UpstreamUpstream andand GasGas George Kirkland Executive Vice President Upstream & Gas
© 2008 Chevron Corporation Delivering on Our 2007 Commitments
99 2.6 MMBOED Production Target 99 Bibiyana Startup 99 Tengiz Staged Oil Startup 99 Agbami Progress 99 Blind Faith Progress 99 Frade Progress 99 Nigeria GTL Progress
Tahiti Progress
© 2008 Chevron Corporation 2 Additional 2007 Accomplishments
99 Superior Safety Performance 99 Thailand Contract Extension 99 Angola LNG FID 99 Chuandongbei PSC Signing 99 Agbami FPSO Arrival on Location 99 Gorgon Environmental Approvals 99 Exploration Success 99 Competitive Margins and Returns 99 NWS Train 5 Progress
Reserves Replacement
© 2008 Chevron Corporation 3 Net BOE Production 2007 vs. 2006
Thousands of Barrels Equivalent Per Day
73
(62) (16) 2,667 2,619 (43)
2006 Actual Empresa Price Base Major Capital 2007 Actual Mixta Production Projects Impact
© 2008 Chevron Corporation 4 Delivering Strong Earnings per Barrel and Competitive ROCE
Earnings/BOE (A/T) Competitive ROCE 1
$/barrel ROCE 50% $20 40%
$15 30%
$10 20%
10% $5 2007 Rank: #2 2006 Rank: #2 0% $0 2003 2004 2005 2006 2007 2003 2004 2005 2006 2007
Competitor Group: XOM, BP, COP and RDS Competitive ROCE calculated based on Chevron estimates and public information handled on a consistent basis. Excludes special items. Reconciliation to non-GAAP earnings measure for Chevron is available at www.chevron.com under Investors.
1 2007 ROCE updated on March 26, 2008
© 2008 Chevron Corporation 5 Right Effective Profitable Strategies Execution Growth
© 2008 Chevron Corporation 6 RightRight StrategiesStrategies
© 2008 Chevron Corporation 7 Upstream Has the Right Strategies
Grow profitably in core areas and build new legacy positions
Achieve world-class operational performance
Maximize and grow the Base Business
Lead the industry in selection and execution of Major Capital Projects
Achieve superior Exploration performance
Identify, capture and effectively incorporate new core positions
© 2008 Chevron Corporation 8 Positioned With a Strong Worldwide Portfolio
Regional Exploration & Production Companies
North America Europe, Eurasia and Middle East 800 MBOED 620 MBOED
11 billion BOE net proved reserves
2.7 million BOED net production capacity
Leading positions in key oil and gas basins Africa and Asia-Pacific Latin America 700 MBOED 580 MBOED
© 2008 Chevron Corporation 9 Exploration Strategy Focus and Impact
West Norway Alaska Greenland Alaska West of Shetlands Canada
East Coast Gulf of Mexico Canada Deepwater Libya Gulf of Thailand
Northwest West Africa Australia Focus Areas Deepwater Brazil Test Areas Deepwater New Entry
© 2008 Chevron Corporation 10 Growing a Diversified Resource* Portfolio
70 Resource Growth Resource Distribution Billion70 BOE Billion BOE 60
60 12% 50 Europe, Eurasia 50 and Middle East 40 40 Asia-Pacific 30 30
20 20 Americas
10 10 Africa 0 0 YE 2004 YE 2007 * Resource is defined as unrisked proved, probable and possible reserves plus potential recoverable resources contingent on commerciality. Includes oil volumes associated with Athabasca Oil Sands mining. Crude oil extracted through bitumen mining operations is not considered to be an oil and gas producing activity by the Securities and Exchange Commission. © 2008 Chevron Corporation 11 Proved Reserve Changes 2004–2007 and 2010 Projected
Millions of Barrels
1,465 2,748 605 1,413
11,252 10,777 ~11,300
YE 2004 Production Price Effect Unocal Net YE 2007 Projected Additions YE 2010
Does not include oil volumes associated with Athabasca Oil Sands mining. Crude oil extracted through bitumen mining operations is not considered to be an oil and gas producing activity by the Securities and Exchange Commission.
© 2008 Chevron Corporation 12 Proved Reserve Changes 2007–2010 Projection
Millions of Barrels
1,100
3,000 2,400
~11,300 10,777
YE 2007 Production MCP Base Adds & YE 2010 Actual Contract Projection Extensions Does not include oil volumes associated with Athabasca Oil Sands mining. Crude oil extracted through bitumen mining operations is not considered to be an oil and gas producing activity by the Securities and Exchange Commission.
© 2008 Chevron Corporation 13 Over 140 Tcf of Equity Natural Gas Resources*
Gas portfolio is growing and becoming a key component of Chevron’s overall production.
Gas Production as % Europe, Eurasia of Total Chevron and Middle East Net Production 18 Tcf 45%
40%
35% Americas 35 Tcf 30%
Africa Asia-Pacific 25% 26 Tcf 67 Tcf 2007 2010 2015 2020
* Unrisked Circles represent geographic coverage and not the size of the resource.
© 2008 Chevron Corporation 14 Growing the Gas Business
Commercialize our equity resource base while growing a high-impact global gas business
Progressing the queue of more than 10 world-class gas projects
Building a global portfolio of LNG supply
Progressing the construction of our first GTL plant
Enabling gas business growth through midstream capabilities
© 2008 Chevron Corporation 15 Gas Business Achievements 2007
Angola LNG FID
Gorgon LNG environmental approval and capacity expansion
Bibiyana startup
Angola LNG Plant site schematic Thailand contract extension and gas sales agreement signed with PTT
Chuandongbei sour gas PSC signed with CNPC
Piceance tight gas entered development phase Site works for the Angola LNG Plant
© 2008 Chevron Corporation 16 EffectiveEffective ExecutionExecution
© 2008 Chevron Corporation 17 Leader in Exploration Results
Chevron “leads its peers on our underlying exploration reserve replacement metric, having replaced an outstanding 120% of its production between 2002 and 2006 through new field exploration success alone.” RADAR report by Wood Mackenzie, January 2008
Reserve* Replacement Through Exploration, 2002-2006 Percent 140 Chevron 120
100 BP 80 Total COP Shell 60 ExxonMobil 40
20
0 *Wood Mackenzie reserve replacement metric does not reflect the Company’s reported proved reserves.
© 2008 Chevron Corporation 18 Consistent Exploration Success
Average Exploration success rate for 2002–2007 is 42% 8 7 Billions of Barrels 6 of Oil Equivalent 5 4 3 2 Cumulative Resources 1 Added From Exploration 0 2002 2003 2004 2005 2006 2007
2002 2003 2004 2005 2006 2007
Year-End Mean Resource Estimates
© 2008 Chevron Corporation 19 Exploration Finding Costs Are Among the Lowest
Underlying Finding Cost $/BOE 9
8 Competitors 7 XOM 6 BP RDS 5 COP 4
3 Competitor 2 Range
1
0 2002 2003 2004 2005 2006 Wood Mackenzie, December 2007 (Exploration Costs/Resources Found)
© 2008 Chevron Corporation 20 Key 2008 Exploration Activities
Norway Barents White Hills Rosebank Ells River
Orphan Deepwater Gulf of Mexico Libya Gulf of Nigeria Thailand Venezuela Congo Brazil Angola Northwest Australia Seismic Exploration Wells Appraisal Wells
© 2008 Chevron Corporation 21 Cost Management
Definite cost increases, Despite cost increases, our but not uniform opportunity queue remains robust IHS/CERA Upstream Capital Costs Function of local markets Index (2000 = 100) and varies between certain items 200 3Q 2007: 198 180 Combating increases 3Q 2006: 167 through: 160 140 z Effective contracting 120 z Standardization of designs and materials 100
z Modularization 80 2000 2002 2004 2006 2008
z Technology advances Source: Cambridge Energy Research Associates
© 2008 Chevron Corporation 22 Superior Contracting Strategies Have Cushioned Rising Deepwater Rig Rates
Worldwide Deepwater Rig Rates Equivalent Rig Years $M/day Under Contract 500 6 Market Average Rate Chevron Average 400 Contract Rate
4 300
200 2
100
0 0 2003 2004 2005 2006 2007 2008 Drilling units rated for >7,500 ft water depth Forecast Market data sources for similar type of rig: GDC, Fearnley Offshore, Rig Logix
© 2008 Chevron Corporation 23 Upstream Costs Have Been Among the Lowest
$/BOE Competitors 28 BP MRO COP MUR RDS OXY 24 XOM TOT HES $19.40 20 Competitor 16 Range
12
8 2002 2003 2004 2005 2006 2007 Ranking 3/10 3/10 2/10 3/10 2/10
Source: AG Edwards; includes production costs, exploration expense, DD&A and other expenses
© 2008 Chevron Corporation 24 Disciplined Base Business Focus
McAllen Ranch Field PNZ 200 200 Production MMCFPD Production MBOEPD 160 180 120 10% decline 160 80 30% decline 1% decline 140 40
0 120 2002 2003 2004 2005 2006 2007 2002 2003 2004 2005 2006 2007
San Joaquin Valley Business Unit Duri Steamflood, Indonesia 280 Production MBOPD 250 Production MBOEPD 240 260 6% decline 230 16% decline 220 240 2% decline 210 3% decline 200 220 190 200 180 2002 2003 2004 2005 2006 2007 2002 2003 2004 2005 2006 2007
© 2008 Chevron Corporation 25 Global Leader in Thermal Recovery Processes
World’s largest thermal operations: San Joaquin Valley and Duri Field
Well-positioned for future opportunities, such as Ells River, Petropiar (Hamaca) and PNZ
Heavy Oil Center of Excellence develops and deploys technology applications, tools and best practices
© 2008 Chevron Corporation 26 ProfitableProfitable GrowthGrowth
© 2008 Chevron Corporation 27 A Leading Portfolio of Projects
Amauligak Rosebank Lochnagar AOSP Expansion 1 AOSP Expansion 2 TCO SGI/SGP Karachaganak III Blind Faith Hebron Tengiz Expansion Tahiti Piceance Chuandongbei Gas Perdido Chuandongbei Gas ACG II-III Big Foot Jack Petropiar Upgrader St.Malo Plataforma Deltana Platong II Tubular Bells Vietnam Gas Gendalo - Gehem Frade North Duri Papa Terra
Agbami Nigeria GTL Usan Moho Bilondo Bonga SW Aparo Tombua Landana NWS Train 5 Greater Gorgon Nsiko Angola LNG Wheatstone Olokola Lucapa Nigeria EGP 3 All projects shown are >$1B Chevron share
© 2008 Chevron Corporation 28 A Leading Portfolio of Projects XX 2004-2007
Amauligak Rosebank Lochnagar AOSP Expansion 1 AOSP Expansion 2 X TCO SGI/SGP Karachaganak III Blind Faith Hebron Tengiz Expansion Tahiti Piceance Chuandongbei Gas Perdido Chuandongbei Gas X ACG II-III Big Foot Jack X Petropiar Upgrader St.Malo Plataforma Deltana Platong II Tubular Bells Vietnam Gas Net Production - MBOEPD Gendalo - Gehem 1200 Frade North Duri MCP Papa Terra Base
800 Agbami Nigeria GTL Usan Moho Bilondo Bonga SW Aparo Tombua Landana NWS Train 5 400 Greater Gorgon 2007 Nsiko Angola LNG Wheatstone Olokola Lucapa 2004 Nigeria EGP 3 0 All projects shown are >$1B Chevron share
© 2008 Chevron Corporation 29 A Leading Portfolio of Projects XX 2008-2009
Amauligak Rosebank Lochnagar AOSP Expansion 1 AOSP Expansion 2 TCO SGI/SGP Karachaganak III X Blind Faith Hebron Tengiz Expansion X Tahiti X Piceance Chuandongbei Gas Perdido Chuandongbei Gas ACG II-III Big Foot Jack Petropiar Upgrader St.Malo Plataforma Deltana Platong II Tubular Bells Vietnam Gas Net Production - MBOEPD Gendalo - Gehem 1200 X Frade X North Duri MCP Papa Terra Base
800 2009 X Agbami X Nigeria EGP 3 Nigeria GTL X Moho Bilondo 2008 Usan X Tombua Landana X NWS Train 5 400 Greater Gorgon Bonga SW Aparo Angola LNG Wheatstone Nsiko Lucapa 2004 Olokola 0 All projects shown are >$1B Chevron share
© 2008 Chevron Corporation 30 A Leading Portfolio of Projects XX 2010-2011
Amauligak Rosebank Lochnagar X AOSP Expansion 1 AOSP Expansion 2 TCO SGI/SGP Karachaganak III Blind Faith Hebron Tengiz Expansion Tahiti Piceance X Chuandongbei Gas X Perdido X Chuandongbei Gas ACG II-III Big Foot Jack Petropiar Upgrader St.Malo Plataforma Deltana X Platong II Tubular Bells Vietnam Gas Net Production - MBOEPD 1200 Gendalo - Gehem 2011 Frade North Duri MCP X Papa Terra Base 2010
800 Agbami Nigeria EGP 3 X Nigeria GTL Moho Bilondo X Usan Tombua Landana NWS Train 5 400 Greater Gorgon Bonga SW Aparo Angola LNG Wheatstone Nsiko Lucapa 2004 Olokola 0 All projects shown are >$1B Chevron share
© 2008 Chevron Corporation 31 Execution Focus 2008 & 2009 Startup Projects
Blind Faith – Gulf of Mexico 9 Drill and complete 3 wells in initial development plan 9 Set topsides on hull and complete integration 9 Tow to location 1Q 2008 Drill and complete 4th well 2Q 2008 First oil 2Q 2008
Tahiti – Gulf of Mexico 9 Drill all 6 wells in initial development plan 9 Topsides modules ready to install 9 Tow spar hull to field 1Q 2008 Subsea installation Phase 1 complete 2Q 2008 Set topsides on hull 3Q 2008 Subsea installation Phase 2 complete 1Q 2009 First oil 3Q 2009
© 2008 Chevron Corporation 32 Execution Focus 2008 Startup Projects
Agbami – Nigeria 9 FPSO arrived in Nigeria at year-end 2007
FPSO and subsea hookup in progress
Complete 5 producers and 1 injector by first production date
First oil by 3Q 2008
Tengiz Sour Gas Injection/ 2nd Generation Plant – Kazakhstan
9 Staged oil startup and sour gas injection
Construction and commissioning of oil, gas and sulfur plants 3Q 2008
Full production facilities startup 3Q 2008
© 2008 Chevron Corporation 33 Global Leader in Sour Oil & Gas Processing
Wyoming Tengiz China Carter Creek Sour Production Chuandongbei Sour Gas Plant Facilities Project Excellent safety, One of a kind with New opportunity reliability and excellent to apply our sour environmental performance production record capabilities and technologies
© 2008 Chevron Corporation 34 Significant Position in Asia-Pacific
2007-2011 Growth NWS Train 5 Chuandongbei Gas Project Bibiyana North Duri Steamflood Platong II
Net Production MBOEPD 2012+ Growth 800 base growth Gorgon 600 Wheatstone
400 Vietnam Gas Development Gendalo – Gehem 200
0 '05 '06 '07 '08 '09 '10 '11
© 2008 Chevron Corporation 35 Strong Presence in the Caspian and Middle East Regions
2007-2011 Growth Tengiz SGI/SGP Azeri-Chirag-Guneshli Phase III PNZ – Large Scale Steamflood Pilot
Net Production MBOEPD 2012+ Growth
600 base growth Tengiz Expansion Karachaganak III Expansion 400
200
0 '05 '06 '07 '08 '09 '10 '11
© 2008 Chevron Corporation 36 New Projects Will Increase Production in West Africa
2007-2011 Growth Agbami Tombua Landana Moho Bilondo Usan Nigeria GTL Nigeria EGP 3 Net Production MBOEPD
800 base growth 2012+ Growth
600 Angola LNG Bonga SW/Aparo 400 Bonga SW/Aparo Olokola LNG 200 Negage 0 Lucapa '05 '06 '07 '08 '09 '10 '11 Lucapa
© 2008 Chevron Corporation 37 Deepwater Brazil Adding to Latin America’s Growth
2007-2011 Growth Frade Papa-Terra
2012+ Growth Net Production MBOEPD Plataforma Deltana 300 base growth Starfish Petropiar Expansion 200
100
0 '05 '06 '07 '08 '09 '10 '11
© 2008 Chevron Corporation 38 Sustaining North American Production
2007-2011 Growth Blind Faith Tahiti Piceance San Ardo Perdido AOSP Expansion 1 Net Production MBOEPD
1000 base growth 2012+ Growth 800 Big Foot Tubular Bells 600 Tonga AOSP Expansion 2 400 Jack Hebron 200 St. Malo Amauligak
0 '05'06'07'08'09'10'11
© 2008 Chevron Corporation 39 Production Growth Driven by a Steady Queue of Projects
100% Peak Net Production MBOED Chevron WI Startup Project Production Current Operator % Project 3.5 @ $70/bbl MBOEPD Project Phase 2007 Tengiz SGI/SGP √ 50 250 Prod 3.0 Bibiyana √ 98 85 Prod San Ardo √ 100 15 Prod 2008 2.5 2008 Agbami √ 68 250 Const Blind Faith √ 75 70 Const NWS Train 5 17 95 Const 2.0 N Duri Steamflood √ 100 70 Const Moho Bilondo 32 90 Const 1.5 Callanish-Brodgar 16-25 45 Const ACG III 10 340 Const 2009 1.0 2009 Tombua Landana √ 31 100 Const Tahiti √ 58 135 Const Frade √ 52 90 Const 0.5 Piceance √ 100 70 Const Nigeria EGP 3 √ 40 140 Const 0.0 2010 Perdido 33-60 130 Const 2007 2010 Nigeria GTL √ 75 35 Const AOSP Expansion I 20 100 Const
© 2008 Chevron Corporation 40 Our Continued Commitment to Earnings and Returns
Production CAGR >3% 2005-2010
Reserves Replacement 2008-2010 Ratio >100%
TCO SGP Full Capacity 2008 Blind Faith Startup 2008 Agbami Startup 2008 NWS Train 5 Startup 2008 Tahiti Startup 2009 Frade Startup 2009 Tombua-Landana Startup 2009
© 2008 Chevron Corporation 41 AppendixAppendix
© 2008 Chevron Corporation Upstream Major Capital Projects Asia-Pacific Region
C&E Peak Prod Current Project Location Operator WI % $Billion MBOED Phase Startup
Bibiyana Gas Development Bangladesh Chevron 98.0 0.3 85 Production 2007
NWS Train 5 Australia Other 16.7 2.1 95 Construction 2008
North Duri Steamflood Indonesia Chevron 100 1.3 70 Construction 2008 Development (all phases)
Platong II Thailand Chevron 69.8* 3.1 65 Construction 2011
Chuandongbei Gas Area China Chevron 49.0 TBD 80 Design TBD
Greater Gorgon Offshore 440 Australia Chevron 50.0 TBD Design TBD Development & LNG Capacity
Wheatstone Australia Chevron 100 TBD TBD Evaluation TBD
Gendalo - Gehem Indonesia Chevron 80.0 TBD TBD Design TBD
Vietnam Gas Development Vietnam Chevron 42.9* 4.3 85 Evaluation 2012
*Represents a weighted average of Chevron’s interest across multiple blocks C&E is estimated 100% gross project C&E Peak production is estimated 100% gross production when project is at its maximum level © 2008 Chevron Corporation 43 Upstream Major Capital Projects Caspian and Middle East Regions
C&E Peak Prod Current Project Location Operator WI % $Billion MBOED Phase Startup Tengiz Sour Gas Injection/ Kazakhstan Chevron 50.0 7.2 250 Production 2007 Second Generation Plant Azeri-Chirag-Guneshli (ACG) Refer to Azerbaijan Other 10.3 340 Construction 2008 Development III Operator
Large-Scale Steamflood Pilot PNZ Chevron 50.0 0.2 10 Construction 2007
Tengiz Expansion Kazakhstan Chevron 50.0 TBD TBD Design TBD
Refer to Karachaganak Expansion III Kazakhstan Other 20.0 235 Evaluation 2012+ Operator
C&E is estimated 100% gross project C&E Peak production is estimated 100% gross production when project is at its maximum level © 2008 Chevron Corporation 44 Upstream Major Capital Projects West Africa Region – Angola/Congo
C&E Peak Prod Current Project Location Operator WI % $Billion MBOED Phase Startup
Benguela Belize Lobito Tomboco (BBLT) Deepwater Angola Chevron 31.0 2.5 200 Production 2006 Development
Tombua Landana Deepwater Angola Chevron 31.0 3.8 100 Construction 2009 Development
Moho Bilondo Deepwater Refer to Congo Other 31.5 90 Construction 2008 Development Operator
Chevron Angola LNG Angola 36.4 TBD 110 Construction 2012 (co-operator)
Negage Angola Chevron 31.0 TBD TBD Evaluation TBD
Lucapa Angola Chevron 31.0 TBD TBD Evaluation TBD
C&E is estimated 100% gross project C&E Peak production is estimated 100% gross production when project is at its maximum level © 2008 Chevron Corporation 45 Upstream Major Capital Projects West Africa Region – Nigeria
C&E Peak Prod Current Project Location Operator WI % $Billion MBOED Phase Startup Agbami Deepwater Nigeria Chevron 68.2 5.4 250 Construction 2008 Development Usan Deepwater Refer to Nigeria Other 30.0 180 Construction 2011 Development Operator
Nigeria GTL Nigeria Chevron 75.0 2.9 35 Construction 2010
Nigeria EGP3 Nigeria Chevron 40.0 2.8 140 Construction 2009
Bonga SW/Aparo Deepwater Refer to Nigeria Other 19.7* 150 Design 2012 Development Operator 500 Olokola LNG Plant Nigeria Other 19.5 TBD Design TBD capacity
Olokola Gas Supply Nigeria Chevron 40.0 TBD 360 Design TBD
*Equity is pending execution of the pre-unit agreement. C&E is estimated 100% gross project C&E Peak production is estimated 100% gross production when project is at its maximum level © 2008 Chevron Corporation 46 Upstream Major Capital Projects Latin America Region
C&E Peak Prod Current Project Location Operator WI % $Billion MBOED Phase Startup
Frade Deepwater Brazil Chevron 51.7 2.8 90 Construction 2009 Development
Papa-Terra BC-20 Deepwater Brazil Other 37.5 TBD 80 Evaluation 2011 Development
Plataforma Deltana Venezuela Chevron 60.0 TBD TBD Evaluation TBD
Petropiar Expansion Venezuela Other 30.0 TBD TBD Evaluation TBD
Trinidad Starfish and Other 50.0 TBD TBD Evaluation TBD Tobago
C&E is estimated 100% gross project C&E Peak production is estimated 100% gross production when project is at its maximum level © 2008 Chevron Corporation 47 Upstream Major Capital Projects North America Region
C&E Peak Prod Current Project Location Operator WI % $Billion MBOED Phase Startup Mid Piceance Chevron 100 7.3 70 Construction 2009 Continent San Ardo Steamflood SJV Chevron 100 0.3 15 Production 2007 Tahiti Deepwater GOM Chevron 58.0 4.7 135 Construction 2009 Blind Faith Deepwater GOM Chevron 75 1.4 70 Construction 2008 33.3 – Perdido Region Deepwater GOM Other 4.5 130 Construction 2010 60.0 Athabasca Oil Sands Project Canada Other 20.0 10.2 100 Construction 2010 (AOSP) Expansion 1 Jack GOM Chevron 50.0 TBD TBD Evaluation TBD St. Malo GOM Chevron 41.3 TBD TBD Evaluation TBD Big Foot GOM Chevron 60.0 TBD TBD Evaluation TBD Tonga GOM Chevron 20.5 TBD TBD Evaulation TBD AOSP Expansion 2 Canada Other 20.0 TBD TBD Evaluation TBD Tubular Bells GOM Other 30.0 TBD TBD Evaluation TBD Hebron Canada Chevron 28.0 TBD TBD Evaluation TBD Amauligak Canada Other 32.5 TBD TBD Evaluation TBD C&E is estimated 100% gross project C&E Peak production is estimated 100% gross production when project is at its maximum level © 2008 Chevron Corporation 48