Exploration: Going All In
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Project Management for Decommissioning of Hope Brook
Uranium Development & Exploration The Athabasca Basin, Northern Saskatchewan July 2020 | Corporate Update Cautionary Statements & References This presentation and the information contained herein is designed to help you understand management’s current views, and may not be appropriate for other purposes. This presentation contains information relating to other companies and provincial infrastructure, and the plans and availability thereof, derived from third-party publications and reports which Denison believes are reliable but have not been independently verified by the Company. Certain information contained in this presentation constitutes “forward-looking information”, within the meaning of the United States Private Securities Litigation Reform Act of 1995 and similar Canadian legislation concerning the business, operations and financial performance and condition of Denison. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as “plans”, “expects”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes”, or the negatives and / or variations of such words and phrases, or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur”, “be achieved” or “has the potential to”. In particular, this presentation contains forward-looking information pertaining to the results of, and estimates, assumptions and projections provided in, the PFS, including future development methods and plans, market prices, costs -
Regulatory Oversight Report for Uranium Mines and Mills in Canada: 2018
Regulatory Oversight Report for Uranium Mines and Mills in Canada: 2018 Commission Meeting December 12, 2019 CMD 19-M36.A CNSC Staff Presentation e-Doc 5970530 PPTX e-Doc 6018833 PDF Commission Meeting, December 12, 2019 CMD 19-M36.A – 2018 ROR for Uranium Mines and Mills CNSC Regulatory Oversight Reports for 2018 • November 6, 2019: Canadian Nuclear Power Generating Sites: 2018 • November 7, 2019: Use of Nuclear Substances in Canada: 2018 • November 7, 2019: Canadian Nuclear Laboratories Sites: 2018 • December 11, 2019: Uranium and Nuclear Substance Processing Facilities in Canada: 2018 • December 12, 2019: Uranium Mines and Mills in Canada: 2018 Reporting on licensee performance based on CNSC oversight nuclearsafety.gc.ca 2 Commission Meeting, December 12, 2019 CMD 19-M36.A – 2018 ROR for Uranium Mines and Mills Presentation Outline • Errata • CNSC’s regulatory oversight activities • Uranium mine and mill facilities • Performance of uranium mines and mills • Interventions • Conclusions SAG mill used to grind ore at the McArthur River Operation. (Photo source: CNSC) nuclearsafety.gc.ca 3 Commission Meeting, December 12, 2019 CMD 19-M36.A – 2018 ROR for Uranium Mines and Mills Errata – to be corrected before the report is published Appendix B, Table B1, corrected information Facility Safety and control area Date report issued Fitness for Service, Conventional Health and Safety, March 20, 2018 Environmental Protection, Human Performance Management Environmental Protection, Radiation Protection, October 31, 2018 McArthur Conventional Health and Safety River Physical Design, Environmental Protection, Radiation August 8, 2018 Operation Protection, Conventional Health and Safety Environmental Protection October 2, 2018 Emergency Management and Fire Protection January 16, 2019 nuclearsafety.gc.ca 4 Commission Meeting, December 12, 2019 CMD 19-M36.A – 2018 ROR for Uranium Mines and Mills Errata – to be corrected before the report is published Appendix J: Environmental Action Level and Regulatory Exceedances Reported to CNSC. -
Transcript of Commission Meeting of December 14, 2016
Canadian Nuclear Commission canadienne de Safety Commission sûreté nucléaire Public meeting Réunion publique December 14th, 2016 Le 14 décembre 2016 Public Hearing Room Salle des audiences publiques 14th floor 14e étage 280 Slater Street 280, rue Slater Ottawa, Ontario Ottawa (Ontario) Commission Members present Commissaires présents Dr. Michael Binder M. Michael Binder Dr. Sandy McEwan Dr Sandy McEwan Ms Rumina Velshi Mme Rumina Velshi Secretary: Secrétaire: Mr. Marc Leblanc M. Marc Leblanc General Counsel: Avocate générale : Ms Lisa Thiele Me Lisa Thiele 613-521-0703 StenoTran www.stenotran.com ii TABLE OF CONTENTS PAGE Opening Remarks 1 CMD 16-M66.C 3 Approval of Agenda CMD 16-M68 3 Status Report on Power Reactors CMD 16-M64 13 Written submission from CNSC staff CMD 16-M50/16-M50.A 18 Oral presentation by CNSC staff CMD 16-M50.1 46 Written submission by Canadian Nuclear Workers' Council CMD 16-M50.2 48 Written submission from Northwatch CMD 16-M70/16-M70.A 155 Oral presentation by CNSC staff CMD 16-M70.1 179 Submission from Énergie NB Power CMD 16-M70.2 180 Submission from Canadian Nuclear Laboratories CMD 16-M49/16-M49.A 245 Oral presentation by CNSC staff CMD 16-M49.5/16-M49.5A 270 Presentation by Cameco Corporation CMD 16-M49.3 298 Submission from the Canadian Nuclear Workers' Council iii TABLE OF CONTENTS PAGE CMD 16-M49.4/16-M49.4A/16-M49.4B 348 Presentation by AREVA Resources Canada Inc. CMD 16 M49.1 363 Submission from the Saskatchewan Environmental Society and the Athabasca Chipewyan First Nation CMD 16-M69 397 Submission from CNSC staff CMD 16-M72 411 Written submission from CNSC staff 1 Ottawa, Ontario / Ottawa (Ontario) --- Upon commencing on Wednesday, December 14, 2016 at 8:34 a.m. -
Nuclear France Abroad History, Status and Prospects of French Nuclear Activities in Foreign Countries
Mycle Schneider Consulting Independent Analysis on Energy and Nuclear Policy 45, allée des deux cèdres Tél: 01 69 83 23 79 91210 Draveil (Paris) Fax: 01 69 40 98 75 France e-mail: [email protected] Nuclear France Abroad History, Status and Prospects of French Nuclear Activities in Foreign Countries Mycle Schneider International Consultant on Energy and Nuclear Policy Paris, May 2009 This research was carried out with the support of The Centre for International Governance Innovation (CIGI) in Waterloo, Ontario, Canada (www.cigionline.org) V5 About the Author Mycle Schneider works as independent international energy nuclear policy consultant. Between 1983 and April 2003 Mycle Schneider was executive director of the energy information service WISE-Paris. Since 2000 he has been an advisor to the German Ministry for the Environment, Nature Conservation and Reactor Safety. Since 2004 he has also been in charge of the Environment and Energy Strategies Lecture of the International Master of Science for Project Management for Environmental and Energy Engineering at the French Ecole des Mines in Nantes, France. In 2007 he was appointed as a member of the International Panel on Fissile Materials (IPFM), based at Princeton University, USA (www.fissilematerials.org). In 2006-2007 Mycle Schneider was part of a consultants’ consortium that assessed nuclear decommissioning and waste management funding issues on behalf of the European Commission. In 2005 he was appointed as nuclear security specialist to advise the UK Committee on Radioactive Waste Management (CoRWM). Mycle Schneider has given evidence and held briefings at Parliaments in Australia, Belgium, France, Germany, Japan, South Korea, Switzerland, UK and at the European Parliament. -
A Preeminent Uranium Explorer in Canada's Athabasca Basin
A Preeminent Uranium Explorer in Canada’s Athabasca Basin TSX-V: SYH October 2021 Disclaimer This presentation has been prepared by Skyharbour Resources Ltd. (“SYH”) using its best efforts to realistically and factually present the information contained. However, subjective opinion, dependence upon factors outside SYH’s control and outside information sources unavoidably dictate that SYH cannot warrant the V: SYH | SKYHARBOURLTD.COM information contained to be exhaustive, complete or sufficient. In addition, many factors can effect the - presentation which could significantly alter the results intended by SYH, rendering the presentation TSX unattainable or substantially altered. Therefore, interested uses should conduct their own assessment and consult with their own professional advisors prior to making any investment decisions. This presentation does not constitute a prospectus or public offering for financing, and no guarantees are made or implied with regard to the success of SYH proposed ventures. Interested investors are advised to seek advice from the investment advisors. Some of the statements in this document may be deemed to be "forward-looking statements". All statements on in this document, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward- looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. -
Reasons for Decision Ministerial Approval Ministerial Change Approval Pursuant to Section 16(2)(C) the Environmental Assessment Act
REASONS FOR DECISION MINISTERIAL APPROVAL MINISTERIAL CHANGE APPROVAL PURSUANT TO SECTION 16(2)(C) THE ENVIRONMENTAL ASSESSMENT ACT CAMECO CORPORATION KEY LAKE EXTENSION PROJECT Introduction The Environmental Assessment Act (hereinafter called the Act) states that where a proponent has received Ministerial Approval to proceed with a development and the proponent intends to make a change in the development that does not conform to the terms or conditions contained in the approval, the proponent must receive Ministerial Approval prior to making those changes. On February 13, 1981 Ministerial Approval was issued to Key Lake Mining Corporation for the Key Lake Mine and Mill Project (EAB#: 1976-006). Several changes to the Key Lake operation have also received Ministerial Approval pursuant to Section 16(2) of the Act (EAB# 1990-048, 1991-031, 1992-001, 1998-015, 2000-025, 2002-055, 2003-005). These changes have related to tailings deposition location and methodology, development of the mined-out Deilmann pit as the Deilmann Tailings Management Facility (DTMF), processing of ore from the McArthur River mine, processing of by-products generated at facilities in Ontario and increasing milling and processing rates at the facility. In March 2010, Cameco submitted a proposal for a change to the previously approved Key Lake operation to allow increased tailing storage in the existing DTMF, an increase of the Key Lake mill nominal annual production capacity, an increase to the ore storage area and modifications to the existing mill (the project). The proposal was sent to provincial agencies and the Government of Canada for technical review. Following technical review, it was determined that the proposed change did not conform to the terms and conditions of previous approvals and therefore Cameco would require approval under section 16(2) of the Act prior to proceeding and would be required to conduct an environmental impact assessment (EIA) for the proposed change. -
Primary Uranium Extraction
Primary Extraction IAEA - INT2019 Interregional Workshop on Case Study of Conventional Uranium Production: from Exploration to Closure October 14 to 18th, 2019, Prague, Czech Republic Agenda • Uranium Market Fundamentals • Cost of Production around the Globe • Where are the World’s Uranium Resources • Current Mining Methods and costs • Production capacity of the Athabasca Basin • What are some potential new mines in Canada Uranium Market Fundamentals • The greatest sensitivity when assessing most uranium deposits is in understanding what market conditions will be by the time you are able to bring the deposit into production (5 to 10-year time lag). • Compared to other metal groups, the price of uranium has been challenging over the past ten years. Gold and base metals are near or above their ten year average price, but uranium remains well below it’s average ten year price range. • Challenging market post-Fukushima 10 Year U3O8 10 Year Copper Spot Price Spot Price World Production & Consumption World Uranium Resources (WNA/IAEA) Australia has the largest amount of U resources, based on USD $130 per kg of U. However the “quality” of the resources in terms of grade and cost sensitivity to the price of uranium must be taken into account. Production method Canada which is in the top 3 for Uranium Resources and production has not yet used ISR as a primary extraction method (table is from WNA) Uranium Mining Methods Uranium is currently mined in one of four ways: • In-situ leach mining – ISL [also ISR or solution mining] • Underground with -
Graham Simpson 2007
Presentation to the Nunavut Planning Commission Discussion on Uranium Mining Graham Simpson, Saskatoon (June 5th 2007) A. I wish to thank the Commission for inviting me to bring some experiences of the Inter-Church Uranium Committee Educational Co-operative (ICUCEC) of Saskatoon. B. I am a retired Prof. of Plant Sciences at the University of Saskatchewan where I taught and did research for 40 years in the field of plant physiology. I am particularly concerned about the deterioration in the environment and biosphere by radioactive pollution that can have long-term genetic effects in all living things. I have been a member of ICUCEC since it began. C. I will give you a brief history of ICUCEC that has been in existence now for 27 years. Following the Cluff Lake Enquiry in Saskatchewan in 1978 the Provincial Government decided to permit new uranium mines in the Wollaston Lake basin in the far north of the Province. The nuclear industry decided to quietly buy up land owned by Mennonite dairy farmers close to Saskatoon, with the object of building a uranium refinery to avoid sending yellowcake all the way to Port Hope in Ontario. The farmers were angry at the deceit and called on local churches of different denominations to oppose a refinery when hearings were held by the Saskatchewan Government. The United Church, Catholic, Anglican, Lutheran and Mennonite churches banded together in an organisation initially called the Inter-Church Uranium Committee (ICUC) that made a convincing case to the hearings against having a refinery(1). The committee then focussed on the expanding uranium mines and for ethical reasons opposed them on the grounds that uranium was going from Saskatchewan to atom bombs (The Cold War was on) also to nuclear reactors that created huge amounts of radioactive waste posing a threat to the environment and humans for ages to come. -
Bibliography on Saskatchewan Uranium Inquiries and the Northern and Global Impact of the Uranium Industry
University of Regina iNis-mf—13125 __ CA9200098 Prairie Justice Research Bibliography on Saskatchewan Uranium Inquiries and The Northern and Global Impact of the Uranium Industry :• IN THF PimhlC INTEREST BIBLIOGRAPHY ON SASKATCHEWAN URANIUM INQUIRIES AND THE NORTHERN AND GLOBAL IMPACT OF THE URANIUM INDUSTRY Jim Harding, B.A. (Hons.), M.A., Ph.D. Director, Prairie Justice Research Beryl Forgay, B.Ed., B.HE., M.A. Research Officer, Prairie Justice Research Mary Gianoli, B.Ed. Research Co-ordinator, Prairie Justice Research Cover Design: Rick Coffin Published by PRAIRIE JUSTICE RESEARCH 1988 SERIES: IN THE PUBLIC INTEREST (Research Report No. 1) Published by: Prairie Justice Research Room 515 Library Building University of Regina Regina, Saskatchewan Canada S4S OA2 Cataloguing in Publication Data Harding, Jim, 1941- Bibliography on Saskatchewan uranium inquiries and the northern and global impact of the uranium industry ISBN 0-7731-0052-0 I. Uranium mines and mining - Environmental aspects - Saskatchewan - Bibliography. 2. Uranium industry - Environmental aspects - Saskatchewan - Bibliography. 3. Uranium industry - Government policy - Saskatchewan - Bibliography. I. Forgay. Beryl, 1926- II. University of Regina. Prairie Justice Research. III. Title. Z6738.U7H37 1986 016.3637'384 C86-091166-: ISBN 0-7731-0135 (Set) This is a publication of Prairie Justice Research at the University of Regina. Prairie Justice Research is funded by an operating contract with the Ministry of the Solicitor General and has the capacity to conduct socio-legal research for a diverse range of constituencies. For further informaiton contact: Dr. Jim Harding Director Prairie Justice Research Library Building University of Regina Regina, Saskatchewan Canada S4S 0A2 (306) 584-4064 NOTE: This research project was funded through "Human Context of Science and Technology" strategic grants of the Social Sciences and Humanities Research Council of Canada. -
History of Mining in Saskatchewan
History of Mining In Saskatchewan Early Mining in Saskatchewan The earliest mining occurred when earth’s inhabitants started using various stones for tools or certain clays for cooking vessels. The earliest recorded occupation in Saskatchewan was around 9000 B.C. at the Niska site in the southern part of the province. Ample evidence of the use of stone tools, arrow heads, and spear heads, etc. has been found in the area. Much of the material used by these early inhabitants was imported or traded from other regions of North America. The study of the stone tools provides us with information about the people’s work, their history, their religion, their travels and their relationships with other groups or nations. Stone is readily available throughout most of Saskatchewan. This was especially important for Saskatchewan’s First Nations people who moved their camps frequently in search for food. The stones available were not all suitable for tools and they needed a constant supply of stone material that broke cleanly or was hard enough for pounding. Consequently, they made regular trips to the source areas or traded with people who lived near the sources. For these early residents of our province, the exchange of goods was more than just a means of acquiring things. Bartering and gift exchange was a means of creating and reinforcing relationships between individuals, families and nations. For thousands of years, goods have been exchanged through networks that extended across North America. Although perishable goods were also traded, our records are in the form of shell or stone artefacts. -
Canadian Nuclear Safety Commission
CANADIAN NUCLEAR SAFETY COMMISSION Jason K. Cameron Vice-President, Regulatory Affairs, and Chief Communications Officer NARUC Summer Policy Summit – Committee on International Relations July 15, 2018 – Scottsdale, Arizona OUR MANDATE 2 Regulate the use of nuclear energy and materials to protect health, safety, and security and the environment Implement Canada's international commitments on the peaceful use of nuclear energy Disseminate objective scientific, technical and regulatory information to the public Canadian Nuclear Safety Commission – nuclearsafety.gc.ca THE CNSC REGULATES ALL NUCLEAR FACILITIES 3 AND ACTIVITIES IN CANADA Uranium mines Uranium fuel Nuclear power Nuclear substance Industrial and and mills fabrication and plants processing medical applications processing Nuclear research Transportation of Nuclear security Import and Waste management and educational nuclear substances and safeguards export controls facilities activities Canadian Nuclear Safety Commission – nuclearsafety.gc.ca CNSC STAFF LOCATED ACROSS CANADA 4 Headquarters (HQ) in Ottawa Four site offices at power plants One site office at Chalk River Four regional offices Fiscal year 2017–18 • Human resources: 857 full-time equivalents • Financial resources: $148 million Saskatoon Calgary (~70% cost recovery; ~30% appropriation) • Licensees: 1,700 Chalk River HQ • Licences: 2,500 Point Lepreau Laval Bruce Darlington Mississauga Pickering Canadian Nuclear Safety Commission – nuclearsafety.gc.ca INDEPENDENT COMMISSION 5 TRANSPARENT, SCIENCE-BASED DECISION MAKING • Quasi-judicial administrative tribunal • Agent of the Crown (duty to consult) • Reports to Parliament through Minister of Natural Resources • Commission members are independent and part time • Commission hearings are public and Webcast • Staff presentations in public • Decisions are reviewable by Federal Court Canadian Nuclear Safety Commission – nuclearsafety.gc.ca THE CNSC’S NEW PRESIDENT 6 Ms. -
Transcript of May 15, 2019 Public Hearing on Application by Orano
Canadian uclear Commission canadienne de Safety Commission sûreté nucléaire Public hearing Audience publique May 15th, 2019 Le 15 mai 2019 Publi Hearing Room Salle des audien es publiques 14th floor 14e étage 280 Slater Street 280, rue Slater Ottawa, Ontario Ottawa (Ontario) Commission Members present Commissaires présents me Ms Rumina Velshi M Rumina Velshi r Dr. Sandor Demeter D Sandor Demeter Mr. Timothy Berube M. Timothy Berube me Ms Kathy Penney M Kathy Penney Dr. Mar el La roix M. Mar el La roix Assistant Secretary: Secrétaire-adjointe: e Ms. Kelly M Gee M Kelly M Gee Senior General Counsel: Avocate-générale principale : e Ms. Lisa Thiele M Lisa Thiele 613-521-0703 StenoTran www.stenotran.com ii TABLE OF CONTENTS PAGE CMD 19-H1.B 3 Adoption of Agenda CMD 19-H3.1/19-H3.1A 6 Oral presentation by Orano Canada Inc. CMD 19-H3/19-H3.A 28 Oral presentation by CNSC staff CMD 19-H3.4 80 Oral presentation by the Saskatchewan Environmental Society CMD 19-H3.6 99 Oral presentation by Rodney Gardiner CMD 19-H3.7 116 Oral presentation by Val Drummond CMD 19-H3.9 133 Oral presentation by the Northern Saskatchewan Environmental Quality Committee CMD 19-H3.12 142 Oral Presentation by the Clearwater River Dene Nation CMD 19-H3.5/19-H3.5A 166 Oral presentation by the Ya'thi Néné Land and Resource Office CMD 19-H3.13 183 Oral presentation by the Athabasca Chipewyan First Nation CMD 19-H3.10 199 Oral presentation by the Métis Nation of Saskatchewan iii TABLE OF CONTENTS PAGE CMD 19-H3.11 208 Written submission from Emile Burnouf CMD 19-H3.3 208 Written submission from Cameco Corporation CMD 19-H3.8 208 Written submission from the Saskatchewan Mining Association 1 Ottawa, Ontario / Ottawa (Ontario) --- Upon commencing on Wednesday, May 15, 2019 at 10:37 a.m.