ENVIRONMENT MANAGEMENT PLAN
UDIYAKHEDI SAND DEPOSIT QUARRY VILLAGE- UDIYAKHEDI, TEHSIL- JAORA, DIST.- RATLAM LEASE AREA – 8.00 HA. KHASRA NO. 274,275
PROPONENT SHRI EHSAN KHAN S/O SHRI SATTAR KHAN RESI. VILL. DODIYANA, TH. JAORA, DISTT. RATLAM, MADHYA PRADESH
PREPARED BY OMPRAKASH YADAV REGD. NO. RQP/DGMMP/007/2013
RESI. RAMKRIPA NIWAS, KAMLA COMPOUND, MEGHNAGAR (M.P.)
UDIYAKHEDI SAND DEPOSIT QUARRY
INTRODUCTION IDENTIFICATION OF PROJECT AND PROJECT APPLICANTS:-
The project Udiyakhedi Sand Mine situated at Khasra no. 274,275 in Village – Udiyakhedi, Tehsil – Jaora, District - Ratlam. This site is 25.00 km away from District- Ratlam. The Area is ratified by authorized agency for excavation of sand has known minable sand reserve. Applicant Shri Ehsan Khan S/o Shri Sattar Khan, Resi. Vill. Dodiyana, TH. Jaora, Distt. Ratlam, Madhya Pradesh has been granted mine ‘on auction’ of river sand for 5 years in 2016. The total qualified area is 8.00 hectare. The proposed production is 1600 CUM / annum.
The environment management plan has been prepared for the open cast mining operation of river sand with capacity of 1600 m3 per year. The EMP includes formulation, implementation and monitoring of environmental protection measures during operation of the project. The EMP lists all these measures for the mining activities. The EMP is prepared keeping in view all possible strategies oriented towards impact minimization.
PROJECT DESCRIPTION:-
I. TYPES OF PROJECT: - Mining (River Sand)
II. LOCATION OF THE PROJECT
S.NO. Particular 1 Name of Applicant Shri Ehsan Khan S/o Shri Sattar Khan 2 Address Resi. Vill. Udiyakhedi, Tehsil Jaora, Distt. Ratlam (Madhya Pradesh)
3 District Ratlam 4 Tehsil Jaora 5 Vilage Udiyakhedi 6 Khasra No 274,275 7 Area 8.00 Hect.
UDIYAKHEDI SAND DEPOSIT QUARRY
Shown on the Surface and on the Surface Co-ordinates of boundary Geological Plan, as Follows: pillars: Pillar No. A : N-23° 31’ 47.05” , E-75° 11’ 14.45”
Udiyakhedi Sand auction query is situated in Jaora Tahsil of Ratlam District, Madhya Pradesh. The climate is tropical with well marked summer, winter and rainy season. The sand available in the lease area shall be mined (raised) by manual method of mining
Khasra no. 274,275
Village Udiyakhedi
Tehsil Jaora
District / State Ratlam/ Madhya Pradesh
Nearest Railway / Road Namli station – 15.00 km
Land area & Land use Total area – 8.00 hectare is revenue waste
land (Non agriculture)
UDIYAKHEDI SAND DEPOSIT QUARRY
Objectives:-
To anticipate the impact of proposed mining operation on the environment. To prepare an action plan for implementation of ameliorative measures. To suggest preventive and ameliorative measures to minimize calamities and maximize beneficial impacts. To suggest post operational monitoring programmes for ameliorative measures to ensure environment quality. To suggest formation of a core group responsible for implementation of protective measures. To prepare capital cost estimate and annual recurring cost for Environmental Management Plan.
Ameliorative measures at the source level and overall management plan are proposed for environment conservation. The environmental attributes, which are likely to be affected, are land use, topography, water resources, soil, air quality, socio-economic status, ecology and public health.
Influence on ecosystem
The potential sources of ecosystem unbalance arising from the existing is observed from excavation of mineral, waste dumps, haul roads and transportation of mineral in the vicinity. However ameliorative measures indicates for desirability that air quality should be monitored on a regular basis.
The environmental control measures have been proposed to control dust release during river sand excavation. During the mining of river sand following measures has been taken to mitigate the effect of river sand mining operation over ecosystem. Frequent Water spraying on the haulage roads, services road & dump area. Dust masks have been provided to workers. Regular maintenance of vehicles and machines have been carried out to control emissions All above measures is expected to be continue in future
CO & NO2 levels The concentration of CO was less than 1.00ppm and can be controlled by proper
maintenance and servicing of vehicles. NO2 concentration can be controlled by proper maintenance and servicing of vehicles.
UDIYAKHEDI SAND DEPOSIT QUARRY
Noise level monitoring Noise level monitoring carried out in and around the existing quarry shows that expected noise levels are well within the stipulated limits of CPCB. The following control measures are being adopted to keep the ambient noise levels well below the limits: Trees shall be planted on both sides of roads used for transport of men and material; Silencers have been provided to modulate the noise generated by machines. Installation of noise generating machinery, strictly in compliance with the recommendations of the manufacturers. This would ensure an installation free from vibration and exhaust leaks which are also major contributors to increased noise levels Use of damping materials such as thin rubber sheet for wrapping the worn places of compressors, generators etc. Acoustic treatment for rotating equipments. The workforce at the mining face (where high noise level is expected) have been provided with protective device for safety. Compulsory use of personnel protective equipment (PPE) such as ear plugs for the workers.
Hydrosphere analysis of the area The main drainage of the area is through river. The water table in the quarry area varies from 10 to 15 ft whereas mining will be done up to avg. 5.00 ft. above the surface level thus ground water table will not be touched during working period. Rainwater may get accumulated in the working pit which will be pumped out at village pond. It is ensured that silt content in the mines discharged is minimum and the quality of drinking water for the worker is hygienic.
Safety measures for flora and fauna The flora and fauna categories will not be affected due to proposed activity as there is no loss to both or any. The impact on these due to dust generation is minimized by well- developed green belt in and around mining lease area. The plantation matrix should be adopted for the green belt development includes pits of 0.3m x 0.3m x 0.3 m size with the spacing of 2.0 m x 2.0m.
Required plantation plan to minimize pollution The selection of plant species depends on various factors such as climate, elevation and soil. Area falls under tropical region and thus local species should be selected.As far as
UDIYAKHEDI SAND DEPOSIT QUARRY possible, the species should be indigenous and locally available Soil improving plants (Nitrogen fixing, rapidly decomposable leaf litter). Plantation statistics
Year PROPOSED SITE SPECIES No. OF SAPLING
1st Year Along with boundary Local 100
2nd Year Along with boundary Local 100
3rd Year Along with boundary Local 100
4th Year Along with boundary Local 100
5th Year Along with boundary Local 100
Health and Safety measures:-
Safety measures to avoid adverse affects on the health of workers due to dust & noise includes: Provision of shelters for mine workers with amenities like drinking water, fans, toilets etc. Provision of personal protection devices to the workers; First-aid facilities in the mining area. periodic health check up to ensure effective implementation of policy.
Safety accessories provided:- Ear plugs. Safety helmets Gloves (PVC, asbestos, special rubber make) Rubber sole shoes and gum boots Safety shoes with toe protection Safety belt with life line (leather, hard rubber or neoprene)
Socio economic Measures Socio-economic was been conducted in 4 to 5 villages of the study area out of villages. The selected villages under its CSR plan identifies the needs of the surrounding villages and
UDIYAKHEDI SAND DEPOSIT QUARRY has developed a social management plan to benefit the surrounding areas. Thus the surrounding villages have been benefited from the mining activity. Local employed generated approximate 20 numbers as per the qualification and skill unskilled. Has already carried out number of welfare activities in the area like: Proposed CSR activate
Samuhik Kanya Vivah Deeping of local pond Free Medical Camp (Eye & Dental check-up) Contribute to Local Area Development Fund Free drinking water supply facility to nearby village by Tanker
Environment management.
A. ENVIRONMENTAL MONITORING BUDGET S.NO PARTICTULARS NO. OF PROPOSED FREQU BUDGETARY PR STATION NECY OVISIONS (Per Anum)
1 AAQM PM10 & PM2.5, SOx, 2 20,000 NOx, as per CPCB Norms 2 Water Quality IS 17025 -10500 2 10,000 Monitoring 3 Noise Level As per CPCB Norms 2 10,000 Monitoring TOTAL 40,000
B. MAINTENANCE & POLLUTION MITIGATION PROGRAM S.NO PARTICULARS COST ANALYSIS BUDGETARY . PROVISIONS (Per Anum) 1 Dust Suppression Water tanker cost & 1,75,000/- Maintenance Tanker- 30,000 per month Driver – 5000 per month Total – 35000 x 5 = 1,75,000/- 2 Road cost maintenance 1750 meter x 10 meter = 87,500/- 17500 square meter x Rs. 5.0 /- 3 Afforstation/Plantation Rs. 500 per plant X 500 2,50,000 Plants TOTAL 5,12,500/-
UDIYAKHEDI SAND DEPOSIT QUARRY
C.BUDGET FOR CSR ACTIVITIES S.No. DESCRIPTION COST TO BE INCURRED (PER YEAR) 1 Funds for Digital literacy / computer education , 60,000 Arrangements of Computer Systems and instructors for Govt. & Pvt. Schools 2 Solar Light Village side road & Mines office 30,000 3 Water Purifier Systems for Schools & Gram 30,000 panchayat office TOTAL 1,20,000
D.FACILITIES FOR MINE WORKER’S S.No. DESCRIPTION COST TO BE INCURRED (PER YEAR) 1 Mobile Toilets 2 (@ 12,500 Rs) 25,000 2 Shelter rooms 15,000 3 Funds for mine labour’s child education 20,000 TOTAL 60,000
Signature Mr. OMPRAKASH YADAV REGN. NO. RQP/DGMMP/007/2013,
VALIDUP TO – 25-04-2018.
RESI. RAMKRAPA NIWAS, KAMLA COMPOUND, MEGHNAGAR,DIST. JHANUA (M.P.)