Port of Gold Coast - Ocean-Side Cruise Ship

Total Page:16

File Type:pdf, Size:1020Kb

Port of Gold Coast - Ocean-Side Cruise Ship Port of Gold Coast - Ocean-side Cruise Ship Terminal Initial Advice Statement 16 August 2019 Artist impression Table of Contents Foreword ............................................................................................................................................... 5 Executive Summary ............................................................................................................................. 6 1. Introduction ................................................................................................................................... 8 1.1 Purpose and Scope of the IAS ............................................................................................ 8 1.2 Background ......................................................................................................................... 8 2. The Proponent ............................................................................................................................. 10 3. Nature of the Proposal ................................................................................................................ 11 3.1 Project Location ................................................................................................................. 11 3.2 Project Description ............................................................................................................ 13 3.3 Land Use ........................................................................................................................... 17 3.4 Project Need, Justification and Alternatives Considered ................................................... 18 3.4.1 Strategic Rationale ................................................................................................... 18 3.4.2 Do Nothing ............................................................................................................... 19 3.4.3 Alternative Locations ................................................................................................ 19 3.4.4 Queensland Government – The Spit Master Plan May 2019 ................................... 20 3.5 Components, Developments, Activities and Infrastructure that Constitutes the Project to be Declared and Coordinated ............................................................................................ 20 3.6 External Infrastructure Requirements ................................................................................ 20 3.7 Timeframe for the Project .................................................................................................. 21 3.8 Construction and Operational Processes .......................................................................... 21 3.8.1 Construction ............................................................................................................. 21 3.8.2 Operation ................................................................................................................. 22 3.9 Workforce Requirements during Construction and Operation ........................................... 22 3.10 Economic Indicators .......................................................................................................... 23 3.11 Financing Requirements and Implications ......................................................................... 23 4. Location of Key Project Elements ............................................................................................. 25 4.1 Location ............................................................................................................................. 25 4.2 Tenure ............................................................................................................................... 25 4.3 Native Title ......................................................................................................................... 25 5. Description of the Existing Environment .................................................................................. 27 5.1 Natural Environment .......................................................................................................... 27 5.1.1 Land ......................................................................................................................... 27 5.1.2 Water ........................................................................................................................ 28 5.2 Coastal Processes ............................................................................................................. 28 5.3 Ecology .............................................................................................................................. 29 5.3.1 Terrestrial Flora ........................................................................................................ 29 5.3.2 Marine Ecology ........................................................................................................ 30 5.3.3 Avifauna ................................................................................................................... 32 Initial Advice Statement Page 2 of 73 5.4 Amenity .............................................................................................................................. 33 5.4.1 Visual amenity .......................................................................................................... 33 5.4.2 Air Quality ................................................................................................................. 34 5.4.3 Noise ........................................................................................................................ 34 5.5 Social and Economic Environment .................................................................................... 34 5.5.1 Social ....................................................................................................................... 34 5.5.2 Accommodation and Housing .................................................................................. 36 5.5.3 Cultural Heritage (Indigenous and non-Indigenous)................................................. 37 5.6 Built Environment .............................................................................................................. 38 5.6.1 Regional Context ...................................................................................................... 38 5.6.2 Local Context ........................................................................................................... 38 5.7 Traffic and Transport Analysis ........................................................................................... 38 5.7.1 Current Traffic Levels ............................................................................................... 39 5.7.2 Trip Generation Assessment .................................................................................... 39 5.8 Land Use ........................................................................................................................... 40 5.8.1 Key Local and Regional Land Uses ......................................................................... 40 5.8.2 Key Local and Regional Land Tenures .................................................................... 41 5.9 Planning Instruments ......................................................................................................... 41 5.9.1 State Planning Instruments ...................................................................................... 41 5.9.2 Local Planning Instruments ...................................................................................... 45 6. Potential Project Impacts ........................................................................................................... 46 6.1 Natural Environment .......................................................................................................... 46 6.1.1 Land ......................................................................................................................... 46 6.1.2 Water ........................................................................................................................ 47 6.2 Coastal Processes ............................................................................................................. 47 6.3 Ecology .............................................................................................................................. 50 6.3.1 Flora ......................................................................................................................... 50 6.3.2 Fauna ....................................................................................................................... 50 6.3.3 Fauna Strike ............................................................................................................. 50 6.3.4 Underwater Noise .................................................................................................... 50 6.3.5 Lighting ..................................................................................................................... 51 6.3.6 Pest and feral animals .............................................................................................. 52 6.4 Amenity .............................................................................................................................. 52 6.4.1 Visual Amenity ........................................................................................................
Recommended publications
  • Implementation of the Spit Master Plan Bill 2019
    Implementation of The Spit Master Plan Bill 2019 Report No. 45, 56th Parliament State Development, Natural Resources and Agricultural Industry Development Committee February 2020 State Development, Natural Resources and Agricultural Industry Development Committee Chair Mr Chris Whiting MP, Member for Bancroft Deputy Chair Mr Pat Weir MP, Member for Condamine Members Mr David Batt MP, Member for Bundaberg Mr James (Jim) Madden MP, Member for Ipswich West Mr Brent Mickelberg MP, Member for Buderim Ms Jessica (Jess) Pugh MP, Member for Mount Ommaney Committee Secretariat Telephone +61 7 3553 6623 Fax +61 7 3553 6699 Email [email protected] Technical Scrutiny +61 7 3553 6601 Secretariat Committee webpage www.parliament.qld.gov.au/SDNRAIDC Acknowledgements The committee acknowledges the assistance provided by the Department of State Development, Manufacturing, Infrastructure and Planning, the Gold Coast Waterways Authority, and the Queensland Parliamentary Service. Implementation of The Spit Master Plan Bill 2019 Contents Abbreviations ii Chair’s foreword iii Recommendations iv 1 Introduction 1 Role of the committee 1 Inquiry process 1 Policy objectives of the Bill 1 Government consultation on the Bill 2 Should the Bill be passed? 2 2 Background to the Bill 3 The Spit Master Plan 3 The Gold Coast Waterways Authority 5 3 Examination of the Bill 7 Granting of unallocated state land outside the processes under the Land Act 1994 7 Land tenure 8 Continuing arrangements for land tenure 9 Roads and road closures 10 Amendment of the Gold
    [Show full text]
  • Impacts to Sediment Dynamics in Tidal Entrances from Bypassing and Associated Management Implications
    Long-term Impacts of Bypassing on Sediment Transport in Tidal Estuaries An introduction to Doctorate research at the Griffith Centre for Coastal Management Queensland Coastal Conference, Airlie Beach, September 2017 Jemma Purandare Griffith Centre for Coastal Management (PhD Candidate – Coastal Sedimentology) Presentation Structure • Background ◦ Purpose and relevance of the research ◦ Prior work ◦ Gold Coast Broadwater and Seaway • Literature Review ◦ Findings to date ◦ Knowledge gaps • Upcoming work ◦ Research tasks ◦ Project outputs JEMMA PURANDARE September 2017 2 GRIFFITH CENTRE FOR COASTAL MANAGEMENT Introduction • Tidal Entrances • Recreation • Navigation • Highly dynamic • Engineering • Fixing • Dredging • Bypassing City of Gold Coast, 2015 • Beach management 3 Tidal Entrances – Globally Significant • East Coast US (Hayes, 1979) • Guadiana estuary, Portugal (Garel et.al., 2014) • Kennebec River entrance, Maine (FitzGerald et.al., 2000) • New England, USA (FitzGerald et.al., 2002) • Golden Gate inlet, San Francisco Bay (Erikson et.al., 2013; Elias & Hansen, 2013) • Dutch Wadden Sea, the Netherlands (Dissanayake et.al., 2009; van Leuuwen et.al., 2003; van der Vegt et.al., 2009) • Danshui River estuary, Taiwan (Chen et.al., 2015) • Currumbin Creek, Gold Coast (Castelle et.al., 2007) • Obidos lagoon, Portugal (Bruneau et.al., 2011) • Dyfi Estuary, UK (Brown & Davies, 2010) • Canaceral Entrance, Florida (Bodge, 1993) • Jiaozhou Bay, China (Wang et.al., 2014) • Nerang River inlet (Broadwater), Gold Coast (Whitlow, 2005; Sennes et.al., 2007; Ryan et.al., 2003; Robinson et.al., 2006; Mirfenderesk et.al., 2007) 4 The Broadwater, Southport, Gold Coast • Semi-enclosed tidal estuary (Sennes et.al., 2007) • Highly dynamic prior to engineering intervention (Whitlow, 2005) • Seaway training walls • Sand bypassing system • Initial capital dredging: Wave Break Island • Maintenance dredging • Coomera and Nerang River catchments • Highly developed and urbanised Imagery – Google, 2016 Data – SIO, NOAA, U.S.
    [Show full text]
  • Anchors Away: Contested Space and Local Resistance on Australia's Gold Coast
    Anchors Away: Contested Space and Local Resistance on Australia's Gold Coast Author Southorn, Ed J Published 2020-09-07 Thesis Type Thesis (PhD Doctorate) School School of Hum, Lang & Soc Sc DOI https://doi.org/10.25904/1912/3950 Copyright Statement The author owns the copyright in this thesis, unless stated otherwise. Downloaded from http://hdl.handle.net/10072/397591 Griffith Research Online https://research-repository.griffith.edu.au Anchors Away / Southorn ANCHORS AWAY: CONTESTED SPACE AND LOCAL RESISTANCE ON AUSTRALIA’S GOLD COAST Edward J. Southorn Bachelor of Arts; Master of Philosophy (Creative Writing Non-fiction) School of Humanities, Language and Social Science; Arts, Education and Law Griffith University This thesis is submitted in fulfilment of the requirements of the degree of Doctor of Philosophy 7 March 2020 1 Anchors Away / Southorn Abstract The neoliberal ascendancy has exacerbated social conflict around urban growth in emergent cities, demonstrating how contested space is a signifier of late modernity. Government officials and elected agents with limited funding for public infrastructure and public services may be forced to choose between retaining public open space or divesting public land to property developers able to access global funding streams. The resultant spatially determined risk generates community debate in which local residents choose between promises of economic security or maintaining publicly accessible sites for recreation and the delivery of public services. In such cases, the collective identity of a particular place may be at stake. This thesis, in two components, explores via a case study of Australia’s largest regional city, how contested space gives rise to local resistance in a battle over the development of public space for private gain.
    [Show full text]
  • Annual Report 2018/19 Surf Life Saving Queensland Slsq Snapshot Contents
    ANNUAL REPORT 2018/19 SURF LIFE SAVING QUEENSLAND SLSQ SNAPSHOT CONTENTS Surf Life Saving Clubs Operations Support Our Commitment to Saving Lives 2 North Queensland Branch Westpac Lifesaver Rescue Helicopter Service Port Douglas Patron’s and Premier’s Message 3 Westpac Lifesaver Rescue Drone Program Ellis Beach Cairns Rescue Water Craft service Board Biography 4 Etty Bay SurfCom communications centres Mission Beach State Operations and Communications Centre Patrons and Honours 5 North Barrier Branch Duty Officer program Forrest Beach Coastalwatch cameras President’s Report 6 Arcadian Brisbane Lifesaving Service Townsville Picnic Bay Emergency Response Groups CEO’s Report 8 Ayr Gold Coast Dawn and Dusk Patrols Eimeo Mackay Corporate Governance 10 Sarina Australian Lifeguard Service Wide Bay Capricorn Branch People and Culture 11 Servicing: Yeppoon Emu Park Bundaberg Regional Council Club Services Tannum Sands Burdekin Shire Council Agnes Water Cassowary Coast Regional Council Lifesaving Services 13 Moore Park Cairns Regional Council Bundaberg Council of the City of Gold Coast Elliott Heads Douglas Shire Council Membership Development 16 Hervey Bay Fraser Coast Regional Council Sunshine Coast Branch Gladstone Regional Council Surf Sports 18 Gympie Regional Council Rainbow Beach Hinchinbrook Shire Council Noosa Heads Regional Support 21 Sunshine Beach Livingstone Shire Council Coolum Beach Mackay Regional Council Commercial Marcoola Moreton Bay Regional Council Mudjimba Noosa Shire Council Maroochydore Australian Lifesaving Academy Queensland
    [Show full text]
  • EPBC Act Referral
    Submission #1949 - Gold Coast Cruise Ship Terminal Title of Proposal - Gold Coast Cruise Ship Terminal Section 1 - Summary of your proposed action Provide a summary of your proposed action, including any consultations undertaken. 1.1 Project Industry Type Tourism and Recreation 1.2 Provide a detailed description of the proposed action, including all proposed activities. The City of Gold Coast (the City) is investigating the opportunity to establish an ocean-side cruise ship terminal (the proposed action) at Philip Park, Main Beach, Queensland. The ocean- side cruise ship terminal has been identified as strategic marine industry infrastructure for the cruise market that has the potential to grow Queensland and regional tourism. It will provide a new gateway for the expanding cruise shipping market to access the high quality and unique tourism and recreation experiences of the Gold Coast enhancing the City’s reputation as a world class tourist destination. To maximise the economic development opportunities for the City, the proposal is to establish the cruise ship facility as a base port that will provide facilities to support cruise ships at point of origin and destination, including resupply and refuelling. The cruise shipping schedule may provide for up to 150 cruise ship visits in a year, involving a 24 hour berth for disembarking, resupply, refuelling and boarding. Options that may provide enhanced economic and social benefits include integrating a diving platform, viewing platform or combined pedestrian/cycle access. The proposed infrastructure will involve the development of 1200 m jetty/wharf structure and berthing/mooring dolphins of raked piling construction and 800 m caisson and rock armour breakwater within Queensland State waters.
    [Show full text]
  • The Spit Master Plan
    The Spit Master Plan Embracing the past Understanding the present Looking to the future Background Summary Report The Department of State Development, Manufacturing, Infrastructure and Planning is responsible for driving Queensland’s economic prosperity and championing the interests of business and industry. Copyright This publication is protected by the Copyright Act 1968. LicenceThe Department of State Development, Infrastructure and Planning is responsible for driving Queensland’s economic Thisprosperity work and is championing licenced Department the interests of ofbusiness State andDevelopment, industry. Manufacturing,Copyright Infrastructure and Planning under a Creative CommonsThis publication Attribution is protected by (CC the CopyrightBY) 3.0 Act Australia 1968. licence. The Department of State Development, Infrastructure and Planning is responsible for driving Queensland’s economic prosperityLicence and championing the interests of business and industry. ToThis viewwork ais copylicenced of Department this licence, of State visit: Development, Infrastructure and Planning under a Creative Copyright Commons Attribution (CC BY) 3.0 Australia licence. To view a copy of this licence, visit: This publication is protectedcreativecommons.org/licenses/by/http://www.creativecommons.org/licenses/by/3.0/au/ by the Copyright Act 1968. 3.0/au You are free to copy, communicate and adapt this publication, as long as you attribute it as follows: YouLicence are free to copy, communicate and adapt this © State of Queensland,This Departmentwork is licenced of State DepartmentDevelopment, of InfrastrucState Development,ture and Planning, InfrastructureApril 2018. and Planning under a Creative publication, as longCommons as you Attribution attribute (CC BY) it 3.0as Australia follows: licence. To view a copy of this licence, visit: The Queenslandhttp://www.creativecommons.org/licenses/by/3.0/au/ Government is committed to providing accessible services to Queenslanders of all cultural and © State oflinguistic Queensland, backgrounds.
    [Show full text]
  • GCSMP Volume 1 Executive Summary Part 1
    *2/'&2$676+25(/,1(0$1$*(0(173/$1 9ROXPH([HFXWLYH6XPPDU\ /LWWRUDO5HYLHZ3DUW$ಧ&KDSWHUVWR Griffith Centre for Coastal Management Research Report No. 90 'HFHPEHU 35(3$5('%< N. LAZAROW R. TOMLINSON R. POINTEAU D. STRAUSS R. NORIEGA S. KIRKPATRICK G. STUART S. HUNT ,QSDUWQHUVKLSZLWK RESEARCH REPORT SERIES DOCUMENT CONTROL SHEET GRIFFITH CENTRE FOR Document: Griffith Centre for Coastal COASTAL MANAGEMENT Management Research Report No. 90 DRAFT Project: Gold Coast Shoreline Management Griffith University Gold Coast Plan Parklands Drive Title: Volume 1: Executive Summary and Littoral SOUTHPORT QLD 4215 Review Part A – Chapters 1 to 5. Project Leaders: Professor Rodger Tomlinson PMB 50 Neil Lazarow Gold Coast Mail Centre 9726 Author(s): Neil Lazarow Rodger Tomlinson Telephone (07) 55528506 Renan Pointeau Facsimile (07) 55528067 Darrell Strauss www.gu.edu.au/centre/gccm/ Rocio Noriega Sally Kirkpatrick Greg Stuart Shannon Hunt Sponsoring Organisation: Gold Coast City Council Contact: Shannon Hunt Synopsis: This report presents the findings of a review of littoral processes and past beach management, and the development of a shoreline management plan for the Gold Coast beaches. Keywords: Coastal erosion, stakeholder engagement, coastal process modelling, Gold Coast REVISION/CHECKING HISTORY REVISION REPORT CHECKED BY ISSUED BY NUMBER DATE 0 December Rodger Tomlinson Rodger Tomlinson 2008 1 December Greg Stuart Rodger Tomlinson 2008 DISTRIBUTION REVISION DESTINATION 0 1 2 3 4 5 6 7 8 GCCM FILE 2 1 GCCC 3 1 GCCM Library 1 1 i There is a mysterious attraction about the coast, something every beach and ocean lover knows. It’s a powerful addiction that we’ve all been hooked on since first climbing a sand dune and squinting through the haze to the beautiful big blue.
    [Show full text]
  • Storm Tides, Coastal Erosion and Inundation
    Case Study Storm tides, coastal erosion and inundation Synthesis and Integrative Research Program Historical Case Studies of Extreme Events Storm tides, coastal erosion and inundation Authors: P. Helman, Griffith University F. Thomalla, Griffith University C. Metusela, Griffith University R. Tomlinson, Griffith University Published by the National Climate Change Adaptation Research Facility 2010 ISBN: 978-1-921609-19-0 NCCARF Publication 17/10 Australian copyright law applies. For permission to reproduce any part of this document, please approach the authors. Please cite this report as: Helman, P, Thomalla, F, Metusela, C & Tomlinson, R 2010, Storm tides, coastal erosion and inundation, National Climate Change Adaptation Research Facility, Gold Coast, 37 pp. Author contact details Professor Rodger Tomlinson Griffith Centre for Coastal Management Gold Coast Campus Griffith University Queensland 4222, Australia T: +61 7 5552 8499 Email: [email protected] Acknowledgement This work was carried out with financial support from the Australian Government (Department of Climate Change and Energy Efficiency) and the National Climate Change Adaptation Research Facility (NCCARF). The role of NCCARF is to lead the research community in a national interdisciplinary effort to generate the information needed by decision makers in government, business and in vulnerable sectors and communities to manage the risk of climate change impacts. Disclaimer The views expressed herein are not necessarily the views of the Commonwealth or NCCARF, and neither the Commonwealth nor NCCARF accept responsibility for information or advice contained herein. Cover image: © Peta Williams Preface The National Climate Change Research Facility (NCCARF) is undertaking a program of Synthesis and Integrative Research to synthesise existing and emerging national and international research on climate change impacts and adaptation.
    [Show full text]
  • 758 Economy, Planning and Environment Committee
    758th Council Meeting 31 July 2018 117 Economy, Planning & Environment Committee Meeing Attachment 1 ADOPTED REPORT 25 July 2018 GCCC Maps 0 74 148 m Projection Disclaimer: Gold Coast City Council, Queensland 2014 or The State of Queensland 2014. No Warranty given in relation to the data (including accuracy, reliability, completeness or suitability) MGA94, Zone 56 and no liability accepted (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws. 758th Council Meeting 31 July 2018 Attachment 2 (page 1 of 3 118 Economy, Planning & Environment Committee Meeing ADOPTED REPORT 25 July 2018 4 SP185374 Proposed Indoor Sports & Recreation Site Area: 1899m2 (Dance Studio) 3 3 2 SITE PLAN RP143383 SP185374 SP185374 H 1459 A Ref No: RP Applicant: 11176 Dance Headquarters P/L E 186 09'25" R Drawn By: MM 1 0 S T Checked: DM SP185374 SP185374 R 533 E 19 49 E 2 19' 40" T Scale: 1:200 Subject Site: 2 Lot 2 on SP110872 SP110872 34 2/1 Geary Crescent RP801733 Molendinar Proposed Indoor Qld 4214 Recreation Area 1 Date Prepared: Lot area: 463m2 SP110872 12 January 2017 e x i 36619 s Drawing: 1 t 84 26'30" i extern n al lighting g 2 d 4 1 r i 7 v 4 8 Revison: 3 3 e wa 4 7 4 2 y ' tempora 3 ry SRV 0 Page: 1 of 3 standing " 0 zone 0 (6.4m x 2 3.5m) 6 tem Notes: pedestrian access 0 porary unit 1 service ve SP110872 hicle ;7'$+''11%'% small car standing 2600 area ;!'!0'4'!*Q 1 only
    [Show full text]