ONGOING PROJECTS Construction Underway Projects added and updates for the current month are highlighted

Contractor: Ace Pipeline Inc. Capacity: 200 MMcf/d GAS | The Americas Type: Project includes pipeline construction Completion: 3Q 2018 U.S. Comments: System includes the Iron Horse Plant, BIRDSBORO POWER LLC – (5/18) designed to accommodate additional ASPEN MIDSTREAM – (12/18) Project: Birdsboro Pipeline expansions that would bring total Project: Austin Chalk Pipeline Type: Project includes construction of pipeline processing capacity to 600 MMcf/d to Type: Project includes pipeline construction Length: 14 miles serve production growth, and is anchored Length: 90 miles Diameter: 24 or 30 inches by a long-term acreage dedication from Location: Katy, TX Location: Oley Township, PA Travis Peak Resources LLC Capacity: 200 MMcf/d Capacity: 79 MDth/d Completion: 3Q 2019 CHENIERE CORPUS CHRISTI PIPELINE LP – Contractor: InfraSource (5/17) ATLANTIC COAST PIPELINE LLC – (2/18) Type: Project includes pipeline construction Project: Corpus Christi Pipeline Owners: Dominion Energy; Duke Energy; Piedmont Type: Project includes pipeline construction and Southern Company Gas BLUE MOUNTAIN MIDSTREAM LLC — (7/18) Length: 23 miles Project: Atlantic Coast Pipeline Project: Blue Mountain Delivery Project Diameter: 48 inches Type: Project includes construction of pipeline Type: Project includes pipeline construction Location: Sinton, TX – Corpus Christi, TX Length: 600 miles Length: 10 miles Completion: 2019 Diameter: 20, 36 and 42 inches Location: Grady County, OK Comments: Pipeline will allow for the interconnection Location: Harrison County, WV – Chesapeake, VA Capacity: 255 MMcf/d points with interstate and intrastate Capacity: 1.5 Bcf/d Comments: Project will run from Blue Mountain natural gas transmission pipelines in South Completion: 4Q 2019 Midstream’s natural gas processing plant Texas, including Tennessee Gas Pipeline, Comments: Project will transport domestically- in Grady County, OK Southcross, Kinder Morgan Tejas Pipeline produced, clean-burning natural gas and Transcontinental Gas Pipeline. The from West Virginia to communities in BOARDWALK LOUISIANA MIDSTREAM LLC – line will terminate at the proposed Corpus Virginia and North Carolina that lack the (REV 7/17) Christi Liquefaction Plant infrastructure needed to generate cleaner Operator: Gulf South Pipeline LP Coastal Bend Header electricity, heat homes and power new Project: Contractor: Associated Pipe Line Type: Project includes the construction of industries Type: Project includes pipeline construction pipeline, three compressor stations and

seven meter stations Contractor: Spring Ridge Constructors LLC COLUMBIA PIPELINE GROUP INC. – (4/18) Length: 66 miles Type: Project includes pipeline construction Owner: TransCanada Corp. Diameter: 16 and 36 inches Project: B-System Project Location: Port Neches, TX - Devers, TX Contractor: Michels Corp. Type: Project includes construction of pipeline, Completion: 3Q 2018 Type: Project includes pipeline construction replacement of existing pipeline and Contractor: Sunland Construction upgrades to equipment and facilities Price Gregory International Inc. Contractor: Type: Project includes pipeline construction Length: 20.8 miles Type: Project includes pipeline construction Diameter: 20 inches BOARDWALK PIPELINE PARTNERS LP – Location: Fairfield and Franklin counties, OH Contractor: Rockford Corp. (3/18) Completion: 3Q 2018 Type: Project includes pipeline construction Operator: Gulf South Pipeline LP Comments: Project will also retire an existing 17.6 mile Project: St. Charles Parish Expansion Project pipeline as part of Columbia’s ongoing Contractor: U.S. Pipeline Inc. Type: Project includes construction of pipeline Modernization Program to ensure the safe Type: Project includes pipeline construction and a new compressor station and reliable delivery of vital natural gas Length: 1.25 miles supply lines for the wider Columbus, OH Project: Atlantic Coast Pipeline Diameter: 16 inches metro area Segment: Supply Header Project Location: Montz, LA Type: Project includes pipeline construction and Capacity: 133 Mcf/d Contractor: Price Gregory International Inc. facility modifications Completion: 3Q 2018 Type: Project includes construction of pipeline, Length: 38 miles Comments: Project will connect to Gulf South’s replacement of existing pipeline and Diameter: 30 inches 24-inch Index 270 pipeline upgrades to equipment and facilities Location: Westmoreland County, PA; Wetzel County, WV CARDINAL MIDSTREAM III LLC – (4/18) CONSUMERS ENERGY – (10/17) Capacity: 1.5 MMDth/d Owner: Cardinal Midstream LLC Project: Saginaw Trail Pipeline Completion: 4Q 2019 Project: Iron Horse Gathering System Type: Project will be executed in five phases Comments: Project will move Marcellus Shale gas Type: Project includes construction of a gas and includes take up and relay of existing from Ohio, West Virginia and Pennsylvania gathering and processing system pipeline into the Atlantic Coast Pipeline for further Length: 100 Length: 94 miles delivery to Virginia and North Carolina Location: Canadian, Grady, Caddo and McClain Diameter: 24 inches counties, OK Location: Saginaw, Genesee,Oakland counties, MI

pipeline-news.compipeline-news.com | February | February 2019 2019 | Pipeline | Pipeline News News15 ONGOING PROJECTS Construction Underway

Completion: 2022 Contractor: R&R Pipeline Inc. Project: Driver to High Plains Lateral Comments: Project is part of the Transmission Type: Project includes pipeline construction Type: Project includes construction of a pipeline Enhancements for Deliverability & lateral Integrity (TED-I) and will be built in five Contractor: Troy Construction Co. Length: 9 miles stages Type: Project includes pipeline construction Diameter: 36 inches Location: Midland, TX Contractor: Welded Construction Project: Enable Gas Transmission Expansion/ Comments: Project is associated with the Gulf Coast Type: Project includes construction of Phase 1 Enable Oklahoma Intrastate Transmission Express Pipeline of the pipeline Expansion Type: Project includes the expansion of two Contractor: Taylor Construction Co. Inc. DTE ENERGY — (8/18) existing pipelines Type: Project includes pipeline construction Operator: NEXUS Gas Transmission System Location: Oklahoma (SCOOP/STACK) Project: NEXUS Project Capacity: 205 MMcf/d Contractor: Pumpco Inc. Type: Project includes pipeline construction and Type: Project includes pipeline construction four compressor stations ENBRIDGE INC. – (10/18) Length: 255 miles Project: South Texas Expansion Project Contractor: Strike LLC Diameter: 42 inches Type: Project includes mainline reversal, new Type: Project includes pipeline construction Location: Ohio and Michigan compression and station reversal on Capacity: 1.5 Bcf/d existing pipeline JACKALOPE GAS GATHERING SERVICES LLC Completion:4Q 2019 Location: Vidor, TX – Petronila, TX – (9/18) Capacity: 400 MDth/d Project: Jackalope Gas Gathering System Contractor: Fluor Completion: 4Q 2018 Expansion Type: Front-end engineering and design Comments: Project will expand the existing South Type: Project includes expansion of an existing Texas Pipeline System in South Texas, an gathering system and the associated Contractor: Michels Corp. area with increasing load from the market Bucking Horse Gas Processing Facility Type: Pipeline construction in Mexico Location: Converse County, WY Location: Ohio and Michigan Capacity: 200 MMcf/d Contractor: Latex Construction ENERGY TRANSFER PARTNERS — (1/18) Completion: 4Q 2019 Type: Pipeline construction Project: Revolution Pipeline Location: Ohio Type: Project includes the construction of KINDER MORGAN INC.– (9/18) pipeline and a fractionation facility Project: SK Pipeline Contractor: M.G. Dyess Inc. Length: 120 miles Type: Project includes construction of pipeline Type: Pipeline construction Diameter: 24 and 30 inches and additional compressor facilities Location: Ohio Capacity: 440 MMcf/d Length: 40 miles Location: Butler County, PA – Revolution Plant Diameter: 30 inches EASTERN SHORE NATURAL GAS CO. – (4/18) Location: West Columbia, TX - Stratton Ridge, TX Owner: Chesapeake Utilities Corp. Contractor: Capstone Energy Capacity: 320 MDth/d Project: 2017 Expansion Project Type: Project includes pipeline construction Completion:3Q 2019 Type: Project includes pipeline looping, upgrades to existing metering facilities Contractor: Willbros Operator: Kinder Morgan Louisiana Pipeline LLC and installation of a compressor unit Type: Project includes pipeline construction Project: Sabine Pass Expansion Project Length: 40 miles Type: Project includes construction of a tap Diameter: 10, 16 and 24 inches Contractor: Pumpco and lateral; modification of three existing Location: Pennsylvania, Maryland, Delaware Type: Project includes pipeline construction delivery interconnects; construction of Capacity: 86 MDth/d additional compression; construction of Completion: 3Q 2018 EQT MIDSTREAM PARTNERS LP – (2/18) header pipelines; and the abandonment Project: Equitrans Expansion Project and replacement of a meter station Type: Project includes construction of pipeline Length: 1.6 miles Contractor: Voshell Bros. Welding and expansion of existing compressor Location: Cameron Parish, LA Type: Project includes pipeline welding stations Capacity: 600 MDth/d Length: 8 miles Completion:2Q 2019 Contractor: Appalachian Pipeline Contractors LLP Diameter: 6 and 30 inches Type: Project includes pipeline engineering and Location: Greene, Allegheny and Washington Operator: Tennessee Gas Pipeline Co. LLC construction counties, PA; Wetzel County, WV Project: Abandonment and Capacity Restoration Capacity: 600 MDth/d Project (ACR Project) ENABLE MIDSTREAM PARTNERS – (9/18) Type: Project includes abandonment of GULF COAST EXPRESS PIPELINE LLC – (6/18) certain natural gas pipeline facilities and Operator: Oklahoma Gas and Electric (OG&E) Project: Gulf Coast Express Pipeline Project modifications of existing pipeline facilities Project: Muskogee Pipeline Type: Project includes pipeline construction and compressor stations Type: Project includes construction of pipeline Length: 447 miles Length: 964 miles (abandonment) and associated metering facilities Diameter: 36 and 42 inches 14 miles (construction) Length: 68 miles Location: Coyanosa, TX - Agua Dulce, TX Diameter: 2 , 16, 30 and 36 inches Diameter: 20 inches Capacity: 1.92 Bcf/d Location: Natchitoches Parish, LA; Columbiana Location: Oklahoma Start: 2Q 2018 County, OH; Kentucky 228 Mcf/d Capacity: Completion: 4Q 2019 Comments: Project will abandon pipeline facilities Completion: 4Q 2018 from Station 40 in Natchitoches Parish, Comments: The 20-year contract will support OG&E’s LA, to Station 216 in Columbiana planned conversion of two 500 megawatt County, OH, and construct replacement coal-fired generating units to natural gas

Pipeline16 Pipeline News News | February | February 2019 2019 | pipeline-news.com | pipeline-news.com facilities in OH and KY. Construction of pipeline facilities Contractor: Snelson Companies Inc. the replacement facilities will enable Location: Cass County, TX; White County, AR Type: Project includes pipeline installation TGP to abandon the lines by sale to Capacity: 460 MDth/d UMTP, which plans to convert the lines Completion: 4Q 2018 PASO NORTE PIPELINE GROUP – (REV 5/18) to non-jurisdictional natural gas liquids Comments: Project is a market-driven response Project: Paso Norte Pipeline transportation as a component of the to access increasing domestic natural Type: Project includes pipeline construction UMTP Project gas supplies available to NGPL’s Gulf Length: 340 miles Coast Mainline System for delivery to Diameter: 32 inches Project: Gulf Coast Southbound Expansion Phase I growing industrial demand and export Location: Deming, NM - Mexico/Chihuahua Type: Project includes the construction of opportunities in the Gulf Coast area Capacity: 366 MMcf/d a new compressor station, modifying Comments: Project will deliver efficient, clean existing valve sites and replacement of NEXTERA ENERGY INC. – (5/18) burning, and cost effective natural gas a minimal length of pipeline facilities, as Project: Okeechobee Lateral Project from the United States to a dynamic well as modifications to NGPL’s existing Type: Project includes construction of a pipeline region of North Central Mexico; the compressor station facilities lateral, receiver and launcher and other western portion of the State of Chihuahua Location: Cass, Victoria, Wharton and Angelina associated facilities counties, TX; White County, AR Length: 5.2 miles PAIUTE PIPELINE CO. – (9/18) Capacity: 460 MDth/d Diameter: 24 inches Project: 2018 Expansion Project Completion: 4Q 2018 Location: Okeechobee County, FL Type: Project includes pipeline replacement and Capacity: 12 MMcf/d pipeline looping 3Q 2018 Project: Gulf Coast Southbound Expansion Start: Length: 8.4 miles Completion:1Q 2019 Phase II Diameter: 12 and 20 inches Type: Project includes construction of additional Location: Douglas and Lyon counties, NE Contractor: Rockford Corp. compression facilities at NGPL’s new Capacity: 4.6 MDth/d Type: Project includes pipeline construction compressor station Comments: Project is an expansion of the existing Carson and South Tahoe laterals Location: Chicago Market, IL - Agua Dulce Hub, LA NIOCORP DEVELOPMENTS LTD. – (1/18) Capacity: 250 MDth/d Operator: Rockies Express Pipeline LLC Completion: 4Q 2019 PIEDMONT NATURAL GAS CO. INC. – (3/18) Project: Elk Creek Lateral Project: Line 434 Project Type: Project includes pipeline construction Type: Project includes construction of gas MILLENNIUM PIPELINE CO. LLC – (3/18) Length: 28 miles distribution lines and facilities Project: Eastern System Upgrade Location: Marshall County, KS – Elk Creek, NE Type: Project includes construction of looped Capacity: 26.8 Mcf/d Length: 35 miles pipeline, new compression capabilities Comments: Pipeline will supply NioCorp’s planned Diameter: 30 inches and upgrades to existing stations Elk Creek Superalloy Facility (Elk Creek Location: Laurinburg, NC Length: 10 miles Facility) Capacity: 80 Bcf/y Diameter: 36 inches Comments: Project will put swine-waste gas on Location: Rockland County, NY Contractor: Rockies Express Pipeline LLC Piedmont’s system for use by Duke Capacity: 200 MDth/d Type: Contract includes the design, Energy at two of its plants (H.F. Lee Completion: 4Q 2018 construction, and operation of the Station Combined Cycle Plant and Sutton pipeline Combined Cycle Plant) MOUNTAIN VALLEY PIPELINE LLC – (2/18) ONEOK INC. — (8/18) Project: Mountain Valley Pipeline Type: Project includes expansions of the existing Contractor: Troy Construction Co. Type: Project includes construction of pipeline WesTex Transmission and ONEOK Gas Type: Project includes pipeline construction and three compressor stations Transportation systems, and making the Length: 301 miles Roadrunner Gas Transmission Pipeline POMELO CONNECTOR LLC – (4/18) Diameter: 42 inches bi-directional Owner: Canyon Midstream Partners LLC Location: Wetzel County, WV - Pittsylvania County, Location: Permian Basin and Oklahoma Project: Pomelo Connector Pipeline VA Capacity: 1.7 Bcf/d Type: Project includes construction of pipeline Capacity: 2 Bcf/d Completion: 1Q 2019 and a compressor station Completion: 4Q 2018 Comments: Projects are backed by multiple firm Length: 14 miles transportation commitments Diameter: 30 inches Contractor: Precision Pipeline LLC Location: Nueces County, TX Type: Project includes pipeline construction PACIFIC GAS AND ELECTRIC CO. – (8/17) Capacity: 400 MDth/d Operator: Northwest Natural Gas Co. Comments: Project will provide firm transportation Contractor: Price Gregory International Project: North Mist Expansion Project capacity between Texas Eastern Type: Project includes pipeline construction Type: Project includes pipeline construction, a Transmission LP and the Nueces Header new reservoir and a compressor station to be constructed by Valley Crossing Contractor: US Trinity Energy Services LLC Length: 13 miles Pipeline LLC Type: Project includes pipeline construction Diameter: 16 inches Location: Portland, OR SPIRE INC. – (3/18) NATURAL GAS PIPELINE CO. OF AMERICA LLC Capacity: 2.5 Bcf/d Operator: Spire STL Pipeline LLC – (2/18) Completion: 4Q 2018 Project: Spire STL Pipeline Owner: Kinder Morgan Inc. Type: Project includes installation of steel Project: Gulf Coast Southbound Expansion Project Contractor: Fluor pipeline and minor modifications to line Type: Project includes construction of a new Type: Project includes front-end engineering 880 compressor station, modifications to and design Length: 65 miles existing compressor station facilities and Diameter: 24 inches valve sites, and replacement of existing Location: Scott County, IL - St. Louis County, MO

pipeline-news.compipeline-news.com | February | February 2019 2019 | Pipeline | Pipeline News News17 ONGOING PROJECTS Construction Underway

Capacity: 400 MDth/d Type: Project includes construction of three Completion: 4Q 2019 compressor stations, modifications to WILLIAMS PARTNERS LP – (11/18) Comments: Project will connect to the existing three existing compressor stations and Operator: Transcontinental Gas Pipe Line Co. LLC Rockies Express Pipeline one regulating station Project: Rivervale South to Market Project Location: Marshall and Cabell counties, WV Type: Project includes pipeline looping, Contractor: T.G. Mercer Consulting Services Inc. Capacity: 2.7 Bcf/d upgrades and existing facility Type: Project includes offloading of pipe Completion: 4Q 2018 modifications Comments: Project is associated with the Mountaineer Length: 11 miles Contractor: Michels Corp. XPress Project Location: New Jersey Type: Project includes pipeline construction Capacity: 190 MDth/d Contractor: ProFoam LLC Completion: 2Q 2019 STERLING ENERGY – (3/18) Type: Project includes providing foam breakers Operator: Northwest Pipeline LLC Project: Jackson Lake Gas Gathering System on pipeline Project: North Seattle Lateral Upgrade Project Type: Project includes construction of a pipeline Type: Project includes pipeline removal and gathering system Contractor: Welded Construction LP replacement with 20-inch diameter line Length: 12.2 miles Type: Project includes pipeline construction and facility upgrades Diameter: 12 inches Length: 7 miles Location: Morgan County, CO – Weldona, CO TRANSCONTINENTAL GAS PIPE LINE CO. LLC Diameter: 8 inches Completion: 1Q 2020 – (5/18) Location: Snohomish County, WA Comments: Project will connect to the Jackson Project: St. James Supply Lateral Lake Gas Processing Facility and be built Type: Project includes construction of pipeline, Operator: Transcontinental Gas Pipe Line Company, adjacent to another pipeline that is already compressor stations and a pig receiver site LLC on the property Length: .7 miles Project: Gulf Connector Expansion Project Diameter: 20 inches Type: Project includes increasing compression TALLGRASS INTERSTATE GAS TRANSMISSION Location: St. James Parish, LA on the existing pipeline LLC – (2/18) Capacity: 161.5 MDth/d Location: Texas – Louisiana Owner: Tallgrass Energy Partners LP Completion: 2020 Capacity: 475 MDth/d Project: Segment 55 Pipeline Abandonment Completion: 1Q 2019 Project UGI ENERGY SERVICES — (7/18) Type: Project includes abandoning an existing Project: Auburn Gathering System Expansion WILLIAMS PARTNERS LP – (1/19) pipeline segment in place Type: Project includes construction of two Project: Gateway Expansion Project Length: 47 miles additional compressor stations Type: Project includes installation of Diameter: 16 inches Location: Susquehanna and Wyoming counties, PA additional electric horsepower at an Location: Converse and Platte counties, WY Capacity: 150 MMcf/d existing compressor station (Station Comments: Segment will be sold to Tallgrass Completion: 4Q 2018 303), modifications to an existing meter Midstream LLC and converted to a crude Comments: Project will transport gas from acreage station and the replacement of an oil pipeline being produced by Cabot Oil & Gas and existing meter station will boost total system capacity to 620 Location: Essex County, NJ; Passaic County, NJ TAPROOT ROCKIES MIDSTREAM LLC – (9/18) MMcf/d Capacity: 65 MDth/d Project: Taproot Rockies Midstream System Start: 4Q 2019 Type: Project includes the construction and WBI ENERGY INC. – (10/18) Completion: 4Q 2020/2021 operation of a multi-product midstream Project: Valley Expansion Pipeline Project Status: Project has FERC approval system in the DJ Basin comprised of Type: Project includes construction of pipeline, Comments: Williams has executed agreements with natural gas, crude oil and produced interconnect facilities, an electric PSEG Power and UGI Energy Services for water gathering, natural gas treating and compressor station, replacement of two firm transportation service under the processing and fresh water supply existing town border stations and the project Location: Weld County, CO construction a regulator station Completion: 4Q 2018 Length: 38 miles WILLIAMS TRANSCONTINENTAL – (REV 3/18) Comments: System will initially serve a substantial Diameter: 16 inches Owner: Williams Partners LP acreage dedication from Bison Oil & Gas Location: Clay County MN; Cass, Burleigh, Stutsman Project: Southeast Market Pipelines Project II LLC and strategically position Taproot and Barnes counties, ND Segment: Hillabee Expansion (Phases I, II and III) to provide similar midstream services to Capacity: 40 MMcf/d Type: Project includes pipeline looping and other operators active in this area Completion: 4Q 2018 installation of additional compression on the mainline TRANSCANADA CORP. – (10/18) Project: Line Section 27 Expansion Length: 45 miles Project: Eastern Panhandle Expansion Type: Project includes expansion of the existing Diameter: 42 inches Coosa, Chilton and Choctaw counties, AL Type: Project includes pipeline construction Line Section 27 pipeline including pipeline Location: Capacity: 1.2 MMDth/d Length: 4 miles construction and installation of associated Completion: 4Q 2021 Diameter: 8 inches facilities Location: Fulton County, PA - Morgan County, WV Length: 13 miles Diameter: 24 inches Capacity: 47.5 MMcf/d Canada Start: 2Q 2018 Location: Northwest North Dakota Comments: Project will provide firm capacity to Capacity: 200 MMcf/d ENBRIDGE INC. — (6/18) Mountaineer Gas Completion: 4Q 2018 Project: Spruce Ridge Program Comments: Upon completion, the total transportation Type: Project includes the addition of two Operator: Columbia Pipeline Group Inc. capacity on WBI Energy’s Line Section 27 new sections of pipeline and additional Project: Gulf Xpress Project will be over 600 MDth/d compression on an existing pipeline Length: 25 miles

Pipeline18 Pipeline News News | February | February 2019 2019 | pipeline-news.com | pipeline-news.com Diameter: 24 and 36 inches Contractor: Quanta Services Inc. sections, comprising 1,810km of trunk Location: Chetwynd, BC and Fort St. John, BC Type: Contract includes pipeline construction lines and 2,334km of branch lines Capacity: 402 MMcf/d for spread three of the mainline Length: 2,574 miles Completion: 3Q 2019 Length: 39 miles (trunklines: 1,450) Location: Fort St. John, BC (gathering lines: 1,124 miles) KEYERA CORP. – (2/18) Diameter: 24 inches (trunklines) Project: North Wapiti Pipeline System Contractor: Macro Enterprises Inc. 4 to 10 inches (gathering lines) Type: Project includes construction of a sour Type: Contract includes pipeline construction Location: Formosa, Chaco, Santa Fe, Salta, gas gathering pipeline, a condensate and for spread two of the project Corrientes and Misiones provinces, water pipeline, and a compressor station Argentina Length: 21 miles Contractor: Spiecapag Capacity: 11.2 MMcf/d Diameter: 8 and 12 inches Type: Contract includes pipelaying for the Completion: 2Q 2018 Location: Grande Prairie, AB project Comments: Project will supply natural gas to 168 cities Capacity: 150 MMcf/d and will connect to the national pipeline Completion: 2Q 2019 TRANSGAS – (1/19) network and to the Juana Azurduy Project: South Saskatoon Pipeline linking Argentina with Bolivia NOVA GAS TRANSMISSION LTD. — (9/18) Type: Project includes pipeline construction Project: Northwest Mainline Loop (Boundary Lake Length: 38 miles Contractor: Tenaris North Section) Location: Vascoy to Patience Lake Type: Contract includes pipe supply Type: Project includes pipeline looping Completion: 4Q 2019 Length: 1,330 miles (trunklines) Length: 14 miles Comments: The project involves initial construction 403 miles (gathering lines) Location: Clear Hills County, AB work to prepare the area, begin drilling Comments: Project will transport sweet natural gas the river crossing, and marking out right Contractor: SIAT S.A. from a tie in connection adjacent to the of ways. After initial construction, pipeline Type: Contract includes pipe supply Owl Lake South Meter Station to the construction will begin. existing Hidden Lake Compressor Station Contractor: Techint E&C-Panedile Type: Contract includes engineering and PEMBINA PIPELINE CORP. — (7/18) Caribbean/South & construction Project: Peace Pipeline Expansion (Phase VI) Central America Segment: Section I Type: Project includes pipeline construction and installation of additional pump stations ENCANA – (REV 11/17) Contractor: Vertúa S.A. Diameter: 16 and 20 inches Owner: Argentine Government Type: Contract includes engineering and Location: LaGlace - Wapitiand, AB and Kakwa to Project: Noreste Argentino Pipeline construction Lator, AB Type: Project includes the construction of Segment: Section II Completion: 1Q 2020 a main trunk line, branch lines and compressor stations Contractor: Helport-CPC-Rovella Carranza and TRANSCANADA CORP. – (11/18) Length: 910 miles Contreras Hnos Operator: Coastal GasLink Pipeline Ltd. Diameter: 30 inches Type: Contract includes engineering and Project: Coastal GasLink Pipeline Location: Buenos Aires - Uruguay construction Type: Project includes construction of pipeline Capacity: 10 Bcm/y Segment: Section III and compressor stations Cost: $2 billion Length: 416 miles Completion: 2Q 2018 PATAGONIA – (1/19) Diameter: 48 inches Comments: Project will be carried out in three Project: Cordillerano Pipeline Extension Location: Dawson Creek - Kitimat, B.C. different construction phases: Salta, Type: Project includes the compressor plant Completion: 2Q 2024 Formosa and Santa Fe in Rio Senguer, along with 62 miles (100 km) of reinforcing gas pipelines, running Contractor: Pacific Atlantic Pipeline Construction Inc. Contractor: Siat and Tubacero parallel to the current one Type: Contract includes pipeline construction Type: Project includes pipeline supply Location: Bariloche, Argentina Length: 62 miles Contractor: Surerus Murphy Joint Venture Contractor: Vertúa Completion: 1Q 2019 Type: Contract includes pipeline construction Segment: Salta Comments: According to government sources work, Type: Project includes pipeline construction which is underway in Pilcaniyeu, Villa La Contractor: SA Energy Group Angostura, Trevelin and Gobernador Costa Type: Contract includes pipeline construction Contractor: Techint-Panedile is more than 40% complete. Segment: Formosa Contractor: Macro Spiecapag Joint Venture Type: Project includes pipeline construction PERU – (REV 11/17) Type: Contract includes pipeline construction Project: Southern Peruvian Gasline Contractor: Helport-CPC-Rovella Carranza and Type: Project includes pipeline construction Project: North Montney Project Contreras Hermanos Length: 620 miles Type: Project includes construction of pipeline, Segment: Santa Fe Diameter: 32 inches associated metering facilities, valve sites Type: Project includes pipeline construction Location: Camisea field - Southern Peru and compression facilities Capacity: 800 MMcf/d Length: 190 miles ENERGÍA ARGENTINA S.A. – (REV 1/18) Status: Peru has canceled a contract for Diameter: 42 inches Project: Argentina Northeast Gas Pipeline construction of the pipeline after the Location: Peace River, AB Segment 1: Formosa, Salta and Santa Fe consortium hired to build it failed to meet Completion: 3Q 2019 Segment 2: Formosa, Chaco and Santa Fe its financing deadline. Odebrecht SA, Segment 3: Corrientes and Misiones the subject of a multinational corruption Type: Project includes the construction of three investigation, led the consortium with a

pipeline-news.compipeline-news.com | February | February 2019 2019 | Pipeline | Pipeline News News19 ONGOING PROJECTS Construction Underway

55% stake, Enagas SA held 25% and Grupo Contractor: Fermaca Pipeline el Encino, S de R.L. Comments: Future expansion could include the Grana y Montero 20% de C.V. addition of a full loop of Sand Hills, which Comments: If built, project will improve the existing Type: Project includes engineering, could increase capacity by over 100 Mbpd Peruvian Energy Network, contributing to procurement and construction for the to a minimum of 550 Mbpd the development of an Energy Node and pipeline Petrochemical Hub in Southern Peru ENERGY TRANSFER PARTNERS LP – (12/18) TRANSCANADA CORP. – (REV 7/17) Project: Lone Star Express Pipeline Expansion Contractor: Tipiel SA Project: Tuxpan-Tula Pipeline Type: Project includes pipeline construction Type: Project includes the front-end Type: Project includes the construction and and an additional fractionation facility engineering and design for the pipeline operation of a natural gas pipeline Length: 352 miles Length: 155 miles Diameter: 24 inches Diameter: 36 inches Location: West Texas - Mont Belvieu, TX Mexico Location: Tuxpan, Veracruz - Tula Capacity: 150 Mbpd Capacity: 703 MMcf/d Completion: 4Q 2020 COMISION FEDERAL DE ELECTRICIDAD – Completion: 2Q 2018 (12/17) Comments: Pipeline will transport natural gas Project: Empalme Branch Pipeline ENTERPRISE PRODUCTS brought from the US (through a future PARTNERS LP – (6/17) Type: Project includes pipeline construction South Texas-Tuxpan Maritime Pipeline) Project: Shin Oak NGL Pipeline Length: 12.5 miles to the states of Veracruz, Puebla and Type: Project includes the construction of Diameter: 24 inches Hidalgo where it will be connected to the pipeline Location: Sonora - Empalme country’s pipeline network Capacity: 236 MMcf/d Length: 571 miles Diameter: 24 inches Status: Project is experiencing commissioning Contractor: Jacobs Engineering Group Location: Gaines County, TX - Mont Belvieu, TX delays Type: Project includes engineering, Completion: 1Q 2018 procurement and construction for the Capacity: 250 Mbpd (initial) Comments: Project will transport gas from the Sásabe- pipeline 600 Mbpd (maximum) Guaymas and Guaymas-El Oro pipelines Completion: 2Q 2019 to a combined cycle power plant Project: Tula - Villa de Reyes Pipeline Comments: Project will have an initial design capacity Type: Project involves pipeline construction of 250 Mbpd, expandable to 600 Mbpd Contractor: Gasoducto de Aguaprieta Length: 284 miles Type: Project includes pipeline construction Diameter: 36 inches ENTERPRISE PRODUCTS PARTNERS LP – Location: Tula, Hidalgo - Villa de Reyes, San Luis (12/18) Project: Hermosillo Branch Pipeline Potosí Project: Mentone Pipeline Type: Project includes pipeline construction Capacity: 550 MMcf/d Type: Project includes construction of large- Length: 30 miles Completion: 2Q 2018 diameter gathering and residue pipelines Diameter: 16 inches Comments: Pipeline will supply natural gas to the and expanding compression capabilities Location: Sonora - Hermosillo CFE’s power generation plants located Length: 66 miles Capacity: 100 MMcf/d in the States of Hidalgo and San Luis Location: Loving County, TX Status: Project is experiencing commissioning Potosí, as well as the Central and Western Capacity: 40 Mbpd delays regions of the country Completion: 2Q 2019 Comments: Project will transport gas from the Sásabe Comments: Project will allow the Mentone natural -Guaymas Pipeline to a combined cycle gas processing plant to link to the power plant NGL | The Americas partnership’s NGL system, including U.S. the Shin Oak Pipeline scheduled for Contractor: Gas Natural del Noroeste completion in the second quarter of Type: Project includes pipeline construction APACHE MIDSTREAM/SALT CREEK 2019, as well as Enterprise’s existing Texas Cost: MIDSTREAM — (7/18) Intrastate natural gas pipeline network Project: SCM Alpine Header System FERMACA PIPELINE EL ENCINO, S DE R.L. Type: Project includes construction of two EPIC NGL PIPELINE LP – (REV 5/18) pipelines DE C.V. – (REV 6/17) Project: EPIC NGL Pipeline Location: Reeves County, TX - Waha, TX Owner: Fermaca Type: Project includes construction of pipeline Capacity: 445 Mbpd Project: La Laguna–Aguascalientes Natural Gas Length: 650 miles Completion: 1Q 2019 Pipeline Diameter: 16, 20, 24 and 30 inches Comments: Project will interconnect to downstream Type: Project involves building and operating a Location: Orla, Pecos, Crane and Midland counties, pipelines providing access to Mont Belvieu natural gas pipeline TX - Corpus Christi, TX and Corpus Christi fractionation facilities Length: 290 miles Capacity: 220 Mbpd (initial) Diameter: 42 inches 440 Mbpd (maximum) Contractor: ARM Midstream Location: Durango - Zacatecas - Aguascalientes Completion: 1Q 2019 Type: Contract includes pipeline construction Capacity: 1.2 Bcf/d Comments: First phase of the project is complete and operation Completion: 2Q 2018 Comments: Pipeline will supply CFE’s power plants DCP MIDSTREAM LP – (7/17) Project: WPX Lateral in Aguascalientes and Jalico states, as Project: Sand Hills Pipeline Extension (Phase II) Type: Project includes construction of a pipeline well as central and western parts of the Type: Project includes the partial looping of the lateral country pipeline and the addition of seven new Length: 6 miles pump stations in the initial phase of the Diameter: 8 inches extension Location: Reeves County, TX Capacity: 85 Mbpd Completion: 1Q 2019 Location: Mont Belvieu, TX Comments: Project is associated with the EPIC NGL Completion: 2Q 2018 Pipeline

Pipeline20 Pipeline News News | February | February 2019 2019 | pipeline-news.com | pipeline-news.com ONEOK INC. – (11/18) Comments: Wood has been awarded a $43 million Location: Allen, Hamilton, Vermillion and Parke Project: Arbuckle II NGL Pipeline contract by a large-cap midstream counties, IN; Douglas County, IL; Lenawee Type: Project includes pipeline construction company County, MI Length: 530 miles Capacity: 750 MMcf/d Diameter: 24 and 30 inches Comments: Project will interconnect with the Rover Location: Oklahoma - Mont Belvieu, TX Canada Pipeline Capacity: 500 Mbpd (initial), 1 MMbpd (maximum) KEYERA CORP. – (2/18) Completion: 1Q 2021 Project: Keylink NGL Gathering Pipeline System Contractor: BigInch Fabricators and Construction Inc. Type: Project includes pipeline construction and Type: Project includes the installation of pipeline PHILLIPS 66 — (8/18) utilization of existing pipeline Length: 24 miles Project: Sweeny Pipeline Length: 150 miles Diameter: 2 and 24 inches Type: Project includes associated pipeline Location: West-central Alberta Location: Hamilton County, IN construction for the Sweeny Hub Capacity: 22 Mbpd Expansion Completion: 3Q 2018 Contractor: BigInch Fabricators and Construction Inc. Location: Old Ocean, TX Comments: Project will provide producers in west- Type: Project includes the installation and Completion: 4Q 2020 central Alberta with a pipeline alternative station fabrication of various pipeline Comments: Project is part of the Sweeny Hub for transporting NGLs from a number of Diameter: 2 to 36 inches Expansion Keyera gas plants Location: Parke County, IN TARGA RESOURCES CORP. – (REV 5/18) ENLINK MIDSTREAM PARTNERS LP — (8/18) Project: Grand Prix NGL Pipeline OIL | The Americas Project: Avenger Crude Oil Gathering System Type: Project includes construction of pipeline Type: Project includes construction of a Length: 75 miles U.S. gathering system Diameter: 24, 30 inches BAYOU BRIDGE PIPELINE LLC – (3/18) Length: 57 miles Location: West Texas - Mont Belvieu, TX Location: Eddy and Lea counties, NM North Texas - Oklahoma Project: Bayou Bridge Pipeline Type: Project will be built in two phases and Capacity: 1.8 Bcf/d Capacity: 450 Mbpd (initial) Completion: 1Q 2019 950 Mbpd (maximum) includes the construction of new pipeline 163 miles Comments: System is anchored by a 10-year contract Completion: 2Q 2019 Length: Diameter: 12 and 24 inches with Devon Energy Corp. and is supported Comments: Targa announced the Grand Prix NGL by dedications from Devon’s Todd (Eddy Pipeline Extension, which will run from Location: Lake Charles, LA - St. James, LA Capacity: 280 Mbpd (initial), 480 Mbpd (maximum) and Lea Counties, NM) and Potato Basin North Texas to Oklahoma and have (Eddy County, NM) development areas an initial capacity of 300 Mbpd and a Completion: 4Q 2018 maximum capacity of 950 Mbpd Comments: Project will connect key Louisiana refining operations with new, sustainable and EPIC PIPELINE CO. LLC – (REV 9/18) diverse sources of American energy Project: EPIC Crude Oil Pipeline Contractor: WHC Energy Services Inc. production Type: Project includes pipeline construction Type: Project includes pipeline construction Length: 730 miles Diameter: 16, 20, 24 and 30 inches WEST TEXAS LPG PIPELINE LTD. – (REV 6/18) Contractor: Stupp Corp. Project includes sourcing the steel Location: Orla, Pecos, Crane and Midland counties, Project: Delaware Basin Extension Type: fabrication and providing storage and TX - Corpus Christi, TX Type: Project includes construction of pipeline, Capacity: 550 Mbpd two pump stations and pipeline looping logistics for the pipe until placed in the ground Completion: 1Q 2019 Length: 120 miles Status: EPIC has executed definitive agreements Diameter: 16 inches Contractor: TRC Solutions Inc. to add Diamondback Energy as a strategic Location: Midland, TX - Reeves County, TX Type: Project includes providing civil survey and partner and signed other new primary Capacity: 110 Mbpd (initial) engineering design services shippers Comments: Project will link producers’ NGL reserves in Contractor: WHC Energy Services LLC Contractor: Troy Construction Co. the Permian and Eagle Ford Basins to Gulf Type: Project includes pipeline construction Type: Project includes pipeline construction Coast refiners, petrochemical companies (spreads one and two) and export markets, and will run side by Project: Delaware Basin Extension Looping Contractor: Sunland Construction Inc. side with the previously announced EPIC Type: Project includes construction of pipeline Project includes pipeline construction NGL Pipeline looping Type: (spreads three and four) Length: 30 miles Contractor: Pumpco Inc. Diameter: 16 inches Type: Project includes pipeline construction Location: Midland and Howard counties, TX Project: Line 78 Project Comments: Project is associated with the Delaware Contractor: Minnesota Ltd. LLC Contractor: Holloman Corp. Basin Extension on the existing West Texas Type: Project includes the removal of pipeline Type: Project includes pipeline construction LPG Pipeline Diameter: 24 inches Contractor: WHC Energy Services LLC Location: Will County, IL Contractor: MPG Pipeline Contractors LLC Type: Project includes pipeline construction Supt: Kerry Schott Type: Project includes pipeline construction WOOD GROUP – (1/19) ENERGY TRANSFER PARTNERS – (REV 10/17) ENLINK MIDSTREAM PARTNERS LP — (7/18) Type: Project includes steel pipeline Project: Panhandle Backhaul Project Type: Project includes upgrades and Project: Redbud Pipeline System construction modifications to allow for bi-directional Type: Project includes construction of a Location: West TX flow of natural gas on their existing gathering system Length: 80 miles pipeline systems Location: Blaine County, OK Status: Contract awarded Completion: 3Q 2018

pipeline-news.compipeline-news.com | February | February 2019 2019 | Pipeline | Pipeline News News21 ONGOING PROJECTS Construction Underway

Comments: System will build upon the Black Coyote NOBLE MIDSTREAM PARTNERS LP – (11/18) SEABROOK LOGISTICS LLC – (3/18) footprint, with total 2018 growth capital Project: Wink Trunk Line Owner 1: Magellan Midstream Partners LP, 50% expenditures related to this expansion Type: Project includes pipeline construction Owner 2: LBC Tank Terminals LLC, 50% expected to be approximately $40 million Length: 95 miles Type: Project includes the construction a Diameter: 20 inches bi-directional pipeline ENTERPRISE PRODUCTS PARTNERS LP – Location: Pecos County, TX - Winkler County, TX Length: 13 miles (9/18) Capacity: 200 Mbpd Diameter: 24 inches Project: Seaway 2 Pipeline Expansion Completion: 2Q 2019 Location: Seabrook, TX Type: Project includes adding drag reducing agents to boost capacity on the Seaway 2 NUSTAR PERMIAN TRANSPORTATION AND Contractor: Troy Construction Co. line by about 100 Mbpd STORAGE LLC – (6/18) Type: Project includes pipeline construction Capacity: 100 Mbpd Project: County Line Lateral Pipeline System/ Completion: 3Q 2018 County Line Lateral Loop TALLGRASS ENERGY/SILVER CREEK Type: Project includes construction of multiple MIDSTREAM (12/18) EXXONMOBIL PIPELINE CO. — (6/18) interconnects connecting to the existing Project: Powder River Gateway Project Project: Delaware Connector Pipeline system Type: Project includes construction of two Type: Project includes pipeline construction Location: Howard County, TX pipelines Length: 48 miles Length: 13 miles Length: 52 miles Diameter: 30 inches Diameter: 16 inches Location: Converse County, WY Location: Loving and Winkler counties, TX Capacity: 70 Mbpd Capacity: 200 Mbpd Comments: Pipeline will help the company triple Completion: 1Q 2019 Permian output by 2025 ORYX MIDSTREAM SERVICES II LLC – TALLGRASS PONY EXPRESS PIPELINE LLC – (REV 8/18) (2/18) GIBSON ENERGY INC. – (4/18) Project: Oryx II Pipeline Owner: Tallgrass Energy Partners LP Project: Viking Pipeline Type: Project includes pipeline construction and Project: Platteville Extension Type: Project includes pipeline construction looping Type: Project includes construction of facilities Length: 75 miles Length: 400 miles to connect Holly Frontier’s refinery Location: Viking Basin – Hardisty, AB Diameter: 16, 20 and 24 inches complex Capacity: 13.3 Mbpd (initial), 25 Mbpd Location: Carlsbad, NM - Midland, TX Length: 55 miles (maximum) Capacity: 650 Mbpd (transportation), 1.5 MMbbl Location: Platteville, CO Completion: 1Q 2019 (storage) Capacity: 44 Mbpd (initial), 80 Mbpd (maximum) Completion: 4Q 2019 Completion: 2Q 2018 JUPITERMLP LLC – (11/18) Project: Jupiter Pipeline Contractor: Holloman Corp. Type: Project includes construction of pipeline Type: Contract includes the engineering, Canada Length: 670 miles procurement and construction of pipeline Diameter: 16, 20 inches ENBRIDGE ATHABASCA – (REV 6/17) Project: Athabasca Pipeline Twinning Location: Orla, TX – Port of Brownsville, TX PLAINS ALL AMERICAN PIPELINE LP – (11/18) Capacity: 30 Mbph Type: Project includes: a new pump station at Project: Sunrise Pipeline System Expansion Completion: 2020 the existing Kirby Lake Terminal; a new Type: Project includes construction of pipeline pump station at the existing Bonnyville and utilization of existing pipeline MAGELLAN MIDSTREAM PARTNERS LP — Station; and a new 36-inch pipeline Length: 180 miles (REV 6/18) Length: 214 miles Diameter: 24 inches Location: Kirby Lake Project: Delaware Basin Pipeline Location: Colorado City, TX – Wichita Falls, TX Comments: The in-service date of the project has Type: Project includes construction of pipeline Capacity: 120 Mbpd been delayed until 2017 due to changes and a terminal, which will offer broad Start: 4Q 2018 in production estimates from oil sands inbound and outbound pipeline access to Completion: 2Q 2019 operations parties that connect to the facility Contractor: Holloman Corp. Length: 60 miles Type: Contract includes pipeline construction Diameter: 24 inches PEMBINA PIPELINE CORP. – (REV 11/17) Location: Wink, TX - Crane, TX Project: Phase IV Expansion Contractor: Energy Services South LLC Capacity: 250 Mbpd (initial) Type: Project involves the expansion of the Fox Type: Contract includes pipeline construction 600 Mbpd (expandable) Creek and Namao Pipeline through two Status: Project is under construction and will new pump stations undergo an open season at a later date Project: Cactus II Pipeline Location: Fox Creek - Namao Completion: 2Q 2019 Type: Project includes construction of two Capacity: 180 Mbpd pipelines that will connect to the existing Completion:4Q 2018 Project: Wink to Western Lateral Cactus network Comments: Pembina has the ability to further expand Type: Project includes construction of a pipeline Length: 80 miles capacity between Fox Creek and Namao lateral Diameter: 20 inches by adding additional pump stations Length: 3 miles Location: Odessa, TX – McCamey, TX (first pipeline), Diameter: 24 inches Corpus Christi, TX – Ingleside, TX (second Project: Phase V Expansion Location: Wink, TX pipeline) Type: Project involves pipeline construction, Comments: Project is associated with the Delaware Capacity: 185 Mbpd installation of a new pump station and Basin Pipeline Status: Project’s capacity has been fully upgrading an existing pump station committed Location: Lator and Fox Creek, AB Completion: 4Q 2019 Length: 60 miles Diameter: 20 inches

Pipeline22 Pipeline News News | February | February 2019 2019 | pipeline-news.com | pipeline-news.com Capacity: 260 Mbpd (transmission) Contractor: Allseas 40 Mbbl (storage) OFFSHORE Type: Project includes the supply a Ballgrab Status: Clearing of the right-of-way is almost The Americas Pipeline Recovery Tool (PRT) for a subsea complete pipeline Completion: 4Q 2018 U.S. Comments: Project will address capacity constraints ENBRIDGE OFFSHORE FACILITIES LLC – Contractor: Nippon Steel & Sumitomo Metal Corp./ between Lator and Fox Creek by adding (12/18) Mitsui & Co. Ltd. capacity, which will support growth in the Project: Vito Field Development Project Type: Project includes the supply of a 600,000 prolific Monteny and Deep Basin resource Type: Project includes development of the Vito ton steel order consisting of large plays Field diameter welded steel pipe and plate as Length: 67 miles raw material for the pipeline PRODUCTS Diameter: 10, 18 inches Location: offshore New Orleans, LA Contractor: Shawcor Ltd. The Americas Type: Project includes the coating of pipe with Contractor: Subsea 7 the application of concrete weight coating U.S. Type: Contract includes pipeline installation in a variety of thicknesses (2.25, 2.75 and AIR LIQUIDE AMERICA CORP. – (3/18) 3.5 inches) and the installation of 5,000 sacrificial anodes Owner: Air Liquide SA ENBRIDGE INC. — (6/18) Project: Air Liquide St. James Pipeline Project: Stampede Oil Pipeline SUBSEA 7 – (5/17) Type: Project includes pipeline construction Type: Project includes Owner: BP Length: 25 miles Length: 16 miles Project: Mad Dog 2 development Diameter: 12 inches Diameter: 18 inches Type: Project includes the engineering, Location: St. James Parish, LA Location: Gulf of Mexico (offshore Louisiana) procurement, construction and Cost: $170 million Capacity: 100 Mbpd installation of the subsea umbilicals, risers Completion: 4Q 2019 Completion: 4Q 2018 and pipeline systems and associated subsea architecture for the project Contractor: Air Liquide Global E&C Solutions FIELDWOOD ENERGY – (11/18) Location: Offshore New Orleans Type: Project includes engineering Project: Katmai Field Development Type: Project includes the development of the Contractor: Hollico Inc. deepwater Katmai Field TECHNIP FMC – (5/17) Type: Project includes pipeline construction Length: 25 miles Owner: Shell Offshore Inc. Diameter: 12 inches Project: Kaikias deep water project Type: Project includes the delivery, integration, BUCKEYE PARTNERS LP – (REV 6/17) Location: US Gulf of Mexico (Green Canyon 40) and installation of the subsea production Project: Michigan/Ohio Pipeline Expansion Project system and subsea riser, jumper and (Phase II) Contractor: Subsea Integration Alliance flowline equipment for phase one of the Type: Project includes the reversal on a portion Type: Contract includes project management, project of the existing Laurel Pipeline to facilitate engineering, procurement, construction Location: Gulf of Mexico the transportation of refined and installation of a flowline and tie-ins products Location: Pittsburgh, PA INFRAESTRUCTURA MARINA DEL GOLFO – Canada Completion: 2018 (4/18) Owner: TransCanada Corp. HUSKY ENERGY — (10/17) Project: Michigan/Ohio Pipeline Expansion Project: Sur de Texas-Tuxpan Pipeline Owner 2: Suncor Energy (25%) (Phase I) Type: Project includes pipeline construction Owner 3: Nalcor Energy (5%) Type: Project includes the reversal of a portion Length: 497 miles Project: West White Rose Extension Project of the existing Laurel Pipeline Diameter: 42 inches Type: Project includes the construction of a new Location: Detroit, MI, Lima, OH and Midland, PA Capacity: 2.6 MMcf/d fixed wellhead platform in the White Rose Location: Gulf of Mexico - Tuxpan, Veracruz Field CENEX PIPELINE LLC – (5/18) Completion: 4Q 2019 Location: offshore St. Johns Capacity: 75 Mbpd Project: Cenex Pipeline Replacement Comments: The subsea gas pipeline will interconnect Completion: 1Q 2022 Type: Project includes 8-inch pipeline with the Nueces-Brownsville Pipeline and replacement the Tuxpan-Tula Pipeline Contractor: TechnipFMC Length: 182 miles Type: Contract includes engineering, Diameter: 10 inches Contractor: M2 Subsea procurement, construction and Location: Sidney, MT – Minot, ND Type: Project includes pipeline span support installation subsea equipment, including Completion: 2Q 2019 installation for the project Comments: M² Subsea will manage the project tie-in manifolds, flexible flowlines, and ONEOK INC. – (11/18) control umbilicals, which will connect Project: West Texas LPG System Expansion II working closely with local partner the recently announced West White Rose Type: Project includes upgrades to two existing Frontera Resources using the Mexican flagged multipurpose support vessel platform to the existing SeaRose FPSO pumps and pipeline looping on the vessel existing West Texas LPG System Tehuana, as well as installing grout Location: Midland County, TX – Loving County, TX supports along the southern leg of Capacity: 80 Mbpd the pipeline to prevent stress during Completion: 1Q 2020 installation and hydrostatic testing

pipeline-news.compipeline-news.com | February | February 2019 2019 | Pipeline | Pipeline News News23 ONGOING PROJECTS Construction Underway

Contractor: OilServe/Oando Caribbean/South & GAS | International Type: Contract includes construction of Lot 1 of Central America the pipeline Africa PETROBRAS – (12/18) Length: 125 miles DANGOTE INDUSTRIES LTD. – (4/18) Project: Rota 3 Gas Export Pipeline Cost: $855 million Owner: Dangote Group Type: Project includes construction of the third Project: East West Offshore Gas Gathering System subsea pipeline segment of an existing Contractor: Brentex/China Petroleum Pipeline Bureau Type: Project includes construction of two system Type: Contract includes construction of Lot 3 of parallel subsea pipelines Length: 6 miles the pipeline Length: 684 miles Diameter: 24 inches Length: 137 miles Diameter: 38 inches Location: offshore Rio de Janeiro Cost: $1.2 billion Location: Bonny, Rivers - Ogidigben – Olokola - Lekki, Lagos Contractor: McDermott International Inc. Capacity: 3 Bcf/d Type: Contract includes design, engineering, Asia Pacific Completion: 3Q 2018 (Phase I) procurement, construction and APA GROUP – (3/18) 2Q 2025 (Phase II) installation of a rigid concrete coated Owner 1: Gold Road Resources Ltd., 50% Comments: Project will create a corridor for pipeline to the shore, including a Owner 2: Gold Fields Ltd., 50% evacuation of trapped gas from offshore horizontal directional drill, tie-in spools Project: Yamarna Gas Pipeline platforms in Nigeria to allow their and pre-commissioning services Type: Project includes pipeline construction and monetization and will deliver gas to a new a gas-fired station build gas receiving plant to be located at Length: 123 miles the Dangote Refinery Complex in Lekki, Location: Yamarna, Western Australia Lagos Mexico Cost: $180 million Comments: Project is part of the Gruyere Project and PEMEX EXPLORACIÓN Y PRODUCCIÓN – Contractor: Paradigm Environmental System will be built east of Laverton in Western (9/18) Consultants Australia, running from a connection Project: Ayatsil Field Pipeline Type: Contracts includes conducting an point off the existing Eastern Goldfields Type: Project includes subsea pipeline flowline Environmental Impact Assessment for the Gas Pipeline to the new Gruyere gold installation in support of its Ayatsil Field project Length: 3 miles mine project site Diameter: 8 and 24 inches GALSI PIPELINE – (REV 10/16) Location: Bay of Campeche, offshore Mexico Contractor: Nacap Owners: Sonatrach/Edison/Enel/Hera Group Type: Project includes pipeline construction Completion: 1Q 2019 Project: Galsi Pipeline Type: Project includes the construction of ARROW ENERGY – (REV 5/16) Contractor: McDermott International Inc. 351 miles of offshore pipeline crossing Project: Arrow Bowen Pipeline Type: Contract includes design and detailed the Mediterranean Sea and 161 miles Type: Project includes the construction of high- engineering, procurement, construction of onshore pipeline, including gas pressure steel pipeline and installation of two subsea pipelines compression facilities Length: 512 miles Length: 512 miles Location: Bowen Basin - Gladstone Location: Koudiet Draouche - Piombino Completion: 2018 Completion: 2018 Comments: The initial transport capacity will be 8 Bcm AZERBAIJAN INTERNATIONAL per year OPERATING CO. – (REV 11/15) KINGDOM OF MOROCCO/ Project: Azeri Pipeline Type: Project includes the construction of new FEDERAL REPUBLIC OF NIGERIA – (1/17) pipeline Pipeline: Trans-African Pipeline Length: 2,175 miles Type: Project includes the construction of a new Location: Georgia, , , , gas pipeline and Location: Nigeria – Morocco - Europe. Completion: 2019 Comments: The Trans-African Pipeline will improve Comments: Pipeline will have a capacity of 16 Bcm/y access to energy across West Africa and establish a competitive regional market GAIL INDIA LTD. – (3/18) for electricity Project: Jagdishpur-Haldia-Bokaro-Dhamra Gas Pipeline (Phase I) NIGERIAN NATIONAL PETROLEUM CORP. — Type: Project includes construction of a (6/18) transmission pipeline and multiple spur Project: Ajaokuta - Kaduna – Kano (AKK) Pipeline lines Type: Project includes pipeline construction Length: 470 miles Length: 381 miles Diameter: 4, 8, 12, 18, 30 and 36 inches Diameter: 40 inches Location: Phulpur – Dobhi Location: Kaduna - Kano Capacity: 565 Bcf/d (Phase I and II) Cost: $2.8 billion Cost: $50 million Completion: 4Q 2020 Completion: 4Q 2018 Comments: Project will help establish connectivity Comments: Project will usher Industrial development between the East, West and North parts of in eastern part of India by supplying Nigeria environmentally clean natural gas to fertilizer and power plant, refineries, steel

Pipeline24 Pipeline News News | February | February 2019 2019 | pipeline-news.com | pipeline-news.com INTERNATIONAL

plants and other Industries PERUSAHAAN GAS NEGARA – (8/17) Operator: Pertamina FSU Eastern Europe Contract: JSIW Infrastructure Pvt. Ltd. Project: Duri-Dumai Pipeline System AZERBAIJAN INTERNATIONAL Type: Project includes engineering, design, Type: Project includes construction of OPERATING CO. – (REV 12/16) procurement and construction transmission and distribution pipelines Project: South Caucasus Pipeline Expansion Length: 75 miles Type: Project includes pipeline looping and two Contract: IL&FS Engineering & Construction Co. Ltd. Diameter: 24 inches new compressor stations Type: Project includes pipelaying Location: Dumai, Riau Length: 303 miles Capacity: 140 MMcf/d Completion: 2019 Project: Jagdishpur-Haldia-Bokaro-Dhamra Gas Cost: $574 million Location: Azerbaijan - Georgia-Turkey border Pipeline (Phase II) Start: 3Q 2017 Comments: Project will connect with the Trans- Type: Project includes pipeline construction Completion: 4Q 2018 Anatolian Natural Gas Pipeline Length: 1,180 miles Diameter: 4, 8, 12, 18, 30 and 36 inches Contractor: P.T. Connusa Energindo FGSZ LTD. – (12/17) Location: Jharkhand - West Bengal - Odisha Type: Project includes engineering, Project: Bulgaria--- (BRUA) Capacity: 565 Bcf/d (Phase I and II) procurement and design Pipeline Project Cost: $146 million Type: Project includes construction of pipeline Completion: 4Q 2020 Contractor: Pertamina and three compressor stations Comments: Project will usher Industrial development Type: Project includes construction of Length: 819 miles in eastern part of India by supplying transmission and distribution pipelines Diameter: 32 inches environmentally clean natural gas to Location: Bulgaria - Romania - Hungary – Austria fertilizer and power plant, refineries, steel PETROVIETNAM GAS/MOECO/ Capacity: 1.7 Bcm/y (initial) plants and other Industries PTTEP – (REV 6/16) 4.4 Bcm/y (maximum) Project: O Mon Gas Pipeline Completion:4Q 2019 Contract: JSIW Infrastructure Pvt. Ltd. Type: Project includes the construction of risers, Comments: Project will increase security of gas supply Type: Project includes engineering, design, subsea pipeline, onshore pipeline and a and to reduce energy dependence by procurement and construction line break valve making it possible to diversify gas supply Length: 248 miles routes and sources Contract: IL&FS Engineering & Construction Co. Ltd. Location: Malay Basin - southern Vietnam Type: Project includes pipelaying Completion: 2023 Contractor: Transgaz Comments: Pipeline will have a capacity of 20.3 Type: Contract includes the first phase of GUJARAT STATE PETROLEUM MMcm/y construction for the Romanian section of CORP. – (REV 12/16) the pipeline Contractor: GSPL India Gasnet PUNJ LLOYD – (5/16) Length: 297 miles Project: Mehsana-Bhatinda Pipeline Type: Project includes the construction of a Location: Podisor - Recas Type: Project includes the construction of new 14-inch pipeline (186 miles) and a 32-inch pipeline pipeline (187 miles) and the construction GASCADE – (10/18) Length: 1,037 miles of a block valve and pigging stations Project: European Gas Pipeline Link (EUGAL) Location: Mehsana-Bhatinda Length: 373 miles Type: Project includes pipeline construction Comments: Pipeline is currently being considered Location: Oman New Delhi Length: 298 miles for cancellation but, if built, will have a Completion: 2018 Diameter: 56 inches transportation capacity of 30 MMcf/d Location: Mecklenburg-Western Pomerania – RELIANCE INDUSTRIES – (REV 11/16) Brandenburg - Saxony Contractor: GAIL Owner: China National Petroleum Corp. Capacity: 55 Bcf/y Project: Mallavaram-Bhilwara Pipeline Project: Shahdol-Phulpur Pipeline Completion: 4Q 2020 Type: Project includes the construction of new Type: Project includes the construction of new Comments: System will be powered by the Nord pipeline pipeline Stream 2, the gas transport network that Length: 984 miles Length: 188 miles connects Siberia to the heart of Europe via Location: Mallavaram - Bhilwara Location: Shahdol - Jaysing Nagar - Beohari-Gurh the Baltic Sea Comments: Pipeline is currently being considered - Phulpur for cancellation but, if built, will have a Completion: 2023 Contractor: Bonatti/Max Streicher JV transportation capacity of 30 MMcf/d Comments: Pipeline will have a capacity of 4.3 Type: Contract includes construction of six lots MMcm/d of the European Gas Pipeline Link IIL&FS ENGINEERING AND CONSTRUCTION CO. LTD. – (REV 2/17) Project: Dahej Nagothane Ethane Pipeline Project Contractor: Europipe Owner: Gas Authority of India Ltd. Type: Project includes the construction of new Type: Contract includes pipeline supply and Project: Kochi-Koottanad-Bangalore-Mangalore pipeline delivery for the project Pipeline Length: 301 miles Type: Project includes the laying and Location: Dahej, Gujarat – Nagothane, Maharashtra Contractor: Mulheim Pipecoatings construction of 30-inch pipeline along Comments: Project will transport 1.25 MMtpa of liquid Type: Contract includes pipe coating for the with associated works ethane project Length: 685 miles Location: Kerala Completion: 2019 – (2/16) Project: Pipeline Comments: GAIL has won a second extension for Type: Project includes the construction of completing the project as it faces 55-inch pipeline that will run through unprecedented problems in getting land swampy, mountainous and seismically in Kerala and Tamil Nadu hazardous areas

pipeline-news.compipeline-news.com | February | February 2019 2019 | Pipeline | Pipeline News News25 ONGOING PROJECTS Construction Underway

Length: 1,864 miles Contractor: MMT Completion: 2018 Location: Irkutsk Region - Republic of Sakha Type: Contract includes a route survey for the Comments: Project will have a capacity of 12.4 Bcm/y (Yakutia) - Amur Region offshore pipeline will link the liquefied natural gas terminals Capacity: 38 Bcm/y of natural gas from in the port of Karachi and the city of Cost: $400 billion Contractor: Corinth Pipeworks Lahore Status: According to Russian media, the project is Type: Contract includes pipeline supply for the moving ahead of schedule and 448 miles onshore portion of the project STROYGAZMONTAZH – (2/17) of the pipeline has been completed Owner: Gazprom Completion: 2018 Contractor: Allseas Project: Ukhta-Torzhok 2 Pipeline Comments: Project is a key element in a 30-year gas Type: Contract includes offshore pipeline Type: Project includes the construction and supply deal between Moscow and Beijing installation installation of 60-inch pipeline and seven compressor stations Contractor: DENSO Group Germany 2 AG – (5/18) Length: 173 miles (602 miles total) Type: Contract includes field-joint coatings, Project: Nord Stream 2 Pipeline Location: Yamal - Ukhta - Torzhok pipe rehabilitation and coatings Type: Project includes twinned pipeline Completion: 2019 construction Comments: Project will play a key role in ensuring Project: Yakutia-Kahbarovsk-Vladivostok Pipeline Length: 745 miles the delivery of the needed gas volumes Type: Project includes the construction of new Diameter: 48 inches to northwestern Russia for domestic 56-inch pipeline Location: Russia - Baltic Sea - Greifswald in consumption and export purposes, Length: 2,500 miles Germany including an order to deliver natural gas Location: Yakutia - Vladivostok Capacity: 55 Bcm/y into Nord Stream 2, and will have an Completion: 2019 Completion: 4Q 2019 annual capacity of 45 Bcm of natural gas Comments: Project will have a design capacity of 61 Bcm/y of natural gas Contractor: Next Geosolutions AG – (10/16) Type: Project includes survey work on the Contractor: Himachal Futuristic Communications Ltd. GAZ-SYSTEM S.A — (8/18) pipeline deploying the Go Electra vessel Owner: Trans Adriatic Pipeline AG Project: Lwówek-Odolanów Pipeline from Hanko in Finland, which will be Project: Trans Adriatic Pipeline Type: Project includes pipeline construction supported by 15 of M² Subsea’s personnel Type: Project includes the supply and delivery of Length: 168 miles who will carry out the UXO identification 963 miles of fiber optic cable Location: Lwówek-Odolanów work Length: 545 miles Completion: 2020 Location: Azerbaijan – Europe Comments: System is part of the international North- Contractor: Allseas Group Completion: 2020 South Gas Corridor. It also constitutes the Type: Project includes offshore pipe laying of Comments: The pipeline will connect with the Trans final element of the mainline connecting both pipelines through the Baltic Sea Anatolian Pipeline the LNG terminal in Swinoujscie with the underground gas storage facilities in Contractor: Wasco Contractor: SPIECAPAG Wierzchowice and Mogilno Type: Project includes applying concrete weight Owner: Trans Adriatic Pipeline AG coating to the 48-inch pipe Project: Trans Adriatic Pipeline Project: Baltic Connector Pipeline Type: Project includes supplying 4-inch pre- Type: Project includes the construction of a Contractor: MMT Sweden commissioning tools, tracking equipment, bi-directional gas transmission pipeline, Type: Project includes the visual and as well as accessories for the pipeline two onshore gas transmission pipelines, a instrumental inspection of both lines with gas metering station and two compressor remotely operated vehicles over the entire Contractor: Siemens stations length of the route, including the project’s Project: Trans Adriatic Pipeline Length: 93 miles trenched sections and cable crossings Type: Project includes the installation of six Diameter: 20 and 27 inches 15-megawatt SGT-400-driven turbo Location: Paldiski (Estonia) - Inkoo (Finland) Contractor: Wasco Coatings Europe BV compressor trains Capacity: 7.2 MMcm/d Type: Project includes transport, handling and Completion: 1Q 2020 storage of 113,000 pipes Comments: Project will connect the Finnish and Baltic Contractor: Technip gas grids, which are also expected to be Contractor: Intertek Project: Trans Adriatic Pipeline linked with Poland at around the end of Type: Project includes pipeline inspection Type: Project includes supplying 4-inch pre- this decade. Russia’s Gazprom is currently commissioning tools, tracking equipment, the sole supplier of pipeline natural gas POLAND/LITHUANIA – (REV 3/12) as well as accessories for the pipeline to Finland. The EU is striving to reduce its Type: Project includes the construction of new reliance on Russian gas across its member pipeline Contractor: Technip states to improve the security of its Length: 445 miles Project: Trans Adriatic Pipeline supplies Location: Estonia - Latvia - Lithuania - Poland Type: Project includes the overall project and Comments: Project is in the feasibility stage site management, procurement and Contractor: Dovre Group subcontracting for all the EPC packages Type: Contract includes project management ROSTEC – (12/15) throughout the engineering, procurement for the pipeline Owner: Russia/Pakistan and construction phases, as well as Project: Karachi-Lahore Pipeline warranty management and the project Contractor: Neste Jacobs Type: Project includes the construction of new close-out Type: Contract includes engineering for the pipeline and eight compressor stations project along the route Contractor: Industria Meccanica Bassi S.p.A Length: 684 miles Project: Trans Adriatic Pipeline Location: Karachi - Lahore Type: Project includes two contracts: first,

Pipeline News | February 2019 | pipeline-news.com INTERNATIONAL

for engineering, manufacturing and TRANSNEFT PCD LLC — (8/18) delivery of 48-inch and 36-inch piggable LNG | International Project: Novovelichkovskaya - Krasnodar Oil T-pieces and welded elbows of different Asia Pacific Pipeline characteristics and, second, scraper traps Type: Project includes pipeline construction units for intelligent pigging KUMUL PETROLEUM HOLDINGS LTD. — Length: 31 miles (10/17) Diameter: 21 inches Contractor: Nuova Giungas Project: Kikori Energy Hub Location: Novovelichkovskaya - Krasnodar Project: Trans Adriatic Pipeline Type: Project includes a mid-scale LNG Capacity: 4.5 MMt/y Type: Project includes the engineering, liquefaction and regional export Completion: 2019 manufacturing and delivery of 48-inch facility,180MW power generation Comments: System will join Novovelichkovskaya oil and 36-inch isolating joints facility, methanol process facility and a pump station with refineries of Krasnodar condensate stabilization, storage and Territory - Afipsky and Ilsky regional export facility Middle East Location: Gulf Province, Papua New Guinea UGANDA/TOTAL E&P – (7/17) PETROJET – (3/17) Status: Project is in the preliminary front-end Contractor: Gulf Interstate Engineering has been Owner: Oman Gas Co. engineering and design stage awarded a contract for the front-end Project: Duqm Pipeline Comments: Project is part of the Western Pipeline engineering and design of the pipeline Type: Project includes the construction and Extension Project, which will allow Project: Uganda–Tanzania Crude Oil Pipeline looping of 36-inch pipeline stranded oil and gas fields in the western Type: Project includes the construction of an Length: 137 miles provinces to come to the coast for export export pipeline and an associated oil Location: Saih Nihayda - Wusta coast refinery Completion: 2018 Contractor: KBR Inc. Length: 897 miles Type: Project includes conceptual development Diameter: 24 inches SAUDI ARABIAN OIL CO. – (9/18) and feasibility study services for the Kikori Location: Hoima, Uganda - Tanga, Tanzania Energy Hub Project: South Gas Compression Plant Pipelines Capacity: 200 Mbpd Type: Project includes construction of flowlines, Cost: $4 billion trunklines and transmission lines OIL | International Status: President Museveni and his Tanzanian Length: 435 miles counterpart John Pombe Magufuli Location: Eastern Saudi Arabia Asia Pacific signed the East African Crude Oil Pipeline Completion: 2021 Agreement in Dar es Salaam to express BANGLADESH PETROLEUM CORP. – (12/17) intent to go ahead with the construction Comments: Project is associated with the Haradh Gas Type: Project includes the construction of off Plant and comes under the Southern Area of the project shore and onshore pipeline Completion: 4Q 2020 Energy Efficiency Program Length: 135 miles (90 miles offshore) and (45 miles onshore) Contractor: Saipem Location: Bay of Bengal Africa Type: Contract includes procurement and Cost: $550 million construction for the project Status: Exim Bank of China will finance the project GOVERNMENT OF KENYA – (7/18) Completion: 1Q 2020 Owner 1: PLC Contractor: Tefken Comments: Pipeline will unload oil from ships in the Owner 2: African Oil Ltd. Type: Contract includes building satellite gas Bay of Bengal and deliver it onshore Owner 3: Maersk Oil compression plant pipelines for the Project: Lokichar - Lamu Pipeline (Kenya Crude Oil Haradh Gas Plant CHINA – (8/16) Pipeline) Project: Gwadar-Kashgar Pipeline Type: Project includes pipeline construction TAPI PIPELINE CO. LTD. – (4/18) Type: Project includes the construction of Length: 537 miles Owners: TurkmenGaz, Afghan Gas Enterprise, Inter pipeline Diameter: 20 inches State Gas Systems, GAIL Length: 1,500 miles Location: Lokichar, Kenya – Lamu, Kenya Project: Turkmenistan – Afghanistan – Pakistan - Location: Gwadar - Kashgar Capacity: 80 Mbpd (initial) India (TAPI) Pipeline Start: 2017 120 Mbpd (maximum) Type: Project includes pipeline construction Completion: 2021 Completion: 1Q 2021 Length: 1,127 miles Comments: Pipeline will transport Uganda’s crude oil Diameter: 56 inches RELIANCE INDUSTRIES LTD. – (12/17) from Kabaale, in Hoima district, northwest Location: Heart – Kandahar – Chamman – Zhob of Kampala to Chongoleani peninsula, Project: KG-D6 Subsea Field Development – DG Khan – Multan - Fazilika (Pakistan- near the Tanga port in Tanzania Type: Project includes developing the R-series India Border) Capacity: 3.2 Bcf/d fields as a subsea tieback to the existing Cost: $22.5 billion Contractor: Wood Group control and riser platform off Block KGD6 Completion: 1Q 2020 Type: Contract includes the front-end Location: Krishna Godavari Basin, offshore India Comments: Project is being funded by the Asian engineering design for the project Capacity: 425 MMcf/d Development Bank and will connect the Cost: $6 billion state of Punjab in northern India with Contractor: Total SA Completion: 2020 the Galkynysh gas field in the desert in Type: Project includes pipeline construction eastern Turkmenistan Contractor: McDermott International Inc. Type: Contract includes engineering, procurement, installation and pre-commissioning for the project Comments: The optional scope also consists of two additional subsea structures and flowlines at a water depth between 4,593 and 5,905 feet

pipeline-news.com | February 2019 | Pipeline News ONGOING PROJECTS Construction Underway

FSU Eastern Europe Contractor: Essar Projects Contractor: Bonatti AMBO LLC – (9/13) Type: Work scope includes engineering, Type: Project includes construction and pre- Project: AMBO Pipeline procurement and construction for the commissioning of the pipeline gathering Type: Project includes the construction of new Al-Zour Refinery Project, Package-4 system pipeline Cost: $1.57 billion Length: 575 miles ZAKHEM INTERNATIONAL – (REV 8/14) Location: - Vlore Contractor: Fluor Corp. Owner: Kenya Pipeline Co. Comments: Pipeline is on hold due to the lack of Type: Work scope includes two engineering, Project: Mombasa-Nairobi Pipeline availability of crude oil coupled with procurement and construction contracts Type: Project includes the design and financial hurdles for key process units, utilities and supervision of the construction of new infrastructure for the new Al-Zour Refinery 14-inch pipeline Project Length: 280 miles Middle East Cost: $2.6 billion Location: Mombasa-Nairobi KURDISTAN REGIONAL GOVERNMENT – Comments: As of April 2016, the project has been (1/18) Contractor: Técnicas Reunidas delayed Type: Work scope includes the installation of Project: Kirkuk–Ceyhan Pipeline processing units for the Al-Zour Refinery Type: Project includes the construction of Project pipeline and two pumping stations Western Europe & Cost: $4.1 million Length: 217 miles EU Countries Diameter: 40 inches MINISTRY OF OIL OF IRAQ – (4/18) YOKOGAWA ELECTRIC CORP. – (3/17) Location: Baiji, Saladin Province - Fish-Khabur Operator: Iraq State Co. for Oil Projects Owner: British Pipeline Agency Ltd. border crossing with Turkey Project: Basra-Aqaba Pipeline Type: Project includes the engineering, Capacity: 1 MMbpd Type: Project includes construction of dual oil installation and commissioning of a Comments: The new pipeline section will replace an and gas pipelines major multi-product fuel pipeline system old pipeline that suffered severe damage Length: 1,044 consisting of three integrated pipelines in terror attacks after ISIS took control of Location: Basra, Iraq - Aqaba, Jordan Length: 404 miles Mosul in June 2014 Capacity: 1 MMbpd (oil), 258 MMcf/d (gas) Location: Ellesmere port in northwestern England - Cost: $18 billion southeastern coast KUWAIT OIL CO. – (11/17) Comments: Project will help to meet Jordan’s energy Completion: 2018 Project: Al Zour Refinery needs and crude will be supplied by state- Comments: The pipelines connect to the City of Type: Project includes construction of an oil owned South Oil Co., via the State Oil London’s major airports and are a critical refining plant, which will be one of the Marketing Organization part of the UK’s infrastructure largest refining plants worldwide Location: Kuwait Contractor: SNC Lavalin Capacity: 615 Mbpd Type: Project includes engineering, OFFSHORE – Cost: $14.5 billion procurement and design International Completion: 1Q 2019 Comments: Project is part of the Clean Fuels Project to NATIONAL IRANIAN OIL ENGINEERING AND Africa upgrade, expand, and transform the 270 CONSTRUCTION CO. – (REV 12/17) DANGOTE OIL REFINERY CO. – (3/18) Mbpd Mina Abdullah and 466 Mbpd Mina Project: Goureh-Jask Crude Oil Pipeline Owner: Dangote Group Al Ahmadi refineries into an integrated Type: Project includes construction of pipeline Project: Dangote Oil Pipeline 800 Mbpd merchant refining complex and and five pumping facilities Type: Project includes the transportation and permanently shut down the 200 Mbpd Length: 621 miles installation of nine subsea pipelines Shuaiba Refinery Diameter: 42 inches Length: 62 miles Location: Genaveh – Jask Diameter: 24 and 48 inches Contractor: Larsen & Toubro Capacity: 1 MMbpd Location: Lagos, Nigeria Type: Project includes engineering, Comments: Project will transfer crude oil to Jask Oil Completion: 3Q 2019 procurement and construction for the Terminal in the southern Hormozgan Comments: Project will connect to the 650 Mbpd refinery Province Dangote Oil Refinery and is part of Cost: $265 million Dangote’s $17 billion gas pipeline, fertilizer, petrochemicals and refinery Contractor: Saipem PRODUCTS – projects Type: Project includes engineering, procurement, construction and International Contractor: China Harbor Engineering Co. commissioning activities associated with Middle East Type: Project includes engineering, the feed pipelines for the Al Zour Refinery procurement and construction Length: 280 miles TENGIZCHEVROIL – (3/18) Cost: $850 million Project: Area 51 Pipelines Contractor: China’s Offshore Oil Engineering Co. Comments: Project is designed to transport crude oil Type: Project includes construction of a pipeline Type: Project includes engineering, and gas from various South Tank Farm gathering system procurement and construction manifolds to the new Al Zour Refinery and Length: 234 miles refined products to storage areas in the Location: Kazakhstan Mina Al Ahmadi Refinery Comments: Project is part of the FGP-WPMP Project MOBIL PRODUCING NIGERIA UNLIMITED — and will transport fluids (water, fuel (6/18) Contractor: Amec Foster Wheeler gas, diesel) from the Tengiz and Korolev Project: Uplift Pipeline Type: Work scope includes front-end reservoirs to the new FGP processing Type: Project includes offshore pipeline engineering and design for the project facilities construction

Pipeline News | February 2019 | pipeline-news.com INTERNATIONAL

Length: 12.5 miles Contractor: Wood Group Field Diameter: 24 inches Type: Contract includes engineering, design, Location: offshore Nigeria construction management, procurement, Contractor: Wood Group Comments: Project will run between the Idoho logistics, quality assurance, health, Type: Projects includes subsea engineering platform, an onshore terminal, and the environment and safety management services for the gas export pipeline Edop and Idoho platforms services for Chevron-operated onshore associated with Ichthys LNG Project and offshore assets Contractor: Subsea 7 Contractor: Halfwave Type: Contract includes engineering, CHINA NATIONAL OFFSHORE OIL CORP. – Type: Project includes multiple inline pipeline construction, transportation, installation (11/17) inspections and pre-commissioning of pipeline Project: Lingshui 17-2 Gas Development Comments: The scope of work includes a custom built Cost: $300 million Type: Project includes construction and 42-inch acoustic resonance technology installation of a subsea production system, (ART) Scan™ by Halfwave to inspect the PETROSHOROUK – (11/17) including the installation of a subsea subsea pipeline that requires a low flow Project: Zohr Field Development Project distribution unit south of the floater, a subsea launch with high speed inspection Type: Project includes construction and pipeline-end manifold and five other of the transmission pipeline installation of an export pipeline and manifolds, three to be installed in the east umbilicals and two in the west Contractor: JKC Australia LNG Diameter: 8 and 30 inches Location: Qiongdongnan Basin, South China Sea Type: Project includes construction of the Location: offshore Egypt Capacity: 2.3 Bcm/y (initial) onshore facilities associated with Ichthys Completion: 4Q 2018 30 Bcm/y (maximum) LNG Project Completion: 2020 Contractor: BHGE Comments: Gas will initially be sent to Hong Kong Contractor: Samsung Heavy Industries Segment: Zohr Field Development Project Phase II through an existing pipeline for power Type: Project includes construction of the Type: Contract includes project management, generation, but will also target the Pearl central processing facility associated with engineering, procurement, fabrication, River Mouth Delta region in Guangdong the Ichthys LNG Project construction, testing and transportation of province the subsea production system Contractor: Daewoo Shipbuilding and Marine Contractor: Offshore Oil Engineering Co. Engineering Contractor: Saipem Type: Contract includes the front-end Type: Project includes construction of the FPSO Segment: Optimized Ramp Up Phase engineering and design for the project associated with the Ichthys LNG Project Type: Project includes engineering, procurement, construction and Contractor: Wood Group L&T HYDROCARBON installation of an export pipeline and Type: Contract includes subsea and flow ENGINEERING LTD. – (5/17) umbilicals assurance services Project: Neelam Re-Development & B173AC Cost: $900 million Project Comments: Saipem will deploy several vessels from INPEX OPERATIONS AUSTRALIA PTY LTD. — Type: Project includes the engineering, its highly specialized fleet, including (10/17) procurement, construction, installation the Castorone (the latest generation Operator: INPEX Operations Australia Pty Ltd. and commissioning and includes one ultra-deepwater pipelayer); the subsea Project: Ichthys LNG Project new process platform containing gas field development ship DSSaipem F2; Type: Project includes the development of a processing and compression facilities, the Saipem 3000 (a subsea construction gas export pipeline (lchthys LNG Project three new well head platforms, a 20-mile vessel), the Castoro 6 and the trenching GEP), onshore LNG facilities, a central pipeline, and modification work on eight barge Castoro 10 processing facility and an FPSO facility existing platforms Length: 553 miles Length: 20 miles Diameter: 42 inches Location: Neelam Field offshore India Asia Pacific Location: offshore Western Australia Completion: 2019 CHEVRON AUSTRALIA – (9/18) Capacity: 8.9 MMtpa (LNG) Project: Gorgon LNG Project (Stage II) 1.6 MMtpa (LPG) MURPHY SABAH OIL – (12/17) Type: Project includes 15 new wells, subsea 100 Mbpd (condensate) Owner 2: PETRONAS (56%) installations and pipelaying work Cost: $34 billion Project: Phase 1A Block H Gas Development Location: Offshore Australia Completion: 3Q 2018 Type: Project includes the construction of a Capacity: 15.6 MMtpy Comments: Gas and condensate from the Ichthys floating LNG facility Comments: Project comprises offshore field facilities Field will be exported to onshore facilities Location: offshore Sabah, Malaysia (Sabah Delta feeding gas and condensate into three for processing near Darwin via the export Basin – Block H) LNG trains and a domestic gas plant on pipeline. Most condensate will be directly Completion: 2018 Barrow Island shipped to global markets from a floating production, storage and offloading facility Contractor: TechnipFMC Contractor: TechnipFMC permanently moored near the Ichthys Type: Contract includes the engineering, Type: Contract includes project management Field in the Browse Basin procurement, construction, installation and engineering, transportation, and commissioning of the umbilicals, installation and pre-commissioning of Contractor: Saipem risers and flowlines as well as the umbilicals and flying leads as well as Type: Project includes engineering, transportation and installation of subsea manifolds procurement, construction and hardware and controls Comments: Contract also includes fabrication, installation of the gas export pipeline transportation, installation and testing of associated with Ichthys LNG Project rigid spools Comments: Saipem’s deep water installation vessel, Castorone, will lay the pipe to the Ichthys

pipeline-news.com | February 2019 | Pipeline News ONGOING PROJECTS Construction Underway

procurement, construction, installation NEXEN PETROLEUM UK LTD. – (9/18) FSU Eastern Europe and commissioning of the platform Project: Buzzard Phase II Development Project GAZPROM — (REV 1/18) Type: Project includes a subsea development of Operator: Transport B.V. Contractor: Saipem the Buzzard northern area consisting of Project: TurkStream Pipeline Project Type: Contract includes engineering, a 12-slot manifold and will be tied back Type: Project includes construction of two procurement, construction and to the existing Buzzard complex with a parallel pipelines installation of the pipeline pipeline bundle assembly incorporating Length: 1,190 miles pipelines, manifolds, subsea controls and Diameter: 32 inches STATOIL – (5/18) chemical injection Location: Ipsala, Turkey – – Krasnodar, Project: Askeladd - Snøhvit Pipeline Location: Offshore Scotland Russia Type: Project includes pipeline construction Completion: 1Q 2021 Capacity: 31.5 Bcm/y Length: 115 miles Completion: Project will allow production at Buzzard Cost: $14 billion Diameter: 27 inches to be accelerated and increased by Status: Project construction has reached Turkish Location: weBarents Sea accessing reserves in these reservoir waters Comments: Snøhvit development consists of the blocks which cannot be reached from the Completion: 4Q 2019 Snøhvit and Albatross fields, which are existing Buzzard Wellhead Platform Comments: Project will directly connect the large currently operational, and the Askeladd gas reserves in Russia to the Turkish gas field, which is under development and Contractor: TechnipFMC transportation network, to provide reliable designed to maintain a full capacity utili- Type: Contract includes project management, energy supplies for Turkey and south-east zation at the Melkøya LNG plant engineering, procurement, construction Europe and installation of a pipeline bundle along Contractor: Subsea 7 S.A. with associated well and platform tie-ins, Contractor: Type: Contract includes pipelaying and provision of a heavy lift vessel for Type: Project includes engineering, Length: 75 miles transport and installation of a new topside procurement and construction services Diameter: 20 inches module for onshore pipelines and a gas receiving Completion: 1Q 2020 terminal associated with the TurkStream OIL & NATURAL GAS CORP. – (1/18) Pipeline Project: Pipeline Replacement Project-4 (PRP4) Location: Kıyıköy, Turkey Middle East Type: Project includes surveys; residual design; Capacity: 31.5 Bcm/y BP OMAN – (3/18) engineering, procurement and fabrication; Cost: $409 million Owner 2: Oman Oil Company Exploration & anti-corrosion and weight coating; Comments: The facility will receive gas from the Production, 40% installation of a submarine pipeline, riser TurkStream Pipeline, originating from the Project: BP Khazzan Project (Phase II) and I/J tubes; modifications on existing compressor station in , Russia Type: Project includes the ongoing expansion of facilities; and hook-up, testing, pre- the gas gathering system, wellsite facilities commissioning and commissioning of Contractor: Allseas Group S.A. and export pipelines facilities Type: Project includes pipe laying of the first Location: Sultanate of Oman Length: 54 miles and second string of the pipeline’s Comments: Khazzan is considered to be one of the Location: Arabian Sea offshore section biggest tight gas projects in the Middle Comments: Project is part of ONGC’s strategy to Length: 560 miles offshore (1,190 total) East and Phase 1 is expected to develop replace some of its well fluid, gas lift approximately 7 Tcf of gas, deliver plateau and water injection pipelines along with PREMIER – (10/18) production of 1 Bcf/d and 25 Mbpd of gas brownfield modification works on existing Project: Tolmount Field Gas Project condensate platforms in the company’s Mumbai High, Type: Project includes a minimal facilities Neelam, Heera and Bassein and Satellite platform exporting gas to shore via a new Contractor: Jacobs Engineering Group Inc. fields in the Western Offshore field in the gas pipeline Type: Project includes engineering, Arabian Sea on the continental shelf of Location: Southern procurement and construction Western India Capacity: 300 MMcf/d management of the gathering system, Completion: 4Q 2020 export pipeline and wellsite facilities Contractor: L&T Hydrocarbon Engineering Ltd. Comments: Field is scheduled to produce gas for 10 - Type: Project includes engineering, 15 years Contractor: Petrofac Corp. procurement, construction, installation Type: Project includes engineering, and commissioning activities Contractor: Storage Ltd. procurement and construction Cost: $194 million Type: Contract includes modifications to its management of an additional third gas Easington Terminal so that it can receive train, liquid and compression trains and SUBSEA 7 S.A. – (5/17) and process the gas from the Tolmount associated infrastructure, as well as Owner: Cooper Energy Ltd. field, which will arrive through a new gas brownfield work Project: Sole Development Project pipeline Cost: $800 million Type: Project includes the subsea tie-back Location: Easington, Yorkshir Comments: The third gas train with a capacity for of the Sole well to the Orbost Gas Comments: Contract will extend the life of CSL’s nominally handling 500 MMcfd will help Plant, the fabrication and installation of gas terminal at Easington, Yorkshire, drive increased total production capacity pipeline, spool and manifold, along with until at least 2030, creating hundreds from the CPF to 1.5 Bcfd installation of a 40-mile umbilical and the of jobs during the construction phase commissioning of the system and securing 80 over the lifetime of the ENERGEAN OIL & GAS PLC – (5/18) Length: 40 miles contract Project: Karish & Tanin Development Project Location: Gippsland Basin Type: Project includes pipeline construction Completion: 2018 Contractor: Rosetti Marino Length: 56 miles Type: Contract includes engineering, Location: offshore Israel

Pipeline News | February 2019 | pipeline-news.com INTERNATIONAL

Capacity: 3.8 Bcm/y procurement, construction and Completion: 1Q 2019 Completion: 1Q 2021 installation of the platform Updates: In support of the project, Energean has Contractor: TechnipFMC signed long-term agreements with some Contractor: National Petroleum Construction Co. Type: Contract includes engineering, of the largest private power producers Type: Contract includes the engineering, procurement, construction and and industrial companies in Israel procurement, construction and installation for the project Comments: System will connect a proposed FPSO to installation of the pipeline Israel’s domestic sales gas grid NDT GLOBAL – (8/16) Owner: Statoil Contractor: Technip FMC Project: Åsgard Pipeline Type: Contract includes engineering, Western Europe & Type: Project includes the development of procurement, construction, installation EU Countries a suitable inline inspection tool and and commissioning for the project corresponding survey for the 14-inch ENI – (8/17) pipeline SAIPEM — (7/18) Owner 2: Sonatrach Length: 440 miles Type: Contract includes engineering, Operator: Transmediterranean Pipeline Co. Ltd. Location: Norwegian Sea procurement, construction and Contractor: DOF Subsea Start: 2016 installation activities for four pipelines Project: Trans-Mediterranean Pipeline Completion: 2017 Diameter: 24 and 32 inches Type: Project includes pipeline inspection of five Location: Middle East submarine pipelines STATOIL – (9/17) Length: 466 miles Comments: Company has not said where the pipelines Project: Askeladd - Snøhvit Pipeline Diameter: 20 and 48 inches will be built or which operating company Type: Project includes pipeline construction Location: Sicily-Tunisia has awarded the contract Length: 115 miles Diameter: 27 inches SAUDI ARAMCO – (1/18) EQUINOR ASA — (8/18) Location: Barents Sea Project: Zuluf Field Expansion Project: Trolls Phase III Project Comments: Snøhvit development consists of the Type: Project includes the installation of water Type: Project includes subsea production Snøhvit and Albatross fields, which are injection and oil wellhead platforms, tie-in systems will comprise two subsea currently operational, and the Askeladd platforms, trunk lines and flowlines along templates or manifolds, as well as nine field, which is under development and with onshore central processing facilities trees designed to maintain a full capacity utili- Location: offshore Saudi Arabia Location: Norwegian Continental Shelf zation at the Melkøya LNG plant Capacity: 600 Mbpd Completion: 2Q 2021 Completion: 1Q 2021 Comments: The initial development was carried Contractor: Ramboll Comments: The gas and condensate will be sent to out over two phases, and now Equinor Type: Project includes pipeline front-end the new Tanajib gas plant, which is part of is starting the Phase 3 development to engineering and procurement the new Marjan Program recover the large amount of gas resources in the western part of the field Contractor: GE Oil & Gas Contractor: Jacobs Engineering Group Inc. Type: Project includes project development and Type: Contract includes engineering and project Contractor: Nexans S.A. equipment supply management for the project Type: Contract includes providing umbilicals required to power and control the subsea Operator: Statoil Project: Haradh Gas Increment Program systems Project: Johan Sverdrup Field Type: Project includes construction of pipeline Length: 18 miles Segment: Johan Sverdrup Pipeline and new gas compression facilities Type: Project includes installation of a gas Length: 280 miles GASTRADE S.A. — (8/17) export pipeline and an oil export pipeline Location: offshore Saudi Arabia Project: Alexandroupolis Independent Natural Gas Length: 170 miles (oil) Capacity: 290 Mcf/d System 102 miles (gas) Completion: 2Q 2019 Type: Project includes pipeline construction Diameter: 18 and 36 inches Comments: Pipeline will transport natural gas from the Location: offshore Greece Location: North Sea Haradh field to the Hawiyah processing Length: 17 miles Cost: $18 billion plant Diameter: 30 inches Completion: 1Q 2019 Capacity: 6.1 Bcf/y Comments: The oil pipeline will be installed and Contractor: China Petroleum Pipelines Co. Completion: 4Q 2019 connected to the Mongstad oil terminal Type: Contract includes pipeline construction Comments: Pipeline is associated with the and the gas pipeline will be installed and Alexandroupolis LNG project connected to the Kårstø gas terminal Project: Safaniya Field Expansion Type: Project includes the construction and Contractor: Wood Group Contractor: Petroleum Safety Authority (PSA) Norway installation of a tie in platform to serve Type: Project includes front-end engineering Type: Project includes an audit and as an extra gathering hub for future oil and design development of an installation concept wellhead platforms, along with a trunkline Length: 16 miles HURRICANE ENERGY PLC – (11/17) Contractor: Samsung Heavy Industries Diameter: 30 inches Project: Lancaster Early Production System Project Type: Project includes supply of pipeline and Location: offshore Saudi Arabia Type: Project includes installation of production fittings Comments: Pipeline will run between the new TP-21 flowlines, manifolds and the FPSO and the onshore Safaniya GOSP-1 mooring system; and commissioning and Contractor: Mitsui & Co. Norway AS ongoing production of oil via the FPSO Type: Project includes pipeline fabrication Contractor: McDermott International Inc. Location: offshore west Shetland Type: Contract includes the engineering, Capacity: 17 Mbpd

pipeline-news.com | February 2019 | Pipeline News ONGOING PROJECTS Construction Underway

Contractor: Wasco Coatings Malaysia Sdn. Bhd. Project: Fenja Redevelopment Project Type: Project includes delivering engineering, Type: Project includes external anticorrosion Type: Project includes installation of subsea procurement and construction services treatment and concrete weight coating equipment including umbilicals, risers, to six U.K. continental shelf offshore flowlines and the subsea production upstream assets Contractor: Saipem Ltd. system for the Fenja Project, which will Location: North Sea Type: Project includes pipelay be tied back to the Njord platform with an Completion: 2020 electrically trace heated pipeline Contractor: DeepOcean Length: 23 miles Type: Project includes engineering, Location: offshore Norway OTHER – International procurement, construction and Asia Pacific installation of umbilicals and manifolds Contractor: Reinertsen AS Type: Contract includes providing engineering DUBAI ELECTRICITY AND WATER AUTHORITY Contractor: TechnipFMC services for the project (8/17) Project: Visund Nord IOR Project Project: Dubai Plan 2021 Project Contractor: Aker Solutions Type: Project includes main water pipe Contractor: Wood Group Type: Contract includes FEED services for extension Project: Tampen Oil Pipeline subsea production systems for the project Length: 25 miles Diameter: 23 to 47 inches STATOIL – (2/18) Contractor: Subsea7 Location: Dubai Owners: Petoro AS (30%); ExxonMobil Exploration Type: Contract includes FEED services for Cost: $67.5 million and Production Norway AS (17.44%); subsea structures, umbilicals, risers and Completion: 1Q 2021 Idemitsu Petroleum Norge AS (9.6%); DEA flowlines for the project Status: Project has been awarded to an unknown Norge AS (8.57%); and Point Resources AS contractor (1.1%) Contractor: TechnipFMC Project: Snorre Expansion Project Type: Contract includes integrated engineering, Type: Project includes fabrication and procurement, construction and installation of a pipeline bundle system, installation services for the project modification work on Snorre A and a rig Cost: $250 million deal Location: Tampen area, North Sea WOODSIDE ENERGY – (8/17) Completion: 2020 Operator: Woodside Petroleum Ltd. Comments: Snorre has been producing oil and gas Project: Greater Western Flank (GWF) Project since August 1992 Phase II Type: Project includes development of six Contractor: TechnipFMC hydrocarbon fields, installation of Type: Project includes an EPC contract for the a flowline, subsea hardware and an subsea production system umbilical to tie wells into the GWF-2 Pipeline Contractor: Subsea 7 Location: North West Shelf Type: Project includes fabrication and Capacity: 1.2 Tcf installation of the pipeline bundle system Cost: $2 billion Completion: 1Q 2019 Contractor: Aibel Type: Project includes modification work on Contractor: FMC Technologies Snorre A Type: Project includes design, manufacture and supply of subsea production systems Contractor: Transocean Cost: $180 million Type: Project includes a rig deal for the expansion Operator: Woodside Petroleum Ltd. Project: GWF-2 Pipeline TOTAL E&P DENMARK – (11/18) Type: Project includes construction of pipeline Project: Tyra Redevelopment Subsea Installation Length: 22 miles Phase II Diameter: 16 inches Type: Project includes relocating and Comments: Pipeline is part of the Greater Western connecting subsea pipelines as well as the Flank Project Phase II installation of manifolds, vertical platform production risers and umbilicals Contractor: Wood Group Kenny Location: Danish North Sea Type: Project includes engineering support during the fabrication and construction Contractor: Royal Boskalis Westminster N.V. stages of the pipeline Type: Contract includes subsea engineering, Cost: $6 million procurement, fabrication and installation for the project Contractor: McDermott Type: Project includes transportation and VNG NORGE – (2/18) installation of pipeline Owners: VNG Norge (operator, 30%); Faroe Petroleum (25%); and Point Resources Owner: BP (45%) Project: Forties Pipeline System

Pipeline News | February 2019 | pipeline-news.com