BIO-DATA

1. Name Anil Kumar Gupta 2. Director Identification 07272946 Number (refer Note 1)

3. Income Tax PAN 4. Gender Male Nationality Indian 5. Father's Name Sh. S.N. Gupta iviother's name 5mt. Murti Devi Spouse's name Smt. Rekha Gupta 6. Date of Birth 4"July 1958 7. Present Position Retired as Chief Engineer on 31.1.2017 (Held the charge of Engineer-In-Chief from 15.7 2015 to 31.1 2017).

Occupation Service

8. Full Mailing address (present and permanent 01/2-2583157 (Res.) with PIN code, Telephone, PIN 134109 Mobile No. and E-Mail Mob.No. 9465216890 address) Email

9. Educational & Professional Qualification (Graduation onwards)

Sr. Course Subjects University/ Year of Division/ no. Institute Passing Class ----· 1. Bachelor of Civil Delhi College of 1979 st Science Engineering Engineering Engineering subjects. (Civil) 10. Work Experience:

I have worked in Irrigation and Water Resources Department, on different posts with different nature of work as per details given below:-

Sr. j Organization/ Post Held Period Nature of Work No Institute (From ­ To)

1. Central Design Assistant 13.09.1980 Carried out design of Bridges, Office (CDO) Executive to Head Regulators, X-regulator, Engineer 17.4.1984 Canals, Drains and other X­ drainaae works. 2 WAPCOS Delhi. Project 17.04.1984 During this period feasibility Engineer to reports of various projects were 11.07.1989 prepared and business development work was carried out. 3 Mechanical Executive 12.07.1989 Carried out operation and I Division, Charkhi Engineer to maintenance of various pump I Dadri 30.09.1989 houses on Lift Irrigation Schemes. 4. Bunds and Executive 01.10.1989 The duty of construction of new Investigation Engineer to bunds along the foothills and Division, 31.08.1991 maintenance of existing bunds was assigned to me.

5 Mohindergarh Executive 01.09.1991 Worked as Executive Engineer. Water Services Engineer to I was responsible for operation Division 1. 31.6.1993 and maintenance of Mahendergarh Lift Irrigation Canal System.

6 Worked In Head Executive 01.07.1993 As Executive Engineer/Works to Office Engineer to Chief Engineer/Lift Canals Unit, 30.09.1994 I used to put up files to CE/LCU for decision after thorough analvsis and mv observations. 7 Construction Executive 01.10.1994 I rehabilitated various canals Division No. 28, Engineer to and drains under WRCP Sonepat 30.09.1996 (Water Resources Consolidation Project) during this period 8 Procurement Executive 01.10.1996 During this period, I was Department Engineer to assigned the task of 30.11.1998 procurement of various instruments and machinery eg. Computers, Printers, UPS, AC's, Trucks, JCBs etc. 9. Sonepat Water Executive 01.12.1998 I was responsible for operation Services Division Engineer to and maintenance of canal 08.08.2005 system and drainage network in mv iurisdiction 10. Jhajjar Water Superin­ 09.08.2005 Construction, Operation and Services Circle, tending to maintenance of canals and Jhajjar Engineer 31.03.2007 drainage network were the task assigned to me during this period. 11 CADA, Superin­ 01.04.2007 Development of Micro Irrigation tending to System, construction of Engineer 31.08.2008 Watercourses & Construction of Field Drains was the work assigned to me. 12 Beas Satluj Chief 01.09.2008 I was handling the work of Project (BSL) Engineer to operation, maintenance and 31.03.2009 repair of Pandoh Dam, Baggi I Hydel Channel, Sundernagar balancing reservoir and tunnel & pen stocks leading to Dehar Power House. 13 Head Office Chief 31.03.2009 The various duties carried out Engineer/ to during this period are as under­ Co- 15.07.2015 ordination As Chief Engineer/ Chief Coordination: Engineer/ Apart from the Coordination BWS and work between different units of Chief the Department as well as from Engineer/ different Departments, I handled LCU the work of Construction of Kaushalya Dam (Panchkula) from beginning to its completion. This was a 34 M high dam constructed on for the purpose of flood control and supplying drinking water to Panchkula Town. As Chief Engineer/BWS: I was handling the work of construction, operation and maintenance of canal svstem and drainage network in Bhakra Area. I also handled various inter-state issues during this period. As Chief Enqineer/LCU: I was assigned the work of construction, operation and maintenance of canal system and drainage network in my jurisdiction. I was also looking after the JLN lift Irrigation System as Chief Engineer/LCU. 14. Head Office holding the 15.07.2015 As a Head of the Department, I charge of to was responsible for Engineer­ 31.01.2017 construction, operations and in-Chief maintenance of canal and drainage network of the whole of the State. I also used to attend various meetings at Govt. of level and senior level in the State. Besides Technical work, I was also handling the Administrative Work of the Department. Attending various I Inter-State meetings and I handling Inter-State disputes I was also a part of mv duties.

11. Whether No. SC/ST /OBC/Minorities/ Women (if yes, indicate the relevant category)

12. Area of 37 years Experience in Planning, design, Specialization( Fina nee, Law, construction, operation and maintenance of Management, Sales, Irrigation projects. Marketing, Administration, Research, Corporate Governance, Technical Operations or any other).

13. Indicate how you fill the laid Professionals of repute having more than 15 down criteria (Refer annex.) years of relevant domain experience in fields relevant to the Company's area of experience. 14 a)Have any legal proceedings No. initiated or are pending against you:

(b)lf yes, please furnish the Nil. details

15. (a)Have you been or are No. designated partner in limited liability partnerships (LLP):

(b) If yes, please furnish the Name of LLP Nature of J Duration (with following details industrv dates) Not applicable

16 Directorship held in Name of Nature of Nature of Duration companies (both CPSEs and Company industry directorship (with dates) Private) Director, Govt. Part time 15 7 2015 Minor Undertaking Director to Irrigation & 31.1 2017 Tubewell Corporation (MITC) Director, Govt. Part time 15.7.2015 Haryana Undertaking Director to Land 31.1.2017 Reclamation and Development Corporation (HLRDC)

k8-p Date (Anil Kumar Gupta.)