Pradhan Mantri Gram Sadak Yojana

Road List for attachment with Sanction Letter - District Wise Abstract

State : Sanction Year : 2016-2017 Batch : 2 Collaboration : Regular PMGSY

Sr.No. District No of Road Length MoRD Cost State Cost (Rs Total Cost Maint. Cost Habs (1000+, 500+, 250+, <250, Total) Works (Kms) / Bridge (Rs Lacs) Lacs) (Rs Lacs) (Rs Lacs) Length (Mtrs) 1 2 3 4 5 6 7 8 9

Road Proposals

1 38 117.129 3,535.93 2,357.30 5,893.23 561.59 (4 , 13 , 28 , 2 , 47)

2 Chatra 28 78.025 2,489.27 1,659.52 4,148.79 363.80 (1 , 8 , 31 , 14 , 54)

3 Deoghar 8 21.684 595.24 397.44 992.68 100.05 (2 , 11 , 7 , 1 , 21)

4 Dumka 42 82.263 2,554.82 1,703.25 4,258.07 330.18 (0 , 15 , 30 , 0 , 45)

5 East Singhbhum 38 126.941 3,747.42 2,498.31 6,245.73 545.31 (5 , 18 , 32 , 14 , 69)

6 Garhwa 18 95.772 2,436.41 1,624.26 4,060.67 765.80 (13 , 19 , 17 , 3 , 52)

7 Giridih 95 261.974 8,013.00 5,342.02 13,355.02 1,216.91 (13 , 28 , 96 , 47 , 184)

8 Godda 26 56.436 1,641.89 1,094.61 2,736.50 222.67 (17 , 14 , 11 , 5 , 47)

9 Gumla 8 22.124 647.77 431.84 1,079.61 77.77 (0 , 6 , 10 , 4 , 20)

10 Hazaribagh 55 154.974 4,281.81 2,856.52 7,138.33 604.73 (7 , 6 , 43 , 7 , 63)

11 Jamtara 12 35.047 1,044.61 696.43 1,741.04 187.50 (7 , 11 , 12 , 8 , 38)

12 Khunti 28 75.009 2,391.12 1,594.11 3,985.23 409.29 (2 , 3 , 27 , 1 , 33)

13 Koderma 2 17.600 526.37 350.91 877.28 81.89 (2 , 1 , 1 , 0 , 4)

14 Lohardaga 3 25.100 741.91 494.60 1,236.51 85.22 (2 , 1 , 1 , 0 , 4)

15 Pakur 17 83.320 2,328.35 1,554.35 3,882.70 387.24 (19 , 22 , 23 , 15 , 79)

16 Palamau 7 14.850 380.71 253.79 634.50 39.07 (2 , 4 , 4 , 0 , 10)

17 Ramgarh 19 38.350 1,188.23 792.15 1,980.38 188.96 (3 , 2 , 15 , 8 , 28)

18 Ranchi 58 157.543 4,716.44 3,144.28 7,860.72 687.78 (14 , 24 , 44 , 31 , 113)

19 Sahebganj 38 147.591 4,487.17 2,991.45 7,478.62 1,199.25 (23 , 25 , 14 , 3 , 65)

20 Saraikela Kharsawan 37 113.620 2,939.78 1,960.05 4,899.83 516.59 (8 , 24 , 26 , 5 , 63)

21 Simdega 3 17.635 467.37 311.58 778.95 76.69 (1 , 1 , 2 , 2 , 6)

22 West Singhbhum 57 268.325 8,495.91 5,663.99 14,159.90 1,071.66 (3 , 35 , 82 , 75 , 195)

Roads Total 637 2,011.312 59,651.52 39,772.77 99,424.29 9,719.94 (148 , 291 , 556 , 245 , 1240)

Long Span Bridge Proposals

1 East Singhbhum 2 102.680 214.82 143.21 358.03 6.47 -

2 Garhwa 20 647.390 528.43 1,040.48 1,568.91 55.39 -

3 Giridih 5 258.000 273.43 257.33 530.76 5.13 -

4 Godda 2 34.260 52.76 93.79 146.55 1.48 -

5 Khunti 4 102.500 114.56 203.65 318.21 31.82 -

6 Palamau 2 204.400 229.61 338.52 568.13 0.00 -

7 Ranchi 3 224.520 363.28 371.85 735.13 9.31 -

8 West Singhbhum 13 564.710 970.06 722.20 1,692.26 42.06 -

Bridges Total 51 2,138.460 2,746.95 3,171.04 5,917.99 151.66 -

Grand Total 688 Total Road 62,398.47 42,943.81 1,05,342.28 9,871.60 (148 , 291 , 556 , 245 , 1240) Length:2011.312 Kms Total LSB Length:2138.460 Mtrs

Page 1 of 1 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

State : Jharkhand Sanction Year : 2016-2017 Batch : 2 Collaboration : Regular PMGSY Note : All Costs are in Lakhs and Lengths are in Kms.

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Road Proposals

District- Bokaro

Block-

1 L070 L070-PWD Road to Brajgram New -- 2.200 3.750 Complete 1 56.85 37.90 94.75 9.82 (0 , 1 , 0 , 0 , 1) Bandookbera (VR70) Block Bermo Total 2.200 1 56.85 37.90 94.75 9.82 (0 , 1 , 0 , 0 , 1)

Block-

2 L090 L090-Sitanala main road to New Cold Mix 7.366 3.750 Complete 14 234.02 156.01 390.03 39.06 (0 , 0 , 3 , 0 , 3) Damodarpur (VR90) Technology 3 L093 L093-Simuliya main road to New Cement 2.300 3.750 Complete 2 68.28 45.52 113.80 10.60 (0 , 0 , 1 , 0 , 1) Luttutand (VR93) Stabilization 4 L101 L101-Bodma to Rukhatand New Cement 2.235 3.750 Complete 2 64.59 43.06 107.65 8.91 (0 , 0 , 1 , 0 , 1) (VR101) Stabilization 5 L078 L078-Lanka to Palashdabar New Cement 2.100 3.750 Complete 1 54.10 36.07 90.17 9.71 (0 , 0 , 1 , 0 , 1) (VR78) Stabilization Block Chandankiyari Total 14.001 19 420.99 280.66 701.65 68.29 (0 , 0 , 6 , 0 , 6)

Block-

6 L111 L111-REO road to Kasiradih New Cold Mix 1.633 3.750 Complete 7 58.72 39.14 97.86 9.36 (0 , 0 , 1 , 0 , 1) Adiwasi tola (VR111) Technology 7 L123 L123-NH32 to Sati Tola New -- 1.861 3.750 Complete 5 50.01 33.34 83.35 10.05 (0 , 0 , 1 , 0 , 1) (VR123) 8 L121 L121-Radhanagar more to New Cold Mix 1.739 3.750 Complete 7 49.20 32.80 82.00 9.54 (0 , 0 , 1 , 0 , 1) Bhouridih (VR121) Technology 9 L097 L097-REO Road to Sunta New Cold Mix 2.811 3.750 Complete 6 75.05 50.03 125.08 14.98 (0 , 2 , 0 , 0 , 2) (VR97) Technology

Page 1 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

10 L098 L098-REO Road to Tiyari New Cold Mix 1.022 3.750 Complete 2 32.50 21.67 54.17 5.49 (0 , 0 , 2 , 0 , 2) (VR98) Technology 11 L039 L039-Chas Chandankiyari Upgarde -- 1.500 3.750 Complete 2 44.87 29.92 74.79 7.99 (1 , 0 , 0 , 0 , 1) Road to Khemrrbindi 12 L069 L069-Nh32 to kendadih Road Upgarde Cold Mix 3.315 3.750 Complete 5 95.26 63.50 158.76 17.36 (1 , 0 , 0 , 0 , 1) Technology 13 L043 L043-REo Road Andhartolia Upgarde -- 1.940 3.750 Complete 4 57.82 38.54 96.36 10.60 (1 , 0 , 0 , 0 , 1)

14 L032 L032-talgaria Road to Upgarde Cold Mix 5.094 3.750 Complete 13 171.07 114.04 285.11 27.57 (0 , 0 , 1 , 0 , 1) Madhunia Road Technology 15 L041 L041-NH32 to bandhdih Upgarde Cold Mix 1.287 3.750 Complete 4 33.80 22.53 56.33 6.85 (0 , 1 , 0 , 0 , 1) Road Technology 16 L122 L122-NH32 to Kaduagora New -- 3.025 3.750 Complete 2 97.56 65.04 162.60 12.43 (0 , 1 , 2 , 0 , 3) (VR122) 17 L101 L101-Chotitand to New -- 2.930 3.750 Complete 5 91.24 60.83 152.07 13.16 (0 , 0 , 1 , 0 , 1) Chapatand (VR101) Block Chas Total 28.157 62 857.10 571.38 1,428.48 145.36 (3 , 4 , 9 , 0 , 16) Block-

18 L060 L060-Mahuawatarn to Palu New Roller 3.200 3.750 Complete 2 103.00 68.67 171.67 11.79 (0 , 0 , 1 , 0 , 1) (VR60) Compacted Concrete Pavement Block Gomia Total 3.200 2 103.00 68.67 171.67 11.79 (0 , 0 , 1 , 0 , 1)

Block- Jaridhi

19 L053 L053-Baru to Baluadih New -- 1.513 3.750 Complete 4 49.98 33.32 83.30 8.21 (0 , 1 , 0 , 0 , 1) (VR53) 20 L054 L054-Beldih more to New -- 1.108 3.750 Complete 3 35.72 23.81 59.53 5.83 (0 , 0 , 1 , 0 , 1) Prithwidh (VR54) 21 L044 L044-REO road Yogidih to New -- 2.889 3.750 Complete 8 96.77 64.52 161.29 15.53 (0 , 1 , 0 , 0 , 1) Saraybinda (VR44) Block Jaridhi Total 5.510 15 182.47 121.65 304.12 29.56 (0 , 2 , 1 , 0 , 3)

Page 2 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Kasmar

22 L049 L049-Peterwar khatri tola to New -- 2.850 3.750 Complete 5 81.79 54.52 136.31 14.73 (0 , 1 , 0 , 0 , 1) Baraikhurd (VR49) 23 L056 L056-REO road to Triyagazar New Cold Mix 4.621 3.750 Complete 6 138.00 92.02 230.02 24.05 (0 , 1 , 0 , 0 , 1) (VR56) Technology 24 L048 L048-Bagiyari to Telyadih New Cold Mix 2.157 3.750 Complete 5 71.99 48.00 119.99 11.70 (0 , 0 , 1 , 0 , 1) Technology 25 L053 L053-Sillisaram to Khuta New -- 1.162 3.750 Complete 3 34.34 22.90 57.24 6.22 (0 , 0 , 1 , 0 , 1) (VR53) 26 L045 L045-REO road to Sonhar New -- 2.400 3.750 Complete 4 80.28 53.52 133.80 9.73 (0 , 0 , 1 , 0 , 1) (VR45) 27 L044 L044-REO road Manjura to New -- 1.650 3.750 Complete 3 54.45 36.30 90.75 6.81 (0 , 0 , 1 , 0 , 1) Makthab tola Ansari tola (VR44) Block Kasmar Total 14.840 26 460.85 307.26 768.11 73.23 (0 , 2 , 4 , 0 , 6)

Block-

28 L078 L078-PWD Road Goniyato to New -- 2.100 3.750 Complete 1 68.74 45.83 114.57 7.76 (0 , 0 , 1 , 0 , 1) Kausi (VR78) 29 L068 L068-Narayanpur to New Roller 3.950 3.750 Complete 3 132.82 88.55 221.37 16.31 (0 , 0 , 1 , 0 , 1) Karukhunta (VR68) Compacted Concrete Pavement 30 L057 L057-Penk to Kothi New -- 7.300 3.750 Complete 9 214.10 142.74 356.84 33.23 (0 , 1 , 0 , 0 , 1)

31 L079 L079-PWD Road to New -- 6.780 3.750 Complete 5 202.08 134.72 336.80 32.03 (0 , 1 , 0 , 0 , 1) Rohiyabera (VR79) 32 L075 L075-Baridih to Gardih New -- 4.540 3.750 Complete 4 116.15 77.43 193.58 20.65 (0 , 0 , 1 , 0 , 1) (VR75)

Page 3 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

33 L058 L058-Penk Road to Nawadih New Roller 4.400 3.750 Complete 6 145.10 96.73 241.83 18.63 (0 , 0 , 1 , 0 , 1) Kala Compacted Concrete Pavement Block Nawadih Total 29.070 28 878.99 586.00 1,464.99 128.60 (0 , 2 , 4 , 0 , 6)

Block-

34 T03 T03-NH23 road to Chipudag Upgarde CELL Filled 7.932 3.750 Complete 18 217.01 144.67 361.68 42.74 (1 , 0 , 0 , 1 , 2) Concrete 35 L042 L042-Gaga road to Kodarma Upgarde -- 2.000 3.750 Complete 2 56.80 37.86 94.66 10.57 (0 , 1 , 0 , 0 , 1)

36 L058 L058-Petarwar Road to New -- 2.319 3.750 Complete 6 76.24 50.83 127.07 12.43 (0 , 0 , 2 , 1 , 3) Mahalijara via Kenduadih Gunia Patthar 37 L047 L047-Tenu PWD road to New -- 4.900 3.750 Complete 2 146.43 97.62 244.05 18.47 (0 , 1 , 0 , 0 , 1) Katahaltand (VR47) 38 L056 L056-Peterwar Kasmar road New Roller 3.000 3.750 Complete 0 79.20 52.80 132.00 10.74 (0 , 0 , 1 , 0 , 1) to Konar Bera Compacted Concrete Pavement Block Petarwar Total 20.151 28 575.68 383.78 959.46 94.95 (1 , 2 , 3 , 2 , 8)

District Bokaro Total 117.129 181 3,535.93 2,357.30 5,893.23 561.59 (4 , 13 , 28 , 2 , 47) District- Chatra

Block- Chatra Sadar

39 L049 L049-DHARAMPUR TO New -- 3.750 3.750 Complete 6 124.39 82.92 207.31 17.35 (0 , 0 , 3 , 0 , 3) TANUNIATANR (VR38) 40 L058 L058-UNTA TO AHURI (VR58) New -- 1.550 3.750 Complete 6 51.10 34.07 85.17 7.35 (0 , 0 , 1 , 0 , 1)

41 L054 L054-POLPOL TO NAWDIHA New CELL Filled 1.175 3.750 Complete 5 35.62 23.75 59.37 5.65 (0 , 0 , 1 , 0 , 1) (VR54) Concrete

Page 4 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

42 L056 L056-BEDAULI TO BIREKHAP New CELL Filled 1.300 3.750 Complete 5 42.72 28.48 71.20 6.12 (0 , 0 , 1 , 0 , 1) (VR56) Concrete 43 L023 L023-HOLAMGADA KHURD Upgarde -- 2.400 3.750 Complete 9 71.62 47.75 119.37 11.36 (1 , 0 , 0 , 1 , 2) TO ARRA 44 L062 L062-HAFUA TO New -- 2.250 3.750 Complete 2 67.23 44.82 112.05 10.52 (0 , 0 , 1 , 0 , 1) RAMGAWARA (VR62) Block Chatra Sadar Total 12.425 33 392.68 261.79 654.47 58.35 (1 , 0 , 7 , 1 , 9)

Block- Gidhor

45 L028 L028-LOHRI TO New -- 1.200 3.750 Complete 3 41.03 27.36 68.39 5.62 (0 , 0 , 1 , 3 , 4) SINDUARIKALA (VR28) 46 L024 L024-GIDHOR TO PAHARA Upgarde -- 2.000 3.750 Complete 4 59.80 39.87 99.67 9.23 (0 , 1 , 1 , 0 , 2)

Block Gidhor Total 3.200 7 100.83 67.23 168.06 14.85 (0 , 1 , 2 , 3 , 6)

Block- Hunter Ganj

47 L049 L049-FULWARIA TO KURID New -- 4.750 3.750 Complete 15 176.50 117.67 294.17 22.28 (0 , 0 , 3 , 3 , 6) (VR49) 48 L044 L044-BALURI TO New -- 3.000 3.750 Complete 9 95.60 63.73 159.33 14.01 (0 , 0 , 1 , 0 , 1) JAWADOHAR (VR44) Block Hunter Ganj Total 7.750 24 272.10 181.40 453.50 36.29 (0 , 0 , 4 , 3 , 7)

Block- Itkhori

49 L037 L037-PITIZ TO HURNALI New -- 2.300 3.750 Complete 9 76.00 50.67 126.67 10.86 (0 , 0 , 1 , 0 , 1) (VR37) Block Itkhori Total 2.300 9 76.00 50.67 126.67 10.86 (0 , 0 , 1 , 0 , 1)

Block- Kunda

50 L029 L029-8TH KM OF T02 TO New CELL Filled 1.800 3.750 Complete 4 49.85 33.23 83.08 8.48 (0 , 0 , 1 , 0 , 1) CHAYA (VR29) Concrete

Page 5 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

51 L030 L030-7TH KM OF T02 TO New -- 3.100 3.750 Complete 9 85.34 56.89 142.23 14.42 (0 , 0 , 1 , 0 , 1) BHURHA (VR30) Block Kunda Total 4.900 13 135.19 90.12 225.31 22.90 (0 , 0 , 2 , 0 , 2)

Block- Lawalong

52 L034 L034-LAWALONG TO HAHE New -- 4.400 3.750 Complete 12 141.85 94.56 236.41 20.43 (0 , 0 , 1 , 0 , 1) (VR34) Block Lawalong Total 4.400 12 141.85 94.56 236.41 20.43 (0 , 0 , 1 , 0 , 1)

Block- Pathal Gadda

53 L021 L021-BAGASADAM TO KUBA New -- 3.125 3.750 Complete 10 101.66 67.77 169.43 13.47 (0 , 1 , 0 , 0 , 1)

54 L024 L024-KHAIRA TO JEHRA New -- 2.225 3.750 Complete 6 77.28 51.52 128.80 10.38 (0 , 0 , 1 , 0 , 1) (VR24) 55 L026 L026-BARWAGHAT TO JORI New -- 4.100 3.750 Complete 10 136.11 90.74 226.85 19.07 (0 , 0 , 1 , 0 , 1) (VR26) Block Pathal Gadda Total 9.450 26 315.05 210.03 525.08 42.92 (0 , 1 , 2 , 0 , 3)

Block- Pratappur

56 L039 L039-RAJPUR TO BHAUNRAJ New -- 3.300 3.750 Complete 10 106.24 70.83 177.07 15.36 (0 , 1 , 1 , 0 , 2) (VR39) 57 L042 L042-HUMAJANG TO New -- 2.800 3.750 Complete 6 80.67 53.78 134.45 12.93 (0 , 0 , 1 , 1 , 2) BASBUTTA (VR42) 58 L047 L047-GAJWA TO DURGAHI New -- 4.100 3.750 Complete 11 120.56 80.38 200.94 19.04 (0 , 0 , 1 , 0 , 1) BISHUNPUR (VR47) 59 L046 L046-GHUJU TO GIDDHA New -- 6.500 3.750 Complete 23 230.60 153.73 384.33 30.50 (0 , 0 , 1 , 0 , 1) (VR46) 60 L033 L033-BAGHAKOLA MORE TO New -- 1.950 3.750 Complete 12 67.58 45.06 112.64 9.40 (0 , 0 , 1 , 0 , 1) BAGHAKOLA (VR33) 61 L044 L044-PRATAPPUR TO New -- 1.500 3.750 Complete 4 44.89 29.92 74.81 7.00 (0 , 0 , 1 , 0 , 1) KARUDIH (VR44)

Page 6 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

62 L022 L022-NARAYANPUR TO Upgarde -- 4.650 3.750 Complete 24 121.56 81.04 202.60 22.19 (0 , 5 , 2 , 1 , 8) CHMDRY Block Pratappur Total 24.800 90 772.10 514.74 1,286.84 116.42 (0 , 6 , 8 , 2 , 16) Block- Simaria

63 L050 L050-MAHUA MACHAN MORE New -- 1.400 3.750 Complete 1 40.27 26.85 67.12 6.38 (0 , 0 , 1 , 4 , 5) TO MAHUA MACHAN (VR50) 64 L042 L042-KADLE MORE TO KADLE New -- 1.550 3.750 Complete 5 49.28 32.85 82.13 7.27 (0 , 0 , 1 , 0 , 1) (VR42) Block Simaria Total 2.950 6 89.55 59.70 149.25 13.65 (0 , 0 , 2 , 4 , 6)

Block- Tandwa

65 L047 L047-KOED TO NAWDIHA New -- 2.650 3.750 Complete 4 85.38 56.92 142.30 12.23 (0 , 0 , 1 , 1 , 2) (VR47) 66 L046 L046-kOSHA TO UPKAPANI New -- 3.200 3.750 Complete 7 108.54 72.36 180.90 14.90 (0 , 0 , 1 , 0 , 1) (VR46) Block Tandwa Total 5.850 11 193.92 129.28 323.20 27.13 (0 , 0 , 2 , 1 , 3)

District Chatra Total 78.025 231 2,489.27 1,659.52 4,148.79 363.80 (1 , 8 , 31 , 14 , 54) District- Deoghar

Block- Deogarh Sadar

67 L052 L052-Siyatanr to Upgarde -- 4.300 3.750 Complete 7 132.17 88.12 220.29 19.64 (0 , 1 , 1 , 0 , 2) Kokaharajori 68 L035 L035-Patharghatta to Chakai Upgarde -- 2.195 3.750 Complete 3 60.64 40.42 101.06 12.53 (0 , 0 , 1 , 1 , 2) Road Block Deogarh Sadar Total 6.495 10 192.81 128.54 321.35 32.17 (0 , 1 , 2 , 1 , 4)

Page 7 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Karon

69 L046 L046-Salbhadara to Upgarde -- 3.025 3.750 Complete 0 72.38 48.26 120.64 17.35 (0 , 1 , 0 , 0 , 1) Greenjori Road Block Karon Total 3.025 0 72.38 48.26 120.64 17.35 (0 , 1 , 0 , 0 , 1)

Block- Mohanpur

70 L058 L058-Bichgarha to Ratanpur New -- 1.234 3.750 Complete 5 29.97 20.60 50.57 4.91 (0 , 1 , 3 , 0 , 4)

71 L050 L050-Rampur to Upgarde Cold Mix 3.500 3.750 Complete 4 103.55 69.03 172.58 14.95 (2 , 3 , 1 , 0 , 6) Mahatbandih Technology Block Mohanpur Total 4.734 9 133.52 89.63 223.15 19.86 (2 , 4 , 4 , 0 , 10) Block- Sarath

72 L026 L026-Chunardih to Upgarde -- 2.930 3.750 Complete 2 83.27 55.51 138.78 12.51 (0 , 2 , 1 , 0 , 3) Madhupur Sarath Rod 73 L037 L037-Ranabhand to Upgarde -- 2.400 3.750 Complete 3 65.15 43.43 108.58 8.53 (0 , 2 , 0 , 0 , 2) Ranibandh Road 74 L036 L036-Mishradih to Gagiadih Upgarde -- 2.100 3.750 Complete 2 48.11 32.07 80.18 9.63 (0 , 1 , 0 , 0 , 1) Road Block Sarath Total 7.430 7 196.53 131.01 327.54 30.67 (0 , 5 , 1 , 0 , 6)

District Deoghar Total 21.684 26 595.24 397.44 992.68 100.05 (2 , 11 , 7 , 1 , 21) District- Dumka

Block- Gopikander

75 L047 L047-Pakur Pakuria Road to New Roller 2.400 3.750 Complete 4 76.35 50.90 127.25 10.66 (0 , 1 , 0 , 0 , 1) Gumma Pahari (VR47) Compacted Concrete Pavement Block Gopikander Total 2.400 4 76.35 50.90 127.25 10.66 (0 , 1 , 0 , 0 , 1)

Page 8 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Jarmundi

76 L099 L099-Doulapur More to New Roller 1.050 3.750 Complete 2 35.69 23.80 59.49 3.78 (0 , 0 , 1 , 0 , 1) Doulatpur Compacted Concrete Pavement 77 L086 L086-Bedia More to Bedia New Roller 1.750 3.750 Complete 3 58.41 38.94 97.35 7.17 (0 , 0 , 1 , 0 , 1) (VR86) Compacted Concrete Pavement 78 L092 L092-Dhamanchipa More to New Roller 2.500 3.750 Complete 5 82.13 54.75 136.88 9.93 (0 , 1 , 0 , 0 , 1) Dhamanchipa (VR92) Compacted Concrete Pavement 79 L098 L098-Tilbaria More to New Roller 1.050 3.750 Complete 3 34.96 23.30 58.26 4.25 (0 , 0 , 1 , 0 , 1) Tilbaria (VR98) Compacted Concrete Pavement 80 L115 L115-Chandanpahari More New Roller 0.850 3.750 Complete 1 27.46 18.31 45.77 2.72 (0 , 0 , 1 , 0 , 1) to Chandanpahari (VR115) Compacted Concrete Pavement 81 L121 L121-Thori More to Thori New Roller 1.500 3.750 Complete 2 49.90 33.27 83.17 5.23 (0 , 0 , 1 , 0 , 1) (VR121) Compacted Concrete Pavement 82 L111 L111-Kushmaha More to New Roller 1.076 3.750 Complete 2 30.31 20.21 50.52 5.33 (0 , 0 , 1 , 0 , 1) Kushmaha (VR111) Compacted Concrete Pavement 83 L106 L106-Raghauwadih More to New Roller 2.000 3.750 Complete 2 66.60 44.40 111.00 7.34 (0 , 1 , 0 , 0 , 1) Raghuwadih (VR106) Compacted Concrete Pavement

Page 9 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

84 L101 L101-Haripur to Mohanpur New Roller 1.550 3.750 Complete 3 52.65 35.10 87.75 5.80 (0 , 0 , 1 , 0 , 1) (VR101) Compacted Concrete Pavement 85 L087 L087-Kanaiyapur More to New Roller 2.000 3.750 Complete 3 64.02 42.68 106.70 8.27 (0 , 1 , 0 , 0 , 1) Kanaiyapur (VR87) Compacted Concrete Pavement 86 L094 L094-Doulatpur More to New Roller 1.934 3.750 Complete 3 58.14 38.76 96.90 6.93 (0 , 0 , 1 , 0 , 1) Simra (VR94) Compacted Concrete Pavement 87 L042 L042-Jhanakpur to New Roller 1.500 3.750 Complete 3 46.81 31.21 78.02 6.61 (0 , 0 , 1 , 0 , 1) Baghmara Compacted Concrete Pavement 88 L112 L112-Bhulwa More to New Roller 1.400 3.750 Complete 5 45.98 30.65 76.63 7.24 (0 , 0 , 1 , 0 , 1) Bhulwa (VR112) Compacted Concrete Pavement 89 L104 L104-Chamarabahiar to New Roller 2.857 3.750 Complete 5 89.71 59.81 149.52 10.44 (0 , 1 , 0 , 0 , 1) Nawadih (VR104) Compacted Concrete Pavement 90 L084 L084-Kordiha More to New Roller 1.165 3.750 Complete 4 39.19 26.13 65.32 5.13 (0 , 0 , 1 , 0 , 1) Kordiha (VR84) Compacted Concrete Pavement 91 L095 L095-Megha More to Megha New Roller 1.749 3.750 Complete 4 53.71 35.81 89.52 6.88 (0 , 0 , 1 , 0 , 1) (VR95) Compacted Concrete Pavement 92 L109 L109-Dladali to Bansjora New Roller 2.520 3.750 Complete 7 82.46 54.98 137.44 12.83 (0 , 0 , 1 , 0 , 1) (VR109) Compacted Concrete Pavement

Page 10 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

93 L026 L026-Bishanpur More to New Roller 5.006 3.750 Complete 4 153.09 102.06 255.15 22.94 (0 , 0 , 4 , 0 , 4) jhunjhi Compacted Concrete Pavement Block Jarmundi Total 33.457 61 1,071.22 714.17 1,785.39 138.81 (0 , 4 , 17 , 0 , 21) Block- Kathikund

94 L046 L046-Bandaro To Pipra New Roller 2.700 3.750 Complete 5 90.41 60.27 150.68 7.37 (0 , 1 , 0 , 0 , 1) Compacted Concrete Pavement 95 L056 L056-L039-Lakhanpur to Upgarde Roller 2.150 3.750 Complete 3 61.47 40.98 102.45 6.89 (0 , 0 , 1 , 0 , 1) Paharpur (VR56) Compacted Concrete Pavement 96 L042 L042-Harla to Bhitra New Roller 1.650 3.750 Complete 3 55.01 36.68 91.69 6.89 (0 , 0 , 1 , 0 , 1) Compacted Concrete Pavement Block Kathikund Total 6.500 11 206.89 137.93 344.82 21.15 (0 , 1 , 2 , 0 , 3)

Block- Masalia

97 L064 L064-PWD Haruraidih to New Roller 1.059 3.750 Complete 3 34.93 23.29 58.22 4.81 (0 , 0 , 1 , 0 , 1) Anandpahari (VR64) Compacted Concrete Pavement 98 L063 L063-Beliajor More to New Roller 1.187 3.750 Complete 2 40.01 26.67 66.68 5.36 (0 , 1 , 0 , 0 , 1) Beliajor (VR63) Compacted Concrete Pavement Block Masalia Total 2.246 5 74.94 49.96 124.90 10.17 (0 , 1 , 1 , 0 , 2)

Page 11 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Ramgarh

99 L097 L097-Gamharia to Ghurdour Upgarde Roller 2.020 3.750 Complete 4 58.18 38.79 96.97 9.21 (0 , 0 , 1 , 0 , 1) (VR97) Compacted Concrete Pavement 100 L098 L098-Chotiranbahir to Upgarde Roller 2.100 3.750 Complete 4 62.54 41.69 104.23 8.94 (0 , 0 , 1 , 0 , 1) Pandua (VR98) Compacted Concrete Pavement 101 L096 L096-Patgora to Chitbesra New Roller 1.030 3.750 Complete 3 33.81 22.54 56.35 4.76 (0 , 1 , 0 , 0 , 1) (VR96) Compacted Concrete Pavement 102 L095 L095-Bouria to Lilatari New Roller 1.370 3.750 Complete 5 46.32 30.88 77.20 5.40 (0 , 0 , 1 , 0 , 1) (VR95) Compacted Concrete Pavement 103 L100 L100-Sanpdahar to Kendua New Roller 3.130 3.750 Complete 5 100.21 66.81 167.02 13.15 (0 , 0 , 1 , 0 , 1) (VR100) Compacted Concrete Pavement Block Ramgarh Total 9.650 21 301.06 200.71 501.77 41.46 (0 , 1 , 4 , 0 , 5)

Block- Raneshwar

104 L084 L084-REO Road 10th Km to Upgarde Roller 1.780 3.750 Complete 4 52.42 34.95 87.37 7.44 (0 , 1 , 0 , 0 , 1) Bora (VR84) Compacted Concrete Pavement 105 L082 L082-Ranabandh More to New Roller 2.460 3.750 Complete 4 69.60 46.40 116.00 12.00 (0 , 1 , 0 , 0 , 1) Ranabandh (VR82) Compacted Concrete Pavement

Page 12 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

106 L083 L083-Kituri to Haripur Upgarde Roller 1.250 3.750 Complete 3 37.27 24.85 62.12 3.93 (0 , 1 , 0 , 0 , 1) (VR83) Compacted Concrete Pavement 107 L087 L087-REO Road Dakshinjole New Roller 2.400 3.750 Complete 5 80.73 53.82 134.55 12.85 (0 , 0 , 1 , 0 , 1) to Pratappur (VR87) Compacted Concrete Pavement 108 L089 L089-Jivanpur Karikadar Upgarde Roller 1.475 3.750 Complete 4 41.87 27.92 69.79 6.18 (0 , 0 , 1 , 0 , 1) Road to Taradah (VR89) Compacted Concrete Pavement Block Raneshwar Total 9.365 20 281.89 187.94 469.83 42.40 (0 , 3 , 2 , 0 , 5)

Block- Shikaripara

109 L085 L085-PWD Road to Telgula Upgarde Roller 2.385 3.750 Complete 6 69.47 46.31 115.78 10.08 (0 , 0 , 1 , 0 , 1) (VR86) Compacted Concrete Pavement 110 L083 L083-Kushbona to Upgarde Roller 1.550 3.750 Complete 4 45.54 30.36 75.90 5.31 (0 , 0 , 1 , 0 , 1) Sunderpalan (VR83) Compacted Concrete Pavement 111 L091 L091-PWD Road to Upgarde Roller 1.540 3.750 Complete 3 44.67 29.78 74.45 5.03 (0 , 1 , 0 , 0 , 1) Kendpahari (VR91) Compacted Concrete Pavement 112 L087 L087-PWD Road to Siruadih Upgarde Roller 1.500 3.750 Complete 2 42.24 28.16 70.40 5.03 (0 , 1 , 0 , 0 , 1) (VR87) Compacted Concrete Pavement 113 L074 L074-Jamugaria to Upgarde Roller 2.160 3.750 Complete 4 62.82 41.88 104.70 7.48 (0 , 1 , 0 , 0 , 1) Jabardaha (VR74) Compacted Concrete Pavement

Page 13 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

114 L085 L085-PWD Road to Kesargarh Upgarde Roller 1.750 3.750 Complete 4 44.19 29.46 73.65 4.60 (0 , 0 , 1 , 0 , 1) (VR85) Compacted Concrete Pavement 115 L090 L090-PWD Road to Dhanbad New Roller 3.045 3.750 Complete 3 93.92 62.61 156.53 10.39 (0 , 0 , 1 , 0 , 1) (VR90) Compacted Concrete Pavement 116 L063 L063-PWD Road to Ranga Upgarde Roller 4.715 3.750 Complete 8 139.62 93.08 232.70 17.61 (0 , 1 , 0 , 0 , 1) Compacted Concrete Pavement Block Shikaripara Total 18.645 34 542.47 361.64 904.11 65.53 (0 , 4 , 4 , 0 , 8)

District Dumka Total 82.263 156 2,554.82 1,703.25 4,258.07 330.18 (0 , 15 , 30 , 0 , 45) District- East Singhbhum

Block- Bahragora

117 L094 L094-NH-06 Khandamouda New -- 2.000 3.750 Complete 3 70.24 46.82 117.06 8.93 (0 , 1 , 0 , 0 , 1) Gamharia Road to Kathulia (VR94) 118 L093 L093-NH06 Khandamoda New -- 1.500 3.750 Complete 4 46.06 30.71 76.77 7.48 (0 , 0 , 1 , 0 , 1) Gamhariya Road to Galaparashiya (VR93) 119 L092 L092-REO Road New -- 2.200 3.750 Complete 6 80.36 53.58 133.94 9.65 (0 , 0 , 1 , 0 , 1) Manushmuria to Paklo (VR92) 120 L059 L059-Bahragora Bamdol Upgarde Steel Slag 2.275 3.750 Complete 2 59.02 39.35 98.37 9.68 (0 , 1 , 0 , 1 , 2) Road to Mahuldangri 121 L063 L063-REO Road to Jambani Upgarde Steel Slag 3.170 3.750 Complete 3 95.00 63.34 158.34 13.84 (0 , 0 , 1 , 0 , 1)

Block Bahragora Total 11.145 18 350.68 233.80 584.48 49.58 (0 , 2 , 3 , 1 , 6)

Page 14 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Chakulia

122 L085 L085-T02 TO KALIDASHPUR New -- 2.600 3.750 Complete 9 88.55 59.04 147.59 11.01 (0 , 1 , 0 , 0 , 1) (VR85) 123 L043 L043-Chakulia Road to Upgarde -- 1.100 3.750 Complete 3 32.96 21.97 54.93 6.30 (0 , 0 , 1 , 1 , 2) Khakarisol 124 T01 T01-Chakulia Dalbhumgarh Upgarde -- 8.670 3.750 Complete 17 259.10 172.74 431.84 63.65 (0 , 0 , 1 , 1 , 2) Road to Pakuriasol 125 T05 T05-Chakulia Matihana Road Upgarde -- 5.950 3.750 Complete 8 160.33 106.89 267.22 20.76 (0 , 1 , 0 , 0 , 1) to Sardiha Block Chakulia Total 18.320 37 540.94 360.64 901.58 101.72 (0 , 2 , 2 , 2 , 6)

Block- Dhalbhumgarh

126 L066 L066-BHALKI TOLA TO New -- 8.100 3.750 Complete 19 306.06 204.04 510.10 27.83 (0 , 1 , 0 , 0 , 1) PATADI (VR66) 127 L068 L068-L050 to Kendbani New -- 1.100 3.750 Complete 4 39.31 26.21 65.52 6.34 (0 , 0 , 1 , 0 , 1) (VR68) Block Dhalbhumgarh Total 9.200 23 345.37 230.25 575.62 34.16 (0 , 1 , 1 , 0 , 2)

Block- Dumaria

128 L051 L051-T05 TO BANKISOL New -- 1.500 3.750 Complete 3 58.24 38.83 97.07 7.42 (1 , 0 , 0 , 0 , 1) (VR3) 129 L025 L025-REO Road to Koisa Upgarde CELL Filled 2.200 3.750 Complete 3 59.33 39.55 98.88 11.79 (0 , 0 , 1 , 0 , 1) Concrete
Steel Slag 130 T01 T01-Dumaria Main Road To Upgarde CELL Filled 7.600 3.750 Complete 13 210.07 140.05 350.12 26.01 (0 , 1 , 4 , 1 , 6) Kundaluka Concrete
Steel Slag 131 L036 L036-Dokaghuttu to Upgarde CELL Filled 1.550 3.750 Complete 6 44.35 29.56 73.91 7.74 (0 , 0 , 1 , 1 , 2) Dongakocha Concrete 132 L045 L045-REO Road to Kasibera Upgarde Steel Slag 4.534 3.750 Complete 9 127.63 85.08 212.71 17.10 (0 , 0 , 1 , 2 , 3)

Page 15 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

133 T03 T03-Dumaria Ashti road to Upgarde Steel Slag 4.315 3.750 Complete 13 121.76 81.18 202.94 16.29 (0 , 1 , 1 , 1 , 3) Ghagada via Baredih 134 T05 T05-Kumarasole Chowk to Upgarde -- 6.050 3.750 Complete 8 175.73 117.16 292.89 21.08 (0 , 0 , 4 , 1 , 5) Potka Block Border Block Dumaria Total 27.749 55 797.11 531.41 1,328.52 107.42 (1 , 2 , 12 , 6 , 21) Block- Ghatsila

135 L037 L037-Jagannathpur NH33 to Upgarde CELL Filled 2.500 3.750 Complete 4 66.28 44.19 110.47 10.42 (0 , 1 , 1 , 0 , 2) Kitadih tola Concrete 136 T04 T04-NH33 Kashida to Upgarde Steel Slag 4.600 3.750 Complete 13 129.74 86.49 216.23 16.98 (0 , 1 , 1 , 0 , 2) Jambad 137 L076 T05-T04 Chengjora to Upgarde CELL Filled 3.000 3.750 Complete 7 80.53 53.69 134.22 11.42 (1 , 0 , 3 , 1 , 5) Mahatantola Concrete
Steel Slag 138 L025 L025-Narsinghpur Road to Upgarde CELL Filled 5.500 3.750 Complete 9 141.71 94.48 236.19 19.54 (0 , 1 , 1 , 0 , 2) Kalejhoretola Concrete
Steel Slag 139 L026 L026-Kesharpur Road to Upgarde Steel Slag 2.000 3.750 Complete 2 55.78 37.18 92.96 8.84 (0 , 0 , 1 , 0 , 1) Rajabasa 140 L057 L057-Ganghania to Chhota Upgarde CELL Filled 1.500 3.750 Complete 2 40.60 27.06 67.66 7.37 (1 , 0 , 2 , 1 , 4) Dhadhika Concrete 141 L073 L073-NH-33 to Upgarde CELL Filled 1.700 3.750 Complete 3 36.76 24.50 61.26 8.09 (0 , 1 , 0 , 0 , 1) Kalapatharkhas (VR73) Concrete 142 T03 T03-NH33 Phuldungri to Upgarde CELL Filled 15.475 3.750 Complete 30 463.88 309.26 773.14 50.83 (0 , 0 , 1 , 0 , 1) Narsinghpur Tola Concrete Dumkakocha Block Ghatsila Total 36.275 70 1,015.28 676.85 1,692.13 133.50 (2 , 4 , 10 , 2 , 18) Block- Musabani

143 L038 L038-HATA MSB Road to Upgarde -- 0.572 3.750 Complete 0 16.40 10.94 27.34 7.25 (1 , 0 , 0 , 0 , 1) Merhia

Page 16 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

144 L042 L042-Bajrang Chowk Upgarde Steel Slag 3.750 3.750 Complete 5 105.34 70.23 175.57 16.77 (0 , 2 , 0 , 1 , 3) Giridanga to Shark Ghuttu 145 L054 L054-MSB Dumaria Road to Upgarde CELL Filled 1.800 3.750 Complete 3 50.38 33.58 83.96 8.30 (0 , 0 , 1 , 1 , 2) Bandughuttu Concrete Block Musabani Total 6.122 8 172.12 114.75 286.87 32.32 (1 , 2 , 1 , 2 , 6)

Block- Patamda

146 L113 L113-Boram to Muchidih New -- 1.800 3.750 Complete 4 58.69 39.12 97.81 8.35 (0 , 1 , 0 , 0 , 1) (VR113) 147 L097 L097-Kumir Dandudih Road New -- 2.305 3.750 Complete 6 71.59 47.72 119.31 9.99 (0 , 1 , 0 , 0 , 1) to Hurumbil (VR97) 148 L064 L064-Lakro to Madhopur Upgarde CELL Filled 0.700 3.750 Complete 1 20.76 13.84 34.60 8.79 (0 , 0 , 1 , 0 , 1) Concrete Block Patamda Total 4.805 11 151.04 100.68 251.72 27.12 (0 , 2 , 1 , 0 , 3)

Block- Potka

149 L129 L129-T05 to Baghmara New -- 3.350 3.750 Complete 11 114.59 76.39 190.98 13.54 (0 , 1 , 0 , 0 , 1) (VR129) 150 L029 L029-Sundernagar Jadugora Upgarde -- 1.300 3.750 Complete 3 38.88 25.92 64.80 6.90 (0 , 1 , 0 , 0 , 1) road to Murggahutu 151 L028 L028-Gob jaduroad to Upgarde CELL Filled 0.800 3.750 Complete 1 22.03 14.69 36.72 5.26 (0 , 0 , 1 , 0 , 1) Barjudih Concrete 152 L101 L101-Bagargoal to Upgarde -- 1.500 3.750 Complete 1 42.04 28.03 70.07 7.32 (0 , 0 , 1 , 0 , 1) Brekomdih 153 L111 L111-T08 to Gangidih Upgarde CELL Filled 1.800 3.750 Complete 3 46.53 31.02 77.55 9.60 (1 , 0 , 0 , 0 , 1) Concrete
Steel Slag 154 T05 T05-T05 to Hartopa Upgarde CELL Filled 4.575 3.750 Complete 12 110.81 73.88 184.69 16.88 (0 , 1 , 0 , 1 , 2) Concrete
Steel Slag Block Potka Total 13.325 31 374.88 249.93 624.81 59.50 (1 , 3 , 2 , 1 , 7)

Page 17 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District East Singhbhum Total 126.941 253 3,747.42 2,498.31 6,245.73 545.31 (5 , 18 , 32 , 14 , 69) District- Garhwa

Block- Garhwa Sadar

155 L052 L052-T02 to Datma (VR50) New -- 1.490 3.750 Complete 4 39.16 26.11 65.27 15.57 (0 , 1 , 0 , 0 , 1)

156 T01 T01-T01 to Belhara (VR42) New -- 3.090 3.750 Complete 16 86.70 57.80 144.50 32.51 (0 , 1 , 0 , 1 , 2)

157 L044 L044-T04 to Gurdi New -- 4.380 3.750 Complete 14 129.02 86.01 215.03 46.84 (1 , 0 , 0 , 0 , 1)

158 T03 T03-T03 to Bharatiya (VR47) New -- 3.000 3.750 Complete 11 87.81 58.54 146.35 31.65 (0 , 0 , 1 , 0 , 1)

159 L033 L033-T02 to Chattarpur New -- 4.800 3.750 Complete 14 123.88 82.58 206.46 62.01 (1 , 0 , 2 , 0 , 3)

160 L055 L055-L027 Tidag to Barahi New Roller 2.331 3.750 Complete 10 68.39 45.59 113.98 10.01 (0 , 0 , 1 , 0 , 1) Tola (VR51) Compacted Concrete Pavement 161 L021 L021-T01 to Khajuri Upgarde -- 18.000 3.750 Complete 37 372.73 248.48 621.21 91.77 (2 , 2 , 3 , 1 , 8)

162 L025 L025-T01 to Motihara Upgarde -- 7.695 3.750 Complete 18 192.46 128.30 320.76 45.75 (3 , 4 , 2 , 0 , 9)

163 L032 L032-T02 to Banutikar Upgarde -- 6.860 3.750 Complete 18 162.92 108.61 271.53 68.51 (0 , 1 , 0 , 0 , 1)

164 L029 L029-T 01 to Nawadohri Upgarde -- 9.250 3.750 Complete 34 209.34 139.56 348.90 69.17 (2 , 2 , 3 , 0 , 7)

Block Garhwa Sadar Total 60.896 176 1,472.41 981.58 2,453.99 473.79 (9 , 11 , 12 , 2 , 34) Block- Kandi

165 L044 L044-L035 TO DEMA (VR41) New -- 2.384 3.750 Complete 9 60.89 40.60 101.49 25.17 (0 , 0 , 1 , 0 , 1)

166 L042 L042-L027 To Sabua (VR39) New -- 2.934 3.750 Complete 9 83.69 55.80 139.49 31.26 (0 , 0 , 2 , 1 , 3)

167 L041 L041-L023 To Kowari (VR38) New Roller 1.748 3.750 Complete 7 52.18 34.79 86.97 9.83 (0 , 0 , 1 , 0 , 1) Compacted Concrete Pavement

Page 18 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

168 L025 L025-TO1 to Rambandh Upgarde -- 3.575 3.750 Complete 12 106.22 70.82 177.04 38.78 (0 , 2 , 0 , 0 , 2)

169 L035 L035-T02 TO GOSANG Upgarde -- 8.000 3.750 Complete 14 196.27 130.85 327.12 55.94 (1 , 0 , 1 , 0 , 2)

Block Kandi Total 18.641 51 499.25 332.86 832.11 160.98 (1 , 2 , 5 , 1 , 9)

Block- Ramna

170 T02 T02-T02 to Kabisa (VR22) New Roller 3.000 3.750 Complete 10 86.54 57.69 144.23 15.60 (1 , 0 , 0 , 0 , 1) Compacted Concrete Pavement 171 L040 L040-T03 to Bachhikhoh New Roller 7.035 3.750 Complete 16 192.70 128.46 321.16 47.09 (1 , 0 , 0 , 0 , 1) Compacted Concrete Pavement 172 L026 L026-Babudih tola to Upgarde -- 6.200 3.750 Complete 27 185.51 123.67 309.18 68.34 (1 , 6 , 0 , 0 , 7) Dumuhan Tola Block Ramna Total 16.235 53 464.75 309.82 774.57 131.03 (3 , 6 , 0 , 0 , 9)

District Garhwa Total 95.772 280 2,436.41 1,624.26 4,060.67 765.80 (13 , 19 , 17 , 3 , 52) District- Giridih

Block- Bagodar

173 L076 L076-T05 to Dama (VR65) New -- 3.040 3.750 Complete 8 87.66 58.44 146.10 13.15 (1 , 0 , 0 , 0 , 1)

174 L085 L085-T03 to Mundro (VR66) New -- 2.092 3.750 Complete 5 63.38 42.25 105.63 8.72 (1 , 0 , 0 , 0 , 1)

175 L050 L050-L039 to Belgai (VR67) New -- 2.060 3.750 Complete 6 61.78 41.19 102.97 9.05 (0 , 0 , 1 , 0 , 1)

176 L055 L055-L032 Barwadih to New -- 2.550 3.750 Complete 6 78.67 52.45 131.12 8.02 (0 , 1 , 0 , 0 , 1) Kanadih (VR70) 177 L077 L077-T05 to Karnodih (VR75) New -- 1.370 3.750 Complete 2 40.52 27.01 67.53 5.14 (0 , 1 , 0 , 0 , 1)

178 L079 L079-T03 to Dumardeli New -- 1.210 3.750 Complete 3 35.34 23.56 58.90 5.17 (0 , 0 , 1 , 0 , 1) (VR77)

Page 19 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

179 L081 L081-T03 to Balhedih (VR79) New -- 3.400 3.750 Complete 10 98.75 65.83 164.58 15.45 (0 , 1 , 0 , 0 , 1)

180 L082 L082-T03 to Tilabani (VR80) New -- 3.000 3.750 Complete 8 91.12 60.75 151.87 12.65 (0 , 0 , 1 , 0 , 1)

181 L083 L083-T06 to Simrabera New -- 3.370 3.750 Complete 10 101.13 67.42 168.55 15.42 (0 , 1 , 0 , 0 , 1) (VR81) 182 L087 L087-T05 to Dhawaiyatanr New -- 2.840 3.750 Complete 5 90.45 60.30 150.75 10.56 (0 , 1 , 0 , 0 , 1) (VR84) 183 L061 L061-L024 to Dhobari (VR72) New -- 2.800 3.750 Complete 7 84.15 56.10 140.25 13.19 (0 , 1 , 0 , 0 , 1)

184 L072 L072-T04 to Chichaki (VR61) New -- 4.250 3.750 Complete 7 136.69 91.12 227.81 18.89 (1 , 0 , 0 , 0 , 1)

185 L068 L068-T01 to Tuktuko (VR58) New -- 4.900 3.750 Complete 7 138.39 92.26 230.65 22.45 (1 , 0 , 0 , 0 , 1)

Block Bagodar Total 36.882 84 1,108.03 738.68 1,846.71 157.86 (4 , 6 , 3 , 0 , 13) Block- Bengabad

186 L047 L047-T03 to Jarwadih (VR6) New -- 2.700 3.750 Complete 4 84.46 56.31 140.77 11.03 (0 , 1 , 0 , 0 , 1)

187 L058 L058-T02 to Dhobani (VR43) New -- 1.960 3.750 Complete 3 63.86 42.58 106.44 12.22 (0 , 0 , 2 , 0 , 2)

188 L057 L057-L029 to Saharpura New Cement 1.560 3.750 Complete 5 52.72 35.15 87.87 10.67 (0 , 0 , 1 , 0 , 1) (VR42) Stabilization Block Bengabad Total 6.220 12 201.04 134.04 335.08 33.92 (0 , 1 , 3 , 0 , 4)

Block- Birni

189 L050 L050-T05 to Bergaro (VR57) New -- 2.000 3.750 Complete 4 59.14 39.42 98.56 8.34 (0 , 0 , 1 , 0 , 1)

190 L059 L059-L031 to Garaidih New -- 1.364 3.750 Complete 3 41.06 27.37 68.43 5.49 (0 , 0 , 1 , 0 , 1) (VR61) 191 L062 L062-T01 to Kumharpiti New -- 3.400 3.750 Complete 8 99.76 66.51 166.27 15.54 (0 , 0 , 1 , 0 , 1) (VR63) 192 L054 L054-T08 to Banpura (VR58) New -- 1.520 3.750 Complete 3 49.60 33.07 82.67 4.86 (0 , 0 , 1 , 0 , 1)

193 L060 L060-L027 to Matiasingha New -- 1.340 3.750 Complete 4 42.11 28.07 70.18 5.56 (0 , 0 , 1 , 0 , 1) (VR62)

Page 20 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

194 L053 L053-T05 to Kalhajori New -- 2.100 3.750 Complete 5 59.83 39.89 99.72 8.03 (1 , 0 , 0 , 0 , 1) (VR53) Block Birni Total 11.724 27 351.50 234.33 585.83 47.82 (1 , 0 , 5 , 0 , 6)

Block- Deori

195 L055 L055-L045 Ghuthia to New -- 6.300 3.750 Complete 12 166.36 110.90 277.26 28.35 (0 , 0 , 1 , 5 , 6) Gadikhurd (VR55) 196 L057 L057-L050 to Garhi (VR57) New -- 0.890 3.750 Complete 2 26.46 17.64 44.10 3.56 (0 , 0 , 1 , 0 , 1)

197 L068 L068-L046 to Karmatanr New -- 0.900 3.750 Complete 2 19.88 13.25 33.13 3.73 (0 , 0 , 1 , 0 , 1) (VR68) 198 L069 L069-L046 to Belkusi (VR69) New -- 0.740 3.750 Complete 2 22.50 15.00 37.50 2.96 (0 , 0 , 1 , 0 , 1)

199 L054 L054-T05 to Koiridih (VR54) New -- 3.400 3.750 Complete 3 102.92 68.61 171.53 10.75 (0 , 0 , 1 , 3 , 4)

200 L059 L059-L023 to Chandadih New -- 4.050 3.750 Complete 8 134.99 89.99 224.98 18.93 (0 , 0 , 1 , 0 , 1) (VR59) 201 L060 L060-L021 to Harkund New -- 1.820 3.750 Complete 3 62.48 41.65 104.13 8.53 (0 , 1 , 0 , 0 , 1) (VR60) 202 L072 L072-L051 to Bijhara (VR72) New CELL Filled 1.100 3.750 Complete 2 33.62 22.41 56.03 3.37 (0 , 0 , 1 , 0 , 1) Concrete 203 L070 L070-L048 to Pipradih New -- 1.850 3.750 Complete 1 56.97 37.98 94.95 9.97 (0 , 0 , 2 , 1 , 3) (VR70) 204 L062 L062-L022 to Arwara (VR62) New -- 3.150 3.750 Complete 7 106.83 71.22 178.05 15.17 (0 , 0 , 1 , 1 , 2)

205 L067 L067-L040 to Lilaidih (VR67) New -- 3.000 3.750 Complete 6 96.34 64.23 160.57 13.61 (0 , 0 , 1 , 0 , 1)

206 L063 L063-L025 to Nardha (VR63) New -- 2.060 3.750 Complete 2 64.90 43.27 108.17 10.46 (0 , 0 , 1 , 0 , 1)

207 L071 L071-L051 to Maldiha (VR71) New -- 1.000 3.750 Complete 2 31.81 21.20 53.01 5.15 (0 , 0 , 1 , 0 , 1)

Page 21 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

208 L064 L064-L048 to Parsadih Upgarde Roller 3.000 3.750 Complete 5 89.23 59.49 148.72 15.58 (0 , 0 , 1 , 0 , 1) (VR64) Compacted Concrete Pavement Block Deori Total 33.260 57 1,015.29 676.84 1,692.13 150.13 (0 , 1 , 14 , 10 , 25) Block- Dumri

209 L060 L060-L039 to Pokharia New -- 2.700 3.750 Complete 2 82.94 55.29 138.23 9.47 (0 , 0 , 1 , 1 , 2) (VR65) 210 L061 L061-L042 to Ohdhar New -- 0.850 3.750 Complete 1 25.94 17.29 43.23 3.00 (0 , 0 , 1 , 2 , 3) Nawadih (VR66) 211 L072 L072-Babhandiha to New -- 1.850 3.750 Complete 5 51.42 34.28 85.70 8.44 (0 , 0 , 1 , 0 , 1) Bishunbera (VR77) 212 L046 L046-LAXMAN TUNDA TO New -- 2.700 3.750 Complete 5 82.95 55.30 138.25 10.66 (1 , 1 , 0 , 0 , 2) TUIO (VR84) 213 L098 L047-L024 to Saharpur New Roller 2.500 3.750 Complete 5 79.62 53.08 132.70 8.04 (1 , 0 , 0 , 0 , 1) (VR58) Compacted Concrete Pavement Block Dumri Total 10.600 18 322.87 215.24 538.11 39.61 (2 , 1 , 3 , 3 , 9)

Block- Gandey

214 L065 L065-T04 to Baghadih New -- 2.000 3.750 Complete 5 60.07 40.05 100.12 8.58 (0 , 1 , 0 , 0 , 1) (VR58) 215 L044 L044-T01 to Mandro (VR46) Upgarde -- 4.560 3.750 Complete 10 132.60 88.40 221.00 20.08 (0 , 1 , 4 , 2 , 7)

216 L046 L046-T04 to Nawada (VR48) New CELL Filled 1.650 3.750 Complete 3 53.94 35.96 89.90 4.84 (0 , 0 , 4 , 0 , 4) Concrete 217 L062 L062-T02 to Parmadih (VR3) New CELL Filled 4.000 3.750 Complete 4 121.29 80.86 202.15 21.12 (0 , 0 , 5 , 0 , 5) Concrete 218 L057 L057-L051 to Pandnatanr New -- 1.350 3.750 Complete 1 42.71 28.47 71.18 7.50 (0 , 1 , 0 , 0 , 1) (VR51)

Page 22 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

219 L052 L052-T01 to Koiridih (VR24) New -- 2.700 3.750 Complete 5 90.01 60.01 150.02 18.16 (0 , 0 , 1 , 0 , 1)

220 L055 L055-L030 To Ludhitia New Cement 2.630 3.750 Complete 3 75.30 50.20 125.50 13.52 (0 , 0 , 2 , 1 , 3) (VR21) Stabilization 221 L045 L045-T03 to Amre (VR1) New -- 3.360 3.750 Complete 12 108.66 72.44 181.10 21.21 (0 , 0 , 1 , 1 , 2)

222 L047 L047-Lakhanpur to Topa New Cement 3.432 3.750 Complete 8 99.35 66.23 165.58 21.70 (0 , 0 , 1 , 0 , 1) (VR49) Stabilization 223 L056 L056-T01 Dasdih to Dharleto New -- 3.100 3.750 Complete 1 99.19 66.13 165.32 18.62 (0 , 0 , 1 , 0 , 1) (VR50) 224 L060 L060-T02 to Sujna (VR54) New Nano 2.380 3.750 Complete 6 64.81 43.21 108.02 12.27 (0 , 1 , 0 , 0 , 1) Technology 225 L061 L061-T02 to Pandaria (VR55) New Cement 1.100 3.750 Complete 2 28.70 19.13 47.83 5.42 (0 , 3 , 1 , 0 , 4) Stabilization 226 L051 L051-Barmasia to Naitanr New -- 4.150 3.750 Complete 4 135.74 90.49 226.23 19.09 (0 , 1 , 2 , 1 , 4) (VR45) 227 L054 L054-T03 to Phulchi (VR27) New -- 4.350 3.750 Complete 4 152.18 101.45 253.63 20.67 (1 , 0 , 0 , 1 , 2)

228 L063 L063-T06 to Rampur (VR56) New Cement 1.050 3.750 Complete 3 34.69 23.13 57.82 5.78 (0 , 0 , 1 , 0 , 1) Stabilization
Roller Compacted Concrete Pavement 229 L050 L050-T01 to Merho (VR36) New -- 4.380 3.750 Complete 7 141.88 94.59 236.47 17.92 (0 , 0 , 2 , 1 , 3)

230 L059 L059-T05 Jodhpur to New Cement 1.800 3.750 Complete 3 55.26 36.84 92.10 10.95 (0 , 0 , 2 , 0 , 2) Ranitanr (VR53) Stabilization 231 L049 L049-T05 to Chegarbad New Cement 11.250 3.750 Complete 12 309.60 206.40 516.00 55.42 (0 , 1 , 0 , 0 , 1) (VR28) Stabilization Block Gandey Total 59.242 93 1,805.98 1,203.99 3,009.97 302.84 (1 , 9 , 27 , 7 , 44) Block- Gawan

232 L037 L037-L025 to Rajpura (VR10) New -- 2.670 3.750 Complete 3 80.61 53.74 134.35 10.50 (0 , 0 , 1 , 0 , 1)

Page 23 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

233 L039 L039-L029 to Mahatpur New -- 0.750 3.750 Complete 2 22.79 15.20 37.99 1.20 (0 , 0 , 1 , 0 , 1) (VR34) 234 L040 L040-L022 Serua to Dabar New -- 2.750 3.750 Complete 7 82.12 54.75 136.87 12.63 (0 , 1 , 1 , 1 , 3) (VR35) 235 L027 L027-Gorianchu to Upgarde -- 1.750 3.750 Complete 3 50.17 33.45 83.62 7.66 (0 , 0 , 1 , 1 , 2) Harlaghati 236 L038 L038-L023 to Lakhekura New -- 2.390 3.750 Complete 5 73.94 49.29 123.23 13.75 (0 , 0 , 2 , 0 , 2) (VR9) Block Gawan Total 10.310 20 309.63 206.43 516.06 45.74 (0 , 1 , 6 , 2 , 9)

Block- Giridih Sadar

237 L065 L065-T12 to Sindwariya New -- 2.600 3.750 Complete 3 81.70 54.47 136.17 9.46 (1 , 0 , 0 , 0 , 1) (VR52) 238 L063 L063-T02 to Gamhara New Roller 3.815 3.750 Complete 6 125.49 83.66 209.15 22.96 (0 , 0 , 1 , 0 , 1) (VR50) Compacted Concrete Pavement 239 L064 L064-T12 to Simariya (VR51) New -- 1.100 3.750 Complete 1 34.74 23.16 57.90 3.65 (0 , 1 , 0 , 1 , 2)

240 L022 L022-SH T01 TO JHARIAGADI Upgarde -- 1.800 3.750 Complete 3 52.06 34.70 86.76 7.12 (1 , 0 , 1 , 0 , 2)

241 L057 L057-Matrukha to Balho New CELL Filled 3.130 3.750 Complete 6 99.92 66.62 166.54 17.40 (0 , 0 , 1 , 1 , 2) (VR7) Concrete Block Giridih Sadar Total 12.445 19 393.91 262.61 656.52 60.58 (2 , 1 , 3 , 2 , 8)

Block- Jamua

242 L067 L067-T01 to Pathratanr New -- 0.900 3.750 Complete 2 25.67 17.11 42.78 3.91 (0 , 0 , 1 , 0 , 1) (VR68) 243 L064 L064-Giridih Jamua Rd. to New -- 6.800 3.750 Complete 7 221.54 147.69 369.23 33.83 (2 , 2 , 2 , 1 , 7) Koradih (VR65) 244 L066 L066-T02 to Ledwaradih New -- 5.350 3.750 Complete 11 177.18 118.12 295.30 22.05 (0 , 0 , 3 , 0 , 3) (VR67)

Page 24 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

245 L065 L065-T13 to Bariarpur New -- 4.675 3.750 Complete 4 138.34 92.23 230.57 22.83 (0 , 2 , 0 , 1 , 3) (VR66) Block Jamua Total 17.725 24 562.73 375.15 937.88 82.61 (2 , 4 , 6 , 2 , 14) Block- Pirtand

246 L033 L033-PIPRODIHMORE TO New -- 6.700 3.750 Complete 15 217.27 144.85 362.12 32.74 (0 , 1 , 1 , 1 , 3) OJIBAD 247 L048 L048-T03 to Kenduadih New -- 1.540 3.750 Complete 4 41.17 27.45 68.62 6.27 (0 , 0 , 2 , 1 , 3) (VR18) 248 L051 L051-L021 to Ghorchanchi New -- 0.753 3.750 Complete 2 22.64 15.10 37.74 3.31 (0 , 0 , 1 , 0 , 1) (VR42) 249 L053 L053-T03 to Lukurwa (VR10) New -- 4.400 3.750 Complete 6 132.81 88.54 221.35 16.95 (0 , 0 , 1 , 0 , 1)

250 L052 L052-L021 to Champanagar New -- 2.170 3.750 Complete 4 70.88 47.25 118.13 12.84 (0 , 0 , 1 , 0 , 1) (VR3) 251 L050 L050-L022 to Pathaljor New -- 3.033 3.750 Complete 1 105.00 70.00 175.00 18.18 (0 , 0 , 1 , 1 , 2) (VR41) 252 L045 L045-T01 to Dewandih New -- 1.310 3.750 Complete 3 42.95 28.64 71.59 8.75 (0 , 0 , 1 , 1 , 2) (VR32) 253 L046 L046-T01 to Jharha (VR38) New -- 3.000 3.750 Complete 5 96.14 64.09 160.23 15.51 (0 , 0 , 2 , 1 , 3)

254 L047 L047-T01 to Madhupur New CELL Filled 2.650 3.750 Complete 6 82.31 54.88 137.19 14.81 (0 , 0 , 2 , 1 , 3) (VR39) Concrete Block Pirtand Total 25.556 46 811.17 540.80 1,351.97 129.35 (0 , 1 , 12 , 6 , 19) Block- Raj Dhanwar

255 L050 L050-L022 to Jhalakdiha New -- 1.080 3.750 Complete 3 34.00 22.66 56.66 5.05 (0 , 0 , 1 , 0 , 1) (VR52)

Page 25 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

256 L052 L052-T02 to Dulho (VR54) New Cement 2.350 3.750 Complete 3 47.33 31.55 78.88 10.26 (0 , 0 , 1 , 0 , 1) Stabilization Block Raj Dhanwar Total 3.430 6 81.33 54.21 135.54 15.31 (0 , 0 , 2 , 0 , 2)

Block- Tisri

257 L030 L030-Ghasnitetaria to New -- 3.940 3.750 Complete 7 118.23 78.82 197.05 16.17 (0 , 0 , 1 , 3 , 4) Jalgora (VR53) 258 L031 L031-T07 to Khakhodhab New -- 3.290 3.750 Complete 5 95.49 63.66 159.15 12.88 (0 , 0 , 2 , 1 , 3) (12L021) 259 L032 L032-L031 to Nima (12L049) New -- 3.510 3.750 Complete 7 99.97 66.65 166.62 14.78 (0 , 0 , 2 , 1 , 3)

260 L033 L033-T07 to Sirsia (12L024) New -- 2.720 3.750 Complete 5 79.90 53.27 133.17 10.57 (0 , 0 , 1 , 2 , 3)

261 L034 L034-T07 to Karichihar New -- 4.450 3.750 Complete 8 145.57 97.05 242.62 17.21 (0 , 0 , 1 , 4 , 5) (12L023) 262 L035 L035-T06 to Lachkan (VR54) New -- 2.800 3.750 Complete 5 74.09 49.40 123.49 12.08 (0 , 1 , 0 , 0 , 1)

263 L028 L028-Paharpur to Gungi Upgarde -- 3.320 3.750 Complete 10 98.19 65.46 163.65 14.92 (1 , 2 , 0 , 0 , 3)

264 L038 L038-T03 To Naitanr (VR38) New Roller 1.700 3.750 Complete 2 53.68 35.79 89.47 7.24 (0 , 0 , 2 , 1 , 3) Compacted Concrete Pavement 265 L043 L043-T03 To Danokhunta New -- 4.000 3.750 Complete 6 127.06 84.71 211.77 20.55 (0 , 0 , 1 , 3 , 4) (VR43) 266 L039 L039-T01 to Dhawatanr New -- 2.050 3.750 Complete 2 67.02 44.68 111.70 10.81 (0 , 0 , 1 , 0 , 1) (12L029) 267 L037 L037-T01 to Jagarnatha New -- 2.800 3.750 Complete 5 90.32 60.21 150.53 13.93 (0 , 0 , 1 , 0 , 1) (12L031) Block Tisri Total 34.580 62 1,049.52 699.70 1,749.22 151.15 (1 , 3 , 12 , 15 , 31) District Giridih Total 261.974 468 8,013.00 5,342.02 13,355.02 1,216.91 (13 , 28 , 96 , 47 , 184)

Page 26 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District- Godda

Block- Boarijore

268 L040 REO ROAD KUSHBILLA - New -- 3.370 3.750 Complete 5 95.74 63.82 159.56 10.29 (0 , 1 , 0 , 0 , 1) KUSUMGHATI 269 L053 L053-PWD Road to Muchar New -- 2.700 3.750 Complete 3 86.51 57.68 144.19 9.12 (0 , 0 , 1 , 0 , 1) Daldali 270 L038 L038-Reo Road to Ratanpur New -- 1.850 3.750 Complete 5 52.46 34.97 87.43 8.36 (0 , 0 , 1 , 0 , 1) via sijwa Block Boarijore Total 7.920 13 234.71 156.47 391.18 27.77 (0 , 1 , 2 , 0 , 3)

Block- Godda Sadar

271 L070 L070-Chinadhab to New -- 2.160 3.750 Complete 8 67.82 45.21 113.03 10.70 (1 , 0 , 0 , 0 , 1) Gaychand Road (VR61) 272 L067 L067-Nepura to Singhpur Upgarde -- 3.050 3.750 Complete 11 88.91 59.27 148.18 11.19 (0 , 1 , 2 , 0 , 3)

273 L042 L042-Kundadah to Hijaljore Upgarde -- 1.500 3.750 Complete 4 45.48 30.32 75.80 6.33 (0 , 1 , 0 , 0 , 1)

Block Godda Sadar Total 6.710 23 202.21 134.80 337.01 28.22 (1 , 2 , 2 , 0 , 5)

Block- Mahagama

274 L061 L061-RWD Road to Garhi New -- 2.270 3.750 Complete 5 66.97 44.65 111.62 7.11 (1 , 0 , 0 , 0 , 1) (VR47) 275 L047 L047-PWD Road Kaswa to New -- 1.200 3.750 Complete 2 39.52 26.35 65.87 3.62 (1 , 0 , 0 , 0 , 1) Asota (VR33) 276 L021 L021-Srimatpur to Mohani New -- 1.420 3.750 Complete 6 46.42 30.95 77.37 6.40 (0 , 1 , 1 , 0 , 2) via Jatama 277 L055 L055-Darighat to Gourikita New -- 1.170 3.750 Complete 3 33.63 22.42 56.05 3.15 (0 , 1 , 1 , 0 , 2) Road (VR41) 278 L064 L064-Godda Pirpainti Road New -- 0.900 3.750 Complete 1 28.77 19.18 47.95 3.19 (1 , 0 , 0 , 0 , 1) to Jiyajori (VR50) 279 L035 L035-Mirjachak to Hundra Upgarde -- 3.000 3.750 Complete 12 90.52 60.35 150.87 11.54 (0 , 1 , 0 , 0 , 1)

Page 27 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

280 L022 L022-Sinpur to Domachak Upgarde -- 2.500 3.750 Complete 5 74.65 49.77 124.42 7.99 (1 , 2 , 0 , 1 , 4)

281 L024 L024-Firozpur to Kuthari Upgarde -- 1.500 3.750 Complete 7 44.73 29.82 74.55 7.09 (1 , 1 , 0 , 1 , 3)

282 L031 L031-Sukkalchak to Upgarde -- 1.740 3.750 Complete 11 50.69 33.79 84.48 8.56 (0 , 1 , 0 , 1 , 2) Gouradih via Chichori Block Mahagama Total 15.700 52 475.90 317.28 793.18 58.65 (5 , 7 , 2 , 3 , 17) Block- Meharma

283 L052 L052-Ghorichak to New -- 1.800 3.750 Complete 3 58.47 38.98 97.45 6.34 (1 , 0 , 0 , 0 , 1) Kumardiha (VR35) 284 L028 L028-PWD Main Road to Upgarde -- 3.230 3.750 Complete 10 90.57 60.38 150.95 13.70 (2 , 0 , 0 , 0 , 2) Benidas Bhuska Block Meharma Total 5.030 13 149.04 99.36 248.40 20.04 (3 , 0 , 0 , 0 , 3)

Block- Pathargama

285 L024 L024-Kohwara chouk to Upgarde -- 4.350 3.750 Complete 16 118.03 78.69 196.72 21.68 (1 , 0 , 0 , 0 , 1) Bhalsunhiya 286 L037 L037-Bandanwar to Upgarde -- 3.650 3.750 Complete 18 102.03 68.02 170.05 12.33 (4 , 1 , 1 , 1 , 7) Jhajkitta Block Pathargama Total 8.000 34 220.06 146.71 366.77 34.01 (5 , 1 , 1 , 1 , 8)

Block- Sunderpahari

287 L043 L043-T02 to Chhota New -- 1.200 3.750 Complete 2 37.06 24.71 61.77 5.20 (0 , 1 , 0 , 0 , 1) Kalhajore Road (VR44) 288 L042 L042-T02 to Langodih Road New -- 1.800 3.750 Complete 6 57.24 38.16 95.40 6.34 (0 , 1 , 0 , 0 , 1) (VR43) 289 L026 L026-Chandna to Sagar Upgarde -- 1.430 3.750 Complete 4 41.69 27.79 69.48 5.77 (0 , 0 , 1 , 0 , 1)

Block Sunderpahari Total 4.430 12 135.99 90.66 226.65 17.31 (0 , 2 , 1 , 0 , 3)

Page 28 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Thakurgangti

290 L041 L041-Bhiganda to New -- 1.306 3.750 Complete 2 25.34 16.90 42.24 5.85 (0 , 1 , 1 , 0 , 2) Ashakhapar (VR26) 291 L028 L028-Mal Mandro to Mordiha Upgarde -- 3.480 3.750 Complete 9 92.80 61.87 154.67 12.61 (2 , 0 , 0 , 0 , 2)

292 L036 L036-Chapri to Dumaria Upgarde -- 1.460 3.750 Complete 3 33.73 22.49 56.22 6.82 (1 , 0 , 1 , 0 , 2)

293 L037 L037-PWD Road 2km to Upgarde -- 2.400 3.750 Complete 10 72.11 48.07 120.18 11.39 (0 , 0 , 1 , 1 , 2) Haripur Block Thakurgangti Total 8.646 24 223.98 149.33 373.31 36.67 (3 , 1 , 3 , 1 , 8)

District Godda Total 56.436 171 1,641.89 1,094.61 2,736.50 222.67 (17 , 14 , 11 , 5 , 47) District- Gumla

Block- Bharno

294 L047 L047-T01 Borotoli Pabiya to New -- 1.700 3.750 Complete 4 50.16 33.44 83.60 5.10 (0 , 1 , 0 , 0 , 1) Morgaon (VR46) 295 L043 L043-T03 Darhalapung to New -- 4.474 3.750 Complete 7 133.24 88.83 222.07 15.21 (0 , 0 , 2 , 0 , 2) Bangru via Jirhul (VR42) Block Bharno Total 6.174 11 183.40 122.27 305.67 20.31 (0 , 1 , 2 , 0 , 3)

Block- Ghaghra

296 L059 L059-T04 to Badri (VR58) New -- 3.700 3.750 Complete 10 106.66 71.10 177.76 14.16 (0 , 1 , 0 , 0 , 1)

297 L062 L062-T04 Belagarha to New -- 1.300 3.750 Complete 2 38.77 25.85 64.62 4.51 (0 , 2 , 0 , 0 , 2) Chumnu (VR60) 298 L050 L050-T02 to Dardag (VR51) New -- 3.400 3.750 Complete 9 96.04 64.02 160.06 11.99 (0 , 1 , 1 , 0 , 2)

299 L055 L055-T07 to Lawadag (VR56) New -- 3.300 3.750 Complete 10 97.31 64.87 162.18 11.32 (0 , 0 , 3 , 1 , 4)

Block Ghaghra Total 11.700 31 338.78 225.84 564.62 41.98 (0 , 4 , 4 , 1 , 9)

Page 29 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Gumla Sadar

300 L056 L056-L056 Murkunda to New -- 3.100 3.750 Complete 7 91.21 60.81 152.02 11.20 (0 , 0 , 2 , 0 , 2) Purnatoli (VR62) Block Gumla Sadar Total 3.100 7 91.21 60.81 152.02 11.20 (0 , 0 , 2 , 0 , 2)

Block- Sisai

301 L030 L030-T02 Nimraha To New -- 1.150 3.750 Complete 2 34.38 22.92 57.30 4.28 (0 , 1 , 2 , 3 , 6) Dobitoli Via Merangbira Block Sisai Total 1.150 2 34.38 22.92 57.30 4.28 (0 , 1 , 2 , 3 , 6)

District Gumla Total 22.124 51 647.77 431.84 1,079.61 77.77 (0 , 6 , 10 , 4 , 20) District- Hazaribagh

Block- Barhi

302 L067 L067-PWD ROAD TO KAJARA New Cold Mix 1.539 3.750 Complete 5 36.80 24.53 61.33 6.02 (0 , 0 , 1 , 0 , 1) (VR67) Technology 303 L068 L068-GAURIA KARMA TO New Cold Mix 3.179 3.750 Complete 2 95.83 63.89 159.72 10.39 (0 , 0 , 1 , 1 , 2) ROHANIA TAND (VR68) Technology 304 L049 L049-L021 TO MAHUWA TAND New Cold Mix 1.545 3.750 Complete 3 42.08 28.05 70.13 7.02 (0 , 0 , 1 , 0 , 1) (VR57) Technology Block Barhi Total 6.263 10 174.71 116.47 291.18 23.42 (0 , 0 , 3 , 1 , 4)

Block- Barkagaon

305 L039 L039-T02 TO SUKULKHAPIYA New -- 1.487 3.750 Complete 2 48.63 32.42 81.05 4.70 (0 , 0 , 1 , 0 , 1) (VR74) 306 L037 L037-DARI MORE TO New Cold Mix 1.856 3.750 Complete 1 55.42 36.95 92.37 6.35 (0 , 0 , 1 , 0 , 1) MANJHLI DARI (VR72) Technology 307 L054 L054-GONDALPURA KADMA New Cold Mix 2.370 3.750 Complete 2 73.58 49.05 122.63 8.71 (0 , 0 , 1 , 0 , 1) TOLA TO GALI (VR89) Technology

Page 30 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

308 T02 T02-BHAGWAN BAGI TO Upgarde Cold Mix 3.160 3.750 Complete 3 87.20 58.13 145.33 10.79 (1 , 0 , 0 , 0 , 1) MAHUGAIN KALA Technology Block Barkagaon Total 8.873 8 264.83 176.55 441.38 30.55 (1 , 0 , 3 , 0 , 4)

Block- Barkatha

309 L054 L054-JAMSOTI ROAD L025 New -- 1.950 3.750 Complete 3 48.45 32.30 80.75 8.49 (0 , 0 , 1 , 0 , 1) TO BANGAWAN (VR54) 310 L066 L066-G.T. ROAD TO New -- 3.925 3.750 Complete 12 122.98 81.99 204.97 16.54 (0 , 0 , 1 , 1 , 2) BHUIYANDIH TOLA (VR66) 311 L052 L052-REO ROAD T01 TO New -- 1.519 3.750 Complete 4 49.57 33.05 82.62 6.10 (0 , 0 , 1 , 0 , 1) LOKIYA (VR52) 312 L053 L053-CHANDGARH TO New -- 2.876 3.750 Complete 2 83.21 55.47 138.68 11.53 (0 , 0 , 1 , 0 , 1) PARATKOLA (VR53) 313 L057 L057-CHALKUSA TO BARADIH New -- 2.750 3.750 Complete 2 86.90 57.94 144.84 10.49 (0 , 1 , 0 , 0 , 1) (VR57) 314 L074 L074-GAIRA CHHUTHARI New -- 1.579 3.750 Complete 7 49.54 33.02 82.56 6.42 (1 , 0 , 0 , 0 , 1) KATIA ROAD TO BANPURA Block Barkatha Total 14.599 30 440.65 293.77 734.42 59.56 (1 , 1 , 4 , 1 , 7)

Block- Bishnugarh

315 T03 T03-NH 100 TO BARAI New -- 2.000 3.750 Complete 4 64.77 45.19 109.96 5.96 (0 , 0 , 1 , 0 , 1)

316 L072 L072-T09 TO ALKILWA (VR92) New -- 1.855 3.750 Complete 1 45.09 30.06 75.15 5.59 (0 , 0 , 1 , 0 , 1)

317 L073 L073-T09 TP LAHARIYA DIH New -- 1.466 3.750 Complete 3 39.81 26.54 66.35 6.22 (0 , 0 , 1 , 0 , 1) (VR93) 318 L074 L074-T09 TO BARISIMAR New Cold Mix 1.677 3.750 Complete 3 47.12 31.41 78.53 6.92 (0 , 0 , 1 , 0 , 1) (VR94) Technology 319 L076 L076-L045 TO KHARKUNDO New Roller 1.250 3.750 Complete 2 29.68 19.79 49.47 2.85 (0 , 0 , 1 , 0 , 1) (VR96) Compacted Concrete Pavement

Page 31 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

320 L077 L077-T010 TO ALKARIKHURD New Cold Mix 4.522 3.750 Complete 9 131.52 87.68 219.20 19.08 (0 , 0 , 1 , 1 , 2) (VR97) Technology 321 L080 L080-L053 TO BAUDHA New -- 1.670 3.750 Complete 3 53.31 35.54 88.85 6.21 (0 , 0 , 1 , 0 , 1) (VR100) 322 L081 L081-DHARAMPUR TO MARPA New -- 1.176 3.750 Complete 1 33.96 22.64 56.60 3.55 (0 , 0 , 1 , 0 , 1) (VR101) 323 L082 L082-T012 TO SIJU (VR102) New -- 2.512 3.750 Complete 3 66.07 44.05 110.12 10.18 (0 , 0 , 1 , 0 , 1)

324 L084 L084-DHAMPUR TO JERUDIH New -- 2.766 3.750 Complete 4 78.84 52.56 131.40 17.22 (0 , 0 , 1 , 1 , 2) (VR104) 325 L085 L085-5TH KM OF T013 TO New -- 2.769 3.750 Complete 6 84.35 56.23 140.58 11.38 (0 , 0 , 1 , 0 , 1) BHANDERI (VR105) 326 L087 L087-4TH KM OF T04 TO New -- 1.456 3.750 Complete 0 36.99 24.66 61.65 4.93 (0 , 1 , 0 , 0 , 1) TARWA TARN (VR107) 327 L050 L050-NH 100 TO New Cold Mix 3.419 3.750 Complete 6 95.89 63.93 159.82 14.25 (0 , 0 , 1 , 1 , 2) Technology 328 L066 L066-T05 TO BAHERATAND New Cold Mix 4.382 3.750 Complete 4 111.45 74.30 185.75 16.88 (0 , 0 , 1 , 0 , 1) (VR86) Technology Block Bishnugarh Total 32.920 49 918.85 614.58 1,533.43 131.23 (0 , 1 , 13 , 3 , 17) Block- Churchu

329 L040 L040-BEDAM TO PALMA New -- 3.254 3.750 Complete 5 90.74 60.49 151.23 13.07 (0 , 0 , 1 , 0 , 1) (VR60) 330 L061 L061-L0-40 TO JULMI (VR61) New -- 3.614 3.750 Complete 10 110.96 73.97 184.93 15.42 (0 , 0 , 1 , 0 , 1)

331 L043 L043-L042 TO AMBA DOHAR New Roller 0.908 3.750 Complete 2 22.07 14.71 36.78 3.53 (0 , 0 , 1 , 0 , 1) (VR63) Compacted Concrete Pavement 332 L044 L044-KANJIYA TO AKAKUBA New -- 3.724 3.750 Complete 5 97.17 64.78 161.95 15.58 (0 , 0 , 1 , 1 , 2) (VR64) 333 L046 L046-DIGWAR TO JHARNA New -- 3.976 3.750 Complete 5 113.18 75.45 188.63 14.97 (0 , 0 , 1 , 0 , 1) (VR66)

Page 32 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

334 L047 L047-T01 TO JAMDIHA New -- 2.182 3.750 Complete 4 54.38 36.25 90.63 8.48 (0 , 0 , 1 , 0 , 1) (VR67) 335 L048 L048-NAGRI TO KHURANDIH New -- 5.001 3.750 Complete 2 147.14 98.09 245.23 20.06 (0 , 0 , 1 , 0 , 1) (VR68) 336 L049 L049-L0 48 TO TASNALO New Roller 3.960 3.750 Complete 5 107.94 71.96 179.90 15.06 (0 , 0 , 1 , 0 , 1) Compacted Concrete Pavement 337 L050 L050-NAGRI TO DHAMAN New -- 2.381 3.750 Complete 5 74.34 49.56 123.90 9.23 (0 , 0 , 1 , 0 , 1) SARIYA (VR70) 338 L051 L051-NAGRI TO LOTHEY New Cold Mix 6.609 3.750 Complete 5 172.97 115.31 288.28 26.63 (0 , 0 , 1 , 0 , 1) Technology 339 L052 L052-CHURCHU TO New -- 4.719 3.750 Complete 4 130.58 87.05 217.63 19.06 (0 , 0 , 1 , 0 , 1) GONDWAR (VR72) Block Churchu Total 40.328 52 1,121.47 747.62 1,869.09 161.08 (0 , 0 , 11 , 1 , 12) Block- Ichak

340 L021 L021-RATANPUR TO New Cold Mix 9.934 3.750 Complete 15 260.98 173.99 434.97 42.07 (0 , 1 , 1 , 0 , 2) DARIGHAGHAR Technology 341 L064 L064-T03 KABILASI TO New Roller 1.606 3.750 Complete 3 43.29 28.86 72.15 5.42 (0 , 0 , 1 , 0 , 1) SILADIH (VR54) Compacted Concrete Pavement 342 L060 L060-T02 TO SIMARADHAB New -- 4.100 3.750 Complete 1 103.18 68.79 171.97 16.63 (0 , 0 , 1 , 0 , 1) (VR44) 343 L065 L065-T07 BARIAT TO BARIAT Upgarde Roller 0.577 3.750 Complete 0 11.40 7.60 19.00 1.42 (0 , 0 , 1 , 1 , 2) LALPAR (VR55) Compacted Concrete Pavement Block Ichak Total 16.217 19 418.85 279.24 698.09 65.54 (0 , 1 , 4 , 1 , 6)

Block- Katkamsandi

344 L046 L046-T01 DHOUTWA TO New -- 2.231 3.750 Complete 5 64.56 43.04 107.60 8.59 (0 , 0 , 1 , 0 , 1) KARICHATTN (VR52)

Page 33 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

345 L061 L061-T08 SULTANA TO New Roller 3.870 3.750 Complete 1 89.69 59.79 149.48 12.38 (0 , 0 , 1 , 0 , 1) TILAIYA (VR66) Compacted Concrete Pavement 346 L056 L056-T05 TO KANSAR New Roller 2.590 3.750 Complete 2 72.30 48.20 120.50 9.65 (0 , 1 , 0 , 0 , 1) BIRHOR TOLA (VR61) Compacted Concrete Pavement 347 L057 L057-T05 KANSAR MORE TO New -- 2.565 3.750 Complete 1 70.31 46.87 117.18 7.72 (0 , 1 , 0 , 0 , 1) NAWADAH (VR62) 348 L059 L059-T08 TO BANKA (VR64) New Roller 1.860 3.750 Complete 3 34.11 22.74 56.85 5.89 (1 , 0 , 0 , 0 , 1) Compacted Concrete Pavement 349 L065 L065-T08 TO HATHAMEDHI New -- 3.238 3.750 Complete 1 70.78 47.19 117.97 12.27 (1 , 0 , 0 , 0 , 1) (VR69) 350 L068 L068-T08 BANADAG TO New -- 2.402 3.750 Complete 3 73.56 49.04 122.60 10.67 (1 , 0 , 0 , 0 , 1) SALGAOWN (VR49) 351 L047 L047-T02 BARIKOLA New -- 3.482 3.750 Complete 8 100.44 66.96 167.40 14.77 (0 , 0 , 1 , 0 , 1) JHONJHI TO NAUWAKHAP (VR53) 352 L049 L049-T02 TO DANTO KALAN New Roller 5.360 3.750 Complete 12 164.42 109.61 274.03 20.34 (1 , 0 , 0 , 0 , 1) (VR46) Compacted Concrete Pavement 353 L053 L053-T05 TO HARHAD (VR58) New -- 2.101 3.750 Complete 5 58.98 39.32 98.30 11.29 (0 , 0 , 1 , 0 , 1)

354 L050 L050-RAIBER TO BALIA New -- 2.030 3.750 Complete 7 61.81 41.21 103.02 8.31 (0 , 0 , 1 , 0 , 1) (VR55) 355 L039 L039-BAHIMAR TO Upgarde Roller 3.475 3.750 Complete 5 70.19 46.79 116.98 10.25 (0 , 1 , 0 , 0 , 1) BELARGARA Compacted Concrete Pavement

Page 34 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

356 L067 L067-T08 TO DAMUDIH Upgarde Roller 0.570 3.750 Complete 0 11.30 7.53 18.83 1.21 (1 , 0 , 0 , 0 , 1) (VR71) Compacted Concrete Pavement Block Katkamsandi Total 35.774 53 942.45 628.29 1,570.74 133.35 (5 , 3 , 5 , 0 , 13) District Hazaribagh Total 154.974 221 4,281.81 2,856.52 7,138.33 604.73 (7 , 6 , 43 , 7 , 63) District- Jamtara

Block- Jamtara Sadar

357 L029 L029-Piyarsola to Kelahi Upgarde -- 2.016 3.750 Complete 5 60.12 40.08 100.20 10.71 (1 , 0 , 0 , 0 , 1)

358 L044 L044-Tarni to shampur Upgarde -- 3.113 3.750 Complete 9 94.69 63.13 157.82 16.64 (1 , 0 , 3 , 0 , 4)

359 L048 L048-Bhaga to Kushbediya Upgarde -- 4.729 3.750 Complete 11 125.22 83.48 208.70 25.49 (1 , 0 , 0 , 0 , 1)

360 L022 L022-Kala Dabur to Dalberia Upgarde -- 3.147 3.750 Complete 8 93.94 62.63 156.57 16.72 (2 , 3 , 0 , 0 , 5)

361 L032 L032-Tilabad to Upgarde -- 7.629 3.750 Complete 15 219.29 146.20 365.49 40.46 (0 , 1 , 1 , 3 , 5) Baidyanathdih 362 L067 L067-Jamtara to Supaidih Upgarde -- 2.652 3.750 Complete 7 78.46 52.31 130.77 14.22 (1 , 0 , 2 , 2 , 5)

363 L026 L026-Gorainala to Jiajori Upgarde -- 2.635 3.750 Complete 6 100.54 67.03 167.57 14.06 (1 , 0 , 0 , 0 , 1)

Block Jamtara Sadar Total 25.921 61 772.26 514.86 1,287.12 138.30 (7 , 4 , 6 , 5 , 22) Block- Kundhit

364 L068 L068-Anguthia to Upgarde Cold Mix 2.436 3.750 Complete 5 74.00 49.33 123.33 12.94 (0 , 1 , 2 , 0 , 3) Simaldangal Technology 365 L029 L029-Khajuri to Chandarpur Upgarde -- 1.533 3.750 Complete 4 46.46 30.97 77.43 8.33 (0 , 3 , 2 , 2 , 7)

Block Kundhit Total 3.969 9 120.46 80.30 200.76 21.27 (0 , 4 , 4 , 2 , 10)

Page 35 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Nala

366 L094 L094-Madhsa to Bando Upgarde -- 1.313 3.750 Complete 3 38.90 25.94 64.84 6.93 (0 , 1 , 1 , 0 , 2)

367 L025 L025-Badalpur to Kalipathar Upgarde Cold Mix 1.843 3.750 Complete 4 55.40 36.94 92.34 9.99 (0 , 1 , 1 , 1 , 3) 1 Technology 368 L075 L075-Kuraljoria to Kendua Upgarde Cold Mix 2.001 3.750 Complete 6 57.59 38.39 95.98 11.03 (0 , 1 , 0 , 0 , 1) Technology Block Nala Total 5.157 13 151.89 101.27 253.16 27.94 (0 , 3 , 2 , 1 , 6)

District Jamtara Total 35.047 83 1,044.61 696.43 1,741.04 187.50 (7 , 11 , 12 , 8 , 38) District- Khunti

Block- Arki

369 L056 L056-KATUO TO DARHI New Cold Mix 2.247 3.750 Complete 10 103.90 69.27 173.17 12.49 (0 , 0 , 1 , 0 , 1) (VR105) Technology 370 L059 L059-Purnanagar to New Cold Mix 2.113 3.750 Complete 6 67.51 45.01 112.52 11.34 (0 , 0 , 1 , 0 , 1) Purnapani Technology 371 L055 L055-T02 to Tirilpiri (VR104) New Cold Mix 0.967 3.750 Complete 3 27.55 18.37 45.92 5.24 (0 , 0 , 1 , 0 , 1) Technology 372 L057 L057-Musanga to Indipiri New -- 1.471 3.750 Complete 5 45.90 30.60 76.50 8.10 (0 , 0 , 1 , 0 , 1)

373 L054 L054-KOTA TO SURAKOCHA New -- 3.196 3.750 Complete 9 127.84 85.23 213.07 17.22 (0 , 0 , 2 , 0 , 2) (VR103) Block Arki Total 9.994 33 372.70 248.48 621.18 54.38 (0 , 0 , 6 , 0 , 6)

Block- Bundu

374 L026 L026-Bundu Sonahatu Road New -- 3.789 3.750 Complete 9 133.87 89.25 223.12 20.09 (0 , 0 , 2 , 1 , 3) To Sumandih 375 T02 T02-T02 to Baretola (VR74) New -- 2.256 3.750 Complete 8 57.68 38.46 96.14 12.28 (0 , 0 , 1 , 0 , 1)

376 L025 L025-Bundu To Gutuhatu New Cold Mix 1.830 3.750 Complete 10 55.00 36.66 91.66 10.20 (0 , 0 , 1 , 0 , 1) Technology

Page 36 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

377 L032 L032-Tunju to Karambu Upgarde Roller 6.150 3.750 Complete 24 157.35 104.90 262.25 35.74 (2 , 0 , 1 , 0 , 3) Compacted Concrete Pavement 378 L029 L029-Bichahatu to Upgarde -- 5.411 3.750 Complete 21 157.14 104.76 261.90 29.28 (0 , 0 , 1 , 0 , 1) hethburadih Block Bundu Total 19.436 72 561.04 374.03 935.07 107.59 (2 , 0 , 6 , 1 , 9)

Block- Sonahatu

379 L046 L046-L046 TO HITJARA New Cold Mix 6.172 3.750 Complete 16 250.02 166.68 416.70 32.59 (0 , 0 , 1 , 0 , 1) (VR86) Technology Block Sonahatu Total 6.172 16 250.02 166.68 416.70 32.59 (0 , 0 , 1 , 0 , 1)

Block- Tamar

380 L070 L070-PRABHA NAGAR TO New -- 0.686 3.750 Complete 5 27.88 18.58 46.46 4.04 (0 , 0 , 1 , 0 , 1) PRATAPPUR (VR143) 381 L061 L061-L061 TO LUPUNGDIH New Cold Mix 1.356 3.750 Complete 8 45.98 30.66 76.64 7.96 (0 , 0 , 1 , 0 , 1) (VR141) Technology 382 L072 L072-KHUTUKTANR TO New CELL Filled 1.161 3.750 Complete 4 27.77 18.51 46.28 6.35 (0 , 0 , 1 , 0 , 1) JAREYA (VR144) Concrete 383 L078 L078-L045 TO ROLADIH New Cold Mix 1.237 3.750 Complete 6 39.10 26.06 65.16 6.89 (0 , 1 , 0 , 0 , 1) (VR150) Technology 384 L079 L079-TORANG MORE TO New CELL Filled 4.579 3.750 Complete 13 88.42 58.95 147.37 24.86 (0 , 1 , 0 , 0 , 1) GUTIBARU (VR151) Concrete
Cold Mix Technology 385 L026 L026-L026 TO BARUDIH New Cold Mix 2.745 3.750 Complete 14 83.26 55.51 138.77 15.33 (0 , 0 , 1 , 0 , 1) Technology 386 L061 L061-JANUMPIRI TO New Cold Mix 1.994 3.750 Complete 9 59.65 39.77 99.42 10.95 (0 , 0 , 1 , 0 , 1) NICHETOLA (VR139) Technology 387 L073 L073-RARGAON TO New Cold Mix 2.051 3.750 Complete 8 87.19 58.13 145.32 11.12 (0 , 0 , 1 , 0 , 1) MISHRIDERO (VR146) Technology 388 L069 L069-LOHARTOLA TO New Cold Mix 2.434 3.750 Complete 11 79.11 52.74 131.85 13.38 (0 , 0 , 1 , 0 , 1) SALGADIH (VR142) Technology

Page 37 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

389 L074 L074-L045 TO BURUDIH New -- 2.504 3.750 Complete 8 106.48 70.99 177.47 13.62 (0 , 0 , 1 , 0 , 1) (VR147) Block Tamar Total 20.747 86 644.84 429.90 1,074.74 114.51 (0 , 2 , 8 , 0 , 10) Block- Torpa

390 L056 L056-Dorma to tirilpiri New -- 3.224 3.750 Complete 8 91.61 61.08 152.69 17.41 (0 , 0 , 1 , 0 , 1)

391 L059 L059-Sundari Bazaartanr to New Cold Mix 3.669 3.750 Complete 8 110.27 73.51 183.78 19.46 (0 , 0 , 1 , 0 , 1) Bishunpur Technology 392 L069 L069-TORPA GOBINDPUR New -- 2.054 3.750 Complete 5 72.88 48.59 121.47 10.96 (0 , 0 , 1 , 0 , 1) ROAD TO JOGISOSO 393 L062 L062-Kutam to Alangkel New -- 1.732 3.750 Complete 5 50.60 33.74 84.34 9.74 (0 , 0 , 1 , 0 , 1) (VR95) 394 L041 L041-ERMERA TO ICHA New Cold Mix 4.559 3.750 Complete 11 134.82 89.88 224.70 24.42 (0 , 1 , 0 , 0 , 1) Technology 395 L022 L022-Nandatoli to Urhutoli New -- 1.827 3.750 Complete 6 55.11 36.74 91.85 9.93 (0 , 0 , 1 , 0 , 1)

396 L064 L064-Marcha Bania to New -- 1.595 3.750 Complete 3 47.23 31.48 78.71 8.30 (0 , 0 , 1 , 0 , 1) Urmitoli Road (L046) Block Torpa Total 18.660 46 562.52 375.02 937.54 100.22 (0 , 1 , 6 , 0 , 7)

District Khunti Total 75.009 253 2,391.12 1,594.11 3,985.23 409.29 (2 , 3 , 27 , 1 , 33) District- Koderma

Block- Chandwara

397 L023 L023-Baraki Dhamoray to Upgarde -- 3.000 3.750 Complete 9 90.26 60.17 150.43 14.04 (1 , 0 , 0 , 0 , 1) Murtia Block Chandwara Total 3.000 9 90.26 60.17 150.43 14.04 (1 , 0 , 0 , 0 , 1)

Page 38 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Satgawn

398 T03 T03-Panchmoh to Koderma Upgarde -- 14.600 3.750 Complete 35 436.11 290.74 726.85 67.85 (1 , 1 , 1 , 0 , 3)

Block Satgawn Total 14.600 35 436.11 290.74 726.85 67.85 (1 , 1 , 1 , 0 , 3)

District Koderma Total 17.600 44 526.37 350.91 877.28 81.89 (2 , 1 , 1 , 0 , 4)

District- Lohardaga

Block- Kisko

399 T02 T02-Nari Dhurwa more to Upgarde -- 16.500 3.750 Complete 32 500.96 333.97 834.93 53.10 (0 , 1 , 0 , 0 , 1) Sangodih Nari Dhurwa More to Makka Block Kisko Total 16.500 32 500.96 333.97 834.93 53.10 (0 , 1 , 0 , 0 , 1)

Block- Lohardaga Sadar

400 T02 T02-State Highway to Nadi Upgarde -- 5.350 3.750 Complete 9 143.59 95.72 239.31 19.08 (1 , 0 , 1 , 0 , 2) Nagra To 1 to Dumar toli Block Lohardaga Sadar Total 5.350 9 143.59 95.72 239.31 19.08 (1 , 0 , 1 , 0 , 2)

Block- Senha

401 T01 T01-Datri to Jamundipa Upgarde -- 3.250 3.750 Complete 10 97.36 64.91 162.27 13.04 (1 , 0 , 0 , 0 , 1) Datri to Jhaljhamira Block Senha Total 3.250 10 97.36 64.91 162.27 13.04 (1 , 0 , 0 , 0 , 1)

District Lohardaga Total 25.100 51 741.91 494.60 1,236.51 85.22 (2 , 1 , 1 , 0 , 4)

District- Pakur

Block- Amrapara

402 L037 L037 - Khandokata to New -- 2.700 3.750 Complete 9 88.43 61.11 149.54 11.64 (0 , 0 , 1 , 1 , 2) ChhotaBasko Pahar

Page 39 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

403 L056 L056-PWD ROAD TO New -- 2.500 3.750 Complete 7 75.29 50.19 125.48 11.75 (0 , 0 , 1 , 0 , 1) JAGGITPUR (VR56) 404 T04 T04-T0213th KM to Telai Upgarde -- 4.000 3.750 Complete 9 121.62 81.08 202.70 18.50 (0 , 0 , 3 , 2 , 5) para pahar 405 L027 L027-Salpatra To Ambnadiha Upgarde -- 6.250 3.750 Complete 13 158.40 105.60 264.00 28.81 (1 , 0 , 0 , 0 , 1)

Block Amrapara Total 15.450 38 443.74 297.98 741.72 70.70 (1 , 0 , 5 , 3 , 9)

Block- Maheshpur

406 L069 L069-NANDANPARA TO New -- 2.900 3.750 Complete 5 99.31 66.20 165.51 13.55 (0 , 1 , 1 , 0 , 2) BALIPATRA (VR69) 407 L029 L029-Bilaspur To Jaypur Upgarde -- 8.530 3.750 Complete 14 249.80 166.53 416.33 38.99 (2 , 5 , 2 , 3 , 12) barunga 408 L047 L047-Narayangarh PWD To Upgarde -- 7.250 3.750 Complete 11 180.14 120.09 300.23 33.72 (1 , 5 , 1 , 0 , 7) Bara Kendua 409 T05 T05-Hathimara To Damdama Upgarde -- 8.600 3.750 Complete 14 243.85 162.56 406.41 40.15 (2 , 0 , 2 , 1 , 5)

410 T02 T02-Maheshpur to Askandha Upgarde -- 8.510 3.750 Complete 19 220.34 146.90 367.24 40.06 (0 , 3 , 8 , 7 , 18)

Block Maheshpur Total 35.790 63 993.44 662.28 1,655.72 166.47 (5 , 14 , 14 , 11 , 44) Block- Pakur Sadar

411 L058 L058-NASHIPUR TO New CELL Filled 2.850 3.750 Complete 10 102.46 68.31 170.77 13.78 (0 , 1 , 0 , 0 , 1) BOSTAMDANGA (VR58) Concrete 412 L044 L044-Barhabad To Upgarde CELL Filled 6.400 3.750 Complete 15 162.94 108.62 271.56 29.72 (0 , 1 , 2 , 0 , 3) Palasdanga Concrete 413 L040 L040-Srirampur to Upgarde CELL Filled 3.500 3.750 Complete 9 104.45 69.63 174.08 16.42 (0 , 1 , 1 , 1 , 3) Kasiadanga Concrete 414 L028 L028-Baliadanga to Ilami Upgarde Nano 6.900 3.750 Complete 9 168.80 112.53 281.33 32.19 (6 , 1 , 1 , 0 , 8) Technology Block Pakur Sadar Total 19.650 43 538.65 359.09 897.74 92.11 (6 , 4 , 4 , 1 , 15)

Page 40 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Pakuria

415 L057 L057-Lakrapahari To Upgarde -- 4.300 3.750 Complete 10 119.14 79.42 198.56 19.95 (2 , 3 , 0 , 0 , 5) Mahulpahari 416 L045 L045-REO Road salgadih part Upgarde -- 5.030 3.750 Complete 15 147.31 98.20 245.51 23.61 (2 , 1 , 0 , 0 , 3) A 417 L048 L048-REO Road pakur To Upgarde -- 1.100 3.750 Complete 2 27.26 18.17 45.43 5.05 (1 , 0 , 0 , 0 , 1) Aludaha 418 L037 L037-Haripur To Domagaria Upgarde -- 2.000 3.750 Complete 5 58.81 39.21 98.02 9.35 (2 , 0 , 0 , 0 , 2)

Block Pakuria Total 12.430 32 352.52 235.00 587.52 57.96 (7 , 4 , 0 , 0 , 11) District Pakur Total 83.320 176 2,328.35 1,554.35 3,882.70 387.24 (19 , 22 , 23 , 15 , 79) District- Palamau

Block- Chainpur

419 L051 L051-BANDUWA TO KARAKAT Upgarde -- 1.050 3.750 Complete 0 19.58 13.06 32.64 0.10 (0 , 1 , 0 , 0 , 1)

Block Chainpur Total 1.050 0 19.58 13.06 32.64 0.10 (0 , 1 , 0 , 0 , 1)

Block- Chattarpur

420 L092 L092-REGONIA TO TILHARWA New -- 0.800 3.750 Complete 0 21.00 14.00 35.00 0.05 (0 , 1 , 0 , 0 , 1) (VR82) Block Chattarpur Total 0.800 0 21.00 14.00 35.00 0.05 (0 , 1 , 0 , 0 , 1)

Block- Daltonganj Sadar

421 L033 L033-CHUKRO TO KOURIYA Upgarde -- 1.875 3.750 Complete 2 48.11 32.07 80.18 5.38 (1 , 1 , 0 , 0 , 2)

Block Daltonganj Sadar Total 1.875 2 48.11 32.07 80.18 5.38 (1 , 1 , 0 , 0 , 2)

Block- Hariharganj

422 L077 L077-JAGDISHPUR TO New -- 3.050 3.750 Complete 2 81.79 54.52 136.31 8.01 (0 , 1 , 0 , 0 , 1) KOTHILA (VR47)

Page 41 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

423 L074 L074-PIPRA TO BISHUNPUR Upgarde -- 3.000 3.750 Complete 6 81.79 54.52 136.31 8.34 (0 , 0 , 1 , 0 , 1) (VR44) Block Hariharganj Total 6.050 8 163.58 109.04 272.62 16.35 (0 , 1 , 1 , 0 , 2)

Block- Hussainabad

424 L032 L032-Japla Nabinagar pitch Upgarde -- 3.700 3.750 Complete 6 89.96 59.97 149.93 12.20 (1 , 0 , 0 , 0 , 1) up to village darua Block Hussainabad Total 3.700 6 89.96 59.97 149.93 12.20 (1 , 0 , 0 , 0 , 1)

Block- Manatu

425 L055 L055-B.T. ROAD TO UDIDIH New -- 1.375 3.750 Complete 2 38.48 25.65 64.13 4.99 (0 , 0 , 3 , 0 , 3) (VR50) Block Manatu Total 1.375 2 38.48 25.65 64.13 4.99 (0 , 0 , 3 , 0 , 3)

District Palamau Total 14.850 18 380.71 253.79 634.50 39.07 (2 , 4 , 4 , 0 , 10) District- Ramgarh

Block- Gola

426 L054 L054-Murmuta to Hethgarha New -- 1.400 3.750 Complete 1 43.81 29.20 73.01 11.63 (0 , 0 , 1 , 0 , 1) (VR64) Block Gola Total 1.400 1 43.81 29.20 73.01 11.63 (0 , 0 , 1 , 0 , 1)

Block- Mandu

427 L066 L066-NH 33 Keriband Dump New CELL Filled 2.450 3.750 Complete 6 70.61 47.08 117.69 11.46 (1 , 0 , 0 , 0 , 1) to Banbar (VR67) Concrete
Waste Plastics 428 L067 L067-NH 33 to Kashikhap New -- 1.700 3.750 Complete 5 54.29 36.20 90.49 7.93 (0 , 1 , 0 , 0 , 1)

429 L056 L056-Mandu Balsagra road New -- 1.525 3.750 Complete 3 50.17 33.45 83.62 7.07 (0 , 0 , 1 , 1 , 2) to gotiahi (VR58)

Page 42 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

430 L054 L054-Chainpur to Arjunatanr New -- 2.800 3.750 Complete 8 77.65 51.77 129.42 13.15 (0 , 0 , 2 , 1 , 3) (VR56) 431 L060 L060-sewta to Rauta 1 New -- 1.650 3.750 Complete 3 51.58 34.38 85.96 7.60 (0 , 0 , 1 , 0 , 1)

432 L065 L065-Hirak Road to Joba New -- 2.200 3.750 Complete 6 67.55 45.04 112.59 15.20 (0 , 0 , 1 , 0 , 1)

433 L063 L063-NH33 to Simra (VR64) New -- 1.600 3.750 Complete 5 53.23 35.48 88.71 7.50 (0 , 0 , 1 , 0 , 1)

434 L045 L045-Digbar Rly Halt to New -- 2.400 3.750 Complete 5 72.86 48.58 121.44 11.10 (0 , 0 , 1 , 0 , 1) Pipratanr (VR47) 435 L059 L059-Digbar to khaira New -- 2.750 3.750 Complete 4 87.75 58.50 146.25 12.70 (0 , 0 , 0 , 4 , 4) (VR60) 436 L049 L049-Ichakdih to Jitratongri New -- 2.500 3.750 Complete 7 72.02 48.02 120.04 11.63 (0 , 0 , 2 , 2 , 4) (VR51) Block Mandu Total 21.575 52 657.71 438.50 1,096.21 105.34 (1 , 1 , 9 , 8 , 19) Block- Patratu

437 L048 L048-Tyre more to New -- 4.250 3.750 Complete 8 139.72 93.14 232.86 20.08 (0 , 0 , 1 , 0 , 1) Katchudag 438 L055 L055-Nimmi to Pali (VR46) New -- 2.000 3.750 Complete 5 66.11 44.07 110.18 9.25 (1 , 0 , 0 , 0 , 1)

439 L060 L060-Salgo to Mahato tola New -- 1.500 3.750 Complete 5 45.41 30.27 75.68 7.02 (0 , 0 , 1 , 0 , 1) (VR51) 440 L068 L068-SOLIYA TO ORAONTOLA New -- 1.600 3.750 Complete 5 52.21 34.80 87.01 7.50 (0 , 0 , 1 , 0 , 1) (VR59) 441 L064 L064-Soliya Industrial Aera New -- 1.000 3.750 Complete 3 34.66 23.11 57.77 4.69 (0 , 0 , 1 , 0 , 1) to Garebatanr (VR55) 442 L059 L059-oriyatu to Bahera New CELL Filled 1.700 3.750 Complete 6 51.65 34.43 86.08 7.99 (0 , 0 , 1 , 0 , 1) tungti (VR50) Concrete
Waste Plastics 443 L051 L051-Sh Road to Hehel New CELL Filled 1.900 3.750 Complete 0 56.08 37.39 93.47 8.76 (1 , 0 , 0 , 0 , 1) (VR42) Concrete

Page 43 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

444 L067 L067-Rochap to jhijhritanr New CELL Filled 1.425 3.750 Complete 3 40.87 27.24 68.11 6.70 (0 , 1 , 0 , 0 , 1) (VR58) Concrete Block Patratu Total 15.375 35 486.71 324.45 811.16 71.99 (2 , 1 , 5 , 0 , 8)

District Ramgarh Total 38.350 88 1,188.23 792.15 1,980.38 188.96 (3 , 2 , 15 , 8 , 28) District- Ranchi

Block- Angara

445 L076 L076-T04 TO MAHALI HUHU New Cold Mix 1.000 3.750 Complete 3 35.90 23.94 59.84 4.23 (0 , 1 , 0 , 0 , 1) (VR78) Technology 446 L074 L074-L068 TO KARMALITOLI New Waste Plastics 1.130 3.750 Complete 2 35.84 23.89 59.73 4.35 (0 , 0 , 1 , 0 , 1) (VR76) 447 L075 L075-L071 TO KUSUMTOLI New Cold Mix 0.810 3.750 Complete 3 29.03 19.36 48.39 3.47 (0 , 0 , 1 , 0 , 1) (VR77) Technology Block Angara Total 2.940 8 100.77 67.19 167.96 12.05 (0 , 1 , 2 , 0 , 3)

Block- Bero

448 L081 L081-TO6 TO KHAMBHA New Cold Mix 1.600 3.750 Complete 5 50.74 33.82 84.56 7.16 (0 , 0 , 1 , 0 , 1) (VR114) Technology 449 L044 L044-Bero to Idri via a Tero Upgarde -- 3.000 3.750 Complete 4 88.01 58.68 146.69 12.72 (0 , 1 , 2 , 2 , 5) Mahugow Block Bero Total 4.600 9 138.75 92.50 231.25 19.88 (0 , 1 , 3 , 2 , 6)

Block- Burmu

450 L022 L022-Badluta to Padriya New -- 6.003 3.750 Complete 13 202.48 134.98 337.46 37.91 (0 , 0 , 2 , 0 , 2)

451 L044 L044-Gurgai to Murumgara Upgarde -- 3.450 3.750 Complete 4 103.43 68.95 172.38 12.81 (0 , 2 , 0 , 0 , 2)

452 L037 L037-Kotari Basti to Bare Upgarde -- 9.800 3.750 Complete 20 268.41 178.94 447.35 41.04 (1 , 0 , 1 , 1 , 3)

453 L036 L036-Korabar to Manatu Upgarde Cold Mix 2.250 3.750 Complete 7 66.40 44.26 110.66 10.04 (0 , 1 , 0 , 0 , 1) Technology

Page 44 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

454 L050 L050-Murupiri to Chayan Upgarde -- 3.900 3.750 Complete 11 112.55 75.04 187.59 17.41 (0 , 0 , 1 , 1 , 2)

455 L038 L038-Turmuli to Pokhratoli Upgarde -- 3.750 3.750 Complete 7 106.30 70.86 177.16 16.88 (0 , 0 , 1 , 0 , 1) Mundatoli Hisri 456 L060 L060-Mahulia to Jobia Upgarde -- 3.290 3.750 Complete 11 95.55 63.70 159.25 15.31 (0 , 0 , 1 , 1 , 2)

Block Burmu Total 32.443 73 955.12 636.73 1,591.85 151.40 (1 , 3 , 6 , 3 , 13) Block- Chanho

457 L074 L074-T01 TO JAMUN TOLI New -- 2.050 3.750 Complete 7 65.44 43.62 109.06 9.05 (0 , 0 , 1 , 0 , 1) (VR84) 458 L073 L073-T02 TO CHALIO New Waste Plastics 1.820 3.750 Complete 5 57.48 38.32 95.80 7.82 (0 , 0 , 1 , 0 , 1)

459 L062 L062-NH75 to Masmano Upgarde -- 2.170 3.750 Complete 8 64.45 42.96 107.41 9.53 (1 , 0 , 0 , 0 , 1)

460 L044 L044-NH75 Road to Karkatta Upgarde -- 2.950 3.750 Complete 7 87.97 58.64 146.61 12.82 (1 , 0 , 0 , 0 , 1)

461 L059 L059-NH75 Road to Patratoli Upgarde Cold Mix 1.570 3.750 Complete 3 39.77 26.51 66.28 7.15 (0 , 1 , 2 , 0 , 3) Technology 462 L043 L043-Choriya Road to Upgarde -- 2.650 3.750 Complete 9 79.37 52.92 132.29 11.69 (0 , 0 , 3 , 0 , 3) Mathatoli 463 L063 L063-Chanho Silagai Road to Upgarde Cold Mix 1.220 3.750 Complete 5 36.40 24.27 60.67 5.22 (0 , 1 , 0 , 0 , 1) Poratoli Technology 464 L064 L064-Chanho Silgai Road to Upgarde -- 1.680 3.750 Complete 8 50.15 33.43 83.58 7.66 (0 , 1 , 0 , 0 , 1) Koko 465 L055 L055-NH75 to karmatoli Upgarde Waste Plastics 1.000 3.750 Complete 1 28.90 19.27 48.17 4.33 (0 , 1 , 0 , 0 , 1)

466 L035 L035-SH Khelari Choriya Upgarde Cold Mix 1.620 3.750 Complete 7 49.28 32.86 82.14 7.11 (0 , 1 , 0 , 0 , 1) Road to Choriyo City Technology 467 L060 L060-NH75 to Sarnatoli Upgarde Cold Mix 1.260 3.750 Complete 3 35.97 23.98 59.95 5.82 (0 , 0 , 1 , 1 , 2) Technology 468 L022 L022-Bijupara Khelari Road Upgarde -- 1.950 3.750 Complete 4 57.35 38.24 95.59 8.33 (0 , 0 , 1 , 2 , 3) to Choti Tungri 469 L050 L050-NH75 to Lundri Upgarde -- 4.880 3.750 Complete 20 147.65 98.43 246.08 20.52 (1 , 0 , 0 , 0 , 1)

Page 45 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

470 L047 L047-NH75 Bijupara to Upgarde -- 2.175 3.750 Complete 6 64.05 42.70 106.75 10.12 (0 , 0 , 1 , 0 , 1) Damdamatoli 471 L024 L024-Bijupara Khelari Road Upgarde -- 2.430 3.750 Complete 10 72.26 48.17 120.43 11.13 (0 , 0 , 0 , 2 , 2) to Kauragarha 472 L036 L036-Dimbatoli to Dimba Upgarde -- 2.700 3.750 Complete 7 78.10 52.07 130.17 12.01 (0 , 0 , 0 , 3 , 3) Chapar 473 L046 L046-Damdamatoli to Upgarde Cold Mix 1.200 3.750 Complete 5 32.50 21.66 54.16 4.94 (0 , 0 , 1 , 0 , 1) Ranichancho Technology Block Chanho Total 35.325 115 1,047.09 698.05 1,745.14 155.25 (3 , 5 , 11 , 8 , 27) Block- Kanke

474 L051 L051-Balwapiri to Rarha Upgarde -- 5.930 3.750 Complete 14 177.38 118.25 295.63 26.52 (1 , 0 , 0 , 0 , 1)

475 T10 T10-Urugutu to Benti Upgarde -- 12.350 3.750 Complete 23 366.67 244.44 611.11 53.30 (0 , 1 , 1 , 3 , 5)

476 L064 L064-Kanke to Kadma Upgarde Cold Mix 1.680 3.750 Complete 6 50.20 33.46 83.66 6.41 (1 , 0 , 0 , 0 , 1) Technology 477 L065 L065-Kanke to Garu Upgarde -- 2.180 3.750 Complete 4 64.66 43.11 107.77 7.03 (1 , 0 , 0 , 0 , 1)

478 L031 L031-Ulatu to Soso Upgarde Cold Mix 0.565 3.750 Complete 2 14.63 9.76 24.39 2.41 (0 , 1 , 0 , 1 , 2) Technology 479 L023 L023-Barhu to Pithoria via Upgarde -- 5.640 3.750 Complete 8 159.18 106.12 265.30 23.77 (0 , 0 , 1 , 1 , 2) Bhagalpur Barwatoli 480 L070 L070-Patratu to Nichebagda Upgarde -- 4.180 3.750 Complete 11 124.34 82.89 207.23 18.16 (0 , 0 , 1 , 2 , 3)

481 L024 L024-Madanpur to Barwatoli Upgarde Cold Mix 1.650 3.750 Complete 7 49.43 32.95 82.38 7.28 (0 , 0 , 1 , 1 , 2) Technology 482 T09 T09-Kanke to Gagi Upgarde -- 4.140 3.750 Complete 15 123.92 82.62 206.54 17.96 (5 , 4 , 0 , 0 , 9)

Block Kanke Total 38.315 90 1,130.41 753.60 1,884.01 162.84 (8 , 6 , 4 , 8 , 26) Block- Lapung

483 L039 L039-Lapung parsa SH Road Upgarde -- 5.150 3.750 Complete 14 152.69 101.80 254.49 22.57 (0 , 0 , 3 , 2 , 5) to Baraidih via Lete

Page 46 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

484 L035 L035-Kakaria Fatehpur Road Upgarde -- 4.100 3.750 Complete 10 122.36 81.57 203.93 17.11 (0 , 0 , 2 , 4 , 6) to Darmitoli 485 L047 L047-Gudgud more to Upgarde -- 2.250 3.750 Complete 7 66.95 44.64 111.59 9.84 (0 , 0 , 1 , 0 , 1) Urekel Road 486 L051 L051-Laryatoli more to Upgarde Cold Mix 1.650 3.750 Complete 5 49.18 32.79 81.97 7.57 (0 , 0 , 1 , 1 , 2) Royatoli Technology 487 T01 T01-Lapung SH Road to Bero Upgarde -- 3.900 3.750 Complete 7 114.42 76.28 190.70 16.67 (1 , 2 , 2 , 2 , 7) Road via Malgo Jhiki Koisara Kakaria Nawatoli Block Lapung Total 17.050 43 505.60 337.08 842.68 73.76 (1 , 2 , 9 , 9 , 21) Block- Mandar

488 L026 L026-Brambey thakurgaon Upgarde Cold Mix 1.650 3.750 Complete 3 49.49 32.99 82.48 6.88 (1 , 0 , 0 , 0 , 1) Road to Bargari Technology 489 L040 L040-Tangarbasuli Dumri Upgarde -- 3.030 3.750 Complete 4 90.66 60.44 151.10 12.83 (0 , 1 , 0 , 0 , 1) Road to Kanijari 490 L027 L027-NH 75 to Garmi Upgarde -- 2.200 3.750 Complete 5 65.09 43.40 108.49 9.68 (0 , 0 , 1 , 0 , 1)

Block Mandar Total 6.880 12 205.24 136.83 342.07 29.39 (1 , 1 , 1 , 0 , 3)

Block- Namkum

491 L050 L050-T06 TO TETRI (VR59) New -- 2.350 3.750 Complete 3 83.04 55.36 138.40 8.79 (0 , 1 , 0 , 0 , 1)

492 L048 L048-L024 TO JARATOLI New -- 2.635 3.750 Complete 7 85.54 57.03 142.57 10.89 (0 , 1 , 0 , 0 , 1) (VR57) 493 L049 L049-T06 TO KUTIATU New Cold Mix 1.030 3.750 Complete 3 32.83 21.88 54.71 4.74 (0 , 1 , 0 , 0 , 1) (VR58) Technology 494 L032 L032-Plandu Tunju Road Upgarde Cold Mix 1.300 3.750 Complete 3 38.86 25.91 64.77 5.87 (0 , 0 , 1 , 1 , 2) Okhergarahatoli to Ketaitoli Technology Block Namkum Total 7.315 16 240.27 160.18 400.45 30.29 (0 , 3 , 1 , 1 , 5)

Page 47 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Ormanjhi

495 L069 L069-T01 to Partundaholi New Cold Mix 1.120 3.750 Complete 7 35.79 23.86 59.65 4.72 (0 , 0 , 2 , 0 , 2) (VR75) Technology 496 L063 L063-L063 to Baragagari New -- 1.870 3.750 Complete 7 60.64 40.42 101.06 7.94 (0 , 0 , 1 , 0 , 1)

497 L068 L068-T02 to Piparbanda New -- 0.825 3.750 Complete 2 32.51 21.68 54.19 2.34 (0 , 0 , 1 , 0 , 1) (VR74) 498 L062 L062-L028 to Banlotwa New Cold Mix 1.500 3.750 Complete 3 48.98 32.66 81.64 6.17 (0 , 0 , 1 , 0 , 1) (VR68) Technology 499 L021 L021-NH 33 to Khirabera Upgarde -- 2.420 3.750 Complete 6 69.59 46.39 115.98 10.68 (0 , 1 , 0 , 0 , 1)

500 L044 L044-NH 33 Ormanjhi to Upgarde -- 1.730 3.750 Complete 5 51.40 34.27 85.67 7.90 (0 , 1 , 0 , 0 , 1) Burhi Bagi 501 L052 L052-T04 to Gunja Upgarde -- 1.730 3.750 Complete 4 51.07 34.04 85.11 6.93 (0 , 0 , 1 , 0 , 1)

Block Ormanjhi Total 11.195 34 349.98 233.32 583.30 46.68 (0 , 2 , 6 , 0 , 8)

Block- Silli

502 L041 L041-Sillidih to Itihasa Upgarde Cold Mix 1.480 3.750 Complete 2 43.21 28.80 72.01 6.24 (0 , 0 , 1 , 0 , 1) Technology Block Silli Total 1.480 2 43.21 28.80 72.01 6.24 (0 , 0 , 1 , 0 , 1)

District Ranchi Total 157.543 402 4,716.44 3,144.28 7,860.72 687.78 (14 , 24 , 44 , 31 , 113) District- Sahebganj

Block- Borio

503 L053 L053-SH to Ranchara (VR53) New -- 1.590 3.750 Complete 4 53.68 35.78 89.46 15.94 (0 , 1 , 0 , 0 , 1)

504 L051 L051-Pathara Rly Stn to New -- 1.880 3.750 Complete 5 64.16 42.77 106.93 17.29 (0 , 1 , 0 , 0 , 1) Dhanelo (VR51) 505 L021 L021-Bara Jirvabari to Upgarde -- 5.480 3.750 Complete 17 164.41 109.61 274.02 57.06 (2 , 0 , 1 , 0 , 3) Satichouki Khuthari

Page 48 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

506 T06 T01-Chaldhova to Amarpur Upgarde -- 6.850 3.750 Complete 23 227.38 151.58 378.96 77.65 (0 , 1 , 1 , 0 , 2)

Block Borio Total 15.800 49 509.63 339.74 849.37 167.94 (2 , 3 , 2 , 0 , 7)

Block- Burhait

507 L046 L046-Chapri bathan to Upgarde -- 2.280 3.750 Complete 3 65.60 43.74 109.34 12.29 (0 , 0 , 1 , 0 , 1) Baghmara 508 L057 L057-PWD Road to Upgarde CELL Filled 1.658 3.750 Complete 8 58.04 38.70 96.74 9.70 (0 , 1 , 0 , 0 , 1) Bhairodhab Concrete 509 L039 L039-PWD Road to Kadma Upgarde -- 1.218 3.750 Complete 4 36.62 24.41 61.03 6.84 (1 , 0 , 0 , 0 , 1)

510 L029 L029-Barhait Barharwa PWD Upgarde -- 0.992 3.750 Complete 4 29.42 19.61 49.03 4.36 (1 , 0 , 0 , 0 , 1) Road to Barmasia 511 L023 L023-Barhait Sonmani Road Upgarde -- 1.070 3.750 Complete 3 32.09 21.39 53.48 5.98 (1 , 0 , 0 , 0 , 1) to Rohara Village Road 512 L028 L028-Barhait Barharwa PWD Upgarde -- 1.109 3.750 Complete 0 32.27 21.51 53.78 5.83 (1 , 0 , 0 , 0 , 1) Road to Dhobdiha 513 T07 T07-Ranga to Sanjori Upgarde -- 3.165 3.750 Complete 10 94.64 63.10 157.74 18.34 (2 , 1 , 0 , 1 , 4)

514 L025 L025-Petkhasa Doria Upgarde -- 4.539 3.750 Complete 16 133.15 88.77 221.92 25.15 (0 , 1 , 0 , 0 , 1) Santhali Road to Sarjanghuttu 515 L024 L046-Jhabri to Chapribathan Upgarde -- 6.428 3.750 Complete 22 198.77 132.51 331.28 35.54 (0 , 1 , 0 , 0 , 1)

516 L048 L048-Ilaki to TilakiRoad Upgarde -- 2.839 3.750 Complete 5 84.69 56.46 141.15 15.29 (1 , 1 , 1 , 0 , 3)

Block Burhait Total 25.298 75 765.29 510.20 1,275.49 139.31 (7 , 5 , 2 , 1 , 15) Block- Burharwa

517 L021 L021-Ramnagar to Upgarde -- 2.649 3.750 Complete 4 77.14 51.43 128.57 14.30 (1 , 2 , 1 , 1 , 5) Kasbasirasin 518 L031 L031-Kotalpokhar to Nimjol Upgarde -- 2.104 3.750 Complete 3 63.60 42.40 106.00 11.30 (0 , 0 , 1 , 1 , 2)

Page 49 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

519 L034 L034-Kotalpokhar to Upgarde -- 3.085 3.750 Complete 11 93.41 62.28 155.69 17.09 (0 , 0 , 2 , 0 , 2) Piparjori Block Burharwa Total 7.838 18 234.15 156.11 390.26 42.69 (1 , 2 , 4 , 2 , 9)

Block- Mandro

520 L029 L029-MDR To Ranidih Upgarde -- 3.791 3.750 Complete 9 110.78 73.86 184.64 20.92 (0 , 1 , 2 , 0 , 3)

521 L033 L033-T02 Bara Deodar to Upgarde -- 4.381 3.750 Complete 14 130.49 87.00 217.49 24.26 (0 , 1 , 1 , 0 , 2) Chhota Kendua Block Mandro Total 8.172 23 241.27 160.86 402.13 45.18 (0 , 2 , 3 , 0 , 5)

Block- Patna

522 L031 L031-Borna Pahari to Upgarde -- 3.550 3.750 Complete 12 106.23 70.82 177.05 39.96 (1 , 0 , 1 , 0 , 2) Moidikola 523 L033 L033-Shivapahar to Upgarde -- 7.153 3.750 Complete 25 224.81 149.88 374.69 84.40 (1 , 0 , 1 , 0 , 2) Sugnibasa 524 L032 L032-Kendua to Tilbhita Upgarde -- 2.446 3.750 Complete 8 72.96 48.64 121.60 26.21 (1 , 0 , 0 , 0 , 1)

525 L023 L026-Jhiktia to Barmasia Upgarde -- 3.060 3.750 Complete 16 89.73 59.82 149.55 30.25 (0 , 1 , 0 , 0 , 1)

526 L030 L027-Dharampur to Ranga Upgarde -- 4.180 3.750 Complete 20 134.24 89.49 223.73 42.73 (0 , 1 , 0 , 0 , 1)

527 L040 L040-Lakhipur to Upgarde -- 2.110 3.750 Complete 7 62.64 41.76 104.40 21.45 (0 , 1 , 0 , 0 , 1) Pandanbhita 528 L037 L037-Shahari to Kesh Chipri Upgarde -- 5.160 3.750 Complete 17 167.05 111.36 278.41 55.27 (0 , 0 , 1 , 0 , 1)

Block Patna Total 27.659 105 857.66 571.77 1,429.43 300.27 (3 , 3 , 3 , 0 , 9)

Block- Rajmahal

529 L025 L025-NH 80 Phulbaria More Upgarde -- 3.939 3.750 Complete 9 124.26 82.84 207.10 21.57 (1 , 1 , 0 , 0 , 2) to Gadaganj 530 L027 L027-PWD Road Khairbani to Upgarde -- 5.628 3.750 Complete 10 170.90 113.93 284.83 30.54 (2 , 2 , 0 , 0 , 4) Darlaghat

Page 50 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

531 L024 L024-NH80 Lakhipur to Upgarde Cement 3.155 3.750 Complete 9 91.31 60.88 152.19 18.06 (1 , 1 , 0 , 0 , 2) Samaspur Stabilization 532 T03 T03-NH 80 Araje Mokimpur Upgarde -- 5.534 3.750 Complete 22 159.58 106.38 265.96 30.70 (1 , 1 , 0 , 0 , 2) to PWD Road Pararia Block Rajmahal Total 18.256 50 546.05 364.03 910.08 100.87 (5 , 5 , 0 , 0 , 10) Block- Sahebganj Sadar

533 L035 L035-Kishan Prasad to Hari New -- 7.890 3.750 Complete 16 278.18 185.46 463.64 87.04 (1 , 0 , 0 , 0 , 1) Prasad (VR35) 534 L026 L026-NH 80 to Dihari Upgarde -- 4.201 3.750 Complete 11 115.28 76.85 192.13 24.54 (1 , 0 , 0 , 0 , 1)

Block Sahebganj Sadar Total 12.091 27 393.46 262.31 655.77 111.58 (2 , 0 , 0 , 0 , 2)

Block- Taljhari

535 L065 L065-PWD Road Chamdi New -- 18.000 3.750 Complete 17 508.54 339.02 847.56 210.27 (0 , 1 , 0 , 0 , 1) Raksithan to Jhirik Kang Shivgadi Temple (VR65) 536 L035 L035-Tinpahar to Ajodhya Upgarde -- 4.887 3.750 Complete 14 146.74 97.83 244.57 27.22 (1 , 1 , 0 , 0 , 2)

537 L064 L064-Nimgachhi to Paharpur Upgarde -- 1.469 3.750 Complete 8 43.68 29.12 72.80 8.37 (0 , 1 , 0 , 0 , 1)

538 L039 L039-PWD Road to Upgarde -- 0.881 3.750 Complete 2 25.31 16.87 42.18 4.88 (1 , 0 , 0 , 0 , 1) Brindaban 539 L036 L036-Barmasia to Hisiganj Upgarde -- 4.390 3.750 Complete 17 131.09 87.39 218.48 24.31 (0 , 2 , 0 , 0 , 2)

Block Taljhari Total 29.627 58 855.36 570.23 1,425.59 275.04 (2 , 5 , 0 , 0 , 7)

Block- Udhwa

540 L027 L027-NH 80 Baniadih to Upgarde -- 2.850 3.750 Complete 12 84.30 56.20 140.50 16.37 (1 , 0 , 0 , 0 , 1) Masna Block Udhwa Total 2.850 12 84.30 56.20 140.50 16.37 (1 , 0 , 0 , 0 , 1)

District Sahebganj Total 147.591 417 4,487.17 2,991.45 7,478.62 1,199.25 (23 , 25 , 14 , 3 , 65)

Page 51 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District- Saraikela Kharsawan

Block- Gamharia Adityapur

541 L050 L050-SH 5 at 32 to Upgarde -- 1.050 3.750 Complete 3 30.65 20.43 51.08 3.20 (0 , 0 , 1 , 0 , 1) Sahebganj 542 L028 L028-Chhota gamharia to Upgarde -- 1.700 3.750 Complete 2 50.82 33.88 84.70 5.18 (0 , 1 , 0 , 0 , 1) Jhurkuli 543 L034 L034-Kumari to Upgarde -- 1.400 3.750 Complete 3 41.29 27.52 68.81 4.09 (0 , 1 , 1 , 0 , 2) Brahmandungri 544 L033 L033-Kumari to Jhiling gora Upgarde -- 1.125 3.750 Complete 4 33.17 22.11 55.28 4.92 (2 , 1 , 1 , 0 , 4)

545 L038 L038-Trila to Samurama Upgarde -- 2.675 3.750 Complete 7 75.82 50.55 126.37 11.22 (1 , 1 , 0 , 0 , 2)

546 L058 L058-Dugni to Jordiha Upgarde -- 1.500 3.750 Complete 3 40.00 26.67 66.67 3.98 (0 , 1 , 0 , 0 , 1)

547 L067 L067-L042 TO GOHIRA New -- 2.000 3.750 Complete 9 72.99 48.66 121.65 7.16 (0 , 1 , 0 , 0 , 1) (VR93) 548 L054 L054-Sh 21 to Bholadih Upgarde Iron Slag 3.700 3.750 Complete 5 98.91 65.94 164.85 15.02 (0 , 0 , 1 , 0 , 1)

549 T05 T04-SH 5 at Ch 34 to Upgarde Iron Slag 9.125 3.750 Complete 25 271.42 180.94 452.36 45.53 (1 , 0 , 0 , 0 , 1) Udaypur Block Gamharia Adityapur Total 24.275 61 715.07 476.70 1,191.77 100.30 (4 , 6 , 4 , 0 , 14) Block- Ichagarh

550 L023 L023-Situ Baralapang Road Upgarde -- 1.150 3.750 Complete 1 33.83 22.55 56.38 4.57 (0 , 2 , 0 , 0 , 2) to Sisi 551 T04 T04-NH 33 Rangamati block Upgarde CELL Filled 12.300 3.750 Complete 29 311.15 207.44 518.59 54.92 (0 , 2 , 1 , 1 , 4) border road to Kathgora Concrete 552 L038 L038-NH33 Rangamati Block Upgarde -- 2.100 3.750 Complete 6 53.92 35.94 89.86 8.49 (0 , 0 , 1 , 0 , 1) Border Road to Ghatia 553 L025 L025-Situ Baralapang Road Upgarde -- 1.520 3.750 Complete 7 45.22 30.14 75.36 6.96 (1 , 0 , 2 , 0 , 3) to Vankarduri Block Ichagarh Total 17.070 43 444.12 296.07 740.19 74.94 (1 , 4 , 4 , 1 , 10)

Page 52 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Kharsawan

554 L021 L021-Tankodih to Upgarde -- 2.750 3.750 Complete 2 52.41 34.94 87.35 14.86 (0 , 1 , 1 , 0 , 2) Narayanbera 555 L038 L038-Khamardih to Kauntala Upgarde -- 3.000 3.750 Complete 8 83.10 55.40 138.50 12.03 (0 , 1 , 0 , 1 , 2) via Kudasingi 556 L043 L043-Gopalpur to Gitilata Upgarde -- 1.600 3.750 Complete 3 44.15 29.44 73.59 5.70 (0 , 1 , 0 , 0 , 1) via jordiha 557 L044 L044-Krishnapur to Jordiha Upgarde -- 3.375 3.750 Complete 14 78.32 52.22 130.54 15.36 (0 , 0 , 1 , 0 , 1) via Rajabasa Block Kharsawan Total 10.725 27 257.98 172.00 429.98 47.95 (0 , 3 , 2 , 1 , 6)

Block- Kuchai

558 T01 T01-Sursi to Jenalong Upgarde -- 5.875 3.750 Complete 27 152.77 101.90 254.67 26.54 (0 , 3 , 1 , 1 , 5) Baridih 559 L034 L034-Jowajanjeer to Upgarde -- 1.000 3.750 Complete 4 28.53 19.07 47.60 3.67 (0 , 0 , 1 , 0 , 1) Ramaisal 560 L021 L021-Sursi to Gomiadih Road Upgarde -- 8.300 3.750 Complete 27 143.50 95.67 239.17 50.11 (0 , 1 , 0 , 1 , 2)

561 L038 L038-Chhota Chakri to Upgarde -- 2.150 3.750 Complete 6 60.34 40.23 100.57 8.43 (0 , 0 , 2 , 0 , 2) Bangurdih 562 L036 L036-Kuchai durusai road to Upgarde -- 6.400 3.000 Complete 22 136.26 90.84 227.10 33.88 (0 , 1 , 0 , 0 , 1) Bandolohar Block Kuchai Total 23.725 86 521.40 347.71 869.11 122.63 (0 , 5 , 4 , 2 , 11) Block- Nimdih

563 L045 L045-Puriyara to Kadala Upgarde -- 1.200 3.750 Complete 3 33.53 22.40 55.93 4.44 (0 , 1 , 0 , 0 , 1)

564 T01 T01-Jamdih Rly. Crossing to New -- 2.775 3.750 Complete 9 91.71 61.14 152.85 10.29 (1 , 0 , 0 , 0 , 1) Sirka (VR43) Block Nimdih Total 3.975 12 125.24 83.54 208.78 14.73 (1 , 1 , 0 , 0 , 2)

Page 53 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Rajnagar Govindpur

565 L079 L079-Tengrani to Chhelkhani Upgarde -- 4.400 3.750 Complete 12 91.97 61.31 153.28 20.39 (0 , 2 , 1 , 0 , 3)

566 L065 L065-Telai to Ara Hasa Upgarde -- 1.525 3.750 Complete 4 45.13 30.08 75.21 5.88 (0 , 0 , 1 , 0 , 1)

567 L073 L073-Raj Nagar to Namibera Upgarde -- 2.650 3.750 Complete 6 65.78 43.86 109.64 10.90 (0 , 0 , 1 , 0 , 1)

568 L066 L066-SH 6 to Katanga Upgarde -- 3.950 3.750 Complete 14 116.83 77.88 194.71 28.18 (0 , 0 , 2 , 0 , 2)

569 L040 L040-Bara Sigulata to Upgarde Cement 5.900 3.750 Complete 23 169.66 113.11 282.77 26.08 (0 , 1 , 1 , 0 , 2) Itapokhar via Gobardhan Stabilization Block Rajnagar Govindpur Total 18.425 59 489.37 326.24 815.61 91.43 (0 , 3 , 6 , 0 , 9)

Block- Saraikela Sadar

570 L025 L025-SH 5 at CH 25 to Sindri Upgarde -- 2.025 3.750 Complete 4 58.91 39.27 98.18 6.14 (0 , 0 , 1 , 0 , 1)

571 L024 L024-Ukari to Padampur Upgarde -- 1.000 3.750 Complete 4 19.04 12.74 31.78 5.19 (0 , 0 , 2 , 0 , 2)

572 L052 L052-Seraikela Taramba at 4 Upgarde -- 1.600 3.750 Complete 1 33.64 22.43 56.07 8.13 (1 , 0 , 0 , 0 , 1) to Pandra via Gobindpur 573 L055 L055-Ghoralong to Upgarde -- 1.575 3.750 Complete 4 41.65 27.77 69.42 7.34 (0 , 1 , 0 , 1 , 2) Kadamdiha 574 L027 L027-SH 5 at CH 27 to Upgarde -- 0.500 3.750 Complete 3 14.80 9.86 24.66 1.33 (0 , 1 , 0 , 0 , 1) Ulidih 575 L053 L053-Seraikela Taramba MDR Upgarde -- 2.100 3.000 Complete 12 60.71 40.48 101.19 11.62 (0 , 0 , 1 , 0 , 1) 1 at 5point9 to Mahalimurup 576 L044 L044-Kudarsai to Mahuldiha Upgarde -- 4.800 3.750 Complete 3 103.63 69.09 172.72 17.46 (0 , 0 , 1 , 0 , 1)

577 L054 L054-Ghoralong to Murup Upgarde -- 1.825 3.750 Complete 7 54.22 36.15 90.37 7.40 (1 , 0 , 1 , 0 , 2)

Block Saraikela Sadar Total 15.425 38 386.60 257.79 644.39 64.61 (2 , 2 , 6 , 1 , 11) District Saraikela Kharsawan Total 113.620 326 2,939.78 1,960.05 4,899.83 516.59 (8 , 24 , 26 , 5 , 63)

Page 54 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District- Simdega

Block- Jaldega

578 L037 L037-Jaldega Bansjor Road New -- 8.450 3.750 Complete 21 221.41 147.61 369.02 36.42 (0 , 0 , 1 , 1 , 2) to Binjhipani via Latapani 579 L026 L026-Orga to Dheisera Upgarde -- 4.135 3.750 Complete 5 97.17 64.78 161.95 17.85 (0 , 1 , 1 , 0 , 2) Orissa Border Block Jaldega Total 12.585 26 318.58 212.39 530.97 54.27 (0 , 1 , 2 , 1 , 4)

Block- Kurdeg

580 L064 L064-Kurdeg Barkibura to Upgarde -- 5.050 3.750 Complete 11 148.79 99.19 247.98 22.42 (1 , 0 , 0 , 1 , 2) Gariajor Block Kurdeg Total 5.050 11 148.79 99.19 247.98 22.42 (1 , 0 , 0 , 1 , 2)

District Simdega Total 17.635 37 467.37 311.58 778.95 76.69 (1 , 1 , 2 , 2 , 6)

District- West Singhbhum

Block- Bendgaon

581 L047 L047-L026 TO DURUDURDA New -- 3.800 3.750 Complete 6 124.00 82.67 206.67 14.39 (0 , 0 , 1 , 0 , 1) (VR54) 582 L051 L051-L035 TO RONGRING New -- 5.900 3.750 Complete 20 177.75 118.50 296.25 19.73 (0 , 2 , 1 , 0 , 3) (VR59) 583 T01 T01-PWD ROAD TO New -- 3.650 3.750 Complete 10 120.07 80.04 200.11 14.05 (0 , 0 , 1 , 0 , 1) GOPALPUR (VR56) 584 L042 L042-Yakubtola to Kelum New -- 1.700 3.750 Complete 4 53.11 35.41 88.52 8.04 (0 , 0 , 1 , 1 , 2)

585 L039 L039-PWD Road Kopa To New -- 3.800 3.750 Complete 8 125.31 83.54 208.85 14.38 (0 , 0 , 2 , 3 , 5) Chaki via Kendujuli 586 L052 L052-L033 TO SUWARNSAI New -- 1.925 3.750 Complete 4 63.82 42.54 106.36 8.69 (0 , 1 , 0 , 0 , 1) (VR60) Block Bendgaon Total 20.775 52 664.06 442.70 1,106.76 79.27 (0 , 3 , 6 , 4 , 13)

Page 55 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Chaibasa

587 L034 L034-Renghobasa to Upgarde -- 2.950 3.750 Complete 5 93.93 62.62 156.55 12.49 (1 , 0 , 1 , 0 , 2) Urangsai Road 588 L029 L029-Burujal to Nakahasa Upgarde -- 3.130 3.750 Complete 5 89.84 59.90 149.74 14.12 (0 , 1 , 0 , 1 , 2)

589 L025 L025-Dobrosai to Burujal Upgarde -- 3.000 3.750 Complete 11 77.18 51.45 128.63 13.12 (0 , 3 , 0 , 0 , 3)

590 L050 L050-Dangrupi to Guira Upgarde -- 4.620 3.750 Complete 9 116.96 77.97 194.93 19.12 (1 , 0 , 2 , 0 , 3)

591 L024 L024-Chandmari to Upgarde -- 3.000 3.750 Complete 6 91.99 61.33 153.32 13.68 (0 , 0 , 1 , 0 , 1) Mundasai Block Chaibasa Total 16.700 36 469.90 313.27 783.17 72.53 (2 , 4 , 4 , 1 , 11) Block- Goelkera

592 L039 L039-SARBIL TO PATUNG New -- 18.900 3.750 Complete 51 639.68 426.46 1,066.14 61.60 (0 , 4 , 4 , 0 , 8) (VR168) 593 L049 L049-GITILULI TO SIMKO New -- 6.050 3.750 Complete 15 199.96 133.31 333.27 21.35 (0 , 0 , 1 , 0 , 1) (VR178) 594 T01 T01-PURANA GOILKERA TO New -- 2.500 3.750 Complete 4 79.75 53.16 132.91 10.42 (0 , 0 , 1 , 0 , 1) KENTRA (VR182) 595 L057 L057-POSAITA TO BALIYA New -- 23.370 3.750 Complete 51 768.12 512.08 1,280.20 74.29 (0 , 1 , 1 , 3 , 5) LEVENTA (VR187) 596 L068 L068-CHITIR TO HINDUNG New -- 10.825 3.750 Complete 25 357.14 238.10 595.24 37.27 (0 , 0 , 3 , 1 , 4) (VR197) 597 L054 L054-BADGUA TO ROWAM New -- 10.670 3.750 Complete 24 352.22 234.82 587.04 35.52 (0 , 0 , 4 , 1 , 5) SIMANA (VR183) 598 L043 L043-KEBEDKERA TO New -- 3.800 3.750 Complete 3 103.78 69.18 172.96 14.16 (0 , 1 , 0 , 0 , 1) DHOBADIHA (VR172) 599 L062 L062-KONENA TO New -- 3.000 3.750 Complete 5 89.86 59.91 149.77 11.93 (0 , 0 , 1 , 0 , 1) MUKUNDPUR (VR191)

Page 56 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

600 L046 L046-T02 TO GOTAMBA New -- 1.000 3.750 Complete 3 32.83 21.88 54.71 5.94 (0 , 1 , 0 , 0 , 1) (VR175) Block Goelkera Total 80.115 181 2,623.34 1,748.90 4,372.24 272.48 (0 , 7 , 15 , 5 , 27) Block- Jagannathpur

601 L044 L044-Mundasai to Botasar Upgarde -- 1.500 3.750 Complete 3 44.24 29.50 73.74 5.82 (0 , 1 , 5 , 6 , 12)

602 L030 L030-Kakuita to Dipasai Upgarde -- 5.370 3.750 Complete 5 138.30 92.20 230.50 23.87 (0 , 2 , 0 , 0 , 2) Road 603 L037 L037-Kharhiguira to Upgarde -- 3.350 3.750 Complete 5 97.98 65.32 163.30 15.48 (0 , 0 , 1 , 3 , 4) Majhgaon Block Sima Road Block Jagannathpur Total 10.220 13 280.52 187.02 467.54 45.17 (0 , 3 , 6 , 9 , 18) Block- Jhinkpani

604 T05 T05-PWD Kolaisai to Kochra Upgarde -- 4.000 3.750 Complete 6 115.25 76.84 192.09 19.18 (0 , 0 , 4 , 1 , 5)

605 L027 L027-PWD Matagutu to Upgarde -- 5.250 3.750 Complete 7 141.18 94.12 235.30 22.55 (0 , 0 , 1 , 1 , 2) Asura road Block Jhinkpani Total 9.250 13 256.43 170.96 427.39 41.73 (0 , 0 , 5 , 2 , 7)

Block- Khuntpani

606 L047 L047-Chhota Kudabera Upgarde -- 5.500 3.750 Complete 12 140.60 93.74 234.34 23.08 (0 , 0 , 3 , 0 , 3) Chowk to Parlong Road 607 L051 L051-Pasuhatu to Galubasa Upgarde -- 3.480 3.750 Complete 6 92.40 61.60 154.00 14.57 (0 , 2 , 1 , 2 , 5)

608 L033 L033-Hesabandh to Pandabir Upgarde -- 3.500 3.750 Complete 8 100.70 67.13 167.83 15.32 (0 , 0 , 1 , 2 , 3)

Block Khuntpani Total 12.480 26 333.70 222.47 556.17 52.97 (0 , 2 , 5 , 4 , 11)

Page 57 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Kurnardungi

609 L033 L033-Andhari to Nayaktola Upgarde -- 3.000 3.750 Complete 6 88.74 59.16 147.90 13.47 (0 , 0 , 2 , 2 , 4) Road 610 L030 L030-Balibandh to Phokharia Upgarde -- 4.500 3.750 Complete 5 134.40 89.60 224.00 20.10 (0 , 0 , 2 , 3 , 5) Road 611 L029 L029-Sialbinj to Upgarde -- 2.330 3.750 Complete 2 58.45 38.97 97.42 10.17 (0 , 0 , 1 , 2 , 3) Kakhamiposi Road Block Kurnardungi Total 9.830 13 281.59 187.73 469.32 43.74 (0 , 0 , 5 , 7 , 12) Block- Manjhgaon

612 L030 L030-Haldia to Orissa Sima Upgarde -- 3.500 3.750 Complete 5 96.41 64.27 160.68 16.99 (0 , 1 , 2 , 3 , 6) Road 613 T03 T03-Pokharia to Orissa Sima Upgarde -- 6.530 3.750 Complete 10 180.67 120.45 301.12 31.62 (1 , 2 , 7 , 13 , Road 23) 614 L038 L038-kanka Setarahe Road Upgarde -- 1.500 3.750 Complete 3 46.74 31.16 77.90 7.16 (0 , 0 , 1 , 4 , 5) to Damodarsai Road Block Manjhgaon Total 11.530 18 323.82 215.88 539.70 55.77 (1 , 3 , 10 , 20 , 34) Block- Manoharpur

615 L071 L071-SATPOTKA TO SIRKA New -- 1.000 3.750 Complete 3 32.94 21.96 54.90 5.99 (0 , 1 , 0 , 0 , 1) (VR97) 616 L073 L073-BODAITA TO New -- 3.800 3.750 Complete 13 125.60 83.74 209.34 14.69 (0 , 0 , 1 , 0 , 1) TUNGRITOLA (VR99) 617 L065 L065-KULAIBURU TO New -- 12.555 3.750 Complete 38 414.86 276.58 691.44 41.60 (0 , 0 , 1 , 0 , 1) BAHADA 618 L037 L037-MAHULDIHA TO New -- 2.450 3.750 Complete 7 80.12 53.41 133.53 10.40 (0 , 0 , 1 , 0 , 1) GOPIPUR 619 L050 L050-CHIRUMATHA TO New -- 3.300 3.750 Complete 7 108.68 72.45 181.13 12.91 (0 , 0 , 1 , 0 , 1) MERALIKIR 620 L054 L054-PWD ROAD TO BANDI New -- 4.505 3.750 Complete 16 148.49 98.99 247.48 16.93 (0 , 1 , 0 , 0 , 1)

Page 58 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

621 L068 L068-PWD DOMLAI MORE TO New -- 2.590 3.750 Complete 9 81.23 54.16 135.39 10.95 (0 , 1 , 0 , 0 , 1) DOMLAI (VR94) 622 L080 L077-RAIDIH TO MAHULDIHA Upgarde -- 5.000 3.750 Complete 12 146.06 97.38 243.44 18.17 (0 , 0 , 1 , 0 , 1) (VR102) Block Manoharpur Total 35.200 105 1,137.98 758.67 1,896.65 131.63 (0 , 3 , 5 , 0 , 8)

Block- Noamundi

623 L043 L043-Lipunga to Upgarde -- 5.750 3.750 Complete 16 172.76 115.17 287.93 28.02 (0 , 2 , 1 , 0 , 3) Bakhalhating 624 L042 L042-Lipunga to Patahatu Upgarde -- 5.750 3.750 Complete 16 177.05 118.04 295.09 28.10 (0 , 1 , 0 , 0 , 1) Road 625 L041 L041-Khasjamda to Kantoria Upgarde -- 3.730 3.750 Complete 5 107.11 71.41 178.52 16.80 (0 , 0 , 1 , 1 , 2) Forest Road Block Noamundi Total 15.230 37 456.92 304.62 761.54 72.92 (0 , 3 , 2 , 1 , 6)

Block- Sonua

626 L048 L048-LODHAI TO JORO New -- 3.000 3.750 Complete 7 98.99 65.99 164.98 12.00 (0 , 1 , 0 , 0 , 1) (VR63) 627 L027 L027-Chandipur to Upgarde -- 4.780 3.750 Complete 11 122.30 81.54 203.84 22.56 (0 , 1 , 2 , 2 , 5) Brindaban Road 628 T03 T03-Sonua to Karmaba via Upgarde -- 6.950 3.750 Complete 21 348.05 232.03 580.08 32.96 (0 , 2 , 2 , 3 , 7) Lonjo 629 T02 T02-SONUA BANDU VIA GIRU Upgarde -- 5.150 3.750 Complete 13 164.93 109.95 274.88 26.26 (0 , 2 , 6 , 12 , PENDING 20) 630 L043 L043-Porahat to Upper tola New -- 4.005 3.750 Complete 16 131.93 87.96 219.89 15.45 (0 , 0 , 1 , 0 , 1)

631 L039 L039-BERA KAYAM TO New -- 4.500 3.750 Complete 13 148.32 98.88 247.20 16.71 (0 , 0 , 2 , 0 , 2) BURUKOGAM 632 L051 L051-KULUNDU TO New -- 3.350 3.750 Complete 9 106.61 71.07 177.68 13.14 (0 , 0 , 1 , 1 , 2) ASANTALIYA RWD ROAD

Page 59 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

633 L050 L050-PWD NISHCHINTPUR New -- 3.050 3.750 Complete 13 101.02 67.35 168.37 12.47 (0 , 0 , 1 , 0 , 1) TO BANJIRA (VR65) Block Sonua Total 34.785 103 1,222.15 814.77 2,036.92 151.55 (0 , 6 , 15 , 18 , 39) Block- Tantnagar

634 L021 L021-PWD Main Road to Upgarde -- 2.580 3.750 Complete 7 74.67 49.78 124.45 11.41 (0 , 1 , 0 , 1 , 2) Rugtabasa Road 635 L035 L035-PWD Main Road to Upgarde -- 2.600 3.750 Complete 6 74.98 49.99 124.97 11.64 (0 , 0 , 1 , 1 , 2) Lowalandir Block Tantnagar Total 5.180 13 149.65 99.77 249.42 23.05 (0 , 1 , 1 , 2 , 4)

Block- Tonto

636 L026 L026-Hartahatu to Kndwa Upgarde -- 5.030 3.750 Complete 12 241.19 160.79 401.98 20.69 (0 , 0 , 1 , 0 , 1) L015 Road 637 L024 L024-Talasai Khar to Upgarde -- 2.000 3.750 Complete 5 54.66 36.44 91.10 8.17 (0 , 0 , 2 , 2 , 4) Jojobassa L002 Road Block Tonto Total 7.030 17 295.85 197.23 493.08 28.86 (0 , 0 , 3 , 2 , 5)

District West Singhbhum Total 268.325 627 8,495.91 5,663.99 14,159.90 1,071.66 (3 , 35 , 82 , 75 , 195) Road Proposals Total 2,011.312 4,560 59,651.52 39,772.77 99,424.29 9,719.94 (148 , 291 , 556 , 245 , 1240) Long Span Bridge Proposals

District- East Singhbhum

Block- Dumaria

638 L036 BRIDGE OVER LOCAL NALA New -- 34.240 0.000 Complete 0 88.55 59.03 147.58 3.24 (0 , 0 , 0 , 0 , 0) AT CH-0.870 KM

Page 60 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

639 L045 BRIDGE OVER LOCAL NALA New -- 68.440 0.000 Complete 0 126.27 84.18 210.45 3.24 (0 , 0 , 0 , 0 , 0) AT CH-0.753 KM Block Dumaria Total 102.680 0 214.82 143.21 358.03 6.47 (0 , 0 , 0 , 0 , 0)

District East Singhbhum Total 102.680 0 214.82 143.21 358.03 6.47 (0 , 0 , 0 , 0 , 0)

District- Garhwa

Block- Bhandaria

640 L022 L021 to Manjri ch-1500 New -- 21.580 0.000 Complete 0 24.82 45.41 70.23 2.19 (0 , 0 , 0 , 0 , 0)

641 L030 Bargar to Gariya Ch-600 New -- 30.000 0.000 Complete 0 8.82 15.68 24.50 2.67 (0 , 0 , 0 , 0 , 0)

642 L030 Bargar to Gariya Ch-8250 New -- 25.000 0.000 Complete 0 7.02 12.48 19.50 1.89 (0 , 0 , 0 , 0 , 0)

643 L030 Bargar to Gariya Ch-9900 New -- 20.000 0.000 Complete 0 5.94 10.56 16.50 1.83 (0 , 0 , 0 , 0 , 0)

644 L036 Bhandaria to Rodo Ch-3000 New -- 30.000 0.000 Complete 0 8.82 15.68 24.50 2.66 (0 , 0 , 0 , 0 , 0)

645 T04 Tehri to Parro Ch-4050 New -- 20.000 0.000 Complete 0 5.94 10.56 16.50 1.56 (0 , 0 , 0 , 0 , 0)

646 T04 Tehri to Parro Ch-5100 New -- 22.380 0.000 Complete 0 29.84 54.59 84.43 2.09 (0 , 0 , 0 , 0 , 0)

647 T04 Tehri to Parro Ch-8500 New -- 17.130 0.000 Complete 0 31.34 56.92 88.26 2.66 (0 , 0 , 0 , 0 , 0)

648 T04 Tehri to Parro Ch-9350 New -- 22.380 0.000 Complete 0 26.30 48.11 74.41 2.62 (0 , 0 , 0 , 0 , 0)

649 T04 Tehri to Parro Ch-13.9 KM New -- 43.140 0.000 Complete 0 46.00 81.78 127.78 2.17 (0 , 0 , 0 , 0 , 0)

650 L029 Bargar to Mutaki New -- 64.580 0.000 Complete 0 50.00 132.81 182.81 5.71 (0 , 0 , 0 , 0 , 0)

651 L036 Bhandaria to Rodo Ch-2000 New -- 30.000 0.000 Complete 0 8.82 15.68 24.50 1.73 (0 , 0 , 0 , 0 , 0)

Block Bhandaria Total 346.190 0 253.66 500.24 753.91 29.78 (0 , 0 , 0 , 0 , 0)

Page 61 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Dandai

652 L021 L021- T02 to Jhotar New -- 32.360 0.000 Complete 0 34.20 62.65 96.85 2.69 (0 , 0 , 0 , 0 , 0)

Block Dandai Total 32.360 0 34.20 62.65 96.85 2.69 (0 , 0 , 0 , 0 , 0)

Block- Dhurki

653 L028 Dhuki to Kumba Kala New -- 32.360 0.000 Complete 0 35.53 65.09 100.62 3.75 (0 , 0 , 0 , 0 , 0)

654 L029 L029 - T03 to Kadwa New -- 19.580 0.000 Complete 0 32.90 59.87 92.77 2.73 (0 , 0 , 0 , 0 , 0)

Block Dhurki Total 51.940 0 68.43 124.95 193.38 6.48 (0 , 0 , 0 , 0 , 0)

Block- Ramkanda

655 L022 Udaypur to Gamhariya Ch- New -- 39.140 0.000 Complete 0 35.98 66.11 102.09 2.66 (0 , 0 , 0 , 0 , 0) 400 656 L022 Udaypur to Gamhariya Ch- New -- 39.140 0.000 Complete 0 40.19 73.65 113.84 2.81 (0 , 0 , 0 , 0 , 0) 2900 657 L022 Udaypur to Gamhariya Ch- New -- 43.920 0.000 Complete 0 42.40 77.73 120.13 3.09 (0 , 0 , 0 , 0 , 0) 3700 658 L022 Udaypur to Gamhariya ch- New -- 30.000 0.000 Complete 0 8.82 15.68 24.50 2.31 (0 , 0 , 0 , 0 , 0) 9100 Block Ramkanda Total 152.200 0 127.39 233.17 360.56 10.86 (0 , 0 , 0 , 0 , 0)

Block- Ranka

659 L024 Sikardoha to Jolanga CH- New -- 64.700 0.000 Complete 0 44.75 119.47 164.22 5.58 (0 , 0 , 0 , 0 , 0) 3700 Block Ranka Total 64.700 0 44.75 119.47 164.22 5.58 (0 , 0 , 0 , 0 , 0)

District Garhwa Total 647.390 0 528.43 1,040.48 1,568.91 55.39 (0 , 0 , 0 , 0 , 0)

District- Giridih

Page 62 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Bagodar

660 L079 Bridge Over Duma River New -- 50.000 0.000 Complete 0 68.36 45.57 113.93 0.96 (0 , 0 , 0 , 0 , 0)

Block Bagodar Total 50.000 0 68.36 45.57 113.93 0.96 (0 , 0 , 0 , 0 , 0)

Block- Tisri

661 L032 Bridge Over Nia River New -- 25.000 0.000 Complete 0 46.24 30.82 77.06 0.50 (0 , 0 , 0 , 0 , 0)

662 L034 Bridge Over Kari River New -- 100.000 0.000 Complete 0 45.03 105.07 150.10 1.98 (0 , 0 , 0 , 0 , 0)

663 L033 Bridge Over Harhara River New -- 33.000 0.000 Complete 0 50.16 33.44 83.60 0.63 (0 , 0 , 0 , 0 , 0)

664 L028 Bridge Over paha River New -- 50.000 0.000 Complete 0 63.64 42.43 106.07 1.06 (0 , 0 , 0 , 0 , 0)

Block Tisri Total 208.000 0 205.07 211.76 416.83 4.17 (0 , 0 , 0 , 0 , 0)

District Giridih Total 258.000 0 273.43 257.33 530.76 5.13 (0 , 0 , 0 , 0 , 0)

District- Godda

Block- Mahagama

665 L021 Mohani New -- 17.130 0.000 Complete 0 26.68 47.42 74.10 0.74 (0 , 0 , 0 , 0 , 0)

666 L021 Sri New -- 17.130 0.000 Complete 0 26.08 46.37 72.45 0.74 (0 , 0 , 0 , 0 , 0)

Block Mahagama Total 34.260 0 52.76 93.79 146.55 1.48 (0 , 0 , 0 , 0 , 0)

District Godda Total 34.260 0 52.76 93.79 146.55 1.48 (0 , 0 , 0 , 0 , 0)

District- Khunti

Block- Arki

667 L054 Bridge on KOTA TO New -- 37.400 0.000 Complete 0 40.21 71.49 111.70 11.17 (0 , 0 , 0 , 0 , 0) SURAKOCHA

Page 63 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

668 L054 Bridge on KOTA TO New -- 21.700 0.000 Complete 0 26.75 47.55 74.30 7.43 (0 , 0 , 0 , 0 , 0) SURAKOCHA 669 L054 Bridge on KOTA TO New -- 18.700 0.000 Complete 0 26.03 46.27 72.30 7.23 (0 , 0 , 0 , 0 , 0) SURAKOCHA Block Arki Total 77.800 0 92.99 165.31 258.30 25.83 (0 , 0 , 0 , 0 , 0)

Block- Tamar

670 - BRIDGE OVER L045 TO Upgarde -- 24.700 0.000 Complete 0 21.57 38.34 59.91 5.99 (0 , 0 , 0 , 0 , 0) BURUDIH Block Tamar Total 24.700 0 21.57 38.34 59.91 5.99 (0 , 0 , 0 , 0 , 0)

District Khunti Total 102.500 0 114.56 203.65 318.21 31.82 (0 , 0 , 0 , 0 , 0)

District- Palamau

Block- Hariharganj

671 T02 bridge in third km Batany Upgarde -- 146.000 3.750 Complete 0 117.53 263.80 381.33 0.00 (0 , 0 , 0 , 0 , 0) River 672 L065 Hl bridge in second km Upgarde -- 58.400 3.750 Complete 0 112.08 74.72 186.80 0.00 (0 , 0 , 0 , 0 , 0)

Block Hariharganj Total 204.400 0 229.61 338.52 568.13 0.00 (0 , 0 , 0 , 0 , 0)

District Palamau Total 204.400 0 229.61 338.52 568.13 0.00 (0 , 0 , 0 , 0 , 0)

District- Ranchi

Block- Burmu

673 - Kothar Upgarde -- 74.840 0.000 Complete 0 128.68 85.79 214.46 2.72 (0 , 0 , 0 , 0 , 0)

Block Burmu Total 74.840 0 128.68 85.79 214.46 2.72 (0 , 0 , 0 , 0 , 0)

Block- Kanke

674 - Local Nalah Upgarde -- 37.440 0.000 Complete 0 77.91 51.94 129.85 1.74 (0 , 0 , 0 , 0 , 0)

Block Kanke Total 37.440 0 77.91 51.94 129.85 1.74 (0 , 0 , 0 , 0 , 0)

Page 64 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Lapung

675 - LAWAGARHA Upgarde -- 112.240 0.000 Complete 0 156.69 234.13 390.82 4.86 (0 , 0 , 0 , 0 , 0)

Block Lapung Total 112.240 0 156.69 234.13 390.82 4.86 (0 , 0 , 0 , 0 , 0)

District Ranchi Total 224.520 0 363.28 371.85 735.13 9.31 (0 , 0 , 0 , 0 , 0)

District- West Singhbhum

Block- Goelkera

676 L039 BRIDGE OVER LOCAL NALA New -- 26.240 0.000 Complete 0 53.44 35.63 89.07 3.24 (0 , 0 , 0 , 0 , 0) AT CH-16.10 KM 677 L039 BRIDGE OVER LOCAL NALA New -- 34.240 0.000 Complete 0 71.81 47.88 119.69 3.24 (0 , 0 , 0 , 0 , 0) AT CH-16.85 KM 678 L039 BRIDGE OVER LOCAL NALA New -- 34.240 0.000 Complete 0 61.27 40.85 102.12 3.24 (0 , 0 , 0 , 0 , 0) AT CH-17.50 KM 679 L049 BRIDGE OVER LOCAL NALA New -- 26.240 0.000 Complete 0 62.96 41.98 104.94 3.24 (0 , 0 , 0 , 0 , 0) AT CH-1.950 KM 680 L057 BRIDGE OVER LOCAL NALA New -- 89.440 0.000 Complete 0 67.94 120.79 188.73 3.24 (0 , 0 , 0 , 0 , 0) AT CH-2.4 KM 681 L068 BRIDGE OVER LOCAL NALA New -- 68.440 0.000 Complete 0 105.56 70.37 175.93 3.24 (0 , 0 , 0 , 0 , 0) AT CH-3.65 KM 682 L068 BRIDGE OVER LOCAL NALA New -- 26.240 0.000 Complete 0 70.02 46.68 116.70 3.24 (0 , 0 , 0 , 0 , 0) AT CH-6.15 KM 683 L057 BRIDGE OVER LOCAL NALA New -- 26.240 0.000 Complete 0 66.28 44.18 110.46 3.24 (0 , 0 , 0 , 0 , 0) AT CH-6.8 KM 684 T01 BRIDGE OVER LOCAL NALA New -- 22.930 0.000 Complete 0 53.72 35.81 89.53 3.24 (0 , 0 , 0 , 0 , 0) AT CH-0.628 KM 685 L049 BRIDGE OVER LOCAL NALA New -- 68.440 0.000 Complete 0 104.19 69.46 173.65 3.24 (0 , 0 , 0 , 0 , 0) AT CH-3.45 KM

Page 65 of 66 Generated On : 21/07/2016 12:26 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

686 L068 BRIDGE OVER LOCAL NALA New -- 34.240 0.000 Complete 0 68.15 45.44 113.59 3.24 (0 , 0 , 0 , 0 , 0) AT CH-5.65 KM Block Goelkera Total 456.930 0 785.35 599.06 1,384.41 35.59 (0 , 0 , 0 , 0 , 0)

Block- Manoharpur

687 L080 BRIDGE OVER LOCAL NALA New -- 68.440 0.000 Complete 0 102.24 68.16 170.40 3.24 (0 , 0 , 0 , 0 , 0) AT CH-2.5 KM Block Manoharpur Total 68.440 0 102.24 68.16 170.40 3.24 (0 , 0 , 0 , 0 , 0)

Block- Sonua

688 L048 BRIDGE OVER LOCAL NALA New -- 39.340 0.000 Complete 0 82.47 54.98 137.45 3.24 (0 , 0 , 0 , 0 , 0) AT CH-0.725 KM Block Sonua Total 39.340 0 82.47 54.98 137.45 3.24 (0 , 0 , 0 , 0 , 0)

District West Singhbhum Total 564.710 0 970.06 722.20 1,692.26 42.06 (0 , 0 , 0 , 0 , 0)

Long Span Bridge Proposals Total 2,138.460 0 2,746.95 3,171.04 5,917.99 151.66 (0 , 0 , 0 , 0 , 0)

Grand Total Total Road Length:2011.312 Kms 4,560 62,398.47 42,943.81 1,05,342.28 9,871.60 (148 , 291 , 556 Total LSB Length:2138.460 Mtrs , 245 , 1240)

Page 66 of 66 Generated On : 21/07/2016 12:26 PM