TAPP II: Infrastructure Tracker

Cost Funding Type Private Phase/Status No. Sector Location Project Name (in PhP or Agency Description (GPH, ODA, PPP, Date of Information Counterpart (Completion Date) US$ B) Private, PDMF)

Rails Projects Phase 1: 50.5 km from the Malolos end of North-South Commuter Railway up to Clark Rails North-South Railway Project (north line) Phase 1 construction: Q2 2019 1 Luzon DOTr airport will have five stations—Malolos, Apalit, ODA/GOJ 06-Jun-17 Projects (Malolos-Clark Railway Phase 1) Completion: Q2 2022 San Fernando City, Clark and Clark ₱ 211.42 International Airport. Phase 2: 19 km railway to connect airport to Rails North-South Railway Project (north line) Clark Green City through three more 2 Luzon DOTr ODA/GOJ 06-Jun-17 Projects (Malolos-Clark Railway Phase 2) stations—Calumpit, Angeles City and Clark Green City.

Financing, design, construction, operation & maintenance of 23km line with 14 stations from San Jose Del Monte, Rails Under Construction 3 NCR MRT Line 7 Project ₱ 69.30 DOTr SMC Bulacan to MRT 3 North Avenue in Quezon PPP (unsolicited) 26-May-17 Projects (5.04% complete) City and 22km asphalt road from Bocaue Interchange of NLEX to intermodal terminal in Tala.

A Brown Unsolicited Project. PNR has yet Construction, operation and maintenance of Company Inc., to submit to PPP Secretariat Rails 11-station East-West Rail (EWR), a mostly 4 NCR East-West Rail Project TBD PNR and MTD PPP (unsolicited) documents required by ICC to 09-May-17 Projects elevated 9.4km railway line from Diliman, Philippines, commence project appraisal and to Lerma, . Inc. approval process.

Design and construction of LRT2 3km West extension, which will run from to Pier 4, including the turn-back track. Three Rails proposed additional stations: Tutuban (next to For bidding 5 NCR LRT-2 west extension ₱ 10.12 DOTr PPP 05-Jun-17 Projects the Cluster Mall); Divisoria (west of the Recto '(2019) Avenue and Asuncion Street intersection); and Pier 4 (located 50 meters north of Zaragoza Street). Cost Funding Type Private Phase/Status No. Sector Location Project Name (in PhP or Agency Description (GPH, ODA, PPP, Date of Information Counterpart (Completion Date) US$ B) Private, PDMF)

Rails Projects LRMC LRT 1 will be extended from Ongoing soft renovation and (Ayala Corp, to future Niyog Station in , upgrades of LRT Line 1 existing Rails LRT Line 1 Cavite Extension and O&M MPIC, approximately 11.7km. Of this length, 10.5km system and other pre- 6 NCR ₱ 64.90 DOTr PPP 26-May-17 Projects (of existing LRT 1) Macquarie will be elevated and 1.2km will be at-grade. construction activities. Infrastructure Eight passenger stations are proposed to be (GPH ROW delayed Holdings) constructed. groundbreaking date) Financing, design, construction, operations Rails and maintenance of a new 19km line 7 NCR LRT Line 4 Project TBD DOTr PPP Under Development 09-May-17 Projects running west from SM City in Taytay to Sta.Mesa, Manila.

Rails Rehabilitation of MRT3 from North Ave. 8 NCR MRT 3 Rehabilitation PPP 26-May-17 Projects station in Quezon City to Taft station in .

A subway connecting the cities of , Rails Pasay, and . The project would be a 20 9 NCR Subway ₱ 374.50 DOTr JICA ODA 09-Jun-17 Projects km system that will consist of a 16 km tunnel, a 4 km elevated railway, and 11 stations.

A 25km underground mass transportation system connecting major business districts and government centers. It is expected to serve around 370,000 passengers per day in its opening year.

The proposed 13 stations of the subway system are: Rails a) Along Avenue, North Avenue, for project development 10 NCR Subway $ 4.50 DOTr N/A ODA 26-May-17 Projects Quezon Avenue, East Avenue, Anonas and (Aug 2017) Katipunan in Quezon City b) Ortigas North and Ortigas South in City c) Kalayaan Avenue in Makati City d) , Cayetano Boulevard and Food Terminal Inc. (FTI) in Taguig e) and the Ninoy Aquino International Airport in Pasay City Cost Funding Type Private Phase/Status No. Sector Location Project Name (in PhP or Agency Description (GPH, ODA, PPP, Date of Information Counterpart (Completion Date) US$ B) Private, PDMF)

Rails Projects

Rails A 4km extension of existing LRT-2 system Groundbreaking - May 2017 11 NCR LRT-2 east extension (construction) ₱ 1.80 DOTr DM Consunji PPP 05-Jun-17 Projects from Santolan, Pasig to Masinag, Antipolo. (Aug. 2018)

O&M of the existing LRT Line 2 from Recto to Rails Operation & Maintenance of LRT Line-2 East DOTr and Bid Submission Delayed as of 12 NCR ₱ 1.20 Santolan, the 4km East Extension from PPP 26-May-17 Projects Extension LRTA May 25, 2017 Santolan to Masinag. SM Prime Common station will link existing MRT Line 3, Holdings Inc., Rails LRT Line 1 and to-be-built MRT-7, providing a 13 NCR Common Train Station ₱ 2.80 DOTr SMC., and GPH For MOA 11-May-17 Projects convenient access point for 1.5 M commuters Light Rail daily. Manila Corp.

Construction of railway from San Mateo connecting to the MRT 7, passing through Rails 14 NCR Manila East-Rail Transit System Project TBD DOTr Ortigas Avenue. It will link the municipalities PPP Under Development 09-May-17 Projects of Rodriguez and San Mateo in Rizal to cities of , Pasig, Taguig, and Makati.

Financing, design, construction, operations and maintenance, including procurement of rolling stock and systems, of a new 19km light Rails 15 NCR LRT Line 6 Project ₱ 65.09 DOTr rail line along from Niyog, PPP Under review 09-May-17 Projects Bacoor (terminus of LRT Line 1 Cavite Extension Project) to Dasmariñas City in Cavite.

38km railway linking Tutuban, Manila to Malolos, Bulacan. It will run across 10 Rails North-South Railway Project (central line) DOTr and To start construction in 2019; 16 NCR $ 1.99 JICA elevated stations, and will have 13 train sets ODA/GOJ 16-Mar-17 Projects (Phase 1) PNR operations in 2022. with 8 cars that can carry 2,238 passengers per train. Cost Funding Type Private Phase/Status No. Sector Location Project Name (in PhP or Agency Description (GPH, ODA, PPP, Date of Information Counterpart (Completion Date) US$ B) Private, PDMF)

Rails Projects

Following DOTr's manifestation NCR/ Region IV-A during March 21, 2017 ICC-CC Rails North-South Railway Project (south line) DOTr and 56 km Commuter Line from Manila to 17 (CALABARZON)/ $ 3.01 JICA ODA/GOJ meeting, O&M component for 16-Mar-17 Projects (Segment 1) PNR Calamba City, Laguna. Region V (Bicol) Commuter Line will still be procured through PPP

Long-Haul Line from Manila to Legazpi City NCR/ Region IV-A Rails North-South Railway Project (south line) DOTr and in (478 km main line), 18 (CALABARZON)/ $ 3.01 ODA 09-Jun-17 Projects (Segment 2) PNR which may be developed on a phased basis Region V (Bicol) based on delivery of right of way

Long-Haul Line Expansion consisting of (a) an extension from Legazpi City to NCR/ Region IV-A Matnog in Sorsogon (117km) (the “Long Haul Rails North-South Railway Project (south line) DOTr and 19 (CALABARZON)/ $ 3.01 Line Extension”) and (b) a branch line ODA 09-Jun-17 Projects (Segment 3) PNR Region V (Bicol) from Calamba to City (58km) (the “Long Haul Line Branch”), to be developed once right of way is available.

Tagum, Davao del Rails : Tagum-Davao City-Digos A 105 km segment of the larger $9 billion, for project development 20 Norte, Davao City, ₱ 31.50 DOTr GAA 26-May-17 Projects (TDD) Segment 2,000 km Mindanao Railway network. (May 2017) Digos, Davao del Sur as of July 3, 2017