%U-% %U-% Page 1 of 9 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 105 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2014 Kodiak RSA P-185b Ton 52,650 50.00 63.33 70.00 58,222,248 05 Extension & Devils Creek Underlayer Stone, 75.00 70.00 50.00 70.00 Culvert Repair U-700 7.25% 6.33% 4.40% 5.58% (42772/53587 57474/4820) 3 Bids Tendered 2012 U-100a Linear 25 210.00 362.60 500.00 19,645,356 06 Improvements 2012 12" Class 52 Ductile Foot 150.00 330.00 210.00 273.00 (38122/53443/0) Iron Pipe 0.01% 0.04% 0.03% 0.03% 5 Bids Tendered 2016 ANC Gates B1, B3, and U-100a EACH 7 15,000.00 26,840.00 50,000.00 6,938,487 12 B5 Reconstruction FIRE HYDRANT 17,000.00 24,500.00 24,700.00 50,000.00 (46402//4958) ASSEMBLY (DOUBLE 1.98% 2.47% 2.46% 4.50% 5 Bids Tendered PUMPER) 2011 Kodiak Airport U-100a Lump 1 130,000.00 203,333.33 250,000.00 22,758,321 06 Improvements, 2011 Water System Sum 311,200.00 230,000.00 250,000.00 130,000.00 (33348/52739/4958) 0.99% 1.01% 1.05% 0.46% 3 Bids Tendered 2012 Unalaska Airport U-100b Linear 795 160.00 196.80 300.00 19,645,356 06 Improvements 2012 16" Class 52 Ductile Foot 180.00 175.00 160.00 174.00 (38122/53443/0) Iron Pipe 0.54% 0.71% 0.63% 0.67% 5 Bids Tendered 2016 ANC Gates B1, B3, and U-100b EACH 20 310.00 397.80 554.00 6,938,487 12 B5 Reconstruction ANODE 1,200.00 310.00 554.00 350.00 (46402//4959) 0.40% 0.09% 0.16% 0.09% 5 Bids Tendered 2012 Unalaska Airport U-100c Linear 235 200.00 315.40 500.00 19,645,356 06 Improvements 2012 20" Class 52 Ductile Foot 280.00 310.00 200.00 247.00 (38122/53443/0) Iron Pipe 0.25% 0.37% 0.23% 0.28% 5 Bids Tendered 2016 ANC Gates B1, B3, and U-100c(1) LINEAR 40 560.00 903.60 2,100.00 6,938,487 12 B5 Reconstruction 10-INCH C900 DR18 FOOT 300.00 560.00 608.00 600.00 (46402//4960) PVC PIPE 0.20% 0.32% 0.35% 0.31% 5 Bids Tendered 2016 ANC Gates B1, B3, and U-100c(2) LINEAR 74 270.00 531.20 1,000.00 6,938,487 12 B5 Reconstruction 12-INCH C900 DR18 FOOT 350.00 270.00 286.00 1,000.00 (46402//4960) PVC 0.43% 0.29% 0.30% 0.95% 5 Bids Tendered 2012 Unalaska Airport U-100d Each 2 5,826.00 8,705.20 13,200.00 19,645,356 06 Improvements 2012 20" Butterfly Valve and 14,500.00 13,200.00 8,000.00 5,826.00 (38122/53443/0) Valve Box 0.11% 0.13% 0.08% 0.06% 5 Bids Tendered 2016 ANC Gates B1, B3, and U-100d(1) EACH 5 3,500.00 7,464.00 20,000.00 6,938,487 12 B5 Reconstruction 10-INCH GATE VALVE 3,000.00 4,230.00 5,590.00 20,000.00 (46402//4961) 0.25% 0.30% 0.40% 1.29% 5 Bids Tendered 2016 ANC Gates B1, B3, and U-100d(2) EACH 1 5,620.00 16,392.00 50,000.00 6,938,487 12 B5 Reconstruction 12-INCH GATE VALVE 4,500.00 5,620.00 6,340.00 50,000.00 (46402//4961) 0.07% 0.08% 0.09% 0.64% 5 Bids Tendered %U-% %U-% Page 2 of 9 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 105 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2012 Unalaska Airport U-100e Each 1 4,528.00 6,365.60 8,800.00 19,645,356 06 Improvements 2012 16" Butterfly Valve and 12,500.00 8,800.00 5,000.00 4,528.00 (38122/53443/0) Valve Box 0.05% 0.04% 0.02% 0.02% 5 Bids Tendered 2011 Kodiak Airport U-100e Lump 1 10,000.00 36,666.67 50,000.00 22,758,321 06 Improvements, 2011 Utility Duct Installation Sum 31,650.00 50,000.00 50,000.00 10,000.00 (33348/52739/0) 0.10% 0.22% 0.21% 0.04% 3 Bids Tendered 2014 ANC 7L/25R U-100e.n1 Each 2 1,000.00 1,250.00 1,500.00 48,474,000 04 Rehabilitation Adjust Valve Box 1,500.00 1,000.00 1,500.00 0.00 (42781/53598/0) 0.01% 0.00% 0.01% 0.00% 2 Bids Tendered 2012 Unalaska Airport U-100f Each 1 3,625.00 5,365.00 7,700.00 19,645,356 06 Improvements 2012 12" Gate Valve and 10,000.00 7,700.00 4,500.00 3,625.00 (38122/53443/0) Valve Box 0.04% 0.04% 0.02% 0.02% 5 Bids Tendered 2015 ANC Taxiway Y&K Safety U-100f LUMP 1 1,359.81 1,786.60 2,000.00 5,289,768 05 Area Widening WATER SYSTEM SUM 5,000.00 1,359.81 2,000.00 2,000.00 (44206/55731/0) ADJUSTMENTS 0.07% 0.03% 0.04% 0.03% 3 Bids Tendered 2012 Unalaska Airport U-100g Each 1 5,500.00 10,130.00 13,000.00 19,645,356 06 Improvements 2012 Single Pumper Hydrant 10,000.00 12,650.00 7,500.00 5,500.00 (38122/53443/0) Assembly 0.04% 0.06% 0.04% 0.03% 5 Bids Tendered 2012 Unalaska Airport U-100h Each 1 6,100.00 11,420.00 16,000.00 19,645,356 06 Improvements 2012 Double Pumper 12,000.00 16,000.00 8,000.00 6,100.00 (38122/53443/0) Hydrant Assembly 0.04% 0.08% 0.04% 0.03% 5 Bids Tendered 2012 Unalaska Airport U-100i Each 1 1,000.00 2,200.00 3,300.00 19,645,356 06 Improvements 2012 Remove and Salvage 6,000.00 3,300.00 1,500.00 3,200.00 (38122/53443/0) Hydrant Assembly 0.02% 0.02% 0.01% 0.02% 5 Bids Tendered 2012 Unalaska Airport U-100j Lump 1 4,400.00 6,290.00 10,000.00 19,645,356 06 Improvements 2012 Connect to Existing Sum 10,000.00 4,400.00 6,000.00 6,050.00 (38122/53443/0) Combination 0.04% 0.02% 0.03% 0.03% 5 Bids Tendered Air/Vacuum Relief Vault 2012 Unalaska Airport U-100k Each 3 1,500.00 7,220.00 16,500.00 19,645,356 06 Improvements 2012 Connect to Existing 7,000.00 16,500.00 1,500.00 3,100.00 (38122/53443/0) Waterline 0.08% 0.25% 0.02% 0.04% 5 Bids Tendered 2012 Unalaska Airport U-100l Lump 1 13,150.00 53,270.00 200,000.00 19,645,356 06 Improvements 2012 Abandon Existing Sum 10,000.00 13,200.00 20,000.00 13,150.00 (38122/53443/0) Waterline 0.04% 0.07% 0.10% 0.06% 5 Bids Tendered 2016 ANC Gates B1, B3, and U-101a(1) LINEAR 1,008 360.00 661.00 1,000.00 6,938,487 12 B5 Reconstruction CIPP WATER PIPE FOOT 670.00 360.00 420.00 1,000.00 (46402//0) LINER (10-INCH) 11.23% 5.23% 6.03% 12.96% 5 Bids Tendered %U-% %U-% Page 3 of 9 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 105 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2016 ANC Gates B1, B3, and U-101a(2) LINEAR 315 375.00 609.00 1,000.00 6,938,487 12 B5 Reconstruction CIPP WATER PIPE FOOT 720.00 375.00 420.00 1,000.00 (46402//0) LINER (12-INCH) 3.77% 1.70% 1.89% 4.05% 5 Bids Tendered 2016 ANC Gates B1, B3, and U-101b LUMP 1 50,000.00 85,400.00 150,000.00 6,938,487 12 B5 Reconstruction CIPP ACCESS PIT AT SUM 95,000.00 107,000.00 150,000.00 60,000.00 (46402//0) HYDRANT 1924-914 1.58% 1.54% 2.14% 0.77% 5 Bids Tendered 2012 Unalaska Airport U-200a Linear 770 95.00 110.00 130.00 19,645,356 06 Improvements 2012 6" Class 52 Ductile Foot 115.00 130.00 100.00 95.00 (38122/53443/0) Iron Pipe 0.33% 0.51% 0.38% 0.35% 5 Bids Tendered 2009 Chignik Lagoon Runway U-200a Lump 1 50,000.00 152,760.00 238,800.00 4,754,600 05 Repairs Rebid Sanitary Sewer Sum 111,000.00 200,000.00 150,000.00 125,000.00 (23073/51024/4962) System 2.01% 4.21% 2.97% 2.42% 5 Bids Tendered 2011 U-200a 110000 1.0 45,000.00 60,000.00 100,000.00 1,475,427 09 Improvements (33921) Sanitary Sewer (Alt) 110,000.00 45,000.00 50,000.00 100,000.00 4 Bids Tendered System 4.95% 3.05% 3.17% 5.58% 2011 Homer Airport U-200a LUMP 1 45,000.00 60,000.00 100,000.00 1,475,427 09 Improvements Sanitary Sewer SUM 110,000.00 45,000.00 50,000.00 100,000.00 (33921/52714/0) System 4.95% 3.05% 3.17% 5.58% 4 Bids Tendered 2017 Aip U-200a LUMP 1 96,000.00 103,000.00 110,000.00 9,826,116 03 Drainage Improvements SANITARY SEWER SUM 30,000.00 110,000.00 96,000.00 0.00 (46769/69436/0) SYSTEM 0.27% 1.12% 0.86% 0.00% 2 Bids Tendered 2017 Aniak Airport Runway Shift U-200a LUMP 1 265,000.00 591,250.00 1,500,000.00 38,969,351 09 (47424//0) SANITARY SEWER SUM 220,000.00 325,000.00 265,000.00 1,500,000.00 4 Bids Tendered SYSTEM 0.47% 0.83% 0.67% 3.66% 2012 Kotzebue Airport And U-200a.n2 Lump 1 800,000.00 1,251,666.67 1,480,000.00 30,931,995 09 Safety Area Improvements Sanitary Sewer Sum 830,000.00 1,480,000.00 800,000.00 1,475,000.00 - Stage I I I System, SDR-17 2.62% 4.78% 2.58% 4.67% (38453/63851/0) 3 Bids Tendered 2012 Unalaska Airport U-200b Each 1 3,000.00 8,480.00 12,000.00 19,645,356 06 Improvements 2012 4' Diameter Manhole 9,000.00 11,000.00 3,000.00 6,400.00 (38122/53443/0) 0.03% 0.06% 0.01% 0.03% 5 Bids Tendered 2012 Unalaska Airport U-200c Each 1 1,350.00 5,610.00 10,000.00 19,645,356 06 Improvements 2012 Drop Connection 5,000.00 7,700.00 4,000.00 1,350.00 (38122/53443/0) 0.02% 0.04% 0.02% 0.01% 5 Bids Tendered 2012 Unalaska Airport U-200d Each 2 8,000.00 13,300.00 18,000.00 19,645,356 06 Improvements 2012 Cleanout Manhole 12,000.00 16,500.00 9,000.00 8,000.00 (38122/53443/0) 0.09% 0.17% 0.09% 0.08% 5 Bids Tendered 2017 Aniak Airport Runway Shift U-200d LUMP 1 25,000.00 38,212.50 65,000.00 38,969,351 09 (47424//0) SAND-CEMENT SUM 40,000.00 28,000.00 65,000.00 25,000.00 4 Bids Tendered SLURRY 0.09% 0.07% 0.16% 0.06% %U-% %U-% Page 4 of 9 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 105 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2015 ANC Taxiway Y&K Safety U-200d LUMP 1 2,000.00 2,600.43 3,000.00 5,289,768 05 Area Widening SANITARY SEWER SUM 5,000.00 2,801.29 3,000.00 2,000.00 (44206/55731/0) ADJUSTMENTS 0.07% 0.05% 0.05% 0.03% 3 Bids Tendered 2016 ANC Taxiway R U-200d Each 1 10,000.00 20,000.00 30,000.00 19,955,808 04 Improvements & ANC Sanitary Sewer 10,000.00 30,000.00 10,000.00 0.00 Taxiway T Improvements Manhole 0.04% 0.15% 0.05% 0.00% (45753//4962) 2 Bids Tendered 2010 Northern Region U-200d.1 Each 2 1,400.00 4,633.33 10,000.00 2,002,694 03 Certificated Airport Adjust Manhole 1,500.00 1,400.00 2,500.00 10,000.00 Compliance Stage I I 0.13% 0.14% 0.22% 0.57% (Kotzebue) (27773/63503/0) 3 Bids Tendered 2018 ANC Runway 15/33 U-200d.n2 Each 2 2,500.00 3,250.00 4,000.00 52,882,604 03 Rehabilitation Sanitary Sewer 10,000.00 4,000.00 2,500.00 0.00 (48247/Z590490000/4962) Manhole 0.03% 0.02% 0.01% 0.00% 2 Bids Tendered 2012 Unalaska Airport U-200e Each 1 2,000.00 11,760.00 25,000.00 19,645,356 06 Improvements 2012 Connect to Existing 8,000.00 18,700.00 2,000.00 3,100.00 (38122/53443/0) Sewer Line 0.03% 0.10% 0.01% 0.01% 5 Bids Tendered 2012 Unalaska Airport U-200f Lump 1 14,500.00 35,900.00 95,000.00 19,645,356 06 Improvements 2012 2" Force Main Sum 25,000.00 95,000.00 30,000.00 14,500.00 (38122/53443/0) 0.09% 0.48% 0.15% 0.07% 5 Bids Tendered 2012 Unalaska Airport U-200g Lump 1 13,150.00 19,030.00 25,000.00 19,645,356 06 Improvements 2012 Abandon Existing Sum 10,000.00 22,000.00 25,000.00 13,150.00 (38122/53443/0) Sewer Line 0.04% 0.11% 0.12% 0.06% 5 Bids Tendered 2017 Haines Airport Aip U-200h LUMP 1 5,750.00 12,875.00 20,000.00 9,826,116 03 Drainage Improvements REMOVE SANITARY SUM 15,000.00 5,750.00 20,000.00 0.00 (46769/69436/0) SEWER SYSTEM 0.14% 0.06% 0.18% 0.00% 2 Bids Tendered 2017 Haines Airport Aip U-200z LUMP 1 2,500.00 2,850.00 3,200.00 9,826,116 03 Drainage Improvements SANITARY SEWER SUM 2,000.00 3,200.00 2,500.00 0.00 (46769/69436/0) AS-BUILT PLANS 0.02% 0.03% 0.02% 0.00% 2 Bids Tendered 2014 Koliganek Airport U-500a Lump 1 45,000.00 69,080.63 95,903.14 7,994,086 09 Reconstruction Primary Line Extension Sum 100,000.00 45,000.00 64,500.00 95,903.14 (43353/59276/4967) 1.44% 0.56% 0.75% 0.99% 5 Bids Tendered 2012 Unalaska Airport U-500a Lump 1 5,000.00 12,720.00 25,000.00 19,645,356 06 Improvements 2012 Retire 35KV, 3-Phase Sum 50,000.00 12,000.00 5,000.00 6,600.00 (38122/53443/0) Underground Electric 0.19% 0.06% 0.02% 0.03% 5 Bids Tendered Circuit %U-% %U-% Page 5 of 9 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 105 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2010 Northern Region U-500a Lump 1 100,000.00 206,666.67 360,000.00 2,002,694 03 Certificated Airport Underground Electrical Sum 42,500.00 160,000.00 100,000.00 360,000.00 Compliance Stage I I Utility System 1.88% 7.99% 4.35% 10.30% (Kotzebue) (27773/63503/4967) 3 Bids Tendered

2016 Kotzebue Airport Ga Apron U-500a Lump 1 20,000.00 139,333.33 200,000.00 5,943,070 08 Expansion (46137//0) Underground Electrical Sum 151,000.00 198,000.00 200,000.00 20,000.00 3 Bids Tendered Utility System 3.17% 3.33% 3.15% 0.30% 2012 Kotzebue Airport And U-500a.n2 Lump 1 103,500.00 372,833.33 700,000.00 30,931,995 09 Safety Area Improvements Underground Electrical Sum 354,500.00 103,500.00 700,000.00 315,000.00 - Stage I I I Utility System 1.12% 0.33% 2.26% 1.00% (38453/63851/0) 3 Bids Tendered 2013 Runway U-500b .n2_B Lump 1 20,000.00 65,000.00 150,000.00 26,561,061 09 Safety Area Electrical Line Sum 76,498.95 150,000.00 25,000.00 20,000.00 Improvements/ Nome Extension 0.23% 0.56% 0.08% 0.05% Apron Improvements (41524/61413/60558/0) 3 Bids Tendered 2009 Runway U-500b Lump 1 137,000.00 232,800.00 437,000.00 5,448,815 02 Relocation Electrical Line Sum 150,000.00 240,000.00 137,000.00 437,000.00 (19058/57775/4968) Extension 1.85% 4.40% 2.06% 6.29% 5 Bids Tendered 2011 U-500b Lump 1 400,000.00 550,000.00 790,000.00 6,767,130 03 Relocation, Stage I V Electrical Line Sum 1,200,000.00 450,000.00 790,000.00 560,000.00 (32334/62325 & Extension 12.13% 6.65% 10.99% 7.55% 61823/4968) 7 Bids Tendered 2015 U-500b Lump 1 81,000.00 115,250.00 200,000.00 25,767,875 08 Improvements Electrical Line Sum 87,461.00 85,000.00 81,000.00 200,000.00 (44980/57419/4968) Extension 0.33% 0.33% 0.29% 0.69% 4 Bids Tendered 2012 Tununak Airport U-500b Lump 1 600,000.00 843,040.00 1,220,000.00 19,963,988 09 Relocation Electrical Line Sum 969,186.68 1,000,000.00 600,000.00 1,220,000.00 (38596/51791/4968) Extension 4.31% 5.01% 2.87% 5.63% 5 Bids Tendered 2009 Takotna Airport Relocation U-500b Lump 1 165,000.00 249,500.00 350,000.00 13,296,580 07 (23792/56774/4968) Electrical Line Sum 200,000.00 235,000.00 165,000.00 248,000.00 4 Bids Tendered Extension 1.33% 1.77% 1.20% 1.69% 2010 Relocation - U-500b Lump 1 50,000.00 163,400.00 300,000.00 13,477,354 06 Phase II Electrical Line Sum 63,400.00 165,000.00 50,000.00 147,000.00 (28834/57796/4968) Extension 0.36% 1.22% 0.32% 0.87% 5 Bids Tendered 2015 Pilot Station Airport U-500b Lump 1 507,000.00 668,666.67 800,000.00 19,784,261 08 Relocation Electrical Line Sum 617,688.00 507,000.00 680,000.00 800,000.00 (44341/62581/0) Extension 4.07% 2.56% 3.40% 3.69% 6 Bids Tendered %U-% %U-% Page 6 of 9 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 105 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2010 Chefornak Airport U-500b Lump 1 300,000.00 362,692.00 500,000.00 17,443,650 09 Relocation - Stage ii Electrical Line Sum 234,400.00 300,000.00 312,000.00 360,000.00 (30873/57281/4968) Extension 1.07% 1.72% 1.78% 1.90% 8 Bids Tendered 2012 Unalaska Airport U-500b Each 1 40,000.00 71,000.00 100,000.00 19,645,356 06 Improvements 2012 Install 35 KV, 3-Phase 150,000.00 68,000.00 40,000.00 47,000.00 (38122/53443/0) Pad Mounted Section 0.56% 0.35% 0.20% 0.23% 5 Bids Tendered Cabinet 2014 Koliganek Airport U-500b Lump 1 5,600.00 18,524.29 30,421.44 7,994,086 09 Reconstruction Secondary Line Sum 15,000.00 24,000.00 6,600.00 30,421.44 (43353/59276/4968) Extension to Electrical 0.22% 0.30% 0.08% 0.31% 5 Bids Tendered Equipment Building 2016 Kotzebue Airport Ga Apron U-500b Lump 1 20,000.00 33,333.33 60,000.00 5,943,070 08 Expansion (46137//0) Underground Sum 23,000.00 20,000.00 60,000.00 20,000.00 3 Bids Tendered Telephone Utility 0.48% 0.34% 0.94% 0.30% System 2012 Kotzebue Airport And U-500b.n2 Lump 1 55,000.00 107,666.67 200,000.00 30,931,995 09 Safety Area Improvements Underground Sum 104,500.00 68,000.00 200,000.00 55,000.00 - Stage I I I Telephone Utility 0.33% 0.22% 0.65% 0.17% (38453/63851/0) System 3 Bids Tendered 2012 Unalaska Airport U-500c Linear 535 53.00 74.00 100.00 19,645,356 06 Improvements 2012 Electrical Distribution Foot 150.00 53.00 85.00 100.00 (38122/53443/0) Duct Bank, 2-6 inch 0.30% 0.14% 0.23% 0.26% 5 Bids Tendered HDPE Conduits 2015 Hooper Bay Airport U-500c Lump 1 100,000.00 314,250.00 420,000.00 25,767,875 08 Improvements Electrical Line Sum 529,746.00 380,000.00 357,000.00 100,000.00 (44980/57419/4969) Relocation 1.99% 1.47% 1.28% 0.34% 4 Bids Tendered 2014 Koliganek Airport U-500c Lump 1 4,000.00 10,320.31 19,601.57 7,994,086 09 Reconstruction Secondary Line Sum 15,000.00 6,500.00 4,500.00 19,601.57 (43353/59276/4969) Extension to FAA 0.22% 0.08% 0.05% 0.20% 5 Bids Tendered Facility 2009 U-500c.2 Lump 1 18,500.00 43,946.67 81,340.00 8,080,460 06 Improvements Electrical Line Sum 35,000.00 81,340.00 32,000.00 18,500.00 (23512/62595/4969) Relocation 0.43% 1.01% 0.38% 0.13% 3 Bids Tendered 2012 Kotzebue Airport And U-500c.n2 Lump 1 65,000.00 87,333.33 100,000.00 30,931,995 09 Safety Area Improvements Underground Fiber Sum 90,000.00 97,000.00 100,000.00 65,000.00 - Stage I I I Optic Utility System 0.28% 0.31% 0.32% 0.21% (38453/63851/0) 3 Bids Tendered 2017 Aniak Airport Runway Shift U-500d LINEAR 6,465 8.10 21.46 50.00 38,969,351 09 (47424//0) REMOVE OVERHEAD FOOT 4.00 14.00 8.10 50.00 4 Bids Tendered ELECTRICAL LINE 0.06% 0.23% 0.13% 0.79% 2012 Unalaska Airport U-500d Linear 650 61.00 99.40 154.00 19,645,356 06 Improvements 2012 Telecom Distribution Foot 200.00 61.00 135.00 154.00 (38122/53443/0) Duct Bank, 4-4 inch 0.49% 0.20% 0.44% 0.48% 5 Bids Tendered HDPE Conduits %U-% %U-% Page 7 of 9 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 105 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2012 Kotzebue Airport And U-500d.n2 Lump 1 85,000.00 90,000.00 100,000.00 30,931,995 09 Safety Area Improvements Underground FAA Sum 116,500.00 85,000.00 100,000.00 85,000.00 - Stage I I I Communications 0.37% 0.27% 0.32% 0.27% (38453/63851/0) System 3 Bids Tendered 2012 Unalaska Airport U-500e Linear 815 97.00 142.40 240.00 19,645,356 06 Improvements 2012 Combination Foot 300.00 97.00 155.00 240.00 (38122/53443/0) Electrical/Telecom 0.92% 0.40% 0.63% 0.94% 5 Bids Tendered Duct Bank, 2-6 & 4-4 inch HDPE Conduits 2017 Aniak Airport Runway Shift U-500e LINEAR 2,620 8.00 19.03 50.00 38,969,351 09 (47424//0) REMOVE FOOT 3.00 8.00 10.10 50.00 4 Bids Tendered UNDERGROUND 0.02% 0.05% 0.07% 0.32% ELECTRICAL LINE 2012 Unalaska Airport U-500f Each 1 29,500.00 38,300.00 47,000.00 19,645,356 06 Improvements 2012 Furnish & Install 20,000.00 29,500.00 40,000.00 47,000.00 (38122/53443/0) Electrical Pull Vault 0.07% 0.15% 0.20% 0.23% 5 Bids Tendered 2017 Aniak Airport Runway Shift U-500f EACH 12 405.00 6,238.75 20,000.00 38,969,351 09 (47424//0) REMOVE 1,000.00 2,900.00 405.00 20,000.00 4 Bids Tendered TRANSFORMER 0.03% 0.09% 0.01% 0.59% 2017 Aniak Airport Runway Shift U-500g LINEAR 6,015 33.35 68.34 150.00 38,969,351 09 (47424//0) INSTALL OVERHEAD FOOT 35.00 45.00 33.35 150.00 4 Bids Tendered ELECTRICAL LINE 0.45% 0.69% 0.51% 2.20% 2012 Unalaska Airport U-500g Each 1 4,500.00 7,700.00 16,000.00 19,645,356 06 Improvements 2012 Install 20,000.00 4,500.00 5,000.00 7,000.00 (38122/53443/0) Telecommunications 0.07% 0.02% 0.02% 0.03% 5 Bids Tendered Handhole 2017 Aniak Airport Runway Shift U-500h LINEAR 1,150 24.75 105.50 200.00 38,969,351 09 (47424//0) INSTALL FOOT 50.00 100.00 24.75 200.00 4 Bids Tendered UNDERGROUND 0.12% 0.30% 0.07% 0.56% ELECTRICAL LINE 2012 Unalaska Airport U-500h Each 2 400.00 1,704.00 6,500.00 19,645,356 06 Improvements 2012 Vault Coring 5,000.00 400.00 600.00 520.00 (38122/53443/0) 0.04% 0.00% 0.01% 0.01% 5 Bids Tendered 2012 Unalaska Airport U-500i Linear 1,350 70.00 77.60 87.00 19,645,356 06 Improvements 2012 35kV Cable Installation Foot 200.00 70.00 76.00 87.00 (38122/53443/0) and Termination 1.01% 0.48% 0.51% 0.57% 5 Bids Tendered 2017 Aniak Airport Runway Shift U-500i EACH 4 5,700.00 17,800.00 50,000.00 38,969,351 09 (47424//0) INSTALL 15,000.00 5,800.00 9,700.00 50,000.00 4 Bids Tendered TRANSFORMER 0.13% 0.06% 0.10% 0.49% 2012 Unalaska Airport U-500j Lump 1 6,000.00 14,640.00 21,000.00 19,645,356 06 Improvements 2012 Abandon Existing Sum 20,000.00 6,000.00 18,200.00 21,000.00 (38122/53443/0) Electric Conduits 0.07% 0.03% 0.09% 0.10% 5 Bids Tendered 2017 Aniak Airport Runway Shift U-500j EACH 6 2,800.00 6,475.00 10,000.00 38,969,351 09 (47424//0) INSTALL SERVICE 2,500.00 6,600.00 2,800.00 10,000.00 4 Bids Tendered ENTRANCE 0.03% 0.10% 0.04% 0.15% %U-% %U-% Page 8 of 9 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 105 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2012 Unalaska Airport U-500k Lump 1 2,230.00 7,746.00 15,000.00 19,645,356 06 Improvements 2012 Abandon Existing Sum 20,000.00 2,230.00 9,000.00 9,500.00 (38122/53443/0) Telecommunications 0.07% 0.01% 0.04% 0.05% 5 Bids Tendered Duct 2017 Aniak Airport Runway Shift U-500k LINEAR 1,116 11.00 34.25 100.00 38,969,351 09 (47424//0) INSTALL OVERHEAD FOOT 15.00 11.00 15.00 100.00 4 Bids Tendered TELEPHONE LINE 0.04% 0.03% 0.04% 0.27% 2017 Aniak Airport Runway Shift U-500l LINEAR 3,595 23.50 45.13 100.00 38,969,351 09 (47424//0) INSTALL FOOT 30.00 24.00 33.00 100.00 4 Bids Tendered UNDERGROUND 0.23% 0.22% 0.30% 0.88% TELEPHONE LINE 2017 Aniak Airport Runway Shift U-500m* LUMP 1 21,550.00 144,262.50 500,000.00 38,969,351 09 (47424//0) ELECTRICAL UTILITY SUM 36,000.00 28,000.00 21,550.00 500,000.00 4 Bids Tendered BETTERMENTS 0.08% 0.07% 0.05% 1.22% 2016 FIA Security Upgrades U-505a-1 Lump 1 0.00 2,306,031.00 2,994,000.00 3,350,366 08 FY2015 (46071/60540/0) CCTV/Security Sum 2,432,650.00 2,793,777.00 2,945,344.00 2,929,361.00 6 Bids Tendered System, includes door 77.91% 83.39% 83.49% 74.28% and gate controls 2016 FIA Security Upgrades U-505a-2 Lump 1 0.00 299,852.50 616,213.00 3,350,366 08 FY2015 (46071/60540/0) CCTV/Security Sum 453,350.00 320,222.00 325,080.00 616,213.00 6 Bids Tendered System, complete 14.52% 9.56% 9.22% 15.63% 2016 ANC Gates B1, B3, and U-600a LUMP 1 400,000.00 541,600.00 750,000.00 6,938,487 12 B5 Reconstruction FUEL SYSTEM SUM 900,000.00 653,000.00 405,000.00 400,000.00 (46402//4978) MODIFICATIONS 14.96% 9.41% 5.77% 5.14% 5 Bids Tendered 2013 ANC Taxiways M, L & U-600o.n2 Contingent 1 20,000.00 20,000.00 20,000.00 13,468,572 06 Taxilane E2 Assess Infrastructure Sum 20,000.00 20,000.00 20,000.00 0.00 Reconstruction 0.14% 0.15% 0.14% 0.00% (40991/54028/0) 2 Bids Tendered 2018 ANC Taxiway R Group VI U-600q Each 4 130,000.00 130,000.00 130,000.00 15,287,034 03 Improvements (48142//0) Fuel Vault Extension 163,645.00 130,000.00 130,000.00 0.00 2 Bids Tendered (Aircraft Rated) 4.01% 3.40% 3.38% 0.00% 2013 ANC Taxiways M, L & U-600q Each 2 48,300.00 49,150.00 50,000.00 13,468,572 06 Taxilane E2 PCC Fuel Vault Lid 25,500.00 50,000.00 48,300.00 0.00 Reconstruction Replacement 0.36% 0.74% 0.67% 0.00% (40991/54028/0) 2 Bids Tendered 2013 ANC Taxiways M, L & U-600r Each 1 30,000.00 31,700.00 33,400.00 13,468,572 06 Taxilane E2 EMS Pit and PCC Slab 5,000.00 30,000.00 33,400.00 0.00 Reconstruction Replacement 0.04% 0.22% 0.23% 0.00% (40991/54028/0) 2 Bids Tendered 2018 ANC Taxiway R Group VI U-600r Each 1 75,000.00 77,500.00 80,000.00 15,287,034 03 Improvements (48142//0) Fuel Vault Extension 85,500.00 80,000.00 75,000.00 0.00 2 Bids Tendered (Non-Aircraft Rated) 0.52% 0.52% 0.49% 0.00% 2015 ANC Taxiway Y&K Safety U-600r LUMP 1 2,759.90 11,919.97 25,000.00 5,289,768 05 Area Widening PETROLEUM LINE SUM 5,000.00 2,759.90 8,000.00 25,000.00 (44206/55731/0) ADJUSTMENTS 0.07% 0.05% 0.14% 0.39% 3 Bids Tendered (ASIG) %U-% %U-% Page 9 of 9 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 105 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2018 ANC Taxiway R Group VI U-600s Each 5 3,000.00 3,250.00 3,500.00 15,287,034 03 Improvements (48142//0) Cathodic Protection 6,500.00 3,000.00 3,500.00 0.00 2 Bids Tendered Test Station 0.20% 0.10% 0.11% 0.00% 2013 ANC Taxiways M, L & U-600s.n2 Each 1 30,000.00 32,584.00 35,168.00 13,468,572 06 Taxilane E2 LPD Pit and PCC Slab 5,000.00 30,000.00 35,168.00 0.00 Reconstruction Replacement 0.04% 0.22% 0.24% 0.00% (40991/54028/0) 2 Bids Tendered 2018 ANC Taxiway R Group VI U-600t Each 2 34,000.00 34,500.00 35,000.00 15,287,034 03 Improvements (48142//0) High Point Vent 34,000.00 35,000.00 34,000.00 0.00 2 Bids Tendered Adjustment 0.42% 0.46% 0.44% 0.00% 2018 ANC Taxiway R Group VI U-600u Each 1 35,000.00 40,000.00 45,000.00 15,287,034 03 Improvements (48142//0) Low Point Drain 42,500.00 35,000.00 45,000.00 0.00 2 Bids Tendered Adjustment 0.26% 0.23% 0.29% 0.00% 2017 U-700a Each 1 275.00 6,400.07 30,000.00 2,947,832 03 Lake Hood Lakeshore Utility Crossing 2,005.00 1,500.00 5,000.00 3,225.70 Taxilane Reconstruction 0.05% 0.05% 0.17% 0.11% (46714//0) 10 Bids Tendered 2016 U-700a EACH 8 1,100.00 2,060.00 5,000.00 6,793,720 04 Improvements & UTILITY CROSSING 2,500.00 2,560.00 2,500.00 1,500.00 Pavement Rehabilitation 0.15% 0.30% 0.29% 0.15% (45740//0) 11 Bids Tendered 2017 Sitka Perimeter Fencing & U-700a Lump 1 8,000.00 54,000.00 100,000.00 692,400 08 Gate Upgrades (47258//0) Utility Crossing Sum 10,000.00 100,000.00 8,000.00 0.00 2 Bids Tendered Locates 1.73% 14.44% 1.01% 0.00% 2017 Haines Airport Aip U-700c LUMP 1 2,500.00 14,875.00 27,250.00 9,826,116 03 Drainage Improvements UTILITY SUM 10,000.00 27,250.00 2,500.00 0.00 (46769/69436/0) COORDINATION 0.09% 0.28% 0.02% 0.00% 2 Bids Tendered 2018 Lake Hood Seaplane Base U-800b Lump 1 83,000.00 110,703.96 180,000.00 5,162,564 03 LHD Taxiway V Aircraft Detection Sum 35,000.00 83,000.00 147,000.00 85,000.00 Reconstruction System Modifications 0.59% 1.61% 2.76% 1.55% (48180//4993) 8 Bids Tendered