Emerald Coast Utilities Authority Capital Improvements Program
Total Page:16
File Type:pdf, Size:1020Kb
Emerald Coast Utilities Authority Capital Improvements Program Fiscal Years 2021 – 2025 Emerald Coast Utilities Authority Board of Directors Emerald Coast Utilities Authority Executive Director J.Bruce Woody, P.E. Deputy Executive Directors Engineering & Environmental Maintenance & Construction Donald Palmer Gerry Piscopo Shared Services Randy Rudd Department Directors Finance Customer Service Patricia Sheldon Gabe Brown Information Technology Water Production John M. Daane Tom Dawson Human Resources/Admin. Services Engineering Kimberly Scruggs Stacy Hayden Regional Services Water Reclamation Brian Reid Randy Sears Emerald Coast Utilities Authority 2021 Approved CIP Budget Department of Finance Staff Patricia L. Sheldon Director of Finance Justin Smith Assistant Director of Finance Ronda Branton-McCurley Confidential Assistant Sherry Rawleigh Accountant II TABLE OF CONTENTS INTRODUCTION Executive Director’s Letter ................................................................................................................... i‐iv Summary by System ............................................................................................................................... 1 Chart: Summary of All Funds 5‐Year Total ............................................................................................ 2 WATER & WASTEWATER PROGRAM SUMMARIES Summary by Program ............................................................................................................................. 3 Chart: Summary of 5 Year Requirements .............................................................................................. 4 Summary by Program Type .................................................................................................................... 5 PROJECT DATA SHEETS WATER PRODUCTION CIP ...................................................................................................................................... 6‐21 Renewal & Replacement ................................................................................................... 22‐41 WATER DISTRIBUTION CIP……….. ........................................................................................................................... 42‐54 Renewal & Replacement ................................................................................................... 55‐91 WATER RECLAMATION CIP .................................................................................................................................... 92‐98 Renewal & Replacement ................................................................................................. 99‐101 WASTEWATER COLLECTION CIP ................................................................................................................................ 102‐136 Renewal & Replacement ............................................................................................... 137‐182 UTILITY RELOCATIONS. CIP ................................................................................................................................ 183‐194 GENERAL PROJECTS CIP ................................................................................................................................ 195‐203 Renewal & Replacement ............................................................................................... 204‐208 SANITATION SYSTEM AND MATERIAL RECYCLING FACILITY Summary by type ............................................................................................................................... 209 Chart: Funding Requirements by Year .............................................................................................. 210 PROJECT DATA SHEETS SANITATION CIP ................................................................................................................................ 211‐214 Renewal & Replacement ............................................................................................... 215‐219 MATERIAL RECYCLING CIP ................................................................................................................................. 220‐222 Renewal & Replacement ............................................................................................... 223‐224 Introduction P.O. Box 17089 9255 Sturdevant Street Pensacola, Florida 32522-7089 ph: 850 476-5110 • fax: 850 494-7346 October 1, 2020 Dear Chairman and Board Members: I am pleased to deliver herewith, the approved Emerald Coast Utilities Authority Capital Improvements Program. This five-year program includes fiscal years 2021 through 2025. Input during the process of formulating this plan came from the Board, the Citizens' Advisory Committee, members of the public, and the ECUA staff. After holding numerous meetings, the staff developed a plan that clearly expresses the capital needs of the ECUA through FY 2025. The FY 2021 CIP budget provides a programmed approach targeting system repairs along with the Sanitary Sewer Overflow/Inflow & Infiltration (SS0/1&1) Consent Order requirements. The staff has continued making a concerted effort to be frugal with expenditures, which helps to keep annual rate increases as small as possible. Almost fifty percent of the CIP budget in the Water/Wastewater System for FY 2021 is comprised of projects addressing the SS0/1&1 Program ($148 million) in response to the FDEP Consent Order (CO), which the ECUA Board approved in May 2012. This will be the ninth year of a 16-year program that we have established to make repairs to the system as required in the CO. With "shovel-ready" projects addressing the CO requirements, it is imperative for the ECUA to initiate construction on the affected lines and systems both methodically and aggressively. Additionally, this plan allows for new infrastructure in the system as well. Shown below is a combined summary, by fund, of the Water & Wastewater System, the Sanitation System, and the Materials Recycling Facility. COMBINED SUMMARY BY SYSTEM FY 2021-2025 In OOO's FY FY FY FY FY FUND SYSTEM 2021 2022 2023 2024 2025 TOTAL Water & Wastewater Systems Programs $31,000 $90,064 $64,159 $46,528 $76,102 $307,853 Sanitation System Programs 2,262 4,750 7,550 4,700 4,700 23,962 Materials Recycling Facility Programs 400 100 100 100 100 800 TOTAL $33,662 $94,914 $71,809 $51,328 $80,902 $332,615 Vicki Campbell Lois Benson Dr. Cedric Alexander Dale Perkins Larry Walker District One District Two District Three District Four District Five Capital Improvements Program FY 2021- FY 2025 October 1, 2020 Page 2 Water/Wastewater Systems Total new capital improvement requirements for the Water & Wastewater Systems through FY 2025 are estimated at $308 million. Funding in FY 2021 is scheduled to come from existing balances, operating revenues, and the Capital Improvement Fee. There are no plans for new debt issuance for FY 2021. However, the major portions of some projects may need funding in later years from additional debt, which will require annual rate increases at the time of issuance. WATER & WASTEWATER SYSTEM FY 2021-2025 FUNDS {000) FY FY FY FY FY FUND 2021 2022 2023 2024 2025 TOTAL Water Production $4,660 $24,815 $6,310 $3,900 $3,900 $43,585 Water Distribution 6,950 18,365 18,900 12,955 12,585 69,755 Water Reclamation 100 4,975 4,775 1,000 11,000 21,850 Wastewater Collection 15,380 35,865 29,725 23,075 44,405 148,450 Utility Relocations 890 2,140 1,690 2,690 1,190 8,600 General Projects 3,020 3,904 2,759 2,908 3,022 15,613 Total all programs $31,000 $90,064 $64,159 $46,528 $76,102 $307,853 Sanitation System and Materials Recycling Total new capital improvement requirements for the Sanitation Systems through FY 2025 are estimated at $24 million and includes funds for new equipment to serve additional customers, funds to replace a portion of our fleet, funds to develop plans for and construct a new transfer station, and funds to provide equipment replacement for the composting activity. Funding in FY 2021 is scheduled to come from the newly authorized capital funding fee, existing balances, and operating revenues. ECUA contracts with the Santa Rosa Board of County Commissioners to provide solid waste collection to certain areas of Santa Rosa County. We have also contracted with the Town of Jay in Santa Rosa County. Both of these contracts expire December 31, 2020 and will not be renewed. Personnel and equipment currently being used in those service areas will return to service in the Escambia service area. Currently, between both Escambia and Santa Rosa County, the ECUA provides residential garbage collection to approximately 115,000 customers. Since 1992, the ECUA has been the exclusive provider of dumpster service on Pensacola Beach. ii Capital Improvements Program FY 2021- FY 2025 October 1, 2020 Page 3 The commercial operation on the mainland includes automated can and roll-off container services. The composting activity grinds the collected yard waste into mulch, mixes it with bio-solids, and then further processes it into high quality compost. The composting activity keeps yard waste out of the landfill, thereby reducing the cost of tipping fees while the sale of the compost material generates a modest source of revenue. Capital requirements for the MRF include storage modifications and annual MRF equipment upgrades at the facility. The storage modifications are necessary to house replacement parts and other equipment needed for timely repair of the equipment. SANITATION SYSTEM FY 2021 - 2025 In OOO's FY FY FY FY FY