Executive Board Thursday, May 27, 2021 • 10:00 – 11:30 AM Virtual Meeting

The meeting will be streamed live over the internet at www.psrc.org. *************************************************************************************************************************** PUBLIC NOTICE: In accordance with the Governor’s proclamations, PSRC’s offices are closed to the public and no in-person meetings are permitted. Should any major changes to current guidance occur, this meeting may be rescheduled.

Watch the meeting live stream at https://www.psrc.org/boards/watch-meetings or listen by phone at 1-888- 475-4499, Meeting ID: 963 7900 9804 Passcode: 512481.

Public comment may be made via Zoom or phone. Registration is required and closes one hour before the meeting starts. Late registrations will not be accepted. Register here.

Comments may also be submitted via email to [email protected] up to one hour before the meeting and these comments will be emailed to Board members. Comments received after that deadline will be provided to Board members after the meeting. *************************************************************************************************************************** 1. Call to Order and Roll Call (10:00) - Councilmember Claudia Balducci, President 2. Communications and Public Comment 3. President's Remarks 4. Executive Director's Report 5. Committee Reports a. Operations Committee - Mayor Becky Erickson, Vice President 6. Consent Agenda (10:20) a. Approve Minutes of Meeting held April 22, 2021 b. Approve Vouchers Dated March 15, 2021 through May 3, 2021 in the Amount of $1,721,102.06 c. Approve Contract Authority for Website Design and Development d. Approve Contract Authority for Ongoing Administrative Support e. Approve Contract Authority for ESRI GIS Consulting Support f. Adopt Routine Amendment to the 2021-2024 Transportation Improvement Program g. Authorize a Change in the Regional Transportation Plan Project Status for ’s RapidRide H Line Project h. Authorize a Change in the Regional Transportation Plan Project Status for ’s Swift BRT Orange Line – 164th Street & 196th Street Corridors Project i. Approve 2021 Federal Transit Administration Funding Annual Adjustments -- Kelly McGourty, PSRC 7. New Business (10:25) a. Approve 2021 Delivery: Final Supplemental Funding Actions -- Kelly McGourty, PSRC 8. Discussion Item (10:35) a. Regional Aviation Baseline Study Completed -- Jason Thibedeau, PSRC 9. Discussion Item (11:00) a. Briefing on Regional Housing Strategy -- Laura Benjamin, PSRC 10. Information Item a. New Employees Status Report 11. Other Business 12. Next Meeting: Thursday, June 24, 2021, 10 – 11:30 AM, Virtual Meeting 13. Adjourn (11:30)

Board members please submit proposed amendments and materials prior to the meeting for distribution. Organizations/individuals may submit information for distribution. Send to Sheila Rogers at [email protected].

Sign language and communication material in alternate formats can be arranged given sufficient notice by calling (206) 464-7090 or ,Arabic, 中文 | Chinese, Deutsch | German, Français | French, 한국어 | Korean, Русский | Russian |العربية .TTY Relay 711 Español | Spanish, Tagalog, Tiếng việt | Vietnamese, contact Maggie Moore at [email protected].

5.a

May 13, 2021

Future of Transportation Survey

The Transportation Policy Board was briefed on the initial results of the representative Future of Transportation Survey. The discussion covered the methodology used for the survey, information on survey respondents, a summary of key initial findings and next steps for outreach. View the presentation or watch the meeting video.

For more information, contact Kelly McGourty at [email protected] or (206) 971-3601.

PSRC Funding

The Transportation Policy Board made a recommendation on additional 2021 Federal Transit Administration funds and a final supplemental funding action to meet PSRC’s 2021 delivery target for Federal Highway Administration funds. The FTA recommendation includes seven projects that are currently out for public comment. The Executive Board will take final action at its meeting on May 27.

For more information, contact Kelly McGourty at [email protected] or (206) 971-3601.

Communication: Operations Committee - Mayor Becky Erickson, Vice President (Committee Reports) Regional Transportation Plan Financial Strategy

The Transportation Policy Board has been briefed regularly on the development of the financial strategy for the plan that will be adopted next year. This briefing covered the status of key milestones and relevant state and federal funding

Packet Pg. 3 5.a activities. Over the next several months, the board will be provided information on the updated current law and new revenue assumptions for the Regional Transportation Plan as well as information on the updated estimates of expenditures across all transportation categories, out to 2050. By July, the board will be asked for direction to proceed on the package of revenues and expenditures for the complete financial strategy, to be incorporated in the analysis of the Regional Transportation Plan over the summer. View the presentation.

For more information, contact Kelly McGourty at [email protected] or (206) 971-3601.

Climate Briefing

The Transportation Policy Board was briefed on PSRC’s ongoing climate change work program and current and upcoming activities. In addition, Sara Nichols from the Puget Sound Clean Air Agency provided an overview of the joint effort with PSRC on development of a Regional Electric Vehicle forum, and Michael Breish from the State Department of Commerce briefed the board on recent legislation related to electric vehicles.

For more information, contact Kelly McGourty at [email protected] or (206) 971-3601.

In other business, the board:

• Recommended approval of a Routine Amendment to the 2021-2024 Transportation Improvement Program (TIP). • Recommended Authorizing a Change in the Regional Transportation Plan Project Status for King County Metro’s RapidRide H Line Project. • Recommended Authorizing a Change in the Regional Transportation Plan Project Status for Community Transit’s Swift BRT Orange Line – 164th Street & 196th Street Corridors Project.

Communication: Operations Committee - Mayor Becky Erickson, Vice President (Committee Reports)

Packet Pg. 4 5.a

May 6, 2021

Stability and Subsidy in Regional Housing Strategy

The Growth Management Policy Board was asked to provide feedback on draft goals and actions related to stability and subsidy in the Regional Housing Strategy. The strategy aims to coordinate work around housing access and affordability in the region while providing communities with actions that can be tailored to their needs. The board will be asked for input on goals and actions related to housing supply at their June meeting.

For more information, contact Laura Benjamin at [email protected].

Updated Charter for Regional Transit-Oriented Development Advisory Committee

The board approved an update to the Regional Transit-Oriented Development Advisory Committee’s (RTODAC) charter, allowing the committee to restructure its membership. RTODAC was originally formed in 2014 to advance the Growing Transit Communities (GTC) Strategy. The adoption of VISION 2050 provided an opportunity for the restructure, allowing the committee to be better aligned with current and future regional TOD work.

For more information, contact Laura Benjamin at [email protected].

Equity Advisory Committee Seeking Membership Applications

The newly formed Equity Advisory Committee is currently seeking applications for membership. PSRC staff briefed the board on the purpose and structure of the committee and its role in developing the Regional Equity Strategy. Communication: Operations Committee - Mayor Becky Erickson, Vice President (Committee Reports) For more information, contact Charles Patton at [email protected].

School Siting Briefing Paper Update

Packet Pg. 5 5.a

As the region continues to grow, new schools and classrooms will need to be built to accommodate a larger school-aged population. To better understand the issues and priorities around school siting, PSRC drafted a briefing paper and presented the findings to the board.

For more information, contact Ben Kahn at [email protected].

Countywide Planning Policies Update

The first local implementation step for VISION 2050 includes updating countywide planning policies and growth targets. To support the 2024 local comprehensive plan update process, countywide policies and targets are expected to be updated by the end of 2021. PSRC staff have been actively engaged in this process with countywide groups and provided the board with an update on the progress made.

For more information, contact Liz Underwood-Bultmann at [email protected].

Communication: Operations Committee - Mayor Becky Erickson, Vice President (Committee Reports)

Packet Pg. 6 5.a

May 5, 2021

2021 Work Plan and Regional Economic Strategy

The Central Puget Sound Economic Development District Board discussed the implementation of its 2021 Focus Areas to date and the work underway to update the Regional Economic Strategy. Later in May, a draft assessment will be made available online for board members, stakeholders, and the public to provide an opportunity to give feedback on challenges, opportunities, strategies, and implementation. View the presentation or watch the meeting video.

For more information, contact Jason Thibedeau at 206-389-2879 or [email protected].

Greater Partners Regional Recovery Framework

The Partners have convened a Task Force to lead this work. They have identified a portfolio of regional, evidence-based initiatives aimed at creating more good jobs and successful BIPOC-and women-owned firms, improve the quality and diversity of jobs in key sectors, develop diverse talent, and connect people to jobs by reducing geographic and other barriers. In May and June of 2021, the Task Force will work to design initiatives, and develop a fundraising strategy and organizational structure. A draft of the recovery plan is expected to be released in 2021. View the presentation. Communication: Operations Committee - Mayor Becky Erickson, Vice President (Committee Reports)

For more information, contact Jason Thibedeau at 206-389-2879 or [email protected].

Packet Pg. 7 6.a

MINUTES

Puget Sound Regional Council Executive Board Thursday, April 22, 2021, 10 – 11:30 AM Virtual Meeting

This meeting was conducted remotely.

CALL TO ORDER AND ROLL CALL

The meeting of the Executive Board was called to order at 10:02 AM by Pierce County Executive Bruce Dammeier, President, PSRC. The meeting was conducted remotely. Roll call determined attendance and that a quorum was present.

[To watch a video of the meeting and hear the full discussion, please go to https://www.psrc.org/boards/watch-meetings.]

Members and Alternates that participated for all or part of the meeting included: Caption

Bruce Dammeier, Pierce County Executive—President Claudia Balducci, King County Councilmember—Vice President Don Anderson, City of Lakewood Mayor Jay Arnold, City of Kirkland Deputy Mayor Glen Bachman, Port of Everett Commissioner Nancy Backus, City of Auburn Mayor Angela Birney, City of Redmond Mayor Dow Constantine, King County Executive Becky Erickson, City of Poulsbo Mayor - Other Cities & Towns in Kitsap County Fred Felleman, Port of Seattle Commissioner Jim Ferrell, City of Federal Way Mayor Cassie Franklin, City of Everett Mayor Charlotte Garrido, Kitsap County Commissioner Kathy Lambert, King County Councilmember Andrew Lewis, City of Seattle Councilmember Sam Low, Snohomish County Councilmember Dick Marzano, Port of Tacoma Commissioner Ms. Robin Mayhew, WA State Department of Transportation

Doc ID 3122 Packet Pg. 8 6.a

Roger Millar, WA State Department of Transportation Secretary Amy Ockerlander, City of Duvall Mayor - Other Cities & Towns in King County Armondo Pavone, City of Renton Mayor Bill Pugh, City of Sumner Mayor - Other Cities & Towns in Pierce County Rob Putaansuu, City of Port Orchard Mayor Dana Ralph, City of Kent Mayor Chris Roberts, City of Shoreline Councilmember - Other Cities & Towns in King County Lynne Robinson, City of Bellevue Mayor Leslie Schneider, City of Bainbridge Island – Other City & Towns in Kitsap County Hester Serebrin, WA State Transportation Commissioner Dave Somers, Snohomish County Executive Axel Strakeljahn, Port of Bremerton Commissioner Penny Sweet, City of Kirkland Mayor Barbara Tolbert, City of Arlington Mayor - Other Cities & Towns in Snohomish County Nancy Tosta, City of Burien Councilmember - Other Cities & Towns in King County Toni Troutner, City of Kent Councilmember Jeff Wagner, City of Covington Mayor Bryan Wahl, City of Mountlake Terrace, Other Cities & Towns in Snohomish County Greg Wheeler, City of Bremerton Mayor Derek Young, Pierce County Councilmember

Members absent included: (*alternate present)

Jenny Durkan, City of Seattle Mayor *Allan Ekberg, City of Tukwila Mayor - Other Cities & Towns in King County Lorena González, City of Seattle Councilmember Dan Strauss, City of Seattle Councilmember Victoria Woodards, City of Tacoma Mayor

COMMUNICATIONS AND PUBLIC COMMENT

There were no public comments received.

PRESIDENT’S REMARKS

President Bruce Dammeier thanked members for participating in today’s meeting. He stated that “today we have two important action items that will bring additional transportation funding into the region. First, we have a supplemental funding action for projects on the adopted contingency lists for PSRC’s Federal Highway Administration funds. The second is great news! PSRC will be distributing $580 million in Coronavirus Response and Relief Supplemental Appropriations Act funding. We will learn all about that today.”

COMMITTEE REPORTS

Doc ID 3122 Packet Pg. 9 6.a

Included in the agenda packet were reports on the Transportation and Growth Management Policy Boards. The Operations Committee did not meet this morning.

CONSENT AGENDA

ACTION: It was moved and seconded (Balducci/Erickson) to: (a) Approve Minutes of Meeting held March 25, 2021 and (c) Approve 2021 Project Extension Requests. Item (b) Adopt Routine Amendment to the 2021-2024 Transportation Improvement Program was pulled from the Consent Agenda, by Mayor Lynne Robinson for discussion. The motion passed unanimously.

NEW BUSINESS

Adopt Routine Amendment to the 2021-2024 Transportation Improvement Program – pulled from Consent Agenda for discussion

Kelly McGourty, Director of Transportation Planning, briefed the board on the monthly routine TIP process, noting that WSDOT submitted two projects this month for routine amendment into the Regional TIP. These projects were awarded local, state, and federal funding through various processes, such as Connecting Washington funds managed by the Washington State Department of Transportation. PSRC staff reviewed the projects for compliance with federal and state requirements, and consistency with VISION 2050 and the Regional Transportation Plan. At its meeting on April 8, the Transportation Policy Board recommended adoption of the amendment.

WSDOT Secretary Roger Millar responded to Mayor Lynn Robinson’s concern about environmental protections for the I-90/Westbound Mercer Slough Bridge – Bridge Scour.

ACTION: It was moved and seconded (Low/Erickson) to Adopt Routine Amendment to the 2021-2024 Transportation Improvement Program. The motion passed unanimously.

Approve 2021 Delivery and Contingency Funding Recommendations

Kelly McGourty, Director of Transportation Planning, briefed the board on the request to approve the supplemental FHWA funding to the list of projects identified in Attachment 1 (contingency projects recommended for supplemental FHWA funding) and Attachment 2 (immediately ready to go contingency projects to assist region in meeting the annual delivery target).

ACTION: It was moved and seconded (Birney/Garrido) to approve supplemental FHWA funding to the list of projects identified in Attachments 1 and 2. The motion passed unanimously.

Doc ID 3122 Packet Pg. 10 6.a

Approve Coronavirus Response and Relief Supplemental Appropriations Act (CRRSAA) Funding Distribution

Kelly McGourty, Director of Transportation Planning, reviewed with the board the request to approve the distribution of Coronavirus Response and Relief Supplemental Appropriations Act (CRRSAA) funding to the region’s transit agencies. Under CRRSAA, $14 billion is available nationwide to support transit agencies during the COVID-19 public health emergency. Approximately $580 million is available to transit agencies serving King, Pierce, Snohomish and Kitsap counties. PSRC has been working with the region’s transit agencies over the last three months on the distribution methodology for the CRRSAA funding.

MAIN MOTION: It was moved and seconded (Erickson/Backus) to approve the distribution of CRRSAA funding to the region’s transit agencies as identified in Attachment 1.

ACTION: It was moved and seconded (Young/Anderson) to continue the topic to the May 27, 2021 Executive Board meeting. The motion failed 81 percent.

ACTION ON MAIN MOTION: The motion passed 84 percent.

OTHER BUSINESS

There was no other business brought before the board.

NEXT MEETING

The Executive Board will next meet on Thursday, May 27, 2021, 10 - 11:30 AM. This will be a virtual meeting.

ADJOURN

The meeting adjourned at 11:20 AM. ------

Adopted this 27th day of May, 2021.

______Councilmember Claudia Balducci, President Puget Sound Regional Council

ATTEST: ______Josh Brown, Executive Director

Doc ID 3122 Packet Pg. 11 6.b

CONSENT AGENDA May 20, 2021

To: Executive Board

From: Mayor Becky Erickson, Chair, Operations Committee

Subject: Approve Vouchers Dated March 15, 2021 through May 3, 2021 in the Amount of $1,721,102.06

IN BRIEF

Two representatives of the Operations Committee review and sign off on the vouchers. In accordance with RCW 42.24.080, following the Operations Committee’s review, the Executive Board approves the vouchers. Because the meeting is being attended remotely, PSRC will email voucher information to 2 members of the Operations Committee for review and approval.

RECOMMENDED ACTION

Recommend the Executive Board approve the following vouchers:

REQUESTED WARRANT DATE VOUCHER NUMBER TOTALS 03/15/21 - 05/03/21 AP Vouchers $ 682,673.35 03/15/21 - 04/15/21 Payroll $ 1,038,428.71

$ 1,721,102.06

For additional information, please contact Diana Lauderbach at 206-464-5416; email [email protected].

Doc ID 3113 Packet Pg. 12 6.c

CONSENT AGENDA May 20, 2021

To: Executive Board

From: Mayor Becky Erickson, Chair, Operations Committee

Subject: Approve Contract Authority for Website Design and Development

IN BRIEF

Authorization by the Executive Board is required for the Executive Director to enter into a contract in excess of $10,000. A request is being made to authorize a professional services contract to design and develop a new PSRC website (psrc.org).

RECOMMENDED ACTION

Recommend the Executive Board authorize the Executive Director to enter into one or more consultant contracts, not to exceed $150,000, to design, develop and maintain a new PSRC website.

BUDGET IMPACT

The Adopted Biennial Budget and Work Program for Fiscal Years 2022-2023 includes $150,000 for this project under Administrative Services (Task 900). The contract(s) would not begin until after the beginning of the budget period, July 1, 2021.

DISCUSSION

The website is one of the agency’s key communications and outreach tools. It was last updated in 2016 using an open-source content management system, Drupal 7. This version of Drupal will be retired in November 2022 and will no longer be supported after this date.

The primary goal of this project is to migrate the website to the current release of Drupal or an equivalent system. With the migration, the design and layout of the website will be

Doc ID 3116 Packet Pg. 13 6.c

refreshed so that the site is visually appealing and engaging, works on all screen sizes, is easy to navigate, and meets Section 508/ADA accessibility requirements. The work will also include system improvements, such as better image and file handling and updated internal site search tools.

For more information, please contact Carolyn Downs at [email protected] or Anne Avery at [email protected].

Doc ID 3116 Packet Pg. 14 6.d

CONSENT AGENDA May 20, 2021

To: Executive Board

From: Mayor Becky Erickson, Chair, Operations Committee

Subject: Approve Contract Authority for Ongoing Administrative Support

IN BRIEF

Executive Board authorization is required for the Executive Director to enter into a contract in excess of $10,000. A request is being made to authorize new contracts for ongoing administrative consulting services for the Fiscal Years 2022-2023 biennium.

RECOMMENDED ACTIONS

1. Authorize the Executive Director to enter one or more contracts for accounting and financial consulting services, not to exceed $147,000 for the FY 2022-2023 biennium.

2. Authorize the Executive Director to enter one or more contracts for legal services, not to exceed $225,000 for the FY 2022-2023 biennium.

3. Authorize the Executive Director to enter one or more contracts for HR support services, not to exceed $95,000 for the FY 2022-2023 biennium.

4. Authorize the Executive Director to enter one or more contracts for informational technology consulting services, not to exceed $120,400 for the FY 2022-2023 biennium.

BUDGET IMPACT

Doc ID 3119 Packet Pg. 15 6.d

The adopted Biennial Budget and Work Program for Fiscal Years 2022-2023 includes $147,000 for the biennium for accounting and financial consulting services; $250,000 for the biennium for legal services; $95,000 for the biennium for human resources assistance; and $120,400 for information technology services, under Administrative Services (Task 900).

DISCUSSION

For the fiscal years 2022-2023, PSRC would like to continue our practice of using outside consultants to provide finance, legal service, human resource assistance, and information technology consulting.

Finance Contracted accounting and financial management services include, but are not limited to: audit preparation, internal audit services, and ongoing accounting and financial management consulting. A competitive procurement process was completed in 2020 for financial and accounting services.

Legal PSRC currently contracts out legal counsel to provide on-call legal support for the agency, as well as ongoing representation in existing litigation. PSRC will continue contracting out legal support for the fiscal years 2022-2023. A competitive procurement process was completed in December 2019 for legal services.

Human Resources Contracted on-call human resource assistance includes, but is not limited to: continued recruitment assistance, employee surveys, and ongoing general human resource support. A competitive procurement process was completed in November 2017 for human resources services. We will conduct a new competitive process in November 2021.

Information Services PSRC outsources network management and maintenance to assist PSRC’s information technology (IT) staff. Services include review of PSRC’s network and IT needs, incident response, project engineering, and back-up “help desk” support. The current contract for these services expires June 30, 2021 and a competitive procurement process will be conducted in June 2021. The scope of services during this biennium will support PSRC’s space planning and office lease negotiations.

For more information, please contact Diana Lauderbach at 206-802-5231 or [email protected].

Doc ID 3119 Packet Pg. 16 6.e

CONSENT AGENDA May 20, 2021

To: Executive Board

From: Mayor Becky Erickson, Chair, Operations Committee

Subject: Approve Contract Authority for ESRI GIS Consulting Support

IN BRIEF

Authorization by the Executive Board is required for the Executive Director to enter a contract in excess of $10,000. A request is being made to authorize a consultant contract after July 1, 2021, not to exceed $20,000, to assist in the design of the cloud computing resources the agency uses for operation of ESRI’s Geographic Information Systems (GIS) software.

RECOMMENDED ACTION

Authorize the Executive Director to enter a consultant contract after July 1, 2021 for on- call support to assist in the design of the cloud computing resources the agency uses for operation of ESRI’s GIS software.

BUDGET IMPACT

The recently adopted Biennial Budget and Work Program for Fiscal Years 2022-2023 includes funding for consultant services to support the design of cloud-based computing resources to support the agency’s GIS needs, under Data (Task 400). The total budget for this consultant work is not to exceed $20,000. The contract will not begin until after the beginning of the FY2022-2023 biennium (July 1, 2021).

DISCUSSION

In the prior fiscal year, PSRC transitioned many agency servers and computing resources to a cloud-based computing architecture. This move has provided operational efficiencies for the vast majority of PSRC’s computing needs; however, there are a few

Doc ID 3118 Packet Pg. 17 6.e

systems that have become less stable and accessible in a cloud-based implementation. Users of PSRC’s GIS software have experienced connection and speed issues that the organization has been unable to fully address. This contract would be utilized to obtain on-call support to aid our IT team in the design and implementation of an updated IT system that will meet the needs of GIS users across the organization. The goal of the project will be to increase the speed and stability for access to the agencywide GIS data in the most cost-effective and sustainable way possible.

For more information, please contact Craig Helmann at (206) 389-2889 or [email protected].

Doc ID 3118 Packet Pg. 18 6.f

CONSENT AGENDA May 20, 2021

To: Executive Board

From: Mayor Becky Erickson, Chair, Transportation Policy Board

Subject: Adopt Routine Amendment to the 2021-2024 Transportation Improvement Program

IN BRIEF

Two agencies submitted seven projects this month for routine amendment into the Regional TIP. These projects are summarized in Exhibit A. These projects were awarded local, state, and federal funding through various processes, such as Connecting Washington funds managed by the Washington State Department of Transportation. PSRC staff reviewed the projects for compliance with federal and state requirements, and consistency with VISION 2050 and the Regional Transportation Plan. At its meeting on May 13, the Transportation Policy Board recommended adoption of the amendment.

RECOMMENDED ACTION

The Executive Board should adopt an amendment to the 2021-2024 Regional TIP to include the projects as shown in Exhibit A.

DISCUSSION

Under the Fixing America’s Surface Transportation (FAST) Act, PSRC has project selection authority for all projects programming regional funds from the Federal Highway Administration (FHWA) - Surface Transportation Block Grant Program (STP) and Congestion Mitigation and Air Quality Improvement Program (CMAQ) - and Federal Transit Administration (FTA) - Urbanized Area Formula Program (5307), State of Good Repair (5337), Bus and Bus Facilities Formula (5339), and Enhanced Mobility of Seniors and Individuals with Disabilities (5310).

Doc ID 3107 Packet Pg. 19 6.f

While PSRC does not have project selection authority for other types of federal, state, or local funds, the Executive Board does have responsibility for adding these projects to the Regional TIP. Each project must comply with requirements regarding plan consistency, air quality, and financial constraint. The attached Exhibit A illustrates the action needed to amend the Regional TIP.

The recommended action would approve the TIP amendment request based on a finding of consistency with VISION 2050, the Regional Transportation Plan, and the air quality conformity determination of the Regional TIP. Approval is also based on a determination that funding is reasonably expected to be available to carry out the project. Information describing plan consistency, air quality conformity, and the funding basis for approving the request is further described below.

Consistency with VISION 2050 and the Regional Transportation Plan

The projects recommended for action were reviewed by PSRC staff and have been determined to be consistent with the multicounty policies in VISION 2050 and the Regional Transportation Plan.

Air Quality Conformity

The projects in Exhibit A were reviewed and it has been determined that a new air quality analysis and conformity determination is not required because each project falls into one or more of the following categories: • It is exempt from air quality conformity requirements. • It is an existing project already included in the current air quality modeling. • It is a non-exempt project not able to be included in the regional model.

Funding Reasonably Expected to be Available

For the projects in Exhibit A, PSRC has confirmed that the funds are reasonably expected to be available.

PSRC’s Project Tracking Policies

This month’s amendment includes no project tracking actions.

Federal Fund Source Descriptions

The following is a list of state and federal funding sources that are referenced in Exhibit A.

Connecting Washington State Connecting Washington Account.

Doc ID 3107 Packet Pg. 20 6.f

NHPP Provides support for the condition and performance of the National Highway System (NHS).

For more information, please contact Jennifer Barnes at 206-389-2876 or [email protected].

Attachments: Exhibit A

Doc ID 3107 Packet Pg. 21 6.f.a

Month: May Project(s) Proposed for Routine Amendment to 20 -202 TIP Year: 2021 21 4 Exhibit A

PSRC Action Needed Project Title New and Project Project/ UPWP Sponsor Work Description Funding Tracking Phase Other Amend

1. King County Eastrail (ERC) Corridor $3,000,000 State Parks Wilburton Segment $22,800,000 Local Department New project with a construction phase to construct a paved $25,800,000 Total nonmotorized multi-use path approximately 0.44 mile in length from the WSDOT right-of-way at I-405 to SE 5th Street as a segment of the Eastrail Corridor. The project will include the rehabilitation of the historic Wilburton Trestle for regional trail purposes, trail lighting, user safety improvements, a small paved parking area and access path at SE 5th Street, and a ramp at SE 32nd Street (Arrow Road) .

2. WSDOT I-5/Northbound Lake $21,707,088 Connecting Washington Northwest Washington Ship Canal Region Bridge - Deck Overlay $21,707,088 Total New project with preliminary engineering and construction phases to repair and resurface the existing bridge deck, and rehabilitate the expansion joints and headers.

3. WSDOT SR 167 Toll Upgrade $10,619,210 Northwest Connecting Washington Region New project with preliminary $10,619,210 Total engineering and construction phases to upgrade the toll equipment on SR 167 corridor to align with the I-405 system. Attachment: Exhibit A (3107 : Routine Amendment to the 2021-2024 Transportation Improvement Program (TIP))

Packet Pg. 22 6.f.a

PSRC Action Needed Project Title New and Project Project/ UPWP Sponsor Work Description Funding Tracking Phase Other Amend

4. WSDOT I-90/Eastbound Mercer Slough $11,758,535 Federal NHPP Northwest Bridge - Rehabilitation $336,739 Local Region New project with preliminary engineering and construction $12,095,274 Total phases to stabilize the eastbound I-90 bridge over the Mercer Slough.

5. WSDOT SR 305/Port Madison, $8,510,065 Connecting Washington Olympic Region Agatewood Road, Adas Will Lane - Safety Improvements $8,510,065 Total New project with preliminary engineering, right of way, and construction phases to construct roundabouts at the intersections of Port Madison and SR 305 and at Adas Will Lane and SR 305.

6. WSDOT SR 305/Suquamish Way - $7,493,000 Connecting Washington Olympic Region Safety Improvements $7,493,000 Total New project with preliminary engineering and construction phases to construct a roundabout at the intersection of Suquamish Way and SR 305.

7. WSDOT SR 305/Totten Road - Safety $6,406,508 Connecting Washington Olympic Region Improvements $6,406,508 Total New project with preliminary engineering, right of way, and construction phases to construct a roundabout at the intersection of Totten Road and SR 305. Attachment: Exhibit A (3107 : Routine Amendment to the 2021-2024 Transportation Improvement Program (TIP))

Packet Pg. 23 6.g

CONSENT AGENDA May 20, 2021

To: Executive Board

From: Mayor Becky Erickson, Chair, Transportation Policy Board

Subject: Authorize a Change in the Regional Transportation Plan Project Status for King County Metro’s RapidRide H Line Project

IN BRIEF

King County Metro has submitted a request to change the status of the RapidRide H Line Project from “Candidate” to “Approved.” Per PSRC’s adopted procedures, requests to change a project status require Board action. At its meeting on May 13, the Transportation Policy Board recommended that the Executive Board authorize changing the status of the project as requested

RECOMMENDED ACTION

The Executive Board should authorize a change in project status for King County Metro’s RapidRide H Line Project from “Candidate” to “Approved.”

DISCUSSION

The Regional Transportation Plan contains policies requiring PSRC’s Executive Board to approve regionally significant transportation capacity projects before those projects begin implementation phases. Projects in the Regional Transportation Plan are designated as Candidate, Approved, or Conditionally Approved. A Candidate designation means a project has gone through a comprehensive planning process, but that one or more of the following has not yet been completed: environmental documentation and approvals, financial plan, and/or other planning requirements. A project’s status is changed to Approved once these requirements have been met. Conditional Approval may be granted if a project has fulfilled most of the approval criteria but lacks only certain details. For example, if a project awaits only final signatures on its environmental documentation but has completed all other requirements,

Doc ID 3106 Packet Pg. 24 6.g

the Executive Board may grant Conditional Approval. Once the final details have been completed, staff has the authority to grant a project full Approval status administratively, thereby saving the project sponsor several weeks of delay.

This project will construct a new RapidRide line connecting Burien to via Ambaum Boulevard SW, Delridge Way SW and East Marginal Way South. It will connect two Regional Growth Centers (Burien and Downtown Seattle) and the Duwamish Manufacturing/Industrial Center and provide connections to other regional transit services including King County Metro’s RapidRide C and D lines and the planned RapidRide G line, as well as ’s , commuter rail and I-405 STRIDE bus rapid transit. The project will also enhance bicycle and pedestrian access to transit along the corridor. Specific elements of the project include:

• new transit-only and Business Access Transit (BAT) lanes on existing or new right-of-way along the proposed routing to maintain high transit travel speeds. • major intersection investments at priority intersections to improve traffic flow, transit reliability and increase transit speeds. • new transit signal priority at many of the signalized intersections along the route. • upgraded passenger amenities with better information and passenger safety to facilitate greater transit use and remove barriers of existing use.

Table 1 provides additional details of the project, including the criteria used to review the project for the requested status change.

Table 1: Project Details and Review Criteria Review Criteria RapidRide H Line Project

Total Project Cost $79,576,420

Consistency with Regional This project is consistent with regional policy. Policies

Not required – This project is below Benefit-Cost Analysis $100,000,000.

Environmental SEPA DNS (Determination of Non-Significance) Documentation was issued in November of 2019.

King County Metro has executed an Interlocal Other Planning Agreement for Cooperative Planning, Design, and Requirements Construction of the RapidRide H Line with the City of Burien and City of Seattle.

Doc ID 3106 Packet Pg. 25 6.g

Review Criteria RapidRide H Line Project

The project is fully funded with $43.5 million from King County Metro sales tax and revenue; $20.5 million from the State Regional Mobility Grant Program; $6.5 million from Connecting Financial Feasibility Washington; $6.9 million from the City of Seattle; and $2.2 million from Sound Transit for a total cost of $79.6 million in 2022 year of expenditure dollars.

Approving this project will not change the region’s Air Quality Conformity air quality conformity determination.

For more information, please contact Jennifer Barnes at 206-389-2876 or [email protected].

Doc ID 3106 Packet Pg. 26 6.h

CONSENT AGENDA May 20, 2021

To: Executive Board

From: Mayor Becky Erickson, Chair, Transportation Policy Board

Subject: Authorize a Change in the Regional Transportation Plan Project Status for Community Transit’s Swift BRT Orange Line – 164th Street & 196th Street Corridors Project

IN BRIEF

Community Transit has submitted a request to change the status of the Swift BRT Orange Line – 164th Street & 196th Street Corridor Project from “Candidate” to “Approved.” Per PSRC’s adopted procedures, requests to change a project status require Board action. At its meeting on May 13, the Transportation Policy Board recommended that the Executive Board authorize changing the status of the project as requested.

RECOMMENDED ACTION

The Executive Board should authorize a change in project status for Community Transit’s Swift BRT Orange Line – 164th Street & 196th Street Corridor Project from “Candidate” to “Approved.”

DISCUSSION

The Regional Transportation Plan contains policies requiring PSRC’s Executive Board to approve regionally significant transportation capacity projects before those projects begin implementation phases. Projects in the Regional Transportation Plan are designated as Candidate, Approved, or Conditionally Approved. A Candidate designation means a project has gone through a comprehensive planning process, but that one or more of the following has not yet been completed: environmental documentation and approvals, financial plan, and/or other planning requirements. A project’s status is changed to Approved once these requirements have been met. Conditional Approval may be granted if a project has fulfilled most of the approval

Doc ID 3109 Packet Pg. 27 6.h

criteria but lacks only certain details. For example, if a project awaits only final signatures on its environmental documentation but has completed all other requirements, the Executive Board may grant Conditional Approval. Once the final details have been completed, staff has the authority to grant a project full Approval status administratively, thereby saving the project sponsor several weeks of delay.

This project will provide Community Transit’s 3rd Bus Rapid Transit (BRT) line and will operate in the 164th/196th Street Corridors between two terminals adjacent to McCollum Park & Ride in Everett and Edmonds Community College. The Orange Line will include approximately 13 station pairs (26 individual stations) along an 11.5-mile corridor that will connect to the Blue and Green BRT lines, Sound Transit’s Link light rail and Stride I-405 BRT. The project also includes priority treatments for speed and reliability along the corridor. Service will begin in 2024 with 13 BRT-branded, 60-foot buses. Service will be provided to the Lynnwood Regional Growth Center, two locally designated centers, and four park-and-ride facilities with all-day, bi-directional service operating at 10-minute frequencies during peak hours.

Table 1 provides additional details of the project, including the criteria used to review the project for the requested status change.

Table 1: Project Details and Review Criteria Swift BRT Orange Line – 164th Street & 196th Review Criteria Street Corridor Project Total Project Cost $80,972,240

Consistency with Regional This project is consistent with regional policy. Policies

Not required – This project is below Benefit-Cost Analysis $100,000,000.

Environmental NEPA DCE (Documented Categorical Exclusion) Documentation was issued in May of 2020.

Community Transit has executed Interlocal Agreements with the City of Lynnwood, City of Mill Creek, and WSDOT. Community Transit is also Other Planning pursuing Interlocal Agreements with Snohomish Requirements County and Sound Transit which are expected to be executed by summer 2021. Agreements are also underway with various utilities and Edmonds Community College.

Doc ID 3109 Packet Pg. 28 6.h

The project is fully funded with $14.1 million of Federal Transit Administration (FTA) Section 5307 funds; $37.0 million of FTA Section 5309 Small Starts Program funds; $7.0 million Federal Financial Feasibility Highway Administration funds; , $5.0 million Connecting Washington funds;, and $ 17.9 million of local funds for a total cost of $81 million in 2021 year of expenditure dollars.

Approving this project will not change the region’s Air Quality Conformity air quality conformity determination.

For more information, please contact Jennifer Barnes at 206-389-2876 or [email protected].

Doc ID 3109 Packet Pg. 29 6.i

ACTION ITEM May 20, 2021

To: Executive Board

From: Mayor Becky Erickson, Chair, Transportation Policy Board

Subject: Approve 2021 Federal Transit Administration Funding Annual Adjustments

IN BRIEF

In January of 2021, PSRC was notified of the region’s final allocation of federal fiscal year (FFY) 2021 Federal Transit Administration (FTA) funds. FTA requires that PSRC review the estimates used to program its FTA funds with the actual allocation approved by Congress on an annual basis. Due to the final allocation being higher than the original estimates used for programming, there is an additional $27.4 million available for distribution. A summary of the funds originally programmed and the adjustments for FFY 2021 is provided in Attachment A. The recommendation of the Transportation Operators Committee (TOC) for the adjustments, including the distribution of additional funds to projects, is contained in Attachment B. At its meeting on May 13, the Transportation Policy Board recommended Executive Board approval.

RECOMMENDED ACTION

The Executive Board should approve the adjustments and $27.4 million in additional FFY 2021 FTA funds to the list of projects as shown in Attachment B.

DISCUSSION

PSRC’s 2021 FTA funds were originally distributed to projects as part of the 2018 project selection process using an estimate based on previous funding levels. FTA requires that PSRC review the estimates with the actual allocation approved by Congress on an annual basis. In January of 2021 PSRC was notified of the region’s final allocation of FFY 2021 FTA funds. The final 2021 allocation is higher than originally estimated, providing an increase of approximately $27.4 million to the region.

Doc ID 3110 Packet Pg. 30 6.i

There are three urbanized areas (UZAs) in the region, as designated by the U.S. Census. These are the Seattle-Tacoma-Everett UZA, the Bremerton UZA and the Marysville UZA. and Community Transit are the sole transit agencies within the Bremerton and Marysville UZAs, respectively. In the Seattle-Tacoma-Everett UZA, there are multiple transit agencies, including three agencies that provide service within the Seattle-Tacoma-Everett UZA but are located outside of it. These include Kitsap Transit in Kitsap County, in Thurston County, and in Skagit County. Per adopted regional policy, these external agencies are able to access the FTA funds earned from the service they provide within the Seattle-Tacoma- Everett UZA.

Since Kitsap Transit and Community Transit are the only transit agencies operating in the Bremerton and Marysville UZAs, FTA funds within those UZAs are distributed entirely through an earned share process. In the Seattle-Tacoma-Everett UZA, approximately 86% of the FTA funds earned are based on the service and operating characteristics of the transit agencies providing service to the UZA. Per adopted regional policy, this portion of the funds is distributed to each transit agency based on their earnings. The remaining funds, approximately 14%, come to the region based on regional attributes such as population density. This portion of the funds is distributed via a regional competition.

The $27.4 million in additional FFY 2021 FTA funds is the net total to the region, reflecting both increases and decreases in amounts earned by each transit agency. This also reflects an increase to the regional portion of funds in the Seattle-Tacoma- Everett UZA, resulting in approximately $862,000 being recommended for distribution to projects on the FTA Regional contingency list. A summary of the changes between the estimates used for programming as part of the 2018 project selection process and the final 2021 allocation amounts is contained in Attachment A.

As part of the FFY 2021 FTA annual adjustments, five agencies are requesting redistribution of funds among projects, as described in Attachment C. In addition, there are seven new projects being proposed to receive funding, as identified in Attachment B. Per adopted policy these projects will be released for public comment from May 6 through May 7, 2021.

For additional information, please contact Jennifer Barnes at [email protected] or (206) 389-2876.

Attachments: A - Summary of PSRC’s FFY 2021 FTA Funding Adjustments B - TOC Recommendation of FFY 2021 FTA Adjustments, by Agency and Project C - Additional Information on 2021 FTA Redistribution Requests

Doc ID 3110 Packet Pg. 31 6.i.a

ATTACHMENT A: SUMMARY OF PSRC'S FFY 2021 FTA FUNDING ADJUSTMENTS Urbanized Area (UZA) Original Award Final Amount Adjustment Bremerton $3,880,417 $4,464,517 $584,100 Marysville $2,241,542 $2,401,164 $159,622 Seattle-Tacoma-Everett $167,524,890 $194,198,670 $26,673,780 Total for all three UZAs $173,646,849 $201,064,351 $27,417,502

Bremerton UZA Funding Original Award Final Amount Adjustment Kitsap Transit $3,853,750 $4,437,850 $584,100 PSRC Planning and Programming $26,667 $26,667 $0 Total for Bremerton UZA $3,880,417 $4,464,517 $584,100

Marysville UZA Funding Original Award Final Amount Adjustment Community Transit $2,224,875 $2,384,497 $159,622 PSRC Planning and Programming $16,667 $16,667 $0 Total for Marysville UZA $2,241,542 $2,401,164 $159,622

Seattle-Tacoma-Everett (STE) UZA Original Award Final Amount Adjustment Earned Share and Preservation Set Aside Funding Community Transit $9,591,512 $11,770,649 $2,179,137 $1,438,879 $1,435,863 ($3,016) Intercity Transit $2,591,790 $2,133,698 ($458,092) King County Metro $67,487,537 $81,836,815 $14,349,278 Kitsap Transit $447,427 $1,238,301 $790,874 $7,808,653 $8,176,865 $368,212 PSRC Planning and Programming $1,206,666 $1,206,666 $0 City of Seattle $1,435,063 $1,418,035 ($17,028) Skagit Transit $0 $375,995 $375,995 Sound Transit $50,697,178 $56,542,236 $5,845,058 $12,820,185 $15,201,427 $2,381,242 Regional Competition & Contingency List Funding Projects awarded funds through the $12,000,000 $12,862,119 $862,119 regional FTA competition

Total for STE UZA $167,524,890 $194,198,669 $26,673,779

Total of All Three UZAs for FFY 2021 FTA Adjustments $27,417,501 Attachment: A - Summary of PSRC’s FFY 2021 FTA Funding Adjustments (3110 : Federal Transit Administration Annual

Packet Pg. 32 6.i.b

Attachment B: TOC Recommendation of FFY 2021 FTA Adjustments, by Agency and Project Bremerton UZA Programmed Sponsor Project ID Title Fund Source Adjustment Redistributions Final Funds KT-28 North Kitsap Base 5307 $ - $ 502,359 $ - $ 502,359 5307 $ 3,337,348 $ - $ (3,337,348) $ - KT-58 2021-22 Bus and OTR Coach Purchase 5339 $ 256,274 $ 51,108 $ - $ 307,382 Kitsap Transit 2021-22 Passenger Only Ferry System Preventive KT-59 Maintenance 5337 HIFG $ 260,128 $ 30,633 $ - $ 290,761 TBD M/V Solano 5307 $ - $ - $ 3,337,348 $ 3,337,348 Regional Transportation Planning and Programming, PSRC PSRC-23 FY22-23 5307 $ 26,667 $ - $ - $ 26,667 Total $ 3,880,417 $ 584,100 $ - $ 4,464,517

Marysville UZA Programmed Sponsor Project ID Title Fund Source Adjustment Redistributions Final Funds CT-68 Marysville UZA Transit Operations 2021-2022 5307 $ 2,020,854 $ 118,746 $ - $ 2,139,600 Community Transit CT-69 Transit Revenue Vehicles 2021-2022 5339 $ 204,021 $ 40,876 $ - $ 244,897 Regional Transportation Planning and Programming, PSRC PSRC-23 FY22-23 5307 $ 16,667 $ - $ - $ 16,667 Total $ 2,241,542 $ 159,622 $ - $ 2,401,164

Seattle-Tacoma-Everett - Earned Share Programmed Sponsor Project ID Title Fund Source Adjustment Redistributions Final Funds 5307 $ 6,280,334 $ 1,171,574 $ - $ 7,451,908 Community Transit CT-69 Transit Revenue Vehicles 2021-2022 5337 HIMB $ 1,924,518 $ 677,170 $ - $ 2,601,688 5339 $ 718,237 $ 246,842 $ - $ 965,079 Community Transit Totals $ 8,923,089 $ 2,095,586 $ - $ 11,018,675

ET-42 2021-2022 Preventive Maintenance Vehicle Fleet 5307 $ 1,287,502 $ - $ (1,287,502) $ - ET-43 2021-2022 Transit Revenue Vehicles 5339 $ 87,498 $ - $ (87,498) $ - Everett Transit TBD Everett Station Passenger Amenities 5339 $ - $ 13,991 $ 87,498 $ 101,489 N/A Emergency Relief Funding 5307 $ - $ (13,535) $ 1,287,502 $ 1,273,967 Everett Transit Totals $ 1,375,000 $ 456 $ - $ 1,375,456 Attachment: B - TOC Recommendation of FFY 2021 FTA Adjustments, by Agency and Project (3110 :

Packet Pg. 33 6.i.b

5307 $ - $ (436,821) $ 2,325,872 $ 1,889,051 IT-6 Pattison MOA Base Rehabilitation and Expansion 5339 $ - $ (21,271) $ 265,918 $ 244,647 IT-7 FY 21-22 Capital Preventive Maintenance 5307 $ 320,000 $ - $ (320,000) $ - Intercity Transit 5307 $ 531,872 $ - $ (531,872) $ - IT-8 FY 2021- 2022 Replacement Fixed Route Coaches 5339 $ 265,918 $ - $ (265,918) $ - IT-9 FY 2021- 2022 Vanpool Vans 5307 $ 1,474,000 $ - $ (1,474,000) $ - Intercity Transit Totals $ 2,591,790 $ (458,092) $ - $ 2,133,698

KCFD-11 Vessel Maintenance FY 2021-2022 5337 HIFG $ 898,610 $ - $ - $ 898,610 KCFD-12 West Seattle Terminal Replacement 5307 $ 928,576 $ - $ (928,576) $ - MET-214 500K Substation Breaker Replacement 5337 HIFG $ - $ 2,920,000 $ - $ 2,920,000 MET-217 Broad Street Substation Transformer Replacement 5337 HIFG $ - $ 3,360,000 $ - $ 3,360,000 MET-218 KCM Service Expansion Battery Electric Bus Service 5307 $ - $ 1,608,811 $ 4,231,189 $ 5,840,000 5307 $ 35,646,135 $ - $ (34,190,787) $ 1,455,348 MET-222 60 - Ft Hybrid Bus Replacements 2021-2022 5337 HIMB $ 7,581,876 $ - $ (7,581,876) $ - 5339 $ 3,196,836 $ 2,759,148 $ - $ 5,955,984 Replacement of Overhead Trolley Infrastructure 2021- MET-227 2022 5337 HIFG $ 3,000,000 $ - $ - $ 3,000,000 MET-228 Trolley Pole Replacement 2021-2022 5337 HIFG $ 800,000 $ - $ - $ 800,000 MET-229 Trolley System Transit Asset Management 2021-2022 5337 HIFG $ 5,000,000 $ - $ - $ 5,000,000 King County Metro Vehicle, Equipment and Facilities Maintenance for MET-230 Electric Trolley Fleet 2021-2022 5337 HIFG $ 5,000,000 $ - $ - $ 5,000,000 MET-232 Atlantic Base Vehicle Maintenance Bus Lifts 5337 HIFG $ - $ 1,102,992 $ - $ 1,102,992 MET-234 Trolley System Infrastructure SGR Master Drawings 5337 HIFG $ - $ 1,295,251 $ - $ 1,295,251 SEA-199 Route 48 South Electrification 5307 $ - $ - $ 4,400,000 $ 4,400,000 5307 $ - $ - $ 5,672,115 $ 5,672,115 TBD KCM Bus Base Building HVAC Replacements 5339 $ - $ 567,885 $ - $ 567,885 TBD KCM South Base Complex Electrification 5307 $ - $ - $ 2,658,576 $ 2,658,576 TBD KCM LINK Integration Projects 5307 $ - $ - $ 10,340,751 $ 10,340,751 5307 $ - $ - $ 7,816,732 $ 7,816,732 TBD Vehicle and Facilities Maintenance 2021-22 5337 HIMB $ - $ (57,490) $ 7,581,876 $ 7,524,386 TBD Atlantic Base Wash Equipment Replacement 5337 HIFG $ - $ 1,000,000 $ - $ 1,000,000 King County Totals $ 62,052,033 $ 14,556,597 $ - $ 76,608,630 Attachment: B - TOC Recommendation of FFY 2021 FTA Adjustments, by Agency and Project (3110 :

Packet Pg. 34 6.i.b

5307 $ 401,521 $ 776,809 $ - $ 1,178,330 KT-28 North Kitsap Base 5339 $ 45,906 $ (9,016) $ - $ 36,890 Kitsap Transit 2021-22 Passenger Only Ferry System Preventive KT-59 Maintenance 5337 HIFG $ - $ 23,081 $ - $ 23,081 Kitsap Transit Totals $ 447,427 $ 790,874 $ - $ 1,238,301

PT-169 ADA Service 2021-2022 5307 $ 780,865 $ (41,412) $ - $ 739,453 5307 $ 5,802,616 $ 359,078 $ - $ 6,161,694 Pierce Transit PT-170 Clean Fuels Bus Replacement/Expansion 2021-2022 5337 HIMB $ 125,098 $ (58,378) $ - $ 66,720 5339 $ 595,255 $ 120,364 $ - $ 715,619 Pierce Transit Totals $ 7,303,834 $ 379,652 $ - $ 7,683,486 Regional Transportation Planning and Programming, PSRC PSRC-23 FY22-23 5307 $ 1,206,666 $ - $ - $ 1,206,666 PSRC Totals $ 1,206,666 $ - $ - $ 1,206,666

5307 $ 348,876 $ 162,451 $ 5,108 $ 516,435 SEA-226 Monorail System Maintenance 2021-2022 City of Seattle 5337 HIFG $ 595,605 $ (161,995) $ - $ 433,610 SEA-227 Maintenance 2021-2022 5307 $ 430,519 $ - $ (5,108) $ 425,411 City of Seattle Totals $ 1,375,000 $ 456 $ - $ 1,375,456

Skagit Transit Maintenance Operations and 5307 $ - $ 332,884 $ - $ 332,884 Skagit Transit SKA-4 Administration Facility 5339 $ - $ 43,111 $ - $ 43,111 Skagit Transit Totals $ - $ 375,995 $ - $ 375,995

RTA-95 Downtown Redmond Link Extension 5307 $ 21,404,923 $ 3,263,552 $ - $ 24,668,475 5337 HIMB $ 8,353,486 $ (1,023,083) $ - $ 7,330,403 Sound Transit RTA-101 Regional Express Bus Program 2021-2022 5339 $ 1,240,523 $ 254,038 $ - $ 1,494,561 RTA-102 Sounder and Link State of Good Repair (2021-2022) 5337 HIFG $ 16,164,537 $ 3,272,031 $ - $ 19,436,568 Sound Transit Totals $ 47,163,469 $ 5,766,538 $ - $ 52,930,007

WSF-82 Seattle Multimodal Terminal at Colman Dock 5307 $ 4,673,696 $ - $ - $ 4,673,696 Washington State Ferries 5307 $ - $ 32,714 $ - $ 32,714 WSF-117 Vessel Preservation and Improvement (2021-2022) 5337 HIFG $ 7,252,982 $ 2,270,884 $ - $ 9,523,866 Washington State Ferries Totals $ 11,926,678 $ 2,303,598 $ - $ 14,230,276 Attachment: B - TOC Recommendation of FFY 2021 FTA Adjustments, by Agency and Project (3110 :

Packet Pg. 35 6.i.b

Seattle-Tacoma-Everett Regional Competition Programmed Sponsor Project ID Title Fund Source Funds Adjustment Redistributions Final Community Transit CT-66 Swift BRT Orange Line 5307 $ 2,932,575 $ - $ - $ 2,932,575 Pierce Transit PT-172 Pacific Avenue/SR 7 BRT Buses 5307 $ 5,000,000 $ - $ - $ 5,000,000 Sound Transit RTA-95 Downtown Redmond Link Extension 5307 $ 461,960 $ - $ - $ 461,960 Sound Transit RTA-100 I-405 Bus Rapid Transit 5307 $ 3,605,465 $ - $ - $ 3,605,465 Funds advanced from 2022 to 2021 Community Transit CT-66 Swift BRT Orange Line 5307 $ - $ 862,119 $ - $ 862,119 Total $ 12,000,000 $ 862,119 $ - $ 12,862,119 Recommendation for freed up 2024 funds Programmed Sponsor Project ID Title Fund Source Funds Adjustment Redistributions Final Sound Transit RTA-103 SR 522/NE 145th St BRT* 5307 $ 727,310 $ - $ 727,310 * The contingency funds being added to RTA-103 are lower than the total amount of freed up 2024 funds available because this is the amount needed to bring the project up to its total original request from the 2020 Project Selection Process. Seattle-Tacoma-Everett - Preservation Set Aside Programmed Sponsor Project ID Title Fund Source Funds Adjustment Redistributions Final Community Transit CT-69 Transit Revenue Vehicles 2021-2022 5307 $ 668,423 $ 83,551 $ - $ 751,974 2021-2022 Everett Station Preventive Maintenance and Everett Transit ET-41 Rehabilitation 5307 $ 63,879 $ (3,472) $ - $ 60,407 King County MET-222 60 - Ft Hybrid Bus Replacements 2021-2022 5307 $ 5,298,616 $ - $ (5,298,616) $ - King County KCFD-11 Vessel Maintenance FY 2021-2022 5307 $ 136,888 $ - $ - $ 136,888 King County TBD Vehicle and Facilities Maintenance 2021-22 5307 $ - $ (207,319) $ 5,298,616 $ 5,091,297 Pierce Transit PT-170 Clean Fuels Bus Replacement/Expansion 2021-2022 5307 $ 504,819 $ (11,440) $ - $ 493,379 City of Seattle SEA-226 Monorail System Maintenance 2021-2022 5307 $ 60,063 $ (17,484) $ - $ 42,579 Sound Transit RTA-102 Sounder and Link State of Good Repair (2021-2022) 5307 $ 3,533,709 $ 78,520 $ - $ 3,612,229 Washington State Ferries WSF-117 Vessel Preservation and Improvement (2021-2022) 5307 $ 893,507 $ 77,644 $ - $ 971,151 Total $ 11,159,904 $ - $ - $ 11,159,904 STE UZA Totals $ 167,524,890 $ 26,673,779 $ - $ 194,198,669 TBD = New project Total FFY 2021 FTA Funds $ 173,646,849 $ 27,417,501 $ - $ 201,064,350 Attachment: B - TOC Recommendation of FFY 2021 FTA Adjustments, by Agency and Project (3110 :

Packet Pg. 36 6.i.c

ATTACHMENT C ADDITIONAL INFORMATON ON 2021 FTA REDISTRIBUTION REQUESTS

CITY OF SEATTLE

REQUEST: The City of Seattle requests to redistribute $5,108 in 2021 5307 Earned Share funding from its “Seattle Streetcar Maintenance 2021-2022” to its “Monorail System Maintenance 2021-2022” project.

RATIONALE: The redistribution is needed to balance funding for both the streetcar and monorail maintenance projects.

PROJECT SCOPE IMPACTS: • Seattle Streetcar Maintenance 2021-2022 - The project will add local funding sources to keep the total project budget constant. • Monorail System Maintenance 2021-2022 - The project will still have a net reduction in funds so will add local funding sources to keep the total project budget constant.

EVERETT TRANSIT

REQUEST: Everett Transit requests to redistribute $1,287,502 in 2021 5307 Earned Share and $87,498 in 2021 5339 funding from its “2021-2022 Preventive Maintenance Vehicle Fleet and “2021-2022 Transit Revenue Vehicles” projects to the new “Everett Station Passenger Amenities” project and the FTA Emergency Relief Funding program.

RATIONALE: The redistribution is needed because the agency requires additional funding for operating assistance due to impacts from COVID -19. Funding is being redistributed to the new “Everett Station Passenger Amenities” project to provide ADA enhancements to Everett Station’s public phone and charging station areas and public restrooms.

PROJECT SCOPE IMPACTS: • 2021-2022 Preventive Maintenance Vehicle Fleet - The project will add local funding sources to keep the total project budget constant. • 2021-2022 Transit Revenue Vehicles – This project will reduce the number of paratransit vehicles purchases from the project scope. • Everett Station Passenger Amenities - This is a new project.

INTERCITY TRANSIT

REQUEST: Intercity Transit (IT) requests to redistribute $2,325,872 in 2021 5307 Earned Share and $265,918 in 2021 5339 funding from its “FY 21-22 Capital Preventive Maintenance”, “FY 2021- 2022 Replacement Fixed Route Coaches”, and “FY 2021- 2022 Vanpool Vans” projects to its “Pattison MOA Base Rehabilitation and Expansion” project.

Attachment: C - Additional Information on 2021 FTA Redistribution Requests (3110 : Federal Transit Administration Funding Annual

Packet Pg. 37 6.i.c

RATIONALE: The redistribution is needed because IT has recently received additional FTA competitive awards, allowing all phases of the Pattison Base Project to advance. Since this project is a high priority, they are asking to redistribute funds from other projects.

PROJECT SCOPE IMPACTS: • Pattison MOA Base Rehabilitation and Expansion – The scope will not change but all phases are now planned for construction. Other funding sources will be reduced to keep the total project budget constant. • FY 21-22 Capital Preventive Maintenance – The project will add other funding sources to keep the total project budget constant. • FY 2021- 2022 Replacement Fixed Route Coaches - The project will add other funding sources to keep the total project budget constant. • FY 2021- 2022 Vanpool Vans – The project will reduce the scope by fifty vanpools, reflecting decreased demand due to the pandemic.

KING COUNTY METRO

REQUEST: King County Metro (KCM) requests to redistribute: • $40,417,979 in 2021 5307 Earned Share and Preservation Set-aside finding from its “60 - Ft Hybrid Bus Replacements 2021-2022” and “West Seattle Terminal Replacement” projects to its existing “KCM Service Expansion Battery Electric Bus Service” and “Route 48 South Electrification” projects and four new projects: “Vehicle and Facilities Maintenance 2021-22”, “KCM Bus Base Building HVAC Replacements”, “KCM South Base Complex Electrification”, and “KCM LINK Integration Projects”. • $7,581,876 in 2021 5337 HIMB funding from its ““60 - Ft Hybrid Bus Replacements 2021-2022” project to the new “Vehicle and Facilities Maintenance 2021-22” project.

RATIONALE: The redistribution from “60 - Ft Hybrid Bus Replacements 2021-2022” is needed due to COVID related budget impacts on KCM’s fleet plan, which resulted in plans to purchase fewer buses. The reduction of funds from the “West Seattle Terminal Replacement” project is also due to a COVID related scope and budget reductions. The funding will instead be applied to other eligible projects identified as priorities in the KCM capital budget process because they can more immediately and efficiently utilize the federal funds.

PROJECT SCOPE IMPACTS: • 60 - Ft Hybrid Bus Replacements 2021-2022 – This project will reduce the number of hybrid and fully electric buses purchases in the current scope. • West Seattle Terminal Replacement - The project scope will be reduced by only moving forward on a site evaluation and Preliminary Engineering effort on Phase 1 of the project. Phase 1 is a mobility hub with vehicle parking, bus loading, and pedestrian and bicycle amenities. • KCM Service Expansion Battery Electric Bus Service - The project will remove local funding sources to keep the total project budget constant. • Route 48 South Electrification - The project will remove local funding sources to keep the total project budget constant. • New projects: o Vehicle and Facilities Maintenance 2021-22 o KCM Bus Base Building HVAC Replacements o KCM South Base Complex Electrification o KCM LINK Integration Projects Attachment: C - Additional Information on 2021 FTA Redistribution Requests (3110 : Federal Transit Administration Funding Annual

Packet Pg. 38 6.i.c

KITSAP TRANSIT

REQUEST: Kitsap Transit (KT) requests to redistribute $3,337,348 in 2021 5307 Bremerton UZA Earned Share funding from their “2021-22 Bus and OTR Coach Purchase” project to their new “M/V Solano” project.

RATIONALE: The redistribution is needed because KT recently purchased a fast ferry from California that requires refurbishment prior to entering into service. The funds to refurbish are needed immediately to get the vessel into service this year.

PROJECT SCOPE IMPACTS: • 2021-22 Bus and OTR Coach Purchase - The project will add local funding sources to keep the total project budget constant. • M/V Solano - This is a new project.

Attachment: C - Additional Information on 2021 FTA Redistribution Requests (3110 : Federal Transit Administration Funding Annual

Packet Pg. 39 7.a

ACTION ITEM May 20, 2021

To: Executive Board

From: Mayor Becky Erickson, Chair, Transportation Policy Board

Subject: Approve 2021 Delivery: Final Supplemental Funding Actions

IN BRIEF

In April the Executive Board approved the distribution of supplemental Federal Highway Administration (FHWA) funds to projects on the prioritized contingency lists adopted as part of the 2020 project selection process. It was noted at that time that an additional supplemental funding action necessary to achieve the 2021 annual delivery target was still underway, and that information would be brought back to the board for action in May. At its meeting on May 13, the Transportation Policy Board recommended approval.

ACTION

The Executive Board should approve supplemental FHWA funding to the list of projects identified in Attachment 1.

DISCUSSION

The Transportation Policy Board was briefed in December and January on the availability of supplemental FHWA funds to be distributed in 2021. These included additional FHWA funds to supplement funds previously programmed through PSRC’s project selection process, as well as two additional FHWA funding sources – from the Highway Infrastructure Program and the Transportation Alternatives Program. The majority of these funds were to be awarded to projects on the prioritized contingency lists adopted as part of the 2020 project selection process, and the remaining funds will be distributed via smaller regional competitions to be held in the Fall1.

1 Competitions for 2022-2024 Transportation Alternative Program funding and for PSRC’s Rural Town Centers and Corridors Program will be held later in 2021.

Doc ID 3111 Packet Pg. 40 7.a

PSRC worked closely with project sponsors on the adopted regional and countywide contingency lists, as well as with the four countywide forums and the Regional Project Evaluation Committee (RPEC). Projects recommended to receive the supplemental funding were approved by the Executive Board in April 2021.

At the same time this work was underway, the process to ensure the region’s annual delivery target for FHWA funds was also in process. As a reminder, regions must meet their delivery target for that year’s FHWA funds or risk losing the unused portion of funds to other parts of the state. PSRC’s adopted policies direct the use of the five prioritized strategies listed below that would be implemented when there are not enough projects able to deliver in a given year and additional measures need to be taken in order to meet the required annual delivery target. This may happen due to projects being delayed and/or returning funds for a variety of reasons.

Strategies 1 and 2 work with projects that have already been awarded PSRC funds and can help the region meet the target with no overall increase to funding. When these strategies are exhausted, Strategies 3 through 5 would be implemented as necessary, to award new funds to immediately ready to go projects.

1. Advance projects from later years. 2. Exchange federal funds for local funds between phases or stages of a single project, or between projects within the same agency. 3. Fund immediately ready to go projects from the current adopted contingency lists. 4. Increase the federal share of awarded projects. 5. Solicit new immediately ready to go projects.

PSRC has been working closely with sponsors of every project with current PSRC FHWA funds, as well as projects on the adopted contingency lists, for the past several months in order to ensure the 2021 delivery target will be met. As of April, the work under Strategy 1 was completed, work under Strategies 2 and 4 was in process, and the board approved a supplemental funding action under Strategy 3 for immediately ready to go projects on the prioritized contingency lists. Details of the work underway related to Strategies 2 and 4 were to be brought back to the board in May.

Attachment 1 contains the final list of projects recommended to receive supplemental FHWA funding that will assist the region in meeting the 2021 annual delivery target. These projects had been awarded PSRC funds previously but can accept an increase in the amount awarded. Per the adopted procedures under Strategy 4, the amounts recommended are based on a proportional distribution of the remaining amount of funds needed to achieve the delivery target. Also shown for informational purposes are the projects able to exchange federal and local funds under Strategy 2 above.

For additional information, please contact Kelly McGourty at [email protected] or (206) 971-3601.

Doc ID 3111 Packet Pg. 41 7.a

Attachments: 1 - Increased Federal Share

Doc ID 3111 Packet Pg. 42 7.a.a

ATTACHMENT 1: INCREASED FEDERAL SHARE Original Awarded Current Sponsor ProjectTitle Phase Amount Federal Share Increase Arlington Smokey Point Blvd Overlay Construction $717,920 79.8% $60,078 Sportsman Club & New Brooklyn Road Bainbridge Island Intersection Improvements Construction $400,000 72.2% $79,210 Bellevue Bel-Red Preservation Construction $1,500,000 61.6% $750,000 Bonney Lake Fennel Creek Trail - Segment 2 Construction $1,079,825 16.1% $539,913 Bremerton 6th Street Preservation Phase 2 Construction $770,715 53.0% $385,358 Preliminary Engineering Dupont Center Drive Overlay Phase 6 / Design $72,802 85.0% $1,284 76th Ave. W Overlay from 196th St. SW / Preliminary Engineering Edmonds SR-524 to Olympic View Dr. / Design $105,000 31.8% $52,500 Fife 20th Street Preservation Construction $750,000 44.4% $375,000 SW 356th Street (15th Ave SW to 4th PL Federal Way SW) Preservation Construction $751,000 58.5% $225,300 S 212th Preservation Grant (East Valley Kent Highway - 72nd Ave S) Construction $1,400,000 54.7% $700,000 Preliminary Engineering Kitsap Transit SR 104 and Bond Rd. Park & Ride / Design $376,000 65.0% $124,000 Kitsap County SR 104 Realignment Right of Way $1,400,000 85.9% $9,950 South Tacoma Way - 88th to North City Preliminary Engineering Lakewood Limits / Design $375,000 83.3% $14,250 Preliminary Engineering Mukilteo Harbour Reach Drive Improvements / Design $67,760 62.5% $25,997 Mukilteo Harbour Reach Drive Improvements Construction $632,240 62.5% $242,803 Poulsbo Poulsbo Complete Streets Plan PlanningN $215,000 86.0% $1,250 Preliminary Engineering Redmond 90th Street Preservation / Design $300,000 51.2% $146,600 Seattle 15th Ave S Preservation Construction $1,400,000 40.0% $700,000 Snohomish County Rural Roads Snohomish CountyPreservation Construction $782,000 84.9% $14,579 Preliminary Engineering Tacoma I Street Overlay / Design $98,000 74.8% $15,315 Portland Avenue Freight and Access Preliminary Engineering Tacoma Improvements / Design $370,430 85.0% $6,537 Puyallup Ave Transit/Complete Street Preliminary Engineering Tacoma Improvements / Design $2,100,000 84.0% $62,500 WSDOT SR 167/I-5 to SR 509 - Stage 1B Construction $4,000,000 1.0% $2,000,000 TOTAL: $6,532,423 The following projecs are exchanging federal and local funds, per Strategy 2: Sponsor Project Title Phase Federal before Local before TOTAL before Federal after Local after TOTAL after Bellevue 148th Avenue SE Pavement Preservation Construction $1,400,000 $1,779,300 $3,179,300 $0 $3,179,300 $3,179,300 Mountains to Sound Greenway Trail (C), Bellevue 132nd Ave. SE to 150th Ave. SE Construction $4,760,000 $5,470,000 $10,230,000 $6,160,000 $4,070,000 $10,230,000 Attachment: 1 - Increased Federal Share (3111 : 2021 Delivery: Final Supplemental Funding Actions)

Packet Pg. 43 8.a

DISCUSSION ITEM May 20, 2021

To: Executive Board

From: Josh Brown, Executive Director

Subject: Regional Aviation Baseline Study Completed

IN BRIEF

In early 2019, PSRC launched a Regional Aviation Baseline Study to build on the master planning work underway at many of the region’s airports, consider future regional aviation needs and concerns, and to set the stage for future aviation planning. At the May Executive Board meeting, staff will review key findings from the final report, brief the board on the availability of supporting data and documents, and identify next steps.

DISCUSSION

PSRC has completed work on the Regional Aviation Baseline Study. The final report and supporting materials for this project are being released in May. The Regional Aviation Baseline Study provides a foundation for regional decision makers as they consider if the region should accommodate the growing demand for aviation, and how to do so. The study was designed to provide an understanding of the regional aviation system and forecast future needs. The desired outcomes of the study were to:

• Identify the roles of each airport and the aviation activities within the region • Provide a regional perspective on how aviation activities in the study area interact with each other, the community, and the broader economy • Obtain input from stakeholders about their needs and build a common understanding about aviation and airspace constraints • Identify future aviation needs within the central Puget Sound region and set the stage for future planning Aviation plays a critical role for people and businesses in the growing central Puget Sound region, which is currently home to 29 airports of varied sizes and functions.

Doc ID 3126 Packet Pg. 44 8.a

Continued, coordinated planning is essential for ensuring that the regional airport system can support existing and future demand. As part of these efforts, PSRC launched the Regional Aviation Baseline Study, funded by a $1.6 million grant from the Federal Aviation Administration (FAA).

In a separate effort, in 2019 the Washington State Legislature created the Commercial Aviation Coordinating Commission (CACC), which was tasked with recommending a new primary commercial aviation facility and additional ways to add capacity to accommodate future demand at other facilities.

As the Regional Aviation Baseline study has been underway, staff and consultants have shared key findings with PSRC’s Executive Board and the public, including market trends, regional forecasts, airspace flow analysis, landside and airside capacity needs, scenarios for addressing increased demand, and a summary of stakeholder engagement efforts. The study and its findings have been provided to the Commercial Aviation Coordinating Commission (CACC) and will be transmitted to the Governor, State Legislature, PSRC members, and the general public.

For more information, please contact Ben Bakkenta at [email protected] or (206) 971-3286 or Jason Thibedeau at [email protected] or (206) 389-2879.

Doc ID 3126 Packet Pg. 45 9.a

DISCUSSION ITEM May 20, 2021

To: Executive Board

From: Josh Brown, Executive Director

Subject: Briefing on Regional Housing Strategy

IN BRIEF

Housing access and affordability are key policy areas in VISION 2050, the region’s long-range plan for growth. VISION 2050 calls for the region to better assess and address housing needs through a coordinated regional housing strategy and a regional housing needs assessment. Executive Board members will be briefed on work to date and next steps in the development of the Regional Housing Strategy. No action is required at this time. The housing strategy will return to the Executive Board later this year for review and action.

DISCUSSION

Background Housing was identified as a critical regional issue in VISION 2050, which includes a new housing action (H-Action-1) that directs PSRC to develop a regional housing strategy, including a regional housing needs assessment. The regional housing strategy is intended to serve as a “playbook” of regional and local actions to move towards the region’s goal to preserve, improve, and expand its housing stock to provide a range of affordable, accessible, healthy, and safe housing choices to every resident and to promote fair and equal access to housing for all people.

Based on board and committee review and direction set in H-Action-1, the Growth Management Policy Board developed a project work plan that identifies general direction for the project, issues to address, roles and responsibilities, and timeline. A Housing 101 presentation provides a glossary of common terms and background about housing issues.

Doc ID 3121 Packet Pg. 46 9.a

Regional Housing Needs Assessment PSRC completed a draft Regional Housing Needs Assessment (RHNA) to analyze conditions, trends, and gaps in the region’s housing stock and to demonstrate how local and subregional housing need and supply fit into the regional picture. The findings of the needs assessment will inform the forthcoming strategy. The RHNA Executive Summary and draft full report are now available.

In addition to the quantitative data analysis included in the needs assessment, PSRC is holding a series of focus groups to engage residents dealing with the day to day impacts of rising housing costs and disparities in access to housing that were created and have been perpetuated by systemic racism. Feedback from the focus groups is incorporated into the Regional Housing Needs Assessment and is helping to inform the development of the draft strategy.

Regional Housing Strategy Goals and Actions Using the data analysis of the needs assessment, output from the discussions with residents and stakeholders, and the policy direction in VISION 2050, the Growth Management Policy Board is working to identify, categorize, and prioritize housing strategies. The potential goals and strategies for the Regional Housing Strategy have been organized into the following three broad categories: Supply, Stability and Subsidy. The Growth Management Policy Board is in the middle of assessing the opportunities in each of these categories and working to identify strategies that have the greatest potential to address housing needs at a regional level, at the scale needed, and that support the housing goals of VISION 2050. These goals and strategies will continue to evolve as the board completes its work.

Supply: Build more housing of different types • Allow for more housing choices in neighborhoods near transit to provide greater access for more people • Reduce the costs to build housing corresponding with regulations and fees • Allow and/or incentivize more housing types, specifically middle density housing, to provide greater housing choice for people at all stages of life

Stability: Provide opportunities for residents to live in housing that meets their needs • Strengthen tenant protections to provide opportunities for residents to continue to live in their communities • Leverage growth near transit to incentivize and/or require the creation and preservation of long-term affordable housing

Doc ID 3121 Packet Pg. 47 9.a

Subsidy: Create and sustain long-term funding sources to create and preserve housing for very low-income households and unhoused residents • Identify public, private, and philanthropic funding to finance the acquisition and construction of affordable housing • Develop local funding options and coordinate to leverage funds at the regional and subregional level to better support housing options for the region’s most vulnerable residents

Tailoring a Regional Strategy to Different Types of Places The Regional Housing Strategy is an opportunity to provide both overarching regional approaches to increase consistency and collaboration in housing work and also local and individual actions to best fit communities. These high-level goals will include a range of actions tailored to different types of places. The housing strategy will seek to provide a common regional approach while tailoring recommendations to specific types of locations based on their needs and opportunities.

NEXT STEPS

The Growth Management Policy Board is continuing to develop draft goals and strategies for the Regional Housing Strategy over of the next couple of months and is working towards the potential to release a draft for public comment this summer. Work to refine the draft in response to comments will continue this fall and the Executive Board will continue to be briefed as the housing strategy develops.

PSRC is currently fielding a short online survey to gather more input from residents prior to more focused engagement efforts during the public comment period this summer.

For more information, contact Laura Benjamin at 206-464-7134 or [email protected], or Paul Inghram at 206-464-7549 or [email protected].

Doc ID 3121 Packet Pg. 48 10.a

INFORMATION ITEM May 20, 2021

To: Executive Board

From: Josh Brown, Executive Director

Subject: New Employees Status Report

PSRC has two new employees. Due to the virtual meeting format and time constraints of the meeting, information on the new employees has been included in the memo.

Administrative Services: Melissa Taylor – Senior Accountant

• Senior Accountant in Administrative Services Department. • Melissa has a Bachelor of Science degree in Accounting from Central Washington University. • Prior to joining PSRC, Melissa was a Senior Accountant at Premier Senior Living which is based out of New York.

Communications: Tsukuru Anderson – Digital Graphic Designer

• Digital Graphic Designer in Communications Department. • Tsukuru has a degree in Graphic Design from Tama Art University in Tokyo, Japan. • Prior to joining PSRC, Tsukuru was a Senior Graphic Designer at Pacific Science Center.

For more information, please contact Thu Le at 206-464-6175 or [email protected].

Doc ID 3123 Packet Pg. 49