Ghazipur (UTTAR PRADESH)
Total Page:16
File Type:pdf, Size:1020Kb
PURVANCHAL VIDYUT VITARAN NIGAM LTD. SCHEME FOR HOUSEHOLD ELECTRIFICATION DISTRICT : Ghazipur (UTTAR PRADESH) DEEN DAYAL UPADHYAYA GRAM JYOTI YOJANA Table of Contents Sl.No. Format No. Name Page No. 1 A General Information 1 2 A(I) Brief Writeup 2 3 A(II) Minutes 2 4 A(III) Pert Chart 2 5 A(IV) Certificate 2 6 A(V) Basic Details of District 2 7 A(VI) Abstract : Scope of Work & Estimated Cost 4 8 A(VII) Financial Bankability 33 9 B Electrification of UE villages 35 10 B(I) Block-wise coverage of villages 36 11 B(II) Villagewise/Habitation wise coverage 37 12 B(III) Existing Habitation Wise Infrastructure 37 13 B(IV) Village Wise/Habitation Proposed Works 37 14 B(V) Existing REDB Infrastructure 37 15 B(VI) Block-Wise Substation 41 16 B(VII) Feederwise DTs 42 17 C Feeder Segregation 49 18 C(I) Details of New 11 KV or 22 KV Lines 50 19 C(II) Works Proposed Under Feeder Separation 55 20 D Connecting unconnected RHHs 166 21 D(I) Block-wise coverage of villages 167 22 D(II) Villagewise/Habitation wise coverage 168 23 D(III) Existing Habitation Wise Infrastructure 197 24 D(IV) Village Wise/Habitation Proposed Works 229 25 D(V) Existing REDB Infrastructure 316 26 D(VI) Block-Wise Substation 320 27 D(VII) Eligibility for Augmentation of Existing 33/11 KV Substations 321 28 D(VIII) Feederwise DTs 347 29 E Metering 354 30 E(I) DTR Metering 355 31 E(II) Consumer Metering 429 32 E(III) Feeder Metering 434 33 F System Strengthening and Augmentation 436 34 F(I) Block-Wise Substation 437 35 F(II) New 33 (or 66) KV REDB Works Proposed 438 36 F(III) Proposed Augumentation of Existing Sub-station 439 37 F(IV) EHV Substation Feeding the District 449 38 F(V) Districtwise Details of Existing 66 KV or 33 KV Lines 453 39 F(VI) Districtwise Details of Existing 11 KV or 22 KV Lines 456 40 F(VII) Details of New 66 KV or 33 KV Lines 463 41 F(VIII) Details of New 11 KV or 22 KV Lines 464 42 G SAGY 466 43 G(I) Block-wise coverage of villages 467 44 G(II) Villagewise/Habitation wise coverage 468 45 G(III) Existing Habitation Wise Infrastructure 469 46 G(IV) Village Wise/Habitation Proposed Works 470 Section -A Basic Details of District State : UTTAR PRADESH District : Ghazipur Page 1 of 471 20/07/2016 (AS PER ORIGINAL DPR) A(V) Basic Details of District State : UTTAR PRADESH District : Ghazipur Name of Project Implementing Agency Purvanchal Vidyut Vitaran Nigam Ltd. Name of DISCOM Purvanchal Vidyut Vitaran Nigam Ltd. Name of State UTTAR PRADESH Name of District Ghazipur Total Population of district 3620268 Total Geographical Area(SqKm) 3377 Percentage of Hilly area 0 Total Block in the district 16 Total Urban Town in the district 8 Total Urban Population in the district 274360 Population Of Urban Area 274360 Total Census Revenue Villages in the district 3367 Total Habitations in the district 0 Total Rural Population in the district 3345908 House Holds Details :- Description 2001 Census 2011 Census CAGR Total HHs by Total HHs by 31.03.2015 as derived 31.03.2019 as derived Total House Holds in the district 439970 524961 2.37 626371 747370 Rural HH in the district 407266 485939 1.19 579810 691814 Urban HH in the district 32704 39022 1.18 46561 55556 Total Energised HH in the district 88643 105767 1.19 126199 150578 Urban HH electrified in the district 23506 28047 1.19 33465 39930 Rural HH electrified in the district 65137 77720 1.19 92734 110648 Balance Un-electrified Rural HH 342129 408219 0 487076 581166 Page 2 of 471 20/07/2016 (AS PER ORIGINAL DPR) A(V) Basic Details of District State : UTTAR PRADESH District : Ghazipur Balance Un-electrified Urban HH 9198 10975 -0.01 13096 15626 Balance Total un-electrified HH in the 0 0 0 0 0 district Status of Already Sanctioned 10th / 11th / 12th Plan Projects :- Plan Un-Electrified Villages Intensive Electrified Villages Total Habitation RHH Incl. BPL BPL Coverage Achievement Coverage Achievement Coverage Achievement Coverage Achievement Coverage Achievement 10th 329 250 0 0 0 0 3781 3781 3781 3781 11th 0 0 0 0 0 0 0 0 0 0 12th 0 0 2349 0 5774 0 379176 0 37029 0 Page 3 of 471 20/07/2016 (AS PER ORIGINAL DPR) A(VI) Abstract : Scope of Work & Estimated Cost State : UTTAR PRADESH District : Ghazipur S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) B.Feeder Seperation DTR 1 Alwalpur-Alwalpur 25 KVA(3 Ph) Nos. 9 2.64 23.76 2 Alwalpur-Basdevpur 25 KVA(3 Ph) Nos. 3 2.64 7.92 3 Alwalpur-Socoridih 25 KVA(3 Ph) Nos. 52 2.64 137.28 4 Andhau-Devkathiya 25 KVA(3 Ph) Nos. 4 2.64 10.56 5 Andhau-North 25 KVA(3 Ph) Nos. 10 2.64 26.4 6 Andhau-West No 1 25 KVA(3 Ph) Nos. 3 2.64 7.92 7 Andhau-West No 2 25 KVA(3 Ph) Nos. 10 2.64 26.4 8 Bahadurganj-Bahadurganj No 1 25 KVA(3 Ph) Nos. 11 2.64 29.04 9 Bahadurganj-Dovale 25 KVA(3 Ph) Nos. 10 2.64 26.4 10 Baheriabad-Bahariabad 25 KVA(3 Ph) Nos. 10 2.64 26.4 11 Barchawar-Barije 25 KVA(3 Ph) Nos. 36 2.64 95.04 12 Barchawar-Dohandu 25 KVA(3 Ph) Nos. 58 2.64 153.12 13 Barchawar-Kamopur 25 KVA(3 Ph) Nos. 18 2.64 47.52 14 Bhadaura-Dewal 25 KVA(3 Ph) Nos. 10 2.64 26.4 15 Bhadaura-Maniya 25 KVA(3 Ph) Nos. 12 2.64 31.68 16 Bhadaura-Sewrai 25 KVA(3 Ph) Nos. 10 2.64 26.4 17 Bhimapur-Jauharganj 25 KVA(3 Ph) Nos. 11 2.64 29.04 18 Bhimapur-Samrol 25 KVA(3 Ph) Nos. 45 2.64 118.8 19 Bhurkhuda-Bhurkhuda 25 KVA(3 Ph) Nos. 11 2.64 29.04 20 Birno-Birno 25 KVA(3 Ph) Nos. 46 2.64 121.44 21 Birno-Jairampur 25 KVA(3 Ph) Nos. 12 2.64 31.68 Page 4 of 471 20/07/2016 (AS PER ORIGINAL DPR) A(VI) Abstract : Scope of Work & Estimated Cost State : UTTAR PRADESH District : Ghazipur S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) 22 Birno-Manehari 25 KVA(3 Ph) Nos. 48 2.64 126.72 23 Chechakpur-Laxmanpur 25 KVA(3 Ph) Nos. 11 2.64 29.04 24 Chechakpur-World Bank 25 KVA(3 Ph) Nos. 31 2.64 81.84 25 Deokali-Barhera 25 KVA(3 Ph) Nos. 53 2.64 139.92 26 Deokali-Dhaneipur 25 KVA(3 Ph) Nos. 51 2.64 134.64 27 Deokali-Pahararpur 25 KVA(3 Ph) Nos. 12 2.64 31.68 28 Devadhi-Gayghat 25 KVA(3 Ph) Nos. 14 2.64 36.96 29 Devadhi-Rampur 25 KVA(3 Ph) Nos. 20 2.64 52.8 30 Dhadani-Basuhari 25 KVA(3 Ph) Nos. 51 2.64 134.64 31 Dhadani-Dhandari 25 KVA(3 Ph) Nos. 47 2.64 124.08 32 Dhadani-Sonahoriya 25 KVA(3 Ph) Nos. 23 2.64 60.72 33 Dildar Nagar-Amaura 25 KVA(3 Ph) Nos. 10 2.64 26.4 34 Dildar Nagar-Bhadaura 25 KVA(3 Ph) Nos. 11 2.64 29.04 35 Dildar Nagar-Chitrakone 25 KVA(3 Ph) Nos. 10 2.64 26.4 36 Dildar Nagar-Pachokhar 25 KVA(3 Ph) Nos. 12 2.64 31.68 37 Dubiha-Dubiha 25 KVA(3 Ph) Nos. 120 2.64 316.8 38 Dullahpur-Badhuapur 25 KVA(3 Ph) Nos. 12 2.64 31.68 39 Dullahpur-Dullapur 25 KVA(3 Ph) Nos. 34 2.64 89.76 40 Dullahpur-Jalalabad 25 KVA(3 Ph) Nos. 36 2.64 95.04 41 Dullahpur-Jhakhaniya+Kodari 25 KVA(3 Ph) Nos. 10 2.64 26.4 42 Gahmar-Bhadaura 25 KVA(3 Ph) Nos. 10 2.64 26.4 43 Gahmar-Gahmar 25 KVA(3 Ph) Nos. 10 2.64 26.4 44 Gahmar-Nasirpur 25 KVA(3 Ph) Nos. 12 2.64 31.68 Page 5 of 471 20/07/2016 (AS PER ORIGINAL DPR) A(VI) Abstract : Scope of Work & Estimated Cost State : UTTAR PRADESH District : Ghazipur S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) 45 Hansrajpur-Hansrajpur 25 KVA(3 Ph) Nos. 6 2.64 15.84 46 Hansrajpur-Malikpur 25 KVA(3 Ph) Nos. 49 2.64 129.36 47 Hansrajpur-Yushufpur 25 KVA(3 Ph) Nos. 51 2.64 134.64 48 Jakhania-Bhurkura 25 KVA(3 Ph) Nos. 3 2.64 7.92 49 Jakhania-Newada 25 KVA(3 Ph) Nos. 10 2.64 26.4 50 Jakhania-Padampur 25 KVA(3 Ph) Nos. 37 2.64 97.68 51 Jamaniya-Betawar 25 KVA(3 Ph) Nos. 3 2.64 7.92 52 Jamaniya-Darauli 25 KVA(3 Ph) Nos. 53 2.64 139.92 53 Jamaniya-Malasa 25 KVA(3 Ph) Nos. 42 2.64 110.88 54 Jangipur-Jangepur 25 KVA(3 Ph) Nos. 43 2.64 113.52 55 Jhotari-Banki 25 KVA(3 Ph) Nos. 50 2.64 132 56 Jhotari-Baresar 25 KVA(3 Ph) Nos. 45 2.64 118.8 57 Jhotari-Range 25 KVA(3 Ph) Nos.