PROPOSED DEVELOPMENT AS PART GRAND OF SDZ AT SITE OF NAOMH EANNA SOUTH DOCK ROAD

VESSEL (OLD ARAN ISLAND FERRY) QUAY WHARF CHARLOTTE QUAY SURFDOCKS WATERSPORTS

GRAND EXISTING BUILDINGS ALONG CAMPSHIRE CANAL SLIPWAY FOR VIKING INCLUDE A PROTECTED STRUCTURE POSSIBLE LINK TO GRAND DOCK BOAT SPLASH TOURS AND FORMER U2 RECORDING STUDIO CANAL GREENWAY

WATERSKI ACTIVITIES Zone 2 GRAND CANAL SQUARE Zone 1 BORD GÁIS

THEATRE BIKE EXISTING OPERATIONAL STATION GA1002 CANAL LOCK PATH VIA SOUTHERN LOCK GATES PROPOSED FOR PEDESTRIANS ONLY GA1001 HISTORIC COBBLESTONES AND QUAY WALL MISERY HILL

HANOVER QUAY

THE MARKER HOTEL PROPOSED OPENING BRIDGE TO BUCKINGHAM OLD CANAL DUBLIN BIKE LOCK & POSSIBLE FIXED BRIDGES TO OUTER LOCKS LOCKS STATION (2.5m TO 3.0m WIDE) TO BE CONFIRMED THROUGH CONSULTATION WITH WATERWAYS ASGARD ROAD

FORMER LOCK KEEPER'S

COTTAGE (TOLL HOUSE) FORBES STREET

THORNCASTLE STREET

GREEN STREET EAST PROPOSED PATH VIA NORTHERN HORSE FAIR POSSIBLE OPEN SPACE LOCK GATES FOR CYCLISTS, BLOOD STONEY ROAD LAZER LANE IN FRONT OF 'GRAND DISABLED ACCESS, ETC

CANAL DOCK' SIGN BENSON STREET

POSSIBLE FUTURE GREENWAY LINK

BRITAIN QUAY

THROUGH RINGSEND & IRISHTOWN HORSE FAIR COMMUNITY CENTRE POSSIBLE LINK TO EXISTING TWO EAST COAST TRAIL WAY CYCLE TRACK (S2S ROUTE)

PROPOSED DODDER BRIDGE

FUTURE ROUTE WITH

GA1001A GA1001 POTENTIAL BOARDWALK POSSIBLE LINK TO LIFFEY & SIR JOHN ROGERSON'S GREENWAYS QUAY

PROPOSED LEGEND: KEY PLAN BLOOD STONEY 01 BRIDGE Greenway - Emerging Preferred Route SIR JOHN 01A ROWING CLUB ROGERSON'S QUAY

Greenway - Emerging Preferred Alternative Zone 2 02 Zone 1 Greenway - Pedestrian Priority Route 03 POSSIBLE LINK TO EAST COAST TRAIL (S2S Links to Other Cycle Facilities 04 ROUTE) AND Future/Alternative Links 05

Toucan Crossing 06 09 Boardwalk Shared Space EAST LINK 07 TOLL BRIDGE Green Space 08 ORWELL PARK

Client General Notes D11 04.09.18 JK DRAFT ISSUE Drawn SM Project MC MC (i) This drawing is the property of RPS Consulting Engineers, it is a (v) Hard copies, dwf and pdf will form a controlled issue of the drawing. Checked MC DODDER GREENWAY - D10 23.08.18 JK DRAFT ISSUE confidential document and must not be copied, used, or its content All other formats (dwg etc) are deemed to be an uncontrolled issue MC MC SIR JOHN ROGERSON'S QUAY TO ORWELL PARK divulged without prior written consent. and any work carried out based on these files is at the recipients Approved MC JK (ii) All Levels refer to Ordnance Survey Datum, Malin Head. own risk. RPS will not accept any responsibility for any errors D09 04.07.18 DRAFT ISSUE MC MC (iii) DO NOT SCALE, use figured dimensions only, if in doubt ask. arising from the use of these files, either by human error by the Date OCT. 2015 Title EMERGING PREFERRED (iv) Existing Services. recipient, listing of the un-dimensioned measurements, D02 MAR'16 SM DRAFT ISSUE West Pier T +353 1 4882900 MC MC Scale 1:1000 @ A1 Any information concerning the location of existing services compatibility with the recipients software, and any errors arising Business Campus F +353 1 2835676 ROUTE indicated on this drawing is intended for general guidance only. It when these files are used to aid the recipients drawing production, D01 FEB'16 SM DRAFT ISSUE Dun Laoghaire W www.rpsgroup.com/ireland 1:2000 @ A3 SHEET 1 OF 10 shall be the responsibility of the contractor to determine and verify or setting out on site. FO MC Co Dublin E [email protected] the exact horizontal and vertical alignment of all cables, pipes, etc. Job No. File Ref. Drg. No. Rev. (both underground and overhead) before work commences. No. Date Drn. Amendment / Issue App MDT0761 Chk. MDT0761GA1001-9 - GA1001 D11 R:\MDT0761_Dodder Greenway\8.0 Drawings\MDT0761GA1001-9 - Emerging Preferred Route.dwg Preferred - Emerging Drawings\MDT0761GA1001-9 Greenway\8.0 R:\MDT0761_Dodder R:\MDT0761_Dodder Greenway\8.0 Drawings\MDT0761GA1001-9 - Emerging Preferred Route.dwg Client KEY PLAN ORWELL PARK 09

ROGERSON'S QUAY SIR JOHN AIKENHEAD TERRACE AIKENHEAD 08

07 GA1002 02

01 ST. BRENDAN'S COTTAGES GA1001A 06 05 04 01A

03 IRISHTOWN ROAD Zone 3 Zone DERMOT O'HURLEY

LEGEND: AVENUE Greenway - Pedestrian Priority Route Greenway - Emerging Preferred Alternative Greenway - Emerging Preferred Route Green Space Boardwalk BRIDGE, DUE TO CURRENT & FUTURE TRAFFIC SAFETY PROPOSED TO INCLUDE PARALLEL WALKWAY ON RINGSEND OTHER SENSITIVE ASPECTS OF THE BRIDGE. CONCERNS. DESIGN TO CAREFULLY CONSIDER HERITAGE &

Toucan Crossing

Future/Alternative Links Links to Other Cycle Facilities Zone 2 Zone RECONFIGURED PARKING TO BE PROPOSED 5.0m WIDE GREENWAY RINGSEND PARK Shared Space

FAIRVIEW AVENUE

GREENWAY DIVERSION ROUTE ALTERNATIVE ON-ROAD

FITZWILLIAM QUAY FITZWILLIAM

GREYHOUND STADIUM GREYHOUND SHELBOURNE PARK SHELBOURNE

(iv) (iii) (ii) (i) General Notes FITZWILLIAM STREET FITZWILLIAM Existing Services. DO NOT SCALE, use figured dimensions only, if in doubt ask. (both underground and overhead) before work commences. indicated on this drawing is intended for general guidance only. It shall be the responsibility of contractor to determine and verify divulged without prior written consent. confidential document and must not be copied, used, or its content This drawing is the property of RPS Consulting Engineers, it a the exact horizontal and vertical alignment of all cables, pipes, etc. Any information concerning the location of existing services All Levels refer to Ordnance Survey Datum, Malin Head.

ST. PATRICK'S VILLAS CAMBRIDGE PARK CAMBRIDGE RINGSEND BRIDGE

BRIDGE ST

3 FITZWILLIAM STREET FITZWILLIAM

(v)

Hard copies, dwf and pdf will form a controlled issue of the drawing. 3 recipient, listing of the un-dimensioned measurements, or setting out on site. compatibility with the recipients software, and any errors arising arising from the use of these files, either by human error own risk. RPS will not accept any responsibility for errors and any work carried out based on these files is at the recipients when these files are used to aid the recipients drawing production, All other formats (dwg etc) are deemed to be an uncontrolled issue

2 2

PROPOSED DEVELOPMENT AS PART OF SDZ AT SITE NAOMH EANNA VESSEL (OLD ARAN ISLAND FERRY) CAMBRIDGE SQUARE CAMBRIDGE

RINGSEND ROAD PROPOSED RAMP TO

SOUTH DOCK ROAD DOCK SOUTH PEMBROKE COTTAGES PEMBROKE No. D01 D02 D09 D10 D11

YORK ROAD 04.07.18 23.08.18 04.09.18 MAR'16 FEB'16 GRAND CANAL Date GA1002

GA1001 WHARF Drn.

SM SM JK JK JK

Chk. FO MC MC MC MC THORNCASTLE ST THORNCASTLE Amendment / Issue DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE

BE CONFIRMED THROUGH LOCKS (2.5m TO 3.0m WIDE) FIXED BRIDGES TO OUTER BUCKINGHAM LOCK & POSSIBLE PROPOSED OPENING BRIDGE TO CONSULTATION WITH WATERWAYS IRELAND 1

IN FRONT OF 'GRAND POSSIBLE OPEN SPACE CANAL DOCK' SIGN 1 EXISTING OPERATIONAL CANAL LOCK EAST COAST TRAIL POSSIBLE LINK TO (S2S ROUTE) App EAST LINK MC MC MC MC MC TOLL BRIDGE Zone 2 Dun Laoghaire Business Campus Co Dublin West Pier BOAT SPLASH TOURS SLIPWAY FOR VIKING SURFDOCKS WATERSPORTS

Zone 1 E T W F

[email protected] +353 1 2835676 +353 1 4882900 www.rpsgroup.com/ireland PEDESTRIANS ONLY PATH VIA SOUTHERN LOCK GATES PROPOSED FOR POSSIBLE FUTURE GREENWAY LINK COMMUNITY CENTRE THROUGH RINGSEND & IRISHTOWN HISTORIC COBBLESTONES AND QUAY WALL ETC DISABLED ACCESS, LOCK GATES FOR PROPOSED PATH CYCLISTS, VIA NORTHERN GA1001A LOCKS OLD CANAL POTENTIAL BOARDWALK FUTURE ROUTE WITH Job No. Scale Date Approved Checked Drawn GA1001 POSSIBLE LINK TO EAST GREENWAY COAST TRAIL (S2S ROUTE) AND ROYAL CANAL 1:2000 1:1000 OCT. 2015 MDT0761 ROWING CLUB MC MC SM @ A3 @ A1 File Ref. Title Project SIR JOHN ROGERSON'S QUAY TO ORWELL PARK MDT0761GA1001-9 - DODDER BRIDGE PROPOSED DUBLIN BIKE STATION EMERGING PREFERRED DODDER GREENWAY - SHEET 2 OF 10 ROUTE Drg. No. GA1001A Rev. D11 ALTERNATIVE ON-ROAD GREENWAY DIVERSION

ROUTE RINGSEND ROAD

PROPOSED DEVELOPMENT AS PART OF SDZ AT SITE OF NAOMH EANNA VESSEL (OLD ARAN ISLAND FERRY)

SOUTH DOCK RD DUBLIN BIKE SHELBOURNE PARK STATION GREYHOUND STADIUM Zone 3 Zone 2 DERRYNANE GARDENS

RINGSEND BRIDGE GRAND CANAL PROPOSED SHARED SPACE WITH WHARF EXISTING SHUTTLE SYSTEM ACROSS LONDON BRIDGE PRIVATE MOORING BATH AVENUE FACILITY PROPOSED 5.0m PROPOSED RAMP TO WIDE GREENWAY RINGSEND ROAD

LONDON BRIDGE GA1003 GA1002 4 SOUTH DOCK RD

4 FITZWILLIAM QUAY SYPHON HOUSES

PROPOSE TO WIDEN AIKENHEAD TERRACE PARKING TO BE EXISTING PATH TO 3.0m RECONFIGURED

LANDSDOWNE LAWN RAMP ACCESS OR ALTERATION PROPOSED TO INCLUDE PARALLEL WALKWAY ON RINGSEND GA1002 TO STEPS REQUIRED GA1001 TENNIS CLUB BRIDGE, DUE TO CURRENT & FUTURE TRAFFIC SAFETY CONCERNS. DESIGN TO CAREFULLY CONSIDER HERITAGE & OTHER SENSITIVE ASPECTS OF THE BRIDGE.

AVENUE

DERMOT O'HURLEY

THORNCASTLE ST

Zone 3 Zone 2 FITZWILLIAM STREET

AVENUE

BRIDGE ST LONDONBRIDGE ROAD

OLIVER PLUNKETT

LEGEND: KEY PLAN 01

ALTERNATIVE ON-ROAD Greenway - Emerging Preferred Route SIR JOHN 01A GREENWAY DIVERSION ROUTE ROGERSON'S QUAY

Greenway - Emerging Preferred Alternative 02

IRISHTOWN ROAD Greenway - Pedestrian Priority Route 03 ALTERNATIVE ON-ROAD GREENWAY DIVERSION ROUTE Links to Other Cycle Facilities 04

Future/Alternative Links 05

Toucan Crossing 06 09 Boardwalk Shared Space 07

Green Space 08 ORWELL PARK

Client General Notes D11 04.09.18 JK DRAFT ISSUE Drawn SM Project MC MC (i) This drawing is the property of RPS Consulting Engineers, it is a (v) Hard copies, dwf and pdf will form a controlled issue of the drawing. Checked MC DODDER GREENWAY - D10 23.08.18 JK DRAFT ISSUE confidential document and must not be copied, used, or its content All other formats (dwg etc) are deemed to be an uncontrolled issue MC MC SIR JOHN ROGERSON'S QUAY TO ORWELL PARK divulged without prior written consent. and any work carried out based on these files is at the recipients Approved MC JK (ii) All Levels refer to Ordnance Survey Datum, Malin Head. own risk. RPS will not accept any responsibility for any errors D09 04.07.18 DRAFT ISSUE MC MC (iii) DO NOT SCALE, use figured dimensions only, if in doubt ask. arising from the use of these files, either by human error by the Date OCT. 2015 Title EMERGING PREFERRED (iv) Existing Services. recipient, listing of the un-dimensioned measurements, D02 MAR'16 SM DRAFT ISSUE West Pier T +353 1 4882900 MC MC Scale 1:1000 @ A1 Any information concerning the location of existing services compatibility with the recipients software, and any errors arising Business Campus F +353 1 2835676 ROUTE indicated on this drawing is intended for general guidance only. It when these files are used to aid the recipients drawing production, D01 FEB'16 SM DRAFT ISSUE Dun Laoghaire W www.rpsgroup.com/ireland 1:2000 @ A3 SHEET 3 OF 10 shall be the responsibility of the contractor to determine and verify or setting out on site. FO MC Co Dublin E [email protected] the exact horizontal and vertical alignment of all cables, pipes, etc. Job No. File Ref. Drg. No. Rev. (both underground and overhead) before work commences. No. Date Drn. Amendment / Issue App MDT0761 Chk. MDT0761GA1001-9 - GA1002 D11 R:\MDT0761_Dodder Greenway\8.0 Drawings\MDT0761GA1001-9 - Emerging Preferred Route.dwg Preferred - Emerging Drawings\MDT0761GA1001-9 Greenway\8.0 R:\MDT0761_Dodder R:\MDT0761_Dodder Greenway\8.0 Drawings\MDT0761GA1001-9 - Emerging Preferred Route.dwg Client KEY PLAN ORWELL PARK

Zone 5 Zone GA1004 09

ROGERSON'S QUAY

SIR JOHN GA1003 5 Zone HERBERT COTTAGES

08 Zone 4 Zone 07

02 Zone 4 Zone 01 06 05 04 01A 03 EXISTING 3.0m WIDE PATH (POSSIBLE TO WIDEN) LEGEND:

SHELBOURNE ROAD Greenway - Pedestrian Priority Route Greenway - Emerging Preferred Alternative Greenway - Emerging Preferred Route Boardwalk Green Space Toucan Crossing Future/Alternative Links Links to Other Cycle Facilities FROM IRISH RAIL. REQUIRED. ACCEPTANCE IN PRINCIPLE OBTAINED PROPOSE TO WIDEN EXISTING RAILWAY UNDERPASS TO 5.0m & DEEPEN ACHIEVE 2.4m CLEARANCE WITH PARTICULAR DRAINAGE/FLOOD MEASURES Shared Space DART & AIB BANK CENTRE PEDESTRIAN ACCESS TO OPTION WILL REQUIRE AGREEMENT WITH MARIAN COLLEGE & AIB

RAILWAY COTTAGES DIVERSION ROUTES ALTERNATIVE ON-ROAD GREENWAY (iv) (iii) (ii) (i) General Notes Existing Services. DO NOT SCALE, use figured dimensions only, if in doubt ask. (both underground and overhead) before work commences. indicated on this drawing is intended for general guidance only. It shall be the responsibility of contractor to determine and verify divulged without prior written consent. confidential document and must not be copied, used, or its content This drawing is the property of RPS Consulting Engineers, it a the exact horizontal and vertical alignment of all cables, pipes, etc. Any information concerning the location of existing services All Levels refer to Ordnance Survey Datum, Malin Head. RAILWAY STATION LANSDOWNE ROAD COLLEGE MARIAN EXISTING PEDESTRIAN LINK TO SERPENTINE AVENUE (v) Hard copies, dwf and pdf will form a controlled issue of the drawing. recipient, listing of the un-dimensioned measurements, or setting out on site. compatibility with the recipients software, and any errors arising arising from the use of these files, either by human error own risk. RPS will not accept any responsibility for errors and any work carried out based on these files is at the recipients when these files are used to aid the recipients drawing production, All other formats (dwg etc) are deemed to be an uncontrolled issue LANDSDOWNE EXISTING 3.0m WIDE PATH (POSSIBLE TO WIDEN)

RAILWAY

BRIDGE 5

RAISED TABLE/ TRAFFIC CALMING 5 FOOTBRIDGE TO STATION EXISTING PEDESTRIAN

HERBERT ROAD Zone 4 Zone EAST COAST RAILWAY LINE No. D01 D02 D09 D10 D11

04.07.18 23.08.18 04.09.18

MAR'16 FEB'16 Date Zone 3 Zone

Drn.

SM SM JK JK JK

Chk. FO MC MC MC MC LANSDOWNE ROAD LANSDOWNE Amendment / Issue DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE DIVERSION ROUTES ALTERNATIVE ON-ROAD GREENWAY STADIUM

AVIVA Zone 4 Zone App MC MC MC MC MC ROAD BRIDGE LANDSDOWNE

Dun Laoghaire Business Campus

Co Dublin West Pier POSSIBLE SHARED SPACE WITH SHUTTLE SYSTEM ON BRIDGE Zone 3 Zone E T W F

[email protected] +353 1 2835676 +353 1 4882900 www.rpsgroup.com/ireland EXISTING 2.0m PATH TO 3.0m PROPOSED TO WIDEN

ENHANCEMENT AREA POSSIBLE ECOLOGICAL NEWBRIDGE AVENUE NEWBRIDGE Job No. Scale Date Approved Checked Drawn RIVER DODDER 1:2000 1:1000 OCT. 2015 MDT0761 MC MC SM @ A3 @ A1 File Ref. Title Project SIR JOHN ROGERSON'S QUAY TO ORWELL PARK MDT0761GA1001-9 - RECOMMENDED COMMUTER LINK EXISTING PATH TO 3.0m PROPOSED TO WIDEN EMERGING PREFERRED DODDER GREENWAY - SHEET 4 OF 10 ROUTE

Drg. No. GA1003

LANDSDOWNE LAWN LANDSDOWNE GA1002 TENNIS CLUB GA1003 Rev. D11 AMERICAN EMBASSY PEMBROKE ROAD

LINK TO CITY CENTRE (GDA Cycle Route 13) SHELBOURNE ROAD

ALTERNATIVE ON-ROAD GREENWAY DIVERSION ROUTE Zone 5 HERBERT PARK ROAD Zone 4

PROPOSED 4.0m PROPOSED TO RUN GREENWAY ON INBOUND SIDE OF BALLSBRIDGE. WIDE GREENWAY PROPOSED LANE RECONFIGURATION REQUIRED TO ENABLE SPACE ALLOCATION FOR GREENWAY WITHIN THE EXISTING CROSS-

SECTION. NO STRUCTURAL MODIFICATIONS TO BRIDGE PROPOSED.

GA1003 GA1004

BEATTY'S AVENUE HERBERT COTTAGES HERBERT PARK HOTEL

Zone 5 BALLSBRIDGE Zone 6 PROPOSED TOUCAN CROSSING

6 BALLSBRIDGE PARK HERBERT PARK BALLSBRIDGE AVENUE PROPOSED RAISED TABLE/ TRAFFIC CALMING Zone 5 6 PROPOSED AMENITY AREA Zone 4 WITH POSSIBLE CYCLE CAFE GREENWAY ALONG UPPER LEVEL PATH - MAINTAIN EXISTING 4.0m WIDE PATH RECOMMENDED COMMUTER LINK

7 PROPOSED TO REASSIGN ROAD SPACE

7 RIVER DODDER LEGEND: KEY PLAN 01

LINK TO BLACKROCK Greenway - Emerging Preferred Route SIR JOHN 01A ROGERSON'S QUAY

& DUN LAOGHAIRE GA1004 GA1005 (Cycle Route 13) ANGLESEA ROAD Greenway - Emerging Preferred Alternative 02

MERRION ROAD

Greenway - Pedestrian Priority Route 03 HERBERT PARK HOTEL BRIDGE RDS Links to Other Cycle Facilities 04 SHOWGROUNDS Future/Alternative Links 05

Toucan Crossing ALTERNATIVE ON-ROAD Zone 5 06 09 GREENWAY DIVERSION ROUTE Boardwalk Shared Space Zone 6 07 Green Space 08 ORWELL PARK

Client General Notes D11 04.09.18 JK DRAFT ISSUE Drawn SM Project MC MC (i) This drawing is the property of RPS Consulting Engineers, it is a (v) Hard copies, dwf and pdf will form a controlled issue of the drawing. Checked MC DODDER GREENWAY - D10 23.08.18 JK DRAFT ISSUE confidential document and must not be copied, used, or its content All other formats (dwg etc) are deemed to be an uncontrolled issue MC MC SIR JOHN ROGERSON'S QUAY TO ORWELL PARK divulged without prior written consent. and any work carried out based on these files is at the recipients Approved MC JK (ii) All Levels refer to Ordnance Survey Datum, Malin Head. own risk. RPS will not accept any responsibility for any errors D09 04.07.18 DRAFT ISSUE MC MC (iii) DO NOT SCALE, use figured dimensions only, if in doubt ask. arising from the use of these files, either by human error by the Date OCT. 2015 Title EMERGING PREFERRED (iv) Existing Services. recipient, listing of the un-dimensioned measurements, D02 MAR'16 SM DRAFT ISSUE West Pier T +353 1 4882900 FO MC Scale 1:1000 @ A1 Any information concerning the location of existing services compatibility with the recipients software, and any errors arising Business Campus F +353 1 2835676 ROUTE indicated on this drawing is intended for general guidance only. It when these files are used to aid the recipients drawing production, D01 FEB'16 SM DRAFT ISSUE Dun Laoghaire W www.rpsgroup.com/ireland 1:2000 @ A3 SHEET 5 OF 10 shall be the responsibility of the contractor to determine and verify or setting out on site. FO MC Co Dublin E [email protected] the exact horizontal and vertical alignment of all cables, pipes, etc. Job No. File Ref. Drg. No. Rev. (both underground and overhead) before work commences. No. Date Drn. Amendment / Issue App MDT0761 Chk. MDT0761GA1001-9 - GA1004 D11 R:\MDT0761_Dodder Greenway\8.0 Drawings\MDT0761GA1001-9 - Emerging Preferred Route.dwg Preferred - Emerging Drawings\MDT0761GA1001-9 Greenway\8.0 R:\MDT0761_Dodder R:\MDT0761_Dodder Greenway\8.0 Drawings\MDT0761GA1001-9 - Emerging Preferred Route.dwg

Client

Zone 8 Zone BEECH HILL ESTATE

11 11

GA1006 RECENTLY UPGRADED PEDESTRIAN BRIDGE BROOKVALE ROAD

GA1005 RAISED TABLE / TRAFFIC CALMING REVISED JUNCTION LAYOUT WITH

DUBLIN

DEPOT 7 Zone BROOKVALE ROAD BROOKVALE

POSSIBLE LINK TO UCD EGLINTON ROAD EGLINTON ROAD USING ON CYCLE LANES POSSIBLE GREENWAY COMMUTER LINK VIA EGLINTON & CLONSKEAGH

STILLORGAN ROAD BEAVER ROW BEAVER

(N11) 8 Zone Zone 7 Zone

PROPOSED LINK TO UCD (GDA Cycle Route 12)

10 DONNYBROOK 10 PROPOSED OFF ROAD SEGREGATED GREENWAY CHURCH (iv) (iii) (ii) (i) General Notes Existing Services. DO NOT SCALE, use figured dimensions only, if in doubt ask. (both underground and overhead) before work commences. indicated on this drawing is intended for general guidance only. It shall be the responsibility of contractor to determine and verify divulged without prior written consent. confidential document and must not be copied, used, or its content This drawing is the property of RPS Consulting Engineers, it a the exact horizontal and vertical alignment of all cables, pipes, etc. Any information concerning the location of existing services All Levels refer to Ordnance Survey Datum, Malin Head. LAWN TENNIS CLUB DONNYBROOK

ANGLESEA BROOKVALE ROAD

BRIDGE AILESBURY ROAD AILESBURY OLD WESLEY RFC POSSIBLE LINK TO CITY CENTRE (GDA Cycle Route 12) ENHANCEMENT AREA ECOLOGICAL PROPOSED (v) Hard copies, dwf and pdf will form a controlled issue of the drawing. recipient, listing of the un-dimensioned measurements, UPGRADE PROPOSAL CURRENTLY BECTIVE LAWN TENNIS CLUB - or setting out on site. compatibility with the recipients software, and any errors arising arising from the use of these files, either by human error own risk. RPS will not accept any responsibility for errors and any work carried out based on these files is at the recipients when these files are used to aid the recipients drawing production, All other formats (dwg etc) are deemed to be an uncontrolled issue AT PLANNING STAGE DONNYBROOK RUGBY CLUB

9 GARDA STATION DONNYBROOK EGLINTON TERRACE, BROOKVALE ROAD RECOMMENDED COMMUTER ROUTE VIA 9 & EGLINTON ROAD POTENTIAL BOUNDARY TREATMENT THROUGH AGREEMENT WITH IRFU DONNYBROOK ROAD RIVER DODDER BECTIVE LAWN TENNIS CLUB No. D01 D02 D09 D10 D11 (N11) 04.07.18 23.08.18 04.09.18 MAR'16 FEB'16 Date BIKES DONNYBROOK

Drn. SM SM JK JK JK Chk. FO MC MC MC MC

Amendment / Issue DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE EGLINTON TERRACE ANGLESEA ROAD ANGLESEA

8 FROM FLOOD WALL. SUBJECT TO STRUCTURAL PROPOSE TO SUSPEND CANTILEVER BOARDWALK ASSESSMENT & CONSULTATION WITH DCC CFRAMS. DEFENSE WALL BY CFRAMS PROPOSED FLOOD REQUIRED FROM IRFU POSSIBLE AGREEMENT 8 LANE RAMPART App MC MC MC MC MC Dun Laoghaire Business Campus Co Dublin West Pier

Zone 7 Zone 7 E T W F

[email protected] +353 1 2835676 +353 1 4882900 www.rpsgroup.com/ireland LEGEND:

Zone 6 Zone 6 INVOLVE EMBANKMENT STRENGHTENING AS REQUIRED) IN CONSULTATION WITH DCC CFRAMS. PROPOSED 3.0m GREENWAY OVER CONSTRUCTED FLOOD EMBANKMENT (TO RECENTLY CONSTRUCTED FLOOD DEFENSE EMBANKMENT Greenway - Pedestrian Priority Route Greenway - Emerging Preferred Alternative Greenway - Emerging Preferred Route Boardwalk Green Space Toucan Crossing Future/Alternative Links Links to Other Cycle Facilities ENHANCEMENT AREA ECOLOGICAL PROPOSED Job No. Scale Date Approved Checked Drawn 1:2000 1:1000 OCT. 2015 MDT0761 DIVERSION ROUTE ALTERNATIVE ON-ROAD GREENWAY MC MC SM @ A3 @ A1 Shared Space EXISTING 4.0m TRACK TO BE UPGRADED File Ref. Title Project SIR JOHN ROGERSON'S QUAY TO ORWELL PARK MDT0761GA1001-9 - EMERGING PREFERRED DODDER GREENWAY - KEY PLAN ORWELL PARK SHEET 6 OF 10 09 ROUTE ROGERSON'S QUAY SIR JOHN Drg. No. CRICKET CLUB 08 MERRION GA1005 07 02

01 GA1005 06 Rev. 05 04 D11 01A GA1004 03 R:\MDT0761_Dodder Greenway\8.0 Drawings\MDT0761GA1001-9 - Emerging Preferred Route.dwg

Client Zone 10 Zone GA1007 GA1006

SCULLY'S FIELD

Zone 9 Zone Zone 10 Zone

EXISTING PEDESTRIAN PROPOSED TO UPGRADE /CYCLE FACILITY

RIVER DODDER RIVER Zone 9 Zone POSSIBLE LINK TO UCD PROPOSED CANTILEVER BRIDGE

VALLEY PARK UTILISE PATH IN ITS EXISTING FORM POSSIBLE GREENWAY LOOP TO DODDER CLONSKEAGH BRIDGE POSSIBLE LINK TO UCD SPORTS GROUNDS (iv) (iii) (ii) (i) General Notes Existing Services. DO NOT SCALE, use figured dimensions only, if in doubt ask. (both underground and overhead) before work commences. indicated on this drawing is intended for general guidance only. It shall be the responsibility of contractor to determine and verify divulged without prior written consent. confidential document and must not be copied, used, or its content This drawing is the property of RPS Consulting Engineers, it a the exact horizontal and vertical alignment of all cables, pipes, etc. Any information concerning the location of existing services All Levels refer to Ordnance Survey Datum, Malin Head. CLONSKEAGH HOUSE CAR PARK SIDE ENTRANCE TO CLONSKEAGH

CLONSKEAGH HOSPITAL

HOUSE PUB

13

13 (v) Hard copies, dwf and pdf will form a controlled issue of the drawing. recipient, listing of the un-dimensioned measurements, or setting out on site. compatibility with the recipients software, and any errors arising arising from the use of these files, either by human error own risk. RPS will not accept any responsibility for errors and any work carried out based on these files is at the recipients when these files are used to aid the recipients drawing production, All other formats (dwg etc) are deemed to be an uncontrolled issue

CLONSKEAGH ROAD HARRY'S BIKES PETROL STATION & SHOP FORM PART OF THE GREENWAY PART OF PAPER MILLS REDEVELOPMENT TO PROPOSED 3.0m TO 4.0m RIVERSIDE PATH AS PROPOSED CYCLE STAIRWAY TO BE INSTALLED ALONG STEPS ADJACENT TO ASHTON'S PUB No. D01 D02 D09 D10 D11 04.07.18 23.08.18 04.09.18 MAR'16 FEB'16 Date

Drn. BEECH HILL ROAD SM SM JK JK JK Chk. FO MC MC MC MC Amendment / Issue DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE

12

Zone 9 Zone Zone 9 Zone

ASHTON'S

12 PUB Zone 8 Zone App

MC MC MC MC MC 14 8 Zone RELOCATION OF RAILINGS REQUIRED. PROPOSED TO WIDEN EXISTING 1.7m PATH TO 3.0m AWAY FROM RIVER. POSSIBLE

RIVERSIDE WALK REQUIRED ECOLOGICAL ENHANCEMENT MEASURES DENSE VEGETATION AND MATURE TREES. Dun Laoghaire Business Campus Co Dublin West Pier 14 INCORPORATE AS A FEATURE IN THE SCHEME PRESENT PROPOSE TO PRESERVE & POSSIBLE LOCATION OF HISTORIC MILL RACE. IF ROAD & EGLINTON USING ON POSSIBLE GREENWAY LINK VIA CLONSKEAGH SCHEME. CLONSKEAGH TO CITY CENTRE CYCLE ROUTE CYCLE LANES. TO TIE IN CSEA'S E T W F

[email protected] +353 1 2835676 +353 1 4882900 www.rpsgroup.com/ireland ROUTE VIA BEECH HILL ROAD ALTERNATIVE OFF-ROAD GREENWAY LEGEND: ENHANCEMENT AREA POSSIBLE ECOLOGICAL Greenway - Pedestrian Priority Route Greenway - Emerging Preferred Alternative Greenway - Emerging Preferred Route Green Space Boardwalk Toucan Crossing Future/Alternative Links Links to Other Cycle Facilities Job No. Scale Date Approved Checked Drawn 1:2000 1:1000 OCT. 2015 MDT0761 MC MC SM @ A3 @ A1 Shared Space File Ref. Title Project PROPOSED TO WIDEN EXISTING 2.0m PATH 3.0m WALK APTS REQUIRED IN RELATION TO RELOCATING AND REFURBISHING EXISTING BOUNDARY WALL. AWAY FROM RIVER. AGREEMENT WITH RIVERSIDE POSSIBLE VIEWING AREA SIR JOHN ROGERSON'S QUAY TO ORWELL PARK MDT0761GA1001-9 - EMERGING PREFERRED

BEAVER ROW DODDER GREENWAY - KEY PLAN ORWELL PARK SHEET 7 OF 10 ROUTE 09 ROGERSON'S QUAY SIR JOHN Drg. No. 08 GA1006 07

02 GA1006 01 06

Rev. GA100511

11 05 04 D11 01A 03 POSSIBLE GREENWAY LOOP TO UTILISE PATH IN ITS EXISTING FORM Zone 10

WILDE & GREEN Zone 11 CAFÉ DENSE SHRUBS & WOODLANDS TO REMAIN UNDISTURBED STRAND TERRACE

EXISTING 2.3m PATH

SCULLY'S FIELD ALEXANDRA COLLEGE

LUAS LINE

EXISTING 2.2m WIDE UNDERPASS WITH 2.5m HEADROOM. NON STRUCTURAL BUILD OUT MAY BE REMOVED TO

INCREASE WIDTH. GA1007 GA1006 POSSIBLE LINK TO MILLTOWN STATION

DODDERBANK ALTERNATIVE ON-ROAD APARTMENTS GREENWAY DIVERSION ROUTE EXISTING PEDESTRIAN/CYCLE FACILITIES SOUTH OF RIVER 9 ARCHES TO BE WIDENED TO 3.0-4.0m VIADUCT

MILLTOWN ROAD Zone 10 WHITEBEAM ROAD

EXISTING CROSSING POSSIBLE AMENITY SHANAGARRY TO BE UPGRADED TO Zone 11 /CAFÉ LOCATION APARTMENTS TOUCAN MILLTOWN BRIDGE

EXISTING PATH GA1008 GA1007

PACKHORSE BRIDGE - 3.3m WIDE

MAPLE ROAD LEGEND: KEY PLAN 01 EXISTING CYCLE TRACK Greenway - Emerging Preferred Route SIR JOHN 01A SOUTH OF RIVER TO BE ROGERSON'S QUAY UPGRADED DODDER Greenway - Emerging Preferred Alternative POSSIBLE FUTURE BRIDGE VALLEY PARK 02 TO LINK TO LUAS & PROVIDE DUNDRUM ROAD NORTH/SOUTH CONNECTIONS Greenway - Pedestrian Priority Route 03

Links to Other Cycle Facilities 04

Future/Alternative Links 05 POSSIBLE LINK TO UCD Toucan Crossing 06 09 Boardwalk Shared Space 07 POSSIBLE LINK POSSIBLE LINK TO 08 WINDY ARBOUR TO DUNDRUM Green Space ORWELL PARK

Client General Notes D11 04.09.18 JK DRAFT ISSUE Drawn SM Project MC MC (i) This drawing is the property of RPS Consulting Engineers, it is a (v) Hard copies, dwf and pdf will form a controlled issue of the drawing. Checked MC DODDER GREENWAY - D10 23.08.18 JK DRAFT ISSUE confidential document and must not be copied, used, or its content All other formats (dwg etc) are deemed to be an uncontrolled issue MC MC SIR JOHN ROGERSON'S QUAY TO ORWELL PARK divulged without prior written consent. and any work carried out based on these files is at the recipients Approved MC JK (ii) All Levels refer to Ordnance Survey Datum, Malin Head. own risk. RPS will not accept any responsibility for any errors D09 04.07.18 DRAFT ISSUE MC MC (iii) DO NOT SCALE, use figured dimensions only, if in doubt ask. arising from the use of these files, either by human error by the Date OCT. 2015 Title EMERGING PREFERRED (iv) Existing Services. recipient, listing of the un-dimensioned measurements, D02 MAR'16 SM DRAFT ISSUE West Pier T +353 1 4882900 MC MC Scale 1:1000 @ A1 Any information concerning the location of existing services compatibility with the recipients software, and any errors arising Business Campus F +353 1 2835676 ROUTE indicated on this drawing is intended for general guidance only. It when these files are used to aid the recipients drawing production, D01 FEB'16 SM DRAFT ISSUE Dun Laoghaire W www.rpsgroup.com/ireland 1:2000 @ A3 SHEET 8 OF 10 shall be the responsibility of the contractor to determine and verify or setting out on site. FO MC Co Dublin E [email protected] the exact horizontal and vertical alignment of all cables, pipes, etc. Job No. File Ref. Drg. No. Rev. (both underground and overhead) before work commences. No. Date Drn. Amendment / Issue App MDT0761 Chk. MDT0761GA1001-9 - GA1007 D11 R:\MDT0761_Dodder Greenway\8.0 Drawings\MDT0761GA1001-9 - Emerging Preferred Route.dwg Preferred - Emerging Drawings\MDT0761GA1001-9 Greenway\8.0 R:\MDT0761_Dodder

174D R:\MDT0761_Dodder Greenway\8.0 Drawings\MDT0761GA1001-9176 - Emerging Preferred Route.dwg Client

EXISTING PATH GA1009 GA1008 DISUSED 3.4m WIDE BRIDGE. POSSIBILITY THROUGH AGREEMENT WITH REDDY TO UTILISE AS GREENWAY CROSSING, ARCHITECTS AND MILLTOWN GOLF CLUB PARK WEST DARTRY PEDESTRIAN PRIORITY GREENWAY ENHANCEMENT AREA PROPOSED ECOLOGICAL RATHMINES & RATHGAR POSSIBLE LINK TO

COTTAGES

DARTRY FROM MILLTOWN GOLF COURSE) NORTHERN PERIMETER OF MILLTOWN PROPOSED 3.0m WIDE PATH ALONG GOLF CLUB (AGREEMENT REQUIRED

DODDER WALK (iv) (iii) (ii) (i) General Notes Existing Services. DO NOT SCALE, use figured dimensions only, if in doubt ask. (both underground and overhead) before work commences. indicated on this drawing is intended for general guidance only. It shall be the responsibility of contractor to determine and verify divulged without prior written consent. confidential document and must not be copied, used, or its content This drawing is the property of RPS Consulting Engineers, it a the exact horizontal and vertical alignment of all cables, pipes, etc. Any information concerning the location of existing services All Levels refer to Ordnance Survey Datum, Malin Head.

DARTRY 17

MILLS 17 DARTRY ROAD DARTRY

MILLTOWN GOLF

COURSE

Zone 13 Zone

16 16

(v) Zone 12 Zone

Hard copies, dwf and pdf will form a controlled issue of the drawing. recipient, listing of the un-dimensioned measurements, or setting out on site. compatibility with the recipients software, and any errors arising arising from the use of these files, either by human error own risk. RPS will not accept any responsibility for errors and any work carried out based on these files is at the recipients when these files are used to aid the recipients drawing production, All other formats (dwg etc) are deemed to be an uncontrolled issue

15 15 No. D01 D02 D09 D10 D11 PARK EAST

04.07.18 23.08.18 04.09.18 MAR'16

FEB'16 Date DARTRY MILLTOWN ROAD MILLTOWN POSSIBLE BOARDWALK SUITABLE GRADIENTS SOLUTION TO MAINTAIN

Drn. SM SM JK JK JK Chk. FO MC MC MC MC

POSSIBLE LINK TO CHURCHTOWN

Amendment / Issue DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE Zone 13 Zone

CLASSONS

BRIDGE Zone 12 Zone

DROPPING WELL PROPOSED GREENWAY LOOP ALONG EXISTING PATH App MC MC MC MC MC

PUB CHURCHTOWN ROAD LOWER ROAD CHURCHTOWN EXISTING OFF ROAD CYCLE TRACK TO BE RETAINED Dun Laoghaire Business Campus Co Dublin West Pier LEGEND: E T W F

[email protected] +353 1 2835676 +353 1 4882900 www.rpsgroup.com/ireland HEADROOM UNDERPASS WITH 2.5m EXISTING 1.9m WIDE GREENWAY DIVERSION ROUTE Greenway - Pedestrian Priority Route Greenway - Emerging Preferred Alternative Greenway - Emerging Preferred Route ALTERNATIVE ON-ROAD Green Space Boardwalk

Toucan Crossing Future/Alternative Links Links to Other Cycle Facilities Zone 12 Zone RAILINGS TO BE UPGRADED EXISTING PATH WITH NO PROPOSED BRIDGE Job No. Scale Date Approved Checked Drawn Shared Space 1:2000 1:1000 OCT. 2015 MDT0761 MC MC SM

@ A3 @ A1 Zone 11 Zone File Ref. Title Project

SIR JOHN ROGERSON'S QUAY TO ORWELL PARK KEY PLAN 12 Zone ORWELL PARK RANELAGH & CITY CENTRE LINK TO RATHMINES, MDT0761GA1001-9 - 09 ROGERSON'S QUAY SIR JOHN EMERGING PREFERRED DODDER GREENWAY -

08 SHEET 9 OF 10 11 Zone

ROUTE LUAS LINE 07 Drg. No. 02 PROPOSED LINK WITH LUAS LINE 01 06 GA1008 05 04 01A 03 9 ARCHES VIADUCT Rev. GA1008 D11 GA1007 R:\MDT0761_Dodder Greenway\8.0 Drawings\MDT0761GA1001-9 - Emerging Preferred Route.dwg

Client

DODDER ROAD LOWER ROAD DODDER

BRAEMOR ROAD BRAEMOR

5-8

81

1-4

82 3 BRIDGE TO BE MAINTAINED H EXISTING PEDESTRIAN POSSIBLE LINK TO

CHURCHTOWN

Woodside

30.8

Mh LS

86 H Mh

LS

87

LS Mhs

UND

ELY GATE LS

Co Council Bdy Mhs

91

Mhs

LS

LS 92

LS

Mh

LS

Mh

31.6

Mh

BM 31.93 BM

Mh Mh

LS

H Mhs

HAROLD'S CROSS POSSIBLE LINK TO

LS

Footbridge LB

1 CR CR

LS

DODDER ROAD LOWER LOWER ROAD ROAD DODDER DODDER

LS

H

CR CR CR CR

(iv) (iii) (ii) (i) General Notes Mhs Existing Services. DO NOT SCALE, use figured dimensions only, if in doubt ask. (both underground and overhead) before work commences. indicated on this drawing is intended for general guidance only. It shall be the responsibility of contractor to determine and verify divulged without prior written consent. confidential document and must not be copied, used, or its content This drawing is the property of RPS Consulting Engineers, it a

the exact horizontal and vertical alignment of all cables, pipes, etc. Any information concerning the location of existing services All Levels refer to Ordnance Survey Datum, Malin Head.

LS

34.2

Co Council & Co Boro Bdy Bdy Boro Boro Co Co & & Council Council Co Co

LS H Dodder River

Mhs CW Mhs

UND

UNDER SDCC SECTION POSSIBLE FUTURE BRIDGE LS RE-GRADING OF PATH REQUIRED TO EXISTING 2.75m WIDE UNDERPASS WITH

ACHIEVE 2.4m CLEARANCE. VERTICAL CLEARANCE OF 2.2m. POSSIBLE Mh EXISTING 1.70-2.60m WIDE

PATH

Mh

LS ORWELL ROAD ORWELL

ORWELL (v) PARK Hard copies, dwf and pdf will form a controlled issue of the drawing. recipient, listing of the un-dimensioned measurements, or setting out on site. compatibility with the recipients software, and any errors arising arising from the use of these files, either by human error own risk. RPS will not accept any responsibility for errors and any work carried out based on these files is at the recipients when these files are used to aid the recipients drawing production, All other formats (dwg etc) are deemed to be an uncontrolled issue

Co Council & Co Boro Bdy LS

OFF-ROAD GREENWAY ROUTE College PROPOSE TO MAINTAIN EXISTING PATH

CR

Tanks

LS

Station ESB Sub WALDRONS

BRIDGE

Mh

LS Library No. D01 D02 D09 D10 D11 DODDER ROAD LOWER 04.07.18 23.08.18 04.09.18 MAR'16 FEB'16

Date Tank

Drn. Mhs SM SM JK JK JK Chk. FO MC MC MC MC

H

Mh

Mh

Amendment / Issue DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE DRAFT ISSUE LS

LS

42.8 LS

ENHANCEMENT AREA PROPOSED ECOLOGICAL

32 31 BRAEMOR PARK

ENHANCEMENT AREA PROPOSED AMENITY

LS

Mh 3 H App

MC MC MC MC MC Mhs

5

Hospital Mount Carmel Mount REQUIRED SHORT SECTION OF BOLLARDS BRAEMOR ROAD /PROTECTIVE RAILING MAY BE RE-GRADING OF PATH REQUIRED TO EXISTING 2.85m WIDE UNDERPASS WITH ACHIEVE 2.4m CLEARANCE. VERTICAL CLEARANCE OF 2.2m. POSSIBLE

Mh Dun Laoghaire Business Campus 7 Co Dublin West Pier

H 42.1

27 9 PEDESTRIAN PRIORITY

GREENWAY

Mh 1 ORWELL WALK MOUNT CARMEL

26 LINK TO MOUNT CARMEL HOSPITAL HOSPITAL LS E T W F

Mh [email protected] +353 1 2835676 +353 1 4882900 www.rpsgroup.com/ireland

LEGEND: 7

25 Greenway - Pedestrian Priority Route Greenway - Emerging Preferred Alternative Greenway - Emerging Preferred Route Boardwalk Green Space Toucan Crossing Future/Alternative Links Links to Other Cycle Facilities

22

21 Mhs

41.7

LS

Mh

Mh

BRAEMOR PARK PARK BRAEMOR BRAEMOR LS

Job No. Scale Date Approved Checked Drawn 8 14 Zone

17 LS 1:2000 1:1000

Mh Mh OCT. 2015 MDT0761 11 EXISTING 1.9m WIDE BRIDGE TO BE RETAINED. MC MC

SM 12 Shared Space

H @ A3 @ A1 16 14 Zone GREENWAY DIVERSION ROUTE ALTERNATIVE ON-ROAD

File Ref. Title Project Zone 13 Zone SIR JOHN ROGERSON'S QUAY TO ORWELL PARK MDT0761GA1001-9 - PROPOSED

BRIDGE

CYCLE

Zone 13 Zone 17 EMERGING PREFERRED

KEY PLAN ORWELL PARK 19 DODDER GREENWAY -

09

Newtown Court Newtown

SHEET 10 OF 1-7 ROGERSON'S QUAY

SIR JOHN Mhs

ROUTE

LS 8-14

Drg. No. Mh

08

ES

H 21 Mh

GA1009 23

07 Mhs

02

1-8 LS

01 LS PARK WEST

06

Mhs

House

Newtown

Mh Mh DARTRY

EATON BRAE 25

05 GA1009 04 Rev.

01A

9 03

Mh 27

H Mh D11

LS GA1008

7 Mh

Mh

Mhs LS