To access individual modules referenced within this standard, blue active links are provided from the relevant index pages where these are listed. Clicking on a specific reference will lead to the corresponding document. Please ensure to open bookmarks for easier navigation within the document and to access index of modules. Alternatively, you may use the search facility to search for a specific document by using the complete document reference number – such as NR/L3/SIG/30082/002 – in the search field.

Proceed to document u

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`---

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Level 3 Work Instruction Signal Maintenance Testing Handbook

Approvals

Content approved by:

Pardip Basran, Technical Lead Content approved by: n

Jeremy Morling, Standard and Control Document Owner

Approved for publication by:

Mick McManus, Standards and Controls Management --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`---

This document is the property of Network Rail. It shall not be reproduced in whole or part nor disclosed to a third party without the written permission of Network Rail. O Copyright 2018 Network Rail.

Uncontrolled copy once printed from its electronic source. Published and Issued by Network Rail, 2nd Floor, One Eversholt Street, London, NW1 2DN.

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

User information This Network Rail standard contains colour-coding according to the following Red–Amber– Green classification.

Red requirements – no variations permitted

• Red requirements are to be complied with and achieved at all times. • Red requirements are presented in a red box. • Red requirements are monitored for compliance. • Non-compliances will be investigated and corrective actions enforced.

Amber requirements – variations permitted subject to approved risk analysis and mitigation

• Amber requirements are to be complied with unless an approved variation is in place. • Amber requirements are presented with an amber sidebar. • Amber requirements are monitored for compliance. • Variations can only be approved through the national variations process. • Non-approved variations will be investigated and corrective actions enforced. Green guidance – to be used unless alternative solutions are followed

• Guidance should be followed unless an alternative solution produces a better result. • Guidance is presented with a dotted green sidebar. • Guidance is not monitored for compliance. • Alternative solutions should be documented to demonstrate effective control.

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`---

Page 2 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Compliance This Network Rail standard/control document is mandatory and shall be complied with by Network Rail Limited and its contractors if applicable from 31st May 2018. Where it is considered not reasonably practicable1 to comply with the requirements in this standard/control document, permission to comply with a specified alternative should be sought in accordance with the Network Rail standards and controls process, or with the Railway Group Standards Code if applicable. If this standard/control document contains requirements that are designed to demonstrate compliance with legislation they shall be complied with irrespective of a project’s GRIP stage. In all other circumstances, projects that have formally completed GRIP Stage 3 (Option Selection) may continue to comply with any relevant Network Rail standards/control documents that were current when GRIP Stage 3 was completed. NOTE 1: Legislation includes Technical Specifications for Interoperability (TSIs). NOTE 2: The relationship of this standard/control document with legislation and/or external standards is described in the purpose of this standard.

Disclaimer In issuing this standard/control document for its stated purpose, Network Rail Limited makes no warranties, expressed or implied, that compliance with all or any standards/control documents it issues is sufficient on its own to provide safety or compliance with legislation. Users are reminded of their own duties under legislation. Compliance with a Network Rail standard/control document does not, of itself, confer immunity from legal obligations. Where Network Rail Limited has granted permission to copy extracts from Network Rail standards or control documents, Network Rail Limited accepts no responsibility for, nor any liability in connection with, the use of such extracts, or any claims arising there from.

This disclaimer applies to all forms of media in which extracts from Network Rail standards and control documents might be reproduced.

Supply Copies of standards/control documents are available electronically, within Network Rail’s organisation. Hard copies of this document might be available to Network Rail people on request to the relevant controlled publication distributor. Other organisations can obtain copies of this standard/control document from an approved distributor.

1 This can include gross proportionate project costs with the agreement of the Network Rail Assurance Panel (NRAP).

Page 3 of 35 --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`---

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue record Issue Date Comments 9 March 2016 Update for new and updated SMTH items 10 March 2017 Update for new and updated SMTH items 11 March 2018 Update for new and updated SMTH items

Legislation No legislation has been identified that is applicable to the content of this standard/control document.

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Page 4 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Contents Contents 5 1 Purpose 6 2 Scope 6 3 Definitions 6 4 Index of NR/SMTH 7 4.1 NR/SMTH/Part 01 – Reference Documents & Definitions 7 4.2 NR/SMTH/Part 02 – SMT Process 7 4.3 NR/SMTH/Part 03 – Defined Checks & Tests 8 4.4 NR/SMTH/Part 04 – Test Plans 10 4.5 NR/SMTH/Part M04 – Missing Test Plans 27 4.6 NR/SMTH/Part 05 – Failure Investigation 28 4.7 NR/SMTH/Part 06 – Telecom Test Plans 32 4.8 NR/SMTH/Part 07 – Pre Planned Testing 33

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`---

Page 5 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

1 Purpose This document contains the index to the Signal Maintenance Testing (NR/SMTH)

The SMTH provides a maintenance testing regime for the replacement or installation of signalling equipment that does not affect the application logic of the system or, the controls of the system that have previously been tested to signal works testing.

2 Scope Signalling equipment that is replaced or renewed on a like for like basis under corrective maintenance, temporary design as a result of an incident or engineering works and minor signalling renewals that do not affect the application logic of the system or, the controls of the system that have previously been tested to signal works testing.

3 Definitions Definition Meaning Application Any technology based method that configures a product so as to Logic provide site specific command and control instructions. Application logic includes: a) mechanical logic (e.g. in lever frames); b) electro-mechanical logic (e.g. in relay ); c) electronic switching or code (e.g. in electronic interlocking, telephone concentrators or cab secure radio); d) any combination of the above.

Maintenance Known also as Like-for-Like replacement. The removal and Testing restoration of a product in a previously operational system, where the work does not change the configuration or functionality of the system. Engineering details are not provided for the work, and instead the existing infrastructure records are used as the reference documents. Typically, such work is carried out to replace/repair defective or life- expired products. The work may involve replacing the original item of equipment with the exact same new or refurbished item or replacing it with a differant make that is identical in all areas (apart from visual appearance) to the original. Work undertaken by maintenance testing shall not exceed the definition of extensive and simultaneous.

Page 6 of 35 --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`---

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Definition Meaning Works Works testing consists of the construction/installation of new or Testing modified products and/or application logic where the work changes, or potentially changes, the configuration or functionality of the system. The work is carried out in accordance with engineering details supplied for the purpose. For the purposes of this document, the definition includes: a) the installation of totally new systems; b) the alteration of existing systems; and c) the abolition (also known as ‘recovery’) of existing systems.

Maintenance An individual with the competencies and authority to work Tester appropriate to the required work assigned to specify and/or perform the tests necessary to ensure that the physical implementation of a design is correct and meets all the specified test and acceptance criteria.

Test Plan A test plan comprises any document or suite of documents that determines and defines the processes, resources and specifications required for the testing and commissioning of a product at a specific location.

4 Index of NR/SMTH The indexes show the latest (current) issues of the individual SMTH documents. Updated NR/SMTH documents take time to introduce into service due to briefing and --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- the requirement to implement at the correct point in the maintenance cycle.

4.1 NR/SMTH/Part 01 – Reference Documents & Definitions Issue Issue Compliance Section Description No. Date Date Index 03 06/09/14 07/03/15 Appendix A References 06 02/03/13 07/09/13 Signal Maintenance Testing Related Appendix B 06 06/09/14 07/03/15 Documents Appendix E Action Definitions 02 02/03/13 07/09/13

4.2 NR/SMTH/Part 02 – SMT Process Issue Issue Compliance Section Description No. Date Date Index 05 03/03/18 31/05/18

Page 7 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Part 02 Introduction and Overview 09 03/03/18 31/05/18 Appendix A Maintenance Testing Guidance 05 05/03/11 03/09/11 Appendix B Test Plan Requirements 06 04/03/17 31/05/17 Appendix C Test Record Requirements 08 04/03/17 31/05/17 Appendix Maintenance Test Plan Tick Sheet 01 05/03/11 03/09/11 C01 Diversion of Circuits and Cable Appendix D 03 04/03/17 31/05/17 Renewal Appendix Cable Core Temporary Label 01 05/03/11 03/09/11 D01 Procedure for Monitoring a Appendix E 01 05/03/11 03/09/11 Damaged Cable

4.3 NR/SMTH/Part 03 – Defined Checks & Tests Issue Issue Compliance Section Description No. Date Date Index 05 03/03/18 31/05/18 Part 03 Defined Checks and Tests 05 05/03/11 03/09/11 Defined Check: Check for Correct Check A01 06 03/03/18 31/05/18 Type Check A02 Defined Check: Check for Damage 05 05/03/11 03/09/11 Defined Check: Check for Safe Check A03 05 05/03/11 03/09/11 Insulation Defined Check: Check for Correct Check A04 05 05/03/11 03/09/11 Installation Check A05 Defined Check: Check for Isolation 05 05/03/11 03/09/11 Defined Check: Check for Correct Check A06 05 05/03/11 03/09/11 Labelling Check A07 Defined Check: Correlation Check 05 05/03/11 03/09/11 Test B01 Defined Test: Wire Count 05 05/03/11 03/09/11 Test B01 Wire Count Grid Sheet 01 05/03/11 03/09/11 Appendix A Test B02 Defined Test: Continuity Test 05 05/03/11 03/09/11

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Page 8 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Test B03 Defined Test: Insulation Test 06 05/03/16 04/06/16 Test B04 Defined Test: Cable Function Test 05 05/03/11 03/09/11 Defined Test: Earth Test (DC up to a Test B05 06 03/03/18 31/05/18 nominal 120V) Defined Test: Earth Test (AC up to a Test B06 05 05/03/11 03/09/11 nominal 110V) Test B07 Defined Test: Aspect Test 06 03/03/18 31/05/18 Defined Test: Point Detection and Test B08 07 04/03/17 31/05/17 Correspondence Test Test B08 Point Permutation Chart: One Point 01 05/03/11 03/09/11 Appendix A End Test B08 Point Permutation Chart: Two Point 01 05/03/11 03/09/11 Appendix B Ends Test B08 Point Permutation Chart: Three 01 05/03/11 03/09/11 Appendix C Point Ends Test B08 Point Permutation Chart: Four Point 01 05/03/11 03/09/11 Appendix D Ends Test B08 Point Permutation Chart: Five Point 01 05/03/11 03/09/11 Appendix E Ends Test B08 Point Permutation Chart: Six Point 01 05/03/11 03/09/11 Appendix F Ends Defined Test: Absolute Block Test B09 05 05/03/11 03/09/11 Controls Test Defined Test: Tokenless Block Test B10 05 05/03/11 03/09/11 Controls Test (BRB Type)

Defined Test: Tokenless Block --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Test B11 Controls Test (Open/Sealed Cancel 05 05/03/11 03/09/11 Type) Defined Test: Tokenless Block Test B12 05 05/03/11 03/09/11 Controls Test (Direction Lever) Defined Test: Token Block Controls Test B13 05 05/03/11 03/09/11 Test Defined Test: Tablet Block Controls Test B14 05 05/03/11 03/09/11 Test Defined Test: No Signaller Key- Test B15 05 05/03/11 03/09/11 Token Block Controls Test

Page 9 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Defined Test: No Signaller Token Test B16 Remote (NSTR), No Signaller Token 05 05/03/11 03/09/11 (NST) Block Controls Test Defined Test: Absolute Block Test B17 05 05/03/11 03/09/11 Recovery Test Defined Test: Tokenless Co- Test B18 operative Cancel Test (Direction 05 05/03/11 03/09/11 Lever) Test B19 Defined Test: FREDDY Test 05 05/03/11 03/09/11 Defined Test: TPWS Trackside Test B20 06 03/03/18 31/05/18 Equipment Maintenance Test Defined Test: TPWS Trackside Test B21 06 03/03/18 31/05/18 Equipment Renewals Test Defined Test: TPWS Self-Powered Test B22 OSS (SPOSS) Trackside Equipment 06 03/03/18 31/05/18 Maintenance Test Defined Test: TPWS Failure Test B23 Indication Unit (FIU) Equipment 05 05/03/11 03/09/11 Maintenance Test Defined Test: SSI Trackside Test B24 05 05/03/11 03/09/11 Functional Module Test Defined Test: Mechanical Locking Test B25 05 05/03/11 03/09/11 Function Test Defined Test: TPWS Buffer Stop Test B26 01 05/03/11 03/09/11 Optimisation Project Equipment Test

4.4 NR/SMTH/Part 04 – Test Plans Issue Issue Compliance Section Description No. Date Date Index 10 03/03/18 31/05/18 Repair and Replace an ATP Loop AC01 05 05/03/11 03/09/11 (Chilterns) AC02 Replace an ATP LRU (Chilterns) 05 05/03/11 03/09/11 AC03 Replace an ATP Interface (Chilterns) 05 05/03/11 03/09/11 Renew and Replace an ATP Beacon AG01 05 05/03/11 03/09/11 (GWML) --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`---

Page 10 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Renew and Replace an ATP loop AG02 05 05/03/11 03/09/11 (GWML) Joint / Add a Length of Cable to a AG03 05 05/03/11 03/09/11 ATP Loop (GWML) AG04 Replace an ATP Encoder (GWML) 05 05/03/11 03/09/11 Replace an ATP Parameter Plug AG05 05 05/03/11 03/09/11 (GWML) AG06 Replace an ATP LIT (GWML) 05 05/03/11 03/09/11 AP01 Replace a TPWS Plug-in Module 05 05/03/11 03/09/11 AP02 Replace a TPWS Transmitter Loop 05 05/03/11 03/09/11 Remove and Refit a TPWS AP03 Transmitter Loop Following Track 06 03/03/18 31/05/18 Renewals Work Replace a TPWS Baseplate or AP04 Trackside Enclosure Plugboard 06 04/03/17 31/05/17 Panel Replace a TPWS Failure Indication AP05 05 05/03/11 03/09/11 Unit (FIU) Replace an AWS Permanent AW01 06 03/03/18 31/05/18 Magnet Replace an AWS Permanent AW02 08 03/03/18 31/05/18 Electro-Inductor Replace a Trainstop/Trip Cock AW03 05 05/03/11 03/09/11 Tester AW04 Replace a Trainstop Power Pack 05 05/03/11 03/09/11 AW05 Replace an Indusi Trainstop 05 05/03/11 03/09/11 Replace an AzL 70, 70/30 and AX01 06 03/03/18 31/05/18 70/30s Evaluator Card Replace an AzL 70, 70/30 and AX02 70/30s Count Head or Lineside 07 03/03/18 31/05/18 Amplifier Replace a SK30H Rail Contact AX03 06 03/03/18 31/05/18 (AzLM & AzLE) Replace a EAK30H Unit (AzLM & AX04 06 03/03/18 31/05/18 AzLE)

Page 11 of 35 --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`---

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Replace a EAK30H Board (AzLM & AX05 06 03/03/18 31/05/18 AzLE) Replace a EP/EPCM CPU Card AX06 06 03/03/18 31/05/18 (AzLM) Replace an ACE Serial/Parallel Card AX07 07 03/03/18 31/05/18 (AzLM) Remove and Refit Rail Contact (All AX08 03 03/03/18 31/05/18 AzL, AzLM and AzLE) Replace an EAK30K Unit (AzLM & AX09 02 03/03/18 31/05/18 AzLE) Replace a Rail Contact Adaptor AX10 02 03/03/18 31/05/18 (RCA) (AzLM and AzLE) Replace a SK30K Rail Contact AX11 01 03/03/18 31/05/18 (AzLM and AzLE) Replace a Siemens AzS 350 U Axle AX20 02 02/03/13 07/09/13 Counter Card (VESBA) Replace a Siemens AzS 350 U Axle AX21 Counter Card (SIRIUS2, STEU, 02 02/03/13 07/09/13 VAU) Replace a Siemens AzS 350 U Axle AX22 02 02/03/13 07/09/13 Counter Card (BLEA12) Replace an Siemens Axle Counter AX23 01 05/03/11 03/09/11 VENUS2 CPU Card Replace a Siemens AzSM (E) Axle AX24 01 05/03/11 03/09/11 Counter non CPU Card Replace a Siemens AzSM (E) Axle AX25 01 05/03/11 03/09/11 Counter ZAN Card Replace a Siemens Axle Counter AX26 DEK 43 Wheel Detector or 02 02/03/13 07/09/13 Trackside Connection Box Replace a Siemens Axle Counter ZP AX27 02 02/03/13 07/09/13 43 PCB Card Replace a Siemens WSD Wheel AX28 03 03/03/18 31/05/18 Detector (ACM 100 Axle Counter) --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Replace a Siemens Axle Counter AX29 02 03/03/18 31/05/18 ACM 100 Module

Page 12 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Replace a Siemans ACM 100 Sub- AX30 02 03/03/18 31/05/18 Component Replace a Siemans WSD Wheel AX31 02 03/03/18 31/05/18 Detector Secured with wheel clamp Replace a Frauscher wheel sensor AX40 04 04/03/17 31/05/17 RSR123 Replace an Advanced Evaluation AX41 01 02/03/13 07/09/13 Board AEB Replace a COM-AdC and/or COM- AX42 01 02/03/13 07/09/13 WNC Board AX43 Replace a (Compact Flash) CF Card 01 02/03/13 07/09/13 Replace an Overvoltage Protection AX44 04 04/03/17 31/05/17 Unit BSI005 Replace a Power Supply Board AX45 01 02/03/13 07/09/13 (Crowbar) Replace an Input/Output Extension AX46 01 02/03/13 07/09/13 Board IO-EXB

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Replace a Frauscher ASC2000 AX50 03 04/03/17 31/05/17 Evaluation Board IMC Replace a Frauscher ASC2000 Axle AX51 01 06/09/14 07/03/15 Counter Board ACB Replace a Frauscher ASC2000 SIC AX52 01 06/09/14 07/03/15 Fuse Board Replace a Converter ISDN Ethernet AX60 01 03/03/18 31/05/18 (CIE) (AzLM) Replace a Converter ISDN Ethernet 01 AX61 (CIE) DC - DC Power Supply 03/03/18 31/05/18 (AzLM) Replace a Single Channel Controller 01 AX62 03/03/18 31/05/18 (SCC) CPU Card (AzLM) Replace a Power Data Coupling Unit 01 AX63 03/03/18 31/05/18 (PDC) (AzLM) Replace a DC - DC Convertor 01 AX64 03/03/18 31/05/18 (Power Supply to EAK) (AzLM) Replace an ACE DC - DC Power 01 AX65 03/03/18 31/05/18 Card (AzLM) AX66 Replace a ISDN V24 Converter 01 03/03/18 31/05/18

Page 13 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date AX67 Replace a Modem Card(AzLE) 01 03/03/18 31/05/18 AX68 Replace a Section Card (AzLE) 01 03/03/18 31/05/18 Replace a Sedlbauer unit (PMC 01 AX70 03/03/18 31/05/18 Transformer) (AzLM & AZLE) Replace an ACE Power Supply Card 01 AX71 03/03/18 31/05/18 (AzLE) Replace an ACE Detection Point 01 AX72 03/03/18 31/05/18 Power Supply Card (AzLE) Replace a RSE Wheel Sensor 01 AX95 03/03/18 31/05/18 Assembly Replace a RSE Wheel Sensor 01 AX96 03/03/18 31/05/18 Assembly Cable Junction Box Replace a ARS 4 Evaluation Board 01 AX97 03/03/18 31/05/18 or Enclosure AX98 Replace a ARS 4 Power Supply 01 03/03/18 31/05/18 BA01 Replace a TASS 05 05/03/11 03/09/11 Platform Identification Beacon BA02 02 06/09/14 07/03/15 System Balise Replace a Failed or Missing ASDO BA04 01 06/09/14 07/03/15 Beacon BA05 Replace a Siemens S21 01 04/03/17 31/05/17 BA06 Reinstate a Siemens S21 Eurobalise 01 04/03/17 31/05/17 BA08 Replace an Alstom Balise 01 03/03/18 31/05/18 Programming an (ASDO) Tracklink 01 BA10 03/03/18 31/05/18

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- III Beacon Replace a (ASDO) Tracklink III 01 BA11 03/03/18 31/05/18 Beacon BL01 Replace a Block Instrument 05 05/03/11 03/09/11 BL02 Replace a Block Switch 05 05/03/11 03/09/11 BL03 Replace a Block Winder 05 05/03/11 03/09/11 Replace a Single Line Block BL04 05 05/03/11 03/09/11 Instrument BL05 Replace a Control Instrument 05 05/03/11 03/09/11 Remove and Re-Fit a Cable Core or CA01 05 05/03/11 03/09/11 Wire

Page 14 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date CA02 Renew a Lineside Multi-Core Cable 05 05/03/11 03/09/11 CA03 Replace a Cable or Wire 06 04/03/17 31/05/17 Joint or Add a Length of Cable or CA04 05 05/03/11 03/09/11 Line Wire CA05 Divert a Faulty Cable Core 06 04/03/17 31/05/17 Renew a Plug Coupled Cable CA06 (“interconnect”) with a Non Certified 01 02/03/13 07/09/13 Replacement Renew a Plug Coupled Cable CA07 (“interconnect”) with a Certified 01 02/03/13 07/09/13 Replacement Joint a length onto a plug coupled CA08 cable/lead (replacing a plug in 01 02/03/13 07/09/13 connector) Replace a panel mounted wired CA09 01 02/03/13 07/09/13 receptacle or plug (Non-Cert) Replace a panel mounted wired CA10 01 02/03/13 07/09/13 receptacle or plug (Certified) CE01 Replace a Secondary Cell or Battery 05 05/03/11 03/09/11 CE02 Replace a Primary Cell or Battery 06 04/03/17 31/05/17 DE01 Replace a Detonator Placer 05 05/03/11 03/09/11 EL01 Replace a Fuse Holder 05 05/03/11 03/09/11 Replace a Barrelled or Clip In EL02 05 05/03/11 03/09/11 Component EL03 Replace a Wire Ended Component 05 05/03/11 03/09/11 EL04 Replace a Filament Lamp 07 03/03/18 31/05/18 Replace a Filament Lamp Holder EL05 05 05/03/11 03/09/11 and/or Springs EL06 Replace a Terminal Block 05 05/03/11 03/09/11 EL07 Replace a Non Plug in Unit 05 05/03/11 03/09/11 EL08 Replace a Plug in Unit 07 03/03/18 31/05/18 Remove and replace a Plug in Unit - EL09 01 03/03/18 31/05/18 Relay EL10 Replace an Audible Unit 05 05/03/11 03/09/11

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Page 15 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Replace a Push Button or Switch EL11 05 05/03/11 03/09/11 Unit EL12 Replace a Plugboard 05 05/03/11 03/09/11 EL13 Re-allocate a Contact 05 05/03/11 03/09/11 EL14 Replace a Geographical Relay Unit 05 05/03/11 03/09/11 EL15 Replace a Contact 05 05/03/11 03/09/11 EL16 Replace a Panel Tile 05 05/03/11 03/09/11 EL17 Replace an Electromagnetic Lock 02 03/03/18 31/05/18 EL18 Remove and Refit a Contact Bank 05 05/03/11 03/09/11 Replace a Printed Circuit Board EL19 (PCB) in an Ansaldo T72 Point 01 05/03/11 03/09/11 Machine Junction Box Removing Dim resistor associated EL20 01 03/03/18 31/05/18 with LED signal head/signal module Replace a Light Emitting Diode EL21 06 03/03/18 31/05/18 (LED) Signal Light Module (SLM) Replace a Howells LED SL35 Light EL22 03 03/03/18 31/05/18 Engine EL25 Replace an Automatic Gate Closer 01 03/03/18 31/05/18 Cambrian ERTMS: Replace a Vital IE02 Single Programmable Printed Circuit 02 03/03/18 31/05/18 Board and/or associated Dongle Cambrian ERTMS: Replace a Non IE03 01 02/03/13 07/09/13 Programmable Printed Circuit Board Cambrian ERTMS: Replace an Item IE06 01 02/03/13 07/09/13 of Plug and Play Equipment Cambrian ERTMS Replace a Non IE07 01 06/09/14 07/03/15 Vital Programmable Device Cambrian ERTMS Replace a Fan IE08 02 03/03/18 31/05/18 Rack Cambrian ERTMS Replace a Plug in IE09 01 06/09/14 07/03/15 Power supply Cambrian ERTMS Program an IE10 01 06/09/14 07/03/15 Ansaldo Eurobalise

Page 16 of 35 --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Cambrian ERTMS Check the IE11 Program Stored on an Ansaldo 01 06/09/14 07/03/15 Eurobalise Cambrian ERTMS Replace an IE12 Ansaldo Eurobalise Mounting 01 06/09/14 07/03/15 Bracket Cambrian ERTMS Replace an IE13 01 06/09/14 07/03/15 Ansaldo Eurobalise Cambrian ERTMS Replace a CRCD IE14 02 03/03/18 31/05/18 Board (Ansaldo Interlocking) Cambrian ERTMS Replace an ISDN IE15 01 06/09/14 07/03/15 V24 Converter Cambrian ERTMS Replace a Fibre IE16 01 06/09/14 07/03/15 Optic or LAN Patch Cord Cambrian ERTMS Replace a IE17 reflective Board, Sign or support 01 06/09/14 07/03/15 structure Replace a CALMS2 Board (Ansaldo IE18 01 03/03/18 31/05/18 interlocking) Replace a CALS Board (Ansaldo IE19 01 03/03/18 31/05/18 Interlocking) Replace a CAP Board (Ansaldo IE20 01 03/03/18 31/05/18 Interlocking) Replace a CAP Dongle (Ansaldo

IE21 01 03/03/18 31/05/18 --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Interlocking) Replace a CIER2 Board (Ansaldo IE22 01 03/03/18 31/05/18 Interlocking) Replace a CME+ Board (Ansaldo IE23 01 03/03/18 31/05/18 Interlocking) Replace a CP module (Ansaldo IE24 01 03/03/18 31/05/18 Interlocking) Replace a CVO Board (Ansaldo IE26 01 03/03/18 31/05/18 Interlocking) Replace a CVO Dongle (Ansaldo IE27 01 03/03/18 31/05/18 Interlocking) Replace a Ethernet Switch (Ansaldo IE28 01 03/03/18 31/05/18 Interlocking)

Page 17 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Replace a IOM-AG module (Ansaldo IE29 01 03/03/18 31/05/18 Interlocking) Replace a IOM-SX module (Ansaldo IE30 01 03/03/18 31/05/18 Interlocking) Replace a MTOR Dongle (Ansaldo IE31 01 03/03/18 31/05/18 Interlocking) Replace a MTOR2 Board (SEI- IE32 01 03/03/18 31/05/18 CLSS) Replace a RIF computer (Ansaldo IE33 01 03/03/18 31/05/18 Interlocking Replace a VSS and 24VHES fuse IE34 01 03/03/18 31/05/18 (Ansaldo Interlocking) Replace an Atlas 200 ETCS IF01 Network Transmission Gateway 01 03/03/18 31/05/18 LRU Replace an Atlas 200 RBC IF02 01 03/03/18 31/05/18 Computing Subsystem Module IF03 Replace an Atlas 200 RBC Fan Unit 01 03/03/18 31/05/18 Replace an Atlas 200 RBC Front IF04 01 03/03/18 31/05/18 Panel Fuse Replace an Atlas 200 RBC I/O IF05 01 03/03/18 31/05/18 Subsystem Module Replace an Atlas 200 RBC Main IF06 01 03/03/18 31/05/18 PSU Replace an RBC Maintenance IF07 Supervision System (MSS) Gateway 01 03/03/18 31/05/18 PC Wyse Terminal Replace an RBC Maintenance IF08 Supervision System (MSS) Sub- 01 03/03/18 31/05/18 --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Component Replace an Atlas 200 LEU COBALT IF10 01 03/03/18 31/05/18 Micro-Coder Replace an Atlas 200 LEU IF11 01 03/03/18 31/05/18 Configuration Key Replace an Atlas 200 LEU MIPS200 IF12 01 03/03/18 31/05/18 Power Supply

Page 18 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Replace a Futur 2500 Radio Block IG10 Centre (RBC) System - Vital Printed 01 03/03/18 31/05/18 Circuit Board and Associated Dongle Replace a Moviola - Vital Printed IG11 01 03/03/18 31/05/18 Circuit Board and Associated Dongle Replace a Reliable Data Storage - IG12 Vital Printed Circuit Board and 01 03/03/18 31/05/18 Associated Dongle Replace a Thameslink RBC System IG13 01 03/03/18 31/05/18 - RBC Processor Mk2 Replace a Thameslink RBC System IG14 01 03/03/18 31/05/18 - RBC Processor Mk2 Card Replace a Thameslink RBC System IG15 01 03/03/18 31/05/18 - STRATUS TCC FTS Replace a Thameslink RBC System IG16 01 03/03/18 31/05/18 - ISDN Unit Replace a ElectroLogIXS Central IH01 01 03/03/18 31/05/18 Power Supply (CPS) Module Replace a ElectroLogIXS Chassis IH02 01 03/03/18 31/05/18 Information (CI) Module Replace a ElectroLogIXS IH03 Communication Input-Output 01 03/03/18 31/05/18 Protocol Converter (PCA) Module Replace a ElectroLogIXS Input - IH04 01 03/03/18 31/05/18 Output (IO) Module Replace a ElectroLogIXS Vital IH05 01 03/03/18 31/05/18 Peripheral Master (VPM) Module Replace a ElectroLogIXS IH06 Personality Module (VIO24-86S and 01 03/03/18 31/05/18 VIO50-86S) Replace a ElectroLogIXS IH07 01 03/03/18 31/05/18 Personality Module (VLD - R8AC) IK01 Replace a Client PC – Fan Unit 01 03/03/18 31/05/18 Replace a Client PC – Power Supply IK02 01 03/03/18 31/05/18 Unit IK03 Replace a Client PC - Hard Drive 01 03/03/18 31/05/18

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Page 19 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Replace a WESTeX IS01 01 03/03/18 31/05/18 Predictor Card Replace a Keylock within an Electric KL01 Release Instrument or Mechanical 05 05/03/11 03/09/11 Lever Replace a Manchester ROC JA10 01 03/03/18 31/05/18 Signalling Network Switch LD01 Replace a Barrier Boom 05 05/03/11 03/09/11 LD02 Replace a Barrier Power Pack 06 04/03/17 31/05/17 LD03 Replace a Level Crossing Gate 05 05/03/11 03/09/11 Replace a Level Crossing Local LD04 05 05/03/11 03/09/11 Control Unit (LCU) Replace a Level Crossing Flasher LD05 06 05/03/16 04/06/16 Unit Replace a Level Crossing Gate Post LD06 05 05/03/11 03/09/11 Mechanical Equipment Lock Replace an S60 Machine (Down LD07 01 03/03/18 31/05/18 Position) Damper Spring Replace a Level Crossing Filament LD08 05 04/03/17 31/05/17 Light Unit LD09 Replace a barrier boom light 01 03/03/18 31/05/18 Replace a Level Crossing Audible LD10 05 05/03/11 03/09/11 Warning Control Unit (AWCU) Replace a Level Crossing Gate LD11 05 05/03/11 03/09/11 Machine Replace an EBI Gate 630 Barrier LD15 01 03/03/18 31/05/18 Machine Replace an EBI Gate 630 Barrier LD16 01 03/03/18 31/05/18 Boom LD17 Replace EBI Gate 630 Motor 01 03/03/18 31/05/18 LD18 Replace EBI Gate 630 Cog Belt 01 03/03/18 31/05/18 Replace EBI Gate 2000 - Modular LD19 01 03/03/18 31/05/18 Components Replace an EBI Gate Sub- LD20 02 04/03/17 31/05/17 component LD21 Replace POGO gate sub-component 01 06/09/14 07/03/15

Page 20 of 35 --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`---

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Replace VaMos Crossing System LD22 01 05/03/16 04/06/16 Sub-components LD23 Replace A Shunt (HXP-3) 01 03/03/18 31/05/18 LD30 Replace a Coe 300 CCTV Module 01 03/03/18 31/05/18 LV01 Replace an Electric Lever Lock 05 05/03/11 03/09/11 LV02 Replace a Circuit Controller 05 05/03/11 03/09/11 LV03 Replace a Plunger 05 05/03/11 03/09/11 LV04 Replace a Key Release Instrument 05 05/03/11 03/09/11 Replace a Mechanical Interlocking LV05 05 05/03/11 03/09/11 Component Replace a Lever or Lever LV06 05 05/03/11 03/09/11

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Component Replace AB Type 803 Style F LV07 05 05/03/11 03/09/11 Rotating Cam Switch Replace a Microswitch within an LV08 01 06/09/14 07/03/15 Ultra Circuit Controller LV09 Replace a Lever frame Key 01 04/03/17 31/05/17 LV10 Replace a Lever frame key lock 01 04/03/17 31/05/17 MS01 Replace a PM SOM24 MAU 01 02/03/13 07/09/13 Replace an Invensys Rail Object MS02 Controller TPWS, or Points 01 02/03/13 07/09/13 Equipment Panel Remove and Refit a Fibre Optic Patch Cord, Fibre Optic Patch MS03 01 02/03/13 07/09/13 Panel, Ethernet cables Fibre Optic lead MS04 Remove and Refit Ethernet Modules 01 02/03/13 07/09/13 Replace a Surge Protection Unit, MS05 01 02/03/13 07/09/13 Surge Suppression Unit MS06 Replace a Switch Rack 01 02/03/13 07/09/13 MS07 Replace a Battery Pack 01 02/03/13 07/09/13 Replace an individual Power Rack MS08 01 02/03/13 07/09/13 Module MS10 Replace a Charger Rack 01 02/03/13 07/09/13

Page 21 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Replace a Power Box Temperature MS11 01 02/03/13 07/09/13 Sensor Replace an Invensys Rail Modular MS12 01 02/03/13 07/09/13 Technicians Facility PC MS13 Replace a Rextron KAG12 switch 01 02/03/13 07/09/13 MS14 Replace an Object Controller 01 02/03/13 07/09/13 MS15 Replace a Feeder Pillar 01 02/03/13 07/09/13 MS16 Replace a Power Box 01 02/03/13 07/09/13 Replace an MCB-OD RADAR OD01 01 02/03/13 07/09/13 Scanner Replace an MCB-OD LIDAR OD02 01 02/03/13 07/09/13 Scanner Replace an MCB-OD RADAR OD03 01 02/03/13 07/09/13 Scanner Replaceable Component Replace Rodding, Drives, Lock and PA01 06 02/03/13 07/09/13 Detector Equipment Replace or Adjust a Point Stretcher PA02 06 06/09/14 07/03/15 Bar PA03 Replace a Crank or signal Wheel 05 05/03/11 03/09/11 Replace or adjust a Tubular Stretch PA04 02 05/03/16 04/06/16 Bar Replace a Complete Clamp Lock PB01 05 05/03/11 03/09/11 Body Replace a Point Hydraulic Power PB02 06 06/09/14 07/03/15 Pack

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- PB03 Replace a Hydraulic Actuator 06 06/09/14 07/03/15 PB04 Replace a Hose 06 06/09/14 07/03/15 Replace an Electric Point Detector PB05 05 05/03/11 03/09/11 or Microswitch Replace a Clamp Lock Detector and PB06 05 05/03/11 03/09/11 Lock Arm Assembly Replace a Break Out Device as PB07 01 06/09/14 07/03/15 used in Hy-drive system Replace an SO Unit as used in the PB08 01 06/09/14 07/03/15 Hy-drive system

Page 22 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Remove and Refit a Hydraulic PB18 01 06/09/14 07/03/15 Derailer unit PC02 Replace an Electric Motor 05 05/03/11 03/09/11 Replace a HW2000 Point Machine PC03 05 05/03/11 03/09/11 Clutch Replace a Ansaldo T72 Point PC04 01 05/03/11 03/09/11 Machine VCC ‘C’ Arm Assembly Replace a Ansaldo T72 Point PC05 01 05/03/11 03/09/11 Machine VCC Lock Frame Assembly Replace an Ansaldo T72 Point PC06 01 05/03/11 03/09/11 Machine VCC Detector Unit Replace a WRSL Style 63 Point PC07 01 05/03/11 03/09/11 Machine Circuit Controller Replace a HW2000 Point Machine PC08 01 04/03/17 31/05/17 Variable Resistor Replace a HW Style Point Machine PC09 02 03/03/18 31/05/18 Gearbox Replace an Electro-Pneumatic (EP) PD01 05 05/03/11 03/09/11 Valve Replace an Electro-Pneumatic (EP) PD02 05 05/03/11 03/09/11 Piston Replace an Electro-Pneumatic (EP) PD03 05 05/03/11 03/09/11 Slide Bar Assembly Replace a HPSS Electrical PH01 06 03/03/18 31/05/18 Component Replace a HPSS Mechanical PH02 05 05/03/11 03/09/11 Component PT01 Replace a Hydro-Pneumatic Unit 05 05/03/11 03/09/11 Replace a Transformer-Rectifier or PW01 05 05/03/11 03/09/11 Battery Charger PW02 Replace a Transformer 05 05/03/11 03/09/11 Replace a Non Plug in Inverter or PW03 05 05/03/11 03/09/11 Converter Replace a Back Projection Lamp SB01 01 05/03/11 03/09/11 Unit SG02 Replace a Lens 05 05/03/11 03/09/11

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Page 23 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date SG03 Replace a Signal Wire (or part of) 05 05/03/11 03/09/11 SG06 Replace a Lamp Case or Pyrometer 05 05/03/11 03/09/11 SG07 Replace a Signal Arm or Fittings 05 05/03/11 03/09/11 Replace a Mechanical Searchlight SG08 05 05/03/11 03/09/11 Mechanism Replace an Ansaldo SD 321 Signal SG11 01 05/03/11 03/09/11 Head Filter Unit Replace an Ansaldo SD 321 Signal SG12 01 05/03/11 03/09/11 Head Optical Unit Replace a SMARTLOCK CIXL SL01 01 06/09/14 07/03/15 Computing Subsystem module Replace a SMARTLOCK CIXL IO SL02 01 06/09/14 07/03/15 Subsystem module Replace a SMARTLOCK CIXL Main SL03 01 06/09/14 07/03/15 PSU Replace a SMARTLOCK TICC Front SL04 01 06/09/14 07/03/15 End Module Replace a SMARTLOCK TICC GW SL05 01 06/09/14 07/03/15 Module Replace a SMARTLOCK SSys SL06 01 06/09/14 07/03/15 Component Replace a SMARTLOCK SSys SL07 01 06/09/14 07/03/15 Client PC SS01 Replace an SSI MPM or PPM 05 05/03/11 03/09/11 SS02 Replace an SSI TFM, DLM, or LDT 05 05/03/11 03/09/11 Replace an Ansaldo Interlocking SS03 01 05/03/11 03/09/11 Plug in Module SS04 Replace a VHLC Card 01 03/03/18 31/05/18 Partial Testing of EBI Track 200 (T121), 50Hz AC, FS2600, Reed, TC00 06 03/03/18 31/05/18 and HVI Track Circuits for Defined Tasks Replace Plug in TC01 06 03/03/18 31/05/18 Equipment TC02 Replace Track Circuit Equipment 07 03/03/18 31/05/18

Page 24 of 35

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Replace a Trackside Track Tuning TC04 05 05/03/11 03/09/11 Unit TC05 Replace a Track Circuit Interrupter 06 04/03/17 31/05/17 TC06 Replace an Impedance Bond 05 05/03/11 03/09/11 TC07 Replace a Track Loop 05 05/03/11 03/09/11 Replace a Track Circuit Aid (TCAID) TC08 05 05/03/11 03/09/11 Unit TQ01 Replace a Silec Mechanical 05 05/03/11 03/09/11 Replace a TETS Wheel Flange TQ02 05 05/03/11 03/09/11 Reading Device Replace a GETS or Siemens TQ03 01 05/03/11 03/09/11 Electronic Wheel Sensor Replace a GETs Electronic Treadle TQ04 01 03/03/18 31/05/18 Unit (ETU) TQ11 Replace a Treadle Timing Screw 01 06/09/14 07/03/15 Replace JE Style Trainstop TS10 01 03/03/18 31/05/18 (Complete) and or Trip Arm Replace JE Style Trainstop - Motor TS11 01 03/03/18 31/05/18 Assembly. Replace WESTCAD-E MCR WC01 01 03/03/18 31/05/18 Modules except CPU-4 Replace WESTCAD-E MCR CPU-4 WC02 01 03/03/18 31/05/18 Modules --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Replace WESTCAD-E MCR WC03 01 03/03/18 31/05/18 Housing Replace a WESTLOCK Interlocking WL01 03 04/03/17 31/05/17 Module Replace a WESTLOCK Ethernet WL02 03 04/03/17 31/05/17 Switch Replace a WESTLOCK Power WL03 01 05/03/11 03/09/11 Supply Unit (PSU) Replace a WESTLOCK CSG or WL04 01 05/03/11 03/09/11 TW(L) Module WL05 Replace a WESTLOCK Baseplate 03 04/0317 31/05/17 Replace a WESTLOCK FEP WL06 02 04/03/17 31/05/17 Housing Backplane

Page 25 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Replace a Siemens Zone Controller WL07 02 04/03/17 31/05/17 module Replace a Siemens Zone Controller WL08 03 04/03/17 31/05/17 Housing Backplane Replace a Siemens Zone Controller WL09 02 04/03/17 31/05/17 PM Backplane Replace a Siemens Zone Controller WL10 02 04/03/17 31/05/17 Surge Interface Board --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Replace a Siemens Zone Controller WL11 01 04/03/17 31/05/17 MAU Backplane Replace a WESTLOCK FEP PM WL12 02 04/03/17 31/05/17 Backplane Replace a Siemens FEP/ZC WL13 02 04/03/17 31/05/17 Addressing Plug Replace a Siemens Zone Controller WL14 01 04/03/17 31/05/17 Housing Replace a Siemens Zone Controller WL15 01 04/03/17 31/05/17 Power Distribution Housing Replace a Siemens FEP/ZC Power WL16 02 04/03/17 31/05/17 Supply Modules Replace a Siemens Zone Controller WL17 02 04/03/17 31/05/17 Power Buffer Unit Replace a Siemens Zone Controller WL18 02 04/03/17 31/05/17 TPWS Circuit Breaker Replace a Siemens Zone Controller WL19 01 04/03/17 31/05/17 I/O Cable Replace a Siemens Ethernet Switch WL20 02 04/03/17 31/05/17 Power Supply Replace a Siemens Ethernet Switch WL21 02 04/03/17 31/05/17 Power Buffer Unit Replace a Siemens AMI-SRA WL22 02 04/03/17 31/05/17 Modular Technicians Facility PC Replace a Siemens BlueChip C110 WL23 02 04/03/17 31/05/17 Technicians Facility PC WP01 Replace a WESTPLEX Module 01 05/03/11 03/09/11 Divert a Faulty WESTPLEX Cable WP02 01 05/03/11 03/09/11 Core

Page 26 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Replace a WESTPLEX LAN End of WP03 01 05/03/11 03/09/11 Line (EOL) Unit

4.5 NR/SMTH/Part M04 – Missing Test Plans Issue Issue Compliance Section Description No. Date Date Index 07 03/03/18 31/05/18 AC01X Missing ATP Loop (Chilterns) 01 05/03/11 03/09/11 AG01X Missing ATP Beacon (GWML) 01 05/03/11 03/09/11 AG02X Missing ATP Loop (GWML) 01 05/03/11 03/09/11 AP01X Missing TPWS Plug in Module 01 05/03/11 03/09/11 AP02X Missing TPWS Transmitter Loop 01 05/03/11 03/09/11 AW01X Missing AWS Permanent Magnet 02 03/03/18 31/05/18 AW02X Missing AWS Electro Magnet 02 03/03/18 31/05/18 Replace a Missing AzL 70, 70/30 AX02X and 70/30s Count Head or Lineside 01 03/03/18 31/05/18 Amplifier Missing Thales AzLM Axle Counter AX03X 02 03/03/18 31/05/18 Rail Contact Replace a SK30K Rail Contact AX11X 01 03/03/18 31/05/18 (AzLM & AzLE) Missing Siemens Axle Counter DEK AX26X 43 Wheel Detector or Trackside 02 02/03/13 07/09/13 --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Connection Box Missing Frauscher wheel sensor 31/05/17 AX40X RSR123 04 04/03/17 Replace a Missing RSE Wheel 31/05/18 AX95X Sensor Assembly 01 03/03/18 Replace a Missing RSE Wheel AX96X Sensor Assembly Cable Junction 01 03/03/18 31/05/18 Box. Replace Missing a Platform BA02X 02 06/09/14 07/03/15 Identification Beacon System Balise Replace a Missing Siemens S21 BA05X 01 04/03/17 31/05/17 Eurobalise BA08X Replace an Alstom Balise 01 03/03/18 31/05/18 BL01X Missing Block Instrument 01 05/03/11 03/09/11

Page 27 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date CE01X Missing Secondary Cell or Battery 01 05/03/11 03/09/11 Cambrian ERTMS Replace a IE11X 01 06/09/14 07/03/15 Missing Ansaldo Eurobalise Cambrian ERTMS Replace a IE12X 02 03/03/18 31/05/18 Missing Reflective Board or Sign Missing Barrelled or Clip In EL02X 01 05/03/11 03/09/11 Component EL04X Missing Filament Lamp 01 05/03/11 03/09/11 EL08X Missing Plug in Unit 01 05/03/11 03/09/11 EL25X Missing Lineside Disconnection Box 01 05/03/11 03/09/11 EL26X Missing Link 01 05/03/11 03/09/11 LD01X Missing Barrier Boom 01 05/03/11 03/09/11 Missing Level Crossing Filament LD08X 01 05/03/11 03/09/11 Light Unit PB02X Missing Point Hydraulic Power Pack 01 05/03/11 03/09/11 PB04X Missing Hose 01 05/03/11 03/09/11 PB05X Missing Point Detector/Mircoswitch 01 05/03/11 03/09/11 PH01X Missing HPSS Electrical Component 01 05/03/11 03/09/11 Missing HPSS Mechanical PH02X 01 05/03/11 03/09/11 Component SG02X Missing Lens 01 05/03/11 03/09/11 Missing Plug in Track Circuit TC01X 01 05/03/11 03/09/11 Equipment TC02X Missing Track Circuit Equipment 01 05/03/11 03/09/11 TC04X Missing Trackside Track Tuning Unit 01 05/03/11 03/09/11 TC06X Replace an Impedance Bond 01 05/03/11 03/09/11 TQ01X Missing Silec Mechanical Treadle 01 05/03/11 03/09/11

4.6 NR/SMTH/Part 05 – Failure Investigation Issue Issue Compliance Section Description No. Date Date Index 11 03/03/18 31/05/18 FF01 Faulting Guide: Lucas Track Circuit 01 02/03/13 07/09/13 FF02 Faulting Guide: DC Track Circuit 01 02/03/13 07/09/13

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Page 28 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Faulting Guide: Aster 1 Watt Track FF03 01 02/03/13 07/09/13 Circuit Faulting Guide: EBI Track 200 FF04 03 03/03/18 31/05/18 (TI21) Track Circuit Faulting Guide: Aster SF15/U Track FF05 01 02/03/13 07/09/13 Circuit Faulting Guide: High Voltage FF06 02 03/03/18 31/05/18 Impulse (HVI) Track Circuits Faulting Guide: 50Hz AC Track FF07 01 02/03/13 07/09/13 Circuit Faulting Guide: EBI Gate 200 Level FF08 02 31/05/17 Crossing System 04/03/17 Faulting Guide : GateCare NR2 FF09 Power Operated Gate Opener 01 06/09/14 07/03/15 (POGO) Faulting Guide:Frauscher Advanced FF10 02 06/09/14 07/03/15 Axle Counter Faulting Guide: Platform FF11 03 05/03/16 04/06/16 Identification Beacon FF12 Faulting Guide: TPWS Flowchart 02 05/03/16 04/06/16 Faulting Guide:TPWS FF13 07 04/03/17 31/05/17 FF14 Faulting Guide: 650V 06 05/03/16 04/06/16 FF15 Faulting Guide: 650V Flowchart 02 05/03/16 04/06/16 FF17 Faulting Guide: Siemens ACM100 02 03/03/18 31/05/18 --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- FF18 FF18 Fault Finding Guide: VHLC 01 03/03/18 31/05/18 Faulting Guide EBI Gate 2000 Level 01 FF19 03/03/18 31/05/18 Crossing System FF21 Faulting Guide JE Style Trainstop. 01 03/03/18 31/05/18 Fault Finding Guide for the EBI 630 01 FF22 03/03/18 31/05/18 Barrier Machine FF24 Fault Finding Guide for ARAMIS 01 03/03/18 31/05/18 S001 Failure and Incident Testing 10 03/03/18 31/05/18 S002 Serious Incidents Including SPADs 05 05/03/11 03/09/11 Data Loggers and Condition S003 05 05/03/11 03/09/11 Monitoring Systems

Page 29 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Test and Fault Finding Guide S005 05 05/03/11 03/09/11 Alphabetical Index Signalling Failure and Incident T001 01 05/03/11 03/09/11 Testing Guide Wrong Side Failure Test Guide: T002 07 03/03/18 31/05/18 Track Circuits Wrong Side Failure Test Guide: T003 05 06/09/14 07/03/15 Depression Bar Wrong Side Failure Test Guide: T004 07 03/03/18 31/05/18 Thales AzLM Axle Counter Wrong Side Failure Test Guide: T005 05 05/03/11 03/09/11 Block Wrong Side Failure Test Guide: T006 06 03/03/18 31/05/18 Obscured Signals Wrong Side Failure Test Guide: T007 05 05/03/11 03/09/11 Lamp – No Light (Any Type) Wrong Side Failure Test Guide: T008 07 03/03/18 31/05/18 Colour Light Signal Wrong Side Failure Test Guide: T009 05 05/03/11 03/09/11 Mechanical Signal Wrong Side Failure Test Guide: T010 06 06/09/14 07/03/15 Points Wrong Side Failure Test Guide: T011 08 03/03/18 31/05/18 (AWS) Wrong Side Failure Test Guide: T012 05 05/03/11 03/09/11 Automatic Level Crossings Wrong Side Failure Test Guide: T013 05 05/03/11 03/09/11 Manned Level Crossings Wrong Side Failure Test Guide: T014 05 05/03/11 03/09/11 Staff Warning Systems Wrong Side Failure Test Guide: T015 05 05/03/11 03/09/11 Electro-Hydraulic Trainstop Wrong Side Failure Test Guide: T016 Automatic Train Protection (ATP) 05 05/03/11 03/09/11 (Chilterns)

T017 Wrong Side Failure Test Guide: 05 05/03/11 03/09/11 Automatic Train Protection (ATP)

Page 30 of 35

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date (GWML) Wrong Side Failure Test Guide: T018 05 05/03/11 03/09/11 Balise (TASS) Wrong Side Failure Test Guide: T019 Train Protection Warning System 07 04/03/17 31/05/17 (TPWS) Wrong Side Failure Test Guide: EBI T020 02 31/05/17 Gate 200 04/03/17 Wrong Side Failure Test Guide: 01 T021 31/05/18 Vamos Crossing System 03/03/18 Wrong Side Failure Test Guide: 01 T022 31/05/18 Harmon Crossing Predictor HPX-3 03/03/18 Wrong Side Failure Test Guide: 01 T023 31/05/18 VHCL systems 03/03/18 Wrong side Failure Test Guide: T030 Cambrian ERTMS Irregular 01 06/09/14 07/03/15 Movement Authority Wrong side Failure Test Guide: Cambrian ERTMS Incorrect T031 01 06/09/14 07/03/15 Information Received from a Eurobalise by a train Wrong Side Failure Guide : Siemens 01 T032 03/03/18 31/05/18 ACM 100 Wrong Side Failure Test Guide: T033 02 31/05/18 Balise (Siemens S21 Eurobalise) 03/03/18 Signalling Intermittent/Obscure U001 05 05/03/11 03/09/11 Failure Guides Intermittent/Obscure Failure Guide: U002 05 05/03/11 03/09/11 Point Machines --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Intermittent/Obscure Failure Guide: U003 05 05/03/11 03/09/11 Rail Clamp Point Lock Intermittent/Obscure Failure Guide: U004 05 05/03/11 03/09/11 Electro-Pneumatic Points Intermittent/Obscure Failure Guide: U005 05 05/03/11 03/09/11 Track Circuits Intermittent/Obscure Failure Guide: U006 05 05/03/11 03/09/11 Colour Light Signals

Page 31 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Tests Following an Alleged Signal U007 06 03/03/18 31/05/18 Passed at Danger (SPAD) Tests Following an Alleged Change U008 05 05/03/11 03/09/11 of Aspect (COA) Right Side Failure Test Guide: U009 06 03/03/18 31/05/18 Automatic Warning System (AWS) Intermittent/Obscure Failure Guide: U011 05 05/03/11 03/09/11 Automatic Half Barrier Crossings Intermittent/Obscure Failure Guide: U012 Manually Controlled Barriers 05 05/03/11 03/09/11 (including CCTV) Appendix 01 WSF Test Guide Flowcharts 01 05/03/11 03/09/11 Appendix 02 Instead Data Loggers 01 05/03/11 03/09/11 Train Protection Warning System Appendix 04 01 05/03/11 03/09/11 (TPWS) Failure Report Form Signal Failure & Incident Testing: Appendix 06 Wrongside Failure or Incident Check 02 05/03/11 03/09/11 Sheets Signal Failure & Incident Testing: Appendix 07 Intermittent/Obscure Failure Check 02 05/03/11 03/09/11 Sheets

4.7 NR/SMTH/Part 06 – Telecom Test Plans Issue Issue Compliance Section Description No. Date Date Index 02 03/03/18 31/05/18 Telecoms Maintenance Testing and Part 06 01 05/03/11 03/09/11 Fault Investigation Telecom Maintenance Test Plan: CAB001 Replace or Repair a Telecoms Tail 01 05/03/11 03/09/11 Cable Telecom Maintenance Test Plan: TEL001 01 05/03/11 03/09/11 Replace a Telephone Telecom Maintenance Test Plan: TEL002 01 05/03/11 03/09/11 Replace a Selective Telephone Telecom Maintenance Test Plan: TEL008 01 05/03/11 03/09/11 Replace a Telephone Handset/Cord --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Page 32 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Issue Issue Compliance Section Description No. Date Date Replace a Power supply module IR67 01 03/03/18 31/05/18 and battery pack Replace a Base station radio IR68 01 03/03/18 31/05/18 modules Replace a system control radio rack IR69 01 03/03/18 31/05/18 card/module Replace a RETB TPWS frequency IR70 01 03/03/18 31/05/18 converter Telecom Maintenance Test Plan: MISS001 Missing Telephone, Telephone 01 05/03/11 03/09/11 Handset or Handset Cord Telecom Maintenance Test Plan: MISS002 Missing Loud Sounding or Extension 01 05/03/11 03/09/11 Bell Telecom Maintenance Test Plan: MISS003 01 05/03/11 03/09/11 Missing Telecoms Tail Cable Telecoms Failure Investigation Test TELTFI001 01 05/03/11 03/09/11 Guide: Telephones

4.8 NR/SMTH/Part 07 – Pre Planned Testing Issue Issue Compliance Section Description No. Date Date Index 04 03/03/18 31/05/18 Appendix A Renew Cables by Top Nutting 01 05/03/11 03/09/11 Appendix Status of Existing Cable Checksheet 01 05/03/11 03/09/11 A-01 Appendix Cables Terminated on RHS 01 05/03/11 03/09/11 A-02 Checksheet Appendix Cables Terminated on LHS 01 05/03/11 03/09/11 --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- A-03 Checksheet Appendix Top Nutted Cable on LHS 01 05/03/11 03/09/11 A-04 Checksheet Appendix Top Nutted Cable on RHS 01 05/03/11 03/09/11 A-05 Checksheet Appendix Cables on LHS Changeover 01 05/03/11 03/09/11 A06 Checksheet

Page 33 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

Appendix Cables on RHS Changeover 01 05/03/11 03/09/11 A-07 Checksheet Isolation of TPWS Equipment at AP51 Simple Permanent Speed 02 04/03/17 31/05/17 Restrictions (PSR) Relocate a TPWS Buffer Stop AP53 01 05/03/11 03/09/11 Arming Loop AX69 Replace an Axle Counter Sub-rack 01 03/03/18 31/05/18 CA51 Top Nut an Existing Cable Test Plan 01 05/03/11 03/09/11 Change Over a Top Nutted Cable CA52 01 05/03/11 03/09/11 Test Plan EL17 Upgrade a TRTS Push Button 01 03/03/18 31/05/18 Replace an Electro-mechanical EL23 banner repeating signal with an LED 01 03/03/18 31/05/18 type, using a Howells Interface Unit EL50 Upgrade a TRTS push button 01 03/03/18 31/05/18 Installation of Intelligent ER01 01 03/03/18 31/05/18 infrastructure data logger HABD Equipment: Phoenix MB HD01 01 02/03/13 07/09/13 Remove and Refit for Tamping Work Replace a BR843 Level Crossing LD52 01 05/03/11 03/09/11 Barrier Pedestal Replace a Level Crossing Filament LD58 01 05/03/11 03/09/11 Light Unit PC51 Replace a Complete Point Machine 01 05/03/11 03/09/11 Replace a Filament Light Type SG51 02 03/03/18 31/05/18 Signal Head Replace an Electro-Mechanical SG52 01 05/03/11 03/09/11 Signal Replace an Electro-Mechanical SG53 01 05/03/11 03/09/11 Indicator SG54 Replace a Fibre Optic Signal 01 05/03/11 03/09/11

--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Replace a Light Emitting Diode SG55 03 31/05/18 (LED) Signal 03/03/18 Signal House Fibre Optic Banner to SG56 01 31/05/18 LED conversion - Style Off 1 On 2 03/03/18 Signal House Fibre Optic Banner to SG57 01 31/05/18 LED conversion - Style Off 2 On 2 03/03/18

Page 34 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST Ref: NR/L3/SIG/11231 Issue: 11 Date: 03 March 2018 Compliance date: 31 May 2018

SG51X Missing Filament Lamp Signal Head 02 03/03/18 31/05/18 --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`---

Page 35 of 35

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST

Standard and control document briefing note

Ref: NR/L3/SIG/11231 Issue: 11 Title: Signal Maintenance Testing Handbook (SMTH) Publication date: 03/03/2018 Compliance Date: 31/05/2018 Standard/Control Document Owner: Professional Head of Signalling Non-compliance rep (Approver of TRACKER applications): Route Asset Manager (Signalling) Technical lead/contact for briefings: Pardip Basran – Senior Engineer (Signalling) Tel: 07801 903854 Purpose: Scope: This document contains the index to the Signal Maintenance Signalling equipment that is replaced or renewed on a like for like Testing (NR/SMTH). basis under corrective maintenance, temporary design as a result of an incident or engineering works and minor signalling renewals The SMTH provides a maintenance testing regime for the that do not affect the application logic of the system or, the replacement or installation of signalling equipment that does not controls of the system that have previously been tested to signal affect the application logic of the system or, the controls of the works testing. system that have previously been tested to signal works testing. What’s new/ what’s changed:

a) The table below summarises all the sections/clauses that have been amended/deleted/added: NOTE: It is the duty of those briefed or notified, to read through this document and familiarise themselves with its content.

Section/clause Amended/ Summary of changes deleted/ new Amended formatting and step numbering errors. SMTH Part 2 Part 02 Amended Included to 9.4- requirement to have permutation charts provided in the pre Introduction and Overview planning stage. SMTH Part 3 B05 Defined Test: updated To make consistent the SMS and SMTH the actions required for Earth Earth Test (DC up to a nominal Amended --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- faults 120V) SMTH Part 3 Check A01 - A requirement added to verify the the replacement relay type before attaching a Defined Check Check for Amended Remax top as these are not coded Correct Type SMTH Part 3 Test B20 - Defined Test TPWS Module or A requirement to check the diagram for the correct links, Feed back from Amended Transmitter Loop Replacement Training Center Reformatted following Failure SMTH Part 3 Test B21 - Defined Test TPWS Remove and Refit Amended Title changed to clarify following feed back from Training Center Test SMTH Part 3 Test B22 - Defined Test TPWS Self-Powered OSS Amended Title changed to clarify following feed back from Training Center reformated (SPOSS) Trackside Equipment Test SMTH Part 4 AP03 - Remove and Refit an TPWS Transmitter Amended Typo corrected (link to defined test incorrectly titled) Loop Following Track Renewals Work SMTH Part 4 EL04 Replace a Instruction on how to install quartz Halogen lamp added . (as instructed by Amended Filament Lamp Technical Instruction 169) SMTH Part 4 EL08 - Replace a An additional note has been added concerning the need to verify the the Amended Plug in Unit replacement relay type before attaching a Remax top as these are not coded SMTH Part 4 EL21 Replace a Changed Reference to Test 021(filament lamp test) to test 022(Signal lamp & Light Emitting Diode (LED) Amended Light module proving test) in step 12. Document RAGed and formatted Signal Light Module (SLM) SMTH Part 4 PC09 - Replace a HW Style Point Machine Amended Replacing an HW 2000 Gearbox added Gearbox SMTH Part 4 PH01 Replace a New supplementary sensor bracket mounting requirements added to page 2 (as Amended HPSS Electrical Component instructed by Technical Instruction 133) SMTH Part 4 TC01 Replace Guidance added on Relay replacement management at beginning of test slip Amended Plug in Track Circuit Equipment and RAGed SMTH Part 4 TC02 Replace Amended Guidance added on Relay replacement management at beginning of test slip Track Circuit Equipment SMTH Part 5 T002 Wrong Side D16 changed to read refer to test 279 instead of test 301 (As instructed by Failure Test Guide: Track Amended Technical Instruction 089) AND RAGed Circuits SMTH Part 5 T033 - Wrong Side Amended Ammended to include WSF testing of Alstom Balise Failure Test Guide Balise

Copyright SMTHNetwork Rail Part 5 FF06 Faulting Guidance for working in DC traction areas added to page 1 of FF06 (as Provided by IHS Markit under license with Network Rail Amended Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproductionGuide: or networking High permitted Voltage without Impulse license from IHS instructed by TechnicalNot for Resale, Instruction 03/09/2018 04:02:45 045) MST

(HVI) Track Circuits SMTH Part 5 S001 Failure and Amended Issue number amended from 8 to 10 added Incident Testing SMTH Part 5 U009 Right Side Notes taken from TI005 added to beginning of U009 (As instructed by Technical Failure Test Guide: Automatic Amended Instruction 005) Warning System (AWS) SMTH Part 4 AX01 - Replace a AzL 70, 70-30 and 70-30s Amended Amended to reference to SMS Appendix 15 Evaluator Card SMTH Part 4 AX02 - Replace a AzL 70, 70-30 and 70-30s Count Amended Amended to reference test 042 & SMS Appendix 15 Head or Lineside Amplifier SMTH Part 4 AX03 - Replace a SK30H Rail Contact (AzLM & Amended Amended to show SMS Appendix 15 & 045 AzLE) SMTH Part 4 AX04 - Replace a Amended Amended to show SMS Appendix 15 and SMS Test 030 EAK30H Unit (AzLM & AzLE) SMTH Part 4 AX05 - Replace a Amended to SMS Appendix 15 , Record Card name changed And card Amended EAK30H Board (AzLM & AzLE) compatibility Matrix Added SMTH Part 4 AX06 - Replace a Amended Amended to show SMS Appendix 15 EP-EPCM CPU Card (AzLM) --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- SMTH Part 4 AX07 - Replace a Amended Amended to show AzLE, SMS Appendix 15 and card compatibility Matrix Added ACE Serial-Parallel Card (AzLM) SMTH Part 4 AX08 - Remove and Refit Rail Contact (All Azl, Amended Amended to show AzLE, SMS Appendix 15 and two additional tests added AzLM and AzLE) SMTH Part 4 AX09 - Replace an Amended Amended to show AzLE & SMS Appendix 15 EAK30K Unit (AzLM & AzLE) SMTH Part 4 AX10 - Replace an Rail Contact Adaptor (RCA) Amended Amended to show AzLE & SMS Appendix 15 (AzLM and AzLE) SMTH Part 4 AX11 - Replace a SK30K Rail Contact (AzLM and New New Test Plan AzLE) SMTH Part 4 AX60 - Replace a Converter ISDN Ethernet (CIE) New New Test Plan (AzLM) SMTH Part 4 AX61 - Replace a Converter ISDN Ethernet (CIE) New New Test Plan DC - DC Power Supply (AzLM) SMTH Part 4 AX62 - Replace a Single Channel Controller New New Test Plan (SCC) CPU Card (AzLM) SMTH Part 4 AX63 - Replace a Power Data Coupling Unit New New Test Plan (PDC) (AzLM) SMTH Part 4 AX64 - Replace a DC - DC Convertor (Power New New Test Plan Supply to EAK) (AzLM) SMTH Part 4 AX65 - Replace an ACE DC - DC Power Card New New Test Plan (AzLM) SMTH Part 4 AX66 - Replace a New New Test Plan ISDN V24 Converter SMTH Part 4 AX67 - Replace a New New Test Plan Modem Card(AzLE) SMTH Part 4 AX68 - Replace a New New Test Plan Section Card (AzLE) SMTH Part 4 AX70 - Replace a Sedlbauer unit (PMC New New Test Plan Transformer) (AzLM & AZLE) SMTH Part 4 AX71 - Replace an New New Test Plan ACE Power Supply Card (AzLE) SMTH Part 4 AX72 - Replace an ACE Detection Point Power New New Test Plan Supply Card (AzLE) SMTH Part M04 AX02X - Replace a Missing AzL 70, New New Test Plan 70/30 and 70/30s Count Head or Lineside Amplifier Test plan renamed, and divided to increase clarity into different head types (See SMTH Part M04 AX03X - AX11X) Replace a SK30H Rail Contact New Clause 2, and 23,24, 25 updated in SMTH (As instructed by Technical (AzLM & AzLE) Instruction 104) Copyright Network Rail Provided bySMTH IHS Markit Part under licenseM04 with AX11X Network Rail - New New Test plan createdLicensee=Resourcing when Solutions AX03X Limited/1121226001, was divided User=Christopherson, to increase Joseph clarity. No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST

Replace a SK30K Rail Contact Clause 2, and 21,22,23 updated in SMTH (As instructed by Technical (AzLM & AzLE) Instruction 104) SMTH Part 5 T004 - Thales Axle Additional tests added and amended to show SMS Appendix 15, SMS Test 030 Counter Wrongside Failure Amended & 042 Investigation SMTH Part 7 AX69 - Replace an New New Pre Planned Test Plan Axle Counter Sub-rack SMTH Part 03 B07 Defined Amended f. has test 302 added to the end of "Check that adequate sighting…." Test: Aspect sequence test SMTH Part 04 EL22 Replace a Amended Wire count added to the before check. Beam alighnment check added. howells LED SL35 Light Engine SMTH PartM04 IE12X Amended 10. Changed this to state carry out test 302. SMTH PartM04 SG51X Amended 19. added in signal visibility check test 302. T006 A D02 - added test 302 , removed information "The NR/SMS signal lamp record card gives details of the signal sighting". T006 B N03 and D02 - added SMTH Part 05 T006 wrong side test 302 and removed the information box. T006C failure test guide obscured Amended New step N11: “Check for correct type of signal i.e. ground mounted or elevated” signals added. This was a standard change request (SCR1010), which was the product of a helpline query 439. Document RAGed SMTH Part 05 T008 wrong side failure test guide: colour light Amended Step N40 added test 302 and removed the information box after. signal SMTH Part 05 U007 Tests 14. reworded to remove the reference to the sighting chart in figure 1 (now following an alleged signal Amended deleted) carry out signal visibility check test 302 has been added instead. passed at danger (SPAD) SMTH Part 07 SG51 Replace a Amended 19. added in signal visibility check test 302. filamnet light type signal head SMTH Part 07 SG54 Replace a Amended 21. Removed sighting test requirement Fibre Optic Signal SMTH Part 07 SG55 Replace a Light Emitting Diode (LED) Amended 19. Removed sighting test requirement Signal SMTH Part 4 AW01 Amended References section Z01 and record Card SMTH Part M04 AW01X Amended References section Z01 and record Card Refer Plug Couple dust cap clear, Refer Z01 and added comment about SMTH Part 4 AW02 Amended internal spark quench diodes not being fitted in Vortok magnets Refer Plug Couple dust cap clear, Refer Z01 and added comment about SMTH Part M04 AW02X Amended internal spark quench diodes not being fitted in Vortok magnets Note about Class 319 EMU’s added and internal spark quench diodes not being SMTH Part 5 T011 Amended fitted in Vortok magnets SMTH Part 04 TC00 Partial Added remove and replace TC Connections to the EBI 200 defined tasks box Amended testing of EBI 200 ….. and included disconnection information to close out SINCS failure FRI267773. SMTH Part 06 IR67 - Replace a Power Supply Module and Amended New SMTH Test Plan Battery Pack SMTH Part 06 IR68 - Replace a Replace Base Station Radio Amended New SMTH Test Plan Modules SMTH Part 06 IR69 - Replace a Replace system Control Radio Amended New SMTH Test Plan Rack Card/Module SMTH Part 06 IR70 - Replace a RETB TPWS Frequency Amended New SMTH Test Plan Converter • Move away from multi-meter to current clamp. Simplifying process and reducing potential cabling defects • Modified SMS frequency from 12 months to 6 to 12 months after reliability SMTH Part 04 AX28 - Replace a Amended concerns on Borders Siemens WSD Wheel Detector • Update to more specific torque values • Introduction of a record card • General overhaul of documentation to ease and clarify information • Move away from multi-meter to current clamp. Simplifying process and reducing potential cabling defects SMTH Part 04 AX29 - Replace a • Modified SMS frequency from 12 months to 6 to 12 months after reliability Siemens Axle Counter ACM 100 Amended concerns on Borders

Module • Update to more specific torque values --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- • Introduction of a record card • General overhaul of documentation to ease and clarify information

Copyright Network Rail Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST

• Move away from multi-meter to current clamp. Simplifying process and reducing potential cabling defects SMTH Part 04 AX30 - Replace a • Modified SMS frequency from 12 months to 6 to 12 months after reliability Siemens Axle Counter System Amended concerns on Borders Sub-Components • Update to more specific torque values • Introduction of a record card • General overhaul of documentation to ease and clarify information • Move away from multi-meter to current clamp. Simplifying process and reducing potential cabling defects SMTH Part 04 AX31 - Replace a • Modified SMS frequency from 12 months to 6 to 12 months after reliability Siemens WSD Wheel Detector Amended concerns on Borders secured with Rail Clamp • Update to more specific torque values • Introduction of a record card • General overhaul of documentation to ease and clarify information • Move away from multi-meter to current clamp. Simplifying process and reducing potential cabling defects SMTH Part 05 T032 - Wrong • Modified SMS frequency from 12 months to 6 to 12 months after reliability Side Failure Guide : Siemens Amended concerns on Borders ACM 100 • Update to more specific torque values • Introduction of a record card • General overhaul of documentation to ease and clarify information • Move away from multi-meter to current clamp. Simplifying process and reducing potential cabling defects --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- • Modified SMS frequency from 12 months to 6 to 12 months after reliability SMTH Partt 05 FF17 - Fault Amended concerns on Borders Guide : Siemens ACM 100 • Update to more specific torque values • Introduction of a record card • General overhaul of documentation to ease and clarify information SMTH Part 4 AX95 - Replace a New New Test plan RSE Wheel Sensor Assembly SMTH Part 4 AX96 - Replace a RSE Wheel Sensor Assembly New New Test plan Cable Junction Box SMTH Part 4 AX97 - Replace a ARS 4 Evaluation Board or New New Test plan Enclosure SMTH Part 4 AX98 - Replace a New New Test plan ARS 4 Power Supply SMTH Part M04 AX95X - Replace a Missing RSE Wheel New New Test plan Sensor Assembly SMTH Part M04 AX96X - Replace a Missing RSE Wheel New New Test plan Sensor Assembly Cable Junction Box. SMTH Part 4 IK01 - Replace a New New Test plan Client PC - Fan SMTH Part 4 IK02 - Replace a New New Test plan Client PC - PSU SMTH Part 4 IK03 - Replace a New New Test plan Client PC - SSD Hard Drive SMTH Part 5 FF24 Fault Finding New New Faulting Guide Document For ARAMIS Guide for ARAMIS SMTH Part 4 TS10 - Replace JE Style Trainstop (Complete) and New New Test plan or Trip Arm. SMTH Part 4 TS11 - Replace JE Style Trainstop - Motor New New Test plan Assembly. SMTH Part 5 FF21 - Faulting New New Fault Finding Guide Guide JE Style Trainstop. SMTH Part 4 EL25 - Replace an New New Test plan for Automatic Gate Closer Automatic Gate Closer SMTH Part 4 WC01 - Replace WESTCAD-E MCR Modules New New Test plan except CPU-4 SMTH Part 4 WC02 - Replace WESTCAD-E MCR CPU-4 New New Test plan Modules SMTH Part 4 WC03 - Replace New New Test plan WESTCAD-E MCR Housing SMTH Part 4 IG10 - Replace a Futur 2500 Radio Block Centre (RBC) System - Vital Printed New New Test plan Copyright Network Rail Provided byCircuit IHS Markit Board under license and with NetworkAssociated Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproductionDongle or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST

SMTH Part 4 IG11 - Replace a Moviola - Vital Printed Circuit New New Test plan Board and Associated Dongle SMTH Part 4 IG12 - Replace a Reliable Data Storage - Vital New New Test plan Printed Circuit Board and Associated Dongle SMTH Part 4 IG13 - Replace a Thameslink RBC System - RBC New New Test plan Processor Mk2 SMTH Part 4 IG14 - Replace a Thameslink RBC System - RBC New New Test plan Processor Mk2 Card SMTH Part 4 IG15 - Replace a Thameslink RBC System - New New Test plan STRATUS TCC FTS SMTH Part 4 IG16 - Replace a Thameslink RBC System - ISDN New New Test plan Unit SMTH Part 4 LD15 - Replace an New New Test Plan EBI Gate 630 Barrier Machine SMTH Part 4 LD16 - Replace an New New Test Plan EBI Gate 630 Barrier Boom SMTH Part 4 LD17 - Replace New New Test Plan EBI Gate 630 Motor SMTH Part 4 LD18 - Replace New New Test Plan EBI Gate 630 Cog Belt SMTH Part 4 LD19 - Replace EBI Gate 2000 - Modular New New Test Plan Components SMTH Part 5 FF19 - Faulting Guide EBI Gate 2000 Level New New Faulting Guide Crossing System SMTH Part 4 IH01 - Replace a ElectroLogIXS Central Power New New Test Plan Supply (CPS) Module SMTH Part 4 IH02 - Replace a ElectroLogIXS Chassis New New Test Plan Information (CI) Module SMTH Part 4 IH03 - Replace a ElectroLogIXS Communication New New Test Plan Input-Output Protocol Converter (PCA) Module SMTH Part 4 IH04 - Replace a ElectroLogIXS Input - Output New New Test Plan (IO) Module SMTH Part 4 IH05 - Replace a

ElectroLogIXS Vital Peripheral New New Test Plan --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- Master (VPM) Module SMTH Part 4 IH06 - Replace a ElectroLogIXS Personality New New Test Plan Module (VIO24-86S and VIO50- 86S) SMTH Part 4 IH07 - Replace a ElectroLogIXS Personality New New Test Plan Module (VLD - R8AC) SMTH Part 4 IF01 - Replace an Atlas 200 ETCS Network New New Maintenance Task Transmission Gateway LRU SMTH Part 4 IF02 - Replace an Atlas 200 RBC Computing New New Maintenance Task Subsystem Module SMTH Part 4 IF03 - Replace an New New Maintenance Task Atlas 200 RBC Fan Unit SMTH Part 4 IF04 - Replace an New New Maintenance Task Atlas 200 RBC Front Panel Fuse SMTH Part 4 IF05 - Replace an Atlas 200 RBC IO Subsystem New New Maintenance Task Module SMTH Part 4 IF06 - Replace an New New Maintenance Task Atlas 200 RBC Main PSU SMTH Part 4 IF07 - Replace an RBC MSS Gateway PC Wyse New New Maintenance Task Terminal Copyright Network Rail Provided bySMTH IHS Markit Part under license4 IF08 with Network - Replace Rail an New New MaintenanceLicensee=Resourcing Task Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST

RBC MSS Sub-Component SMTH Part 4 IF10 - Replace an Atlas 200 LEU COBALT Micro- New New Maintenance Task Coder SMTH Part 4 IF11 - Replace an Atlas 200 LEU Configuration New New Maintenance Task Key SMTH Part 4 IF12 - Replace an Atlas 200 LEU MIPS200 Power New New Maintenance Task Supply SMTH Part 4 BA08 - Replace an Amended Amendments to the Balise Alstom Balise SMTH Part 5 T033 - WSF Amended Renamed and amended slightly now includes Alstom Balised Testing Balise SMTH Part M04 BA08X - Amended Amendments to the LEU Micro-coder indications Replace an Alstom Balise SMTH Part 4 LD23 Replace A New New test plan for Replace a Shunt (HXP-3) Shunt (HXP-3) SMTH Part 4 SS04 Replace a New New test plan for VHLC card VHLC Card SMTH Part 5 FF18 Fault New New Faulting Guide Document For Vital Harmon Logic Controller (VHLC) Finding Guide: VHLC SMTH Part 5 T021 Wrong Side New WSF Test guide for VHLC systems. (taken from VHLV SFI Supplement Failure Test Guide: VHCL New v0.6) systems SMTH Part 5 T022 Wrong Side Failure Test Guide: Harmon New New WSF Test guide for HXP-3 (taken from HXP-3 SFI supplement v0.6) Crossing Predictor HPX-3 SMTH Part 04 IE02 - Replace a Updated to remove components which now have their own test plans written as Amended Vital Single Programmable PCB part of the Ferriby to Gilberdyke project SMTH Part 04 IE08 - Replace a New New Test plan for Ansaldo Interlocking PVF Rack SMTH Part 04 IE14 - Replace a New New Test plan for Ansaldo Interlocking CRCD Board SMTH Part 04 IE18 - Replace a New New Test plan for Ansaldo Interlocking CALM2 Board SMTH Part 04 IE19 - Replace a New New Test plan for Ansaldo Interlocking CALS Board SMTH Part 04 IE20 - Replace a New New Test plan for Ansaldo Interlocking CAP Board SMTH Part 04 IE21 - Replace a New New Test plan for Ansaldo Interlocking CAP Dongle SMTH Part 04 IE22 - Replace a New New Test plan for Ansaldo Interlocking CIER2 Board SMTH Part 04 IE23 - Replace a New New Test plan for Ansaldo Interlocking CME+ Board SMTH Part 04 IE24 - Replace a New New Test plan for Ansaldo Interlocking CP Module SMTH Part 04 IE26 - Replace a New New Test plan for Ansaldo Interlocking CVO Board SMTH Part 04 IE27 - Replace a New New Test plan for Ansaldo Interlocking CVO Dongle SMTH Part 04 IE28 - Replace a Ethernet Switch (Cisco WS- New New Test plan for Ansaldo Interlocking C3850-24P-S) SMTH Part 04 IE29 - Replace a New New Test plan for Ansaldo Interlocking IOM-AG modules SMTH Part 04 IE30 - Replace a New New Test plan for Ansaldo Interlocking IOM-SX module SMTH Part 04 IE31 - Replace a New New Test plan for Ansaldo Interlocking MTOR Dongle SMTH Part 04 IE32 - Replace a New New Test plan for Ansaldo Interlocking MTOR2 Board SMTH Part 04 IE33 - Replace a New New Test plan for Ansaldo Interlocking RIF Computer SMTH Part 04 IE34 - Replace a New New Test plan for Ansaldo Interlocking VSS and 24VHES fuse SMTH Part 4 BA10 Programming an (ASDO) New New Test plan for programming auto selective door opening beacons. Tracklink III Beacon SMTH Part 4 BA11 Replace a New New Test plan for replacing auto selective door opening beacons. (ASDO) Tracklink III Beacon SMTH Part 4 EL09--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- - Remove New Document to allow Silver migration tests and faulting proceedure to remove New Copyright andNetwork refit Rail a Plug in Unit - Relay and refit for inspection purposes Provided by IHS Markit under license with Network Rail Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproductionSMTH or networking Part permitted4 EL20 without Removing license from IHS New New SMTH for removalNot for Resale, of 03/09/2018 resistor 04:02:45 when MST replacing SL35 filament lamps (As

Dim resistor associated with instructed by Technical Instruction 100) LED signal head/signal module SMTH Part 4 IS01 Replace a New test plan for replacing a Westex level crossing predictor card. Standard WESTeX Level Crossing New change request 0716 Predictor Card SMTH Part 4 JA10 Replace a Manchester ROC Signalling Amended New SMTH Replace a Manchester ROC Signalling Network Switch Network Switch SMTH Part 4 LD07 - Replace an S60 Machine (Down Position) New New document Damper Spring SMTH Part 4 LD09 Replace a New New SMTH for Replacing a barrier boom light barrier boom light SMTH Part 4 LD30 Replace a New New test plan for Coe300 CCTV (as instructed by Technical Instruction 031) Coe 300 CCTV Module SMTH Part 4 TQ04 Replace a New SMTH Replace a GETs Electronic Treadle Unit (ETU) (As instructed by GETs Electronic Treadle Unit New Technical Instruction 103) (ETU) SMTH Part 7 EL17 - Upgrade a New New Document TRST Push Button SMTH Part 7 EL23 Replace an Electro-mechanical banner New test plan for converting an electro-mechanical banner repeater signal to an repeating signal with an LED New LED type using a Howells interface unit. Standard change request 0710.

type, using--``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`--- a Howells Interface Unit. SMTH Part 7 ER01 Installation New test plan for installation of data logger. (as instructed by Technical of Intelligent infrastructure data New instruction 150) logger SMTH Part 7 EL50 Upgrade a New New document TRTS Push Button. SMTH Part 7 SG56 - Signal House Fibre Optic Banner to New New document LED conversion - Style Off 1 On 2 SMTH Part 7 SG57 - Signal House Fibre Optic Banner to New New Document LED conversion - Style Off 2 On 2 SMTH Part M04 AX05X - Missing Thales AzLM Axle Withdraw Withdraw No longer required Counter EAK Board SMTH Part M04 AX06X - Missing Thales AzLM Axle Withdraw Withdraw No longer required Counter Evaluator CPU Card SMTH Part M04 AX07X - Replace a Thales AzLM Axle Withdraw Withdraw No longer required Counter Evaluator Serial/Parallel Card SMTH Part 5 FF22- Faulting New New Faulting Guide Guide EBI Gate 630 Barrier SMTH Part 04 IE04 - Replace More Than One Vital Deleted, no longer required. Components now have their own test plans written Withdraw Programmable Printed Circuit as part of the Ferriby to Gilberdyke project Board and Associated Dongle

Reasons for change: This standard has been updated to reflect revised/new updates for maintenance testing requirements to enable signalling equipment operate in a safe manner on Network Rail Managed Infrastructure.

Note that a technical brief has been produced to support implementation of issue 11 of the SMTH and is available from [email protected]

Affected documents: Reference Impact NR/L3/SIG/11231 ISSUE 10 Superseded NR/SMTH/PART 02 ISSUE 4 Superseded NR/SMTH/PART 03 ISSUE 4 Superseded NR/SMTH/PART 04 ISSUE 9 Superseded NR/SMTH/PART 05 ISSUE 10 Superseded NR/SMTH/PART 06 ISSUE 1 Superseded Copyright Network Rail ProvidedNR by IHS/SM MarkitTH under/PART license with 07 Network ISSUE Rail 3 Superseded Licensee=Resourcing Solutions Limited/1121226001, User=Christopherson, Joseph No reproduction or networking permitted without license from IHS Not for Resale, 03/09/2018 04:02:45 MST

NR/SMTH/PART M04 ISSUE 6 Superseded Briefing requirements: Technical briefings are given to those who have specific responsibilities within this standard/control document. Awareness briefings are given to those who might be affected by the content but have no specific responsibilities within the standard/control document. Details of the briefing arrangements are included in the associated briefing programme.

Briefing Post Responsible for (A-Awareness/ Function cascade briefing? T-Technical) Y/N T Route Asset Managers [Signalling] Route Businesses Y T Signal & Telecoms Maintenance Engineers Route Businesses Y T Section Manager [Signalling] Route Businesses Y T Signal Technicians/Signalling Technical Support Staff Route Businesses N T S&T Trainers [Workforce Development Specialists] Route Services Y T Senior Project Engineer (High Output Team) Infrastructure Projects Y A Infrastructure Maintenance Engineer Route Businesses N T Works Delivery Manager Route Businesses Y

NOTE: Contractors are responsible for arranging and undertaking their own Technical and Awareness Briefings in accordance with their own processes and procedures. --``,,``,`,,`,```,,``,,````,,,`,-`-`,,`,,`,`,,`---