RapidRide H Line

Metro Route 120 is becoming RapidRide H Line in 2022

King County Metro, in partnership with the Department of Transportation and the City of Burien, is working to upgrade Metro Bus Route 120—one of our 10 busiest routes—to RapidRide H Line. Starting in 2022, RapidRide H Line, connecting Burien and White Center to /South Lake Union through the Delridge neighborhood, will improve travel times, reliability, and connections to other buses and Link .

Enhanced stations Increased safety Improved speed and RapidRide bus stops, called and access reliability Seattle stations, provide riders with RapidRide upgrades will Riders can expect a decrease more amenities and a faster make it easier and safer to in travel time with RapidRide way to travel and board the walk and roll to the bus. upgrades. Additional service bus. Upgrades include: Improvements include: improvements include: Elliott Bay ▶ Stations located ▶ New pedestrian crossing ▶ More frequent buses—every approximately one-third of signals and crosswalks 15 minutes all day, every day a mile apart to help speed ▶ New sidewalks, sidewalk and at least every 10 minutes up travel times repairs and ADA‑compliant during peak travel times ▶ New shelters, ORCA card ramps ▶ Business access and transit readers, lighting, real-time (BAT) lanes travel information, additional ▶ Priority bus signals seating, and all-door boarding ▶ White Center roadway Stations easily accessed Deridge ▶ improvements include new from local businesses and crosswalks and a new community gathering spaces pedestrian flashing beacon

RAPIDRIDE STATION CONCEPTUAL DESIGN 7 White 6 H H Center 1 Shelter 5 1 2 Leaning rail

3 Bench

4 Litter receptacle 509

5 Pedestrian light pole 6 On-demand lighting 2 via push button

7 Tech pylon 4 Burien Transit Center Burien Subject to change. 3

December 2020 Construction starts as soon RapidRide H Line Route through White Center as spring 2021! Before RapidRide service begins on the new route, Metro will construct safety improvements throughout the corridor and upgrade bus S Barton St stations with RapidRide shelters and amenities. We’ll reach out to route neighbors and users in advance of construction to notify them of the work and any impacts. During construction, you can expect: S Robury St ▶ Some sidewalk, intersection, and lane closures ▶ Detours and temporary stop relocations for Route 120 ▶ Typical impacts, such as noise, dust, and truck activity

20th Ave S Schedule 2018 2019 2020 2021 2022 DESIGN CONSTRUCTION

Advance design work Build Ave5th S Gather public input on preferred infrastructure for concepts and final design RapidRide H Line Plan construction RAPIDRIDE H LINE BEGINS SERVICE

Contact us: S 02nd St

26th Ave S VISIT OUR WEBSITE TO SIGN UP FOR CONSTRUCTION EMAIL UPDATES: www.kingcounty.gov/metro/hlineinfo

Robyn Austin, @kingcounty.gov (206) 263-9768 S 06th St Para solicitar esta información en Español, sírvase llamar al 206-263-9988 o envíe S 07th St un mensaje de correo electrónico a [email protected] Si aad u weyddiisato inaad ku hesho macluumaadkan Af-Soomaali, fadlan wac 206-296‑0850 ama iimayl u dir [email protected]

Để có các thông tin này bằng tiếng Việt, xin gọi Key: 6th Ave S số 206-263-9785 hoặc gửi điện thư đến ● RapidRide station [email protected] ■ New business access S 2th St 206-477-6232 and transit (BAT) lanes [email protected]번으로 전화하거나 로이메일을 Pedestrian crossing 보내시면 이정보를 한국어로 받으실수 있습니다 improvements 如果要索取本資訊的中文版,請致電 New crosswalk and community.relations@kingcounty206-263-9784 或發電郵給 pedestrian flashing beacon