Connecting Facility EuroAsia Interconnector - Design, ENERGY Implementation and Environmental Studies

3.10.1-0028-CY-S-M-14 Member States involved: Part of Cluster of the Projects of Common Interest 3.10 , (non-EU country: )

Implementation schedule Start date: January 2015 End date: November 2016

Budget: Estimated total cost of the action: €2,650,000

Maximum EU contribution: €1,325,000

Percentage of EU support: 50%

Beneficiary(ies):

DeiQuantumEnergy Ltd www.dei-quantumenergy.com

Affiliated entity(ies): N/A

Additional information: European Commission http://ec.europa.eu/energy/infrastructu re/index_en.htm The proposed Action concerns the entire cluster 3.10. Israel – Cyprus – Greece between Hadera and Attica region [currently known as the EuroAsia Innovation and Networks Executive Interconnector. It consists of an approximately 1518 km long 400 kV Agency (INEA) interconnector with a capacity of around 2000 MW. http://inea.ec.europa.eu The Action aims to define the Technical and Technological Solution, to Agency for the Cooperation of Energy assess the possible impact on the environment pointing out the potential Regulators (ACER) environmental impact factors and to select the preferred route corridor, www.acer.europa.eu among those already pre-defined and to provide useful results for the cable engineering. European Network of Transmission System Operators for Electricity The Action comprises the preparation of the preliminary technical and (ENTSO-E) environmental studies, including a Reconnaissance Survey. www.entsoe.eu

The Action is ongoing.