Form 1 & 1 A for Proposed Residential & Commercial Project “Royal Rahadki Greens” by M/s G.K Associates, , .

(See paragraph – 6)

F O R M - 1

(I) Basic Information

S. Details Item No. 1 Name of the Project “Royal Rahadki Greens” 2 S. No. in the Schedule 8 (a) Proposed capacity/area/length/tonnage Total Plot Area = 19500.00 m2 to be handled/ command area/ lease Built up Area( FSI) = 24488.75 m2 area/ number of wells to be drilled 3 Built up Area(Non FSI) = 25662.77 m2

Total Built up Area( FSI+ Non FSI) = 50151.52 m2 4 New/Expansion/Modernization New Existing Capacity/Area etc. Total Plot Area = 19500.00 m2 Built up Area( FSI) = 24488.75 m2 5 Built up Area(Non FSI) = 25662.77 m2

Total Built up Area( FSI+ Non FSI) = 50151.52 m2 6 Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ Does it attract the general condition? If 7 No yes, please specify. Does it attract the specific condition? If 8 No yes, please specify. 9 Location of Project Rahatani Plot/Survey/Khasra No. Sr. No. 30/1+2+3,32/2D/3

Village Rahatani

Tehsil Haveli

District Pune State Nearest railway station/airport along Pune Railway Station – 18 Km 10 with distance in Kms. – 23 Km Nearest Town, city, District 11 Headquarters along with distance in Pune –14.4 Km Kms. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body Municipal Corporation 12 (Complete postal addresses with (PCMC) telephone nos. to be given) 13 Name of the applicant M/s. G.K. Associates Form 1 & 1 A for Proposed Residential & Commercial Project “Royal Rahadki Greens” by M/s G.K Associates, Rahatani, Pune.

S.No. 120/2A, Opposite Shivar Garden Pimple 14 Registered Address Saudagar , Pune -27 15 G.K. Associates ,Sr. No. 130(P) Opp. Perivinkal Address for correspondence: Club Nr. Kunal Icon , , Pune -27 Name V.P. Chandwani

Designation (Owner/Partner/CEO) Director G.K. Associates , Address Sr. No. 130(P) Opp. Perivinkal Club Nr. Kunal Icon , Pimple Saudagar , Pune- 27 Pin code Pune 411027

E- mail [email protected] Telephone No. 020- 27201414

Fax No. 020- 27201313 Details of Alternative Sites examined, if 16 any. Location of these sites should be No shown on a t oposheet. 17 Interlinked Projects No Whether separate application of Not Applicable 18 interlinked project has been submitted? 19 If yes, date of submission Not Applicable

20 If no, reason Not Applicable Whether the proposal involves Not Applicable approval/ clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 21 1980? (b) The Wild life (Protection) Act 1972? (c) The C.R.Z. Notification, 1991? Whether there is any Government Order Not Applicable 22 / Policy relevant/ r elating to the site? 23 Forest Land involves (hectares) Not Applicable Whether there is any litigation pending Not Applicable against the project and/ or land in which the project is proposal to be set up? a) Name of the Court 24 b) Case No.

c) Orders / directions of the Court, if any and its relevance with the proposed project. (II) Activity Form 1 & 1 A for Proposed Residential & Commercial Project “Royal Rahadki Greens” by M/s G.K Associates, Rahatani, Pune.

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (Topography, land use, changes in water bodies, etc.) Details thereof (with approximate Sr. Yes/ Information/Checklist confirmation quantities /rates, wherever possible) with No No source of information data Permanent or temporary change in land No Basically land is barren land. The proposed use, land cover or topography including project site is designated for the intended increase in intensity of land use (with purpose and the necessary change in the land respect to local land use plan) use of the plot area measuring 19500 m2 has 1.1 already been affected by converting it for residential and commercial use.

ANNEXURE : II SITE LOCATION PLAN AND DP PLAN Clearance of existing land, vegetation No 1.2 Not Applicable and buildings? 1.3 Creation of new land uses? No Not Applicable Pre-construction investigations e.g. bore 1.4 No Not Applicable houses, soil testing? Construction works? 50151.52 m2 (FSI + NON FSI) will be total built up area. 1.5 Yes

ANNEXURE: IV (MASTER PLAN ) 1.6 Demolition works? No Not Applicable Temporary sites used for construction During construction total 100 Nos. of 1.7 works or housing of construction Yes workers & 10 nos. of Staff will be on site. workers? Above ground buildings, structures or Yes Total 50151.52 m2 (FSI + NON FSI ) will Earth works including linear structures, be built up area for residential purpose. 1.8 cut and fill or excavations Excavated material during construction will be used for leveling of land. Underground works including mining 1.9 No Not Applicable or tunneling? 1.10 Reclamation works? No Not Applicable

1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable Production and manufacturing 1.13 No Not Applicable processes? Facilities for storage of goods or Temporary shed will be constructed for the 1.14 Yes materials? storage of the construction material. Facilities for treatment or disposal of A) SOLID WASTE MANAGEMENT solid waste or liquid effluents? Yes a) During Construction phase – Excavated material will be used for backfilling and landscape.

1.15 During Operation Phase – Total population of the residential and commercial scheme is –2316 Nos. 1) Quantity of the - 1141 Kg/Day solid waste Form 1 & 1 A for Proposed Residential & Commercial Project “Royal Rahadki Greens” by M/s G.K Associates, Rahatani, Pune.

2) Quantity of the - 681.0 Kg/Day wet waste 3) Quantity of the - 460.0 Kg/Day dry waste

Biodegradable and non biodegradable waste will be segregated. Dry waste will be authorized vendor. Wet waste will be treated by ‘ Organic waste Convertor’ for composting.

ANNEXURE X: SOLID WASTE MANAGEMENT :OWC

B) WATER MANAGEMENT –

I) During Construction Phase:

Water Requirement – 60 m3/day source - Tankers

II) During Operation Phases:

Source – Pimpri Chinchwad Municipal Corporation (PCMC)

WATER DEMAND :

Total Water demand is 342.48 m3/day

• Domestic Water for Residential: 202.05 m3/day • Flushing Water for Residential: 101.03 m3/day. • Domestic Water for Commercial : 1.40 m3/day • Flushing Water for commercial : 1.75 m3/day. • Swimming Pool: 10 m 3/day • Club house : 15.00 m3/day • Landscaping is 21.25 m3/day

ANNEXURE VIII : WATER BALANCE STATEMENT

1.16 Facilities for long term housing of No Not Applicable operational workers? 1.17 New road, rail or sea traffic during No Not Applicable construction or operation? 1.18 New road, rail, air waterborne or other No Not Applicable transport infrastructure including new Form 1 & 1 A for Proposed Residential & Commercial Project “Royal Rahadki Greens” by M/s G.K Associates, Rahatani, Pune.

or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not Applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No Not Applicable pipelines? 1.21 Impoundment, damming, culverting, No Not Applicable realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not Applicable

1.23 Abstraction or transfers of water from Yes During Construction phase Tanker water ground or surface waters? will be used for the construction purpose. 1.24 Changes in water bodies or the land No Not Applicable surface affecting drainage or run-off? 1.25 Transport of personnel or materials for Yes Approx. 7 trucks per day for Material construction, operation or transport. Workers through public transport decommissioning? 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes INFLUX DURING CONSTRUCTION: temporarily or permanently? During construction approximately 100 nos. workers & 10 Nos. Staff.

INFLUX DURING OPERATION:

During operation influx of approximately 2316 Nos. of persons are going to reside in the Residential and Commercial complex. 1.29 Introduction of alien species? No Not Applicable 1.30 Loss of native species or genetic No Not Applicable diversity? 1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate Yes/ Sr. No. Information/checklist confirmation quantities /rates, wherever possible) with No source of information data 2.1 Land especially undeveloped or Yes Undeveloped land of about 19500.00 m2 agricultural land (ha) The proposed development has been planned on Non Agriculture land. 2.2 Water (expected source & competing Yes WATER MANAGEMENT – users) unit: KLD I) During Construction Phase:

Water Requirement – 60 m3/day source - Tankers

Form 1 & 1 A for Proposed Residential & Commercial Project “Royal Rahadki Greens” by M/s G.K Associates, Rahatani, Pune.

II) During Operation Phases:

Source – Pimpri Chinchwad Municipal Corporation (PCMC)

WATER DEMAND :

Total Water demand is 342.48 m 3/day

• Domestic Water for Residential: 202.05 m3/day • Flushing Water for Residential: 101.03 m3/day. • Domestic Water for Commercial : 1.40 m3/day • Flushing Water for commercial : 1.75 m3/day. • Swimming Pool: 10 m 3/day • Club house : 15.00 m 3/day • Landscaping is 21.25 m 3/day • ANNEXURE VIII : WATER BALANCE STATEMENT

2.3 Minerals (MT) No Not Applicable 2.4 Construction material - Stone, Yes Companies authorized approved local Aggregates, Sand/Soil (expected source- vendors. MT) 2.5 Forests and timber (source – MT) No Not Applicable

2.6 Energy including electricity and fuels Yes SOURCE – Maharashtra State Electricity (source, competing users) Unit: fuel Distribution Company Limited (MSEDCL) (MT), energy (MW) During Construction Phase: • a) D.G. Set – 62.5 KVA - 2 No. • b) Fuel Consumption / hr. of 62.5 KVA D.G. Set – 11.6 lit/hr. for 100% load. During Operation Phase: Total Demanded load – 2531 KVA Transformer Suggested-630KVA - 4Nos. D.G. Set Suggested – 100 KVA – 1 No. 160 KVA – 1 No. 16.9Lit/Hrs. For 100 % Load 26 Lit/Hrs. For 100 % Load

Form 1 & 1 A for Proposed Residential & Commercial Project “Royal Rahadki Greens” by M/s G.K Associates, Rahatani, Pune.

2.7 Any other natural resources (use No Not Applicable appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sr. No. Details thereof (with approx. quantities/ Yes / Information/Checklist confirmation rates, wherever possible) with source of No information data 3.1 Use of substances or materials, which No Not Applicable are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or No Not Applicable affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by No It can help in improving the living standards changing living conditions? of that area. 3.4 Vulnerable groups of people who could No Not Applicable be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month) Details thereof (with approx. Yes/ Sr.No. Information/Checklist confirmation quantities/rates, wherever possible) with No source of information data 4.1 Soil, overburden or mine wastes No Not Applicable

4.2 Municipal waste (domestic and/or Yes SOLID WASTE MANAGEMENT commercial wastes) During Operation Phase –

Total population of the residential and commercial scheme is –2316Nos. 1)Quantity of the solid waste – 1141 Kg/day 2)Quantity of the wet waste- 681.0 Kg/Day 3)Quantity of the dry waste - 460.0 Kg/Day

Biodegradable and non biodegradable waste will be segregated. Dry waste will be send to authorized vendor. Wet waste will be treated by ‘ Organic waste Convertor’ for composting. ANNEXURE – X -Organic Waste Convertor- Solid Waste Management 4.3 Hazardous wastes (as per Hazardous No Not Applicable Waste Management Rules) 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable Form 1 & 1 A for Proposed Residential & Commercial Project “Royal Rahadki Greens” by M/s G.K Associates, Rahatani, Pune.

4.6 Sewage sludge or other sludge from Yes Sewage Treatment Plant is provided for effluent treatment treatment of domestic effluent. STP details are enclosed. Refer Annexure – IX Sewage Treatment Plant – Schematic Plan & Details 4.7 Construction or demolition wastes Yes Construction debris will be used for leveling / backfilling etc. for landscapes, Internal roads etc. 4.8 Redundant machinery or equipment No Not Applicable 4.9 Contaminated soils or other materials No Not Applicable

4.10 Agricultural waste No Not Applicable 4.11 Other solid wastes No Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Details thereof (with approx. Yes/ Sr.No. Information/Checklist confirmation quantities/rates, wherever possible) with No source of information data 5.1 Emissions from combustion of fossil No Not Applicable fuels from stationary or mobile sources 5.2 Emissions from production processes No Not Applicable

5.3 Emissions from materials handling No Not Applicable including storage or transport 5.4 Emissions from construction activities Yes There will be temporary emission from including plant and equipment construction equipments (mobile Source) 5.5 Dust or odors from handling of materials Yes As per Environment Management Plan refer including construction materials, sewage ANNEXURE XVI and waste 5.6 Emissions from incineration of waste No Not Applicable

5.7 Emissions from burning of waste in open No Not Applicable air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No Not Applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat: 6.1 From operation of equipment e.g. Yes Sources of noise Pollution during engines, ventilation plant, crushers construction phase are machinery like compressor, Compactors, Concrete Plant, Cranes and transportation materials. During operation phase DG sets will be provided with Canopy to reduce noise. 6.2 From industrial or similar processes No Not Applicable 6.3 From construction or demolition Yes As per Environment Management Plan ANNEXURE XVI 6.4 From blasting or piling No Not Applicable 6.5 From construction or operational traffic Yes As per Environment Management Plan ANNEXURE XVI 6.6 From lighting or cooling systems No Not Applicable Form 1 & 1 A for Proposed Residential & Commercial Project “Royal Rahadki Greens” by M/s G.K Associates, Rahatani, Pune.

6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Sr. No. Information/Checklist confirmation Yes/ Details thereof (with approx. No quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage of No Not Applicable hazardous materi als 7.2 From discharge of sewage or other No Sewage will be treated and reused for effluents to water or the land (expected flushing & gardening. mode and place of discharge) Hence there is no risk of contamination due to release of sewa ge. 7.3 By deposition of pollutants emitted to air No Not Applicable into the land or into water 7.4 From any other sources No Not Applicable

7.5 Is there a risk of long term build up of No Not Applicable pollutants in the environment from these sources? 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Details thereof (with approx. Yes/ Sr. No. Information/Checklist confirmation quantities/rates, wherever possible) with No source of information data 8.1 From explosions, spillages, fires etc from No Not Applicable storage, handling, use or production of hazardous substances 8.2 From any other causes Yes There is a risk of accident during construction however proper construction safety measures will be taken 8.3 Could the project be affected by natural Yes Floods and landslides are not expected in the disasters causing environmental damage area. Earthquake proneness: the area falls (e.g. floods, earthquakes, landslides, under Zone III as per IS 1893-2002. Hence cloudburst etc)? relevant design parameters as per zone III have been considered for RCC design of the building. Adequate earthquake proof RCC design is adapted.

ANNEXURE VII - Seismic Zoning Map Of 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. Details thereof (with approx. Sr. Yes/ Information/Checklist confirmation quantities/rates, wherever possible) with No. No source of information data 9.1 Lead to development of supporting . Yes 1) Power supply is available. Facilities, ancillary development or 2) Sewage Treatment Plant will be provided development stimulated by the project hence there will not additional load on which could have impact on the Municipal Sewage treatment. environment e.g.: 3) Solid Waste Management facility will be • Supporting infrastructure (roads, provided. power supply, waste or waste water 4) Adequate parking facility available within treatment, etc.) campus. Form 1 & 1 A for Proposed Residential & Commercial Project “Royal Rahadki Greens” by M/s G.K Associates, Rahatani, Pune.

• Housing development • Extractive industries Housing development • Supply industries • Other 9.2 Lead to after-use of the site, which could No Not Applicable have an impact on the environment. 9.3 Set a precedent for later developments No Not Applicable

9.4 Have cumulative effects due to proximity No Not Applicable to other existing or planned projects with similar effects (III) Environmental Sensitivity Name/ Aerial distance (within 15 km.) Sr. No. Areas Identity Proposed project location boundary 1 Areas protected under international No Not Applicable conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive No Not Applicable for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or No Not Applicable sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground No Not Applicable waters 5 State, National boundaries No Not Applicable

6 Routes or facilities used by the public No Not Applicable for access to recreation or other tourist, pilgrim areas 7 Defense installations No Not Applicable 8 Densely populated or built-up area No Not Applicable

9 Areas occupied by sensitive man-made No Not Applicable land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality No Not Applicable or scarce resources (Ground water resources, surface resources, forestry, agriculture, fisheries, to urism, minerals) 11 Areas already subjected to pollution or No Not Applicable environmental damage. (Those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard No Not Applicable which could cause the project to present environmental problems (Earthquakes, subsidence, landslides, Form 1 & 1 A for Proposed Residential & Commercial Project “Royal Rahadki Greens” by M/s G.K Associates, Rahatani, Pune.

erosion, flooding or extreme or adverse climatic conditions)

(IV) Proposed Terms of Reference for EIA studies. EIA not required as project is under B-2 Category

Form 1 & 1 A for Proposed Residential & Commercial Project “Royal Rahadki Greens” by M/s G.K Associates, Rahatani, Pune.