GOVERNMENT OF MINISTRY OF ROAD TRANSPORT AND HIGHWAYS

LOK SABHA UNSTARRED QUESTION NO. 665 ANSWERED ON 13TH DECEMBER, 2018

EAST-WEST CORRIDOR PROJECT IN

665. KUMARI SUSHMITA DEV:

Will the Minister of ROAD TRANSPORT AND HIGHWAYS

स蔼क परिवहन औि िाजमा셍ग मंत्री be pleased to state:

(a) the details of current status of the East-West Corridor project in Assam, particularly in the districts of Cachar and Dima Hasao;

(b) the year-wise funds allocated, funds released and funds utilised on the project from 2014 to 2018;

(c) whether there is any cost over-run for completion of the projects, if so, the details thereof; and

(d) the tentative date of completion of the project?

ANSWER

THE MINISTER OF STATE IN THE MINISTRY OF ROAD TRANSPORT AND HIGHWAYS

(SHRI MANSUKH L. MANDAVIYA)

(a) Details of East-West Corridor are given at Annexure-I.

(b) to (d) Details given at Annexure II.

Annexure -I ANNEXURE REFERRED TO IN REPLY TO PART (C) TO (D) OF UNSTARRED QUESTION NO.665 ANSWERED ON 13TH DECEMBER, 2018 ASKED BY KUMARI SUSHMITA DEV REGARDING ‘EAST WEST CORRIDOR PROJECT IN ASSAM’.

Details of 4 - Lane / 2 - Lane in NE Region

Total Length Sl. NH No. Total Length Project District Scheme Completed Remarks No (Old / New) (Km) (Km) State Assam (East -West Corridor Projects)

4 laning from WB Border NHDP PH - The Contract was terminated on 29.03.2016. 1 (Srirampur) to Kochugaon section 31C / 27 30.000 27.595 Project reawarded on 31.07.2017 to M/s II (AS-12) Kokrajhar Simplex Infrastructure Projects Ltd. (BTC) 4 laning from Kachugaon to NHDP PH - 2 31C / 27 29.715 29.715 Project Completed Karigaon section (AS-11) II+E8:E23 4 laning from Karigaon to Bongaigaon & NHDP PH - 3 31C / 27 32.671 32.671 Project Completed Rakhaldobi section (AS-10) Chirang (BTC) II 4 laning from Rakhaldobi to 4 31 / 27 Bongaigaon 21.500 21.500 Project Completed Patiladoha section (AS-09) 4 laning from Patiladoha to Kaljhar Barpeta & 5 31 / 27 30.000 30.000 Project Completed section (AS-08) Baska (BTC) 4 laning from Kaljhar to 6 31 / 27 Barpeta 27.300 25.405 Ongoing Project Patacharkuchi section (AS-07) NHDP PH - 4 laning from Patacharkuchi to Nalbari & 7 31 / 27 II 24.700 24.700 Project Substantially Completed Nalbari section (AS-06) Baska (BTC) Nalbari & 4 laning from Nalbari to Puthimari 8 31 / 27 Kamrup 28.000 28.000 Project Completed section (AS-05) (Rural) 4 laning from Puthimari to Amingaon Kamrup 9 31 / 27 26.814 26.814 Project Completed section (AS-04) (Rural) Total Length Sl. NH No. Total Length Project District Scheme Completed Remarks No (Old / New) (Km) (Km) State Assam (East -West Corridor Projects) Construction of New Brahamaputra Kamrup 10 Bridge (Amingaon to Jalukbari) (AS- 31 / 27 4.700 4.700 Project Substantially Completed (Metrol) 28) Kamrup 11 4 laning of Guwahati Bypass 37 / 27 18.000 18.000 Project Completed (Metrol) 4 laning from Khanapara (Guwahati) Kamrup 12 37 / 27 19.100 19.100 Ongoing Project to Sonapur (AS-03) (Metrol) 4 laning from Sonapur to Jagiroad Kamrup 13 37 / 27 22.000 22.000 Project Substantially Completed section (AS-20) (Metrol) 4 laning from Jagirod to Dharmatul 14 37 / 27 Morigaon 25.500 25.500 Project Completed section (AS-19) 4 laning from Dharmaful to Raha Morigaon & 15 37 / 27 24.500 24.500 Project Completed section (AS-02) Nagaon 4 laning from Raha to Nagaon 16 section (i/c Naogaon Bypass) (AS- 37 / 27 23.663 23.663 Project Completed 18) 4 laning from Nagaon to Doboka 17 36 / 27 30.362 30.362 Project Completed section (AS-17) Nagaon 4 laning from Doboka to Lanka 18 section (i/c Daboka Bypass) (AS- 54 / 27 24.032 24.032 Project Completed 16) 4 laning from Lanka to Udali section 19 54 / 27 18.000 18.000 Project Completed (AS-15) 4 laning from Udali to Manderdisa 20 54 / 27 Hojai 20.250 20.250 Project Substantially Completed (Lumding) section (AS-27) 4 laning from Manderdisa (Lumding) 21 54 / 27 Dima Hasao 22.900 22.900 Project Substantially Completed to Hatikhali section(AS-26) Total Length Sl. NH No. Total Length Project District Scheme Completed Remarks No (Old / New) (Km) (Km) State Assam (East -West Corridor Projects) 4 laning from Hatikhali to Lailing 22 54 / 27 27.600 27.600 Project Substantially Completed section (AS-25) 4 laning from Lailing to Maibong 23 54 / 27 15.450 15.450 Project Completed section (AS-24) 4 laning from Maibong to 24 54 / 27 15.570 15.390 Project Substantially Completed Narimbanglo section (AS-23) 4 laning from Narimbanglo to 25 54 / 27 Dima Hasao 23.380 20.940 Foreclosed Jatinga section (AS-22) 4 laning from Jatinga to Harangajao 26 54 / 27 25.190 4.000 Contract Terminated section (AS-21) 4 laning from Balachera to 27 54 / 27 Cachar 25.760 25.760 Project Completed section (AS-01)

Total 636.657 608.547

Annexure-II ANNEXURE REFERRED TO IN REPLY TO PART (C) TO (D) OF LOK SABHA UNSTARRED QUESTION NO.665 ANSWERED ON 13TH DECEMBER, 2018 ASKED BY KUMARI SUSHMITA DEV REGARDING ‘EAST WEST CORRIDOR PROJECT IN ASSAM’.

Date of Additi- NH Cost of Revise Sl. onal Contract Pkg No. Length Commen Award d Cost During N District Cost During During During Remarks Stretch No. (Old/ (km) ce-ment Comp Comp (Rs in ( Rs in FY o. ( Rs in FY FY FY New) (as per (Org) (likely) Crore) Crore) 2017- Crore) 14 -15 15-16 16-17 contract) 18 1 2 3 4 5 6 8 9 10 17 18 19 23 24 25 26 32 Four Laning of WB Border (Srirampur) to The Contract Kochugaon 18.10.05 17.04.08 - 218.38 218.38 0.00 3.22 0.00 0.19 0.00 was terminated section from Km on 29.03.2016 00.00 to Km 30.00 (Terminated) 31C / 1 Balance work of {AS-12} 30.000 27 four Laning of Balance work WB Border Kokrajhar was Re- (Srirampur) to (BTC) awarded on Kochugaon 05.10.17 04.04.20 - 129.19 129.19 0.00 0.00 0.00 0.00 0.00 31.07.2017 to section from Km M/s Simplex 00.00 to Km infra Ltd.. 30.00 (Reawarded) Four Laning of Kachugaon to Project 31C / Project 2 Karigaon section {AS-11} 29.715 06.10.05 05.04.08 Comple 199.41 220.20 20.79 24.38 38.00 21.22 29.45 27 Completed from Km 30.00 to ted Km 60.00 Four Laning of Bongaiga Project Karigaon to on & 31C Project 3 {AS-10} 32.671 06.10.05 05.04.08 Comple 248.69 281.78 33.09 56.46 63.93 37.26 15.58 Rakhaldobi Chirang /27 Completed ted section from Km (BTC) Date of Additi- NH Cost of Revise Sl. onal Contract Pkg No. Length Commen Award d Cost During N District Cost During During During Remarks Stretch No. (Old/ (km) ce-ment Comp Comp (Rs in ( Rs in FY o. ( Rs in FY FY FY New) (as per (Org) (likely) Crore) Crore) 2017- Crore) 14 -15 15-16 16-17 contract) 18 1 2 3 4 5 6 8 9 10 17 18 19 23 24 25 26 32 60.00 to Km 93.00 (Old length 33.00 Km) Four Laning of Rakhaldobi to Project Patiladoha Bongaiga Project 4 {AS-9} 31 /27 21.500 03.11.05 02.05.08 Comple 131.23 151.91 20.68 9.14 0.00 0.00 2.38 section from Km on Completed ted 961.50 to Km 983.00 Four Laning of Patiladoha to Barpeta Project 31 / Project 5 Kaljhar section & Baska {AS-8} 30.000 03.11.05 02.05.08 Comple 187.08 204.00 16.92 10.31 5.26 0.00 0.00 27 Completed from Km 983.00 (BTC) ted to Km 1013.00 Four Laning of Show Caused Kaljhar to Notice has Patacharkuchi been issued to section from Km 31 / 31.03.1 the contractor 6 Barpeta (AS-7) 27.30 19.10.05 19.04.08 207.17 230.00 22.84 7.81 5.37 22.47 0.66 1013.00 to Km 27 9 by the NHAI 1040.30 HQ under clause 63.1 of CoPA Four Laning of 26.04.1 Patacharkuchi to Nalbari & 9 Project 31 / 7 Nalbari section Baska (AS-6) 24.700 10.11.05 10.07.08 (For full 182.48 193.26 10.78 4.16 4.31 6.00 2.88 Substantially 27 from Km 1040.30 (BTC) comple Completed to Km 1065.00 tion) Date of Additi- NH Cost of Revise Sl. onal Contract Pkg No. Length Commen Award d Cost During N District Cost During During During Remarks Stretch No. (Old/ (km) ce-ment Comp Comp (Rs in ( Rs in FY o. ( Rs in FY FY FY New) (as per (Org) (likely) Crore) Crore) 2017- Crore) 14 -15 15-16 16-17 contract) 18 1 2 3 4 5 6 8 9 10 17 18 19 23 24 25 26 32 Four Laning of Nalbari to Nalbari & Project 31 / Project 8 Puthimari section Kamrup (AS-5) 28.000 02.12.05 01.06.08 Comple 192.87 236.75 43.88 53.64 12.91 0.00 6.31 27 Completed from Km 1065.00 (Rural) ted to Km 1093.00 Four Laning of Puthimari to Project Amingaon Kamrup 31 / Project 9 (AS-4) 26.814 02.12.05 01.06.08 Comple 173.63 210.00 36.37 55.40 41.74 0.00 4.42 section from Km (Rural) 27 Completed ted 1093.00 to Km 1119.814 Construction of Project New Substantially 30.04.1 Brahamaputra Completed. 9 Bridge Kamrup 31 / Under DLP 10 (AS-28) 4.700 22.10.06 25.04.10 (For full 238.14 360.84 122.70 56.61 50.32 49.39 5.15 (Amingaon to (Metrol) 27 Bridge has comple Jalukbari) from been tion) Km 1119.81 to inaugurated on Km 1124.51 29.01.2017. Four Laning of Khanapara (Guwahati) to Kamrup 37 / 31.12.1 Ongoing 11 {AS-3) 19.100 25.10.05 24.07.08 166.72 174.34 7.62 0.00 21.22 0.00 4.72 Sonapur section (Metrol) 27 8 Project from Km 163.90 to Km 183.00 Four Laning of 28.02.1 Project Sonapur to 9 Kamrup 37 / Substantially 12 Jagiroad section (AS-20) 22.000 21.12.05 20.06.08 (For full 137.75 167.98 30.23 0.00 4.13 6.11 13.27 (Metrol) 27 Completed. from Km 183.00 comple Under DLP to Km 205.00 tion) Date of Additi- NH Cost of Revise Sl. onal Contract Pkg No. Length Commen Award d Cost During N District Cost During During During Remarks Stretch No. (Old/ (km) ce-ment Comp Comp (Rs in ( Rs in FY o. ( Rs in FY FY FY New) (as per (Org) (likely) Crore) Crore) 2017- Crore) 14 -15 15-16 16-17 contract) 18 1 2 3 4 5 6 8 9 10 17 18 19 23 24 25 26 32 Four Laning of Jagiroad to Project Dharamtul 37 / Project 13 Morigaon {AS-19} 25.500 25.11.05 30.06.08 Comple 173.14 284.27 111.13 40.46 24.80 1.76 8.19 section from Km 27 Completed ted 205.00 to Km 230.50 Four Laning of Dharamtul to Project Morigaon 37 / Project 14 Raha section {AS-02} 24.500 25.11.05 30.06.08 Comple 273.80 372.91 99.11 5.73 13.51 22.86 24.01 & Nagaon 27 Completed from Km 230.50 ted to Km 255.00 Four Laning of Raha to Nagaon section from Km Project 37 / Project 15 255.00 to Km {AS-18} 23.663 16.11.05 15.05.08 Comple 238.72 301.21 62.49 0.00 0.00 0.00 0.00 27 Completed 262.725 & ted 15.943 Km of Nagaon Bypass Four Laning of Nagaon to Project Nagaon 36 / Project 16 Daboka section {AS-17} 30.362 25.11.05 01.07.08 Comple 202.18 309.83 107.65 0.00 0.00 0.00 0.00 27 Completed from Km 5.500 to ted Km 35.862 Four Laning of Daboka to Lanka Project section from Km 54 / Project 17 {AS-16} 24.032 29.11.05 28.06.08 Comple 198.65 221.57 22.92 0.00 0.00 0.00 0.00 0.00 to Km 22.00 27 Completed ted & 4.14 Km of Dakoka Bypass Date of Additi- NH Cost of Revise Sl. onal Contract Pkg No. Length Commen Award d Cost During N District Cost During During During Remarks Stretch No. (Old/ (km) ce-ment Comp Comp (Rs in ( Rs in FY o. ( Rs in FY FY FY New) (as per (Org) (likely) Crore) Crore) 2017- Crore) 14 -15 15-16 16-17 contract) 18 1 2 3 4 5 6 8 9 10 17 18 19 23 24 25 26 32 Four Laning of Lanka to Udali Project section from Km 54 / Project 18 {AS-15} 18.000 14.03.08 13.09.10 Comple 143.97 186.76 42.79 0.00 0.00 0.00 0.00 22.00 to Km 27 Completed ted 40.00 including Lanka Bypass Four Laning of Udali to 31.12.1 Project Manderdisa 8 54 / Substantially 19 (Lumding) Hojai {AS-27} 20.250 15.10.06 14.04.09 (For full 198.68 229.40 30.72 46.98 31.49 28.35 24.33 27 Completed. section from Km comple Under DLP 40.00 to Km tion) 60.50 Four Laning of 30.09.1 Manderdisa Project 8 (Lumding) to 54 / Substantially 20 {AS-26} 22.900 24.07.11 23.01.14 (For full 255.00 326.25 71.25 81.26 89.06 49.58 54.72 Hatikhali section 27 Completed. comple from Km 60.50 to Under DLP tion) Km 83.40 Four Laning of 31.03.1 Project Hatikhali to Dima 9 54 / Substantially 21 Laining section Hasao {AS-25} 27.600 31.01.11 31.07.13 (For full 372.63 279.65 -92.98 67.89 41.06 48.35 50.26 27 Completed. from Km 83.40 to comple Under DLP Km 111.00 tion) Four Laning of Lailing to Project 54 / Project 22 Maibong section {AS-24} 15.450 14.01.11 13.07.13 Comple 225.33 210.84 -14.49 27.81 32.22 14.19 24.92 27 Completed from Km 111.00 ted to Km 126.55 Date of Additi- NH Cost of Revise Sl. onal Contract Pkg No. Length Commen Award d Cost During N District Cost During During During Remarks Stretch No. (Old/ (km) ce-ment Comp Comp (Rs in ( Rs in FY o. ( Rs in FY FY FY New) (as per (Org) (likely) Crore) Crore) 2017- Crore) 14 -15 15-16 16-17 contract) 18 1 2 3 4 5 6 8 9 10 17 18 19 23 24 25 26 32 Four Laning of Project Maibong to Substantially 31.12.1 Narimbanglo Completed. 8 section from Km 54 / Under DLP 23 {AS-23} 15.570 05.08.06 04.02.09 (For full 317.11 404.00 86.89 41.07 40.30 39.69 6.14 126.45 to Km 27 Affected by comple 140.70 & Km landslide. 180m tion) 164.08 to Km road has been 165.40 damaged. Four Laning of Affected by Narimbanglo to landslide.

Jatinga section 4 lane has from Km 140.70 been damaged 54 / 24 to Km 164.08 {AS-22} 23.380 03.11.11 02.05.14 318.69 612.90 294.21 64.96 71.52 104.24 118.76 in some areas 27 due to landslide Dima Foreclosed & sinking. Hasao Package foreclosed Four Laning of Contract Jatinga to Terminated.

Harangajao 4 lane has section from Km been damaged 165.40 to Km due to landslide 190.59 & sinking. 54 / 25 {AS-21} 25.190 30.10.11 29.04.14 333.83 362.95 29.12 22.81 18.18 6.98 0.00 The 27 maintenance of the existing NH

has been taken Contract Terminated. Contract up for the benefits of the road users and Date of Additi- NH Cost of Revise Sl. onal Contract Pkg No. Length Commen Award d Cost During N District Cost During During During Remarks Stretch No. (Old/ (km) ce-ment Comp Comp (Rs in ( Rs in FY o. ( Rs in FY FY FY New) (as per (Org) (likely) Crore) Crore) 2017- Crore) 14 -15 15-16 16-17 contract) 18 1 2 3 4 5 6 8 9 10 17 18 19 23 24 25 26 32 the road is being maintained now.

Four Laning of Balachera to Project 54 / 26 Silchar section Cachar (AS-1) 25.760 17.09.04 16.09.07 Comple 115.86 151.60 35.74 14.26 0.17 11.45 0.00 Completed 27 from Km 275.00 ted to Km 300.76 7032.7 1252.4 Grand Total 618.657 5780.32 694.36 609.50 470.09 396.15 7 5 Guwahati Bypass 18.000 Km Total length of East - West Corridor 636.657 Km