Search Results Recreational Trails Program Project Database

Your search for projects in State: CO, Total Results : 462

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2008 Unknown Trail and Drainage Project includes two steep re-routes; Unspecified/Unidentifi $11,600 $5,200 $16,800

Improvements installation of stone steps, reinforced able

drainage dips, and a split log bridge;

revegetation; dam checks; hardening of

stream crossings; and delineation of

approaches.

CO 2008 Tools and Equipment Purchase Trail Maintenance Purchase a crew passenger van, 2 closed Unspecified/Unidentifi $9,250 $9,293 $18,543

Equipment utility trailers, and equipment for 1 camping able

crew

CO 2008 Unspecified/Unidentifiable Trail Re-Route and Relocation and reconstruction of a new Unspecified/Unidentifi $93,314 $37,886 $131,200

Construction and Trailhead trailhead, restoration of 4x4 road closure (2.5 able

Improvements miles) to wilderness, and installation of a

parking lot, bridge, gate, and information

kiosks. Trail maintenance will also be

performed.

CO 2008 Unspecified/Unidentifiable Trail and Bridge Construction 14 miles of trail maintenance, 3 miles of new Unspecified/Unidentifi $35,292 $42,027 $77,319

trail construction, and installation of 1 bridge able

CO 2008 Unspecified/Unidentifiable Trail Construction, Project will complete construction of 500 feet Unspecified/Unidentifi $30,000 $48,200 $78,200

Maintenance, and Drainage of new trail across a drainage that will able

Improvements connect 2 existing OHV road systems,

creating a 7.5 mile loop. Work on the two

road systems includes corridor clearing,

construction of 10 drainage dips, cleaning...

CO 2008 Unspecified/Unidentifiable Trail Re-route and Project includes 10 miles of trail Unspecified/Unidentifi $20,000 $65,000 $85,000

Maintenance maintenance, a 2,750 foot trail re-route, as able

well as bridge repair.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2008 Unspecified/Unidentifiable Trail Renovation and Slope Reconstruct 0.25 mile trail. Close and reclaim Unspecified/Unidentifi $21,507 $94,611 $116,118

Stabilization social trail and complete slope stabilization able

and erosion control at 14,000 feet.

CO 2008 Unspecified/Unidentifiable Trail, Boardwalk, and Project includes 5 trail Unspecified/Unidentifi $25,000 $107,000 $132,000

Maintenance Improvements maintenance/reconstruction projects able

including 1,000 foot re-route, boardwalk

replacement, resurfacing scenic lake loop

trail, and general trail maintenance.

CO 2008 Unspecified/Unidentifiable Trail Re-route and Construct a 1.1 mile trail re-route, reconstruct Unspecified/Unidentifi $170,075 $175,706 $345,781

Construction 0.29 mile section of existing social trail, able

restore 1.37 miles of poorly located and badly

eroded social trail, and maintain 2.78 miles of

existing trails

CO 2009 Unspecified/Unidentifiable Trail Maintenance Late summer and fall of 2006, the Western Unspecified/Unidentifi $40,000 $4,928 $44,928

Slope of experienced record levels able

of moisture and a combination of saturated

soils and high use have created a backlog of

heavy trail maintenance across the entire

district. The district used a...

CO 2009 Unspecified/Unidentifiable Construct Interpretive Trail Construct a 0.5 mile interpretive trail to Unspecified/Unidentifi $21,665 $105,028 $126,693

and Signs complement a new outdoor classroom and able

educate the public about the unique geology

in the area. Installation of interpretive signs

and connection to 12 other miles of trails

CO 2009 Unspecified/Unidentifiable Trail and Bridge Construction Complete a single-track loop by constructing Unspecified/Unidentifi $9,364 $130,736 $140,100

and Signs 7,400 linear feet for hiking/biking and able

backcountry Nordic skiing. Three bridges will

be installed along with signs (historical,

interpretive, directional)

CO 1999 Sand Creek National Trail Construction Construction of a .5 mile trail segment which 1 $25,000 $27,650 $52,650

Recreation Trail lies on the former Stapleton Airport Property

in Denver

CO 2003 Bluff Trail Construct Trails, Signage, Fencing 1 Denver $15,000 $88,000 $103,000

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2006 Colorado State Parks Trails Crew Leadership Program 1 Denver $27,985 $11,500 $39,485

for Colorado State Parks

CO 2010 N/A Outdoor Stewardship The Outdoor Stewardship Institute is the 1 Denver $10,000 $3,000 $13,000

Institute Training Program training arm of Volunteers for Outdoor

Colorado and will offer trainings to volunteers

and staff of outdoor stewardship

organizations, public land agencies and other

interested parties of non-motorized and...

CO 2011 N/A Outdoor Stewardship The Outdoor Stewardship Institute is the 1 Denver $10,000 $3,000 $13,000

Institute Training Program training arm of Volunteers for Outdoor

Colorado and will offer trainings to volunteers

and staff of outdoor stewardship

organizations, public land agencies and other

interested parties of non-motorized and...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2000 Various Trails Install Signs Signage 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $50,000 $25,000 $75,000

Costilla, Crowley,

Custer, Delta, Denver,

Dolores, Douglas,

Eagle, El Paso, Elbert,

Fremont, Garfield,

Gilpin, Grand,

Gunnison, Hinsdale,

Huerfano, Jackson,

Jefferson, Kiowa, Kit

Carson, La Plata,

Lake, Larimer, Las

Animas, Lincoln,

Logan, Mesa, Mineral,

Moffat, Montezuma,

Montrose, Morgan,

Otero, Ouray, Park,

Phillips, Pitkin,

Prowers, Pueblo, Rio

Blanco, Rio Grande,

Routt, Saguache, San

Juan, San Miguel,

Sedgwick, Summit,

Teller, Washington,

Weld, Yuma

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2001 Colorado Fourteeners Trails Trail Maintenance and Construct Trails, Erosion Control, Kiosks, 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $129,900 $550,400 $680,300

Construction Signage Costilla, Crowley,

Custer, Delta, Denver,

Dolores, Douglas,

Eagle, El Paso, Elbert,

Fremont, Garfield,

Gilpin, Grand,

Gunnison, Hinsdale,

Huerfano, Jackson,

Jefferson, Kiowa, Kit

Carson, La Plata,

Lake, Larimer, Las

Animas, Lincoln,

Logan, Mesa, Mineral,

Moffat, Montezuma,

Montrose, Morgan,

Otero, Ouray, Park,

Phillips, Pitkin,

Prowers, Pueblo, Rio

Blanco, Rio Grande,

Routt, Saguache, San

Juan, San Miguel,

Sedgwick, Summit,

Teller, Washington,

Weld, Yuma

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2001 Winter Trail Improvements Winter Trail Improvements Improvements, Construction, Signage, 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $267,144 $66,786 $333,930

Maintenance, Renovation Costilla, Crowley,

Custer, Delta, Denver,

Dolores, Douglas,

Eagle, El Paso, Elbert,

Fremont, Garfield,

Gilpin, Grand,

Gunnison, Hinsdale,

Huerfano, Jackson,

Jefferson, Kiowa, Kit

Carson, La Plata,

Lake, Larimer, Las

Animas, Lincoln,

Logan, Mesa, Mineral,

Moffat, Montezuma,

Montrose, Morgan,

Otero, Ouray, Park,

Phillips, Pitkin,

Prowers, Pueblo, Rio

Blanco, Rio Grande,

Routt, Saguache, San

Juan, San Miguel,

Sedgwick, Summit,

Teller, Washington,

Weld, Yuma

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2002 State Administration Administration Expenses Administration 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $15,000 $3,750 $18,750

Costilla, Crowley,

Custer, Delta, Denver,

Dolores, Douglas,

Eagle, El Paso, Elbert,

Fremont, Garfield,

Gilpin, Grand,

Gunnison, Hinsdale,

Huerfano, Jackson,

Jefferson, Kiowa, Kit

Carson, La Plata,

Lake, Larimer, Las

Animas, Lincoln,

Logan, Mesa, Mineral,

Moffat, Montezuma,

Montrose, Morgan,

Otero, Ouray, Park,

Phillips, Pitkin,

Prowers, Pueblo, Rio

Blanco, Rio Grande,

Routt, Saguache, San

Juan, San Miguel,

Sedgwick, Summit,

Teller, Washington,

Weld, Yuma

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2004 Safety and Education Trail Access and Safety Southwest Youth Corps respectfully requests 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $27,500 $27,740 $55,240

Initiative a recreation grant from the Colorado State Costilla, Crowley,

Parks Trails Program for a Trail Access and Custer, Delta, Denver,

Safety Initiative which will include clearing Dolores, Douglas,

and maintenance of high-use and neglected Eagle, El Paso, Elbert,

trails in the San Juan National... Fremont, Garfield,

Gilpin, Grand,

Gunnison, Hinsdale,

Huerfano, Jackson,

Jefferson, Kiowa, Kit

Carson, La Plata,

Lake, Larimer, Las

Animas, Lincoln,

Logan, Mesa, Mineral,

Moffat, Montezuma,

Montrose, Morgan,

Otero, Ouray, Park,

Phillips, Pitkin,

Prowers, Pueblo, Rio

Blanco, Rio Grande,

Routt, Saguache, San

Juan, San Miguel,

Sedgwick, Summit,

Teller, Washington,

Weld, Yuma

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2004 Continental Divide National Building (CDT) with 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $69,200 $73,100 $142,300

Scenic Trail community collaboration Costilla, Crowley,

Custer, Delta, Denver,

Dolores, Douglas,

Eagle, El Paso, Elbert,

Fremont, Garfield,

Gilpin, Grand,

Gunnison, Hinsdale,

Huerfano, Jackson,

Jefferson, Kiowa, Kit

Carson, La Plata,

Lake, Larimer, Las

Animas, Lincoln,

Logan, Mesa, Mineral,

Moffat, Montezuma,

Montrose, Morgan,

Otero, Ouray, Park,

Phillips, Pitkin,

Prowers, Pueblo, Rio

Blanco, Rio Grande,

Routt, Saguache, San

Juan, San Miguel,

Sedgwick, Summit,

Teller, Washington,

Weld, Yuma

CO 2005 Winter Recreation Trails Snow Capital Grants Trail Grooming Equipment 1, 2, 3, 4, 5, 6, 7 Statewide $10,000 $2,500 $12,500

Grooming Equipment

CO 2005 Winter Recreation Trails Snow Capital Grants Trail Grooming Equipment 1, 2, 3, 4, 5, 6, 7 Statewide $24,369 $6,092 $30,461

Grooming Equipment

CO 2008 Colorado State Parks Trails Trail Improvements Front and backcountry trail maintenance, 1, 2, 3, 4, 5, 6, 7 Statewide $90,000 $13,000 $103,000

rehab, reconstruction, re-routes and new

construction on Colorado State Parks lands

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2008 Winter Recreation Trails Purchase Snow Trail Replace 1996 Piston Bulley 300 with a newer 1, 2, 3, 4, 5, 6, 7 Statewide $45,000 $20,000 $65,000

Equipment model snowcat to groom winter recreation

trails for 30,000 users (including a new user

group, the hybrid motorized

skier/snowboarder) from November through

May

CO 2008 Winter Recreation Trails Purchase Snow Trail 1,840 hours of volunteer grooming and 1, 2, 3, 4, 5, 6, 7 Statewide $37,500 $37,500 $75,000

Equipment maintenance of 110 miles of

snowmobile/multi-use winter sport trails.

Purchase 4WD wrecker truck with rollback

bed to transport snow groomer to 8 wide

spread winter sport trailheads for grooming

CO 2008 Winter Recreation Trails Purchase Snow Trail Replacement groomer for member-owned 1, 2, 3, 4, 5, 6, 7 Statewide $11,037 $53,963 $65,000

Equipment 1988 snowcat with 14,000 hours for multi-use

winter recreation trail system (for

snowmobiles, cross country skiing,

snowshoeing, and dogsledding). Trail system

receives 50-75 weekday users and over 200

weekday...

CO 2008 Winter Recreation Trails Purchase Snow Trail Purchase new snow cat to groom winter trails 1, 2, 3, 4, 5, 6, 7 Statewide $65,000 $90,000 $155,000

Equipment system, which the club has been grooming

for multi-use winter recreation for 20 years.

The Club also builds alpine ski tracks

alongside the snowmobile trail on the Big

Meadows Trail.

CO 2008 Winter Recreation Trails Purchase Snow Trail Purchase 2006 Bombardier BR350 Groomer 1, 2, 3, 4, 5, 6, 7 Statewide $55,000 $104,000 $159,000

Equipment Snowcat to maintain 91, multi-use winter

recreation trails (for snowmobiles,

cross-country skiing, dog sledding,

snowshoeing, etc.)

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2009 Colorado State Parks Trails Trail Construction and Trail improvements and maintenance on 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $87,000 $13,262 $100,262

Renovation recreational and climbing access trails. Costilla, Crowley,

Project also includes re-routes, rehabilitation, Custer, Delta, Denver,

corridor clearing, and construction on Dolores, Douglas,

Colorado State Parks lands Eagle, El Paso, Elbert,

Fremont, Garfield,

Gilpin, Grand,

Gunnison, Hinsdale,

Huerfano, Jackson,

Jefferson, Kiowa, Kit

Carson, La Plata,

Lake, Larimer, Las

Animas, Lincoln,

Logan, Mesa, Mineral,

Moffat, Montezuma,

Montrose, Morgan,

Otero, Ouray, Park,

Phillips, Pitkin,

Prowers, Pueblo, Rio

Blanco, Rio Grande,

Routt, Saguache, San

Juan, San Miguel,

Sedgwick, Summit,

Teller, Washington,

Weld, Yuma

CO 2009 Winter Recreation Trails Purchase Snow Trail Replace 1996 groomer with 10,600 hours 1, 2, 3, 4, 5, 6, 7 Statewide $60,780 $22,720 $83,500

Equipment with 2004 groomer with 2,900 hours. Trail

system has been ranked by "Snowest"

magazine in the top 10 trail systems in the

U.S., with 36,000 snowmobiles on the system

annually.

CO 2009 Winter Recreation Trails Purchase Snow Trail Groomer purchase. Multi-use winter trail 1, 2, 3, 4, 5, 6, 7 Statewide $26,296 $26,593 $52,889

Equipment system for a 6-month winter season.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2009 Winter Recreation Trails Purchase Snow Trail Upgrade 1990 groomer with 11,000 hours 1, 2, 3, 4, 5, 6, 7 Statewide $7,396 $81,919 $89,315

Equipment with newer model. Trails good for novice to

intermediate recreationists.

CO 2009 Colorado State Parks Trails Support for Youth Corps and Support for 14 volunteer projects, a pilot 1, 2, 3, 4, 5, 6, 7 Statewide $53,903 $244,448 $298,351

Volunteer Trail Work 4-week volunteer trail crew, a 6-weeks of

Youth Corps project, and 8.2 miles of new

and reconstructed trail. Work will be done in

two National Forests and one National Park

(NP).

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2012 Statewide Trail Maintenance OHV Travel Management The Travel Management Signage project is a 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $10,782 $69,218 $80,000

Signage state-wide effort that works with all of the Costilla, Crowley,

federal and state land management agencies Custer, Delta, Denver,

and OHV clubs, both at the state and Field Dolores, Douglas,

Office levels. The goal is to get the best Eagle, El Paso, Elbert,

signage possible installed in the... Fremont, Garfield,

Gilpin, Grand,

Gunnison, Hinsdale,

Huerfano, Jackson,

Jefferson, Kiowa, Kit

Carson, La Plata,

Lake, Larimer, Las

Animas, Lincoln,

Logan, Mesa, Mineral,

Moffat, Montezuma,

Montrose, Morgan,

Otero, Ouray, Park,

Phillips, Pitkin,

Prowers, Pueblo, Rio

Blanco, Rio Grande,

Routt, Saguache, San

Juan, San Miguel,

Sedgwick, Summit,

Teller, Washington,

Weld, Yuma

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2013 Colorado OHV Trails OHV Travel Management The grant is being requested to augment the 1, 2, 3, 4, 5, 6, 7 Clear Creek, Conejos, $49,035 $85,965 $135,000

Signage 13 limited funds available to the land Costilla, Crowley,

management agencies for installing travel Custer, Delta, Denver,

management signage in the field to Dolores, Douglas,

implement the new Travel Management Eagle, El Paso, Elbert,

Plans being adopted in all of the National Fremont, Garfield,

Forests and on... Gilpin, Grand,

Gunnison, Hinsdale,

Huerfano, Jackson,

Jefferson, Kiowa, Kit

Carson, La Plata,

Lake, Larimer, Las

Animas, Lincoln,

Logan, Mesa, Mineral,

Moffat, Montezuma,

Montrose, Morgan,

Otero, Ouray, Park,

Phillips, Pitkin,

Prowers, Pueblo, Rio

Blanco, Rio Grande,

Routt, Saguache, San

Juan, San Miguel,

Sedgwick, Summit,

Teller, Washington,

Weld, Yuma

CO 2015 Safety and Education Training VOC seeks support to maintain participation 1, 2, 3, 4, 5, 6, 7 Statewide $44,907 $13,472 $58,379

in its traditional trail training program for

2015-2017 for 300 participants per year and

expand opportunities for Millennials and rural

residents by creating new and innovative

methods for delivering...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2015 Various OHV Trails 2015 Travel Management The project will permit the distribution of 1, 2, 3, 4, 5, 6, 7 Statewide $109,720 $21,944 $131,664

Signage travel management signage for installation in

the field. Funds from the grant will be used to

purchase fiberglass, wood, and steel sign

posts, numbers, letters, and "open to/closed

to" strip stickers. Some...

CO 2015 Winter Recreation Trails 2015 Snow Grooming Snow grooming to the 28 snow clubs in CO 1, 2, 3, 4, 5, 6, 7 Statewide $369,761 $73,952 $443,713

CO 2016 Fourteen Peaks Trails Sustainable Trail CFI will continue studying the conditions of 1, 2, 3, 4, 5, 6, 7 Statewide $45,000 $13,500 $58,500

Maintenance more than 30 Fourteen Peaks trails. Baseline

inventories will occur on 16 routes that were

not inventoried in 2011-13. Updated

inventories will occur on 12 routes initially

assessed in 2011. Compact trail...

CO 2017 Safety and Education VOC Stewardship Training Volunteers for Outdoor Colorado (VOC) will 1, 2, 3, 4, 5, 6, 7 Statewide $44,670 $13,401 $58,071

convert stewardship trainings to online

courses through Colorado State University

(CSU), expand the new Independent Steward

training in 3 Continental Divide Trail gateway

communities, and develop portable...

CO 2018 Safety and Education Responsible Recreation Motorized recreation education and safety 1, 2, 3, 4, 5, 6, 7, 8 Statewide $139,921 $90,079 $230,000

Campaign

CO 2018 Safety and Education Travel management signage Travel management signage 1, 2, 3, 4, 5, 6, 7, 8 Statewide $59,466 $25,534 $85,000

CO 2000 Ralston Creek Trail Construct Trail, Signage 1, 2, 4, 6, 7 Jefferson, Adams $50,000 $50,000 $100,000

CO 2017 Safety and Education Training Tool and Leaders The grantee seeks support to recruit and train 1, 2, 5, 8, 14, 15 Boulder, Larimer, $45,000 $13,500 $58,500

134 volunteer trail leaders, purchase a trailer Denver

to transport tools and materials to project

sites, purchase new trail tools including

crosscut and chain saws, and create online

refresher videos on...

CO 2003 Garden of the Gods Trail Construct Trail, Erosion Control 11 El Paso $40,800 $134,200 $175,000

CO 2002 Southern Improvements 12 El Paso $33,000 $55,000 $88,000

Greenway

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 1999 Union Pacific Railroad Trail Trail Construction Construction of an 8 foot wide concrete trail, 2 Larimer $20,000 $110,000 $130,000

5 foot wide path, fencing and seeding

CO 1999 South Platte River Trail Bridge Installation Construction of a new bridge to replace the 2 Jefferson $76,000 $113,100 $189,100

railroad in the Buffalo Creek flood,

construction 1/2 mile of new connecting trail,

parking

CO 1999 Continental Divide National Reconstruction and rehabilitation of up to 5 2 Larimer $9,500 $2,375 $11,875

Scenic Trail miles of eroded and braided trail above the

tree line on the Tonahutu

CO 2000 Devil's Backbone Nature Construct Trail, Bridges, Signage, Benches 2 Larimer $60,000 $91,300 $151,300

Trail

CO 2000 Niwot Trail and Cottontail Construct Trail, Signage, Bridge, Fencing 2 Boulder $200,000 $413,000 $613,000

Trail

CO 2002 Boulder Area Trails Mapping and Trail Guides Mapping 2 Boulder $11,800 $18,200 $30,000

CO 2002 Walnut Creek Trail Trail Construction Construct Trail 2 Jefferson $14,700 $24,500 $39,200

CO 2002 Summit County Commons Trail Construction Construct Trail 2 Summit $15,000 $27,293 $42,293

Bikepath

CO 2002 Hayden Green Mountain Trail Construction Construct Trail 2 Jefferson $14,240 $29,200 $43,440

Park Summit Loop Trail

CO 2002 Two Ponds National Wildlife Bridge Installation Bridges 2 Jefferson $15,920 $45,135 $61,055

Refuge

CO 2002 Rimrock Open Space Trail Trail Construction Construct Trail 2 Larimer $51,000 $114,400 $165,400

CO 2002 Bear Creek National Trail Construction Construct Trail 2 Ouray $83,886 $300,000 $383,886

Recreation Trail

CO 2002 Grand Lake Winter Trail Improvements Grooming 2 Eagle $20,332 $5,083 $25,415

CO 2002 Vail Pass National Winter Trail Improvements Grooming 2 Eagle, Summit $8,500 $2,125 $10,625

Recreation Trail

CO 2002 Golden Gate Canyon State Trail Construction Construct Trail 2 Jefferson $9,250 $2,313 $11,563

Park Trails

CO 2002 Trail and Bridge Construction Construct Trail, Bridges, Maintenance 2 Larimer $9,250 $2,313 $11,563

CO 2002 Vail Redstone Road to Winter Trail Improvements Grooming 2 Summit $8,589 $2,147 $10,736

Muddy Pass

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2003 Dillon, Georgetown, Winter Colorado Mountain Club Maintenance, Signage 2 Jefferson $3,000 $1,000 $4,000

Park, CDTA Route Annual Trail Program

CO 2003 Two Ponds National Wildlife Improvements 2 Jefferson $15,000 $7,557 $22,557

Refuge Trail

CO 2003 Mitchell Lake Forest Lakes, Trailhead, Improvements 2 Boulder, Gilpin $6,200 $8,600 $14,800

South Boulder Creek Trail

CO 2004 Buffalo Creek Recreation Trail Improvements Continued trail maintenance and 2 Jefferson $14,300 $10,694 $24,994

Area Trails reconstruction on the Buffalo Creek Area

Trails. Projects include: 1. Colorado Trail

Re-route 1 - 0.3 miles and rehabilitation 2.

Colorado Trail Re-route 2 - 0.1 miles and

rehabilitation 3. Switchback Maintenance

on...

CO 2004 East Eagle Trails Trail Construction Develop a non-motorized trail system on BLM 2 Eagle $11,000 $11,000 $22,000

land adjacent to the Town of Eagle. The

system will consist of 6.6 miles of single track

trails and 7.2 miles of two track trails and

roads. This area is heavily used by hikers,

bikers, runners and...

CO 2004 T1N, R73W, Section 33 Trail and Habitat Restoration Wildlands Restoration Volunteers (WVR) will 2 Boulder $14,400 $30,588 $44,988

T1S, R73W, Section 4 conduct five trail and habitat restoration

projects in 2004 at popular, heavily used, and

heavily impacted sites. These sites are

located in the Indian Peaks and James Peaks

Wilderness areas and other...

CO 2004 Buffalo Mountain Trail Trail Construction The Buffalo Mountain trail construction 2 Summit $18,900 $31,235 $50,135

project is proposed to construct 7,738 of new

trail on the eastern shoulder of Buffalo

Mountain (elevation 12,777 feet).

Approximately 40% of the trail is above tree

line in talus. The existing user-created...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2004 Glenwood Springs Field OHV Trail Crew Hire an OHV Trail Crew for six months and 2 Eagle $34,000 $35,500 $69,500

Office Trails the Rocky Mountain Youth Corps for two

weeks to construct and maintain OHV trail

systems in the Glenwood Springs Field

Office. Ongoing duties will include: maintain

and improve trails, build new trails where...

CO 2004 Yeoman Park Year-Round Trail and Trailhead The trail project is located in Eagle County, 2 Eagle $72,500 $81,300 $153,800

Trail Construction on the White River National Forest. The

project is approximately 15 miles south of the

town of Eagle and adjacent to the Yeoman

Park campground. The project will complete

a 2 mile loop fishing access and...

CO 2004 Swan Mountain Recreational Trail Construction The objective of this overall project is to 2 Summit $100,000 $454,000 $554,000

Pathway complete the recpath loop around Dillon

Reservoir through the construction of a safe,

enjoyable grade separated recpath to

connect the areas of Keystone/Snake River

Basin and Breckenridge/Upper Blue Basin....

CO 2005 White River National Forest Winter Trail Improvements Groom and maintain 28 miles of snowmobile 2 Summit $1,029 $2,271 $3,300

trails from Tiger Road in Breckenridge to the

summit of

CO 2005 Fraser to Granby Trail Capital Equipment We are requesting $12,000 in order to 2 Grand $12,000 $3,000 $15,000

Acquisition, Purchase Trail acquire a small earthmoving machine and a

Maintenance Equipment trailer for use in both maintenance and new

trail construction on the Fraser-to-Granby

Trail. We have constructed approximately 8.5

miles of the Fraser-to-Granby Trail,...

CO 2005 White River National Forest Winter Trail Improvements Groom and maintain 59 miles of snowmobile 2 Eagle $4,412 $10,588 $15,000

trails in Eagle County in the White River

National Forest

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2005 Ypsilon Lake Trail Conservation Corps Support This project will utilize an SCA crew of 6 2 Larimer $15,000 $32,535 $47,535

and Trail Construction students and two crew leaders working

directly with a NPS trail crew on the Ypsilon

Lake Trail. The objective of this project is to

perform needed maintenance on drainage

structures, brush the 4.5 mile trail...

CO 2005 Winter Trail Improvements Groom and maintain 104 miles of 2 Grand $882 $101,118 $102,000

snowmobile trails in the Arapaho National

Forest

CO 2005 Wildlife Restoration Trail Improvements and Wildlands Restoration Volunteers (WRV) will 2 Boulder $14,900 $185,100 $200,000

Volunteers 2005 Partnership Construction conduct seven trail/stewardship projects in

for Stewardship 2005 at popular, heavily used and impacted

sites. Sites include: Lake Isabelle,

Sourdough, Pawnee Pass, and Forest Lakes

trails in the Indian Peaks and ...

CO 2005 Mule Deer Trail Re-route Trail Re-route Reroute old trail to lessen the erosion of the 2 Jefferson $0 Unknown $0

current trail and make people less likely to cut

the trail

CO 2006 Trails, Pyramid Fourteener's Highline and Grip hoists and highline trams will be used on 2 Jefferson $9,800 $4,580 $14,380

Peak Trails Grip hoist Equipment two of CFIs construction and restoration

projects currently underway, on Mt. Evans

and . On both mountains, rock

sources critical to trail work and restoration

are located either hundreds...

CO 2006 National Grays Peak National The Grays Peak NRT Maintenance and 2 Clear Creek $13,000 $12,020 $25,020

Recreation Trail Recreation Trail Restoration Project will complete much

Maintenance and needed trail maintenance on the Grays Peak

Restoration National Recreation Trail. Efforts will focus on

closing and restoring many of the social trails

that exist, between 10,400 feet and...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2006 Lory Trail Lory Trail Maintenance Lory The 2006 Youth Corps project will focus on 2 Larimer $0 $15,600 $15,600

State Park maintenance of the most heavily used trails in

Lory State Park. Maintenance is an annual

need for the trails at Lory State Park. The

park would like to have general maintenance

performed on all of the trails...

CO 2006 Continental Divide National CDT Construction Volunteer The Continental Divide Trail Alliance requests 2 Jefferson $22,218 $39,504 $61,722

Scenic Trail and Youth Corps a grant from Colorado State Parks that will

incorporate volunteers and Youth Corps

crews to complete 21 miles of new trail in four

project areas. This work will be completed by

more than 550 volunteers...

CO 2006 Twin Owls Trail This grant request is for an AmeriCorps 2 Larimer $22,400 $66,640 $89,040

camping crew to assist the trail crew of Rocky

Mountain National Park (RMNP) in the

construction of a new 0.7 mile trail for 4

weeks during the summer of 2006. The Twin

Owls Trail to be constructed in 2006 is...

CO 2006 Lake Irene Trail The Lake Irene trail project will reconstruct 2 Larimer $13,000 $122,200 $135,200

0.5 mile of trail to provide a sustainable,

resource-protecting, and user-friendly trail

and handicap accessible picnic area to

visitors traveling along Trail Ridge Road on

the west side of Rocky Mountain...

CO 2006 Vail Pass Area Winter Trails Vail Pass Winter Recreation Groom and maintain 26 miles of snowmobile 2 Eagle $2,163 $541 $2,704

Area trails in the Vail Pass Area.

CO 2006 Red Sandstone Trail Snowmobile Trails In White Groom and maintain 59 miles of snowmobile 2 Eagle $3,817 $954 $4,771

River National Forest trails in Eagle County in the White River

National Forest

CO 2006 Grand Lake Winter Trails Grand Lake Trail System Groom and maintain 104 miles of 2 Grand $35,127 $8,782 $43,909

snowmobile trails in the Arapaho National

Forest

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2006 Arapaho National Forest North Park Grooming Groom and maintain 81 miles of snowmobile 2 Jackson $37,036 $9,259 $46,295

Winter Recreation Trails trails in Jackson County that includes Gould,

Illinois Pass, Bull and Owl Mountains

CO 2006 Swan Valley Winter Trails Swan Valley Groom and maintain 28 miles of snowmobile 2 Summit $127 $32 $159

trails from Tiger Road in Breckenridge to the

summit of Georgia Pass

CO 2007 White River National Forest Winter Trail Improvements Groom and maintain 59 miles of snowmobile 2 Eagle $2,588 $647 $3,235

Snowmobile Trails trails in Eagle County in the White River

National Forest

CO 2007 Vail Pass Snowmobile Trails Winter Trail Improvements Groom and maintain 26 miles of snowmobile 2 Eagle $1,972 $493 $2,465

trails in the Vail Pass Area

CO 2007 Arapaho National Forest Winter Trail Improvements Groom and maintain 104 miles of 2 Grand $123 $31 $154

Winter Recreation Trails snowmobile trails in the Arapaho National

Forest

CO 2007 Fraser to Granby Trail Trail Construction New construction of 3 miles of the Fraser to 2 Grand $24,300 $6,075 $30,375

Granby Trail within the town limits of Granby,

CO. Trail will be a five foot wide, natural

surface, multi-use, non-motorized trail. 10

small signs with routed posts, one large

trailhead sign, and on posts...

CO 2007 Summit Trail Loop Trail Construction This project is intended to add 1-2.5 miles of 2 Jefferson $9,300 $2,325 $11,625

new trail at the summit of Green Mountain at

Hayden Green Mountain Park (in Lakewood)

to work towards completing a 4.5 mile

Summit Loop Trail. The completed loop will

expand access for users and reduce...

CO 2007 Eagles Nest Trail Trail Maintenance There are 219 miles of trail in the Dillon 2 Summit $15,000 $3,750 $18,750

Ranger District. 113 of those are wilderness

trails, 3.5 are motorized trails (ATV and

Motorcycle). In 2007 the volunteer groups

identified in this proposal will maintain 14

miles. Wheeler Lakes (3.4 mi),...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2007 Georgia Pass Snowmobile Winter Trail Improvements Groom and maintain 28 miles of snowmobile 2 Summit $246 $62 $308

Trails trails from Tiger Road in Breckenridge to the

summit of Georgia Pass

CO 2008 Red Mountain and Hermit Purchase Trail Construction Purchase Bobcat MT52 Trail Building 2 Larimer $5,500 $7,000 $12,500

Park Open Spaces Equipment Machine to construct 20 miles of new trails

between Red Mountain and Hermit Park

Open Spaces. Construct portions of new

trails at area reservoirs identified in 07 Master

Plan, used to maintain 70 miles of existing...

CO 2011 Georgetown/Guanella Trail Georgetown/Guanella Trail The proposed trail follows the overgrown, but 2 Clear Creek $39,000 $11,700 $50,700

Bridge Bridge still evident, 1872 Georgetown and Chicago

Lake Wagon Road footprint along the south

branch of South Clear Creek (aka

Leavenworth Creek). It is inaccessible for

lack of a bridge. The trail starts at the...

CO 2012 McCullough Gulch Trail, 2012-2013 Friends of the This proposal would improve two 2 Summit $34,600 $10,380 $44,980

Soda Creek Trail System Dillon Ranger District non-motorized recreational trails in Summit

Stewardship Program County: 1)McCullough Gulch Trail, an

extremely popular multi-use trail near the

towns of Breckenridge and Blue River that

provides access to a spectacular waterfall

viewing...

CO 2012 PAW's Empire Research PAW's Empire Research PAW's Empire Research Trail (PERT) project 2 Clear Creek $132,966 $39,889 $172,855

Trail Trail is made up of two parts. The first is an

accessible interpretive trail telling the history

of Berthoud Pass. The trail will also serve as

an outdoor classroom for those interested in

new methods of trail...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2012 Dillon Ranger District Winter High Country New Groomer High Country Snowmobile Club proposes to 2 Grand $45,000 $2,000 $47,000

Recreation Trails purchase a used 1985 Pisten Bully, 130D

(5,300 hours). We feel this machine with its

narrow, eight foot width and a mechanical

tiller would be the ideal machine to maintain

the current trails. While the...

CO 2013 Fraser River Trail Trail Sign Program Grand County boasts over 600 miles of trails, 2 Grand $33,000 $9,900 $42,900

the majority of which exist on the public lands

that surround its neighboring communities,

but also includes many family-friendly trails,

which are located within town limits. The

in-town trails are used...

CO 2013 McCullough Gulch Trail, 2013-14 Friends of the Dillon This proposal would improve two 2 Summit $44,450 $13,335 $57,785

Peaks Trail Ranger District Stewardship non-motorized recreational trails on Summit

Projects County: 1) McCullough Gulch Trail, an

extremely popular multi-use trail near the

towns of Breckenridge and Blue River that

provides access to a spectacular waterfall

viewing...

CO 2014 Aspen Alley Trail, Galena Golden Horseshoe Trail The Golden Horseshoe Trail Partnerships 2 Summit $100,000 $30,000 $130,000

Summit Connection Trail, Partnerships project involves the creation of new trails, trail

Galena Extension Trail, Rich realignments, and maintenance on seven

Gulch Trail, Turk's Trail, non-motorized trails. The trails are located

Weber Gulch Trail, ZL Trail directly adjacent to the Town of Breckenridge

on jointly-owned...

CO 2014 Lake Estes and Homer Lake Estes and Homer The Homer Rouse and Lake Estes Trails 2 Larimer $45,000 $13,500 $58,500

Rouse Trail Rouse Trails Flood were damaged during the 2013 September

Reconstruction Flood. Each of these trails are part of integral

connections and avenues for transportation in

the Estes Valley. Both trails combined

experienced approximately $230,450.00...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2014 Arrow Trail Arrow Trail System The Town of Winter Park is proposing to 2 Grand $36,000 $10,800 $46,800

create a non-motorized trail system to allow

users access to the Idlewild Trail System

from downtown Winter Park. Public access to

the Idlewild Trail System is extremely limited

and the Town has worked with a...

CO 2015 Colorado Trail CFRT-Loveland to Fort The Colorado Front Range Trail Loveland to 2 Larimer $128,300 $38,490 $166,790

Collins Connection Fort Collins Connection is a 2.2-mile, 10-foot

wide concrete trail that will connect 49 miles

of concrete trail in Fort Collins with 17 miles

of concrete trail in Loveland. Once complete,

over 65 paved...

CO 2015 North Sourdough Trail Priority 1 Trail Repairs: Flood Damaged Project # 1: North 2 Boulder $44,413 $13,324 $57,737

Boulder Ranger District Sourdough Trail (USFS #835) Project

Scope/Deliverables: ...

CO 2016 Summit Trail Summit Trail Connections In 2016 and 2017, the Town of Breckenridge 2 Summit $169,950 $50,985 $220,935

and Summit County Government will

construct seven natural surface,

non-motorized trail connections and restore

an existing unsustainable route in the Upper

Blue Basin of Summit County and the

greater...

CO 2016 Cataract Lake Bridge Cataract Lake Bridge Replace the deteriorating outlet bridge at 2 Summit $33,780 $10,134 $43,914

Lower Cataract Lake with a new 35 foot

bridge using both USFS and Rocky Mountain

Youth Corp crews. The old bridge would be

removed in fall of 2017 using a Colorado

Correction Industries Crew.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2017 Clear Creek Greenway Clear Creek Greenway Clear Creek County will build .3 miles of the 2 Clear Creek $250,000 $75,000 $325,000

Peaks to Plains - Clear Creek Greenway in

narrow, rugged Clear Creek Canyon. The

vision of the Peaks to Plains Trail is a 65-mile

trail corridor that passes through 3 counties

and 7 cities with a 5,600...

CO 2017 Missing Link Trail Missing Link Trail Medicine Wheel Trail Advocates, in 2 El Paso $78,802 $35,378 $114,180

partnership with Colorado Springs Utilities, is

proposing to build approximately 4 miles of

multi-purpose, natural surface trail which will

connect the (trail to the top of Pikes

Peak) to Jones Park and...

CO 2004 Routt Snow Cat Purchase Snow Trail Replacement of 1996 Bombardier snowcat 2, 3 Routt, Grand, Jackson $43,000 $43,000 $86,000

Equipment which is used for the construction and

maintenance of winter snow trails on Rabbit

Ears Pass & Buffalo Pass in the Routt

National Forest. The 110 mile trail system

spans three counties, providing economic...

CO 2000 Trail, Grays Erosion Control, Trail Development 2, 3, 5 Chaffee, Clear Creek, $155,000 $699,700 $854,700

Trail, Torreys Trail Custer, Summit,

Saguache

CO 2018 Statewide Regional 14er Statewide Regional 14er Maintain 14.15 miles of trail, 2.2 miles of 2, 3, 5 Multiple Counties $200,000 $60,000 $260,000

Maintenance Maintenance intensive trail reconstruction and close,

stabilize and restore 2.86 miles of old social

trails during the 2019 and 2020 summer field

seasons on 19 14,000-foot peaks across

Colorado.

CO 2002 Continental Divide National Maintenance 2, 4 Boulder, Douglas $3,000 $28,000 $31,000

Scenic Trail

CO 2011 West Magnolia Trail, Hewlett Wildlands Restoration West Magnolia Trail Project:... 2, 4 Boulder, Larimer $45,000 $13,500 $58,500

Gulch Trail, Summit Lake Volunteers (WRV) 2011

Trail, Mount Evans Partnership for Stewardship

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2018 Various Rampart Range general trail General trail maintenance and restoration 2, 4, 5 Denver, Teller, El $127,500 $72,500 $200,000

maintenance Paso

CO 2003 Trails On Colorado Trail Construction and Construct Trails, Improvements 2, 5, 16 Statewide $147,920 $411,080 $559,000

Fourteeners Improvements

CO 2018 Winter Recreation Trails 2018 Snow Grooming Trail grooming and signing 2, 5, 6, 7 Statewide $87,061 $51,118 $138,179

CO 2018 Winter Recreation Trails 2018 Snow Grooming Trail grooming and signing 2, 5, 6, 7 Statewide $148,968 $62,344 $211,312

CO 2018 Winter Recreation Trails 2018 Snow Grooming Trail grooming and signing 2, 5, 6, 7 Statewide $216,797 $143,712 $360,509

CO 2000 Big Dry Creek National Construct Trail 2, 6 Adams, Jefferson $50,000 $685,000 $735,000

Recreation Trail

CO 2005 Big Dry Creek National Trail Renovation Big Dry Creek Trail Restoration #10 2, 6 Adams, Jefferson $0 Unknown $0

Recreation Trail

CO 2014 Brainard Lake Trail, Bergen WRV 2015 Partnership for Wildlands Restorations Volunteers (WRV) will 2, 7 Boulder, Jefferson, $35,953 $10,785 $46,738

Peak Trail, Genesee Stewardship conduct FIVE trail projects in 2014-15 at Adams

Flagstaff Trail, Barr Lake popular, heavily used and impacted sites.

Bergman Trail Sites include: Brainard Lake Trails, Bergen

Peak Trail, Genesee Flagstaff Trail, Eldorado

Canyon Flood Trail Repairs and...

CO 2015 State Tools and Equipment WRV 2015-2017 Trail WRV will undertake a two-year project to 2, 7, 6 Multiple along the $36,772 $11,032 $47,804

Volunteer Leadership, Tool, increase our ability to serve trail needs of Colorado Front Range

& Infrastructure Colorado land agency partners, building

capacity sufficient to execute multiple trail

projects per day, both within and outside

Wilderness. With support, WRV will:...

CO 2002 Grange Hall Creek Trail Trail Construction Construct Trail 23 Adams $149,400 $249,000 $398,400

CO 1994 Trail 3 Routt $19,007 $20,000 $39,007

CO 1994 Uncompahgre River Trail Construction Construct 3,000 feet of an 8 foot wide 3 Montrose $87,800 $67,800 $155,600

concrete trail

CO 1997 Fraser River Trails Trail Construction Continuation of the Fraser River Trail over 3 Grand $50,000 $86,500 $136,500

1.5 miles towards Winter Park

CO 1997 Fraser River Trails Trail and Bridge Construction Installation of a 186 foot bridge across 3 Routt $40,000 $1,920,900 $1,960,900

Walton Creek and adjacent trail

improvements

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 1999 Bear Creek National Trail Construction Construction of a .33 mile asphalt trail which 3 Ouray $60,000 $86,600 $146,600

Recreation Trail will link Pikes Peak Greenway with Bear

Creek Park

CO 1999 Jarvis Trail Construction of a 12 foot wide concrete trail 3 Mesa $15,000 $97,700 $112,700

CO 1999 Animas River Greenway Design and construction of 400 linear feet of 3 La Plata $30,000 $135,000 $165,000

a 10 foot wide concrete trail located between

15th Street and the Swinging Bridge

CO 1999 Trail Trail Improvements Construction of Summit Trails, closure of 3 Denver $13,000 $228,629 $241,629

Social Trails, restoration of eroded and

trampled areas

CO 1999 Old Fruita Bridge/Dinosaur Bridge Improvements Restoration of the 400 foot long Fruita 3 Mesa $60,000 $243,200 $303,200

Trail Bike/Pedestrian Bridge, construction of 2 mile

pedestrian/bike trail

CO 1999 Trestle Trailhead Trail and Trailhead Construction of a 9.5 mile natural surface 3 La Plata $44,384 $11,096 $55,480

Construction trail, restoration of the Trout Lake Trestle

Trailhead

CO 1999 Runyon Commuter Trail Trail Construction Construction of 1,050 linear feet of a 10 foot 3 Pueblo $0 Unknown $0

wide concrete trail with soft surface paths

where possible

CO 1999 Yampa River Trail Core Bridge Installation Construction of a bridge to span Walton 3 Routt $0 Unknown $0

Extension Creek and a 3,000 foot long, 10 foot wide

gravel Fitness Trail

CO 2000 Crag Crest National Crag Crest National Construct Trails 3 Delta $20,000 $20,000 $40,000

Recreation Trail Recreation Trail

CO 2000 Galloping Goose Trail Construct Trail 3 San Miguel $47,000 $67,100 $114,100

CO 2000 Avon to Edwards Trail Construct Trail 3 Lake, Routt $71,000 $84,000 $155,000

CO 2000 Pagosa Area Trails Construct Trail 3 Archuleta $65,000 $90,200 $155,200

CO 2000 Yampa River Core Trail Construct Trail 3 Routt $130,000 $184,000 $314,000

CO 2000 Bear Creek National Bear Creek Trail Construct Trail, Parking Lot, Bridge 3 Ouray $77,000 $304,620 $381,620

Recreation Trail

CO 2000 Bear Creek National Construct Trail 3 Ouray $175,000 $532,000 $707,000

Recreation Trail

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2001 Sangre De Cristos Trail Renovation and Trail Renovation, Relocation 3 Rio Grande $17,000 $42,454 $59,454

Relocation

CO 2001 18 Road Trails Parking Lot, Info Kiosk, Shelter, Restrooms 3 Mesa $23,700 $50,000 $73,700

CO 2001 Cuchara Multi-Use Trail Construct Trail, Signage 3 Huerfano $27,000 $66,500 $93,500

CO 2001 Steamboat Lake Trails Winter Trail Improvements Trail Grooming 3 Routt $92,000 $184,000 $276,000

CO 2002 Flattops-West Elk Trails Winter Trail Improvements Restrooms 3 Garfield, $22,668 $500 $23,168

CO 2002 South Fork, Del Norte, Purchase Snow Trail Purchase Equipment 3 Rio Grande, Mineral $15,000 $550 $15,550

Creede Area Trails Equipment

CO 2002 South Fork, Del Norte, Purchase Trail Maintenance Portable Restrooms 3 Rio Grande $4,000 $1,500 $5,500

Creede Area Trails Equipment

CO 2002 Steamboat Lake Shelter Purchase Shelter 3 Routt $6,000 $4,000 $10,000

CO 2002 Uncompahgre Riverwalk Construct Trail 3 Ouray $9,800 $5,750 $15,550

CO 2002 North Park Trails Trail Maintenance Maintenance 3 Jackson $33,000 $19,300 $52,300

CO 2002 Rocky Mountain Youth Trail Construction and Construct Trail, Maintenance 3 Routt $15,300 $29,400 $44,700

Corps Trails Maintenance

CO 2002 Calico National Recreation Upper Calico OHV Trail Construct Trail, Maintenance 3 Dolores, Montezuma $20,400 $31,700 $52,100

Trail

CO 2002 Northwest Colorado Purchase Snow Trail Purchase Equipment 3 Moffat, Routt, Rio $45,000 $35,000 $80,000

Snowmobile Club Equipment Blanco

(NOWECOS) Black

Mountain Trails

CO 2002 Trail Construct Trail Boardwalk, Signage 3 Lake $15,000 $73,100 $88,100

CO 2002 Trail Construction and Construct Trail, Campsites, Fence 3 Archuleta, La Plata $15,300 $3,825 $19,125

Improvements

CO 2002 Winter Trail Improvements Grooming 3 Archuleta $12,100 $3,025 $15,125

Trails

CO 2002 Ophir Creek Trails Winter Trail Improvements Grooming 3 Custer $10,500 $2,625 $13,125

CO 2002 Mairon, Trail Gulch, Flag Purchase Trail Maintenance Purchase Equipment 3 Delta, Mesa, Pitkin, $8,400 $2,100 $10,500

Pole Mountain Equipment Garfield

CO 2002 North Fork Area Winter Trail Improvements Grooming 3 Delta, Montrose, $16,200 $4,050 $20,250

Gunnison

CO 2002 Install Fencing Fence 3 Dolores $15,300 $3,825 $19,125

CO 2002 Lake Trail Trail Construction Construct Trail 3 Eagle $10,200 $2,550 $12,750

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2002 Southern and Eastern Purchase Snow Trail Purchase Equipment 3 Garfield $7,000 $1,750 $8,750

Flattops Equipment

CO 2002 Rifle Creek Trail, Coulter Winter Trail Improvements Grooming 3 Garfield, Rio Blanco $22,500 $5,625 $28,125

Mesa Trail, Flattops Trails

CO 2002 Jackson County Winter Winter Trail Improvements Grooming 3 Jackson $13,949 $3,487 $17,436

Recreation Trails

CO 2002 Calamity Pass Restrooms 3 Jackson $15,000 $3,750 $18,750

CO 2002 National Forest Winter Trail Improvements Grooming 3 Mesa $19,318 $4,830 $24,148

CO 2002 Uncompahgre National Winter Trail Improvements Grooming 3 Montrose, Delta, $12,151 $3,038 $15,189

Forest Ouray

CO 2002 Uncompahgre and Gunnison Purchase Trail Maintenance Purchase Equipment 3 Montrose, Gunnison, $6,980 $1,745 $8,725

National Forest Equipment Ouray

CO 2002 White River Purchase Snow Trail Purchase Equipment 3 Rio Blanco $10,000 $2,500 $12,500

Equipment

CO 2002 Meeker Winter Trail Improvements Grooming 3 Rio Blanco $15,200 $3,800 $19,000

CO 2002 South Fork, Del Norte, Purchase Trail Maintenance Purchase Equipment 3 Rio Grande $13,930 $3,483 $17,413

Creede Area Trails Equipment

CO 2002 Creede Area, Rio Grande Build Structure Build Structure 3 Rio Grande $3,000 $750 $3,750

National Forest

CO 2002 Beaver Trails System Purchase Snow Trail Purchase Equipment 3 Rio Grande $27,000 $6,750 $33,750

Equipment

CO 2002 South Fork Winter Trail Improvements Grooming 3 Rio Grande $25,200 $6,300 $31,500

CO 2002 South Fork, Creede, Del Winter Trail Improvements Grooming 3 Rio Grande, $32,572 $8,143 $40,715

Norte Saguache

CO 2002 Bears Ears Trail Maintenance, Signage 3 Routt $12,000 $3,000 $15,000

CO 2002 Routt National Forest Winter Trail Improvements Grooming 3 Routt $0 Unknown $0

CO 2002 Trail Construction Construct Trail 3 Routt $10,200 $2,550 $12,750

CO 2002 Steamboat Lake Winter Trail Improvements Grooming 3 Routt $13,752 $3,438 $17,190

CO 2002 Silverton Purchase Snow Trail Purchase Equipment 3 San Juan $5,000 $1,250 $6,250

Equipment

CO 2002 Silverton Purchase Snow Trail Purchase Equipment 3 San Juan $5,700 $1,425 $7,125

Equipment

CO 2002 Silverton Winter Trail Improvements Grooming 3 San Juan, Ouray $0 Unknown $0

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2002 Area Trails Winter Trail Improvements Grooming 3 San Miguel $10,802 $2,701 $13,503

CO 2003 Rocky Mountain Youth Maintenance 3 Routt $12,000 $3,000 $15,000

Corps Trails

CO 2003 Little Red Park Restroom, Signage, Maintenance 3 Routt $6,000 $1,500 $7,500

CO 2003 Calico National Recreation Calico OHV Trail Maintenance, Improvements, Signage 3 Dolores, Montezuma $33,000 $4,000 $37,000

Trail

CO 2003 Spring Gulch Trail Purchase Equipment 3 Garfield, Pitkin $15,000 $5,995 $20,995

CO 2003 West Elk Trailhead Restroom 3 Garfield $14,900 $10,000 $24,900

CO 2003 Nowecos Purchase Equipment 3 Moffat $15,000 $16,000 $31,000

CO 2004 Gunnison County Winter Purchase Snow Trail Purchase a Generation II Groomer from 3 Gunnison $16,500 $1,900 $18,400

Recreation Trails Equipment Maxey manufacturing in Fort Collins,

Colorado. The total price with tax is 18,000

dollars.

CO 2004 T46N, R10W Purchase Snow Trail Purchase grooming equipment to better 3 Montrose $8,500 $2,830 $11,330

Equipment groom 80 miles of trails

CO 2004 Wilson Mesa Trail The Wilson Mesa Trail is an 11-mile long 3 San Miguel $24,500 $5,300 $29,800

Improvement Project motorized trail on the southern edge of

Wilson Mesa, approximately 7 miles

southwest of Telluride, Colorado (Map A).

The trail is open to motorcycles, mountain

bikes, equestrians, and foot traffic. The trail...

CO 2004 Ophir Creek Snowmobile Winter Trail Improvements This grant request will fund four weeks of 3 Fremont $15,000 $9,555 $24,555

Trail System Western Colorado Conservation Youth Corps

time. A crew of 8-10 workers will construct

approximately twenty, 20-foot sections of

buck and pole fence trail intersections where

snowmobile trails lead off...

CO 2004 Overlook Trail Trail Relocation This project is located on the Hahns 3 Routt $12,000 $12,000 $24,000

Peak/Bears Ears Ranger District, Routt

National Forest, and approximately 25 miles

north of Steamboat Springs, CO. The current

trail is primarily used by the Elk River Guest

Ranch for horseback rides and runs...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2004 Uncompahgre Valley Snow Purchase Snow Trail The Uncompahgre Valley Trail Riders 3 Montrose, Gunnison, $30,000 $26,000 $56,000

Trails Equipment requests a grant for matching funds to Ouray

purchase a Snow Cat and a used pickup to

be used for grooming snowmobile trails. The

Uncompahgre Valley Trail Riders need to

replace the Snow Cat that is currently owned

as it...

CO 2004 Various Trails Volunteer Trail Crew Support RFOV is bundling together our trail projects 3 Eagle, Pitkin $15,000 $55,000 $70,000

to be constructed by volunteers during our

2003 project season. All four projects are

located within RFOV's service area of our

regional community of Rifle to Aspen: Jeanne

Golay Trail is located on City...

CO 2005 Colorado State Forest, Routt Winter Trail Improvements Groom and maintain 81 miles of snowmobile 3 Jackson $3,529 $71 $3,600

National Forest trails in Jackson County that includes Gould,

Illinois Pass, Bull and Owl Mountains

CO 2005 Rio Grande National Forest Winter Trail Improvements Groom and maintain 96 miles of snowmobile 3 Mineral $3,677 $2,723 $6,400

trails between South Fork and Lake City in

the Rio Grande National Forest

CO 2005 Routt National Forest Winter Trail Improvements Groom and maintain 100 miles of 3 Routt $5,000 $7,000 $12,000

snowmobile trails in the northern part of Routt

County in the Routt National Forest

CO 2005 Uncompahgre National Winter Trail Improvements Groom and maintain 69 miles of snowmobile 3 Delta, Montrose, $2,353 $9,647 $12,000

Forest, Gunnison National trails in eastern Delta, northeastern Gunnison

Forest Montrose, and western Gunnison Counties

CO 2005 Stagecoach Overlook Trail This project will construct the Stagecoach 3 Routt $11,500 $12,160 $23,660

Overlook Trail, a new one mile trail segment

addition to the existing Lakeside Trail within

the Stagecoach Reservoir State Park. The

trail will be four feet wide and trail features

will include a crushed...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2005 San Juan National Forest Winter Trail Improvements Groom 100 miles of trails for snowmobile, 3 Archuleta, Mineral, $1,912 $13,088 $15,000

cross country skiing, and snowshoeing on Hinsdale

USDA Forest Service roads within Archuleta,

Mineral and Hinsdale Counties

CO 2005 Bears Ears Ranger District Winter Trail Improvements Groom and maintain 107 miles of 3 Moffat $5,000 $15,000 $20,000

Trails snowmobile trails in the Routt National Forest

CO 2005 Rio Grande National Forest Winter Trail Improvements Groom and maintain 76 miles of trails in the 3 Rio Grande $1,765 $16,035 $17,800

Del Norte, South Fork, and Creede areas of

the Rio Grande National Forest

CO 2005 Uncompahgre National Winter Trail Improvements Groom and maintain 79 miles of snowmobile 3 Montrose $1,324 $17,176 $18,500

Forest trails on the , Owl

Creek Pass, and Little Cimarron areas of the

San Juan National Forest

CO 2005 White River National Forest Winter Trail Improvements 3 Rio Blanco $294 $18,006 $18,300

CO 2005 Uncompahgre National Winter Trail Improvements Groom and maintain 84 miles of snowmobile 3 San Miguel $882 $19,118 $20,000

Forest, San Juan National trails in the Uncompahgre and San Juan

Forest National Forests in and around Norwood

CO 2005 Rabbit Ears Pass Trail Winter Trail Improvements Groom and maintain the 105 mile Rabbit 3 Routt $5,000 $20,000 $25,000

System Ears Pass Trail System in the Routt National

Forest

CO 2005 White River National Forest Winter Trail Improvements Groom and maintain 80 miles of trails that 3 Garfield $4,118 $21,082 $25,200

Trails include the transfer trail from Glenwood

Springs across the southern end of the Flat

Tops Wilderness Area and the Coffee Pot

road from Dotsero to Deep Lake and

connecting to the Rifle Trail System

CO 2005 Winter Trail Improvements Groom and maintain 55 miles of snowmobile 3 Gunnison $1,765 $22,635 $24,400

Winter Recreation Trails trails in the Kebler Pass, Ohio Creek, Splain's

Gulch, Lost Lake, and Irwin areas of

Gunnison County

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2005 White River National Forest Winter Trail Improvements Groom and maintain 105 miles of 3 Garfield $5,000 $23,400 $28,400

snowmobile trails from Sunlight Ski Area to

Electric Mountain Lodge, and other trails in

the Glenwood Springs, Carbondale, Silt and

Grand Mesa area

CO 2005 Sunlight to Powderhorn Winter Trail Improvements Groom and maintain the 121 miles of the 3 Delta $5,000 $27,000 $32,000

Sunlight to Powderhorn snowmobile trail

system

CO 2005 Rio Grande Forest Winter Winter Trail Improvements Groom and maintain 128 miles of groomed 3 Rio Grande $4,853 $27,647 $32,500

Recreation Trails trails in the Rio Grande National Forest

CO 2005 White River National Forest Winter Trail Improvements Groom and maintain 91 miles of trails in the 3 Garfield $4,706 $27,694 $32,400

White River National Forest

CO 2005 Uncompahgre National Winter Trail Improvements Groom and maintain 100 miles of 3 Hinsdale $4,412 $31,688 $36,100

Forest snowmobile and cross-country trails in the

Uncompahgre National Forest in and around

Lake City

CO 2005 White River National Forest, Winter Trail Improvements Groom and maintain 105 miles of 3 Garfield $2,647 $37,353 $40,000

Dillon and Holy Cross snowmobile trails from Sunlight Ski Area to

Electric Mountain Lodge, and other trails in

the Glenwood springs, Carbondale, Silt and

Grand Mesa area

CO 2005 San Juan National Forest Winter Trail Improvements Groom, maintain, and sign 100 miles of 3 La Plata $5,000 $45,200 $50,200

snowmobile trails in the San Juan National

Forest

CO 2005 T5S, R88W, Sections 2, 4, 6, Roaring Fork Outdoor RFOV is bundling together four trail projects 3 Eagle, Pitkin $15,000 $61,000 $76,000

8 Volunteers 2005 Project to be constructed by volunteers during our

2005 project season. All four projects are

located within RFOVs service area of our

regional community of Rifle to Aspen: The

Colorow Trail is located on BLM...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2005 Nordic Trails Crested Butte Nordic The Crested Butte Nordic Council requests a 3 Gunnison $70,000 $70,000 $140,000

Snowcat Purchase grant for matching funds to complete our

$140,000 campaign to purchase a new snow

cat for the Nordic Center. The Nordic Center

currently uses a snow cat that is over 10

years old, and as such, this snow cat...

CO 2005 San Juan National Forest, Winter Trail Improvements Groom and maintain 100 miles of 3 San Juan $5,000 $94,000 $99,000

San Juan Resource Area snowmobile trails in and around Silverton in

the San Juan National Forest

CO 2005 Trail and Trail Construction Vega State Park Trail and Fence Project 3 Mesa $0 Unknown $0

Fence Project

CO 2005 Motorized Youth Corps The crew would primarily work on 3 Denver $0 Unknown $0

Trails construction 200 feet of new trail across

drainage to connect two existing road

systems. The two road systems would then

be cleared of overhanging vegetation, 10

drainage dips constructed, 7 miles of ditches

cleaned...

CO 2005 Motorized Youth Corps OHV Trail Crew for 6 months and the Rocky 3 Garfield $0 Unknown $0

Mountain Youth Corps for 2 weeks to

construct and maintain OHV trails and trail

system in the Glenwood Springs Field Office

CO 2005 State Forest State Park OHV Trail Maintenance OHV Trail Maintenance 3 Jackson $8,354 $2,089 $10,443

Trails

CO 2005 Stagecoach Overlook Trail Trail Construction This project will construct the Stagecoach 3 Routt $0 Unknown $0

Overlook Trail, a new 1 mile trail segment

addition to the existing Lakeside trail within

the Stagecoach Reservoir State Park. The

trail will be four feet wide and trail features

will include a crushed...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2005 Wilson Mesa Trail Motorized Youth Corps Reconstruct and realign the Wilson Mesa 3 San Miguel $4,770 $1,193 $5,963

Trail in several locations to reduce damage to

wetland habitat and reduce soil loss and

erosion of the trail by repairing drainage

structures throughout the trail's length.

Project will also change livestock...

CO 2006 New Mule Deer Trail New Mule Deer Trail This project is a second part of a two phase 3 Routt $0 $5,600 $5,600

Construction Golden Gate project to build a new trail at Stagecoach

Canyon State Park. As proposed, Phase 1 was to be

completed in the summer of 2005. The

Steamboat Community Youth Corp

completed the trail in its natural dirt state.

Two...

CO 2006 Trail Mancos Trail Surfacing and This project will include the installation of 3 Montezuma $0 $11,200 $11,200

Maintenance, Mancos State geotextile and gravel surfacing for

Park approximately 0.25 miles of trail. Materials

will be hauled on ATVs from stockpile

locations near the project site. The work

involves extensive use of hand tools for...

CO 2006 Windsurf Beach Connector Windsurf Beach Connector Trail construction. The trail will be 3 feet wide 3 Archuleta $0 $11,200 $11,200

Trail Trail Navajo State Park by 850 feet long. It will be cut, layered and

graveled. Project will include construction of

drainages, steps, and culverts and a fence

will need to be pulled out and relocated.

CO 2006 New Mule Deer Trail New Mule Deer Trail Project involves hauling and spreading 3 Jefferson $0 $20,800 $20,800

Construction Golden Gate material for an ADA surface trail, rolling out a

Canyon weed barrier, spreading material, and

compacting material to a level, hard surface.

The width of the surface will be 4 to 6 feet

and the edge will be natural. No...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2006 South Fork Snow Trails Powder Busters Snowcat South Fork Powder Busters Snowmobile 3 Rio Grande $35,000 $50,000 $85,000

Club is presently maintaining 165 miles of

multi-use winter trails. We plan to purchase a

Large Low Hour Snow-Cat that will also be

more fuel efficient and quieter on the trails. A

2000-year model or newer with...

CO 2006 Winter Recreation Trails Delta Grooming Coalition This grant will enable the continuation of the 3 Delta $85,000 $97,840 $182,840

Snowcat current grooming program, trail marking,

maintenance and grooming of 133 miles of

the Sunlight to Powderhorn Trail System on

the Powderhorn end of the system and 17

kilometers of cross country ski and...

CO 2006 San Juan National Forest Snowmobile Trail Grooming Groom 100 miles of trails for snowmobile 3 Archuleta, Mineral, $5,000 $1,250 $6,250

Winter Recreation Trails cross country skiing and snowshoeing on Hinsdale

USDA Forest Service roads within Archuleta,

Mineral, and Hinsdale Counties

CO 2006 Marshall-Monarch Pass Marshall Pass Road Groom and maintain 63 miles of snowmobile 3 Chaffee $254 $64 $318

trails in the Marshall-Monarch Pass areas of

the Pike-San Isabel National Forest

CO 2006 Ophir Creek Snowmobile Ophir Creek Snowmobile Groom and maintain 75 miles of the Ophir 3 Custer $2,926 $732 $3,658

Trail Trail Grooming Creek Snowmobile Trail system in the San

Isabel National Forest

CO 2006 Powderhorn Snowmobile State Park Trail System - Groom and maintain the 121 miles of the 3 Delta $5,000 $1,250 $6,250

Trail Powderhorn End Sunlight to Powderhorn Snowmobile Trail

System

CO 2006 Gunnison National Forest Snowmobile Trail Grooming Groom and maintain 69 miles of snowmobile 3 Delta, Montrose, $382 $96 $478

Winter Recreation Trails Service trails in eastern Delta, northeastern Gunnison

Montrose, and western Gunnison Counties

CO 2006 Sunlight to Powderhorn Trail Sunlight to Powderhorn Trail Groom and maintain 105 miles of 3 Garfield $21,071 $5,268 $26,339

Grooming Grooming snowmobile trails from Sunlight Ski Area to

Electric Mountain Lodge, and other trails in

the Glenwood Springs, Carbondale, Silt and

Grand Mesa areas

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2006 Eastern Flattops Winter Eastern Flattops Area Groom and maintain 80 miles of trails that 3 Garfield $53,817 $13,454 $67,271

Trails include the Transfer Trail from Glenwood

Springs across the southern end of the Flat

Tops Wilderness Area and the Coffee Pot

Road from Dotsero to Deep Lake and

connecting to the Rifle Trail system over

Blair...

CO 2006 White River National Forest Rifle Creek, Flattops, Coulter Groom and maintain 91 miles of trails in the 3 Garfield $4,453 $1,113 $5,566

Winter Recreation Trails Mesa White River National Forest

CO 2006 Gunnison National Forest Gunnison County Groom and maintain 55 miles of snowmobile 3 Gunnison $891 $223 $1,114

Winter Recreation Trails Snowmobile Trails trails in the Kebler Pass, Ohio Creek, Splain's

Gulch, Lost Lake, and Irwin Areas of

Gunnison County

CO 2006 Lake City Area Winter Trails Lake City Area Winter Trail Groom and maintain 100 miles of 3 Hinsdale $21,206 $5,302 $26,508

Grooming snowmobile and cross-country trails in the

Uncompahgre National Forest in and around

Lake City

CO 2006 Grizzly-Helena, Radial USDA Forest Service Forest This grant application is the continuation of a 3 Jackson $9,052 $2,263 $11,315

Mountain, Snyder Creek Service, Parks Ranger joint partnership with the Northern Colorado

Trail System District Trail Riders and the USDA Forest Service to

develop and maintain trails in the

Grizzly-Helena, Radial Mountain, and Snyder

Creek Trail System.

CO 2006 San Juan National Forest Winter Recreation Trails Groom and maintain 100 miles of 3 La Plata $4,326 $1,082 $5,408

Winter Trails Grooming Service snowmobile trails in the San Juan National

Forest

CO 2006 T38N, R12W S9,T38N, Dutch Creek Dutch Creek 3 La Plata $0 Unknown $0

R11W, S15, S20

CO 2006 Creede Area Winter Trails Trail Grooming In Creede Groom and maintain 96 miles of snowmobile 3 Mineral $1,272 $318 $1,590

Area trails between South Fork and Lake City in

the Rio Grande National Forest

CO 2006 Routt National Forest Winter Bears Ears Routt National Groom and maintain 107 miles of 3 Moffat $5,000 $1,250 $6,250

Recreation Trails Forest snowmobile trails in the Routt National Forest

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2006 Uncompahgre National Snowmobile Trail Grooming Groom and maintain 79 miles of snowmobile 3 Montrose $2,417 $604 $3,021

Forest Winter Trails trails on the Uncompahgre Plateau, Owl

Creek Pass, and Little Cimarron areas of the

San Juan National Forest

CO 2006 Crystal Valley Trail Crystal Valley Trail Phase I Phase I of the Crystal Trail will travel south 3 Pitkin, Garfield $624 $156 $780

from Carbondale and its existing trail network

along Highway 133, part of the West Elk

Loop Scenic and Historic Byway, to the BRB

subdivision. This project is the first phase of a

trail which will link...

CO 2006 White River National Forest Grooming Groom and maintain 81 miles of trails in the 3 Rio Blanco $4,509 $1,127 $5,636

Winter Trails White river National Forest, these trails

include Yellow Jacket, Avery Lake, Miller

Creek, Flag Creek, Buford, and Ripple Creek

CO 2006 Rabbit Ears Pass Trail Rabbit Ears Trail System Groom and maintain the 105 mile Rabbit 3 Routt $5,000 $1,250 $6,250

System Grooming Ears Pass Trail System in the Routt National

Forest

CO 2006 North Routt Winter Groom and maintain 147 miles of 3 Routt $1,272 $318 $1,590

Recreation Grooming snowmobile trails in the northern park of

Routt County in the Routt National Forest

CO 2006 Silverton Snowmobile Trail Silverton Snowmobile Trail Groom and maintain 100 miles of 3 San Juan $5,000 $1,250 $6,250

Grooming snowmobile trails in and around Silverton in

the San Juan National Forest

CO 2006 Uncompahgre National Lone Cone West End Groom and maintain 84 miles of snowmobile 3 San Miguel $3,181 $795 $3,976

Forest Winter Trails, San Sledders trails in the Uncompahgre and San Juan

Juan National Forest Winter National Forest in and around Norwood

Trails

CO 2007 Winter Recreation Trails Purchase Snow Trail Project will replace outdated under powered 3 Archuleta $50,000 $12,500 $62,500

Equipment 1989 Tucjer Snow Cat and our oversized

1996 BR400 Groomer with rear tiller for a

newer more fuel efficient eight foot wide used

BR180 or 2007 Husky groomer.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2007 Winter Recreation Trails Winter Trail Improvements Groom and maintain 100 miles of trails for 3 Archuleta, Mineral, $4,930 $1,233 $6,163

snowmobile, cross country skiing, and Hinsdale

snowshoeing on USDA Forest Service roads

within Archuleta, Mineral, and Hinsdale

Counties.

CO 2007 Marshall Pass Road Trail Improvements and Marshall Pass Road, a historic narrow gauge 3 Chaffee $47,449 $11,862 $59,311

Snow Trail Maintenance railroad route starts 5 miles south of Poncha

Springs on Highway 285 and runs 32 miles

over the Continental Divide to Sergeants on

Highway 50 west of Monarch Pass. Project

will provide a minimum 12 foot...

CO 2007 Ophir Creek Snowmobile Winter Trail Improvements Groom and maintain 75 miles of the Ophir 3 Custer $2,835 $709 $3,544

Trail Creek Snowmobile Trail system in the San

Isabel National Forest

CO 2007 Powderhorn Snowmobile Winter Trail Improvements Groom and maintain the 121 miles of the 3 Delta $5,000 $1,250 $6,250

Trail Sunlight to Powderhorn Snowmobile Trail

System

CO 2007 Winter Recreation Trails Winter Trail Improvements Groom and maintain 105 miles of 3 Delta, Garfield $3,944 $986 $4,930

snowmobile trails from Sunlight Ski Area to

Electric Mountain Lodge, and other trails in

the Glenwood Springs, Carbondale, Silt and

Grand Mesa area.

CO 2007 Winter Recreation Trails Winter Trail Improvements Groom and maintain 69 miles of snowmobile 3 Delta, Montrose, $370 $93 $463

trails in the eastern Delta, northeastern Gunnison

Montrose and western Gunnison counties.

CO 2007 South Colony Lakes Basin Trail Renovation Reconstruction of the South Colony Lakes 3 El Paso $25,000 $6,250 $31,250

North Side Trail Basin North Side Trail located in the Sangre

De Cristo Wilderness, San Isabel National

Forest

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2007 Transfer Trail, Coffee Pot Winter Trail Improvements Groom and maintain 80 miles of trails that 3 Garfield $3,697 $924 $4,621

Road include the Transfer Trail from Glenwood

Springs across the southern end of the Flat

Tops Wilderness Area and the Coffee Pot

Road from Detsero to Deep Lake and

connecting to the Rifle Trail System

CO 2007 White River National Forest Winter Trail Improvements Groom and maintain 91 miles of trails in the 3 Garfield $4,313 $1,078 $5,391

Snowmobile Trails White River National Forest

CO 2007 Crystal Valley Trail Trail Construction The Carbondale section of the Crystal Valley 3 Garfield $82,302 $20,576 $102,878

Trail will start at the intersection of

Meadowood Drive and Colorado State

Highway 133. The trail begins where a

federally funded Colorado Safe Routes to

School grant section of the Crystal Valley

Trail...

CO 2007 Trail Trail Renovation and Maintain 2.14 miles of the Uncompahgre 3 Gunnison $25,000 $6,250 $31,250

Construction Peak Trail from the Nellie Creek trailhead to

the summit. Construct a 370 foot re-route of

the trail. Stabilize and re-vegetate portions of

the route, as necessary.

CO 2007 Kebler Pass, Ohio Creek, Winter Trail Improvements Groom and maintain 55 miles of snowmobile 3 Gunnison $986 $247 $1,233

Splain's Gulch, Lost Lake, trails in the Kebler Pass, Ohio Creek, Splain's

Irwin Gulch, Lost Lake and Irwin areas of

Gunnison County

CO 2007 Lake City Area Winter Trails Winter Trail Improvements Groom and maintain 100 miles of 3 Hinsdale $4,313 $1,078 $5,391

snowmobile and cross-country trails in the

Uncompahgre National Forest in and around

Lake City

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2007 T7N, R77W, S26 Trail and Drainage The crew will work on any finish work after 3 Jackson $30,000 $7,500 $37,500

Improvements the completed construction of 500 feet of new

trail across a drainage that connects two

existing road systems. The two road systems

will be cleared of overhanging vegetation, 10

drainage dips constructed, 7...

CO 2007 Jackson County Winter Winter Trail Improvements Groom and maintain 81 miles of snowmobile 3 Jackson $2,465 $616 $3,081

Recreation Trails trails in Jackson County that includes Gould,

Illinois Pass, Bull and Owl Mountains

CO 2007 San Juan National Forest Winter Trail Improvements Groom, maintain, and sign 100 miles of 3 La Plata $4,560 $1,140 $5,700

Snowmobile Trails snowmobile trails in the San Juan National

Forest

CO 2007 Turquoise River Snowmobile Trail Grooming Groom and maintain 43 miles of snowmobile 3 Lake $1,602 $401 $2,003

Trails trails around Turquoise Reservoir near

Leadville

CO 2007 Lake City Area Trail System Purchase Snow Trail The Lake City Area Trail system is used by at 3 Lake, Hinsdale $10,377 $2,594 $12,971

Equipment least 10,000 snowmobiles each year. It is

80% of the winter economy for Lake City and

Hinsdale County. The Continental Divide

Snowmobile Club has a partnership with the

county of Hinsdale and Town of Lake...

CO 2007 Rio Grande National Forest Winter Trail Improvements Groom and maintain 96 miles of snowmobiles 3 Mineral $1,232 $308 $1,540

Snowmobile Trails trails between South Fork and Lake City in

the Rio Grande National Forest.

CO 2007 Routt National Forest Winter Trail Improvements Groom and maintain 107 miles of 3 Moffat $4,930 $1,233 $6,163

Snowmobile Trails snowmobile trails in the Routt National Forest

CO 2007 Uncompahgre Riverway Concrete Trail Construction Concrete approximately 650 feet of the 3 Montrose $25,000 $6,250 $31,250

shared use gravel road/trail segment of the

existing Uncompahgre Riverway Trail

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2007 Winter Recreation Trails Wilderness Non-Motorized This project will provide for a trail crew to 3 Montrose $25,000 $6,250 $31,250

Trail Maintenance work on trail maintenance and rehabilitation

for the non-motorized and wilderness trails on

the Ouray and Norwood Ranger Districts.

The trails that will be the primary focus this

year are Indian, 47,...

CO 2007 Winter Recreation Trails Winter Trail Improvements Groom and maintain 79 miles of snowmobile 3 Montrose $2,588 $647 $3,235

trails on the Uncompahgre Plateau, Owl

Creek Pass, and Little Cimarron areas of the

San Juan National Forest

CO 2007 Winter Recreation Trails Winter Trail Improvements Groom and maintain 81 miles of trails in the 3 Rio Blanco $739 $185 $924

White River National Forest. These trails

include Yellow Jacket, Avery Lake, Miller

Creek, Flag Creek, Buford and Ripple Creek.

CO 2007 Rio Grande National Forest Winter Trail Improvements Groom and maintain 128 miles of groomed 3 Rio Grande $4,313 $1,078 $5,391

Snowmobile Trails trails in the Rio Grande National Forest

CO 2007 Rio Grande National Forest Winter Trail Improvements Groom and maintain 76 miles of trails in the 3 Rio Grande $2,342 $586 $2,928

Trails Del Norte, South Fork, and Creede areas of

the Rio Grande National Forest

CO 2007 Rabbit Ears Pass Trail Winter Trail Improvements Groom and maintain 105 mile Rabbit Ears 3 Routt $5,000 $1,250 $6,250

System Pass Trail System in the Routt National

Forest

CO 2007 Routt National Forest Winter Trail Improvements Groom and maintain 100 miles of 3 Routt $3,697 $924 $4,621

Snowmobile Trails snowmobile trails in the northern part of Routt

County in the Routt National Forest

CO 2007 San Juan National Forest Winter Trail Improvements Groom and maintain 100 miles of 3 San Juan $4,930 $1,233 $6,163

Snowmobile Trails snowmobile trails in and around Silverton in

the San Juan National Forest

CO 2007 San Juan National Forest Winter Trail Improvements Groom and maintain 84 miles of snowmobile 3 San Miguel $3,081 $770 $3,851

Snowmobile Trails trails in the Uncompahgre and San Juan

National Forests in and around Norwood.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2008 Twin Lakes Basin, Sunlight Trail Renovation Use of native building materials and 3 La Plata $169,205 $183,632 $352,837

Peak sustainable design methods to focus

recreational use from the Twin Lakes basin to

the summit of in a single,

sustainable route. Project includes 0.34 miles

of re-route, reconstruction of 0.53 miles...

CO 2009 Mack Ridge, Palisade Rims, Trail Construction Construct 15 miles of new single-track trail in 3 Alamosa, Archuleta, $40,600 $47,600 $88,200

Bangs Canyon, Gateway fours areas of BLM-Grand Junction Field Conejos, Costilla,

Office in Western Colorado (GJFO), an Custer, Delta, Dolores,

international destination for mountain biking, Garfield, Gunnison,

hiking, trail runners, equestrians. Hinsdale, Huerfano,

Construction in Mack Ridge, Palisade... Jackson, La Plata, Las

Animas, Mesa,

Mineral, Moffat,

Montezuma,

Montrose, Ouray,

Pitkin, Pueblo, Rio

Blanco, Rio Grande,

Routt, Saguache, San

Juan, San Miguel,

Otero

CO 2009 Winter Recreation Trails Purchase Snow Trail Replace Bombardier 2000 groomer with 3 San Juan $65,000 $80,000 $145,000

Equipment 7,300 hours with an upgrade to groom

multi-use winter recreation trails in an area

where use has tripled. Silverton Snowmobile

Club provides annual rides to the Southwest

Region disabled, soldier rides, and Big...

CO 2009 White River National Forest Trail Reconstruction, 4 Adopt-A-Trails maintenance projects, 2 3 Eagle $22,650 $84,500 $107,150

Trails Maintenance, and Bridge partner maintenance projects (White River

Repair National Forest), to total 8 miles of

maintenance and bridge repair and 1/2 mile

of restorations

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2009 Winter Recreation Trails Purchase Snow Trail Replace groomer. Multi-use winter recreation 3 Mineral, Rio Grande $55,000 $111,300 $166,300

Equipment trail system provides an estimated 80% of

winter income to community to a

predominantly tourism-based economy on 4

-5 month summer season. Trail system

connects to Mineral and Rio Grande

Counties' trails....

CO 2009 South Canyon Trail Trail Construction Construct the 2nd segment of 5 segments for 3 Garfield, Eagle $136,450 $763,550 $900,000

the South Canyon Trail. Trail will be an 8 foot

wide, asphalt trail, 1,860 linear feet in length

with parking lot. Natural surface trails will

extend to the Colorado River for fishing and

whitewater...

CO 2011 Crested Butte Recreation Crested Butte Recreation The Crested Butte Recreation Path Extension 3 Gunnison $175,872 $68,805 $244,677

Path Path Extension Project will create an off-road trail opportunity for

citizens and visitors of the Upper East River

Valley to connect the communities of Mt.

Crested Butte and Brush Creek Road

subdivisions via the Town of Crested...

CO 2011 Galloping Goose Trail Galloping Goose Trail The Galloping Goose Trail Improvement 3 San Miguel $45,000 $13,500 $58,500

Improvement Project Project will provide essential improvements to

one of the classic rail-trail routes in the State.

Located near Telluride, Colorado, the 9.3

miles of single track on this trail is open to

mountain bikes, horses...

CO 2011 Parallel Trail OHV Parallel Trail 10 miles of new trail construction, 20 miles of 3 Montrose, Ouray $282,450 $82,960 $365,410

trail maintenance, 10 miles of trail

reconstruction, 20 miles to be signed, and a

new kiosk

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2011 Winter Trails San Juan Nordic Club Trail The San Juan Nordic Club is a group of cross 3 Rio Grande and $21,500 $6,450 $27,950

Maintenance Grant country ski enthusiasts who live in the San Mineral

Luis Valley. The club grooms and maintains

10 miles of trails in 3 different locations. All

trails are located on the Forest Service lands

and are open to the...

CO 2011 White River National Forest Flattoppers New Groomer The Flattoppers Snowmobile Club is looking 3 Garfield $45,000 $51,505 $96,505

Winter Recreation Trails to purchase a Bison OC, sn 908900024 with

blade and 66" steel tracks.

CO 2011 White River National Forest Delta-Grand Junction New The club's intention is to purchase a 2010 3 Delta, Mesa, $65,000 $36,560 $101,560

Winter Recreation Trails Groomer Prinoth BR 350. They are equipped to do the Gunnison

regular preventative maintenance

themselves. After 5 years the cat would either

continue in service or have a significant trade

in value.

CO 2011 Winter Recreation Trails Steamboat Lake New Steamboat Lake Snow Club would like to 3 Routt $55,000 $10,000 $65,000

Groomer replace our current groomer, a 2001 Pisten

Bully 200 which had a short run of bad luck

when it was first put into service in 2001. It

currently has just under 4,200 hours on it and

it has been well cared for...

CO 2011 Winter Recreation Trails New Groomer Mt. Sopris Rec Riders (MSRR) is requesting 3 Garfield, Pitkin, Mesa, $65,000 $23,710 $88,710

Capital Grant Funds to assist in the purchase Delta

of an updated snow groomer. Based on the

age of the current MSRR groomer, increased

maintenance costs, and present availability of

new groomers we believe this...

CO 2011 Arapaho National Forest Grand Lake New Groomer We are asking for $50,000 to purchase a 3 Grand $50,000 $15,200 $65,200

Winter Recreation Trails 2005 BR350. We have a strong desire to

replace our 1999 Bombardier BR 275 Plus

MP with 7235 hours. Our club maintains over

100 miles of snowmobile trails. We operate

with one fulltime groomer and two part time...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2012 Trail San Luis Preservation The goal of the San Luis Peak Preservation 3 Saguache $197,164 $59,150 $256,314

project is to realign the San Luis Peak Trail to

a sustainable location. The eroded and

gullied social trails will be restored, and

maintenance activities will occur on access

trails from the trailheads....

CO 2012 Chicken Creek Trail Chicken Creek Trail The Chicken Creek Cross-County Ski 3 Montezuma $10,000 $3,000 $13,000

Grooming Operation Grooming Operation seeks funding from the

State Trails Program to replace much needed

grooming equipment used to provide a safe,

quality skiing experience. The Chicken Creek

Cross-County Ski Corporation (CCCCSC)

is...

CO 2012 Avon Winter Recreation Holy Cross New Groomer The Holy Cross Powder Hounds would like to 3 Eagle $65,000 $10,000 $75,000

Trails procure funds to purchase a new groomer to

replace the 2000 Piston Bully Park Bully that

is owned by the club. The club prefers to

purchase a small groomer to pay to have a

larger groomer cut down to make it...

CO 2012 Grand Mesa Ranger District Arrowhead New Groomer This grant request is for the purpose of 3 Gunnison $65,000 $50,248 $115,248

Winter Recreation Trails updating our Clubs groomer to a newer

model with fewer hours. Our current groomer

is a 2002 Bombardier BR275 with 5,527

hours. Because the Arrowhead Snowmobile

Club was only established in 2008 we are...

CO 2012 Grand Valley Ranger District OHV Maintenance and Grant funds to provide support for two trail 3 Mesa $98,000 $63,000 $161,000

OHV Trails Education Project dozer crews. Funding will cover salaries &

per diem, fuel for dozers and ATVs, repairs,

camp trailer use, Geo-grid map, wooden

posts, steel posts, signs, carsonite, width

restrictors, wire, concrete,...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2012 White River National Forest OHV NW Colorado Trail The Yampa Valley OHV Trailriders club has 3 Moffat $71,390 $56,355 $127,745

Maintenance Dozer been working closely with the Routt National

and White River Forest Service along with

the BLM Little Snake Field Office to help

maintain trails, plan possible re-opening of

closed trails, and add additional...

CO 2013 Mount Eolus and El Diente Southwest Fourteeners Trail Colorado Fourteeners Initiative (CFI) will 3 Dolores, La Plata $199,625 $59,888 $259,513

Peak Reconstruction Project complete high-priority trail projects on two

14ers in the -Mount

Eolus in and El Diente Peaks

Kilpacker Basin-through the Southwest

Fourteeners Trail Reconstruction Project....

CO 2013 Crested Butte to Carbondale Crested Butte to Carbondale The Crested Butte to Carbondale Trail will 3 Gunnison $108,000 $32,400 $140,400

Trail Trail span over 70 miles between two mountain

communities when completed and also

connect to other regional CO Trails.

Approximately 26 miles of trail are already

complete. The specific goals for this phase of

the...

CO 2013 Pueblo Trail The City of Pueblo Trail This project is phase II of a 24.5 mile river 3 Pueblo $106,500 $31,950 $138,450

Revitalization/Construction trail revitalization project. Our 2012-2013

Project Phase II Recreational Trails Grant request includes

repairing the two most dangerous and

dilapidated portion of the trail system totaling

2,350 linear feet at 5-7...

CO 2013 Winter Recreation Trails Update Routt Powder Riders Routt Powder Riders currently owns a 2002 3 Routt $45,750 $45,750 $91,500

Groomer Bombardier Model BR-275 with 5656 hours

which we will not be trading in. We plan to

sell it locally to an interested party and apply

the proceeds of the $25,000 towards the

purchase of an updated groomer...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2013 Routt National Forest Winter Trail Grooming Routt NOWECOS wishes to purchase a 2011 3 Moffat, Routt $65,000 $108,200 $173,200

Recreation Trails National Forest Prinoth Bison 350 to update our current

groomer and trade in our 2006 Prinoth 350

with 4641 hours. We will be keeping out 12'

wide tracks and tiller, which will be rebuilt by

Prinoth as a part of the purchase price....

CO 2013 Routt National Forest Winter North Park Snow Snakes Update the existing 2000 BR180 Snow Cat 3 Jackson $53,750 $53,750 $107,500

Recreation Trails Groomer Grant (3000 hours) with a newer cat with lower

hours. At this time Prinoth is expecting a

2011 Husky 197 hp with approx. 500 hours.

This cat was used as a snowmobile groomer

and is configured to pull a drag. It would...

CO 2013 San Isabel National Forest Groomer Purchase Purchase a 2013 Pisten Bully PB 100, 3 Lake $35,000 $130,000 $165,000

Trading in a 2010 Prinoth Husky with 850

hours

CO 2013 San Juan National Forest Wolf Creek Trailblazers The Wolf Creek Trail Blazers Snowmobile 3 Archuleta $80,000 $100,693 $180,693

2013-2014 Large Groomer Club is planning the purchase of a new 2013

Purchase snowcat trail groomer. Our current machine is

a 2007 Prinoth Husky with an eight foot wide

grooming width. The machine is powered by

a Mercedes-Bens diesel engine...

CO 2013 Grand Valley Ranger District OHV Total Trail Project Approximately 50 percent of grant will furnish 3 Mesa $45,591 $90,409 $136,000

OHV Trails funding to support two Trail dozer Crews. It

pays salaries & per diem of crews. It also

pays for : Fuel for Dozers & ATVs, Repairs,

camp trailer use for forest service, Geo-Grid

mat, wooden posts,...

CO 2014 Gypsum to Dotsero Trail Gypsum to Dotsero Trail The grant will fund construction of 3,700 feet 3 Eagle $140,174 $60,074 $200,248

Phase II of the 2.3 mile Gypsum to Dotsero Trail

Project. The trail will be 10 feet wide and

asphalt paved. The trail project will connect

the communities of Gypsum and Dotsero for

transportation and recreation....

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2014 Challenger Ridge Trail Kit Carson - Challenger The Rocky Mountain Field Institute (RMFI), 3 Saguache $114,000 $34,200 $148,200

Ridge Trail (Phase 1) working with community volunteers and youth

corps crews will complete Phase 1 of a

multi-phase, multi-year new trail construction

from Willow Lake to Challenger Ridge. This

project is designed to reduce...

CO 2014 Galloping Goose Trail Galloping Goose Connection San Miguel County Open Space and 3 San Miguel $51,305 $15,391 $66,696

Recreation Program intends to connect the

Valley Trail system immediately west of

Telluride Colorado to the Galloping Goose

Trail that follows the old railroad grade west

and south into Ilium Valley. The proposed...

CO 2015 Trails Ridgway Trails Project Funding from CPW will help COPMOBA 3 Ouray $200,000 $60,000 $260,000

implement the Ridgway Comprehensive

Travel Management Plan EA which includes

a total of 18.5 miles of non-motorized trails

which will connect to Ridgway State Park and

the Town of Ridgway for over 40 miles of...

CO 2015 McPhee Overlook Trail McPhee Overlook Trail The Forest Service will construct a 7 mile 3 Montezuma $32,288 $9,686 $41,974

long, natural surface non-motorized

multiple-use trail which will connect the town

of Dolores, CO to over 35 miles of

non-motorized single track routes in the

Boggy Draw trail system above McPhee

Reservoir....

CO 2015 Howlesen Hill Biking Trails Howlesen Hill Directional The City of Steamboat Springs will construct 3 Routt $31,488 $9,446 $40,934

Biking Trails two (one beginner, one intermediate)

adjacent approximately mile to 1 mile each

single track, downhill directional flow biking

trails on Howelsen Hill in Steamboat Springs.

The trails will conform to...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2016 Trail Flat Tops Trail Maintenance This project is a collaborative effort between 3 Rio Blanco, Garfield $37,820 $11,346 $49,166

the USFS and local counties to recruit Rocky

Mountain Youth Corps volunteers to work on

general trail cleaning on the Flat Tops area

trails (75 miles) and to perform maintenance

on the Main Marvine,...

CO 2016 Hanging Lake Trail Hanging Lake Trail Crew The White River National Forest will hire a 2 3 Garfield $40,800 $12,240 $53,040

person trail maintenance crew for the 1.2 mile

long Hanging Lake Trail (FDT 1850) in

Glenwood Canyon. The crew will emphasize

resource protection and safety through trail

maintenance-construction,...

CO 2016 Rio Grande Trail Rio Grande Trail The Rio Grande Trail (RGT) is a unique 42 3 Garfield $183,653 $55,096 $238,749

Enhancement and mile, non-motorized multi-use, rail-trail project

Maintenance between Glenwood Springs and Aspen.

Some trail sections are approaching 10 years

old and annual trail counts are 80,000 plus.

Shoulder repairs will enhance...

CO 2016 Kit Carson Challenger Ridge Kit Carson Phase II Implement Phase 2 of the Kit 3 Saguache $171,741 $51,522 $223,263

Trail Carson-Challenger Ridge Trail Project. This

project is designed to reduce visitor impacts

to the area and enhance the quality of the

recreational experience with the Sangre de

Cristo Wilderness.

CO 2016 South Mt Elbert Trail South Mt Elbert Realignment The USDA Forest Service, in partnership with 3 Lake $200,000 $60,000 $260,000

the Rocky Mountain Youth Corps, Colorado

Fourteeners Initiative, Wildlands Restoration

Volunteers, and other partners, will realign

3.7 miles of the South Mt. Elbert trail,

reconstruct 1.8 miles of the...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2016 River Trail River Trail System The Western Slope Conservation Center's 3 Delta $137,626 $41,288 $178,914

River Trail System project will install 2,825

feet of additional trails at the Paonia River

Park. Beginning in September of 2016, they

will construct a 715-foot Southern Loop Trail,

a 1,375-foot Northern Loop,...

CO 2016 Burn Canyon Trail Burn Canyon Trails Norwood Park and Recreation District is 3 San Miguel $200,000 $60,000 $260,000

requesting funding to complete nine miles of

trail construction and one trailhead on a

non-motorized single-track trail system

located less than 5 miles from Norwood on

BLM land. Other accomplishments will...

CO 2016 Ridgeway Trail Mountain This projects implements Phase 2 of the 3 Ouray, Montrose $200,000 $60,000 $260,000

Bike Trail Association Ridgeway Trail System includes construction

Regional Trails of seven miles of new trail and a boardwalk

on BLM land and three miles of trail

construction on the Spring Creek Canyon

Connector Trail west of Montrose on BLM.

Work...

CO 2016 Paradox Trail Reroute This project will create approximately four 3 Montrose $33,600 $10,080 $43,680

miles of new interconnecting single-track

trails in five locations, creating a 17 mile long

signed reroute of the Paradox Trail on BLM

public lands. A new trailhead located within a

quarter of a mile to the...

CO 2016 Gunnison River Valley Gunnison Valley Signage The GCBTA is partnering with local 3 Gunnison $50,000 $15,000 $65,000

stakeholders including the Bureau of Land

Management, Forest Service, Crested Butte

Mountain Bike Association, Gunnison Trails,

and our local municipalities and county

government to install directional and...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2017 River Trail River Trail Replacement The City of Pueblo Parks and Recreation 3 Pueblo $99,000 $19,800 $118,800

Dept. will be removing and replacing 1707

linear feet of 8 foot wide concrete trail on the

Fountain Creek River.

CO 2017 South Canyon Trail System South Canyon Trail System Phase 1 of the South Canyon trail system will 3 Garfield $132,449 $39,735 $172,184

Construction: Phase 1 consist of 8.15 miles of sustainable designed

natural surface trails, improvements to 2 trail

head areas, and interpretive signage. With

close access via I-70 and the future LoVa

Trail, the system will...

CO 2018 Lower Loop Trails Gunsight Bridge Restoration Replacement of Gunsight Bridge, a 3 Gunnison $200,000 $40,000 $240,000

pedestrian bridge that is critical for trail

connectivity and is the only permanent river

crossing in the Slate River Drainage.

CO 2018 -Challenger Kit Carson Phase III Construction of approximately 1/2 mile of 3 Saguache $209,322 $62,797 $272,119

Point Trail sustainable, primitive-use trail at elevations

above 12,000 ft, restoration of .43 miles of

highly eroded alpine environment,

maintenance of 5.2 miles of the Willow Creek

Trail.

CO 2018 Meeker Trail System Meeker Trail System 2018 Construction of two new single-track trails 3 Rio Blanco $106,750 $32,025 $138,775

Expansion that total 4.6 miles adding to the existing

11-mile Meeker Trail System to create a

regionally attractive 15.6 mile trail system

adjacent to the Town of Meeker.

CO 2012 Pike & San Isabel National OHV Rampart Range This project consists of the following 3, 4, 5 Chaffee, Custer, $96,040 $24,010 $120,050

Forest Motorcycle Management activities: coordinate with land managers to Douglas, El Paso,

Committee Sweco develop a seasonal operating plan; identify Huerfano, Teller, Park

and prioritize trail maintenance needs;

contract with heavy equipment operator;

obtain required insurance; utilize a SWECO...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2013 Statewide Trail Maintenance OHV Rampart Range The RRMMC Liaison Officer will be 3, 4, 5 Chaffee, Custer, $63,711 $146,389 $210,100

Motorcycle Management responsible for coordinating with the USDA Douglas, El Paso,

Committee Trail Forest Service and managing volunteers and Huerfano, Teller, Park

Maintenance 13 sub-contractors. This project consists of the

following activities: purchase new Sutter 500

Trail Dozer, flat bed trailer and...

CO 2002 Arkansas Headwaters Trail Construction and Construct Trail, Improvements 3, 5 Chaffee, Fremont, $10,200 $2,550 $12,750

Recreation Area Improvements Lake, Pueblo

CO 2002 Marshall Pass In North Fork Winter Trail Improvements Grooming 3, 5 Gunnison, Chaffee, $8,005 $2,001 $10,006

Garfield

CO 2003 Florence to Fruita Trail Construction and Construct Trails, Maintenance 3, 5 Fremont, Gunnison, $63,000 $194,588 $257,588

Maintenance Chaffee, Mesa, Delta

CO 2016 Stage Rail Trail Stage Rail Trail Phase 1 Phase 1 represents first implementation of 3, 5 Chaffee, Lake $26,298 $7,890 $34,188

the Master Plan for a 64-mile pathway in

Chaffee and Lake Counties. The project is

expected to take 5 years to complete. The

project includes developments along sections

of the trail plus assessing the trail...

CO 1994 Clear Creek National Trail Construction Construct 1,300 feet of a 10 feet wide 4 Adams $68,044 $34,000 $102,044

Recreation Trail concrete trail

CO 1998 Poudre River Trail Corridor Construction of 3 to 10 foot wide concrete 4 Weld $65,000 $195,800 $260,800

National Recreation Trail segments in Windsor's trail system

CO 1998 Poudre River Trail Corridor Construct a 2 mile segment of 10 foot wide 4 Weld $33,700 $228,500 $262,200

National Recreation Trail paved trail as part of the Poudre River Trail

CO 1998 Poudre River Trail Corridor Construction of a 2.5 mile segment of paved 4 Weld $65,000 $314,400 $379,400

National Recreation Trail trail and a bridge as part of the Poudre River

Trail

CO 1999 Purgatoire River Trail Land Acquisition and Land acquisition, construction of a 3 mile long 4 Las Animas $30,000 $7,500 $37,500

Trailhead Construction asphalt trail, parking lot, trail signage, tables,

benches

CO 2000 Poudre River Trail Corridor Construct Trail 4 Weld $107,000 $172,500 $279,500

National Recreation Trail

CO 2000 Cherry Creek Spillway Trail Construct Trail 4 Arapahoe $150,000 $435,000 $585,000

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2000 Heart of Trinidad River Trail Construct Trail 4 Las Animas $198,000 $596,000 $794,000

CO 2001 Big Dry Creek National Bridge Installation Bridge 4 Arapahoe $195,000 $405,900 $600,900

Recreation Trail

CO 2002 Rampart Range Trail Trail Maintenance Maintenance 4 Douglas $36,000 $25,100 $61,100

CO 2002 Willows Trail Construct Trail 4 Gunnison $14,700 $26,735 $41,435

CO 2002 Site Visit 4 Eagle $250 $63 $313

CO 2002 Turquoise Lake Recreation Winter Trail Improvements Grooming 4 Lake $10,600 $2,650 $13,250

Area

CO 2002 Barbour Ponds Trail System Trail Maintenance and Maintenance, Sports Facilities 4 Weld $5,050 $1,263 $6,313

Facilities

CO 2003 Rampart Range Recreation Signage, Improvements 4 Douglas $25,500 $6,375 $31,875

Area

CO 2003 Slvryc Texas Creek Signage, Improvements 4 Fremont $19,000 $32,500 $51,500

CO 2003 East Government Trail, Improvements 4 Eagle, Pitkin $15,000 $61,575 $76,575

Ashcroft Trails

CO 2005 West Shore Trail Extension 4 Unspecified/Unidentifi $0 Unknown $0

able

CO 2005 Timber Trail Renovation Trail Renovation The Timber Trail Renovation will positively 4 Larimer $0 Unknown $0

impact wildlife. It will minimize trail user

impact even more by moving the trail even

farther away from shrubby drainages

(potential Preble's habitat). The trail will cross

intermittent drainages away from...

CO 2009 Unspecified/Unidentifiable Trail Reconstruction and Improve, maintain, reconstruct, and sign 3 4 Unspecified/Unidentifi $38,500 $60,854 $99,354

Drainage Improvements miles of heavily used trail by using rock/log able

checks/waterbars. Elimination of high steps,

improvement of tread, and installation of

retaining walls and small footbridges. Short

re-routes will also be...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2010 Haiyaha Loop Trail Haiyaha Loop Trail The Haiyaha Loop Trail Rehabilitation is a 4 Larimer $29,868 $8,937 $38,805

Rehabilitation Year 2 3-year project to improve 3.0 miles of trail in

Rocky Mountain National Park (NP). This

peaceful trail from Alberta Falls to Lake

Haiyaha is traversed from two very

accessible trailheads in the most heavily...

CO 2011 Windsor Trail Windsor Trail-Greeley No. 2, This project entails upgrading an existing 4 Weld $200,000 $60,000 $260,000

15th to 9th Street natural surface trail to paved surface, filling a

gap (pavement exists to the east and to the

west), and some portion as adjacent natural

surface trail. This section of the Windsor

Trail/Greeley No. 2 is a...

CO 2011 Horsetooth Shore to Shore Horseshoe Shore to Shore The Horsetooth Shore to Shore Trail 4 Larimer $40,053 $12,016 $52,069

Trail Trail Redevelopment Project Redevelopment Project seeks to complete

badly needed work on two trails in the

Horsetooth Reservoir area. The Foothills

Trail, on the east side of the reservoir, and

the Sawmill trail on the west have

deteriorated...

CO 2011 Winter Recreation Trails Colorado Snowmobile This project is designed to purchase and 4 Weld $15,000 $4,500 $19,500

Association Safety Trailer wrap a new trailer to be used by the safety

program of the Colorado Snowmobile

Association. We are looking to purchase a

12-18 V-nose, enclosed aluminum trailer,

outfitted with storage cabinets, heat,...

CO 2012 Great Western Trail Great Western Trail Upgrade the existing dirt surface of the Great 4 Weld $100,000 $30,000 $130,000

Severance-Windsor Trail Western Trail between the towns of

Upgrade Severance and Windsor. Improvements

include a 10' wide aggregate base course

trail surface, seeding of trail shoulder areas

with native grass cover and road crossing...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2015 Old Sopris Trail Old Sopris Trail Land The City is proposing to acquire 4 Las Animas $200,000 $60,000 $260,000

Acquisition-Section Two approximately forty (40) to forty-five (45)

acres of land along the Purgatoire River to

accommodate the construction of most of

Section Two of the Old Sopris Trail Master

Plan.

CO 2017 North Elk Creek Trail North Elk Creek Trail CO Mountain Bike Assoc. and the USFS will 4 Park $107,932 $23,750 $131,682

complete the construction of a new

non-motorized trail segment that will connect

Staunton State Park trails to National Forest

System trails near Evergreen.

CO 2018 Kiowa Park Trail Kiowa Park Trail Construction of a 1.6-mile, 10-foot wide 4 Morgan $22,436 $6,731 $29,167

recycled asphalt trail for non-motorized use.

CO 2015 Various OHV Trails 2015 RRMMC Trail This project consists of the following 4, 5 Chaffee, Custer, $196,040 $39,208 $235,248

Maintenance activities: coordinate with land managers to Douglas, El Paso,

develop a seasonal operating plan; identify Huerfano, Teller, Park

and prioritize trail maintenance needs;

contract with heavy equipment operator;

obtain required insurance; perform the...

CO 2009 Rampart Range Recreation OHV Trail Construction and This project continues the implementation of 4, 6 Douglas $121,930 $123,950 $245,880

Area Trailhead Improvements a plan initiated in 2006 following the

completion of the Rampart Range Recreation

Area Motorized Roads and Trail Plan's

Environmental Assessment. It involves new

trail construction to make vital...

CO 1997 Historic Alpine Trail Trail Renovation and Reconstruction and re-routing of the Historic 5 El Paso $41,800 $20,900 $62,700

Rerouting Alpine Trail in the Ouray Ranger District

CO 1997 Sinton Trail Extension of the Sinton Trail from Holland 5 El Paso $21,400 $21,000 $42,400

Park Boulevard to Garden of the Gods Road

along South Douglas Creek

CO 1997 Spine Foundation Creek Construction of a bridge over Fountain Creek 5 El Paso $36,300 $54,400 $90,700

Regional Trail System as part of the Spine Foundation Creek

Regional Trail System

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 1999 Placer Valley Bike Trail Construction Construction of a 5 mile asphalt bike trail 5 Park $24,700 $210,400 $235,100

Centennial Trail

CO 2002 North and South Crestone Construct Trail 5 Rio Grande $14,240 $21,250 $35,490

Trail

CO 2002 South Fork Snowmobile Purchase Equipment 5 Rio Grande $37,080 $62,750 $99,830

Trails

CO 2002 Rio Grande National Forest Winter Trail Improvements Grooming 5 Lake $31,085 $7,771 $38,856

Snowmobile Trails

CO 2003 OHV Trails Maintenance 5 Rio Grande $22,000 $5,500 $27,500

CO 2003 Moon Pass Trail Maintenance 5 Saguache $11,000 $3,500 $14,500

CO 2003 West Alder and Bear Creek Maintenance 5 Rio Grande $22,000 $4,500 $26,500

CO 2003 Williams Creek Trail Maintenance 5 Hinsdale $11,000 $7,100 $18,100

CO 2003 South Zapata Lakes Trail Construct Trail 5 Alamosa $11,000 $8,750 $19,750

CO 2003 Lower South Colony Lake Construct Trail, Improvements 5 Custer $15,000 $21,400 $36,400

Trail

CO 2004 Midland Bicycle Trail, Trail Renovation The project would reconstruct and control 5 Chaffee $11,500 $6,000 $17,500

Whipple Trail erosion on 7 miles of the existing 22-mile

long Midland Bicycle Trail and its primary

access the Whipple Recreational Trail,

through placement of road base, edge

stabilization, and drainage structures. Entry...

CO 2004 Buena Vista Snow Trails Purchase Snow Trail We wish to acquire a second snow cat one of 5 Chaffee $32,000 $39,118 $71,118

Equipment fairly recent vintage with low hours, complete

with blade, tiller, and compacting bar. This

cat will enable us to double or even triple the

hours spent grooming Tincup Pass, Hancock,

Taylor Park,...

CO 2004 -Humboldt Trail Renovation Funds will support trail/climbing route 5 El Paso $35,000 $57,700 $92,700

Peak Project construction and restoration on two popular

14er peaks: Crestone Needle and Humboldt

Peak during 2004-2005. The State Trails

Program grant will support improvements and

restoration on the final sections yet be...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2004 Crestone Needle-Humboldt Trail Renovation Funds will support trail/climbing route 5 El Paso $35,000 $57,700 $92,700

Peak Project construction and restoration on two popular

14er peaks: Crestone Needle and Humboldt

Peak during 2004-2005. The State Trails

Program grant will support improvements and

restoration on the final sections yet be...

CO 2005 Ophir Creek Snowmobile Winter Trail Improvements Groom and maintain 75 miles of the Ophir 5 Chaffee $2,794 $9,206 $12,000

Trail System Creek Snowmobile Trail system in the San

Isabel National Forest

CO 2005 Pike and San Isabel National Winter Trail Improvements Groom and maintain 100 miles of trails in 5 Chaffee $2,941 $15,059 $18,000

Forest Pike and San Isabel National Forests.

CO 2005 Guanella Pass Trails Trail and Trailhead Guanella Pass Trails Project is a two phase, 5 Clear Creek $200,000 $1,124,240 $1,324,240

Construction comprehensive trails improvement project

that includes new trailheads, accessible

nature and interpretive trails to scenic

overlooks, and provides access to an

extensive network of backcountry trails.

This...

CO 2005 Backcountry Trails Trail Renovation Backcountry Trail Renovation 5 Unspecified/Unidentifi $0 Unknown $0

able

CO 2005 Westside OHV Trail Motorized Youth Corps The Westside OHV Trail Reconstruction 5 Dolores $0 Unknown $0

Reconstruction Project Project is a proposal by the Southwest Youth

Corps (working in conjunction with the Forest

Service and BLM) to reconstruct specific

sections of several trails that are located on

the westside of the Calico Trail....

CO 2005 Pike and San Isabel National Winter Trail Improvements Groom and maintain 63 miles of snowmobile 5 Chaffee $3,529 $882 $4,411

Forest Winter Recreation trails in the Marshall-Monarch Pass areas of

Trails the Pike-San Isabel National Forest

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2005 State Trail Construction Approximately 16.5 miles of natural surface 5 El Paso $0 Unknown $0

Park trails have already been constructed at

Cheyenne Mountain State Park. The park

master plan calls for approximately 18.5

miles of the planned total of approximately 20

miles of trail consisting of natural...

CO 2006 Hogback Trail Hogback Trail This project involves the rehab of 5 Huerfano $0 $5,600 $5,600

Reconstruction Lathrop State approximately 250 yards of badly eroded

Park single track trail. Rebuilding of the trail tread

with soil or crusher fines would be necessary.

The addition of water bars, drainage dips,

and steps in strategic locations to...

CO 2006 Spinney Mountain State Park Backcountry Trail The park currently has approximately 5 miles 5 Park $0 $5,600 $5,600

Renovation Eleven Mile of trails. Trail use continues to increase but in

order to sustain the trail we are still having to

pull plants/roots out of trail surface. In some

areas, dips have to be reconstructed, as well

as other...

CO 2006 Winter Recreation Trails San Isabel National Forest, Groom and maintain 135 miles of trails in the 5 Chaffee $5,000 $1,250 $6,250

Gunnison National Forest San Isabel National Forest and Gunnison

National Forest

CO 2006 Arkansas Headwaters Salida Trail Crew The crew will perform maintenance projects 5 Chaffee $17,855 $4,464 $22,319

Recreation Area on the Big Bend OHV track and in the Texas

Creek, Gold Belt, and Four-mile Travel

Management Areas. The crew will assist in

implementing the goals of the proposed

Arkansas River Travel Management Area.

The...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2006 Arkansas Headwaters Sear OHV Crew The crew will perform maintenance projects 5 Chaffee $17,064 $4,266 $21,330

Recreation Area on the Big Bend OHV track and in the Texas

Creek, Gold Belt, and Four-mile Travel

Management Areas. The crew will assist in

implementing the goals of the proposed

Arkansas River Travel Management Area.

The...

CO 2006 Arkansas Headwaters Salida Trail Crew The crew will perform maintenance projects 5 Fremont $17,481 $4,370 $21,851

Recreation Area on the Big Bend OHV track and in the Texas

Creek, Gold Belt, and Four-Mile Travel

Management Areas. The crew will assist in

implementing the goals of the proposed

Arkansas River Travel Management Area.

The...

CO 2006 Rio Grande National Forest Powder Busters Trail Groom and maintain 128 miles of groomed 5 Rio Grande $5,316 $1,329 $6,645

Winter Trails Grooming trails in the Rio Grande National Forest

CO 2006 Rio Grande National Forest Grooming Snowmobile Trails Groom and maintain 76 miles of trails in the 5 Rio Grande $27,539 $6,885 $34,424

Winter Trails Del Norte, South Fork and Creede areas of

the Rio Grande National Forest

CO 2007 Upper Arkansas Motorized Upper Arkansas Motorized All representatives from each agency will 5 Chaffee $18,900 $4,725 $23,625

Trail Trail Crew work together in repairing and improving

education activities to promote the benefits of

Multiple-use, Tread Lightly, and Stay On Trail

OHV travel practices. The trail crew will

perform maintenance projects...

CO 2007 Upper Arkansas Motorized Upper Arkansas Motorized All representatives from each agency will 5 Chaffee $16,800 $4,200 $21,000

Trail Trail Crew work together in repairing and improving

education activities to promote the benefits of

Multiple-use, Tread Lightly, and Stay On Trail

OHV travel practices. The trail crew will

perform maintenance projects...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2007 Winter Trail Grooming Groom and maintain 100 miles of trails in 5 Chaffee $2,958 $740 $3,698

Trails, San Isabel National Pike and San Isabel National Forests.

Forest Winter Trails

CO 2007 Marshall-Monarch Pass Winter Trail Improvements Groom and maintain 63 miles of snowmobile 5 Chaffee $246 $62 $308

Winter Trails trails in the Marshall-Monarch Pass areas of

Pike and San Isabel National Forests.

CO 2007 Winter Recreation Trails Purchase Snow Trail The Buena Vista Snowmobile Club needs to 5 Chaffee $4,659 $1,165 $5,824

Equipment replace their 1993 BR400+ snowcat with a

2000+ year model used snowcat complete

with blade and tiller.

CO 2007 Pike National Forest OHV Trail Renovation and This project will provide for maintenance, 5 Denver, El Paso, $32,485 $8,121 $40,606

Trails, San Isabel National Construction reconstruction, and enhancements to existing Fremont, Chaffee

Forest OHV Trails motorized recreation areas in 6 districts of the

Pike and San Isabel National Forest. Work to

be provided includes identifying and

prioritizing trail maintenance,...

CO 2007 Columbine Trail Bridge Installation Ongoing erosion along the Columbine Trail in 5 El Paso $54,500 $13,625 $68,125

North Cheyenne Canon Park has left a

section of the Mid-Columbine Trail nearly

impassable. The best solution is to install a

prefabricated fiberglass bridge in the

damaged area and perform major...

CO 2007 Upper Arkansas Motorized Upper Arkansas Motorized All representatives from each agency will 5 Fremont $18,400 $4,600 $23,000

Trail Trail Crew work together in repairing and improving

education activities to promote the benefits of

Multiple-use, Tread Lightly, and Stay On Trail

OHV travel practices. The trail crew will

perform maintenance projects...

CO 2007 Vallecito Reservoir Trail Vallecito Reservoir Trail Repair West Lake Trail damage, purchase 5 La Plata $40,000 $10,000 $50,000

Extension/Maint. cross-country ski groomer to groom Lower

East Lake Trail

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2008 Rainbow Trail, Colorado Trail Construction and Volunteers will use tools to re-route and 5 Chaffee $4,545 $10,463 $15,008

Trail, Continental Divide Maintenance rehabilitate trails and construct a system of

concentric loops on Salida Mountain. Crews

have a minimum of six trail days a year to

maintain existing trails such as Rainbow Trail,

the Colorado Trail, and the...

CO 2008 Rainbow Trail, Crest Trail OHV Trail Maintenance and Funding for a 3-person, interagency (BLM, 5 Chaffee $54,000 $33,732 $87,732

Education Crew USDA Forest Service, Colorado State Parks)

trail maintenance and education crew to

repair and improve motorized trails in the

Upper Arkansas River Valley. Crew conducts

formal and informal education...

CO 2009 Garden of the Gods Trail Trail Re-Route and 1.15 miles of reconstruction, 0.4 miles of 5 El Paso $36,000 $84,400 $120,400

Reconstruction re-route and 0.35 mile closure/restoration.

Garden of the Gods hosts 2 million visitors a

year.

CO 2011 Ute Pass Trail Ute Pass Trail - Phase 1 El Paso County Parks Division is applying for 5 El Paso $119,855 $41,500 $161,355

State Trails consideration to complete the

first phase of Ute Pass Trail, a 3.25-mile long

multi-use trail with interpretive loop and

enhanced signage. The trails will serve as an

important connection to...

CO 2011 Central Garden Recreational Central Garden Recreational The Garden of the Gods is one of the finest 5 El Paso $37,730 $11,319 $49,049

Trails Trails Improvement Project natural landmarks in the Rocky Mountain

Region. The park, a designated National

Historical Landmark, provides invaluable

recreational and social benefits to the

community of Colorado Springs and

surrounding...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2011 Pikes Peak South Slope Recreational Development at After two years of planning, the Recreational 5 Teller, El Paso $200,000 $60,000 $260,000

Pikes Peak South Slope Development at Pikes Peak - South Slope is

ready to move into the construction phase.

Elements within the development plan

include a trailhead, day-use area which will

accommodate hand-launched boating...

CO 2013 Red Rocks Canyon Trail Red Rocks Canyon Trail The Red Rocks Canyon Trail Restoration and 5 El Paso $75,000 $22,500 $97,500

Restoration and Improvement Project seeks to improve the

Improvement Project core of existing trails, add new trail

connections, pave a well-used parking lot,

upgrade a southern trailhead, formalize

several social trails, add signage, and...

CO 2014 Manitou Incline Trail Maintou Incline Trail The Manitou Incline Trail Enhancement 5 El Paso $200,000 $846,700 $1,046,700

Enhancement Project Project will increase safety, provide long-term

trail sustainability, improve environmental

conditions and enhance user experience

along the 1-mile, 2,741 step Mt. Manitou

Incline Trail. With an average grade of...

CO 2014 Rock Island Regional Trail Rock Island Regional Trail This project involves creating safe trail 5 El Paso $31,391 $10,130 $41,521

Extension connections from the Rock Island Regional

Trail to the High Prairie Library and the

Falcon commercial center. This trail project

includes final design and construction of .34

miles of new trails, and .33...

CO 2015 Cottonwood Trail Cottonwood Trail The Cottonwood Trail Project is located four 5 Chaffee $72,350 $21,705 $94,055

Construction/Reconstruction miles northeast of Salida, CO, and has been

Project approved by the USDA Forest Service (FS)

as referenced in the attached FS Decision

Memo. This project will provide 6.1 miles of

new non-motorized single-track...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2016 South Canon Trails South Canon Trails The South Canon Trails project is a 5 Fremont $155,554 $46,666 $202,220

collaborative effort between FAR, the BLM,

and the Recreation District. The project

connects several area parks and trailheads

and will bring diverse trail experiences in a

natural setting.

CO 2017 Two Rivers Trail Two Rivers Trails Project The Two Rivers Trails Project includes a 5 Chaffee $239,213 $60,575 $299,788

1,860' trail along the S. Arkansas River, a

pedestrian bridge crossing the river, and a

1,205' trail that continues and connects to the

existing Salida Trail System.

CO 2017 Mt. Columbia Trail Mt. Columbia Trail, Phase II CFI will work to complete a high-priority trail 5 Chaffee $119,991 $110,820 $230,811

construction project on Mt. Columbia, a 14er

near Buena Vista. Phase II finishes a new

route and begins restoring social trails.

CO 2017 Stage and Rail-Trail Stage and Rail Trail The purpose of this grant request is for 5 Chaffee, Lake $20,200 $6,060 $26,260

Continuation Continuation GARNA and its Stage & Rail Project team to

implement Year 2 of Phase 1 of the Stage

and Rail Trail Master Plan for a 64-mile

hiking, horseback, biking and driving trail in

Chaffee and Lake counties.

CO 2018 Motocross Park Gypsum Moto Cross Phase Development and construction of a 5 Eagle $105,000 $45,000 $150,000

Development 1 motocross park

CO 2018 Lake County OHV Park Lake County OHV Park Continue development of OHV park 5 Lake $24,200 $45,800 $70,000

CO 2018 Meridian Ranch Regional Meridian Ranch Regional Construction of 1.47 miles of trail in Falcon 5 El Paso $136,000 $40,800 $176,800

Trail Trail Regional Park.

CO 2018 Temple Canyon Connection Temple Canyon Connection Construction of 2.7-miles of trail from 5 Fremont $31,316 $9,395 $40,711

BLM-managed lands to the Canon

City-owned Temple Canyon Park.

CO 2003 Missionary Ridge Fire Trail Trail Improvements 6 La Plata $88,000 $105,000 $193,000

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2005 North Halfmoon Massive The North Halfmoon Massive Trail project will 6 Lake $107,500 $191,613 $299,113

Trail construct 1.13 miles of new trail and restore

1.34 miles of Multiple hiker created trails on

the west face of . The

elevation range of this project is between

12,600 feet and 14,000 feet....

CO 2005 Eldorado Canyon Trails Trail Improvements Eldorado Canyon Trails Project 6 Boulder $0 Unknown $0

CO 2006 Walker Ranch Loop Trail Walker Ranch Loop Trail One week of the project will involve 6 Boulder $0 $5,200 $5,200

Maintenance Eldorado maintaining 1.5 miles of the Walker Ranch

Canyon Loop Trail on the Crescent Meadows portion

of the park. Drainage of the trail will be

improved by outsloping and drain dips. Some

sections of the trail will be reinforced...

CO 2011 Buffalo Creek Bridge Buffalo Creek Bridge This grant application is for a proposed 6 Jefferson $42,350 $32,580 $74,930

non-motorized bridge over Buffalo Creek and

its associated floodplain in the Buffalo Creek

Recreation Area (BCRA) of the Pike National

Forest as an integral component of the Nice

Kitty Trail Construction...

CO 2015 Colorado Front Range Trail CFRT-Erger's Pond Open This CFRT (Colorado Front Range Trail) 6 Adams $55,470 $16,641 $72,111

Space Section Ergers Pond Open Space Section project

addresses a missing link of the CFRT that will

provide new access for trail users (walkers,

runners, bikers, skaters, hikers, tourists, and

other leisure and...

CO 2017 Ouray Perimeter Trail Ouray Perimeter Trail Construct better drainage features along the 6 Ouray $30,000 $6,000 $36,000

Oak Creek east side section. Tread will be

maintained to a 24 inch width. Features log

cribbing, rock retaining walls, drain dips and

log/rock waterbars.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2012 Cherry Creek Trail Cherry Creek Trail Signage The Cherry Creek Basin Working Group, 6, 1 Arapaho, Denver, $70,000 $21,000 $91,000

Phase 1 made up of 12 agencies, partnered to create Douglas

regionally-accepted Cherry Creek Basin

Signage Guidelines. With the help of a

consultant, the group identified trail user sign

needs throughout the corridor,...

CO 2005 Pike and San Isabel National Winter Trail Improvements Groom and maintain 43 miles of snowmobile 7 Lake $1,176 $11,824 $13,000

Forest trails around Turquoise Reservoir near

Leadville

CO 2013 Winter Recreation Trails International Snowmobile Colorado Association of Snowmobile Clubs 7 Summit $10,000 $163,550 $173,550

Congress 2014 Funding Inc., dba Colorado Snowmobile Association

is asking for funding to support, in part, the

hosting of the International Snowmobile

Congress in June of 2014 (ISC2014) at

Keystone Resort. This is an international...

CO 2018 Various OHV Supply and Equipment Motorized trail maintenance and development 7 Mesa $19,498 $70,502 $90,000

CO 2002 Grand Lake Purchase Snow Trail Purchase Equipment 8 Grand $16,760 $1,000 $17,760

Equipment

CO 2002 Fraser to Granby Trail Restrooms 8 Grand $15,000 $21,558 $36,558

CO 2002 Eagle River Trail Construct Trail 8 Eagle $136,040 $524,250 $660,290

CO 2003 Sulphur Springs Maintenance 8 Grand $11,000 $2,750 $13,750

CO 2003 Fraser to Granby Trail Construct Trail, Signage 8 Grand $36,800 $62,444 $99,244

CO 2006 Turquoise Reservoir Winter Trail Grooming Leadville Groom and maintain 43 miles of snowmobile 8 Lake $1,145 $286 $1,431

Trails Area trails around Turquoise Reservoir near

Leadville

CO 2017 Buffalo Pass Trails Buffalo Pass Trails Routt County Riders intends to construct 13 8 Routt $222,494 $73,800 $296,294

miles of non-motorized trail, approved in the

USFS Buffalo Pass Trails EA. Trails are

located NE of Steamboat Springs and

connect to the Continental Divide Trail, as

well as many local trail system.

CO 2003 Blodgett Open Space Trailhead 9 El Paso $15,000 $59,674 $74,674

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

CO 2007 14er Trails Regional 14er Maintenance Maintenance work will promote sustainability 9 Lake $33,740 $8,435 $42,175

on 12 miles of trouble spots on 64 miles of

14er trails

Grand $20,345,460 $25,853,085 $46,198,545

Totals

(all results)