TECHNICAL DEMANDING Brisbane Airport Link Tunnel, AustraliaTunnel, Link Airport Brisbane 1 TECHNICAL DEMANDING Brisbane Airport Link Tunnel, AustraliaTunnel, Link Airport Brisbane       Sales    Activities:  Technical demand: 2010/2011/2012 $3Mioworthmembrane,discs,ofanchors,waterbars, etc Specificationselling siteinspectionRegular customerSikavisitto AG Corporate– support Fullwaterproofing system Sika Sika Grouts/Flex/Dur 1,000,000 pcs of Tunnelling Sikaplan Discs 40,000 pcs Sika Anchor 20,000 meters Waterbars – 300,000 m2 of 2mm Sikaplan membrane PVC 2 TECHNICAL DEMANDING Wisconsin, USA Wisconsin, Omron Nestle Nutrition, Eau Claire, Claire, Eau Nutrition, Nestle 3 TECHNICAL DEMANDING Wisconsin, USA Wisconsin, Omron Total-$4,150,000!!!     Sales: theinsulationcompleteand roofingsysteminstalledwas waskeepto installeddryduringthebuilding the wint  variousTraffic etc.types, materialincludingrequirementsCleaningChemicalResist  spray-appliedof levelingSikaTopmortars(keyproblem so  Blockand   Durability, etc.  Technical demand: Total-$4,150,000!!! FlooringBU-$1,100,000 RoofingBU-$2,900,000 BU-$150,000Contractors RoofingInitialinstallationawasverycold during wea RoomFloorsWallsbidwith& wereRoomeach by Room, h concreteMajordefectissuessurface overrequiredsf 100,000 SubstratesincludedPrecastConcrete,Cast-In-Pace Walls,Pr ceilingsFloors,walls,coated all ProjectbasedondesignNestle newrequiremen Corporate Nestle Nutrition, Eau Claire, Claire, Eau Nutrition, Nestle The The entireplantbuiltfood aCleanroom!waslike er, then inthenthespring er, ther. Sarnafil2-Ply ther. (technical solution)(technical ance, Hygiene,ance, lver!) ts for Hygiene,for ts aving individualaving 1/8”-1/4”of ecastPlanks 4 TECHNICAL DEMANDING Strengthening, and Waterproofing, UAE Waterproofing, and Strengthening, Repair, &Substations Manholes RC Admixtures for for Admixtures precast 5 TECHNICAL DEMANDING Strengthening, and Waterproofing, UAE Waterproofing, and Strengthening, Repair, &Substations Manholes RC cables cables case (33 KV cables) Contractor might be forced to work with the life not possible. Very important industrial zones. existing structures. Evenlonger shutdown times  only. months 6 after products competitor using trials Failed repair leakage. water and problems structural reinforcement, of corrosion deterioration, of typesall from Suffering old, years 25 over of basements substations  Technical demand: Demolishing or replacement not is allowed of 700 underground RC manholes and 26 26 and RCmanholes underground 700 Sikadur 30LP, Sikadur Sika 2, Anchorfix  Sika solutions: 3.7 Mio CHF Mio 3.7 Sales: WF Pro3 Sikaflex Sikaswell S, Sikainjection 20, 61, Sikadur 60, systems(Sikadur injection Sika system, combiflex Sikadur  105903,Sikaseal Sikaferrogard 114, Sikacrete 214, Sikagrout 110,Sikatop Sikarep, 614, Monotop Sika  52 41,Sikadur Sikadur Structural Strengthening: Structural Waterproofing: &protection: repair Concrete Sika Carbodur S1012 S1012 &S512, CarbodurSika 330, WrapSika Sikadur 230C, ∼ 4.2 Mio $ Mio 4.2 Sikadur 31, 31, Sikadur 6 TECHNICAL DEMANDING Abu Dhabi Sewage plant Sewage Dhabi Abu Admixtures for for Admixtures precast 7 TECHNICAL DEMANDING Abu Dhabi Sewage plant Sewage Dhabi Abu liquid pressure.  the designed allowed.  at all levels water test, all digesters shows extensive leakage  Technical demand 2009-2012 Construction time: height 28 meters diameter and 32 m numbers Aerobic Digesters of 2600 m2 of Internal lining for 5 Expected dynamic cracks due to the internal Structure’s modulus of elasticity not in line with After the lining application and after the followin g  Microns)(600 63N Sikagard.  Sika solutions: Elastic W 550 Sikagard + Epocem 720 Sikagard by  systemPolyurea 844XT Sikalastic Flexible lining system  dry until accordingly cracks the inject and tests water the after  lining internal the of application  Sika recommendations: 2 Mio US$ Mio 2 Sales: Sikagard 720 Epocem (2.0 mm) + + mm) (2.0 Epocem 720 Sikagard externally concrete digesters the Protect Towith systemspecified the replace To the to prior test water the carry To and during behavior cracks the monitor Total differentproductsSika 36 than more 8 TECHNICAL DEMANDING Space Center, Moscow, Russia Moscow, Center, Space Production and Research State Khrunichev Admixtures for for Admixtures precast 9 TECHNICAL DEMANDING Space Center, Moscow, Russia Moscow, Center, Space Production and Research State Khrunichev tasks at the same time. same the at tasks these 2 solve to used was 277 SikaCor leveling covering. ina moisture  basis. old the with leveling covering  problems: 2 solve to necessary was it So basis. concrete a under waterproofing no was there time same the At floors. polymeric making before thickness sm 6 than more no covering concrete leveling a make to necessary was It Technical Demand construction. Roof drains. booth spray paint the for protection the of construction booths, spray paint and X-ray the in floors of construction shop, assembly final launcher Angara in the floors of Refurbishment Project To exclude a suction of a capillary capillary a of suction a exclude To thin new a coupling of strong provide To of 40,000 40,000 of  842. Sikalastic EpoCem, Sikagard-720 drains: booth spray paint  220W, 263. Sikafloor 262AS, Sikafloor 20,000 of area total a with booths spray paint and X-rayfor coverings floor shop, assembly in the coating launcher final Angara  ViscoCrete 5-800. Sika 277, SikaCor steel-fibro-concrete: using leveling screed a of Construction  Sika solutions: Construction of the roof with a total area total a with roof the of Construction the for protection the of Construction antistatic with floors of Construction To the to prior test water the carry м м 2: Sikaplan VGWT Sikaplan 12 2: Sikafloor 161, Sikafloor 2: . 10 TECHNICAL DEMANDING Elbphilharmonie, – Hamburg Hafencity 11 TECHNICAL DEMANDING Germany Elbphilharmonie, – Hamburg Hafencity Special Special tests for flashing on the aluminium layer. we enhanced our offer up to the complete roof.  Technical demand 2012 of end building- whole the of completion 2011, of Roof-mid Construction time: Herzog de Meuron Master piece architecture by Byhelping the planer in roofing detail solutions 140.000 € roofing turnover roofing € 140.000 Sales: waterproofing flooring, coatings, protective are  system  Sika roofing solution: Mechanically fastened Sarnafil roofing roofing Sarnafil fastened Mechanically Other possible solutions which may come come may which solutions possible Other 12 TECHNICAL DEMANDING Gazela Bridge, Serbia Bridge, Gazela 13 TECHNICAL DEMANDING Gazela Bridge, Serbia Bridge, Gazela   m² 4’500 N, F/Sikafloor-375  Tons 40/32/ 52, & 42 Sikadur  m² 100’000 700S/Sikagard-,  Tons 700 S, 412N/Sikatop-122  750m/8200m Sikawrap,  Tons 14,5 Silica fume,  Sales: 2011 & 2010 Construction time: whole bridge Concrete refurbishment of the EBIT: 35% EBIT: CHF K 709 sales: Total Elastomastic Sika Waterproofing/flooring, – 212 GroutSika Injection, & Grouting Sikagard- protection, Concrete Monotop- Sika repair, Concrete & Carbodur strengthening, Structural Sika Viscocrete/ admixture, Concrete 14 TECHNICAL DEMANDING Cooling Tower Itterson 145 m 145 Itterson Tower Cooling , , Czech 15 TECHNICAL DEMANDING Cooling Tower Itterson 145 m 145 Itterson Tower Cooling •Working samples doneweresamples •Working compositionlayer of possibility variable more for heat) (burning 1716 ISO EN to acc. done were tests fire floor •Additional surfaceanti-slip and resistance chemical resistance, fire •Floor Technical demand: 2012- 2011 Construction time: protectionflooring with fire and tower the of protection Inside and outside surface 2530, Sikafloor 264 for 22.000 m2 floor m2 22.000 for 264 Sikafloor 2530,     smoothing  Sika solutions: Sikafloor Epocem, Level 25N,Sikafloor 25N,Sikafloor Level Epocem, Sikafloor sealing joint for Sikaflex and Combiflex F Poxitar Sika S 680 Sikagard + S 700 Sikagard as 520 Icoment + system 2406 Icosit , , Czech 16 TECHNICAL DEMANDING Romania Bucharest, Plant, Treatment Water Waste 17 TECHNICAL DEMANDING Romania Bucharest, Plant, Treatment Water Waste with support of corporate specialist corporate of support with   tanks)sedimentation in layer protection  project a of  Technical demand: 2010- 2008 Construction time: concrete structures ca. 40.000 m2 of old and new Specific know-how for overall solutions solutions overall for know-howSpecific countriesother in references Successful as USP (EpoCem Sika’s of Use stage planning the in work Specification   CHF 150.000 etc.,  CHF 148.000 AnchorFix,  CHF  CHF 450.000 EpoCem, /  MonoTopCHF 502’000 Sikagard, /  Sales: Total€ Mio. sales >1.5 CHF 37.000 Sikagrout, Grouting, injections, Waterproofing, / waterbars Sika / Sikadur bonding, Structural 201.000 Sikaflex, bonding, Sealing and Sikagard Coating, & Flooring Industrial Sika protection, and repair Cocrete 18 TECHNICAL DEMANDING 7 Wind Farms, Romania Wind Farms, 7 19 TECHNICAL DEMANDING 7 Wind Farms, Romania Wind Farms, 7 08-2011- 2008 Construction time: Full range approach Sikagard-63N + Sikagard-720EC basins: retention  foundationper m2 25 ca MTC-18,  foundation per unipacks 10 ca 3N, Primer  foundationper kgs  Sikadur-52  foundationper m2 200-500 Igasol-101,  concrete m3 800 - 200 has foundation  Solutions: Chemically resistant protection in trafo in protection Chemically resistant Sikalastic waterproofing: and Protection + PRO-3WF Sikaflex sealing: Joint 1.000-2.000 ca - SikaGrout Grouting: MonoTopSika repair: Concrete range, impregnation: underground Foundation concrete each admixtures: Concrete 20 TECHNICAL DEMANDING *Nikola Tesla*, Serbia Tesla*, *Nikola in TE Chimney Concrete of Strengthening 21 TECHNICAL DEMANDING *Nikola Tesla*, Serbia Tesla*, *Nikola in TE Chimney Concrete of Strengthening   431.569€  Sales: 2009-2011 Construction time: Sika CarboDur plates m high concrete chimney with Structural strengthening of 145 Total net sales: 592.090€ sales: net Total 116.441€ 29.800,00kg, Sikadur-30, 15200m, S1214, Plate SikaCarbodur while plates was static. adhesive boxaround the chimney (plates) on plates bymoving the specific type of traditional way of application SD30 adhesive We changed to specific jobsite conditions. ~ 23,5 m1. We adapted tools and equipments chimney's diameter winter),special protection screen,7,5 m weather conditions (long an cold manipulative space,very high ferry, bad  mechanical fastening in overlapping areas. recommendations about necessity of Investor and designer accepted our Finally after many discussions and meetings  in real condition. measurement of outside concrete temperature service temperature? More than one month in  Technical demands: pcfcjbiecniin:(verylow Specific jobsite conditions: Mechanical fastening in overlapping areas. Outside concrete temperature ↔ big length length of each plate big ↔ GTT ↔ 22 TECHNICAL DEMANDING Morrisons DC, Bridgewater, UK DC,Bridgewater, Morrisons 23 TECHNICAL DEMANDING Morrisons DC, Bridgewater, UK DC,Bridgewater, Morrisons     supplySW stores 80,000m2 designed and built to Morrisons Distribution Center, 3,500km armoured jointarmoured 3,500km slabexternal m2 80,000 concrete m3 20,000 slab floor piled Internal m2 86,000       Sales: gaps minimum with joint steel stainless bespoke including a system flooring package full Supplied a Sika solution: gaps).slabs(no tensioned post has normally client etc., hygiene and forklifts wide for too slabs, piled panel large on issues joint Previous Problem: Total £310k £10k 8000L, 24, Curehard £200K 2.2km, Joint, Armour Twinflow,14,000L,£10k Twintop, 300 Tons,£70k W, Proseal £20k 8,600L, 24