GOVERNMENT OF KHYBER PAKHTUNKHWA COMMUNICATION & WORKS DEPARTMENT
NOTICE INVITING E-BIDDING
(Single Stage Two Envelop E-Bidding System)
C&W Highway Division Peshawar, Government of Khyber Pakhtunkhwa invites Electronic Bids from eligible firms/ bidders in accordance with KPPRA procurement rules 2014 on single stage Two envelop procedure for the following works.
Work Name of Work Required Bid Period Last date Date & No Category Security of & Time Time of of PEC Compl of Technical & Codes etion submissi Bids on E- Bids Construction of Technically & Economically Feasible 198 KM Roads in District Peshawar ADP No.1702/200247 (2020-21). 1 SH: Construction & M & R of Roads in UC C4-& 2% of As per 22-01- 22-01- Maryamzai Badaber Badaber Hurizai, Surizai Above E/Cost work 2021 2021 Bala, Surizai Payan, Surizai Maira / Payan order At 12:00 At 12:30 Urmar Bala, UrmarMaina and Maryamzai PM PM District Peshawar. Sub work:- 1. Const: of road (From Bachiano Koroona (Kandaywala) MohallaHaroom Khel to Bazargai District Peshawar. 2. Constn: of Bin Ghazi Road (from Masjid Kandi Bin Ghazi through Aurangzeb Market) District Peshawar. 3. Constn: of Telaband Road (TorsamKoroona from Telaband Road to Khuwarchnear Ifitkharnazim house) District Peshawar. 2 SH: Construction, &M&R of roads in UC C4-& 2% of As per 22-01- 22-01- Mashogagar, Mashokhel, Suleiman Khel,Sheikh Muhammadi UC Mattani UC Aza Khel Adezai Above E/Cost work 2021 2021 Sherkera Yousaf Khel and Passani on need basis order At 12:00 At 12:30 District Peshawar . PM PM Sub work:- 1. Constn: of Mashogagar road (from Mashogagar main road to telephone exchange). 2. Const: of Sarwarabad road (from canal road to doctor Saeed bhati near Zangali). 3. Constn: of jan said koroona road (ladhawar to dagai) Peshawar. 4. Const: of Zaman khan koroona road (Pasani main road to Ghulam Hassan koroona). 3 SH:- Construction ,Improvement and Black C4-& 2% of As per 22-01- 22-01- Topping of Roads, Sidewalls, Shoulders along Above E/Cost work 2021 2021 with drains etc. in various UCs, UC-35 order At 12:00 At 12:30 PM PM pawaka,UC-36 Arbab Road,UC-37 Shaheen Town, Uc-38 Tekhal Payan-1,UC-39 Tehkal Payan-2,UC-40 Tehkal Bala,UC-41 Palosi&BabuGhari District Peshawar. 1. Const:/Rehabilitation of road from Doctor Kifayat clinic to Momen house Palosai atozai (L-1-KM). 2. Const: of Madina town road perano palosai (L-1KM). 3. Constn: kachkol kababi road I/C link road peranu palosai (L-0.9KM). 4. Constn:/Rehabilitation of Rahatabad Raod (L-0.5KM) 5. Const:/Rehabilitation of musali ghari road from majid taciwa to janazgh tekhal bala (L- 1.5-KM). 6. Const:/Rehabilitation of mohallah Mansoor khel to warsak canal (L-1.5KM). 7. Const:/Rehabilitation of musali ghari road No.1 (L-0.7-KM) 4 SH: Construction of Road and drain at C-5 & 2% of As per 22-01- 22-01- UCNo.14,15,16,17,18,19,20,21,22,23,24,25 Above E/Cost work 2021 2021 District Peshawar. Sub work:- order At 12:00 At 12:30 PM PM 1. Rehabilitation/Improvement of road & street with Drain from Lahori kadmal Balochian Mohalla Pir Sado Mohalla Sarbana, Molvie Abdul Hakeem Korona sabaz pir road, and its surrounding link roads (L=0.7 KM) 2. Rehabilitation/Improvement of road & street with Drain from Shah Mashoom, Kareem Pura ,Ghantaghar and its surrounding link roads. (L= 0.7KM). 3. Rehabilitation/Improvement of road & street with Drain from Chowk Nasir khan,ander sehar Dheri Nalbandi and its surrounding link roads (L=0.7KM) 4. Rehabilitation/Improvement of road & street with Drain from Asia 1,Asia 2,Asia 3and its surrounding link roads (L=0.6 KM) 5. Rehabilitation/Improvement of road & street with Drain from Gut Bacha G,Shah Qaboul, . Jahanger pura,Mehrvi and its surrounding link roads L=0.6 Km). 6. Rehabilitation/Improvement of road & street with Drain from Ghor ghari,Ghanj,Baqir shah and its surrounding link roads (L=0.7KM). 7. Rehabilitation/Improvement of road & street with Drain from Sharifabad, Shahbazz town, Yakkatot 1, and its surrounding link road (L=0.9KM). 5 SH: Constn:/Rehab:/Widening/Impvt:/BT Roads C-5 & 2% of As per 22-01- 22-01- and Bridges UCs Nazar Khwani 1&2,Dehbahar, Above E/Cost work 2021 2021 Bazid Khel, Kagawala, Musazai and Akhun order At 12:00 At 12:30 Abad District Peshawar. PM PM Sub work:- 1. Const: Rehabilitation of road from bazid khel to kagawala towards Akhoon salag Baba Distt: Peshawar. 2. Const: of road from mashal CNG Pump to Doziyan Khel Dist: Peshawar. 3. Const: /Rehabilitation of road at Gulshan Town Deh Bahadur Dist: Peshawar. 4. Const:/Rehabilitation of road from Jabbar ustad Masjid to Ghulam Ali ustad House. 5. Const:/Rehabilitation of road from choorkhel to Qabristan road Dist: Peshawar. 6. Const: of road at kagawal (from M. Road to saadullah House) Distt: Peshawar 7. Const: of shaheed stop (Mohalla Abu Bakar from Kohat road to Mohalla Dodhiyan Khel). 8. Const: of Road at Wazeer Ghari road (Abbas khan house to Hazrat Ameen Masjid). 9. Const:/Rehabilitation of road at Shaheed stop Bachi Laar (from Kohat Road to syed wall house) Dist: Peshawar. 10. Constn/Rehabilitation of road at Ahmad khel (from haji gulab sher hujra to canal). 11. Const:/Rehabilitation of road at Durrani Ghari (from Babu Mama chowk to Canal road) 12. . Const:/Rehabilitation of Naray Laar Road , Hazar Khwani). 13. Const: of Umar Khel Road (from jaba canal to mohalla umar khel near molana Abdussalam House).
6 SH:- Construction of 02 No's of Bridges Dheri C-5 & 2% of As per 22-01- 22-01- kallay & Wazir Qilla alongwith Approach roads Above E/Cost work 2021 2021 in Kabul River at UC juggani Peshawar. order At 12:00 At 12:30 (including Design & Supervision Charges @ PM PM 3%).
7 SH:-Construction /Rehabilitation of roads at UC C-5 & 2% of As per 22-01- 22-01- Wadpaga ,kankola, PakhaGulam, Nagai Above E/Cost work 2021 2021 Gulbela, Takhtabad, Khazana and Haryana order At 12:00 At 12:30 District Peshawar. PM PM 1. Const:/Rehabilitation of roads at Wadpaga & Muhammad Zia linked approaches surrounding Areas. 2. Rehabilitation/Improvement of roads at village Kukker internal roads &