical to trail work and restoration
are located either hundreds...
CO 2006 Grays Peak National Grays Peak National The Grays Peak NRT Maintenance and 2 Clear Creek $13,000 $12,020 $25,020
Recreation Trail Recreation Trail Restoration Project will complete much
Maintenance and needed trail maintenance on the Grays Peak
Restoration National Recreation Trail. Efforts will focus on
closing and restoring many of the social trails
that exist, between 10,400 feet and...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2006 Lory Trail Lory Trail Maintenance Lory The 2006 Youth Corps project will focus on 2 Larimer $0 $15,600 $15,600
State Park maintenance of the most heavily used trails in
Lory State Park. Maintenance is an annual
need for the trails at Lory State Park. The
park would like to have general maintenance
performed on all of the trails...
CO 2006 Continental Divide National CDT Construction Volunteer The Continental Divide Trail Alliance requests 2 Jefferson $22,218 $39,504 $61,722
Scenic Trail and Youth Corps a grant from Colorado State Parks that will
incorporate volunteers and Youth Corps
crews to complete 21 miles of new trail in four
project areas. This work will be completed by
more than 550 volunteers...
CO 2006 Twin Owls Trail This grant request is for an AmeriCorps 2 Larimer $22,400 $66,640 $89,040
camping crew to assist the trail crew of Rocky
Mountain National Park (RMNP) in the
construction of a new 0.7 mile trail for 4
weeks during the summer of 2006. The Twin
Owls Trail to be constructed in 2006 is...
CO 2006 Lake Irene Trail The Lake Irene trail project will reconstruct 2 Larimer $13,000 $122,200 $135,200
0.5 mile of trail to provide a sustainable,
resource-protecting, and user-friendly trail
and handicap accessible picnic area to
visitors traveling along Trail Ridge Road on
the west side of Rocky Mountain...
CO 2006 Vail Pass Area Winter Trails Vail Pass Winter Recreation Groom and maintain 26 miles of snowmobile 2 Eagle $2,163 $541 $2,704
Area trails in the Vail Pass Area.
CO 2006 Red Sandstone Trail Snowmobile Trails In White Groom and maintain 59 miles of snowmobile 2 Eagle $3,817 $954 $4,771
River National Forest trails in Eagle County in the White River
National Forest
CO 2006 Grand Lake Winter Trails Grand Lake Trail System Groom and maintain 104 miles of 2 Grand $35,127 $8,782 $43,909
snowmobile trails in the Arapaho National
Forest
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2006 Arapaho National Forest North Park Grooming Groom and maintain 81 miles of snowmobile 2 Jackson $37,036 $9,259 $46,295
Winter Recreation Trails trails in Jackson County that includes Gould,
Illinois Pass, Bull and Owl Mountains
CO 2006 Swan Valley Winter Trails Swan Valley Groom and maintain 28 miles of snowmobile 2 Summit $127 $32 $159
trails from Tiger Road in Breckenridge to the
summit of Georgia Pass
CO 2007 White River National Forest Winter Trail Improvements Groom and maintain 59 miles of snowmobile 2 Eagle $2,588 $647 $3,235
Snowmobile Trails trails in Eagle County in the White River
National Forest
CO 2007 Vail Pass Snowmobile Trails Winter Trail Improvements Groom and maintain 26 miles of snowmobile 2 Eagle $1,972 $493 $2,465
trails in the Vail Pass Area
CO 2007 Arapaho National Forest Winter Trail Improvements Groom and maintain 104 miles of 2 Grand $123 $31 $154
Winter Recreation Trails snowmobile trails in the Arapaho National
Forest
CO 2007 Fraser to Granby Trail Trail Construction New construction of 3 miles of the Fraser to 2 Grand $24,300 $6,075 $30,375
Granby Trail within the town limits of Granby,
CO. Trail will be a five foot wide, natural
surface, multi-use, non-motorized trail. 10
small signs with routed posts, one large
trailhead sign, and on posts...
CO 2007 Summit Trail Loop Trail Construction This project is intended to add 1-2.5 miles of 2 Jefferson $9,300 $2,325 $11,625
new trail at the summit of Green Mountain at
Hayden Green Mountain Park (in Lakewood)
to work towards completing a 4.5 mile
Summit Loop Trail. The completed loop will
expand access for users and reduce...
CO 2007 Eagles Nest Trail Trail Maintenance There are 219 miles of trail in the Dillon 2 Summit $15,000 $3,750 $18,750
Ranger District. 113 of those are wilderness
trails, 3.5 are motorized trails (ATV and
Motorcycle). In 2007 the volunteer groups
identified in this proposal will maintain 14
miles. Wheeler Lakes (3.4 mi),...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2007 Georgia Pass Snowmobile Winter Trail Improvements Groom and maintain 28 miles of snowmobile 2 Summit $246 $62 $308
Trails trails from Tiger Road in Breckenridge to the
summit of Georgia Pass
CO 2008 Red Mountain and Hermit Purchase Trail Construction Purchase Bobcat MT52 Trail Building 2 Larimer $5,500 $7,000 $12,500
Park Open Spaces Equipment Machine to construct 20 miles of new trails
between Red Mountain and Hermit Park
Open Spaces. Construct portions of new
trails at area reservoirs identified in 07 Master
Plan, used to maintain 70 miles of existing...
CO 2011 Georgetown/Guanella Trail Georgetown/Guanella Trail The proposed trail follows the overgrown, but 2 Clear Creek $39,000 $11,700 $50,700
Bridge Bridge still evident, 1872 Georgetown and Chicago
Lake Wagon Road footprint along the south
branch of South Clear Creek (aka
Leavenworth Creek). It is inaccessible for
lack of a bridge. The trail starts at the...
CO 2012 McCullough Gulch Trail, 2012-2013 Friends of the This proposal would improve two 2 Summit $34,600 $10,380 $44,980
Soda Creek Trail System Dillon Ranger District non-motorized recreational trails in Summit
Stewardship Program County: 1)McCullough Gulch Trail, an
extremely popular multi-use trail near the
towns of Breckenridge and Blue River that
provides access to a spectacular waterfall
viewing...
CO 2012 PAW's Empire Research PAW's Empire Research PAW's Empire Research Trail (PERT) project 2 Clear Creek $132,966 $39,889 $172,855
Trail Trail is made up of two parts. The first is an
accessible interpretive trail telling the history
of Berthoud Pass. The trail will also serve as
an outdoor classroom for those interested in
new methods of trail...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2012 Dillon Ranger District Winter High Country New Groomer High Country Snowmobile Club proposes to 2 Grand $45,000 $2,000 $47,000
Recreation Trails purchase a used 1985 Pisten Bully, 130D
(5,300 hours). We feel this machine with its
narrow, eight foot width and a mechanical
tiller would be the ideal machine to maintain
the current trails. While the...
CO 2013 Fraser River Trail Trail Sign Program Grand County boasts over 600 miles of trails, 2 Grand $33,000 $9,900 $42,900
the majority of which exist on the public lands
that surround its neighboring communities,
but also includes many family-friendly trails,
which are located within town limits. The
in-town trails are used...
CO 2013 McCullough Gulch Trail, 2013-14 Friends of the Dillon This proposal would improve two 2 Summit $44,450 $13,335 $57,785
Peaks Trail Ranger District Stewardship non-motorized recreational trails on Summit
Projects County: 1) McCullough Gulch Trail, an
extremely popular multi-use trail near the
towns of Breckenridge and Blue River that
provides access to a spectacular waterfall
viewing...
CO 2014 Aspen Alley Trail, Galena Golden Horseshoe Trail The Golden Horseshoe Trail Partnerships 2 Summit $100,000 $30,000 $130,000
Summit Connection Trail, Partnerships project involves the creation of new trails, trail
Galena Extension Trail, Rich realignments, and maintenance on seven
Gulch Trail, Turk's Trail, non-motorized trails. The trails are located
Weber Gulch Trail, ZL Trail directly adjacent to the Town of Breckenridge
on jointly-owned...
CO 2014 Lake Estes and Homer Lake Estes and Homer The Homer Rouse and Lake Estes Trails 2 Larimer $45,000 $13,500 $58,500
Rouse Trail Rouse Trails Flood were damaged during the 2013 September
Reconstruction Flood. Each of these trails are part of integral
connections and avenues for transportation in
the Estes Valley. Both trails combined
experienced approximately $230,450.00...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2014 Arrow Trail Arrow Trail System The Town of Winter Park is proposing to 2 Grand $36,000 $10,800 $46,800
create a non-motorized trail system to allow
users access to the Idlewild Trail System
from downtown Winter Park. Public access to
the Idlewild Trail System is extremely limited
and the Town has worked with a...
CO 2015 Colorado Front Range Trail CFRT-Loveland to Fort The Colorado Front Range Trail Loveland to 2 Larimer $128,300 $38,490 $166,790
Collins Connection Fort Collins Connection is a 2.2-mile, 10-foot
wide concrete trail that will connect 49 miles
of concrete trail in Fort Collins with 17 miles
of concrete trail in Loveland. Once complete,
over 65 paved...
CO 2015 North Sourdough Trail Priority 1 Trail Repairs: Flood Damaged Project # 1: North 2 Boulder $44,413 $13,324 $57,737
Boulder Ranger District Sourdough Trail (USFS #835) Project
Scope/Deliverables: ...
CO 2016 Summit Trail Summit Trail Connections In 2016 and 2017, the Town of Breckenridge 2 Summit $169,950 $50,985 $220,935
and Summit County Government will
construct seven natural surface,
non-motorized trail connections and restore
an existing unsustainable route in the Upper
Blue Basin of Summit County and the
greater...
CO 2016 Cataract Lake Bridge Cataract Lake Bridge Replace the deteriorating outlet bridge at 2 Summit $33,780 $10,134 $43,914
Lower Cataract Lake with a new 35 foot
bridge using both USFS and Rocky Mountain
Youth Corp crews. The old bridge would be
removed in fall of 2017 using a Colorado
Correction Industries Crew.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2017 Clear Creek Greenway Clear Creek Greenway Clear Creek County will build .3 miles of the 2 Clear Creek $250,000 $75,000 $325,000
Peaks to Plains - Clear Creek Greenway in
narrow, rugged Clear Creek Canyon. The
vision of the Peaks to Plains Trail is a 65-mile
trail corridor that passes through 3 counties
and 7 cities with a 5,600...
CO 2017 Missing Link Trail Missing Link Trail Medicine Wheel Trail Advocates, in 2 El Paso $78,802 $35,378 $114,180
partnership with Colorado Springs Utilities, is
proposing to build approximately 4 miles of
multi-purpose, natural surface trail which will
connect the Barr Trail (trail to the top of Pikes
Peak) to Jones Park and...
CO 2004 Routt Snow Cat Purchase Snow Trail Replacement of 1996 Bombardier snowcat 2, 3 Routt, Grand, Jackson $43,000 $43,000 $86,000
Equipment which is used for the construction and
maintenance of winter snow trails on Rabbit
Ears Pass & Buffalo Pass in the Routt
National Forest. The 110 mile trail system
spans three counties, providing economic...
CO 2000 Crestone Peak Trail, Grays Erosion Control, Trail Development 2, 3, 5 Chaffee, Clear Creek, $155,000 $699,700 $854,700
Trail, Torreys Trail Custer, Summit,
Saguache
CO 2018 Statewide Regional 14er Statewide Regional 14er Maintain 14.15 miles of trail, 2.2 miles of 2, 3, 5 Multiple Counties $200,000 $60,000 $260,000
Maintenance Maintenance intensive trail reconstruction and close,
stabilize and restore 2.86 miles of old social
trails during the 2019 and 2020 summer field
seasons on 19 14,000-foot peaks across
Colorado.
CO 2002 Continental Divide National Maintenance 2, 4 Boulder, Douglas $3,000 $28,000 $31,000
Scenic Trail
CO 2011 West Magnolia Trail, Hewlett Wildlands Restoration West Magnolia Trail Project:... 2, 4 Boulder, Larimer $45,000 $13,500 $58,500
Gulch Trail, Summit Lake Volunteers (WRV) 2011
Trail, Mount Evans Partnership for Stewardship
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2018 Various Rampart Range general trail General trail maintenance and restoration 2, 4, 5 Denver, Teller, El $127,500 $72,500 $200,000
maintenance Paso
CO 2003 Trails On Colorado Trail Construction and Construct Trails, Improvements 2, 5, 16 Statewide $147,920 $411,080 $559,000
Fourteeners Improvements
CO 2018 Winter Recreation Trails 2018 Snow Grooming Trail grooming and signing 2, 5, 6, 7 Statewide $87,061 $51,118 $138,179
CO 2018 Winter Recreation Trails 2018 Snow Grooming Trail grooming and signing 2, 5, 6, 7 Statewide $148,968 $62,344 $211,312
CO 2018 Winter Recreation Trails 2018 Snow Grooming Trail grooming and signing 2, 5, 6, 7 Statewide $216,797 $143,712 $360,509
CO 2000 Big Dry Creek National Construct Trail 2, 6 Adams, Jefferson $50,000 $685,000 $735,000
Recreation Trail
CO 2005 Big Dry Creek National Trail Renovation Big Dry Creek Trail Restoration #10 2, 6 Adams, Jefferson $0 Unknown $0
Recreation Trail
CO 2014 Brainard Lake Trail, Bergen WRV 2015 Partnership for Wildlands Restorations Volunteers (WRV) will 2, 7 Boulder, Jefferson, $35,953 $10,785 $46,738
Peak Trail, Genesee Stewardship conduct FIVE trail projects in 2014-15 at Adams
Flagstaff Trail, Barr Lake popular, heavily used and impacted sites.
Bergman Trail Sites include: Brainard Lake Trails, Bergen
Peak Trail, Genesee Flagstaff Trail, Eldorado
Canyon Flood Trail Repairs and...
CO 2015 State Tools and Equipment WRV 2015-2017 Trail WRV will undertake a two-year project to 2, 7, 6 Multiple along the $36,772 $11,032 $47,804
Volunteer Leadership, Tool, increase our ability to serve trail needs of Colorado Front Range
& Infrastructure Colorado land agency partners, building
capacity sufficient to execute multiple trail
projects per day, both within and outside
Wilderness. With support, WRV will:...
CO 2002 Grange Hall Creek Trail Trail Construction Construct Trail 23 Adams $149,400 $249,000 $398,400
CO 1994 Yampa River Trail 3 Routt $19,007 $20,000 $39,007
CO 1994 Uncompahgre River Trail Construction Construct 3,000 feet of an 8 foot wide 3 Montrose $87,800 $67,800 $155,600
concrete trail
CO 1997 Fraser River Trails Trail Construction Continuation of the Fraser River Trail over 3 Grand $50,000 $86,500 $136,500
1.5 miles towards Winter Park
CO 1997 Fraser River Trails Trail and Bridge Construction Installation of a 186 foot bridge across 3 Routt $40,000 $1,920,900 $1,960,900
Walton Creek and adjacent trail
improvements
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 1999 Bear Creek National Trail Construction Construction of a .33 mile asphalt trail which 3 Ouray $60,000 $86,600 $146,600
Recreation Trail will link Pikes Peak Greenway with Bear
Creek Park
CO 1999 Jarvis Trail Construction of a 12 foot wide concrete trail 3 Mesa $15,000 $97,700 $112,700
CO 1999 Animas River Greenway Design and construction of 400 linear feet of 3 La Plata $30,000 $135,000 $165,000
a 10 foot wide concrete trail located between
15th Street and the Swinging Bridge
CO 1999 Humboldt Peak Trail Trail Improvements Construction of Summit Trails, closure of 3 Denver $13,000 $228,629 $241,629
Social Trails, restoration of eroded and
trampled areas
CO 1999 Old Fruita Bridge/Dinosaur Bridge Improvements Restoration of the 400 foot long Fruita 3 Mesa $60,000 $243,200 $303,200
Trail Bike/Pedestrian Bridge, construction of 2 mile
pedestrian/bike trail
CO 1999 Trout Lake Trestle Trailhead Trail and Trailhead Construction of a 9.5 mile natural surface 3 La Plata $44,384 $11,096 $55,480
Construction trail, restoration of the Trout Lake Trestle
Trailhead
CO 1999 Runyon Commuter Trail Trail Construction Construction of 1,050 linear feet of a 10 foot 3 Pueblo $0 Unknown $0
wide concrete trail with soft surface paths
where possible
CO 1999 Yampa River Trail Core Bridge Installation Construction of a bridge to span Walton 3 Routt $0 Unknown $0
Extension Creek and a 3,000 foot long, 10 foot wide
gravel Fitness Trail
CO 2000 Crag Crest National Crag Crest National Construct Trails 3 Delta $20,000 $20,000 $40,000
Recreation Trail Recreation Trail
CO 2000 Galloping Goose Trail Construct Trail 3 San Miguel $47,000 $67,100 $114,100
CO 2000 Avon to Edwards Trail Construct Trail 3 Lake, Routt $71,000 $84,000 $155,000
CO 2000 Pagosa Area Trails Construct Trail 3 Archuleta $65,000 $90,200 $155,200
CO 2000 Yampa River Core Trail Construct Trail 3 Routt $130,000 $184,000 $314,000
CO 2000 Bear Creek National Bear Creek Trail Construct Trail, Parking Lot, Bridge 3 Ouray $77,000 $304,620 $381,620
Recreation Trail
CO 2000 Bear Creek National Construct Trail 3 Ouray $175,000 $532,000 $707,000
Recreation Trail
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2001 Sangre De Cristos Trail Renovation and Trail Renovation, Relocation 3 Rio Grande $17,000 $42,454 $59,454
Relocation
CO 2001 18 Road Trails Parking Lot, Info Kiosk, Shelter, Restrooms 3 Mesa $23,700 $50,000 $73,700
CO 2001 Cuchara Multi-Use Trail Construct Trail, Signage 3 Huerfano $27,000 $66,500 $93,500
CO 2001 Steamboat Lake Trails Winter Trail Improvements Trail Grooming 3 Routt $92,000 $184,000 $276,000
CO 2002 Flattops-West Elk Trails Winter Trail Improvements Restrooms 3 Garfield, Rio Blanco $22,668 $500 $23,168
CO 2002 South Fork, Del Norte, Purchase Snow Trail Purchase Equipment 3 Rio Grande, Mineral $15,000 $550 $15,550
Creede Area Trails Equipment
CO 2002 South Fork, Del Norte, Purchase Trail Maintenance Portable Restrooms 3 Rio Grande $4,000 $1,500 $5,500
Creede Area Trails Equipment
CO 2002 Steamboat Lake Shelter Purchase Shelter 3 Routt $6,000 $4,000 $10,000
CO 2002 Uncompahgre Riverwalk Construct Trail 3 Ouray $9,800 $5,750 $15,550
CO 2002 North Park Trails Trail Maintenance Maintenance 3 Jackson $33,000 $19,300 $52,300
CO 2002 Rocky Mountain Youth Trail Construction and Construct Trail, Maintenance 3 Routt $15,300 $29,400 $44,700
Corps Trails Maintenance
CO 2002 Calico National Recreation Upper Calico OHV Trail Construct Trail, Maintenance 3 Dolores, Montezuma $20,400 $31,700 $52,100
Trail
CO 2002 Northwest Colorado Purchase Snow Trail Purchase Equipment 3 Moffat, Routt, Rio $45,000 $35,000 $80,000
Snowmobile Club Equipment Blanco
(NOWECOS) Black
Mountain Trails
CO 2002 Sawatch Range Trail Construct Trail Boardwalk, Signage 3 Lake $15,000 $73,100 $88,100
CO 2002 Navajo State Park Trail Construction and Construct Trail, Campsites, Fence 3 Archuleta, La Plata $15,300 $3,825 $19,125
Improvements
CO 2002 San Juan National Forest Winter Trail Improvements Grooming 3 Archuleta $12,100 $3,025 $15,125
Trails
CO 2002 Ophir Creek Trails Winter Trail Improvements Grooming 3 Custer $10,500 $2,625 $13,125
CO 2002 Mairon, Trail Gulch, Flag Purchase Trail Maintenance Purchase Equipment 3 Delta, Mesa, Pitkin, $8,400 $2,100 $10,500
Pole Mountain Equipment Garfield
CO 2002 North Fork Area Winter Trail Improvements Grooming 3 Delta, Montrose, $16,200 $4,050 $20,250
Gunnison
CO 2002 Lone Mesa State Park Install Fencing Fence 3 Dolores $15,300 $3,825 $19,125
CO 2002 Lake Trail Trail Construction Construct Trail 3 Eagle $10,200 $2,550 $12,750
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2002 Southern and Eastern Purchase Snow Trail Purchase Equipment 3 Garfield $7,000 $1,750 $8,750
Flattops Equipment
CO 2002 Rifle Creek Trail, Coulter Winter Trail Improvements Grooming 3 Garfield, Rio Blanco $22,500 $5,625 $28,125
Mesa Trail, Flattops Trails
CO 2002 Jackson County Winter Winter Trail Improvements Grooming 3 Jackson $13,949 $3,487 $17,436
Recreation Trails
CO 2002 Calamity Pass Restrooms 3 Jackson $15,000 $3,750 $18,750
CO 2002 Grand Mesa National Forest Winter Trail Improvements Grooming 3 Mesa $19,318 $4,830 $24,148
CO 2002 Uncompahgre National Winter Trail Improvements Grooming 3 Montrose, Delta, $12,151 $3,038 $15,189
Forest Ouray
CO 2002 Uncompahgre and Gunnison Purchase Trail Maintenance Purchase Equipment 3 Montrose, Gunnison, $6,980 $1,745 $8,725
National Forest Equipment Ouray
CO 2002 White River Purchase Snow Trail Purchase Equipment 3 Rio Blanco $10,000 $2,500 $12,500
Equipment
CO 2002 Meeker Winter Trail Improvements Grooming 3 Rio Blanco $15,200 $3,800 $19,000
CO 2002 South Fork, Del Norte, Purchase Trail Maintenance Purchase Equipment 3 Rio Grande $13,930 $3,483 $17,413
Creede Area Trails Equipment
CO 2002 Creede Area, Rio Grande Build Structure Build Structure 3 Rio Grande $3,000 $750 $3,750
National Forest
CO 2002 Beaver Trails System Purchase Snow Trail Purchase Equipment 3 Rio Grande $27,000 $6,750 $33,750
Equipment
CO 2002 South Fork Winter Trail Improvements Grooming 3 Rio Grande $25,200 $6,300 $31,500
CO 2002 South Fork, Creede, Del Winter Trail Improvements Grooming 3 Rio Grande, $32,572 $8,143 $40,715
Norte Saguache
CO 2002 Bears Ears Trail Maintenance, Signage 3 Routt $12,000 $3,000 $15,000
CO 2002 Routt National Forest Winter Trail Improvements Grooming 3 Routt $0 Unknown $0
CO 2002 Stagecoach State Park Trail Construction Construct Trail 3 Routt $10,200 $2,550 $12,750
CO 2002 Steamboat Lake Winter Trail Improvements Grooming 3 Routt $13,752 $3,438 $17,190
CO 2002 Silverton Purchase Snow Trail Purchase Equipment 3 San Juan $5,000 $1,250 $6,250
Equipment
CO 2002 Silverton Purchase Snow Trail Purchase Equipment 3 San Juan $5,700 $1,425 $7,125
Equipment
CO 2002 Silverton Winter Trail Improvements Grooming 3 San Juan, Ouray $0 Unknown $0
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2002 Lone Cone Area Trails Winter Trail Improvements Grooming 3 San Miguel $10,802 $2,701 $13,503
CO 2003 Rocky Mountain Youth Maintenance 3 Routt $12,000 $3,000 $15,000
Corps Trails
CO 2003 Little Red Park Restroom, Signage, Maintenance 3 Routt $6,000 $1,500 $7,500
CO 2003 Calico National Recreation Calico OHV Trail Maintenance, Improvements, Signage 3 Dolores, Montezuma $33,000 $4,000 $37,000
Trail
CO 2003 Spring Gulch Trail Purchase Equipment 3 Garfield, Pitkin $15,000 $5,995 $20,995
CO 2003 West Elk Trailhead Restroom 3 Garfield $14,900 $10,000 $24,900
CO 2003 Nowecos Purchase Equipment 3 Moffat $15,000 $16,000 $31,000
CO 2004 Gunnison County Winter Purchase Snow Trail Purchase a Generation II Groomer from 3 Gunnison $16,500 $1,900 $18,400
Recreation Trails Equipment Maxey manufacturing in Fort Collins,
Colorado. The total price with tax is 18,000
dollars.
CO 2004 T46N, R10W Purchase Snow Trail Purchase grooming equipment to better 3 Montrose $8,500 $2,830 $11,330
Equipment groom 80 miles of trails
CO 2004 Wilson Mesa Trail The Wilson Mesa Trail is an 11-mile long 3 San Miguel $24,500 $5,300 $29,800
Improvement Project motorized trail on the southern edge of
Wilson Mesa, approximately 7 miles
southwest of Telluride, Colorado (Map A).
The trail is open to motorcycles, mountain
bikes, equestrians, and foot traffic. The trail...
CO 2004 Ophir Creek Snowmobile Winter Trail Improvements This grant request will fund four weeks of 3 Fremont $15,000 $9,555 $24,555
Trail System Western Colorado Conservation Youth Corps
time. A crew of 8-10 workers will construct
approximately twenty, 20-foot sections of
buck and pole fence trail intersections where
snowmobile trails lead off...
CO 2004 Overlook Trail Trail Relocation This project is located on the Hahns 3 Routt $12,000 $12,000 $24,000
Peak/Bears Ears Ranger District, Routt
National Forest, and approximately 25 miles
north of Steamboat Springs, CO. The current
trail is primarily used by the Elk River Guest
Ranch for horseback rides and runs...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2004 Uncompahgre Valley Snow Purchase Snow Trail The Uncompahgre Valley Trail Riders 3 Montrose, Gunnison, $30,000 $26,000 $56,000
Trails Equipment requests a grant for matching funds to Ouray
purchase a Snow Cat and a used pickup to
be used for grooming snowmobile trails. The
Uncompahgre Valley Trail Riders need to
replace the Snow Cat that is currently owned
as it...
CO 2004 Various Trails Volunteer Trail Crew Support RFOV is bundling together our trail projects 3 Eagle, Pitkin $15,000 $55,000 $70,000
to be constructed by volunteers during our
2003 project season. All four projects are
located within RFOV's service area of our
regional community of Rifle to Aspen: Jeanne
Golay Trail is located on City...
CO 2005 Colorado State Forest, Routt Winter Trail Improvements Groom and maintain 81 miles of snowmobile 3 Jackson $3,529 $71 $3,600
National Forest trails in Jackson County that includes Gould,
Illinois Pass, Bull and Owl Mountains
CO 2005 Rio Grande National Forest Winter Trail Improvements Groom and maintain 96 miles of snowmobile 3 Mineral $3,677 $2,723 $6,400
trails between South Fork and Lake City in
the Rio Grande National Forest
CO 2005 Routt National Forest Winter Trail Improvements Groom and maintain 100 miles of 3 Routt $5,000 $7,000 $12,000
snowmobile trails in the northern part of Routt
County in the Routt National Forest
CO 2005 Uncompahgre National Winter Trail Improvements Groom and maintain 69 miles of snowmobile 3 Delta, Montrose, $2,353 $9,647 $12,000
Forest, Gunnison National trails in eastern Delta, northeastern Gunnison
Forest Montrose, and western Gunnison Counties
CO 2005 Stagecoach Overlook Trail This project will construct the Stagecoach 3 Routt $11,500 $12,160 $23,660
Overlook Trail, a new one mile trail segment
addition to the existing Lakeside Trail within
the Stagecoach Reservoir State Park. The
trail will be four feet wide and trail features
will include a crushed...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2005 San Juan National Forest Winter Trail Improvements Groom 100 miles of trails for snowmobile, 3 Archuleta, Mineral, $1,912 $13,088 $15,000
cross country skiing, and snowshoeing on Hinsdale
USDA Forest Service roads within Archuleta,
Mineral and Hinsdale Counties
CO 2005 Bears Ears Ranger District Winter Trail Improvements Groom and maintain 107 miles of 3 Moffat $5,000 $15,000 $20,000
Trails snowmobile trails in the Routt National Forest
CO 2005 Rio Grande National Forest Winter Trail Improvements Groom and maintain 76 miles of trails in the 3 Rio Grande $1,765 $16,035 $17,800
Del Norte, South Fork, and Creede areas of
the Rio Grande National Forest
CO 2005 Uncompahgre National Winter Trail Improvements Groom and maintain 79 miles of snowmobile 3 Montrose $1,324 $17,176 $18,500
Forest trails on the Uncompahgre Plateau, Owl
Creek Pass, and Little Cimarron areas of the
San Juan National Forest
CO 2005 White River National Forest Winter Trail Improvements 3 Rio Blanco $294 $18,006 $18,300
CO 2005 Uncompahgre National Winter Trail Improvements Groom and maintain 84 miles of snowmobile 3 San Miguel $882 $19,118 $20,000
Forest, San Juan National trails in the Uncompahgre and San Juan
Forest National Forests in and around Norwood
CO 2005 Rabbit Ears Pass Trail Winter Trail Improvements Groom and maintain the 105 mile Rabbit 3 Routt $5,000 $20,000 $25,000
System Ears Pass Trail System in the Routt National
Forest
CO 2005 White River National Forest Winter Trail Improvements Groom and maintain 80 miles of trails that 3 Garfield $4,118 $21,082 $25,200
Trails include the transfer trail from Glenwood
Springs across the southern end of the Flat
Tops Wilderness Area and the Coffee Pot
road from Dotsero to Deep Lake and
connecting to the Rifle Trail System
CO 2005 Gunnison National Forest Winter Trail Improvements Groom and maintain 55 miles of snowmobile 3 Gunnison $1,765 $22,635 $24,400
Winter Recreation Trails trails in the Kebler Pass, Ohio Creek, Splain's
Gulch, Lost Lake, and Irwin areas of
Gunnison County
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2005 White River National Forest Winter Trail Improvements Groom and maintain 105 miles of 3 Garfield $5,000 $23,400 $28,400
snowmobile trails from Sunlight Ski Area to
Electric Mountain Lodge, and other trails in
the Glenwood Springs, Carbondale, Silt and
Grand Mesa area
CO 2005 Sunlight to Powderhorn Winter Trail Improvements Groom and maintain the 121 miles of the 3 Delta $5,000 $27,000 $32,000
Sunlight to Powderhorn snowmobile trail
system
CO 2005 Rio Grande Forest Winter Winter Trail Improvements Groom and maintain 128 miles of groomed 3 Rio Grande $4,853 $27,647 $32,500
Recreation Trails trails in the Rio Grande National Forest
CO 2005 White River National Forest Winter Trail Improvements Groom and maintain 91 miles of trails in the 3 Garfield $4,706 $27,694 $32,400
White River National Forest
CO 2005 Uncompahgre National Winter Trail Improvements Groom and maintain 100 miles of 3 Hinsdale $4,412 $31,688 $36,100
Forest snowmobile and cross-country trails in the
Uncompahgre National Forest in and around
Lake City
CO 2005 White River National Forest, Winter Trail Improvements Groom and maintain 105 miles of 3 Garfield $2,647 $37,353 $40,000
Dillon and Holy Cross snowmobile trails from Sunlight Ski Area to
Electric Mountain Lodge, and other trails in
the Glenwood springs, Carbondale, Silt and
Grand Mesa area
CO 2005 San Juan National Forest Winter Trail Improvements Groom, maintain, and sign 100 miles of 3 La Plata $5,000 $45,200 $50,200
snowmobile trails in the San Juan National
Forest
CO 2005 T5S, R88W, Sections 2, 4, 6, Roaring Fork Outdoor RFOV is bundling together four trail projects 3 Eagle, Pitkin $15,000 $61,000 $76,000
8 Volunteers 2005 Project to be constructed by volunteers during our
2005 project season. All four projects are
located within RFOVs service area of our
regional community of Rifle to Aspen: The
Colorow Trail is located on BLM...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2005 Crested Butte Nordic Trails Crested Butte Nordic The Crested Butte Nordic Council requests a 3 Gunnison $70,000 $70,000 $140,000
Snowcat Purchase grant for matching funds to complete our
$140,000 campaign to purchase a new snow
cat for the Nordic Center. The Nordic Center
currently uses a snow cat that is over 10
years old, and as such, this snow cat...
CO 2005 San Juan National Forest, Winter Trail Improvements Groom and maintain 100 miles of 3 San Juan $5,000 $94,000 $99,000
San Juan Resource Area snowmobile trails in and around Silverton in
the San Juan National Forest
CO 2005 Vega State Park Trail and Trail Construction Vega State Park Trail and Fence Project 3 Mesa $0 Unknown $0
Fence Project
CO 2005 State Forest State Park Motorized Youth Corps The crew would primarily work on 3 Denver $0 Unknown $0
Trails construction 200 feet of new trail across
drainage to connect two existing road
systems. The two road systems would then
be cleared of overhanging vegetation, 10
drainage dips constructed, 7 miles of ditches
cleaned...
CO 2005 Motorized Youth Corps OHV Trail Crew for 6 months and the Rocky 3 Garfield $0 Unknown $0
Mountain Youth Corps for 2 weeks to
construct and maintain OHV trails and trail
system in the Glenwood Springs Field Office
CO 2005 State Forest State Park OHV Trail Maintenance OHV Trail Maintenance 3 Jackson $8,354 $2,089 $10,443
Trails
CO 2005 Stagecoach Overlook Trail Trail Construction This project will construct the Stagecoach 3 Routt $0 Unknown $0
Overlook Trail, a new 1 mile trail segment
addition to the existing Lakeside trail within
the Stagecoach Reservoir State Park. The
trail will be four feet wide and trail features
will include a crushed...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2005 Wilson Mesa Trail Motorized Youth Corps Reconstruct and realign the Wilson Mesa 3 San Miguel $4,770 $1,193 $5,963
Trail in several locations to reduce damage to
wetland habitat and reduce soil loss and
erosion of the trail by repairing drainage
structures throughout the trail's length.
Project will also change livestock...
CO 2006 New Mule Deer Trail New Mule Deer Trail This project is a second part of a two phase 3 Routt $0 $5,600 $5,600
Construction Golden Gate project to build a new trail at Stagecoach
Canyon State Park. As proposed, Phase 1 was to be
completed in the summer of 2005. The
Steamboat Community Youth Corp
completed the trail in its natural dirt state.
Two...
CO 2006 Mancos State Park Trail Mancos Trail Surfacing and This project will include the installation of 3 Montezuma $0 $11,200 $11,200
Maintenance, Mancos State geotextile and gravel surfacing for
Park approximately 0.25 miles of trail. Materials
will be hauled on ATVs from stockpile
locations near the project site. The work
involves extensive use of hand tools for...
CO 2006 Windsurf Beach Connector Windsurf Beach Connector Trail construction. The trail will be 3 feet wide 3 Archuleta $0 $11,200 $11,200
Trail Trail Navajo State Park by 850 feet long. It will be cut, layered and
graveled. Project will include construction of
drainages, steps, and culverts and a fence
will need to be pulled out and relocated.
CO 2006 New Mule Deer Trail New Mule Deer Trail Project involves hauling and spreading 3 Jefferson $0 $20,800 $20,800
Construction Golden Gate material for an ADA surface trail, rolling out a
Canyon weed barrier, spreading material, and
compacting material to a level, hard surface.
The width of the surface will be 4 to 6 feet
and the edge will be natural. No...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2006 South Fork Snow Trails Powder Busters Snowcat South Fork Powder Busters Snowmobile 3 Rio Grande $35,000 $50,000 $85,000
Club is presently maintaining 165 miles of
multi-use winter trails. We plan to purchase a
Large Low Hour Snow-Cat that will also be
more fuel efficient and quieter on the trails. A
2000-year model or newer with...
CO 2006 Winter Recreation Trails Delta Grooming Coalition This grant will enable the continuation of the 3 Delta $85,000 $97,840 $182,840
Snowcat current grooming program, trail marking,
maintenance and grooming of 133 miles of
the Sunlight to Powderhorn Trail System on
the Powderhorn end of the system and 17
kilometers of cross country ski and...
CO 2006 San Juan National Forest Snowmobile Trail Grooming Groom 100 miles of trails for snowmobile 3 Archuleta, Mineral, $5,000 $1,250 $6,250
Winter Recreation Trails cross country skiing and snowshoeing on Hinsdale
USDA Forest Service roads within Archuleta,
Mineral, and Hinsdale Counties
CO 2006 Marshall-Monarch Pass Marshall Pass Road Groom and maintain 63 miles of snowmobile 3 Chaffee $254 $64 $318
trails in the Marshall-Monarch Pass areas of
the Pike-San Isabel National Forest
CO 2006 Ophir Creek Snowmobile Ophir Creek Snowmobile Groom and maintain 75 miles of the Ophir 3 Custer $2,926 $732 $3,658
Trail Trail Grooming Creek Snowmobile Trail system in the San
Isabel National Forest
CO 2006 Powderhorn Snowmobile State Park Trail System - Groom and maintain the 121 miles of the 3 Delta $5,000 $1,250 $6,250
Trail Powderhorn End Sunlight to Powderhorn Snowmobile Trail
System
CO 2006 Gunnison National Forest Snowmobile Trail Grooming Groom and maintain 69 miles of snowmobile 3 Delta, Montrose, $382 $96 $478
Winter Recreation Trails Service trails in eastern Delta, northeastern Gunnison
Montrose, and western Gunnison Counties
CO 2006 Sunlight to Powderhorn Trail Sunlight to Powderhorn Trail Groom and maintain 105 miles of 3 Garfield $21,071 $5,268 $26,339
Grooming Grooming snowmobile trails from Sunlight Ski Area to
Electric Mountain Lodge, and other trails in
the Glenwood Springs, Carbondale, Silt and
Grand Mesa areas
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2006 Eastern Flattops Winter Eastern Flattops Area Groom and maintain 80 miles of trails that 3 Garfield $53,817 $13,454 $67,271
Trails include the Transfer Trail from Glenwood
Springs across the southern end of the Flat
Tops Wilderness Area and the Coffee Pot
Road from Dotsero to Deep Lake and
connecting to the Rifle Trail system over
Blair...
CO 2006 White River National Forest Rifle Creek, Flattops, Coulter Groom and maintain 91 miles of trails in the 3 Garfield $4,453 $1,113 $5,566
Winter Recreation Trails Mesa White River National Forest
CO 2006 Gunnison National Forest Gunnison County Groom and maintain 55 miles of snowmobile 3 Gunnison $891 $223 $1,114
Winter Recreation Trails Snowmobile Trails trails in the Kebler Pass, Ohio Creek, Splain's
Gulch, Lost Lake, and Irwin Areas of
Gunnison County
CO 2006 Lake City Area Winter Trails Lake City Area Winter Trail Groom and maintain 100 miles of 3 Hinsdale $21,206 $5,302 $26,508
Grooming snowmobile and cross-country trails in the
Uncompahgre National Forest in and around
Lake City
CO 2006 Grizzly-Helena, Radial USDA Forest Service Forest This grant application is the continuation of a 3 Jackson $9,052 $2,263 $11,315
Mountain, Snyder Creek Service, Parks Ranger joint partnership with the Northern Colorado
Trail System District Trail Riders and the USDA Forest Service to
develop and maintain trails in the
Grizzly-Helena, Radial Mountain, and Snyder
Creek Trail System.
CO 2006 San Juan National Forest Winter Recreation Trails Groom and maintain 100 miles of 3 La Plata $4,326 $1,082 $5,408
Winter Trails Grooming Service snowmobile trails in the San Juan National
Forest
CO 2006 T38N, R12W S9,T38N, Dutch Creek Dutch Creek 3 La Plata $0 Unknown $0
R11W, S15, S20
CO 2006 Creede Area Winter Trails Trail Grooming In Creede Groom and maintain 96 miles of snowmobile 3 Mineral $1,272 $318 $1,590
Area trails between South Fork and Lake City in
the Rio Grande National Forest
CO 2006 Routt National Forest Winter Bears Ears Routt National Groom and maintain 107 miles of 3 Moffat $5,000 $1,250 $6,250
Recreation Trails Forest snowmobile trails in the Routt National Forest
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2006 Uncompahgre National Snowmobile Trail Grooming Groom and maintain 79 miles of snowmobile 3 Montrose $2,417 $604 $3,021
Forest Winter Trails trails on the Uncompahgre Plateau, Owl
Creek Pass, and Little Cimarron areas of the
San Juan National Forest
CO 2006 Crystal Valley Trail Crystal Valley Trail Phase I Phase I of the Crystal Trail will travel south 3 Pitkin, Garfield $624 $156 $780
from Carbondale and its existing trail network
along Highway 133, part of the West Elk
Loop Scenic and Historic Byway, to the BRB
subdivision. This project is the first phase of a
trail which will link...
CO 2006 White River National Forest Grooming Groom and maintain 81 miles of trails in the 3 Rio Blanco $4,509 $1,127 $5,636
Winter Trails White river National Forest, these trails
include Yellow Jacket, Avery Lake, Miller
Creek, Flag Creek, Buford, and Ripple Creek
CO 2006 Rabbit Ears Pass Trail Rabbit Ears Trail System Groom and maintain the 105 mile Rabbit 3 Routt $5,000 $1,250 $6,250
System Grooming Ears Pass Trail System in the Routt National
Forest
CO 2006 North Routt Winter Groom and maintain 147 miles of 3 Routt $1,272 $318 $1,590
Recreation Grooming snowmobile trails in the northern park of
Routt County in the Routt National Forest
CO 2006 Silverton Snowmobile Trail Silverton Snowmobile Trail Groom and maintain 100 miles of 3 San Juan $5,000 $1,250 $6,250
Grooming snowmobile trails in and around Silverton in
the San Juan National Forest
CO 2006 Uncompahgre National Lone Cone West End Groom and maintain 84 miles of snowmobile 3 San Miguel $3,181 $795 $3,976
Forest Winter Trails, San Sledders trails in the Uncompahgre and San Juan
Juan National Forest Winter National Forest in and around Norwood
Trails
CO 2007 Winter Recreation Trails Purchase Snow Trail Project will replace outdated under powered 3 Archuleta $50,000 $12,500 $62,500
Equipment 1989 Tucjer Snow Cat and our oversized
1996 BR400 Groomer with rear tiller for a
newer more fuel efficient eight foot wide used
BR180 or 2007 Husky groomer.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2007 Winter Recreation Trails Winter Trail Improvements Groom and maintain 100 miles of trails for 3 Archuleta, Mineral, $4,930 $1,233 $6,163
snowmobile, cross country skiing, and Hinsdale
snowshoeing on USDA Forest Service roads
within Archuleta, Mineral, and Hinsdale
Counties.
CO 2007 Marshall Pass Road Trail Improvements and Marshall Pass Road, a historic narrow gauge 3 Chaffee $47,449 $11,862 $59,311
Snow Trail Maintenance railroad route starts 5 miles south of Poncha
Springs on Highway 285 and runs 32 miles
over the Continental Divide to Sergeants on
Highway 50 west of Monarch Pass. Project
will provide a minimum 12 foot...
CO 2007 Ophir Creek Snowmobile Winter Trail Improvements Groom and maintain 75 miles of the Ophir 3 Custer $2,835 $709 $3,544
Trail Creek Snowmobile Trail system in the San
Isabel National Forest
CO 2007 Powderhorn Snowmobile Winter Trail Improvements Groom and maintain the 121 miles of the 3 Delta $5,000 $1,250 $6,250
Trail Sunlight to Powderhorn Snowmobile Trail
System
CO 2007 Winter Recreation Trails Winter Trail Improvements Groom and maintain 105 miles of 3 Delta, Garfield $3,944 $986 $4,930
snowmobile trails from Sunlight Ski Area to
Electric Mountain Lodge, and other trails in
the Glenwood Springs, Carbondale, Silt and
Grand Mesa area.
CO 2007 Winter Recreation Trails Winter Trail Improvements Groom and maintain 69 miles of snowmobile 3 Delta, Montrose, $370 $93 $463
trails in the eastern Delta, northeastern Gunnison
Montrose and western Gunnison counties.
CO 2007 South Colony Lakes Basin Trail Renovation Reconstruction of the South Colony Lakes 3 El Paso $25,000 $6,250 $31,250
North Side Trail Basin North Side Trail located in the Sangre
De Cristo Wilderness, San Isabel National
Forest
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2007 Transfer Trail, Coffee Pot Winter Trail Improvements Groom and maintain 80 miles of trails that 3 Garfield $3,697 $924 $4,621
Road include the Transfer Trail from Glenwood
Springs across the southern end of the Flat
Tops Wilderness Area and the Coffee Pot
Road from Detsero to Deep Lake and
connecting to the Rifle Trail System
CO 2007 White River National Forest Winter Trail Improvements Groom and maintain 91 miles of trails in the 3 Garfield $4,313 $1,078 $5,391
Snowmobile Trails White River National Forest
CO 2007 Crystal Valley Trail Trail Construction The Carbondale section of the Crystal Valley 3 Garfield $82,302 $20,576 $102,878
Trail will start at the intersection of
Meadowood Drive and Colorado State
Highway 133. The trail begins where a
federally funded Colorado Safe Routes to
School grant section of the Crystal Valley
Trail...
CO 2007 Uncompahgre Peak Trail Trail Renovation and Maintain 2.14 miles of the Uncompahgre 3 Gunnison $25,000 $6,250 $31,250
Construction Peak Trail from the Nellie Creek trailhead to
the summit. Construct a 370 foot re-route of
the trail. Stabilize and re-vegetate portions of
the route, as necessary.
CO 2007 Kebler Pass, Ohio Creek, Winter Trail Improvements Groom and maintain 55 miles of snowmobile 3 Gunnison $986 $247 $1,233
Splain's Gulch, Lost Lake, trails in the Kebler Pass, Ohio Creek, Splain's
Irwin Gulch, Lost Lake and Irwin areas of
Gunnison County
CO 2007 Lake City Area Winter Trails Winter Trail Improvements Groom and maintain 100 miles of 3 Hinsdale $4,313 $1,078 $5,391
snowmobile and cross-country trails in the
Uncompahgre National Forest in and around
Lake City
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2007 T7N, R77W, S26 Trail and Drainage The crew will work on any finish work after 3 Jackson $30,000 $7,500 $37,500
Improvements the completed construction of 500 feet of new
trail across a drainage that connects two
existing road systems. The two road systems
will be cleared of overhanging vegetation, 10
drainage dips constructed, 7...
CO 2007 Jackson County Winter Winter Trail Improvements Groom and maintain 81 miles of snowmobile 3 Jackson $2,465 $616 $3,081
Recreation Trails trails in Jackson County that includes Gould,
Illinois Pass, Bull and Owl Mountains
CO 2007 San Juan National Forest Winter Trail Improvements Groom, maintain, and sign 100 miles of 3 La Plata $4,560 $1,140 $5,700
Snowmobile Trails snowmobile trails in the San Juan National
Forest
CO 2007 Turquoise River Snowmobile Trail Grooming Groom and maintain 43 miles of snowmobile 3 Lake $1,602 $401 $2,003
Trails trails around Turquoise Reservoir near
Leadville
CO 2007 Lake City Area Trail System Purchase Snow Trail The Lake City Area Trail system is used by at 3 Lake, Hinsdale $10,377 $2,594 $12,971
Equipment least 10,000 snowmobiles each year. It is
80% of the winter economy for Lake City and
Hinsdale County. The Continental Divide
Snowmobile Club has a partnership with the
county of Hinsdale and Town of Lake...
CO 2007 Rio Grande National Forest Winter Trail Improvements Groom and maintain 96 miles of snowmobiles 3 Mineral $1,232 $308 $1,540
Snowmobile Trails trails between South Fork and Lake City in
the Rio Grande National Forest.
CO 2007 Routt National Forest Winter Trail Improvements Groom and maintain 107 miles of 3 Moffat $4,930 $1,233 $6,163
Snowmobile Trails snowmobile trails in the Routt National Forest
CO 2007 Uncompahgre Riverway Concrete Trail Construction Concrete approximately 650 feet of the 3 Montrose $25,000 $6,250 $31,250
shared use gravel road/trail segment of the
existing Uncompahgre Riverway Trail
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2007 Winter Recreation Trails Wilderness Non-Motorized This project will provide for a trail crew to 3 Montrose $25,000 $6,250 $31,250
Trail Maintenance work on trail maintenance and rehabilitation
for the non-motorized and wilderness trails on
the Ouray and Norwood Ranger Districts.
The trails that will be the primary focus this
year are Indian, 47,...
CO 2007 Winter Recreation Trails Winter Trail Improvements Groom and maintain 79 miles of snowmobile 3 Montrose $2,588 $647 $3,235
trails on the Uncompahgre Plateau, Owl
Creek Pass, and Little Cimarron areas of the
San Juan National Forest
CO 2007 Winter Recreation Trails Winter Trail Improvements Groom and maintain 81 miles of trails in the 3 Rio Blanco $739 $185 $924
White River National Forest. These trails
include Yellow Jacket, Avery Lake, Miller
Creek, Flag Creek, Buford and Ripple Creek.
CO 2007 Rio Grande National Forest Winter Trail Improvements Groom and maintain 128 miles of groomed 3 Rio Grande $4,313 $1,078 $5,391
Snowmobile Trails trails in the Rio Grande National Forest
CO 2007 Rio Grande National Forest Winter Trail Improvements Groom and maintain 76 miles of trails in the 3 Rio Grande $2,342 $586 $2,928
Trails Del Norte, South Fork, and Creede areas of
the Rio Grande National Forest
CO 2007 Rabbit Ears Pass Trail Winter Trail Improvements Groom and maintain 105 mile Rabbit Ears 3 Routt $5,000 $1,250 $6,250
System Pass Trail System in the Routt National
Forest
CO 2007 Routt National Forest Winter Trail Improvements Groom and maintain 100 miles of 3 Routt $3,697 $924 $4,621
Snowmobile Trails snowmobile trails in the northern part of Routt
County in the Routt National Forest
CO 2007 San Juan National Forest Winter Trail Improvements Groom and maintain 100 miles of 3 San Juan $4,930 $1,233 $6,163
Snowmobile Trails snowmobile trails in and around Silverton in
the San Juan National Forest
CO 2007 San Juan National Forest Winter Trail Improvements Groom and maintain 84 miles of snowmobile 3 San Miguel $3,081 $770 $3,851
Snowmobile Trails trails in the Uncompahgre and San Juan
National Forests in and around Norwood.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2008 Twin Lakes Basin, Sunlight Trail Renovation Use of native building materials and 3 La Plata $169,205 $183,632 $352,837
Peak sustainable design methods to focus
recreational use from the Twin Lakes basin to
the summit of Sunlight Peak in a single,
sustainable route. Project includes 0.34 miles
of re-route, reconstruction of 0.53 miles...
CO 2009 Mack Ridge, Palisade Rims, Trail Construction Construct 15 miles of new single-track trail in 3 Alamosa, Archuleta, $40,600 $47,600 $88,200
Bangs Canyon, Gateway fours areas of BLM-Grand Junction Field Conejos, Costilla,
Office in Western Colorado (GJFO), an Custer, Delta, Dolores,
international destination for mountain biking, Garfield, Gunnison,
hiking, trail runners, equestrians. Hinsdale, Huerfano,
Construction in Mack Ridge, Palisade... Jackson, La Plata, Las
Animas, Mesa,
Mineral, Moffat,
Montezuma,
Montrose, Ouray,
Pitkin, Pueblo, Rio
Blanco, Rio Grande,
Routt, Saguache, San
Juan, San Miguel,
Otero
CO 2009 Winter Recreation Trails Purchase Snow Trail Replace Bombardier 2000 groomer with 3 San Juan $65,000 $80,000 $145,000
Equipment 7,300 hours with an upgrade to groom
multi-use winter recreation trails in an area
where use has tripled. Silverton Snowmobile
Club provides annual rides to the Southwest
Region disabled, soldier rides, and Big...
CO 2009 White River National Forest Trail Reconstruction, 4 Adopt-A-Trails maintenance projects, 2 3 Eagle $22,650 $84,500 $107,150
Trails Maintenance, and Bridge partner maintenance projects (White River
Repair National Forest), to total 8 miles of
maintenance and bridge repair and 1/2 mile
of restorations
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2009 Winter Recreation Trails Purchase Snow Trail Replace groomer. Multi-use winter recreation 3 Mineral, Rio Grande $55,000 $111,300 $166,300
Equipment trail system provides an estimated 80% of
winter income to community to a
predominantly tourism-based economy on 4
-5 month summer season. Trail system
connects to Mineral and Rio Grande
Counties' trails....
CO 2009 South Canyon Trail Trail Construction Construct the 2nd segment of 5 segments for 3 Garfield, Eagle $136,450 $763,550 $900,000
the South Canyon Trail. Trail will be an 8 foot
wide, asphalt trail, 1,860 linear feet in length
with parking lot. Natural surface trails will
extend to the Colorado River for fishing and
whitewater...
CO 2011 Crested Butte Recreation Crested Butte Recreation The Crested Butte Recreation Path Extension 3 Gunnison $175,872 $68,805 $244,677
Path Path Extension Project will create an off-road trail opportunity for
citizens and visitors of the Upper East River
Valley to connect the communities of Mt.
Crested Butte and Brush Creek Road
subdivisions via the Town of Crested...
CO 2011 Galloping Goose Trail Galloping Goose Trail The Galloping Goose Trail Improvement 3 San Miguel $45,000 $13,500 $58,500
Improvement Project Project will provide essential improvements to
one of the classic rail-trail routes in the State.
Located near Telluride, Colorado, the 9.3
miles of single track on this trail is open to
mountain bikes, horses...
CO 2011 Parallel Trail OHV Parallel Trail 10 miles of new trail construction, 20 miles of 3 Montrose, Ouray $282,450 $82,960 $365,410
trail maintenance, 10 miles of trail
reconstruction, 20 miles to be signed, and a
new kiosk
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2011 San Luis Valley Winter Trails San Juan Nordic Club Trail The San Juan Nordic Club is a group of cross 3 Rio Grande and $21,500 $6,450 $27,950
Maintenance Grant country ski enthusiasts who live in the San Mineral
Luis Valley. The club grooms and maintains
10 miles of trails in 3 different locations. All
trails are located on the Forest Service lands
and are open to the...
CO 2011 White River National Forest Flattoppers New Groomer The Flattoppers Snowmobile Club is looking 3 Garfield $45,000 $51,505 $96,505
Winter Recreation Trails to purchase a Bison OC, sn 908900024 with
blade and 66" steel tracks.
CO 2011 White River National Forest Delta-Grand Junction New The club's intention is to purchase a 2010 3 Delta, Mesa, $65,000 $36,560 $101,560
Winter Recreation Trails Groomer Prinoth BR 350. They are equipped to do the Gunnison
regular preventative maintenance
themselves. After 5 years the cat would either
continue in service or have a significant trade
in value.
CO 2011 Winter Recreation Trails Steamboat Lake New Steamboat Lake Snow Club would like to 3 Routt $55,000 $10,000 $65,000
Groomer replace our current groomer, a 2001 Pisten
Bully 200 which had a short run of bad luck
when it was first put into service in 2001. It
currently has just under 4,200 hours on it and
it has been well cared for...
CO 2011 Winter Recreation Trails Mount Sopris New Groomer Mt. Sopris Rec Riders (MSRR) is requesting 3 Garfield, Pitkin, Mesa, $65,000 $23,710 $88,710
Capital Grant Funds to assist in the purchase Delta
of an updated snow groomer. Based on the
age of the current MSRR groomer, increased
maintenance costs, and present availability of
new groomers we believe this...
CO 2011 Arapaho National Forest Grand Lake New Groomer We are asking for $50,000 to purchase a 3 Grand $50,000 $15,200 $65,200
Winter Recreation Trails 2005 BR350. We have a strong desire to
replace our 1999 Bombardier BR 275 Plus
MP with 7235 hours. Our club maintains over
100 miles of snowmobile trails. We operate
with one fulltime groomer and two part time...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2012 San Luis Peak Trail San Luis Preservation The goal of the San Luis Peak Preservation 3 Saguache $197,164 $59,150 $256,314
project is to realign the San Luis Peak Trail to
a sustainable location. The eroded and
gullied social trails will be restored, and
maintenance activities will occur on access
trails from the trailheads....
CO 2012 Chicken Creek Trail Chicken Creek Trail The Chicken Creek Cross-County Ski 3 Montezuma $10,000 $3,000 $13,000
Grooming Operation Grooming Operation seeks funding from the
State Trails Program to replace much needed
grooming equipment used to provide a safe,
quality skiing experience. The Chicken Creek
Cross-County Ski Corporation (CCCCSC)
is...
CO 2012 Avon Winter Recreation Holy Cross New Groomer The Holy Cross Powder Hounds would like to 3 Eagle $65,000 $10,000 $75,000
Trails procure funds to purchase a new groomer to
replace the 2000 Piston Bully Park Bully that
is owned by the club. The club prefers to
purchase a small groomer to pay to have a
larger groomer cut down to make it...
CO 2012 Grand Mesa Ranger District Arrowhead New Groomer This grant request is for the purpose of 3 Gunnison $65,000 $50,248 $115,248
Winter Recreation Trails updating our Clubs groomer to a newer
model with fewer hours. Our current groomer
is a 2002 Bombardier BR275 with 5,527
hours. Because the Arrowhead Snowmobile
Club was only established in 2008 we are...
CO 2012 Grand Valley Ranger District OHV Maintenance and Grant funds to provide support for two trail 3 Mesa $98,000 $63,000 $161,000
OHV Trails Education Project dozer crews. Funding will cover salaries &
per diem, fuel for dozers and ATVs, repairs,
camp trailer use, Geo-grid map, wooden
posts, steel posts, signs, carsonite, width
restrictors, wire, concrete,...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2012 White River National Forest OHV NW Colorado Trail The Yampa Valley OHV Trailriders club has 3 Moffat $71,390 $56,355 $127,745
Maintenance Dozer been working closely with the Routt National
and White River Forest Service along with
the BLM Little Snake Field Office to help
maintain trails, plan possible re-opening of
closed trails, and add additional...
CO 2013 Mount Eolus and El Diente Southwest Fourteeners Trail Colorado Fourteeners Initiative (CFI) will 3 Dolores, La Plata $199,625 $59,888 $259,513
Peak Reconstruction Project complete high-priority trail projects on two
14ers in the San Juan Mountains-Mount
Eolus in Chicago Basin and El Diente Peaks
Kilpacker Basin-through the Southwest
Fourteeners Trail Reconstruction Project....
CO 2013 Crested Butte to Carbondale Crested Butte to Carbondale The Crested Butte to Carbondale Trail will 3 Gunnison $108,000 $32,400 $140,400
Trail Trail span over 70 miles between two mountain
communities when completed and also
connect to other regional CO Trails.
Approximately 26 miles of trail are already
complete. The specific goals for this phase of
the...
CO 2013 Pueblo Trail The City of Pueblo Trail This project is phase II of a 24.5 mile river 3 Pueblo $106,500 $31,950 $138,450
Revitalization/Construction trail revitalization project. Our 2012-2013
Project Phase II Recreational Trails Grant request includes
repairing the two most dangerous and
dilapidated portion of the trail system totaling
2,350 linear feet at 5-7...
CO 2013 Winter Recreation Trails Update Routt Powder Riders Routt Powder Riders currently owns a 2002 3 Routt $45,750 $45,750 $91,500
Groomer Bombardier Model BR-275 with 5656 hours
which we will not be trading in. We plan to
sell it locally to an interested party and apply
the proceeds of the $25,000 towards the
purchase of an updated groomer...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2013 Routt National Forest Winter Trail Grooming Routt NOWECOS wishes to purchase a 2011 3 Moffat, Routt $65,000 $108,200 $173,200
Recreation Trails National Forest Prinoth Bison 350 to update our current
groomer and trade in our 2006 Prinoth 350
with 4641 hours. We will be keeping out 12'
wide tracks and tiller, which will be rebuilt by
Prinoth as a part of the purchase price....
CO 2013 Routt National Forest Winter North Park Snow Snakes Update the existing 2000 BR180 Snow Cat 3 Jackson $53,750 $53,750 $107,500
Recreation Trails Groomer Grant (3000 hours) with a newer cat with lower
hours. At this time Prinoth is expecting a
2011 Husky 197 hp with approx. 500 hours.
This cat was used as a snowmobile groomer
and is configured to pull a drag. It would...
CO 2013 San Isabel National Forest Groomer Purchase Purchase a 2013 Pisten Bully PB 100, 3 Lake $35,000 $130,000 $165,000
Trading in a 2010 Prinoth Husky with 850
hours
CO 2013 San Juan National Forest Wolf Creek Trailblazers The Wolf Creek Trail Blazers Snowmobile 3 Archuleta $80,000 $100,693 $180,693
2013-2014 Large Groomer Club is planning the purchase of a new 2013
Purchase snowcat trail groomer. Our current machine is
a 2007 Prinoth Husky with an eight foot wide
grooming width. The machine is powered by
a Mercedes-Bens diesel engine...
CO 2013 Grand Valley Ranger District OHV Total Trail Project Approximately 50 percent of grant will furnish 3 Mesa $45,591 $90,409 $136,000
OHV Trails funding to support two Trail dozer Crews. It
pays salaries & per diem of crews. It also
pays for : Fuel for Dozers & ATVs, Repairs,
camp trailer use for forest service, Geo-Grid
mat, wooden posts,...
CO 2014 Gypsum to Dotsero Trail Gypsum to Dotsero Trail The grant will fund construction of 3,700 feet 3 Eagle $140,174 $60,074 $200,248
Phase II of the 2.3 mile Gypsum to Dotsero Trail
Project. The trail will be 10 feet wide and
asphalt paved. The trail project will connect
the communities of Gypsum and Dotsero for
transportation and recreation....
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2014 Challenger Ridge Trail Kit Carson - Challenger The Rocky Mountain Field Institute (RMFI), 3 Saguache $114,000 $34,200 $148,200
Ridge Trail (Phase 1) working with community volunteers and youth
corps crews will complete Phase 1 of a
multi-phase, multi-year new trail construction
from Willow Lake to Challenger Ridge. This
project is designed to reduce...
CO 2014 Galloping Goose Trail Galloping Goose Connection San Miguel County Open Space and 3 San Miguel $51,305 $15,391 $66,696
Recreation Program intends to connect the
Valley Trail system immediately west of
Telluride Colorado to the Galloping Goose
Trail that follows the old railroad grade west
and south into Ilium Valley. The proposed...
CO 2015 Ridgway State Park Trails Ridgway Trails Project Funding from CPW will help COPMOBA 3 Ouray $200,000 $60,000 $260,000
implement the Ridgway Comprehensive
Travel Management Plan EA which includes
a total of 18.5 miles of non-motorized trails
which will connect to Ridgway State Park and
the Town of Ridgway for over 40 miles of...
CO 2015 McPhee Overlook Trail McPhee Overlook Trail The Forest Service will construct a 7 mile 3 Montezuma $32,288 $9,686 $41,974
long, natural surface non-motorized
multiple-use trail which will connect the town
of Dolores, CO to over 35 miles of
non-motorized single track routes in the
Boggy Draw trail system above McPhee
Reservoir....
CO 2015 Howlesen Hill Biking Trails Howlesen Hill Directional The City of Steamboat Springs will construct 3 Routt $31,488 $9,446 $40,934
Biking Trails two (one beginner, one intermediate)
adjacent approximately mile to 1 mile each
single track, downhill directional flow biking
trails on Howelsen Hill in Steamboat Springs.
The trails will conform to...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2016 Flat Tops Trail Flat Tops Trail Maintenance This project is a collaborative effort between 3 Rio Blanco, Garfield $37,820 $11,346 $49,166
the USFS and local counties to recruit Rocky
Mountain Youth Corps volunteers to work on
general trail cleaning on the Flat Tops area
trails (75 miles) and to perform maintenance
on the Main Marvine,...
CO 2016 Hanging Lake Trail Hanging Lake Trail Crew The White River National Forest will hire a 2 3 Garfield $40,800 $12,240 $53,040
person trail maintenance crew for the 1.2 mile
long Hanging Lake Trail (FDT 1850) in
Glenwood Canyon. The crew will emphasize
resource protection and safety through trail
maintenance-construction,...
CO 2016 Rio Grande Trail Rio Grande Trail The Rio Grande Trail (RGT) is a unique 42 3 Garfield $183,653 $55,096 $238,749
Enhancement and mile, non-motorized multi-use, rail-trail project
Maintenance between Glenwood Springs and Aspen.
Some trail sections are approaching 10 years
old and annual trail counts are 80,000 plus.
Shoulder repairs will enhance...
CO 2016 Kit Carson Challenger Ridge Kit Carson Phase II Implement Phase 2 of the Kit 3 Saguache $171,741 $51,522 $223,263
Trail Carson-Challenger Ridge Trail Project. This
project is designed to reduce visitor impacts
to the area and enhance the quality of the
recreational experience with the Sangre de
Cristo Wilderness.
CO 2016 South Mt Elbert Trail South Mt Elbert Realignment The USDA Forest Service, in partnership with 3 Lake $200,000 $60,000 $260,000
the Rocky Mountain Youth Corps, Colorado
Fourteeners Initiative, Wildlands Restoration
Volunteers, and other partners, will realign
3.7 miles of the South Mt. Elbert trail,
reconstruct 1.8 miles of the...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2016 River Trail River Trail System The Western Slope Conservation Center's 3 Delta $137,626 $41,288 $178,914
River Trail System project will install 2,825
feet of additional trails at the Paonia River
Park. Beginning in September of 2016, they
will construct a 715-foot Southern Loop Trail,
a 1,375-foot Northern Loop,...
CO 2016 Burn Canyon Trail Burn Canyon Trails Norwood Park and Recreation District is 3 San Miguel $200,000 $60,000 $260,000
requesting funding to complete nine miles of
trail construction and one trailhead on a
non-motorized single-track trail system
located less than 5 miles from Norwood on
BLM land. Other accomplishments will...
CO 2016 Ridgeway Trail Colorado Plateau Mountain This projects implements Phase 2 of the 3 Ouray, Montrose $200,000 $60,000 $260,000
Bike Trail Association Ridgeway Trail System includes construction
Regional Trails of seven miles of new trail and a boardwalk
on BLM land and three miles of trail
construction on the Spring Creek Canyon
Connector Trail west of Montrose on BLM.
Work...
CO 2016 Paradox Trail Paradox Trail Reroute This project will create approximately four 3 Montrose $33,600 $10,080 $43,680
miles of new interconnecting single-track
trails in five locations, creating a 17 mile long
signed reroute of the Paradox Trail on BLM
public lands. A new trailhead located within a
quarter of a mile to the...
CO 2016 Gunnison River Valley Gunnison Valley Signage The GCBTA is partnering with local 3 Gunnison $50,000 $15,000 $65,000
stakeholders including the Bureau of Land
Management, Forest Service, Crested Butte
Mountain Bike Association, Gunnison Trails,
and our local municipalities and county
government to install directional and...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2017 River Trail River Trail Replacement The City of Pueblo Parks and Recreation 3 Pueblo $99,000 $19,800 $118,800
Dept. will be removing and replacing 1707
linear feet of 8 foot wide concrete trail on the
Fountain Creek River.
CO 2017 South Canyon Trail System South Canyon Trail System Phase 1 of the South Canyon trail system will 3 Garfield $132,449 $39,735 $172,184
Construction: Phase 1 consist of 8.15 miles of sustainable designed
natural surface trails, improvements to 2 trail
head areas, and interpretive signage. With
close access via I-70 and the future LoVa
Trail, the system will...
CO 2018 Lower Loop Trails Gunsight Bridge Restoration Replacement of Gunsight Bridge, a 3 Gunnison $200,000 $40,000 $240,000
pedestrian bridge that is critical for trail
connectivity and is the only permanent river
crossing in the Slate River Drainage.
CO 2018 Kit Carson Peak-Challenger Kit Carson Phase III Construction of approximately 1/2 mile of 3 Saguache $209,322 $62,797 $272,119
Point Trail sustainable, primitive-use trail at elevations
above 12,000 ft, restoration of .43 miles of
highly eroded alpine environment,
maintenance of 5.2 miles of the Willow Creek
Trail.
CO 2018 Meeker Trail System Meeker Trail System 2018 Construction of two new single-track trails 3 Rio Blanco $106,750 $32,025 $138,775
Expansion that total 4.6 miles adding to the existing
11-mile Meeker Trail System to create a
regionally attractive 15.6 mile trail system
adjacent to the Town of Meeker.
CO 2012 Pike & San Isabel National OHV Rampart Range This project consists of the following 3, 4, 5 Chaffee, Custer, $96,040 $24,010 $120,050
Forest Motorcycle Management activities: coordinate with land managers to Douglas, El Paso,
Committee Sweco develop a seasonal operating plan; identify Huerfano, Teller, Park
and prioritize trail maintenance needs;
contract with heavy equipment operator;
obtain required insurance; utilize a SWECO...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2013 Statewide Trail Maintenance OHV Rampart Range The RRMMC Liaison Officer will be 3, 4, 5 Chaffee, Custer, $63,711 $146,389 $210,100
Motorcycle Management responsible for coordinating with the USDA Douglas, El Paso,
Committee Trail Forest Service and managing volunteers and Huerfano, Teller, Park
Maintenance 13 sub-contractors. This project consists of the
following activities: purchase new Sutter 500
Trail Dozer, flat bed trailer and...
CO 2002 Arkansas Headwaters Trail Construction and Construct Trail, Improvements 3, 5 Chaffee, Fremont, $10,200 $2,550 $12,750
Recreation Area Improvements Lake, Pueblo
CO 2002 Marshall Pass In North Fork Winter Trail Improvements Grooming 3, 5 Gunnison, Chaffee, $8,005 $2,001 $10,006
Garfield
CO 2003 Florence to Fruita Trail Construction and Construct Trails, Maintenance 3, 5 Fremont, Gunnison, $63,000 $194,588 $257,588
Maintenance Chaffee, Mesa, Delta
CO 2016 Stage Rail Trail Stage Rail Trail Phase 1 Phase 1 represents first implementation of 3, 5 Chaffee, Lake $26,298 $7,890 $34,188
the Master Plan for a 64-mile pathway in
Chaffee and Lake Counties. The project is
expected to take 5 years to complete. The
project includes developments along sections
of the trail plus assessing the trail...
CO 1994 Clear Creek National Trail Construction Construct 1,300 feet of a 10 feet wide 4 Adams $68,044 $34,000 $102,044
Recreation Trail concrete trail
CO 1998 Poudre River Trail Corridor Construction of 3 to 10 foot wide concrete 4 Weld $65,000 $195,800 $260,800
National Recreation Trail segments in Windsor's trail system
CO 1998 Poudre River Trail Corridor Construct a 2 mile segment of 10 foot wide 4 Weld $33,700 $228,500 $262,200
National Recreation Trail paved trail as part of the Poudre River Trail
CO 1998 Poudre River Trail Corridor Construction of a 2.5 mile segment of paved 4 Weld $65,000 $314,400 $379,400
National Recreation Trail trail and a bridge as part of the Poudre River
Trail
CO 1999 Purgatoire River Trail Land Acquisition and Land acquisition, construction of a 3 mile long 4 Las Animas $30,000 $7,500 $37,500
Trailhead Construction asphalt trail, parking lot, trail signage, tables,
benches
CO 2000 Poudre River Trail Corridor Construct Trail 4 Weld $107,000 $172,500 $279,500
National Recreation Trail
CO 2000 Cherry Creek Spillway Trail Construct Trail 4 Arapahoe $150,000 $435,000 $585,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2000 Heart of Trinidad River Trail Construct Trail 4 Las Animas $198,000 $596,000 $794,000
CO 2001 Big Dry Creek National Bridge Installation Bridge 4 Arapahoe $195,000 $405,900 $600,900
Recreation Trail
CO 2002 Rampart Range Trail Trail Maintenance Maintenance 4 Douglas $36,000 $25,100 $61,100
CO 2002 Willows Trail Construct Trail 4 Gunnison $14,700 $26,735 $41,435
CO 2002 Sylvan Lake State Park Site Visit 4 Eagle $250 $63 $313
CO 2002 Turquoise Lake Recreation Winter Trail Improvements Grooming 4 Lake $10,600 $2,650 $13,250
Area
CO 2002 Barbour Ponds Trail System Trail Maintenance and Maintenance, Sports Facilities 4 Weld $5,050 $1,263 $6,313
Facilities
CO 2003 Rampart Range Recreation Signage, Improvements 4 Douglas $25,500 $6,375 $31,875
Area
CO 2003 Slvryc Texas Creek Signage, Improvements 4 Fremont $19,000 $32,500 $51,500
CO 2003 East Government Trail, Improvements 4 Eagle, Pitkin $15,000 $61,575 $76,575
Ashcroft Trails
CO 2005 West Shore Trail Extension 4 Unspecified/Unidentifi $0 Unknown $0
able
CO 2005 Timber Trail Renovation Trail Renovation The Timber Trail Renovation will positively 4 Larimer $0 Unknown $0
impact wildlife. It will minimize trail user
impact even more by moving the trail even
farther away from shrubby drainages
(potential Preble's habitat). The trail will cross
intermittent drainages away from...
CO 2009 Unspecified/Unidentifiable Trail Reconstruction and Improve, maintain, reconstruct, and sign 3 4 Unspecified/Unidentifi $38,500 $60,854 $99,354
Drainage Improvements miles of heavily used trail by using rock/log able
checks/waterbars. Elimination of high steps,
improvement of tread, and installation of
retaining walls and small footbridges. Short
re-routes will also be...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2010 Haiyaha Loop Trail Haiyaha Loop Trail The Haiyaha Loop Trail Rehabilitation is a 4 Larimer $29,868 $8,937 $38,805
Rehabilitation Year 2 3-year project to improve 3.0 miles of trail in
Rocky Mountain National Park (NP). This
peaceful trail from Alberta Falls to Lake
Haiyaha is traversed from two very
accessible trailheads in the most heavily...
CO 2011 Windsor Trail Windsor Trail-Greeley No. 2, This project entails upgrading an existing 4 Weld $200,000 $60,000 $260,000
15th to 9th Street natural surface trail to paved surface, filling a
gap (pavement exists to the east and to the
west), and some portion as adjacent natural
surface trail. This section of the Windsor
Trail/Greeley No. 2 is a...
CO 2011 Horsetooth Shore to Shore Horseshoe Shore to Shore The Horsetooth Shore to Shore Trail 4 Larimer $40,053 $12,016 $52,069
Trail Trail Redevelopment Project Redevelopment Project seeks to complete
badly needed work on two trails in the
Horsetooth Reservoir area. The Foothills
Trail, on the east side of the reservoir, and
the Sawmill trail on the west have
deteriorated...
CO 2011 Winter Recreation Trails Colorado Snowmobile This project is designed to purchase and 4 Weld $15,000 $4,500 $19,500
Association Safety Trailer wrap a new trailer to be used by the safety
program of the Colorado Snowmobile
Association. We are looking to purchase a
12-18 V-nose, enclosed aluminum trailer,
outfitted with storage cabinets, heat,...
CO 2012 Great Western Trail Great Western Trail Upgrade the existing dirt surface of the Great 4 Weld $100,000 $30,000 $130,000
Severance-Windsor Trail Western Trail between the towns of
Upgrade Severance and Windsor. Improvements
include a 10' wide aggregate base course
trail surface, seeding of trail shoulder areas
with native grass cover and road crossing...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2015 Old Sopris Trail Old Sopris Trail Land The City is proposing to acquire 4 Las Animas $200,000 $60,000 $260,000
Acquisition-Section Two approximately forty (40) to forty-five (45)
acres of land along the Purgatoire River to
accommodate the construction of most of
Section Two of the Old Sopris Trail Master
Plan.
CO 2017 North Elk Creek Trail North Elk Creek Trail CO Mountain Bike Assoc. and the USFS will 4 Park $107,932 $23,750 $131,682
complete the construction of a new
non-motorized trail segment that will connect
Staunton State Park trails to National Forest
System trails near Evergreen.
CO 2018 Kiowa Park Trail Kiowa Park Trail Construction of a 1.6-mile, 10-foot wide 4 Morgan $22,436 $6,731 $29,167
recycled asphalt trail for non-motorized use.
CO 2015 Various OHV Trails 2015 RRMMC Trail This project consists of the following 4, 5 Chaffee, Custer, $196,040 $39,208 $235,248
Maintenance activities: coordinate with land managers to Douglas, El Paso,
develop a seasonal operating plan; identify Huerfano, Teller, Park
and prioritize trail maintenance needs;
contract with heavy equipment operator;
obtain required insurance; perform the...
CO 2009 Rampart Range Recreation OHV Trail Construction and This project continues the implementation of 4, 6 Douglas $121,930 $123,950 $245,880
Area Trailhead Improvements a plan initiated in 2006 following the
completion of the Rampart Range Recreation
Area Motorized Roads and Trail Plan's
Environmental Assessment. It involves new
trail construction to make vital...
CO 1997 Historic Alpine Trail Trail Renovation and Reconstruction and re-routing of the Historic 5 El Paso $41,800 $20,900 $62,700
Rerouting Alpine Trail in the Ouray Ranger District
CO 1997 Sinton Trail Extension of the Sinton Trail from Holland 5 El Paso $21,400 $21,000 $42,400
Park Boulevard to Garden of the Gods Road
along South Douglas Creek
CO 1997 Spine Foundation Creek Construction of a bridge over Fountain Creek 5 El Paso $36,300 $54,400 $90,700
Regional Trail System as part of the Spine Foundation Creek
Regional Trail System
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 1999 Placer Valley Bike Trail Construction Construction of a 5 mile asphalt bike trail 5 Park $24,700 $210,400 $235,100
Centennial Trail
CO 2002 North and South Crestone Construct Trail 5 Rio Grande $14,240 $21,250 $35,490
Trail
CO 2002 South Fork Snowmobile Purchase Equipment 5 Rio Grande $37,080 $62,750 $99,830
Trails
CO 2002 Rio Grande National Forest Winter Trail Improvements Grooming 5 Lake $31,085 $7,771 $38,856
Snowmobile Trails
CO 2003 OHV Trails Maintenance 5 Rio Grande $22,000 $5,500 $27,500
CO 2003 Moon Pass Trail Maintenance 5 Saguache $11,000 $3,500 $14,500
CO 2003 West Alder and Bear Creek Maintenance 5 Rio Grande $22,000 $4,500 $26,500
CO 2003 Williams Creek Trail Maintenance 5 Hinsdale $11,000 $7,100 $18,100
CO 2003 South Zapata Lakes Trail Construct Trail 5 Alamosa $11,000 $8,750 $19,750
CO 2003 Lower South Colony Lake Construct Trail, Improvements 5 Custer $15,000 $21,400 $36,400
Trail
CO 2004 Midland Bicycle Trail, Trail Renovation The project would reconstruct and control 5 Chaffee $11,500 $6,000 $17,500
Whipple Trail erosion on 7 miles of the existing 22-mile
long Midland Bicycle Trail and its primary
access the Whipple Recreational Trail,
through placement of road base, edge
stabilization, and drainage structures. Entry...
CO 2004 Buena Vista Snow Trails Purchase Snow Trail We wish to acquire a second snow cat one of 5 Chaffee $32,000 $39,118 $71,118
Equipment fairly recent vintage with low hours, complete
with blade, tiller, and compacting bar. This
cat will enable us to double or even triple the
hours spent grooming Tincup Pass, Hancock,
Taylor Park,...
CO 2004 Crestone Needle-Humboldt Trail Renovation Funds will support trail/climbing route 5 El Paso $35,000 $57,700 $92,700
Peak Project construction and restoration on two popular
14er peaks: Crestone Needle and Humboldt
Peak during 2004-2005. The State Trails
Program grant will support improvements and
restoration on the final sections yet be...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2004 Crestone Needle-Humboldt Trail Renovation Funds will support trail/climbing route 5 El Paso $35,000 $57,700 $92,700
Peak Project construction and restoration on two popular
14er peaks: Crestone Needle and Humboldt
Peak during 2004-2005. The State Trails
Program grant will support improvements and
restoration on the final sections yet be...
CO 2005 Ophir Creek Snowmobile Winter Trail Improvements Groom and maintain 75 miles of the Ophir 5 Chaffee $2,794 $9,206 $12,000
Trail System Creek Snowmobile Trail system in the San
Isabel National Forest
CO 2005 Pike and San Isabel National Winter Trail Improvements Groom and maintain 100 miles of trails in 5 Chaffee $2,941 $15,059 $18,000
Forest Pike and San Isabel National Forests.
CO 2005 Guanella Pass Trails Trail and Trailhead Guanella Pass Trails Project is a two phase, 5 Clear Creek $200,000 $1,124,240 $1,324,240
Construction comprehensive trails improvement project
that includes new trailheads, accessible
nature and interpretive trails to scenic
overlooks, and provides access to an
extensive network of backcountry trails.
This...
CO 2005 Backcountry Trails Trail Renovation Backcountry Trail Renovation 5 Unspecified/Unidentifi $0 Unknown $0
able
CO 2005 Westside OHV Trail Motorized Youth Corps The Westside OHV Trail Reconstruction 5 Dolores $0 Unknown $0
Reconstruction Project Project is a proposal by the Southwest Youth
Corps (working in conjunction with the Forest
Service and BLM) to reconstruct specific
sections of several trails that are located on
the westside of the Calico Trail....
CO 2005 Pike and San Isabel National Winter Trail Improvements Groom and maintain 63 miles of snowmobile 5 Chaffee $3,529 $882 $4,411
Forest Winter Recreation trails in the Marshall-Monarch Pass areas of
Trails the Pike-San Isabel National Forest
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2005 Cheyenne Mountain State Trail Construction Approximately 16.5 miles of natural surface 5 El Paso $0 Unknown $0
Park trails have already been constructed at
Cheyenne Mountain State Park. The park
master plan calls for approximately 18.5
miles of the planned total of approximately 20
miles of trail consisting of natural...
CO 2006 Hogback Trail Hogback Trail This project involves the rehab of 5 Huerfano $0 $5,600 $5,600
Reconstruction Lathrop State approximately 250 yards of badly eroded
Park single track trail. Rebuilding of the trail tread
with soil or crusher fines would be necessary.
The addition of water bars, drainage dips,
and steps in strategic locations to...
CO 2006 Spinney Mountain State Park Backcountry Trail The park currently has approximately 5 miles 5 Park $0 $5,600 $5,600
Renovation Eleven Mile of trails. Trail use continues to increase but in
order to sustain the trail we are still having to
pull plants/roots out of trail surface. In some
areas, dips have to be reconstructed, as well
as other...
CO 2006 Winter Recreation Trails San Isabel National Forest, Groom and maintain 135 miles of trails in the 5 Chaffee $5,000 $1,250 $6,250
Gunnison National Forest San Isabel National Forest and Gunnison
National Forest
CO 2006 Arkansas Headwaters Salida Trail Crew The crew will perform maintenance projects 5 Chaffee $17,855 $4,464 $22,319
Recreation Area on the Big Bend OHV track and in the Texas
Creek, Gold Belt, and Four-mile Travel
Management Areas. The crew will assist in
implementing the goals of the proposed
Arkansas River Travel Management Area.
The...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2006 Arkansas Headwaters Sear OHV Crew The crew will perform maintenance projects 5 Chaffee $17,064 $4,266 $21,330
Recreation Area on the Big Bend OHV track and in the Texas
Creek, Gold Belt, and Four-mile Travel
Management Areas. The crew will assist in
implementing the goals of the proposed
Arkansas River Travel Management Area.
The...
CO 2006 Arkansas Headwaters Salida Trail Crew The crew will perform maintenance projects 5 Fremont $17,481 $4,370 $21,851
Recreation Area on the Big Bend OHV track and in the Texas
Creek, Gold Belt, and Four-Mile Travel
Management Areas. The crew will assist in
implementing the goals of the proposed
Arkansas River Travel Management Area.
The...
CO 2006 Rio Grande National Forest Powder Busters Trail Groom and maintain 128 miles of groomed 5 Rio Grande $5,316 $1,329 $6,645
Winter Trails Grooming trails in the Rio Grande National Forest
CO 2006 Rio Grande National Forest Grooming Snowmobile Trails Groom and maintain 76 miles of trails in the 5 Rio Grande $27,539 $6,885 $34,424
Winter Trails Del Norte, South Fork and Creede areas of
the Rio Grande National Forest
CO 2007 Upper Arkansas Motorized Upper Arkansas Motorized All representatives from each agency will 5 Chaffee $18,900 $4,725 $23,625
Trail Trail Crew work together in repairing and improving
education activities to promote the benefits of
Multiple-use, Tread Lightly, and Stay On Trail
OHV travel practices. The trail crew will
perform maintenance projects...
CO 2007 Upper Arkansas Motorized Upper Arkansas Motorized All representatives from each agency will 5 Chaffee $16,800 $4,200 $21,000
Trail Trail Crew work together in repairing and improving
education activities to promote the benefits of
Multiple-use, Tread Lightly, and Stay On Trail
OHV travel practices. The trail crew will
perform maintenance projects...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2007 Pike National Forest Winter Trail Grooming Groom and maintain 100 miles of trails in 5 Chaffee $2,958 $740 $3,698
Trails, San Isabel National Pike and San Isabel National Forests.
Forest Winter Trails
CO 2007 Marshall-Monarch Pass Winter Trail Improvements Groom and maintain 63 miles of snowmobile 5 Chaffee $246 $62 $308
Winter Trails trails in the Marshall-Monarch Pass areas of
Pike and San Isabel National Forests.
CO 2007 Winter Recreation Trails Purchase Snow Trail The Buena Vista Snowmobile Club needs to 5 Chaffee $4,659 $1,165 $5,824
Equipment replace their 1993 BR400+ snowcat with a
2000+ year model used snowcat complete
with blade and tiller.
CO 2007 Pike National Forest OHV Trail Renovation and This project will provide for maintenance, 5 Denver, El Paso, $32,485 $8,121 $40,606
Trails, San Isabel National Construction reconstruction, and enhancements to existing Fremont, Chaffee
Forest OHV Trails motorized recreation areas in 6 districts of the
Pike and San Isabel National Forest. Work to
be provided includes identifying and
prioritizing trail maintenance,...
CO 2007 Columbine Trail Bridge Installation Ongoing erosion along the Columbine Trail in 5 El Paso $54,500 $13,625 $68,125
North Cheyenne Canon Park has left a
section of the Mid-Columbine Trail nearly
impassable. The best solution is to install a
prefabricated fiberglass bridge in the
damaged area and perform major...
CO 2007 Upper Arkansas Motorized Upper Arkansas Motorized All representatives from each agency will 5 Fremont $18,400 $4,600 $23,000
Trail Trail Crew work together in repairing and improving
education activities to promote the benefits of
Multiple-use, Tread Lightly, and Stay On Trail
OHV travel practices. The trail crew will
perform maintenance projects...
CO 2007 Vallecito Reservoir Trail Vallecito Reservoir Trail Repair West Lake Trail damage, purchase 5 La Plata $40,000 $10,000 $50,000
Extension/Maint. cross-country ski groomer to groom Lower
East Lake Trail
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2008 Rainbow Trail, Colorado Trail Construction and Volunteers will use tools to re-route and 5 Chaffee $4,545 $10,463 $15,008
Trail, Continental Divide Maintenance rehabilitate trails and construct a system of
concentric loops on Salida Mountain. Crews
have a minimum of six trail days a year to
maintain existing trails such as Rainbow Trail,
the Colorado Trail, and the...
CO 2008 Rainbow Trail, Crest Trail OHV Trail Maintenance and Funding for a 3-person, interagency (BLM, 5 Chaffee $54,000 $33,732 $87,732
Education Crew USDA Forest Service, Colorado State Parks)
trail maintenance and education crew to
repair and improve motorized trails in the
Upper Arkansas River Valley. Crew conducts
formal and informal education...
CO 2009 Garden of the Gods Trail Trail Re-Route and 1.15 miles of reconstruction, 0.4 miles of 5 El Paso $36,000 $84,400 $120,400
Reconstruction re-route and 0.35 mile closure/restoration.
Garden of the Gods hosts 2 million visitors a
year.
CO 2011 Ute Pass Trail Ute Pass Trail - Phase 1 El Paso County Parks Division is applying for 5 El Paso $119,855 $41,500 $161,355
State Trails consideration to complete the
first phase of Ute Pass Trail, a 3.25-mile long
multi-use trail with interpretive loop and
enhanced signage. The trails will serve as an
important connection to...
CO 2011 Central Garden Recreational Central Garden Recreational The Garden of the Gods is one of the finest 5 El Paso $37,730 $11,319 $49,049
Trails Trails Improvement Project natural landmarks in the Rocky Mountain
Region. The park, a designated National
Historical Landmark, provides invaluable
recreational and social benefits to the
community of Colorado Springs and
surrounding...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2011 Pikes Peak South Slope Recreational Development at After two years of planning, the Recreational 5 Teller, El Paso $200,000 $60,000 $260,000
Pikes Peak South Slope Development at Pikes Peak - South Slope is
ready to move into the construction phase.
Elements within the development plan
include a trailhead, day-use area which will
accommodate hand-launched boating...
CO 2013 Red Rocks Canyon Trail Red Rocks Canyon Trail The Red Rocks Canyon Trail Restoration and 5 El Paso $75,000 $22,500 $97,500
Restoration and Improvement Project seeks to improve the
Improvement Project core of existing trails, add new trail
connections, pave a well-used parking lot,
upgrade a southern trailhead, formalize
several social trails, add signage, and...
CO 2014 Manitou Incline Trail Maintou Incline Trail The Manitou Incline Trail Enhancement 5 El Paso $200,000 $846,700 $1,046,700
Enhancement Project Project will increase safety, provide long-term
trail sustainability, improve environmental
conditions and enhance user experience
along the 1-mile, 2,741 step Mt. Manitou
Incline Trail. With an average grade of...
CO 2014 Rock Island Regional Trail Rock Island Regional Trail This project involves creating safe trail 5 El Paso $31,391 $10,130 $41,521
Extension connections from the Rock Island Regional
Trail to the High Prairie Library and the
Falcon commercial center. This trail project
includes final design and construction of .34
miles of new trails, and .33...
CO 2015 Cottonwood Trail Cottonwood Trail The Cottonwood Trail Project is located four 5 Chaffee $72,350 $21,705 $94,055
Construction/Reconstruction miles northeast of Salida, CO, and has been
Project approved by the USDA Forest Service (FS)
as referenced in the attached FS Decision
Memo. This project will provide 6.1 miles of
new non-motorized single-track...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2016 South Canon Trails South Canon Trails The South Canon Trails project is a 5 Fremont $155,554 $46,666 $202,220
collaborative effort between FAR, the BLM,
and the Recreation District. The project
connects several area parks and trailheads
and will bring diverse trail experiences in a
natural setting.
CO 2017 Two Rivers Trail Two Rivers Trails Project The Two Rivers Trails Project includes a 5 Chaffee $239,213 $60,575 $299,788
1,860' trail along the S. Arkansas River, a
pedestrian bridge crossing the river, and a
1,205' trail that continues and connects to the
existing Salida Trail System.
CO 2017 Mt. Columbia Trail Mt. Columbia Trail, Phase II CFI will work to complete a high-priority trail 5 Chaffee $119,991 $110,820 $230,811
construction project on Mt. Columbia, a 14er
near Buena Vista. Phase II finishes a new
route and begins restoring social trails.
CO 2017 Stage and Rail-Trail Stage and Rail Trail The purpose of this grant request is for 5 Chaffee, Lake $20,200 $6,060 $26,260
Continuation Continuation GARNA and its Stage & Rail Project team to
implement Year 2 of Phase 1 of the Stage
and Rail Trail Master Plan for a 64-mile
hiking, horseback, biking and driving trail in
Chaffee and Lake counties.
CO 2018 Motocross Park Gypsum Moto Cross Phase Development and construction of a 5 Eagle $105,000 $45,000 $150,000
Development 1 motocross park
CO 2018 Lake County OHV Park Lake County OHV Park Continue development of OHV park 5 Lake $24,200 $45,800 $70,000
CO 2018 Meridian Ranch Regional Meridian Ranch Regional Construction of 1.47 miles of trail in Falcon 5 El Paso $136,000 $40,800 $176,800
Trail Trail Regional Park.
CO 2018 Temple Canyon Connection Temple Canyon Connection Construction of 2.7-miles of trail from 5 Fremont $31,316 $9,395 $40,711
BLM-managed lands to the Canon
City-owned Temple Canyon Park.
CO 2003 Missionary Ridge Fire Trail Trail Improvements 6 La Plata $88,000 $105,000 $193,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2005 North Halfmoon Massive The North Halfmoon Massive Trail project will 6 Lake $107,500 $191,613 $299,113
Trail construct 1.13 miles of new trail and restore
1.34 miles of Multiple hiker created trails on
the west face of Mount Massive. The
elevation range of this project is between
12,600 feet and 14,000 feet....
CO 2005 Eldorado Canyon Trails Trail Improvements Eldorado Canyon Trails Project 6 Boulder $0 Unknown $0
CO 2006 Walker Ranch Loop Trail Walker Ranch Loop Trail One week of the project will involve 6 Boulder $0 $5,200 $5,200
Maintenance Eldorado maintaining 1.5 miles of the Walker Ranch
Canyon Loop Trail on the Crescent Meadows portion
of the park. Drainage of the trail will be
improved by outsloping and drain dips. Some
sections of the trail will be reinforced...
CO 2011 Buffalo Creek Bridge Buffalo Creek Bridge This grant application is for a proposed 6 Jefferson $42,350 $32,580 $74,930
non-motorized bridge over Buffalo Creek and
its associated floodplain in the Buffalo Creek
Recreation Area (BCRA) of the Pike National
Forest as an integral component of the Nice
Kitty Trail Construction...
CO 2015 Colorado Front Range Trail CFRT-Erger's Pond Open This CFRT (Colorado Front Range Trail) 6 Adams $55,470 $16,641 $72,111
Space Section Ergers Pond Open Space Section project
addresses a missing link of the CFRT that will
provide new access for trail users (walkers,
runners, bikers, skaters, hikers, tourists, and
other leisure and...
CO 2017 Ouray Perimeter Trail Ouray Perimeter Trail Construct better drainage features along the 6 Ouray $30,000 $6,000 $36,000
Oak Creek east side section. Tread will be
maintained to a 24 inch width. Features log
cribbing, rock retaining walls, drain dips and
log/rock waterbars.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2012 Cherry Creek Trail Cherry Creek Trail Signage The Cherry Creek Basin Working Group, 6, 1 Arapaho, Denver, $70,000 $21,000 $91,000
Phase 1 made up of 12 agencies, partnered to create Douglas
regionally-accepted Cherry Creek Basin
Signage Guidelines. With the help of a
consultant, the group identified trail user sign
needs throughout the corridor,...
CO 2005 Pike and San Isabel National Winter Trail Improvements Groom and maintain 43 miles of snowmobile 7 Lake $1,176 $11,824 $13,000
Forest trails around Turquoise Reservoir near
Leadville
CO 2013 Winter Recreation Trails International Snowmobile Colorado Association of Snowmobile Clubs 7 Summit $10,000 $163,550 $173,550
Congress 2014 Funding Inc., dba Colorado Snowmobile Association
is asking for funding to support, in part, the
hosting of the International Snowmobile
Congress in June of 2014 (ISC2014) at
Keystone Resort. This is an international...
CO 2018 Various OHV Supply and Equipment Motorized trail maintenance and development 7 Mesa $19,498 $70,502 $90,000
CO 2002 Grand Lake Purchase Snow Trail Purchase Equipment 8 Grand $16,760 $1,000 $17,760
Equipment
CO 2002 Fraser to Granby Trail Restrooms 8 Grand $15,000 $21,558 $36,558
CO 2002 Eagle River Trail Construct Trail 8 Eagle $136,040 $524,250 $660,290
CO 2003 Sulphur Springs Maintenance 8 Grand $11,000 $2,750 $13,750
CO 2003 Fraser to Granby Trail Construct Trail, Signage 8 Grand $36,800 $62,444 $99,244
CO 2006 Turquoise Reservoir Winter Trail Grooming Leadville Groom and maintain 43 miles of snowmobile 8 Lake $1,145 $286 $1,431
Trails Area trails around Turquoise Reservoir near
Leadville
CO 2017 Buffalo Pass Trails Buffalo Pass Trails Routt County Riders intends to construct 13 8 Routt $222,494 $73,800 $296,294
miles of non-motorized trail, approved in the
USFS Buffalo Pass Trails EA. Trails are
located NE of Steamboat Springs and
connect to the Continental Divide Trail, as
well as many local trail system.
CO 2003 Blodgett Open Space Trailhead 9 El Paso $15,000 $59,674 $74,674
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
CO 2007 14er Trails Regional 14er Maintenance Maintenance work will promote sustainability 9 Lake $33,740 $8,435 $42,175
on 12 miles of trouble spots on 64 miles of
14er trails
Grand $20,345,460 $25,853,085 $46,198,545
Totals
(all results)